Japan
Prior art keywords
unit
column
building
concrete
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3262122A
Other languages
Japanese (ja)
Other versions
JP3045838B2 (en
Inventor
Katsunori Onishi
克則 大西
Chika Iri
知香 伊理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP3262122A priority Critical patent/JP3045838B2/en
Publication of JPH0598706A publication Critical patent/JPH0598706A/en
Application granted granted Critical
Publication of JP3045838B2 publication Critical patent/JP3045838B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PURPOSE:To improve the degree of freedom of plan of an inner space by adding a column unit to a column of an inner unit comprising a box-shaped framed body and adding a girder unit to a beam. CONSTITUTION:An inner unit 11 forming a space in a building and an outer unit forming the outer periphery of the building are adjacently disposed in the vertical and horizontal directions on a foundation to build a unit building. And a column unit including column reinforcing bar arrangement is added to a column 21 of the inner unit 11 and a girder unit including beam reinforcing bar arrangement is added to a beam. Next, concrete is placed in the column unit and girder unit and a column 21, to which a column unit is not added, is made removable from a floor beam 23 and a ceiling beam 25. Consequently, the degree of freedom of plan of the space in the building can be improved without being limited by dimensions of unit.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄筋又は鉄骨鉄筋コン
クリート構造の高層ユニット建物を構築するに好適なユ
ニット建物及びその構築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a unit building suitable for constructing a high-rise unit building having a reinforcing bar or a steel frame reinforced concrete structure, and a method for constructing the same.

【0002】[0002]

【従来の技術】従来、鉄筋又は鉄骨鉄筋コンクリート構
造のユニット建物として、特公昭55-14217号公報に記載
のものがある。このユニット建物は、隣接配置された建
物ユニットの側壁間領域に鉄筋を吊込み設置した後、該
側壁間領域にコンクリートを打設する工程を、各階にわ
たり繰り返すことにて構築されるものである。
2. Description of the Related Art Conventionally, as a unit building having a reinforcing bar or a steel frame reinforced concrete structure, there is one described in JP-B-55-14217. This unit building is constructed by repeating the steps of suspending and installing reinforcing bars in the region between the side walls of adjacently arranged building units and then placing concrete in the region between the side walls over each floor.

【0003】[0003]

【発明が解決しようとする課題】然しながら、従来技術
では、コンクリート壁を構造耐力上有効に配置する必要
があり、建物内部空間のプラン制約となる。
However, in the prior art, it is necessary to arrange concrete walls effectively in terms of structural strength, which becomes a plan constraint for the internal space of the building.

【0004】尚、建物内部空間にコンクリート壁を打設
することなく、構造耐力を確保できるユニット建物とし
て、建物ユニットの柱と梁にコンクリート柱とコンクリ
ート梁を添設し、RCラーメンを構成することも考えら
れる。図8(A)は、本出願人が提案するユニット建物
であり、隣接する建物ユニット1の柱間領域にコンクリ
ート柱1Aを打設し、かつ梁間領域にコンクリート梁1
Bを打設するものである。
It is to be noted that, as a unit building capable of ensuring structural strength without placing a concrete wall in the interior space of the building, concrete columns and concrete beams are attached to the columns and beams of the building unit to form RC ramen. Can also be considered. FIG. 8 (A) is a unit building proposed by the present applicant, in which concrete columns 1A are placed in the inter-column areas of adjacent building units 1 and the concrete beams 1 are placed in the inter-beam areas.
B is placed.

【0005】ところが、この図8(A)のユニット建物
にあっては、建物の柱間隔Lがユニット寸法Wによって
一義的に定まってしまい、この場合にも、建物内部空間
のプラン制約を解消できない。
However, in the unit building of FIG. 8 (A), the column spacing L of the building is uniquely determined by the unit size W, and in this case also, the plan constraint of the interior space of the building cannot be solved. ..

【0006】本発明は、建物ユニットの柱と梁にコンク
リート柱とコンクリート梁を添設してなるユニット建物
を構築するに際し、ユニット寸法に制約されずに柱間隔
を選定でき、建物内部空間のプラン自由度を高めること
を目的とする。
According to the present invention, when constructing a unit building in which a concrete column and a concrete beam are attached to a column and a beam of a building unit, the column interval can be selected without being restricted by the unit size, and the plan of the interior space of the building can be selected. The purpose is to increase the degree of freedom.

