JP3333950B2 - Differential settlement settlement structure - Google Patents

Differential settlement settlement structure

Info

Publication number
JP3333950B2
JP3333950B2 JP12151594A JP12151594A JP3333950B2 JP 3333950 B2 JP3333950 B2 JP 3333950B2 JP 12151594 A JP12151594 A JP 12151594A JP 12151594 A JP12151594 A JP 12151594A JP 3333950 B2 JP3333950 B2 JP 3333950B2
Authority
JP
Japan
Prior art keywords
column
settlement
chord
jack
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP12151594A
Other languages
Japanese (ja)
Other versions
JPH07324347A (en
Inventor
芳正 中野
英男 下村
一宏 畠山
佳裕 辰巳
剛士 松浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP12151594A priority Critical patent/JP3333950B2/en
Publication of JPH07324347A publication Critical patent/JPH07324347A/en
Application granted granted Critical
Publication of JP3333950B2 publication Critical patent/JP3333950B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、例えば、地盤沈下の発
生する可能性のある地域に構築するのに好適な不同沈下
対応構造物に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a differential settlement-compatible structure suitable for construction in an area where land subsidence may occur, for example.

【0002】[0002]

【従来の技術】従来、地盤沈下の発生する可能性のある
地域に構造物を構築するときには、構造物を周辺地盤と
一体に沈下させるようにしたり、あるいは、固い地盤に
杭を構築して、この杭で構造物を支持するようにしてい
る。
2. Description of the Related Art Conventionally, when constructing a structure in an area where land subsidence is likely to occur, the structure is settled integrally with the surrounding ground, or a pile is constructed on solid ground, The pile is used to support the structure.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上述し
たような従来の構造物では、以下のような問題が存在す
る。すなわち、構造物は一様に沈下するとは限らず、各
部分で沈下量が異なる不同沈下現象が発生することがあ
る。このような不同沈下が発生した場合には、構造物に
応力が不均等に作用し、構造物の損壊を招くことがあ
る。これに対し、杭上で構造物を支持する構造では、上
記のような問題は発生しないものの、施工に手間がかか
るうえにコストが高いという問題がある。本発明は、以
上のような点を考慮してなされたもので、低コストで不
同沈下に対応することができる不同沈下対応構造物を提
供することを目的とする。
However, the conventional structure as described above has the following problems. That is, the structure does not always sink uniformly, and an uneven settlement phenomenon in which the settlement amount differs in each part may occur. When such uneven settlement occurs, stress acts unequally on the structure, which may cause damage to the structure. On the other hand, a structure that supports a structure on a pile does not have the above-described problem, but has a problem that it takes a lot of time for construction and is expensive. The present invention has been made in consideration of the above points, and has as its object to provide a differential settlement-capable structure that can cope with differential settlement at low cost.

【0004】[0004]

【課題を解決するための手段】本発明は、構造物が、一
定距離離間して立設された柱間に弦材が架設されるとと
もに、該弦材にはプレストレスを導入するPC鋼材が配
設されてなる構成とされ、かつ、前記柱の柱脚部には、
取り外し可能な荷重分散プレートと、該柱脚部の下面か
ら下方に向けて延出するよう形成されて基礎中に埋設さ
れることにより柱と基礎との水平方向の位置ズレを防ぐ
ガイドピンと、前記柱をジャッキアップするときにジャ
ッキの支持力を受けるためのジャッキ受け金具が取り付
け可能となるよう前記柱脚部の側面に形成された金具取
付部とが備えられていることを特徴としている。
According to the present invention, a structure is provided in which a chord material is erected between columns which are erected at a predetermined distance, and a PC steel material for introducing prestress is applied to the chord material. It is configured to be disposed, and in the column base of the column,
A removable load distribution plate , buried in the foundation formed to extend downward from the lower surface of the column base;
Prevents horizontal displacement between pillar and foundation
A guide pin and a metal fitting mounting portion formed on a side surface of the column base portion so that a jack receiving metal fitting for receiving a supporting force of the jack when the column is jacked up can be mounted. And

【0005】[0005]

