JPH06300166A - Fixing method for drain pipe coupling - Google Patents

Fixing method for drain pipe coupling

Info

Publication number
JPH06300166A
JPH06300166A JP8858993A JP8858993A JPH06300166A JP H06300166 A JPH06300166 A JP H06300166A JP 8858993 A JP8858993 A JP 8858993A JP 8858993 A JP8858993 A JP 8858993A JP H06300166 A JPH06300166 A JP H06300166A
Authority
JP
Japan
Prior art keywords
pipe joint
concrete slab
drainage pipe
slab
insertion hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8858993A
Other languages
Japanese (ja)
Inventor
Noriatsu Kojima
徳厚 小島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP8858993A priority Critical patent/JPH06300166A/en
Publication of JPH06300166A publication Critical patent/JPH06300166A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)
  • Sewage (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

PURPOSE:To fix a drain pipe coupling, fixed in a state to extend through a concrete slab, after it is positioned in an excellent state without depending upon the intuition of an expert. CONSTITUTION:A protrusion 3 is formed on the peripheral surface of a drain pipe coupling 1 along a periphery in a cross section crossing the axial direction of the drain pipe coupling 1 at right angles. Forms 6 for refilling are mounted in a state to be placed on the upper surface side of the protrusion 3. The forms 6 are brought into contact with the under surface of a concrete slab 10 and the protrusion 3 is registered with the under surface of the concrete slab 10. Simultaneously, the lower opening part of an insertion hole l0a is closed. Thereafter, concrete is placed in the insertion hole l0a and cured and this way causes fixing of the drain pipe coupling 1 in a state to effect positioning of a position in a vertical direction to the concrete slab 10 and squareness.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、高層建築物において上
下階を仕切るコンクリートスラブを突き抜けて配管され
る立て管と、各階に配管される横枝管とを接続するため
の排水管継手の、上記コンクリートスラブへの固定方法
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a drainage pipe joint for connecting a vertical pipe that penetrates through a concrete slab that partitions upper and lower floors in a high-rise building, and a horizontal branch pipe that is piped on each floor. The present invention relates to a method of fixing to the concrete slab.

【0002】[0002]

【従来の技術】従来より、この排水管継手を固定する一
手段として、コンクリートスラブの適所に上下階を貫通
する挿通孔を設けておき、この挿通孔内に排水管継手を
位置決めし、この状態を保持して埋め戻すことが行われ
ている。そして、この排水管継手を固定するに先立って
その上下方向の位置およびコンクリートスラブに対する
垂直度等の位置決めをする必要があり、従来この位置決
めは熟練者が排水管継手とコンクリートスラブとの間に
木片を挟み込む等してカンに頼って行われていた。従っ
て、熟練者によらなければ排水管継手の良好な状態での
固定をすることができず、効率よく作業を進める上で障
害となっていた。
2. Description of the Related Art Conventionally, as one means for fixing this drainage pipe joint, an insertion hole penetrating the upper and lower floors is provided at an appropriate position of the concrete slab, and the drainage pipe joint is positioned in this insertion hole. Is being held and backfilled. Prior to fixing the drainage pipe joint, it is necessary to position the vertical position of the drainage pipe joint and the verticality with respect to the concrete slab. Conventionally, this positioning has been performed by a skilled person between the drainage pipe joint and the concrete slab. It was carried out by relying on Kang by sandwiching the. Therefore, unless a skilled person can fix the drainage pipe joint in a good state, it has been an obstacle to efficient work.

【0003】本発明は、この問題を解消すべくなされた
もので、熟練者のカンに頼ることなく、誰にでも簡単か
つ確実に排水管継手を良好に位置決めした状態で固定す
ることのできる排水管継手の固定方法を提供することを
目的とする。
The present invention has been made to solve this problem, and allows anyone to easily and surely fix the drain pipe joint in a well-positioned state without relying on an expert's can. An object is to provide a method for fixing a pipe joint.

【0004】[0004]

【課題を解決するための手段】このため請求項1に記載
の発明は、排水管継手の周面には、この排水管継手の軸
方向に直交する断面の円周に沿って突条を形成してお
き、この突条の上面側に載せ掛けるようにして埋め戻し
用の型枠を装着し、この型枠を前記コンクリートスラブ
の下面に当接させて前記突条を前記コンクリートスラブ
の下面に位置合わせするとともに前記挿通孔の下側開口
部を閉塞し、然る後、この挿通孔を埋め戻して前記排水
管継手を、前記コンクリートスラブに対して上下方向の
位置および直角度に関して位置決めした状態で固定する
ことを特徴とし、また、請求項2に記載の発明では、前
記突条は一定の間隔をおいて複数位置に形成しておき、
施工時にあたってこの複数の突条のうち、前記コンクリ
ートスラブの厚さに適合するものを選択して用いること
を特徴とする。
For this reason, the invention according to claim 1 forms a ridge on the circumferential surface of the drainage pipe joint along the circumference of a cross section orthogonal to the axial direction of the drainage pipe joint. Then, a formwork for backfilling is mounted so as to be hung on the upper surface side of the ridge, and the formwork is brought into contact with the lower surface of the concrete slab to put the ridge on the lower surface of the concrete slab. A state in which the lower opening of the insertion hole is closed together with the positioning, and after that, the insertion hole is backfilled, and the drainage pipe joint is positioned with respect to the vertical position and squareness with respect to the concrete slab. In the invention according to claim 2, the ridges are formed at a plurality of positions at regular intervals,
It is characterized in that, at the time of construction, one that is suitable for the thickness of the concrete slab is selected and used from among the plurality of ridges.

