JPH07324347A - Structure conformable to differential settlement - Google Patents

Structure conformable to differential settlement

Info

Publication number
JPH07324347A
JPH07324347A JP12151594A JP12151594A JPH07324347A JP H07324347 A JPH07324347 A JP H07324347A JP 12151594 A JP12151594 A JP 12151594A JP 12151594 A JP12151594 A JP 12151594A JP H07324347 A JPH07324347 A JP H07324347A
Authority
JP
Japan
Prior art keywords
column
chord member
metal fitting
pillar
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP12151594A
Other languages
Japanese (ja)
Other versions
JP3333950B2 (en
Inventor
Yoshimasa Nakano
芳正 中野
Hideo Shimomura
英男 下村
Kazuhiro Hatakeyama
一宏 畠山
Yoshihiro Tatsumi
佳裕 辰巳
Takeshi Matsuura
剛士 松浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP12151594A priority Critical patent/JP3333950B2/en
Publication of JPH07324347A publication Critical patent/JPH07324347A/en
Application granted granted Critical
Publication of JP3333950B2 publication Critical patent/JP3333950B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PURPOSE:To conform to a differential settlement at low cost by erecting a chord member between the columns stood with a fixed distance of a structure, arranging a PC steel material for guiding a prestress to the chord member, and providing a metal fitting mounting part for mounting a guide pin and a jack receiving metal fitting on a pedestal part. CONSTITUTION:A large frame beam 1 formed into a truss by an-upper chord member 2, a lower chord member 3 and a lattice member 4 connected thereto is erected between columns 5, 5. A PC steel material 6 for guiding a prestress to the beam 1 is arranged thereon. The upper chord member 2 works against a compressing force, and the PC steel material 16 works against a tensile force to make a moment such as bending acting on each column 5 from the beam 1 zero. Only the weight of the beam 1 is supported by each column 5. Even when a foundation B is settled, its position is surely held by a guide pin 14 provided on a pedestal part 5a. Further, when the foundation B is settled, a plate 11 is removed, a metal fitting 16 is fixed to interpose a jack 17 between the foundation B and the horizontal part 16b of the metal fitting 16. Thus. a differential settlement can be conformed to at low cost.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、例えば、地盤沈下の発
生する可能性のある地域に構築するのに好適な不同沈下
対応構造物に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a differential subsidence structure suitable for being constructed in an area where ground subsidence may occur.

【0002】[0002]

【従来の技術】従来、地盤沈下の発生する可能性のある
地域に構造物を構築するときには、構造物を周辺地盤と
一体に沈下させるようにしたり、あるいは、固い地盤に
杭を構築して、この杭で構造物を支持するようにしてい
る。
2. Description of the Related Art Conventionally, when constructing a structure in an area where ground subsidence may occur, the structure may be submerged integrally with the surrounding ground, or a pile may be constructed on a solid ground, The structure is supported by these piles.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上述し
たような従来の構造物では、以下のような問題が存在す
る。すなわち、構造物は一様に沈下するとは限らず、各
部分で沈下量が異なる不同沈下現象が発生することがあ
る。このような不同沈下が発生した場合には、構造物に
応力が不均等に作用し、構造物の損壊を招くことがあ
る。これに対し、杭上で構造物を支持する構造では、上
記のような問題は発生しないものの、施工に手間がかか
るうえにコストが高いという問題がある。本発明は、以
上のような点を考慮してなされたもので、低コストで不
同沈下に対応することができる不同沈下対応構造物を提
供することを目的とする。
However, the conventional structure as described above has the following problems. That is, the structure does not always sink uniformly, and the uneven settlement phenomenon in which the amount of settlement differs in each part may occur. When such a differential settlement occurs, stress may act unevenly on the structure, resulting in damage to the structure. On the other hand, in the structure in which the structure is supported on the pile, the above-mentioned problems do not occur, but there is a problem that the construction is troublesome and the cost is high. The present invention has been made in view of the above points, and an object of the present invention is to provide a differential settlement corresponding structure capable of handling differential settlement at low cost.