【0007】[0007]

【課題を解決するための手段】請求項1に記載の本発明
は、柱と床梁と天井梁とを接合した箱形骨組体からなる
建物ユニットを水平及び鉛直方向に隣接配置して構築さ
れるユニット建物において、コンクリートが打設可能と
される柱配筋を備え、建物ユニットの柱に添設配置され
るコラムユニットと、コンクリートが打設可能とされる
梁配筋を備え、建物ユニットの梁に添設配置されるガー
ダーユニットとを有するとともに、コラムユニットが添
設されない建物ユニットの柱が床梁と天井梁とから取外
し可能とされるようにしたものである。
The present invention according to claim 1 is constructed by horizontally and vertically arranging building units composed of a box-shaped frame structure in which columns, floor beams and ceiling beams are joined. In a unit building that has a column reinforcement that allows concrete to be placed, a column unit that is attached to the pillar of the building unit and a beam reinforcement that allows concrete to be placed, and A girder unit that is attached to a beam is provided, and a pillar of a building unit to which a column unit is not attached can be detached from a floor beam and a ceiling beam.

【0008】請求項2に記載の本発明は、請求項1記載
のユニット建物の構築方法において、1階層を構成する
建物ユニットを水平方向に隣接配置する工程と、コラム
ユニットを建物ユニットの柱に添設配置する工程と、ガ
ーダーユニットを建物ユニットの梁に添設配置する工程
と、1階層分のコラムユニットとガーダーユニットにコ
ンクリートを打設する工程と、コンクリート打設後に、
コラムユニットが添設されなかった建物ユニットの柱を
床梁と天井梁とから取外し撤去する工程とを有し、建物
の各階について上記工程を繰り返すようにしたものであ
る。
According to a second aspect of the present invention, in the method of constructing a unit building according to the first aspect, a step of horizontally arranging building units constituting one floor and a column unit as a pillar of the building unit are arranged. The step of arranging the installation, the step of arranging the girder unit on the beam of the building unit, the step of placing concrete on the column unit and the girder unit for one layer, and after placing the concrete,
The column unit of the building unit to which the column unit is not attached is removed from the floor beam and the ceiling beam, and is removed, and the above process is repeated for each floor of the building.

【0009】[0009]

【作用】本発明によれば、下記、の作用がある。 建物ユニットの柱に添設配置したコラムユニットと、
梁に添設配置したガーダーユニットのそれぞれに、コン
クリートを打設することにて、コンクリート柱とコンク
リート梁とからなるRCラーメンを構成することとな
る。
According to the present invention, there are the following actions. A column unit attached to the pillar of the building unit,
By placing concrete on each of the girder units arranged alongside the beams, an RC rigid frame composed of concrete columns and concrete beams will be constructed.

【0010】従って、建物ユニットの側壁間領域にコン
クリートを打設するものに比して、建物内部空間のプラ
ンをコンクリート壁の存在によって制約することなく、
構造耐力を確保できる。
Therefore, as compared with the case where concrete is placed in the area between the side walls of the building unit, the plan of the interior space of the building is not restricted by the presence of the concrete wall,
Structural strength can be secured.

【0011】上述のコンクリート打設後に、コンク
リートが添設されなかった建物ユニットの柱を床梁と天
井梁とから取外し撤去することにより、建物内部空間か
ら不要な柱を取外すことができる。即ち、ユニット寸法
に制約されない柱間隔を選定でき、建物内部空間のプラ
ン自由度を高めることができる。
After the above-mentioned concrete is poured, unnecessary columns can be removed from the internal space of the building by removing and removing the columns of the building unit to which the concrete is not attached from the floor beam and the ceiling beam. That is, it is possible to select the column interval that is not restricted by the unit size, and it is possible to increase the degree of freedom in planning the interior space of the building.

【0012】尚、コンクリートが添設されなかった建物
ユニットの柱は、上述の撤去前に、輸送時のユニット形
状保持機能、及びコンクリート梁打設後硬化するまでの
支柱的機能を果たす。
The pillars of the building unit to which concrete is not added fulfill the function of retaining the unit shape during transportation and the function of a pillar until it is hardened after the concrete beams are cast before the above-mentioned removal.