【0005】さらに、請求項3記載の発明では、排水管
継手の下部周面には、この排水管継手の軸方向に直交す
る断面の円周に沿って突条を形成する一方、前記排水管
継手の上部には吊り耳片を側方へ張り出して設けてお
き、前記突条の上面側に載せ掛けるようにして埋め戻し
用の型枠を装着し、この型枠を前記コンクリートスラブ
の下面に当接させて前記突条を前記コンクリートスラブ
の下面に位置合わせするとともに前記挿通孔の下側開口
部を閉塞する一方、前記吊り耳片には長尺の補強アーム
を前記軸方向に直交させかつ側方へ張出し状に固定し、
この補強アームと前記コンクリートスラブとの間には調
整ボルトを介装して、この調整ボルトの締め込み量を調
整することで前記補強アームを前記コンクリートスラブ
に対して平行に保持し、然る後、前記挿通孔を埋め戻し
て前記排水管継手を、前記コンクリートスラブに対して
上下方向の位置および直角度に関して位置決めした状態
で固定することを特徴とする。
Further, in the invention according to claim 3, on the lower peripheral surface of the drainage pipe joint, a ridge is formed along the circumference of a cross section orthogonal to the axial direction of the drainage pipe joint, while the drainage pipe is formed. Suspended ear pieces are provided on the upper side of the joint so as to project laterally, and a backfilling mold is mounted so as to be mounted on the upper surface side of the ridge, and this mold is mounted on the lower surface of the concrete slab. While abutting and aligning the ridge with the lower surface of the concrete slab and closing the lower opening of the insertion hole, a long reinforcing arm is orthogonal to the axial direction in the hanging ear piece and Fix it to the side in a protruding shape,
An adjusting bolt is interposed between the reinforcing arm and the concrete slab, and the reinforcing arm is held in parallel with the concrete slab by adjusting the tightening amount of the adjusting bolt. The drainage pipe joint is fixed by filling the insertion hole with the drainage pipe joint being positioned with respect to the concrete slab with respect to the vertical position and the perpendicularity.

【0006】[0006]

【作用】請求項1記載の固定方法によれば、排水管継手
がコンクリートスラブに対して適正な位置に位置決めさ
れた状態において、この排水管継手の周面のコンクリー
トスラブの下面と同レベルとなる位置に位置合わせ用の
突条が形成されているので、この突条に載せ掛けるよう
にして埋め戻し用の型枠を装着しかつこの型枠をコンク
リートスラブの下面に当接することにより、突条を簡単
にコンクリートスラブの下面に位置合わせすることがで
きる。しかも、この突条あるいはコンクリートスラブの
下面に対する型枠の当たり具合を調整することにより、
排水管継手はコンクリートスラブに対して上下方向に位
置決めされ、かつ直角に位置決めされる。そして、この
位置決めされた状態において上記挿通孔は型枠によって
下側の開口部を閉塞されているので、この挿通孔内にコ
ンクリートを流し込んで乾燥固化させれば、排水管継手
はコンクリートスラブに対して上下方向および直角度に
関して良好に位置決めされた状態で固定される。
According to the fixing method of the first aspect, when the drainage pipe joint is positioned at an appropriate position with respect to the concrete slab, it becomes the same level as the lower surface of the concrete slab on the peripheral surface of the drainage pipe joint. Since a ridge for alignment is formed at the position, a ridge for backfill is mounted by mounting it on this ridge, and the ridge is abutted against the lower surface of the concrete slab. Can be easily aligned with the underside of the concrete slab. Moreover, by adjusting the degree of contact of the form against the lower surface of this ridge or concrete slab,
The drain joint is vertically positioned and at right angles to the concrete slab. Then, in this positioned state, the insertion hole closes the lower opening by the formwork, so if concrete is poured into the insertion hole to dry and solidify, the drainage pipe joint is against the concrete slab. It is fixed in a state where it is well positioned with respect to the vertical direction and squareness.

【0007】ここで、コンクリートスラブの厚さには数
種類あり、上記突条を一箇所にのみ有する排水管継手で
はその汎用性に乏しい。そこで、請求項2記載の固定方
法によれば、例えば頻度の高いスラブ厚さに対応して突
条を複数位置に形成しておくことにより、数種のスラブ
厚さに対して横枝管接続部のコンクリートスラブに対す
る位置を変えることなく同じ排水管継手を流用すること
ができる。
[0007] Here, there are several types of concrete slabs, and the drainage pipe joint having the above-mentioned ridge only at one location is poor in versatility. Therefore, according to the fixing method of the second aspect, for example, by forming the ridges at a plurality of positions corresponding to the frequently used slab thickness, the lateral branch pipe connection can be made for several kinds of slab thickness. The same drain pipe joint can be used without changing the position of the section with respect to the concrete slab.

【0008】また、請求項3記載の固定方法によれば、
前記請求項1記載の固定方法に加えて、さらに確実な排
水管継手の位置決めがなされる。すなわち、排水管継手
の上部には補強アームが排水管継手の軸線方向に直交し
て張り出され、この補強アームとコンクリートスラブと
の間には調整ボルトが介装され、この調整ボルトの締め
込み量を調整することにより上記補強アームがコンクリ
ートスラブに対して平行に保持される。従って、この補
強アームおよび調整ボルトによっても排水管継手はコン
クリートスラブに対して軸方向の位置および直角度に関
して適正に位置決めされた状態で保持され、この状態で
埋め戻される。
According to the fixing method of the third aspect,
In addition to the fixing method according to claim 1, more reliable positioning of the drainage pipe joint is performed. That is, a reinforcing arm is projected on the upper part of the drainage pipe fitting orthogonal to the axial direction of the drainage pipe fitting, and an adjusting bolt is interposed between the reinforcing arm and the concrete slab. Adjusting the amount holds the reinforcing arm parallel to the concrete slab. Therefore, also by the reinforcing arm and the adjusting bolt, the drainage pipe joint is held in the state of being properly positioned with respect to the concrete slab with respect to the axial position and the squareness, and is backfilled in this state.