【0004】[0004]

【課題を解決するための手段】本発明は、構造物が、一
定距離離間して立設された柱間に弦材が架設されるとと
もに、該弦材にはプレストレスを導入するPC鋼材が配
設されてなる構成とされ、かつ、前記柱の柱脚部には、
該柱脚部の下面から下方に向けて延出するよう形成され
たガイドピンと、前記柱をジャッキアップするときにジ
ャッキの支持力を受けるためのジャッキ受け金具が取り
付け可能となるよう前記柱脚部の側面に形成された金具
取付部とが備えられていることを特徴としている。
SUMMARY OF THE INVENTION According to the present invention, a structure is constructed such that a chord member is erected between columns vertically erected at a constant distance, and a prestressing PC steel material is introduced into the chord member. It is configured to be arranged, and the column base of the column,
The column base is configured so that a guide pin formed so as to extend downward from the lower surface of the column base and a jack receiving fitting for receiving the supporting force of the jack when the column is jacked up can be attached. And a metal fitting mounting portion formed on the side surface of the.

【0005】[0005]

【作用】本発明の不同沈下構造物では、構造物を、一定
距離離間して立設された柱間に弦材を架設するととも
に、該弦材にプレストレスを導入するPC鋼材を配設す
る構成とした。これにより、弦材がその軸方向に発生す
る圧縮力に抗し、PC鋼材に導入したプレストレスが引
張力を打ち消すので、単純梁として、弦材から柱に作用
する曲げ等のモーメントを0(ゼロ)とする構造とする
ことができ、柱は弦材の重量を支持するのみとなる。そ
して、柱の柱脚部に、下方に向けて延出するガイドピン
と、ジャッキ受け金具が取り付け可能とされた金具取付
部とを備える構成とした。これにより、地盤が沈下して
も、ガイドピンによって柱の位置は保持される。そし
て、金具取付部にジャッキ受け金具を取り付けることに
よって、このジャッキ受け金具と地盤との間にジャッキ
をセットして柱をジャッキアップすることができる。
In the differential settlement structure of the present invention, a chord member is erected between columns vertically erected at a certain distance, and a PC steel material for introducing prestress to the chord member is arranged. It was configured. As a result, the string material resists the compressive force generated in the axial direction thereof, and the prestress introduced into the PC steel material cancels the tensile force, so that as a simple beam, the bending moment acting on the column from the string material to 0 ( Zero), the column will only support the weight of the chord. Further, the pillar base portion of the pillar is provided with a guide pin extending downward and a metal fitting mounting portion to which the jack receiving metal fitting can be mounted. Thereby, even if the ground sinks, the position of the pillar is maintained by the guide pin. Then, by attaching the jack receiving metal fitting to the metal fitting attaching portion, the jack can be set between the jack receiving metal fitting and the ground to jack up the pillar.

【0006】[0006]

【実施例】以下、本発明を図面に示す一実施例を参照し
て説明する。ここでは、例えば、本発明に係る不同沈下
対応構造物を、工場,倉庫等の大スパンを有した大型構
造物に適用する場合の例を用いて説明する。図1ないし
図5は、本発明に係る不同沈下対応構造物を適用した構
造物の一例を示すものである。図1および図2におい
て、符号Aは、工場,倉庫等の大スパンを有した大型の
構造物(不同沈下対応構造物)、符号1は、構造物Aを
構成する大架構梁(スーパーウイング:特公昭62−3
7449号〔出願人所有〕)である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to an embodiment shown in the drawings. Here, for example, description will be given using an example in which the differential settlement-supporting structure according to the present invention is applied to a large structure having a large span such as a factory or a warehouse. 1 to 5 show an example of a structure to which the differential settlement-supporting structure according to the present invention is applied. 1 and 2, reference numeral A is a large structure having a large span such as factories and warehouses (structure that is compatible with subsidence), and reference numeral 1 is a large structural beam (super wing: which constitutes the structure A). Japanese Examined Japanese Patent Sho 62-3
No. 7449 (owned by the applicant)).