【0013】[0013]

【実施例】図1は高層ユニット建物の施工手順を示す模
式図、図2はインナユニットを示す模式図、図3はアウ
タユニットを示す模式図、図4はコラムユニットを示す
模式図、図5はガーダーユニットを示す模式図、図6は
柱梁接合ユニットを示す模式図、図7は高層ユニット建
物のユニット配置状態を示す平面図、図8はユニット建
物における柱配置状態を示す模式図、図9はユニット建
物における柱撤去構造を示す模式図、図10は建物ユニ
ットの仮柱取付け構造を示す模式図である。
EXAMPLE FIG. 1 is a schematic diagram showing a construction procedure of a high-rise unit building, FIG. 2 is a schematic diagram showing an inner unit, FIG. 3 is a schematic diagram showing an outer unit, FIG. 4 is a schematic diagram showing a column unit, and FIG. Is a schematic diagram showing a girder unit, FIG. 6 is a schematic diagram showing a beam-column joining unit, FIG. 7 is a plan view showing a unit arrangement state of a high-rise unit building, FIG. 8 is a schematic diagram showing a column arrangement state in a unit building, FIG. 9 is a schematic diagram showing a pillar removing structure in a unit building, and FIG. 10 is a schematic diagram showing a temporary pillar mounting structure of a building unit.

【0014】ユニット建物10は、図1(A)〜(E)
に示す如く、基礎上に、複数の建物ユニットとしての、
建物内部空間を形成するインナユニット11、建物外周
部を形成するアウタユニット12を水平及び鉛直方向に
隣接配置して構築される。そして、ユニット建物10
は、後に詳述するように、隣接するインナユニット1
1、アウタユニット12の柱間領域に配置されるコラム
ユニット13と、梁間領域に配置されるガーダーユニッ
ト14と、コラムユニット13とガーダーユニット14
の交差領域に配置される柱梁接合ユニット15のそれぞ
れに、コンクリートを打設することにて、コンクリート
柱13Aとコンクリート梁14Aとを具備するRCラー
メンを構成するものである。
The unit building 10 is shown in FIGS. 1 (A) to 1 (E).
As shown in the figure, on the foundation, as a plurality of building units,
The inner unit 11 forming the interior space of the building and the outer unit 12 forming the outer peripheral portion of the building are adjacently arranged in the horizontal and vertical directions. And the unit building 10
As described later in detail, the adjacent inner units 1
1. The column unit 13 arranged in the inter-column region of the outer unit 12, the girder unit 14 arranged in the inter-beam region, the column unit 13 and the girder unit 14.
By concrete is poured into each of the beam-column joining units 15 arranged in the intersection region, the RC rigid frame including the concrete column 13A and the concrete beam 14A is configured.

【0015】インナユニット11は、図2(A)〜
(E)に示す如く、4本の鋼板製柱21と、柱21の下
端部にボルト22により接合される4本の鋼板製床梁2
3と、柱21の上端部にボルト24により接合される4
本の鋼板製天井梁25とを有して構成された箱形骨組体
である。尚、インナユニット11は、床スラブ26、床
下地27、天井根太28、天井ボード29、更には給排
水、光熱配線、配管通信設備等の内装を工場で施された
後、建築現場に搬入され、据付けられる。
The inner unit 11 is shown in FIG.
As shown in (E), four steel plate columns 21 and four steel plate floor beams 2 joined to the lower ends of the columns 21 by bolts 22.
3 and 4 which are joined to the upper ends of the pillars 21 by bolts 4
It is a box-shaped frame body configured by including a steel plate ceiling beam 25 of a book. In addition, the inner unit 11 is carried into the construction site after the floor slab 26, the floor base 27, the ceiling joist 28, the ceiling board 29, the interior of the water supply / drainage, the photothermal wiring, the piping communication equipment, etc. are applied in the factory. Installed.

【0016】アウタユニット12は、図3に示す如く、
鋼板製柱31と、鋼板製梁32とを有して構成された骨
組体であり、外壁33、開口部34等の外装を工場で施
された後、建築現場に搬入され、据付けられる。
The outer unit 12 is, as shown in FIG.
It is a skeleton body having a steel plate column 31 and a steel plate beam 32, and is exteriorized such as an outer wall 33 and an opening 34 in a factory, and then carried into a construction site and installed.

【0017】ここで、インナユニット11、アウタユニ
ット12の柱21、31は、柱間領域に対して凹状をな
すL型断面材にて構成されている。尚、柱21、31の
L型断面の両端部は、コラムユニット13の後述する補
助型枠43の両端折り曲げ係合部43Aと係合し得る折
り曲げ係合部21Aを備えている。
Here, the columns 21 and 31 of the inner unit 11 and the outer unit 12 are formed of L-shaped cross-section members which are concave with respect to the inter-column region. Both ends of the L-shaped cross sections of the columns 21 and 31 are provided with bending engaging portions 21A that can engage with both-end bending engaging portions 43A of an auxiliary mold 43 of the column unit 13 described later.