【0009】[0009]

【実施例】次に、本発明の実施例を図1ないし図3に基
づいて説明する。図1は、本例の固定方法によって排水
管継手1がコンクリートスラブ(以下、単に「スラブ」
という)10に固定された状態を示している。スラブ1
0には、排水管継手1を挿入するための挿通孔10aが
打設時に予め形成され、この挿通孔10aは、排水管継
手1を挿入可能かつその若干の位置調整を許容するに足
る径で形成されている。この挿通孔10aは、後述する
ように排水管継手1の位置決め終了後埋め戻される。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, an embodiment of the present invention will be described with reference to FIGS. FIG. 1 shows that the drainage pipe joint 1 is a concrete slab (hereinafter simply referred to as “slab”) by the fixing method of this example.
It is shown as fixed at 10). Slab 1
No. 0 has a through hole 10a for inserting the drainage pipe joint 1 formed in advance during the driving, and the through hole 10a has a diameter large enough to allow the drainage pipe joint 1 to be inserted and allow some position adjustment thereof. Has been formed. The insertion hole 10a is backfilled after the positioning of the drainage pipe joint 1 is completed, as described later.

【0010】排水管継手1は、上記スラブ10の上面側
から挿通孔10aに挿入した状態で固定されている。図
中、20は排水管継手1の上部接続管部20aに接続さ
れた立て管であり、21は下部接続管部21aに接続さ
れた立て管である。また、22は横枝管接続管部22a
に接続された横枝管である。横枝管接続管部22bは横
枝管接続管部22aとは直角の位置に配置されており、
図では正面から見た状態が示されている。
The drainage pipe joint 1 is fixed in a state of being inserted into the insertion hole 10a from the upper surface side of the slab 10. In the figure, 20 is a stand pipe connected to the upper connecting pipe portion 20a of the drainage pipe joint 1, and 21 is a stand pipe connected to the lower connecting pipe portion 21a. Further, 22 is a lateral branch pipe connecting pipe portion 22a.
Is a lateral branch pipe connected to. The lateral branch pipe connecting pipe portion 22b is arranged at a right angle to the horizontal branch pipe connecting pipe portion 22a,
The figure shows the state viewed from the front.

【0011】上部接続管部20aの外周面の周方向四等
分の位置には吊り耳片20bが側方へ張出し状に一体形
成されている。各吊り耳片20bのほぼ中央にはボルト
孔が形成されている。図示右側(横枝管22が接続され
ていない側)の吊り耳片20bには長尺の補強アーム3
0の一端が固定されており、従ってこの補強アーム30
は排水管継手1の軸方向Cに対して直交する状態で側方
に張り出されている。この補強アーム30の先端にはボ
ルト孔(図示省略)が形成されており、このボルト孔に
は調整ボルト31の上部が挿通されている。調整ボルト
31には二個のナット31a,31aが締め込まれて、
補強アーム30がこの調整ボルト31に固定されてい
る。調整ボルト31は、予めコンクリートスラブ10の
所定位置に直立に固定されたもので、移動不能となって
いる。この調整ボルト31の締め込み量を調整(ナット
31a,31aの位置を調整)することによって補強ア
ーム30とスラブ10間の距離が調整され、かつ補強ア
ーム30がスラブ10に対して平行に保持され、ひいて
は排水管継手1がスラブ10に対して軸方向Cの所定の
位置に位置決めされ、またスラブ10に対して直角に位
置決めされる。
Suspending ear pieces 20b are integrally formed in a laterally bulged manner at four circumferentially equally spaced positions on the outer peripheral surface of the upper connecting pipe portion 20a. A bolt hole is formed substantially in the center of each hanging ear piece 20b. A long reinforcing arm 3 is attached to the hanging ear piece 20b on the right side (the side to which the lateral branch pipe 22 is not connected) in the figure.
0 is fixed at one end, so that this reinforcing arm 30
Is laterally projected in a state orthogonal to the axial direction C of the drainage pipe joint 1. A bolt hole (not shown) is formed at the tip of the reinforcing arm 30, and the upper portion of the adjusting bolt 31 is inserted into the bolt hole. Two nuts 31a, 31a are tightened to the adjusting bolt 31,
The reinforcing arm 30 is fixed to the adjusting bolt 31. The adjustment bolt 31 is previously fixed upright at a predetermined position of the concrete slab 10 and is immovable. By adjusting the tightening amount of the adjusting bolt 31 (adjusting the positions of the nuts 31a and 31a), the distance between the reinforcing arm 30 and the slab 10 is adjusted, and the reinforcing arm 30 is held parallel to the slab 10. As a result, the drainage pipe joint 1 is positioned at a predetermined position in the axial direction C with respect to the slab 10 and at a right angle with respect to the slab 10.

【0012】なお、上記した補強アーム30は、排水管
継手1をスラブ10に吊り下げて固定する場合に利用す
ることが可能である。すなわち、図示は省略したが例え
ば左右両側の吊り耳片20b,20bにそれぞれ補強ア
ーム30を固定し、この両補強アーム30を、スラブ2
0の下面に直立に固定された吊り下げボルトに固定し
て、排水管継手1をスラブ10の下方に吊り下げておく
ことができる。
The reinforcing arm 30 described above can be used when the drainage pipe joint 1 is suspended and fixed to the slab 10. That is, although not shown, for example, the reinforcing arms 30 are fixed to the left and right hanging ear pieces 20b and 20b, and the both reinforcing arms 30 are connected to the slab 2.
The drainage pipe joint 1 can be hung below the slab 10 by being fixed to a hanging bolt that is vertically fixed to the lower surface of 0.