【0007】この大架構梁1は鉄骨造で、例えば、H鋼
材等からなる上弦材(弦材)2と、同じくH鋼材等から
なる下弦材(弦材)3と、これら上弦材2と下弦材3と
の間に配設されて、両端部が上弦材2及び下弦材3に連
結されたラチス材4、4…とから構成されたトラス構造
とされており、その両端部が柱5、5に支持されてい
る。図2に示すように、この大架構梁1には、それぞれ
両端部が、下弦材3の両端近傍にて定着されたPC鋼材
6が緊張状態に張設されており、これらPC鋼材6によ
って大架構梁1に、プレストレスが導入されている。そ
して、このような大架構梁1を所定間隔毎に平行に構築
して、これら大架構梁1同士の間に通常の梁(図示略)
を架設することにより構造物Aの屋根が構成されてい
る。
The large frame beam 1 is made of steel, and is made of, for example, an upper chord member (chord member) 2 made of H steel or the like, a lower chord member (chord member) 3 also made of H steel or the like, and the upper chord member 2 and the lower chord member. The truss structure is formed between the upper chord member 2 and the lower chord member 3 and the lattice members 4, 4 ... It is supported by 5. As shown in FIG. 2, PC steel members 6 fixed at the both ends of the large beam 1 are fixed in the vicinity of both ends of the lower chord member 3 in a tension state. Prestress is introduced into the frame beam 1. Then, such large frame beams 1 are constructed in parallel at predetermined intervals, and normal beams (not shown) are provided between the large frame beams 1.
The roof of the structure A is constructed by erection.

【0008】大架構梁1を支持する各柱5は、以下に示
すような構成となっている。図3に示すように、柱5は
鉄骨造で、H鋼材等からなる一対の主材10,10を主
要構成としている。この柱5の柱脚部5aは、基礎B上
に支持された荷重分散プレート11,11上に一定長を
有した水平材12が載置され、水平材12の両端部の上
面に一定長の主材10,10が接合された構成となって
いる。荷重分散プレート11は、ボルト・ナット部材1
3によって、水平材12に着脱自在に一体化されてい
る。水平材12の下面には、鉛直下方に延出する鋼棒か
らなるガイドピン14,14が設けられている。各ガイ
ドピン14は、それぞれその下端部が基礎B中に一定長
埋め込まれている。また、主材10の下端付近のフラン
ジ部10aには、後述するジャッキ受け金具を取り付け
るためのボルト穴(金具取付部)15が所定数形成され
ている。
Each pillar 5 supporting the large frame beam 1 has the following structure. As shown in FIG. 3, the pillar 5 is made of steel and mainly includes a pair of main members 10 made of H steel or the like. The column base 5a of the column 5 has a horizontal member 12 having a constant length placed on the load distribution plates 11 and 11 supported on the foundation B, and has a constant length on the upper surfaces of both ends of the horizontal member 12. The main materials 10 and 10 are joined together. The load distribution plate 11 is a bolt / nut member 1
By means of 3, the horizontal member 12 is detachably integrated. On the lower surface of the horizontal member 12, guide pins 14, 14 made of a steel rod extending vertically downward are provided. The lower end of each guide pin 14 is embedded in the base B for a certain length. In addition, a predetermined number of bolt holes (metal fitting mounting portions) 15 for mounting a jack receiving metal fitting, which will be described later, are formed in the flange portion 10a near the lower end of the main material 10.

【0009】次に、上記のような構成からなる構造物A
の作用について説明する。図1および図2に示したよう
に、このような構造物Aでは、大架構梁1の上弦材2
が、大架構梁1の軸方向に発生する圧縮力に抗するよう
になっている。そして、下弦材3に配したPC鋼材6に
導入したプレストレスによって、大架構梁1の軸方向に
発生する引張力に抗するようになっている。これによ
り、大架構梁1の自重や雪等の大架構梁1にかかる荷重
による大架構梁1の変位が、通常の例えばラーメン構造
の梁等に比較して、大幅に低減される。この結果、単純
梁として、大架構梁1から各柱5に作用する曲げモーメ
ントがほとんど0(ゼロ)となる構造とすることがで
き、各柱5では、大架構梁1の重量のみを支持するよう
になっている。
Next, the structure A having the above structure
The action of will be described. As shown in FIGS. 1 and 2, in such a structure A, the upper chord member 2 of the large frame beam 1 is used.
However, it resists the compressive force generated in the axial direction of the large frame beam 1. The prestress introduced into the PC steel material 6 arranged on the lower chord member 3 resists the tensile force generated in the axial direction of the large frame beam 1. As a result, the displacement of the large frame beam 1 due to the weight of the large frame beam 1 or the load applied to the large frame beam 1 such as snow is greatly reduced as compared with a normal beam having a rigid frame structure or the like. As a result, as a simple beam, the bending moment acting on each column 5 from the large frame beam 1 can be set to almost 0 (zero), and each column 5 supports only the weight of the large frame beam 1. It is like this.