【作用】本発明の不同沈下構造物では、構造物を、一定
距離離間して立設された柱間に弦材を架設するととも
に、該弦材にプレストレスを導入するPC鋼材を配設す
る構成とした。これにより、弦材がその軸方向に発生す
る圧縮力に抗し、PC鋼材に導入したプレストレスが引
張力を打ち消すので、単純梁として、弦材から柱に作用
する曲げ等のモーメントを0(ゼロ)とする構造とする
ことができ、柱は弦材の重量を支持するのみとなる。そ
して、柱の柱脚部に、取り外し可能な荷重分散プレート
と、柱の位置ズレを防ぐガイドピンと、ジャッキアップ
のためのジャッキ受け金具が取り付け可能とされた金具
取付部とを備える構成とした。これにより、地盤が沈下
しても、ガイドピンによって柱の位置は保持される。そ
して、金具取付部にジャッキ受け金具を取り付けること
によって、このジャッキ受け金具と地盤との間にジャッ
キをセットして柱をジャッキアップすることにより、柱
脚部と荷重分散プレートとの間に継足し材を挿入したり
グラウト材を充填することができる。
According to the differential settlement structure of the present invention, a chord material is erected between the columns erected at a predetermined distance from each other, and a PC steel material for introducing prestress to the chord material is provided. The configuration was adopted. As a result, the string material resists the compressive force generated in the axial direction, and the prestress introduced into the PC steel material cancels the tensile force. Therefore, as a simple beam, the moment such as bending acting on the column from the string material to 0 ( Zero), where the columns only support the weight of the chord. And a removable load distribution plate on the column base
And a guide pin to prevent displacement of the pillar and jack-up
Jack receiving metal for has a structure and a possible and has been metal mounting part mounting. Thereby, even if the ground sinks, the position of the pillar is held by the guide pins. Then, by attaching the jack receiving bracket to the bracket mounting part, setting the jack between this jack receiving bracket and the ground and jacking up the pillar,
Inserting additional material between the leg and the load distribution plate
Grout material can be filled.

【0006】[0006]

【実施例】以下、本発明を図面に示す一実施例を参照し
て説明する。ここでは、例えば、本発明に係る不同沈下
対応構造物を、工場,倉庫等の大スパンを有した大型構
造物に適用する場合の例を用いて説明する。図1ないし
図5は、本発明に係る不同沈下対応構造物を適用した構
造物の一例を示すものである。図1および図2におい
て、符号Aは、工場,倉庫等の大スパンを有した大型の
構造物(不同沈下対応構造物)、符号1は、構造物Aを
構成する大架構梁(スーパーウイング:特公昭62−3
7449号〔出願人所有〕)である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to an embodiment shown in the drawings. Here, for example, a description will be given of an example in which the uneven settlement corresponding structure according to the present invention is applied to a large structure having a large span, such as a factory or a warehouse. FIG. 1 to FIG. 5 show an example of a structure to which a structure corresponding to uneven settlement according to the present invention is applied. 1 and 2, reference numeral A denotes a large-sized structure having a large span such as a factory or a warehouse (a structure corresponding to uneven settlement), and reference numeral 1 denotes a large frame beam (super wing: Tokiko Sho 62-3
No. 7449 (owned by the applicant).

【0007】この大架構梁1は鉄骨造で、例えば、H鋼
材等からなる上弦材(弦材)2と、同じくH鋼材等から
なる下弦材(弦材)3と、これら上弦材2と下弦材3と
の間に配設されて、両端部が上弦材2及び下弦材3に連
結されたラチス材4、4…とから構成されたトラス構造
とされており、その両端部が柱5、5に支持されてい
る。図2に示すように、この大架構梁1には、それぞれ
両端部が、下弦材3の両端近傍にて定着されたPC鋼材
6が緊張状態に張設されており、これらPC鋼材6によ
って大架構梁1に、プレストレスが導入されている。そ
して、このような大架構梁1を所定間隔毎に平行に構築
して、これら大架構梁1同士の間に通常の梁(図示略)
を架設することにより構造物Aの屋根が構成されてい
る。
[0007] The large frame beam 1 is made of steel and has, for example, an upper chord (chord) 2 made of H steel or the like, a lower chord (chord) 3 also made of H steel or the like, and these upper chord 2 and lower chord. A truss structure is provided between the upper chord material 2 and the lower chord material 3 and has lattice members 4, 4... 5 is supported. As shown in FIG. 2, PC steel members 6 fixed at both ends of the large frame beam 1 near both ends of the lower chord member 3 are stretched in tension. A prestress is introduced into the frame beam 1. Then, such large-structure beams 1 are constructed in parallel at predetermined intervals, and ordinary beams (not shown) are provided between the large-structure beams 1.
Is constructed, the roof of the structure A is configured.