【0013】次に、この排水管継手1はその中央から上
記下部接続管部21aに至って漏斗状のテーパ管に形成
されており、このテーパ管部2の下部から下部接続管部
21aにかけて三つの突条3〜5が形成されている。各
突条3〜5は断面略半円状の円環をなし、このテーパ管
部2の周面であって排水管継手1の軸心C(上下の接続
管部20a,21aの軸心)に対して直交する断面の円
周に沿って全周に、かつこの軸心C方向に相互に一定の
間隔をおいて形成されている。
Next, the drainage pipe joint 1 is formed into a funnel-shaped taper pipe from the center thereof to the lower connecting pipe portion 21a, and three pipes are formed from the lower portion of the taper pipe portion 2 to the lower connecting pipe portion 21a. The ridges 3 to 5 are formed. Each of the ridges 3 to 5 forms an annular ring having a substantially semicircular cross section, and is the peripheral surface of the tapered pipe portion 2 and the axial center C of the drainage pipe joint 1 (axial center of the upper and lower connecting pipe portions 20a and 21a). Are formed all along the circumference of the cross section orthogonal to, and at regular intervals in the axial center C direction.

【0014】各突条3〜5は、厚さが150mmのスラ
ブ10、180mmのスラブ11、200mmのスラブ
12の三種類のスラブ10〜12に対応して形成されて
おり、上段の突条3がスラブ厚さが150mm用、中断
の突条4がスラブ厚さが180mm用、また下段の突条
5がスラブ厚さが200mm用である。すなわち、排水
管継手1の横枝管接続管部22aまたは22bとスラブ
10(または11,12)との間に適宜隙間を設けてこ
の排水管継手1を位置させた場合に、各スラブ10〜1
2の下面と同レベルとなる位置に各突条3〜5が形成さ
れている。
Each of the ridges 3 to 5 is formed corresponding to three types of slabs 10 to 12 having a slab 10 having a thickness of 150 mm, a slab 11 having a thickness of 180 mm, and a slab 12 having a thickness of 200 mm. Has a slab thickness of 150 mm, the interrupted ridge 4 has a slab thickness of 180 mm, and the lower ridge 5 has a slab thickness of 200 mm. That is, when the drain pipe joint 1 is positioned with an appropriate gap provided between the lateral branch pipe connecting pipe portion 22a or 22b of the drain pipe joint 1 and the slab 10 (or 11, 12), each slab 10 is located. 1
The protrusions 3 to 5 are formed at the same level as the lower surface of No. 2.

【0015】図では厚さ150mmのスラブ10に排水
管継手1を固定した状態を示しており、従って突条3が
このスラブ10の下面とほぼ同レベルとなっている。そ
して、この突条3とスラブ10の下面との間には埋め戻
し用の型枠6が装着されている。
The figure shows a state in which the drainage pipe joint 1 is fixed to a slab 10 having a thickness of 150 mm, so that the protrusion 3 is at substantially the same level as the lower surface of the slab 10. A backfill form 6 is mounted between the ridge 3 and the lower surface of the slab 10.

【0016】この型枠6は、上記スラブ10の挿通孔1
0aの下側開口部を閉塞するに足る面積の薄鋼板(例え
ば厚さ0,6mm程度)を型枠片6a,6aに二つ割り
してなるもので、施工時において両型枠片6a,6aを
図2に示すように突き合わせて一枚状の型枠6として用
いられる。
The mold 6 has an insertion hole 1 for the slab 10.
0a is a thin steel plate having an area sufficient to close the lower opening (for example, a thickness of about 0,6 mm) is divided into two mold pieces 6a, 6a, and both mold pieces 6a, 6a are constructed at the time of construction. As shown in FIG. 2, they are butted and used as a single form 6.

【0017】両型枠片6a,6aには半円形の逃がし凹
部6b,6bが切込み形成されている。この逃がし凹部
6bは、突条3の外径よりも小さく、かつこの突条3が
形成された部位のテーパ管部2の外径よりも大きな径で
形成されている。従って、図2に示すように排水管継手
1を間にして両型枠片6a,6aを突き合わせて一枚状
の型枠6とすると、上記両逃がし凹部6b,6bが合成
されて型枠6の中央に一つの挿通孔6dが形成される。
この挿通孔6dの内周側に排水管継手1のテーパ管部2
が挿入され、しかも挿通孔6dの周縁が突条3に載せ掛
けられた状態でこの型枠6が装着されている。この型枠
6の四隅には、スラブ10にこの型枠6を釘打して固定
するための釘孔6cが形成されている。
Semi-circular relief recesses 6b, 6b are formed in the two mold pieces 6a, 6a. The escape recess 6b is formed to have a diameter smaller than the outer diameter of the ridge 3 and larger than the outer diameter of the tapered tube portion 2 at the portion where the ridge 3 is formed. Therefore, as shown in FIG. 2, when the mold pieces 6a, 6a are butted to each other with the drainage pipe joint 1 in between to form a single mold 6, the above-mentioned two relief recesses 6b, 6b are combined to form the mold 6. One insertion hole 6d is formed in the center of the.
The tapered pipe portion 2 of the drainage pipe joint 1 is provided on the inner peripheral side of the insertion hole 6d.
Is inserted, and the mold 6 is mounted in a state where the peripheral edge of the insertion hole 6d is placed on the ridge 3. Nail holes 6c for nailing and fixing the form frame 6 to the slab 10 are formed at four corners of the form frame 6.