【0010】また、図3に示したように、構造物Aで
は、地盤沈下により各柱5の基礎Bが沈下しても、各柱
5の柱脚部5aに備えたガイドピン14が基礎B中に一
定長埋設されているので、柱5の水平方向の位置がズレ
ずに保持されるようになっている。このとき、前述した
ように、各柱5は大架構梁1の重量のみを支持するよう
になっているため、ガイドピン14によってその位置を
確実に保持することができる。これに対し、構造物Aに
通常のラーメン構造等を適用した場合には、柱5に曲げ
モーメントが作用するため、基礎Bが沈下すると、ガイ
ドピン14では柱5の柱脚部5aの位置ズレを防ぐこと
ができず、柱脚部5aがはじけるようにしてずれてしま
うのは明らかである。
Further, as shown in FIG. 3, in the structure A, even if the foundation B of each pillar 5 sinks due to ground subsidence, the guide pins 14 provided on the pillar bases 5a of each pillar 5 form the foundation B. Since it is embedded in the column for a certain length, the horizontal position of the column 5 is maintained without displacement. At this time, as described above, since each of the columns 5 supports only the weight of the large frame beam 1, the position can be reliably held by the guide pin 14. On the other hand, when a normal rigid frame structure or the like is applied to the structure A, a bending moment acts on the pillar 5, so that when the foundation B sinks, the guide pin 14 shifts the position of the pillar leg portion 5a of the pillar 5. It is obvious that the column base portion 5a pops out and is displaced.

【0011】そして、基礎Bが沈下したときには、ま
ず、柱5から荷重分散プレート11,11を取り外す。
次いで、図4および図5に示すように、柱5のボルト穴
15(図3参照)に、ジャッキ受け金具16を図示しな
いボルトで固定する。このジャッキ受け金具16は、断
面視L字状で、柱5の主材10のフランジ部10aに対
向する垂直部16aと、これと直交する水平部16b
と、これら垂直部16a,水平部16bを補強する補強
部16cとから形成されている。そして、沈下した基礎
Bと各ジャッキ受け金具16の水平部16bとの間に、
油圧ジャッキ等のジャッキ17,17,…を介装する。
続いて、各ジャッキ17を一斉に伸長させる。するとジ
ャッキ17の伸張力がジャッキ受け金具16を介して柱
5に伝達され、柱5がジャッキアップされるようになっ
ている。この状態においても、ガイドピン14は基礎B
中に埋設されており、柱5の位置はズレることなく保持
されている。図5に示したように、この後、柱5の下方
に、基礎Bの沈下量に対応した所定長を有した継足し材
18を挿入する。このとき、継足し材18の下面には荷
重分散プレート11,11を敷いておく。そして、これ
ら荷重分散プレート11,11、継足し材18、および
柱5を、ボルト・ナット部材13で一体化する。このよ
うにして、柱5を、基礎Bの沈下量に対応して継ぎ足す
ことにより、柱5を基礎B上で確実に支持することがで
きる。上記の作業を、各柱5において、それぞれ基礎B
の沈下量に対応して行うことにより、構造物A全体を基
礎B上で支持して、不同沈下に対応することができるよ
うになっている。
When the foundation B sinks, first, the load distribution plates 11, 11 are removed from the column 5.
Next, as shown in FIGS. 4 and 5, the jack receiving fitting 16 is fixed to the bolt hole 15 (see FIG. 3) of the pillar 5 with a bolt (not shown). The jack receiving fitting 16 is L-shaped in cross section, and has a vertical portion 16a facing the flange portion 10a of the main member 10 of the pillar 5 and a horizontal portion 16b orthogonal to the vertical portion 16a.
And a reinforcing portion 16c that reinforces the vertical portion 16a and the horizontal portion 16b. Then, between the sinking foundation B and the horizontal portion 16b of each jack receiving fitting 16,
The jacks 17, 17, ... Such as hydraulic jacks are interposed.
Then, the jacks 17 are simultaneously extended. Then, the extension force of the jack 17 is transmitted to the pillar 5 through the jack receiving metal fitting 16 so that the pillar 5 is jacked up. Even in this state, the guide pin 14 has the foundation B.
It is embedded inside, and the position of the pillar 5 is maintained without displacement. After this, as shown in FIG. 5, after this, a joining material 18 having a predetermined length corresponding to the sinking amount of the foundation B is inserted below the pillar 5. At this time, the load distribution plates 11, 11 are laid on the lower surface of the joining material 18. Then, the load distribution plates 11, 11, the connecting member 18, and the pillar 5 are integrated by the bolt / nut member 13. In this way, by adding the pillars 5 in correspondence with the subsidence amount of the foundation B, the pillars 5 can be reliably supported on the foundation B. Perform the above work on each pillar 5 in the basic B
It is possible to support the entire structure A on the foundation B and to cope with the differential settlement by performing the above-mentioned method according to the amount of settlement.

