JPS6033159Y2 - Ready-made concrete pile - Google Patents

Ready-made concrete pile

Info

Publication number
JPS6033159Y2
JPS6033159Y2 JP11360682U JP11360682U JPS6033159Y2 JP S6033159 Y2 JPS6033159 Y2 JP S6033159Y2 JP 11360682 U JP11360682 U JP 11360682U JP 11360682 U JP11360682 U JP 11360682U JP S6033159 Y2 JPS6033159 Y2 JP S6033159Y2
Authority
JP
Japan
Prior art keywords
footing
plate
pile
concrete pile
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP11360682U
Other languages
Japanese (ja)
Other versions
JPS5931643U (en
Inventor
康夫 中嶋
栄松 海渡
Original Assignee
株式会社長谷川工務店
三谷セキサン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社長谷川工務店, 三谷セキサン株式会社 filed Critical 株式会社長谷川工務店
Priority to JP11360682U priority Critical patent/JPS6033159Y2/en
Publication of JPS5931643U publication Critical patent/JPS5931643U/en
Application granted granted Critical
Publication of JPS6033159Y2 publication Critical patent/JPS6033159Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

【考案の詳細な説明】 本考案は、地震時の水平力による杭頭部の破壊防止に有
効な既製コンクリート杭を提供するものである。
[Detailed Description of the Invention] The present invention provides a ready-made concrete pile that is effective in preventing the pile head from being destroyed by horizontal force during an earthquake.

コンクリート杭の杭頭とフーチングとの結合構造には、
剛結合によるものとピン結合によるものとがある。
The connection structure between the pile cap and footing of a concrete pile includes:
There are two types: rigid connection and pin connection.

剛結合の場合、地震時における地盤と地上構造物との相
対的な移動に起因する、水平力によって、第1図イに示
すように、杭頭部に最も大きな曲げモーメントが作用す
るが、ピン結合の場合には、同図口に示すように、杭頭
部には曲げモーメントが作用しない。
In the case of a rigid connection, the largest bending moment acts on the pile head due to the horizontal force caused by the relative movement between the ground and the above-ground structure during an earthquake, as shown in Figure 1A, but the pin In the case of a connection, no bending moment acts on the pile head, as shown at the top of the figure.

従って、地震時の水平力による既製コンクリート杭の杭
頭部の曲げモーメントを極カゼ田こ近づけるためには、
杭頭条件をピン結合にすることが望ましい。
Therefore, in order to minimize the bending moment of the pile head of a ready-made concrete pile due to horizontal force during an earthquake,
It is desirable that the pile cap condition be a pin connection.

そのための手段として、従来では、既製コンクリート杭
の打設後、杭頭コンクリートをハツリ取って、抗体に埋
設されている多数のPC鋼材を露出させ、これらを抗体
中心に寄せ集めてフーチングに対する定着筋にすると共
に、杭頭を球面状に形成することが考えられていた。
Conventionally, as a means of achieving this, after driving a ready-made concrete pile, the pile head concrete is chipped off to expose a large number of PC steel materials buried in the antibody, and these are brought together at the center of the antibody to form an anchor for the footing. At the same time, it was considered to form the pile cap into a spherical shape.

しかしながら、これによる場合は、杭頭処理が煩雑で現
場作業工数が多大となり、総じて基礎工期が長くかかる
上、フーチングのコンクリートを打設するまでに、フー
チング定着筋が資材の搬入や運搬など他の作業の邪魔に
なるといった欠点がある。
However, in this case, pile head processing is complicated and requires a large amount of on-site work, and the foundation construction period is generally long.In addition, by the time the footing concrete is poured, the footing anchorage bars are used for carrying in materials, transporting materials, etc. It has the disadvantage of interfering with work.

本考案は、上記の不都合を招くことなく、杭頭とフーチ
ングとをピン結合することができ、しかもフーチング定
着筋の立設作業を任意の時期に且つ非常に容易に行える
ようにした既製コンクリート杭を提供することを目的と
している。
The present invention is a ready-made concrete pile that allows the pile cap and footing to be connected with pins without causing the above-mentioned inconveniences, and also allows the installation of footing anchorage bars to be performed at any time and with great ease. is intended to provide.