【0008】大架構梁1を支持する各柱5は、以下に示
すような構成となっている。図3に示すように、柱5は
鉄骨造で、H鋼材等からなる一対の主材10,10を主
要構成としている。この柱5の柱脚部5aは、基礎B上
に支持された荷重分散プレート11,11上に一定長を
有した水平材12が載置され、水平材12の両端部の上
面に一定長の主材10,10が接合された構成となって
いる。荷重分散プレート11は、ボルト・ナット部材1
3によって、水平材12に着脱自在に一体化されてい
る。水平材12の下面には、鉛直下方に延出する鋼棒か
らなるガイドピン14,14が設けられている。各ガイ
ドピン14は、それぞれその下端部が基礎B中に一定長
埋め込まれている。また、主材10の下端付近のフラン
ジ部10aには、後述するジャッキ受け金具を取り付け
るためのボルト穴(金具取付部)15が所定数形成され
ている。
Each column 5 supporting the large frame beam 1 has the following configuration. As shown in FIG. 3, the pillar 5 is made of a steel frame, and has a pair of main members 10, 10 made of H steel or the like as main components. A column member 5a of the column 5 has a horizontal member 12 having a predetermined length placed on load distribution plates 11, 11 supported on a foundation B, and has a predetermined length on the upper surface of both ends of the horizontal member 12. The main members 10 and 10 are joined. The load distribution plate 11 is a bolt / nut member 1
By 3, it is detachably integrated with the horizontal member 12. The lower surface of the horizontal member 12 is provided with guide pins 14 and 14 made of a steel bar extending vertically downward. Each guide pin 14 has a lower end portion embedded in the base B for a fixed length. A predetermined number of bolt holes (fitting portions) 15 for attaching jack receiving fittings to be described later are formed in the flange portion 10a near the lower end of the main material 10.

【0009】次に、上記のような構成からなる構造物A
の作用について説明する。図1および図2に示したよう
に、このような構造物Aでは、大架構梁1の上弦材2
が、大架構梁1の軸方向に発生する圧縮力に抗するよう
になっている。そして、下弦材3に配したPC鋼材6に
導入したプレストレスによって、大架構梁1の軸方向に
発生する引張力に抗するようになっている。これによ
り、大架構梁1の自重や雪等の大架構梁1にかかる荷重
による大架構梁1の変位が、通常の例えばラーメン構造
の梁等に比較して、大幅に低減される。この結果、単純
梁として、大架構梁1から各柱5に作用する曲げモーメ
ントがほとんど0(ゼロ)となる構造とすることがで
き、各柱5では、大架構梁1の重量のみを支持するよう
になっている。
Next, the structure A having the above structure
The operation of will be described. As shown in FIGS. 1 and 2, in such a structure A, the upper chord 2
However, it is designed to resist the compressive force generated in the axial direction of the large frame beam 1. The prestress introduced into the PC steel member 6 arranged on the lower chord member 3 resists the tensile force generated in the axial direction of the large frame beam 1. Thereby, displacement of the large frame beam 1 due to the weight of the large frame beam 1 or a load applied to the large frame beam 1 such as snow is greatly reduced as compared with a normal beam having a frame structure, for example. As a result, as a simple beam, a structure in which the bending moment acting on each column 5 from the large frame beam 1 can be almost 0 (zero), and each column 5 supports only the weight of the large frame beam 1. It has become.

【0010】また、図3に示したように、構造物Aで
は、地盤沈下により各柱5の基礎Bが沈下しても、各柱
5の柱脚部5aに備えたガイドピン14が基礎B中に一
定長埋設されているので、柱5の水平方向の位置がズレ
ずに保持されるようになっている。このとき、前述した
ように、各柱5は大架構梁1の重量のみを支持するよう
になっているため、ガイドピン14によってその位置を
確実に保持することができる。これに対し、構造物Aに
通常のラーメン構造等を適用した場合には、柱5に曲げ
モーメントが作用するため、基礎Bが沈下すると、ガイ
ドピン14では柱5の柱脚部5aの位置ズレを防ぐこと
ができず、柱脚部5aがはじけるようにしてずれてしま
うのは明らかである。
As shown in FIG. 3, in the structure A, even if the foundation B of each column 5 sinks due to land subsidence, the guide pin 14 provided on the column base 5a of each column 5 Since the column 5 is buried therein for a certain length, the horizontal position of the column 5 is maintained without displacement. At this time, as described above, since each column 5 is configured to support only the weight of the large frame beam 1, its position can be reliably held by the guide pin 14. On the other hand, when the ordinary ramen structure or the like is applied to the structure A, since a bending moment acts on the column 5, when the foundation B sinks, the position of the column base 5 a of the column 5 is displaced by the guide pin 14. Obviously, the column base 5a is displaced so as to pop out.