【0012】上述したように、構造物Aでは、柱5,5
間に大架構梁1が架設され、この大架構梁1にプレスト
レスを導入するPC鋼材6が配設されている。これによ
り、上弦材2が圧縮力に抗し、PC鋼材6が引張力に抗
することによって、大架構梁1から各柱5に作用する曲
げ等のモーメントをほとんど0(ゼロ)とすることがで
き、各柱5では、大架構梁1の重量のみを支持するよう
になっている。そして、柱5の柱脚部5aにはガイドピ
ン14と、ボルト穴15とが設けられた構成とされてい
る。これにより、地盤が沈下しても、ガイドピン14に
よって柱5の位置を保持することができる。また、地盤
沈下した場合には、ボルト穴15にジャッキ受け金具1
6を取り付けることにより、ジャッキ17で柱5をジャ
ッキアップすることができ、継足し材18を挿入するこ
とによって各柱5を基礎Bで確実に支持することができ
る。したがって、各柱5で沈下量の異なる不同沈下が発
生した場合に各柱5の沈下量に対応して処置を施すこと
によって、構造物Aを不同沈下に対応するものとするこ
とができ、その結果、構造物Aの損壊等を防ぐことが可
能となる。しかも柱脚部5aの構造がコンパクトで簡素
な構造であるので、低コストで上記効果を得ることがで
きる。さらには、柱5を継ぎ足すに際しても、容易かつ
短時間で施工を行うことが可能である。
As described above, in the structure A, the columns 5, 5 are
A large frame beam 1 is installed between them, and a PC steel material 6 for introducing prestress to the large frame beam 1 is arranged. As a result, the upper chord member 2 resists the compressive force and the PC steel member 6 resists the tensile force, so that the bending moment acting on each column 5 from the large frame beam 1 can be almost zero. Therefore, each column 5 supports only the weight of the large frame beam 1. Then, the column base portion 5a of the column 5 is provided with a guide pin 14 and a bolt hole 15. Thereby, even if the ground sinks, the position of the pillar 5 can be held by the guide pin 14. In addition, when the ground subsides, jack receiving metal fitting 1
The pillars 5 can be jacked up by the jacks 17 by mounting the pillars 6, and the pillars 5 can be reliably supported by the foundation B by inserting the joining material 18. Therefore, when different subsidence with different subsidence occurs in each pillar 5, the structure A can be dealt with by the different subsidence by performing treatment according to the subsidence of each pillar 5. As a result, it is possible to prevent the structure A from being damaged. Moreover, since the structure of the column base 5a is compact and simple, the above effect can be obtained at low cost. Furthermore, even when the pillars 5 are replenished, the construction can be performed easily and in a short time.

【0013】なお、上記実施例において、構造物Aの構
造、特に大架構梁1の構造については、柱5に作用する
モーメントを最小限とすることができるのであれば、上
記以外の他の構造を適用しても、上記と同様の効果を奏
することができる。また、柱5を継ぎ足すために、柱5
の下方に継足し材18を挿入する構成としたが、これ以
外にも、柱5の下方に,モルタル等のグラウト材を挿入
充填してこのグラウト材で柱5を支持するようにしても
よい。さらに、柱5の構造や、柱5を継ぎ足すための作
業順序等についても、本発明の趣旨を逸脱しない範囲で
あれば、いかなる構成としてもよいのは言うまでもな
い。
In the above embodiment, the structure of the structure A, particularly the structure of the large frame beam 1 is not limited to the above structure as long as the moment acting on the column 5 can be minimized. Even if the above is applied, the same effect as described above can be obtained. In addition, in order to add the pillar 5,
Although the joint material 18 is inserted below the column 5, a grout material such as mortar may be inserted and filled below the column 5 to support the column 5 with this grout material. . Further, it goes without saying that the structure of the pillar 5, the work sequence for adding the pillar 5, and the like may be any structure as long as they do not depart from the gist of the present invention.