上記の目的を達成するため、本考案は、コンクリート杭
主体の頭部に、該コンクリート杭主体のトッププレート
に対面する円形の下面板と該下面板から一体的に上方へ
突出した突曲球面板とを有し、これらの中央部には前記
突曲球面板の球芯を通り且つ上撚がりのテーパー状をな
す貫通孔を形威し、前記下面板の中央部にナツトを前記
貫通孔と同芯状に固着してなるフーチング支持体を固着
したものである。
In order to achieve the above object, the present invention provides a circular bottom plate facing the top plate of the concrete pile main body and a convex spherical plate integrally protruding upward from the bottom plate on the head of the main body of the concrete pile. A through hole passing through the spherical core of the convex curved spherical plate and having a tapered shape with a twist is formed in the center thereof, and a nut is connected to the through hole in the center of the lower plate. Footing supports are fixed in a concentric manner.

以下、本考案の実施例を図面に基づいて説明する。Hereinafter, embodiments of the present invention will be described based on the drawings.

1は既製コンクリート杭Aにおけるコンクリート杭主体
で、それの周部には所定間隔をへだててpc鋼材2・・
・が埋設され且つ該pc鋼材2・・・の止着を兼ねるト
ッププレート3が設けられている。
1 is the concrete pile main body in the prefabricated concrete pile A, and the PC steel material 2...
. is embedded therein, and a top plate 3 is provided which also serves as a fixation for the PC steel materials 2 .

4は、フーチング支持体であり、前記トッププレート3
に対面する円形の下面板4aと該下面板4aから一体的
に上方へ突出した突曲球面板Sとを有し、内部にコンク
リート5を詰めである。
4 is a footing support body, and the top plate 3
It has a circular lower surface plate 4a facing the lower surface plate 4a and a convex spherical surface plate S integrally projecting upward from the lower surface plate 4a, and the inside thereof is filled with concrete 5.

これらの中央部には前記突曲球面板Sの球心を通り且つ
図示の通り上撚がりのテーパー状をなす貫通孔6を形成
し、前記下面板4aの中央部下面にはフーチング定着筋
7を螺着するためのナツト8を図示の通り前記貫通孔6
と同芯状に溶接により固着しである。
A through hole 6 which passes through the center of the convex spherical plate S and has an upwardly twisted tapered shape as shown in the figure is formed in the center of these, and a footing fixing line 7 is formed in the lower surface of the center of the lower plate 4a. As shown in the figure, insert a nut 8 for screwing into the through hole 6.
It is fixed by welding in a concentric manner.

モしてねじ節鉄筋やねじ切り鉄筋等よりなるフーチング
定着筋7をフーチング支持体4の上方から前記貫通孔6
に挿入して前記ナツト8に螺着すべく構威しである。
A footing fixing bar 7 made of a threaded reinforcing bar, a threaded reinforcing bar, etc. is inserted into the through hole 6 from above the footing support 4.
It is intended to be inserted into the nut 8 and screwed onto the nut 8.

9は前記下面板4a及び突曲球面板Sの局部に設けた周
部金具であり、この周部金具9を前記トッププレート3
に溶接することにより、フーチング支持体4をコンクリ
ート杭主体1の頭部に固着しである。
9 is a peripheral metal fitting provided locally on the lower surface plate 4a and the convex spherical plate S, and this peripheral metal fitting 9 is connected to the top plate 3.
The footing support 4 is fixed to the head of the concrete pile main body 1 by welding to the concrete pile main body 1.

10はフーチング、11は必要に応じて前記フーチング
定着筋7の上端部に取り付けられるクランプであり、フ
ーチング10に対する付着力を高める役目を果す。
10 is a footing, and 11 is a clamp that is attached to the upper end of the footing fixing strip 7 as needed, and serves to increase the adhesion force to the footing 10.

上記の構成によれば、既製コンクリート杭Aの打設後、
フーチング支持体4の貫通孔6にフーチング定着筋7を
挿入してナツト8に螺着し、第3図に示すように、突曲
球面板Sに面接嵌合する凹曲球面を有する受は金具12
をフーチング支持体4に被せ、前記受は金具12の下部
フランジ13近くを下面にする状態にフーチング10の
コンクリートを打設することにより、杭頭とフーチング
10をピン結合することができる。
According to the above configuration, after driving the ready-made concrete pile A,
The footing fixing bar 7 is inserted into the through hole 6 of the footing support 4 and screwed onto the nut 8, and as shown in FIG. 12
The pile cap and the footing 10 can be connected by pins by placing the footing 10 on the footing support 4 and pouring concrete for the footing 10 in such a manner that the bottom surface of the support is near the lower flange 13 of the metal fitting 12.