【0018】この埋め戻し用の型枠としては上記した型
枠6の他に、図示は省略したが挿通孔の径(逃がし凹部
の径)について異なる二種類のものが用意されている。
すなわち、突条4の外径よりも小さくかつこの突条4が
形成された部位のテーパ管部2の外径よりも大きな径の
挿通孔を有する型枠と、突条5の外径よりも小さくかつ
この突条5が形成された部位のテーパ管部2の外径より
も大きな径の挿通孔を有する型枠が用意されている。こ
のように、本例では埋め戻し用の型枠として、突条3す
なわち厚さ150mmのスラブ10に対応した150m
m用の型枠6と、突条4すなわち厚さ180mmのスラ
ブ11に対応した180mm用の型枠と、突条5すなわ
ち厚さ200mmのスラブ12に対応した200mm用
の型枠の合計三種類の型枠が用意されている。
As the mold for backfilling, in addition to the mold 6 described above, although not shown, two kinds of molds having different diameters of insertion holes (diameters of escape recesses) are prepared.
That is, a mold having an insertion hole having a diameter smaller than the outer diameter of the ridge 4 and larger than the outer diameter of the taper tube portion 2 at the site where the ridge 4 is formed, and the outer diameter of the ridge 5. A mold having a through hole having a diameter smaller than the outer diameter of the taper tube portion 2 at a portion where the protrusion 5 is formed is prepared. As described above, in this example, as the backfilling mold, 150 m corresponding to the ridges 3, that is, the slab 10 having a thickness of 150 mm.
A total of three types: a mold 6 for m, a ridge 4 or a 180 mm mold corresponding to a slab 11 having a thickness of 180 mm, and a ridge 5 or a 200 mm mold corresponding to a slab 12 having a thickness of 200 mm. The formwork of is prepared.

【0019】以上の構成により排水管継手1は、次のよ
うにしてスラブ10(または11,12)に固定され
る。スラブ10には打設時において予め挿通孔10aを
形成し、かつ前記調整ボルト31を直立状に固定してお
く。また、立て管は通常の手順に従って建物の下階から
順次接続され、よって図1において下側の立て管21は
挿通孔10aの直下に至った状態とされている。この状
態において、排水管継手1をスラブ10の上面側から挿
通孔10aに挿入し、その下部接続管部21aに立て管
21を仮接続する。これにより、排水管継手1はこの立
て管21に概ね載せ掛けられた状態となる。
With the above structure, the drain pipe joint 1 is fixed to the slab 10 (or 11, 12) as follows. An insertion hole 10a is formed in advance in the slab 10 during driving, and the adjustment bolt 31 is fixed in an upright state. Further, the vertical pipes are sequentially connected from the lower floor of the building according to a normal procedure, and thus the lower vertical pipe 21 is in a state of being directly under the insertion hole 10a in FIG. In this state, the drainage pipe joint 1 is inserted into the insertion hole 10a from the upper surface side of the slab 10, and the vertical pipe 21 is temporarily connected to the lower connection pipe portion 21a thereof. As a result, the drainage pipe joint 1 is in a state of being generally placed on the standpipe 21.

【0020】次に、型枠片6a,6aを突条3の上側の
テーパ管部2を挟んだ状態に突き合わせて挿通孔6dの
周縁を突条3に載せ掛けた状態とする。然る後、型枠6
が突条3の上面およびスラブ10の下面に均一かつ適度
に当接される状態で、この型枠6を釘打してスラブ10
に固定する。突条3またはスラブ10に対する型枠6の
当たり具合が良くない場合(隙間がある場合あるいは強
く押し当てられて歪んでいる場合)には、立て管21と
接続管部21aとの接続状態を調整して、この排水管継
手1の上下方向の位置を調整しあるいは傾きをなくす。
Next, the mold pieces 6a, 6a are butted against each other so as to sandwich the taper pipe portion 2 on the upper side of the protrusion 3 so that the peripheral edge of the insertion hole 6d is placed on the protrusion 3. After that, the formwork 6
Is abutted on the upper surface of the ridge 3 and the lower surface of the slab 10 uniformly and appropriately, the formwork 6 is nailed to slab 10
Fixed to. If the mold 6 is not in good contact with the ridges 3 or the slab 10 (if there is a gap or if it is distorted by being strongly pressed), adjust the connection state between the stand pipe 21 and the connection pipe portion 21a. Then, the vertical position of the drainage pipe joint 1 is adjusted or the inclination is eliminated.

【0021】さらに、排水管継手1の図示右側の吊り耳
片20bには補強アーム30の一端を固定するととも
に、この補強アーム30の先端のボルト孔には上記調整
ボルト31を挿通する、そして、ナット31a,31a
の位置を調整してすなわち調整ボルト31の締め込み量
を調整してこの補強アーム30をスラブ10に対して平
行に固定する。
Further, one end of the reinforcing arm 30 is fixed to the hanging ear piece 20b on the right side of the drainage pipe joint 1, and the adjusting bolt 31 is inserted into the bolt hole at the tip of the reinforcing arm 30. Nuts 31a, 31a
The reinforcing arm 30 is fixed in parallel with the slab 10 by adjusting the position of, that is, adjusting the tightening amount of the adjusting bolt 31.

【0022】以上で排水管継手1は、スラブ10に対す
る上下方向の位置および直角度について良好に位置決め
された状態となる。すなわち、型枠6の挿通孔6dは、
突条3の外径よりも小さく、かつこの突条3が形成され
た部位のテーパ管部2の外径よりも大きな径で形成され
ているので、この挿通孔6dとテーパ管部2との間に
は、埋め戻し用のコンクリートが流れ出さないようにほ
とんど隙間のない状態となり、従って、排水管継手1は
型枠6ひいてはスラブ10に対して上下方向および横方
向の位置ずれが許容されない状態となって、上記位置決
めされた状態が保持される。しかも、この保持状態が補
強アーム30によって強固に保持されている。なお、こ
の時点で、横枝管接続管部22a,22bとスラブ10
の上面との間には適当な隙間が形成されている。
As described above, the drainage pipe joint 1 is in a state of being properly positioned with respect to the vertical position and perpendicularity with respect to the slab 10. That is, the insertion hole 6d of the mold 6 is
Since the diameter is smaller than the outer diameter of the protrusion 3 and larger than the outer diameter of the tapered pipe portion 2 in the portion where the protrusion 3 is formed, the insertion hole 6d and the tapered pipe portion 2 are There is almost no gap between them so that the concrete for backfilling will not flow out, so that the drainage pipe joint 1 is not allowed to be displaced in the vertical and horizontal directions with respect to the mold 6 and then the slab 10. Thus, the above-mentioned positioned state is maintained. Moreover, this holding state is firmly held by the reinforcing arm 30. At this point, the lateral branch pipe connecting pipe portions 22a and 22b and the slab 10 are connected.
An appropriate gap is formed between the upper surface and the upper surface.