【0014】[0014]

【発明の効果】以上説明したように、本発明の不同沈下
対応構造物によれば、構造物を、一定距離離間して立設
された柱間に弦材を架設するとともに、弦材にプレスト
レスを導入するPC鋼材を配設する構成とした。これに
より、弦材がその軸方向に発生する圧縮力に抗し、PC
鋼材に導入したプレストレスが引張力を打ち消すので、
単純梁として、弦材から柱に作用する曲げモーメントが
ほとんど0(ゼロ)となる構造とすることができ、柱は
弦材の重量を支持するのみとなる。そして、柱の柱脚部
に、下方に向けて延出するガイドピンと、ジャッキ受け
金具が取り付け可能とされた金具取付部とを備える構成
とした。これにより、地盤が沈下しても、ガイドピンに
よって柱の位置を保持してその位置ズレを防ぐことがで
きる。そして、地盤沈下した場合には、金具取付部にジ
ャッキ受け金具を取り付けることによって、柱をジャッ
キアップすることができ、柱の下方に継足し材やコンク
リート,モルタル等のグラウト材を挿入充填することに
よって、各柱を確実に支持することが可能となる。した
がって、各柱で沈下量の異なる不同沈下が発生した場合
にも、各柱の沈下量に対応して処置を施すことによっ
て、構造物を不同沈下に対応するものとすることがで
き、その結果、構造物の損壊等を防ぐことができる。し
かも柱脚部の構造がコンパクトで簡素な構造であるの
で、低コストで上記効果を得ることができる。さらに
は、柱を継ぎ足すに際しても、容易かつ短時間で施工を
行うことが可能である。
As described above, according to the structure for dealing with uneven settlement of the present invention, the structure is constructed such that the chord member is erected between the columns which are erected at a certain distance and the chord member is pre-mounted. PC steel material for introducing stress is arranged. As a result, the chord material resists the compressive force generated in the axial direction, and the PC
Since the prestress introduced into the steel material cancels the tensile force,
As a simple beam, the bending moment acting on the column from the chord material can be set to almost 0 (zero), and the column only supports the weight of the chord material. Further, the pillar base portion of the pillar is provided with a guide pin extending downward and a metal fitting mounting portion to which the jack receiving metal fitting can be mounted. Thus, even if the ground sinks, the position of the pillar can be held by the guide pin and the displacement of the pillar can be prevented. When the ground subsides, the pillar can be jacked up by attaching the jack receiving metal fitting to the metal fitting mounting part, and the filling material such as sprue material, concrete, mortar, etc. can be inserted and filled under the pillar. This makes it possible to reliably support each pillar. Therefore, even if different subsidence with different subsidence occurs in each pillar, it is possible to make the structure correspond to the different subsidence by applying measures corresponding to the subsidence of each pillar. The structure can be prevented from being damaged. Moreover, since the structure of the column base is compact and simple, the above effect can be obtained at low cost. Furthermore, even when the pillars are replenished, the construction can be performed easily and in a short time.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る不同沈下対応構造物の一例を示す
正面図である。
FIG. 1 is a front view showing an example of a differential settlement-supporting structure according to the present invention.

【図2】前記構造物の一部を示す正面図である。FIG. 2 is a front view showing a part of the structure.

【図3】前記構造物の柱脚部を示す斜視図である。FIG. 3 is a perspective view showing a column base of the structure.

【図4】前記柱脚部をジャッキアップした状態を示す斜
視図である。
FIG. 4 is a perspective view showing a state in which the column base is jacked up.

【図5】同、側面図である。FIG. 5 is a side view of the same.