尚、受は金具12が前記支持体4に対して容易に滑動し
得るように、両者4,12の嵌合面間に、アスファルト
の塗布、テフロン(商品名)のコーティング、テフロン
を含浸させたガラス繊維布等を介在させるなど、摩擦力
を低減させる処理を施しておくことが望ましい。
In addition, in order for the metal fitting 12 to easily slide against the support 4, the receiver is coated with asphalt, coated with Teflon (trade name), or impregnated with Teflon between the fitting surfaces of both 4 and 12. It is desirable to perform a treatment to reduce the frictional force, such as by interposing a glass fiber cloth or the like.

第3図中のaは摩擦力低減用の層を示している。A in FIG. 3 indicates a layer for reducing frictional force.

上記の実施例では、フーチング支持体4にコンクリート
5を詰めているが、フーチング支持体4を中空構造にし
て実施することも可能である。
In the above embodiment, the footing support 4 is filled with concrete 5, but it is also possible to make the footing support 4 into a hollow structure.

以上の通り、本考案による既製コンクリート杭を使用す
れば、コンクリート杭主体の頭部に固着されているフー
チング支持体の突曲球面板の中央部にフーチング定着筋
を立設した状態でフーチングのコンクリートを打設する
ことにより、杭頭とフーチングをピン結合することがで
き、杭頭コンクリートのハツリ取り、ハツリ取りにより
露出させたPC鋼材を曲げ加工して抗生央部へ寄せ集め
る作業、杭頭を球面に形成する作業、ハツリガラス処理
等は一切不要となり、杭頭をピン結合とした基礎杭を容
易かつ短期間に構築できるのである。
As described above, if the prefabricated concrete pile of the present invention is used, the footing can be concreted with the footing fixing bar erected in the center of the convex spherical plate of the footing support, which is fixed to the head of the concrete pile main body. The pile cap and footing can be connected with a pin by driving the concrete, and the work of chipping the pile cap concrete, bending the PC steel exposed by chipping and gathering it in the center of the concrete wall, and removing the pile cap. There is no need for any work to form a spherical surface, chiseling glass treatment, etc., and foundation piles with pin-connected pile heads can be constructed easily and in a short period of time.

殊に、本考案によれば、フーチング支持体の下面板及び
突曲球面板の中央部に貫通孔を形成し、前記下面板の中
央部にナツトを前記貫通孔と同芯状に固着しであるため
、フーチング定着筋を立設するにあたっては、フーチン
グ定着筋を貫通孔に上方から挿入して前記ナツトに螺着
するという上方からの操作のみによって、容易に立設す
ることができる。
In particular, according to the present invention, a through hole is formed in the center of the bottom plate and the convex spherical plate of the footing support, and a nut is fixed to the center of the bottom plate concentrically with the through hole. Therefore, the footing fixing strip can be easily erected by simply inserting the footing fixing strip into the through hole from above and screwing it onto the nut.

また、フーチング定着筋を、フーチングコンクリートの
打設前であれば任意の時期に立設することができるので
、フーチング定着筋が資材の搬入、運搬等の邪魔になる
こともない。
Furthermore, since the footing anchorage bars can be erected at any time before the footing concrete is placed, the footing anchorage bars will not interfere with the loading and transportation of materials.

しかも前記貫通孔は上撚がりのテーパー状に形成されて
いるので、地震時にフーチングと杭頭が水平方向に相対
移動する際、フーチング定着筋が抵抗になることを防止
でき、且つフーチング定着筋周囲のコンクリートの破壊
防止にも有効である。
Moreover, since the through-hole is formed in a tapered shape with a twist, it is possible to prevent the footing anchorage bars from becoming a resistance when the footing and the pile head move relative to each other in the horizontal direction during an earthquake. It is also effective in preventing the destruction of concrete.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図イ9口は曲げモーメント図、第2図は本考案に係
る既製コシクリート杭の杭頭部分の分解断面図、第3図
は杭頭とフーチングをピン結合した状態における要部の
断面図である。 1・・・・・・コンクリート杭主体、4・・・・・・フ
ーチング支持体、4a・・・・・・下面板、6・・・・
・・貫通孔、フーチング定着筋、訃・・・・・ナツト、
10・・・・・・フーチング、S・・・・・・突曲球面
板=
Fig. 1 A9 is a bending moment diagram, Fig. 2 is an exploded sectional view of the pile cap of a ready-made cosiclete pile according to the present invention, and Fig. 3 is a sectional view of the main parts when the pile cap and footing are connected with pins. It is. 1...Concrete pile main body, 4...Footing support, 4a...Bottom plate, 6...
・・Through hole, footing fixation line, butt・・nut,
10... Footing, S... Convex spherical plate =