【0023】このようにして排水管継手1を位置決めし
た後、挿通孔10a内にコンクリートを流し込んでこの
挿通孔10aの埋め戻しを行う。なお、挿通孔10aの
下側の開口部は型枠6によって閉塞されているので、コ
ンクリートがこの挿通孔10a内から流下してしまうこ
とはない。十分な時間を経てコンクリートが乾燥固化さ
れたならば、型枠6を二つ割りしてスラブ10の下面か
ら取り外す。
After positioning the drainage pipe joint 1 in this way, concrete is poured into the insertion hole 10a to backfill the insertion hole 10a. Since the lower opening of the insertion hole 10a is closed by the mold 6, the concrete does not flow down from the insertion hole 10a. When the concrete has dried and solidified after a sufficient time, the form 6 is divided into two and removed from the lower surface of the slab 10.

【0024】以上により、排水管継手1のスラブ10へ
の固定作業は終了するが、この状態において排水管継手
1は、埋め戻し用の型枠6を利用することによりスラブ
10に対して上下方向の位置および直角度について良好
に位置決めされた状態で固定されている。こうして排水
管継手1が所定の位置に固定されると、その上部接続管
部20aに立て管20が接続され、また横枝管接続部2
2aに横枝管22が接続される。
Although the work of fixing the drainage pipe joint 1 to the slab 10 is completed as described above, the drainage pipe joint 1 in this state uses the form 6 for backfilling in the vertical direction with respect to the slab 10. The position and the squareness are fixed in a well-positioned state. When the drainage pipe joint 1 is fixed at a predetermined position in this way, the vertical pipe 20 is connected to the upper connection pipe portion 20a, and the lateral branch pipe connection portion 2 is also provided.
The lateral branch pipe 22 is connected to 2a.

【0025】以上はスラブ厚が150mmのスラブ10
に排水管継手1を固定する場合であったが、スラブ厚が
180mmである場合あるいはスラブ厚が200mmで
ある場合にも同様である。すなわち、厚さ180mmの
スラブ11の場合には、180mm用の型枠と突条4を
用い、厚さ200mmのスラブ12の場合には、200
mm用の型枠と突条5を用いて上記したと同様の手順で
排水管継手1を位置決めし、然る後固定すればよく、こ
れにより排水管継手1は、スラブに対する横枝管接続部
22a,22bの位置を変えることなく、スラブ11ま
たは12に対して上下方向に位置決めし、かつ直角に位
置決めした状態で固定される。
The above is a slab 10 having a slab thickness of 150 mm.
Although the drainage pipe joint 1 is fixed to the above, the same applies to the case where the slab thickness is 180 mm or the slab thickness is 200 mm. That is, in the case of the slab 11 having a thickness of 180 mm, the 180 mm form frame and the protrusions 4 are used, and in the case of the slab 12 having a thickness of 200 mm, 200
The drainage pipe joint 1 may be positioned by the same procedure as described above using the form for mm and the ridges 5, and then fixed, whereby the drainage pipe joint 1 is connected to the lateral branch pipe connection portion to the slab. The slabs 11 and 12 are fixed in a state of being positioned vertically and at right angles without changing the positions of 22a and 22b.

【0026】本例は以上説明したような固定方法とした
ものであり、この方法によれば、埋め戻し用の型枠6
(または7,8)を利用することにより排水管継手1
を、スラブ10(または11,12)に対して正確かつ
簡単に位置決めすることができるので、従来のように作
業者の熟練あるいはカンに頼ることなく、排水管継手1
の固定作業(位置決め作業)を行うことができる。従っ
て、熟練者でなくとも排水管継手1の固定作業を手際よ
くかつ確実に行うことができるようになる。
In this example, the fixing method as described above is used. According to this method, the backfilling mold 6 is used.
(Or 7, 8) by using drain pipe fitting 1
Can be accurately and easily positioned with respect to the slab 10 (or 11, 12), so that the drain pipe joint 1
Can be fixed (positioning work). Therefore, even an unskilled person can perform the work of fixing the drainage pipe joint 1 efficiently and surely.

【0027】しかも、型枠6は突条3に載せ掛けた状態
で装着される。すなわち、この突条3により型枠6は下
方から強固に支持されるので、従来に比してこの型枠の
板厚を薄くすることができ、これによりその軽量化を図
って楽に運搬できるようにすることができる。
Moreover, the mold 6 is mounted in a state of being mounted on the ridge 3. That is, since the formwork 6 is firmly supported from below by the ridges 3, the plate thickness of the formwork can be made thinner than in the conventional case, so that the formwork can be made lighter and easier to carry. Can be

【0028】なお、本例では埋め戻し用の型枠として二
つ割り形式のものを例示したが、これに限らず例えば図
3に示すようなスリット形式の型枠7を用いてもよい。
この型枠7は、スリット7aに対して左右の側片7b,
7cを上下互い違いに押し開いて、この押し開き部分を
経て排水管継手1のテーパ管部2を挿通孔7d内に挿入
するようになっている。四隅に釘孔7eが形成されてい
る点は同様であり、また挿通孔の径についても前記した
ように三種類のスラブ厚さに対応できるよう三種類のも
のを用意しておく。
In this example, the form for backfilling is exemplified by the split type, but the form is not limited to this, and a slit type form 7 as shown in FIG. 3 may be used.
The frame 7 includes side pieces 7b on the left and right with respect to the slit 7a,
7c are pushed open vertically alternately, and the tapered pipe portion 2 of the drainage pipe joint 1 is inserted into the insertion hole 7d through the push open portion. The nail holes 7e are formed in the four corners in the same manner, and the diameters of the insertion holes are prepared in three types so as to correspond to the three types of slab thicknesses as described above.