【0018】コラムユニット13は、図4(A)、
(B)に示す如く、横断面中心部を貫通する鋼管製パイ
プ41を備えるとともに、コンクリートを打設可能とさ
れる柱配筋42を上記パイプ41回りに備える。また、
コラムユニット13は、隣接するインナユニット11、
アウタユニット12の柱間領域回りの、複数の柱間隙に
設置される鋼板製補助型枠43を備えており、相対する
補助型枠43、43を互いに継なぎ筋44にて連結して
いる。尚、継なぎ筋44は、各補助型枠43に溶接され
ている棒鋼製補強リブ45に溶接されている。
The column unit 13 is shown in FIG.
As shown in (B), a pipe 41 made of steel pipe that penetrates through the central portion of the cross section is provided, and column reinforcements 42 that allow concrete to be placed are provided around the pipe 41. Also,
The column unit 13 includes the adjacent inner units 11 and
The outer unit 12 is provided with a steel plate auxiliary mold 43 installed in a plurality of pillar gaps around the inter-columnar region, and the opposing auxiliary molds 43, 43 are connected to each other by a splice 44. The joint bar 44 is welded to a steel bar reinforcing rib 45 which is welded to each auxiliary form 43.

【0019】ここで、コラムユニット13の柱配筋42
は、柱長手方向に延びる柱主筋46と、各柱主筋46を
囲む如くに配設される補強筋47と、上述の継なぎ筋4
4とから構成されている。尚、補助型枠43は両端部に
折り曲げ係合部43Aを備えており、柱21、31の折
り曲げ係合部21Aと係合し得るようになっている。
Here, the column arrangement 42 of the column unit 13
Is a column main bar 46 extending in the column longitudinal direction, a reinforcing bar 47 arranged so as to surround each column main bar 46, and the above-mentioned joint bar 4.
4 and. The auxiliary mold 43 is provided with bending engaging portions 43A at both ends so that it can be engaged with the bending engaging portions 21A of the columns 21 and 31.

【0020】即ち、ユニット建物10にあっては、隣接
するインナユニット11、アウタユニット12の柱2
1、31と、それら柱間隙に設置される補助型枠43と
が、コラムユニット13へのコンクリート柱13A打設
のための捨型枠を構成するようになっている。
That is, in the unit building 10, the pillar 2 of the inner unit 11 and the outer unit 12 which are adjacent to each other.
1, 31 and the auxiliary formwork 43 installed in the space between the columns form a scrap formwork for placing the concrete column 13A on the column unit 13.

【0021】ガーダーユニット14は図5(A)、
(B)に示す如く、コンクリートを打設可能とされる梁
配筋51を備える。また ガーダーユニット14は、隣
接するインナユニット11、アウタユニット12の梁間
領域回りの、複数の梁間隙に設置される鋼板製補助型枠
52、53を備えており、相対する両側面の補助型枠5
2、52を互いに通線パイプ54にて連結し、底面の補
助型枠53を梁配筋51の継なぎ筋55により支持して
いる。補助型枠52は上階インナユニット11の床梁2
3と下階インナユニット11の天井梁25との梁間隙に
設置され、補助型枠53は左右のインナユニット11の
天井梁25の梁間隙に設置される。尚、通線パイプ5
4、継なぎ筋55は、各補助型枠52、53に溶接され
ている。
The girder unit 14 is shown in FIG.
As shown in (B), it is provided with a beam reinforcement 51 capable of placing concrete. Further, the girder unit 14 includes steel plate auxiliary molds 52 and 53 installed in a plurality of beam gaps around the inter-beam regions of the adjacent inner unit 11 and outer unit 12, and the auxiliary molds on the opposite side surfaces are opposed to each other. 5
The two and 52 are connected to each other by a conduit pipe 54, and the auxiliary formwork 53 on the bottom surface is supported by the splice lines 55 of the beam arrangement 51. The auxiliary formwork 52 is the floor beam 2 of the upper floor inner unit 11.
3 and the ceiling beam 25 of the lower inner unit 11 are installed in the beam gap, and the auxiliary formwork 53 is installed in the beam gap of the ceiling beams 25 of the left and right inner units 11. In addition, line pipe 5
4. The joint line 55 is welded to each auxiliary formwork 52, 53.