【0011】そして、基礎Bが沈下したときには、ま
ず、柱5から荷重分散プレート11,11を取り外す。
次いで、図4および図5に示すように、柱5のボルト穴
15(図3参照)に、ジャッキ受け金具16を図示しな
いボルトで固定する。このジャッキ受け金具16は、断
面視L字状で、柱5の主材10のフランジ部10aに対
向する垂直部16aと、これと直交する水平部16b
と、これら垂直部16a,水平部16bを補強する補強
部16cとから形成されている。そして、沈下した基礎
Bと各ジャッキ受け金具16の水平部16bとの間に、
油圧ジャッキ等のジャッキ17,17,…を介装する。
続いて、各ジャッキ17を一斉に伸長させる。するとジ
ャッキ17の伸張力がジャッキ受け金具16を介して柱
5に伝達され、柱5がジャッキアップされるようになっ
ている。この状態においても、ガイドピン14は基礎B
中に埋設されており、柱5の位置はズレることなく保持
されている。図5に示したように、この後、柱5の下方
に、基礎Bの沈下量に対応した所定長を有した継足し材
18を挿入する。このとき、継足し材18の下面には荷
重分散プレート11,11を敷いておく。そして、これ
ら荷重分散プレート11,11、継足し材18、および
柱5を、ボルト・ナット部材13で一体化する。このよ
うにして、柱5を、基礎Bの沈下量に対応して継ぎ足す
ことにより、柱5を基礎B上で確実に支持することがで
きる。上記の作業を、各柱5において、それぞれ基礎B
の沈下量に対応して行うことにより、構造物A全体を基
礎B上で支持して、不同沈下に対応することができるよ
うになっている。
When the foundation B sinks, first, the load distribution plates 11 are removed from the column 5.
Next, as shown in FIGS. 4 and 5, the jack receiving member 16 is fixed to the bolt hole 15 (see FIG. 3) of the column 5 with a bolt (not shown). The jack receiving member 16 has an L-shape in cross section, and has a vertical portion 16a facing the flange portion 10a of the main member 10 of the column 5 and a horizontal portion 16b orthogonal to the flange portion 10a.
And a reinforcing portion 16c for reinforcing the vertical portion 16a and the horizontal portion 16b. And, between the sunk foundation B and the horizontal portion 16b of each jack receiving bracket 16,
A jack 17, such as a hydraulic jack, is interposed.
Subsequently, each jack 17 is simultaneously extended. Then, the extension force of the jack 17 is transmitted to the pillar 5 via the jack receiving bracket 16, and the pillar 5 is jacked up. Even in this state, the guide pin 14
It is buried inside, and the position of the pillar 5 is held without displacement. As shown in FIG. 5, thereafter, the extension member 18 having a predetermined length corresponding to the amount of settlement of the foundation B is inserted below the column 5. At this time, the load distribution plates 11 and 11 are laid on the lower surface of the extension member 18. Then, the load distribution plates 11, 11, the extension members 18, and the columns 5 are integrated by a bolt / nut member 13. In this way, the pillars 5 can be reliably supported on the foundation B by adding the pillars 5 in accordance with the settlement amount of the foundation B. The above work is carried out on each pillar 5 in the foundation B
In this case, the entire structure A can be supported on the foundation B to cope with uneven settlement.