【0029】このように本例では、三種類のスラブ厚さ
に対応できるよう突条3〜5を三箇所に設け、かつそれ
ぞれに対応して三種類の型枠を用意する場合を例示した
が、対応させるスラブ厚は一種類のみとしてもよく、ま
た四種類以上に対応可能とすべく突条をさらに多数箇所
に設け、かつそれぞれに対応してより多くの型枠を用意
しておくこととしてもよい。
As described above, in this example, the case where the ridges 3 to 5 are provided at three positions so as to correspond to the three types of slab thicknesses, and three types of molds are prepared corresponding to the ridges 3 to 5 are exemplified. , The thickness of the slab to be supported may be only one type, or more ridges should be provided in more locations to support four or more types, and more formwork should be prepared for each. Good.

【0030】また、本例では、補強アーム30を図示右
側の吊り耳片20bに固定した場合を例示したが、この
補強アーム30は、調整ボルト31が横枝管22の配管
にあたって障害とならない範囲で固定すればよく、従っ
て二箇所以上に補強アーム30を取り付けて、それぞれ
調整ボルト31による位置決めを行ってもよい。さら
に、調整ボルト31はスラブ10の打設時に予め固定し
ておく手順を例示したが、この調整ボルト31は立て管
21に排水管継手1を接続し、型枠6を装着した後にス
ラブ10に挿入して固定することとしてもよい。また、
この補強アーム30と調整ボルト31による位置決めは
必ずしも必須のものではなく、突条3(〜5)および型
枠6のみによっても良好な位置決めが可能である。
Further, in this example, the case where the reinforcing arm 30 is fixed to the hanging ear piece 20b on the right side of the drawing is illustrated, but in the reinforcing arm 30, the adjusting bolt 31 does not interfere with the piping of the lateral branch pipe 22. Therefore, the reinforcing arms 30 may be attached at two or more positions and the adjustment bolts 31 may be used for positioning. Furthermore, although the procedure for fixing the adjustment bolt 31 in advance when the slab 10 is placed is illustrated, the adjustment bolt 31 connects the drainage pipe joint 1 to the vertical pipe 21 and mounts the form 6 on the slab 10. It may be inserted and fixed. Also,
Positioning by the reinforcing arm 30 and the adjusting bolt 31 is not always essential, and good positioning can be performed only by the ridges 3 (to 5) and the mold 6.

【0031】[0031]

【発明の効果】本発明によれば、従来のように熟練者の
カンに頼ることなく、排水管継手をコンクリートスラブ
に対して簡単かつ正確に位置決めすることができるの
で、排水管継手の取付け工事を手際良く正確に行うこと
ができるようになる。
According to the present invention, the drainage pipe joint can be easily and accurately positioned with respect to the concrete slab without relying on the skill of a skilled worker as in the prior art. You will be able to do it efficiently and accurately.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例を示し、コンクリートスラブに
固定された状態の排水管継手の側面図である(コンクリ
ートスラブは縦断面で示されている)。
FIG. 1 is a side view of a drainage pipe joint fixed to a concrete slab according to an embodiment of the present invention (the concrete slab is shown in a longitudinal section).

【図2】埋め戻し用の型枠(二つ割り形式)の平面図で
あって、その装着方法を示す図である。
FIG. 2 is a plan view of a backfilling formwork (divided form) showing how to mount the formwork.

【図3】埋め戻し用の型枠(スリット形式)の斜視図で
ある。
FIG. 3 is a perspective view of a backfilling formwork (slit type).

【符号の説明】[Explanation of symbols]

1…排水管継手 2…テーパ管部 3…突条(スラブ厚さ150mm用) 4…突条(スラブ厚さ180mm用) 5…突条(スラブ厚さ200mm用) 6…埋め戻し用の型枠(二つ割り形式) 6d…挿通孔 10…コンクリートスラブ(スラブ厚さ150mm) 1 ... Drainage pipe joint 2 ... Tapered pipe part 3 ... Ridge (for slab thickness 150 mm) 4 ... Ridge (for slab thickness 180 mm) 5 ... Ridge (for slab thickness 200 mm) 6 ... Mold for backfilling Frame (divided form) 6d ... Insertion hole 10 ... Concrete slab (slab thickness 150 mm)