【符号の説明】[Explanation of symbols]

2 上弦材(弦材) 3 下弦材(弦材) 5 柱 5a 柱脚部 6 PC鋼線 14 ガイドピン 15 ボルト穴(金具取付部) 16 ジャッキ受け金具 17 ジャッキ A 構造物(不同沈下対応構造物) 2 Upper chord material (chord material) 3 Lower chord material (chord material) 5 Pillar 5a Pillar base 6 PC steel wire 14 Guide pin 15 Bolt hole (metal fitting mounting portion) 16 Jack receiving metal fitting 17 Jack A Structure (structure that supports differential sinking) )

───────────────────────────────────────────────────── フロントページの続き (72)発明者 辰巳 佳裕 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 松浦 剛士 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yoshihiro Tatsumi 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Takeshi Matsuura 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Within the corporation

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 構造物が、一定距離離間して立設された
柱間に弦材が架設されるとともに、該弦材にはプレスト
レスを導入するPC鋼材が配設されてなる構成とされ、
かつ、前記柱の柱脚部には、該柱脚部の下面から下方に
向けて延出するよう形成されたガイドピンと、前記柱を
ジャッキアップするときにジャッキの支持力を受けるた
めのジャッキ受け金具が取り付け可能となるよう前記柱
脚部の側面に形成された金具取付部とが備えられている
ことを特徴とする不同沈下対応構造物。
1. A structure is constructed such that a chord member is erected between columns which are erected at a certain distance and a PC steel material for introducing prestress is arranged on the chord member. ,
In addition, a guide pin formed on the column base of the column so as to extend downward from the lower surface of the column base, and a jack receiver for receiving the supporting force of the jack when jacking up the column. A differential sinking support structure, comprising: a metal fitting mounting portion formed on a side surface of the column base so that the metal fitting can be mounted.
JP12151594A 1994-06-02 1994-06-02 Differential settlement settlement structure Expired - Lifetime JP3333950B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12151594A JP3333950B2 (en) 1994-06-02 1994-06-02 Differential settlement settlement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12151594A JP3333950B2 (en) 1994-06-02 1994-06-02 Differential settlement settlement structure

Publications (2)

Publication Number Publication Date
JPH07324347A true JPH07324347A (en) 1995-12-12
JP3333950B2 JP3333950B2 (en) 2002-10-15

Family

ID=14813125

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12151594A Expired - Lifetime JP3333950B2 (en) 1994-06-02 1994-06-02 Differential settlement settlement structure

Country Status (1)

Country Link
JP (1) JP3333950B2 (en)

Also Published As

Publication number Publication date
JP3333950B2 (en) 2002-10-15

Similar Documents

Publication Publication Date Title
US10837173B2 (en) Beam-column connection structure and method of making the same
KR100890455B1 (en) Loading apparatus using gravitational method and apparatus of manufacturing preflex composite girder using the loading apparatus
US10745906B1 (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
GB2414028A (en) Shear wall anchor member placement system
JP2007077630A (en) Continuous girder using precast main-girder segment, and its erection method
US12012745B2 (en) System and apparatus for securing a floorplate to a structure
JP5342312B2 (en) Precast member installation method
JP3638571B2 (en) Support load transfer method for existing buildings
JP4203441B2 (en) Tower crane support device and construction method thereof
JP2700811B2 (en) Construction method of structure including super frame
JP2002201612A (en) Jig for fixing installing steel member
EP1705313A2 (en) Reinforced console column and the method of its production
JP2007050967A (en) Crane base isolation supporting beam structure
JPH09273163A (en) Earthquake resistant reinforcing method of existing building
JPH07324347A (en) Structure conformable to differential settlement
US10745903B1 (en) Building including horizontally-oriented reinforced transfer beams and a fabrication method therefor
JPH08189054A (en) Structure coping with uneven settlement
JP2001271499A (en) Temporary bearing construction method for existing building by steel batter brace member
JP2974025B1 (en) Construction method of large span large beam upper frame
JP2003161044A (en) Method for installing base-isolation device in existing column
KR20190123408A (en) Mounting Apparatus For Supporting Frames
KR102529806B1 (en) Composite girder for bridge with end cutout and manufacturing method thereof
JP2003064621A (en) Hanging floor slab bridge and reinforcing method of hanging floor slab
JP3856745B2 (en) Bending reinforcement method for joints between existing columns and beams or slabs
RU2188915C1 (en) Method of installation of prestressed strutted frame

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020611

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080802

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090802

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100802

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110802

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110802

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120802

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120802

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130802

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130802

Year of fee payment: 11

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140802

Year of fee payment: 12

EXPY Cancellation because of completion of term