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] コンクリート杭主体の頭部に、該コンクリート杭主体の
トッププレートに対面する円形の下面板と該下面板から
一体的に上方へ突出した突曲球面板とを有し、これらの
中央部には前記突曲球面板の球芯を通り且つ上撚がりの
テーパー状をなす貫通孔を形威し、前記下面板の中央部
にナツトを前記貫通孔と同芯状に固着してなるフーチン
グ支持体を固着しであることを特徴とする既製コンクリ
ート杭。
The head of the main body of the concrete pile has a circular bottom plate facing the top plate of the main body of the concrete pile, and a convex spherical plate that integrally projects upward from the bottom plate. A footing support is formed by forming a through hole passing through the spherical core of the convexly curved spherical plate and forming a tapered shape with a top twist, and fixing a nut concentrically with the through hole in the center of the lower plate. Prefabricated concrete piles characterized by being fixed.
JP11360682U 1982-07-26 1982-07-26 Ready-made concrete pile Expired JPS6033159Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11360682U JPS6033159Y2 (en) 1982-07-26 1982-07-26 Ready-made concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11360682U JPS6033159Y2 (en) 1982-07-26 1982-07-26 Ready-made concrete pile

Publications (2)

Publication Number Publication Date
JPS5931643U JPS5931643U (en) 1984-02-27
JPS6033159Y2 true JPS6033159Y2 (en) 1985-10-03

Family

ID=30262916

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11360682U Expired JPS6033159Y2 (en) 1982-07-26 1982-07-26 Ready-made concrete pile

Country Status (1)

Country Link
JP (1) JPS6033159Y2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63112379A (en) * 1986-10-30 1988-05-17 Teijin Seiki Co Ltd Automatic changeover winding machine
JP2733792B2 (en) * 1989-12-15 1998-03-30 帝人製機株式会社 Yarn winding machine
JP4693299B2 (en) * 2001-08-09 2011-06-01 旭化成建材株式会社 Column base connection structure
JP4562558B2 (en) * 2005-03-17 2010-10-13 ジャパンパイル株式会社 Pile foundation structure

Also Published As

Publication number Publication date
JPS5931643U (en) 1984-02-27

Similar Documents

Publication Publication Date Title
US4785593A (en) Structural building system
US5609005A (en) Foundation connector for tilt-up concrete wall panel and method of use
JPS6033159Y2 (en) Ready-made concrete pile
US5486071A (en) Method and apparatus for supporting a load
JPS6132463B2 (en)
JP3029343U (en) Form tool for mortar material injection in exposed elastic fixed column base method
JPH045330A (en) Erecting method for pc pillar of multistory structure
JPH11280063A (en) Pile head structure and pile head hardware
JPH04128424A (en) Method for constructing anchor supporting beam
CN109797848A (en) Bean column node and its construction method with additional muscle
JPS6242988Y2 (en)
JPH0115763Y2 (en)
JPS629389Y2 (en)
JPS621310Y2 (en)
JPS5989935U (en) Structure for attaching pillars to balcony handrails, etc.
JPH0345479Y2 (en)
JPS6215292Y2 (en)
SU1273448A1 (en) Butt joint of column and foundation
JPH09137638A (en) Piled-up stone and collapse prevention metal fitting thereof
JPH0222178B2 (en)
JP2599258Y2 (en) Beam main bar anchorage device at the connection between column and beam
JPS5838087Y2 (en) Fixing device for unit columns and other unit members
JPH0414226B2 (en)
JPH0220778B2 (en)
JPH0416628A (en) Base construction method and building construction method and base and anchor bolts for base