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 コンクリートスラブに形成された挿通孔
を貫通した状態に固定される排水管継手を、前記コンク
リートスラブに対して位置決めした状態で固定するため
の固定方法であって、前記排水管継手の周面には、この
排水管継手の軸方向に直交する断面の円周に沿って突条
を形成しておき、この突条の上面側に載せ掛けるように
して埋め戻し用の型枠を装着し、この型枠を前記コンク
リートスラブの下面に当接させて前記突条を前記コンク
リートスラブの下面に位置合わせするとともに前記挿通
孔の下側開口部を閉塞し、然る後、この挿通孔を埋め戻
して前記排水管継手を、前記コンクリートスラブに対し
て上下方向の位置および直角度に関して位置決めした状
態で固定することを特徴とする排水管継手の固定方法。
1. A fixing method for fixing a drainage pipe joint fixed in a state of penetrating an insertion hole formed in a concrete slab in a state of being positioned with respect to the concrete slab, the drainage pipe joint A ridge is formed on the circumferential surface of the drain pipe joint along the circumference of a cross section orthogonal to the axial direction of the drain pipe joint, and a backfilling formwork is placed on the upper surface of the ridge. After mounting, the mold is brought into contact with the lower surface of the concrete slab to align the ridge with the lower surface of the concrete slab, and the lower opening of the insertion hole is closed, after which the insertion hole is inserted. And fixing the drainage pipe joint in a state where the drainage pipe joint is positioned vertically and vertically with respect to the concrete slab.
【請求項2】 前記請求項1記載の固定方法において、
前記突条は一定の間隔をおいて複数位置に形成してお
き、施工時にあたってこの複数の突条のうち、前記コン
クリートスラブの厚さに適合するものを選択して用いる
ことを特徴とする排水管継手の固定方法。
2. The fixing method according to claim 1, wherein
Drainage characterized in that the ridges are formed at a plurality of positions at regular intervals, and one that is suitable for the thickness of the concrete slab is selected from the plurality of ridges at the time of construction. How to fix pipe fittings.
【請求項3】 コンクリートスラブに形成された挿通孔
を貫通した状態に固定される排水管継手を、前記コンク
リートスラブに対して位置決めした状態で固定するため
の固定方法であって、前記排水管継手の下部周面には、
この排水管継手の軸方向に直交する断面の円周に沿って
突条を形成する一方、前記排水管継手の上部には吊り耳
片を側方へ張り出して設けておき、前記突条の上面側に
載せ掛けるようにして埋め戻し用の型枠を装着し、この
型枠を前記コンクリートスラブの下面に当接させて前記
突条を前記コンクリートスラブの下面に位置合わせする
とともに前記挿通孔の下側開口部を閉塞する一方、前記
吊り耳片には長尺の補強アームを前記軸方向に直交させ
かつ側方へ張出し状に固定し、この補強アームと前記コ
ンクリートスラブとの間には調整ボルトを介装して、こ
の調整ボルトの締め込み量を調整することで前記補強ア
ームを前記コンクリートスラブに対して平行に保持し、
然る後、前記挿通孔を埋め戻して前記排水管継手を、前
記コンクリートスラブに対して上下方向の位置および直
角度に関して位置決めした状態で固定することを特徴と
する排水管継手の固定方法。
3. A fixing method for fixing a drainage pipe joint fixed in a state of penetrating an insertion hole formed in a concrete slab in a state of being positioned with respect to the concrete slab, the drainage pipe joint On the lower circumference of
While forming a ridge along the circumference of the cross section orthogonal to the axial direction of this drainage pipe joint, a hanging ear piece is provided on the upper part of the drainage pipe joint so as to project laterally, and the upper surface of the ridge is formed. A backfilling mold is mounted so as to be hung on the side, and the mold is brought into contact with the lower surface of the concrete slab to align the ridge with the lower surface of the concrete slab, and under the insertion hole. While the side opening is closed, a long reinforcing arm is fixed to the hanging ear piece so as to be orthogonal to the axial direction and laterally projecting, and an adjusting bolt is provided between the reinforcing arm and the concrete slab. By holding the reinforcing arm parallel to the concrete slab by adjusting the tightening amount of the adjustment bolt,
Then, the insertion hole is backfilled to fix the drainage pipe joint in a state where the drainage pipe joint is positioned with respect to the vertical slab with respect to a vertical position and a right angle.
JP8858993A 1993-04-15 1993-04-15 Fixing method for drain pipe coupling Pending JPH06300166A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8858993A JPH06300166A (en) 1993-04-15 1993-04-15 Fixing method for drain pipe coupling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8858993A JPH06300166A (en) 1993-04-15 1993-04-15 Fixing method for drain pipe coupling

Publications (1)

Publication Number Publication Date
JPH06300166A true JPH06300166A (en) 1994-10-28

Family

ID=13947027

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8858993A Pending JPH06300166A (en) 1993-04-15 1993-04-15 Fixing method for drain pipe coupling

Country Status (1)

Country Link
JP (1) JPH06300166A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114934573A (en) * 2022-05-17 2022-08-23 中交(广州)建设有限公司 Prefabricated assembly type riverside drainage pipeline buttress structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114934573A (en) * 2022-05-17 2022-08-23 中交(广州)建设有限公司 Prefabricated assembly type riverside drainage pipeline buttress structure and construction method thereof
CN114934573B (en) * 2022-05-17 2024-04-19 中交(广州)建设有限公司 Prefabricated assembly type river drainage pipeline buttress structure and construction method thereof

Similar Documents

Publication Publication Date Title
US4785593A (en) Structural building system
JPH01214636A (en) Execution method for water closet of japanese style
JP3728728B2 (en) Column and steel pipe pile positioning device
JPH06300166A (en) Fixing method for drain pipe coupling
EP1156160A1 (en) A canopy
JP2530485B2 (en) Flexible formwork method for gaps between structures
US7089710B2 (en) Piping clamp for concrete form
JP2004068385A (en) Adjustment structure for erection of steel pipe pole
CN112096096B (en) Positioning device for embedded steel plate and construction method thereof
JPS6033159Y2 (en) Ready-made concrete pile
JP2002356853A (en) Anchor bolt location setting jig
JPH08170366A (en) Temporary stopper for column/beam joint member
JPH10237876A (en) Anchor bolt support
JP3016559U (en) Pipe for plumbing
JPH0725389Y2 (en) Formwork for manhole
JPH01278620A (en) Installation method for anchor bolt and anchor bolt supporting device used therefor
JPS649426B2 (en)
JP2662362B2 (en) How to bury underground tanks
JPH0438039Y2 (en)
JPH10184011A (en) Metal tool set for installing anchor bolt
JPH061982Y2 (en) Pipe hole forming tool in concrete construction
JP2000087501A (en) Embedding anchor for alc panel
JPH0345479Y2 (en)
JPH0219478Y2 (en)
JPH082184Y2 (en) Manhole concrete driving equipment