【0012】上述したように、構造物Aでは、柱5,5
間に大架構梁1が架設され、この大架構梁1にプレスト
レスを導入するPC鋼材6が配設されている。これによ
り、上弦材2が圧縮力に抗し、PC鋼材6が引張力に抗
することによって、大架構梁1から各柱5に作用する曲
げ等のモーメントをほとんど0(ゼロ)とすることがで
き、各柱5では、大架構梁1の重量のみを支持するよう
になっている。そして、柱5の柱脚部5aには荷重分散
プレート11を取り外し可能に設けるとともに、柱の水
平方向の位置ズレを防ぐガイドピン14を設け、ジャッ
キ受け金具16を取り付けるためのボルト穴15とが設
けられた構成とされている。これにより、地盤が沈下し
ても、ガイドピン14によって柱5の位置を保持するこ
とができる。また、地盤沈下した場合には、ボルト穴1
5にジャッキ受け金具16を取り付けることにより、ジ
ャッキ17で柱5をジャッキアップすることができ、
脚部5aと荷重分散プレート11との間に継足し材18
を挿入することによって各柱5を継足し材18および荷
重分散プレートを介して基礎Bで確実に支持することが
できる。したがって、各柱5で沈下量の異なる不同沈下
が発生した場合に各柱5の沈下量に対応して処置を施す
ことによって、構造物Aを不同沈下に対応するものとす
ることができ、その結果、構造物Aの損壊等を防ぐこと
が可能となる。しかも柱脚部5aの構造がコンパクトで
簡素な構造であるので、低コストで上記効果を得ること
ができる。さらには、柱5を継ぎ足すに際しても、容易
かつ短時間で施工を行うことが可能である。
As described above, in the structure A, the columns 5, 5
A large structural beam 1 is provided therebetween, and a PC steel material 6 for introducing prestress into the large structural beam 1 is provided. Accordingly, the upper chord member 2 resists the compressive force and the PC steel member 6 resists the tensile force, so that the moment such as bending acting on each column 5 from the large structural beam 1 can be reduced to almost zero. Each column 5 supports only the weight of the large structural beam 1. The load is distributed to the column base 5a of the column 5.
The plate 11 is provided detachably and the water
A guide pin 14 is provided to prevent displacement in the horizontal direction.
A bolt hole 15 for attaching a key receiving bracket 16 is provided. Thereby, even if the ground sinks, the position of the pillar 5 can be held by the guide pin 14. In case of land subsidence, bolt holes 1
By mounting the jack receiving metal 16 to 5, it is possible to jack up the pillar 5 with the jack 17, the pillar
Reinforcement material 18 between the leg 5a and the load distribution plate 11
The pillars 5 are added by inserting
It can be reliably supported on the foundation B via the heavy dispersion plate . Therefore, when an uneven settlement with a different settlement amount occurs in each column 5, by performing a treatment corresponding to the settlement amount of each column 5, the structure A can be adapted to the uneven settlement. As a result, it is possible to prevent the structure A from being damaged. Moreover, since the structure of the column base 5a is compact and simple, the above effects can be obtained at low cost. Further, when the pillars 5 are added, the construction can be performed easily and in a short time.

【0013】なお、上記実施例において、構造物Aの構
造、特に大架構梁1の構造については、柱5に作用する
モーメントを最小限とすることができるのであれば、上
記以外の他の構造を適用しても、上記と同様の効果を奏
することができる。また、柱5を継ぎ足すために、柱5
の下方に継足し材18を挿入する構成としたが、これ以
外にも、柱5の下方に,モルタル等のグラウト材を挿入
充填してこのグラウト材で柱5を支持するようにしても
よい。さらに、柱5の構造や、柱5を継ぎ足すための作
業順序等についても、本発明の趣旨を逸脱しない範囲で
あれば、いかなる構成としてもよいのは言うまでもな
い。
In the above-described embodiment, the structure of the structure A, especially the structure of the large frame beam 1, has a structure other than the above as long as the moment acting on the column 5 can be minimized. Even if is applied, the same effect as described above can be obtained. Also, to add the pillar 5,
In this embodiment, the additional material 18 is inserted below the column 5. Alternatively, a grout material such as mortar may be inserted and filled below the column 5 to support the column 5 with the grout material. . Furthermore, it goes without saying that the structure of the pillars 5 and the work order for adding the pillars 5 may be of any configuration as long as it does not depart from the gist of the present invention.

【0014】[0014]

【発明の効果】以上説明したように、本発明の不同沈下
対応構造物によれば、構造物を、一定距離離間して立設
された柱間に弦材を架設するとともに、弦材にプレスト
レスを導入するPC鋼材を配設する構成とした。これに
より、弦材がその軸方向に発生する圧縮力に抗し、PC
鋼材に導入したプレストレスが引張力を打ち消すので、
単純梁として、弦材から柱に作用する曲げモーメントが
ほとんど0(ゼロ)となる構造とすることができ、柱は
弦材の重量を支持するのみとなる。そして、柱の柱脚部
に、荷重分散プレートを取り外し可能に設けるととも
に、柱の水平方向の位置ズレを防ぐガイドピンを設け、
ジャッキ受け金具を取り付けるための金具取付部とを備
える構成とした。これにより、地盤が沈下しても、ガイ
ドピンによって柱の位置を保持してその位置ズレを防ぐ
ことができる。そして、地盤沈下した場合には、金具取
付部にジャッキ受け金具を取り付けることによって、柱
をジャッキアップすることができ、柱脚部と荷重分散プ
レートとの間に継足し材やコンクリート,モルタル等の
グラウト材を挿入充填することによって、各柱を確実に
支持することが可能となる。したがって、各柱で沈下量
の異なる不同沈下が発生した場合にも、各柱の沈下量に
対応して処置を施すことによって、構造物を不同沈下に
対応するものとすることができ、その結果、構造物の損
壊等を防ぐことができる。しかも柱脚部の構造がコンパ
クトで簡素な構造であるので、低コストで上記効果を得
ることができる。さらには、柱を継ぎ足すに際しても、
容易かつ短時間で施工を行うことが可能である。
As described above, according to the structure for uneven settlement of the present invention, the chord is erected between the columns erected at a predetermined distance and the chord is pressed on the chord. A configuration is adopted in which a PC steel material for introducing stress is provided. As a result, the chord material resists the compressive force generated in its axial direction,
Since the prestress introduced into the steel counteracts the tensile force,
As a simple beam, the structure can be such that the bending moment acting on the column from the chord material is almost 0 (zero), and the column only supports the weight of the chord material. A load distribution plate is detachably provided on the column base of the column.
A guide pin to prevent horizontal displacement of the pillar,
And a metal fitting mounting portion for mounting the jack receiving metal . Thereby, even if the ground sinks, the position of the pillar can be held by the guide pin and the positional deviation can be prevented. When the ground sinks , the column can be jacked up by attaching a jack receiving bracket to the bracket mounting section, and the column base and load distribution
By inserting and filling an additional material or a grout material such as concrete or mortar between the rates, it is possible to reliably support each column. Therefore, even when uneven settlement with different settlement amounts occurs in each column, the structure can be made to respond to the uneven settlement by performing treatment according to the settlement amount of each column, and as a result In addition, damage to the structure can be prevented. Moreover, since the structure of the column base is compact and simple, the above effects can be obtained at low cost. Furthermore, when adding pillars,
Construction can be performed easily and in a short time.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る不同沈下対応構造物の一例を示す
正面図である。
FIG. 1 is a front view showing an example of a differential settlement corresponding structure according to the present invention.

【図2】前記構造物の一部を示す正面図である。FIG. 2 is a front view showing a part of the structure.

【図3】前記構造物の柱脚部を示す斜視図である。FIG. 3 is a perspective view showing a column base of the structure.

【図4】前記柱脚部をジャッキアップした状態を示す斜
視図である。
FIG. 4 is a perspective view showing a state where the column base is jacked up.

【図5】同、側面図である。FIG. 5 is a side view of the same.

【符号の説明】[Explanation of symbols]

2 上弦材(弦材) 3 下弦材(弦材) 5 柱 5a 柱脚部 6 PC鋼線11 荷重分散プレート 14 ガイドピン 15 ボルト穴(金具取付部) 16 ジャッキ受け金具 17 ジャッキ A 構造物(不同沈下対応構造物)B 基礎 2 Upper chord material (chord material) 3 Lower chord material (chord material) 5 Pillar 5a Pillar base 6 PC steel wire 11 Load distribution plate 14 Guide pin 15 Bolt hole (fitting portion) 16 Jack receiving fitting 17 Jack A Structure (unidentified) Subsidence-resistant structure) B Foundation

フロントページの続き (72)発明者 松浦 剛士 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 審査官 深田 高義 (56)参考文献 特開 昭62−37449(JP,A) 特開 昭57−155475(JP,A) 実開 昭62−67294(JP,U) 実開 昭59−172194(JP,U) 特公 昭49−35772(JP,B1) (58)調査した分野(Int.Cl.7,DB名) E02D 35/00 E02D 27/34 E04G 23/06 Continuation of the front page (72) Inventor Takeshi Matsuura 1-3-2 Shibaura, Minato-ku, Tokyo Examiner, Shimizu Construction Co., Ltd. Takayoshi Fukada (56) References JP-A-62-37449 (JP, A) Sho 57-155475 (JP, A) Shokai Sho 62-67294 (JP, U) Shokai Sho 59-172194 (JP, U) Japanese Patent Publication No. Sho 49-35772 (JP, B1) (58) Fields surveyed (Int .Cl. 7 , DB name) E02D 35/00 E02D 27/34 E04G 23/06

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 構造物が、一定距離離間して立設された
柱間に弦材が架設されるとともに、該弦材にはプレスト
レスを導入するPC鋼材が配設されてなる構成とされ、
かつ、前記柱の柱脚部には、取り外し可能な荷重分散プ
レートと、該柱脚部の下面から下方に向けて延出するよ
う形成されて基礎中に埋設されることにより柱と基礎と
の水平方向の位置ズレを防ぐガイドピンと、前記柱をジ
ャッキアップするときにジャッキの支持力を受けるため
のジャッキ受け金具が取り付け可能となるよう前記柱脚
部の側面に形成された金具取付部とが備えられているこ
とを特徴とする不同沈下対応構造物。
1. A structure in which a chord is erected between pillars erected at a predetermined distance and a PC steel material for introducing prestress is disposed on the chord. ,
The column base of the column has a removable load distribution plate.
The column and the foundation by being formed to extend downward from the lower surface of the column base and being buried in the foundation.
A guide pin for preventing horizontal displacement of the bracket, and a bracket mounting portion formed on a side surface of the column base so that a jack receiving bracket for receiving a supporting force of the jack when jacking up the column can be mounted. A structure corresponding to uneven settlement, characterized by comprising:
JP12151594A 1994-06-02 1994-06-02 Differential settlement settlement structure Expired - Lifetime JP3333950B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12151594A JP3333950B2 (en) 1994-06-02 1994-06-02 Differential settlement settlement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12151594A JP3333950B2 (en) 1994-06-02 1994-06-02 Differential settlement settlement structure

Publications (2)

Publication Number Publication Date
JPH07324347A JPH07324347A (en) 1995-12-12
JP3333950B2 true JP3333950B2 (en) 2002-10-15

Family

ID=14813125

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12151594A Expired - Lifetime JP3333950B2 (en) 1994-06-02 1994-06-02 Differential settlement settlement structure

Country Status (1)

Country Link
JP (1) JP3333950B2 (en)

Also Published As

Publication number Publication date
JPH07324347A (en) 1995-12-12

Similar Documents

Publication Publication Date Title
US7470090B2 (en) Lifting bracket system supported on a pier for lifting a foundation
US4793110A (en) Foundation and building structure support system apparatus and method
US20080175673A1 (en) Foundation lifting assembly and method of use
KR100642341B1 (en) A pile for retaining wall
US6763636B2 (en) Method and apparatus for stabilizing a support system utilized for lifting and leveling existing buildings
JP4203441B2 (en) Tower crane support device and construction method thereof
JP2700811B2 (en) Construction method of structure including super frame
JP3333950B2 (en) Differential settlement settlement structure
JP3958319B2 (en) Prestressed temporary construction method
JP5951375B2 (en) Steel tower reinforcement structure
US6748717B2 (en) Method and system for emplacing prefabricated buildings
WO2008039225A2 (en) Foundation lifting asembly and method of use
JP2018193672A (en) Additional foundation structure
JPH08189054A (en) Structure coping with uneven settlement
JP2001271499A (en) Temporary bearing construction method for existing building by steel batter brace member
JPH08193324A (en) Buckling preventive structure of diagonal beam
JP2876182B2 (en) Joint foundation for temporary shutter
KR20040051182A (en) Temporary soil sheathing using prestress and pile thereof
JP3322259B2 (en) Earthquake countermeasures during construction during seismic isolation construction
JPH1018639A (en) Reinforcing construction of building
CA2549993C (en) Lifting bracket system supported on a pier for lifting a foundation
JPH09235889A (en) Base isolation construction method of existing building
JP3829458B2 (en) Attaching the vibration control device to the building
CN214460481U (en) Foundation pit supporting structure
KR102587628B1 (en) A foundation set for a traditional korean house

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020611

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080802

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090802

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100802

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110802

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110802

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120802

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120802

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130802

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130802

Year of fee payment: 11

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140802

Year of fee payment: 12

EXPY Cancellation because of completion of term