【0022】ここで、ガーダーユニット14の梁配筋5
1は、梁長手方向に延びる梁主筋56と、各梁主筋56
を囲む如くの補強筋57と、上述の継なぎ筋55とから
構成されている。尚、補助型枠52は下端部に下階イン
ナユニット11の天井梁25に載る折り曲げ部52Aを
備え、上端部に上階インナユニット11の床梁23を支
える折り曲げ部52Bを備えている。また、補助型枠5
3は両端部に折り曲げ係合部53Aを備えており、天井
梁25の折り曲げ係合部25Aと係合し得るようになっ
ている。
Here, the beam reinforcement 5 of the girder unit 14
1 is a beam main bar 56 extending in the beam longitudinal direction and each beam main bar 56
It is composed of a reinforcing bar 57 that surrounds the above and the above-mentioned connecting bar 55. The auxiliary form 52 has a bent portion 52A on the ceiling beam 25 of the lower inner unit 11 at the lower end, and a bent portion 52B that supports the floor beam 23 of the upper inner unit 11 at the upper end. Also, the auxiliary formwork 5
3 is provided with bending engaging portions 53A at both ends, and can be engaged with the bending engaging portions 25A of the ceiling beam 25.

【0023】即ち、ユニット建物10にあっては、隣接
するインナユニット11、アウタユニット12の床梁2
3、天井梁25、梁32と、それら梁間隙に設置される
補助型枠52、53とが、ガーダーユニット14へのコ
ンクリート梁14A打設のための捨型枠を構成するよう
になっている。
That is, in the unit building 10, the floor beams 2 of the inner unit 11 and the outer unit 12 which are adjacent to each other.
3, the ceiling beam 25, the beam 32, and the auxiliary formwork 52, 53 installed in the beam gap constitute a scrap formwork for placing the concrete beam 14A on the girder unit 14. ..

【0024】柱梁接合ユニット15は、図6(A)、
(B)に示す如く、横断面中心部を貫通する鋼管製中間
パイプ61を備えるとともに、コンクリートを打設可能
とされる柱配筋62と梁配筋63とを備える。
The column-beam joining unit 15 is shown in FIG.
As shown in (B), a steel pipe intermediate pipe 61 that penetrates through the central portion of the cross section is provided, and a column reinforcement 62 and a beam reinforcement 63 that allow concrete to be placed are provided.

【0025】ここで、柱梁接合ユニット15の柱配筋6
2は、柱長手方向に延びる柱主筋64と、各柱主筋64
を囲む如くに配設される補強筋65とから構成されてい
る。また、柱梁接合ユニット15の梁配筋63は、梁長
手方向に延びる梁主筋66と、各梁主筋66を囲む如く
に配設される補強筋67とから構成されている。
Here, the column arrangement 6 of the column-beam joining unit 15
2 is a column main bar 64 extending in the column longitudinal direction, and each column main bar 64
And a reinforcing bar 65 arranged so as to surround the. The beam reinforcement 63 of the beam-column joining unit 15 is composed of a beam main reinforcement 66 extending in the beam longitudinal direction and a reinforcing reinforcement 67 arranged so as to surround each beam main reinforcement 66.

【0026】尚、上下に隣接するインナユニット11、
アウタユニット12のコラムユニット13を柱梁接合ユ
ニット15により接合するに際し、上下階のコラムユニ
ット13のパイプ41は、図4(C)に示す如く、柱梁
接合ユニット15のパイプ61を介して互いに連通せし
められる。このとき、パイプ41、61の上端部はスト
レート状であるのに対し、それらの下端部は受口部68
を備えており、後述する如くにパイプ41、61内を圧
送されるコンクリートが付着残留しにくいパイプ41、
61の上端部ストレート形状を備えるとともに、下階側
のパイプ41、61の上端部に対して嵌合し易いパイプ
41、61の下端部受口形状を備えることとしている。
The inner units 11, which are vertically adjacent to each other,
When the column unit 13 of the outer unit 12 is joined by the beam-column joining unit 15, the pipes 41 of the column units 13 on the upper and lower floors are mutually connected via the pipe 61 of the column-beam joining unit 15 as shown in FIG. 4C. Can communicate. At this time, the upper ends of the pipes 41 and 61 are straight, whereas the lower ends of the pipes 41 and 61 are in the receiving portion 68.
As will be described later, the pipe 41, 61 is less likely to adhere and remain with the concrete to be pumped in the pipe 41, 61,
In addition to the straight shape of the upper end portion of 61, the lower end portion of the pipes 41 and 61 that are easily fitted to the upper end portions of the pipes 41 and 61 on the lower floor side are provided.

【0027】然るに、ユニット建物10のインナユニッ
ト11にあっては、前述の如く、柱21の下端部をボル
ト22により床梁23に接合し、柱21の上端部をボル
ト24により天井梁25に接合している。これにより、
ユニット建物10にあっては、コラムユニット13が添
設されないインナユニット11の柱21を、床梁23、
天井梁25から取外しできることとなる。
However, in the inner unit 11 of the unit building 10, as described above, the lower end of the column 21 is joined to the floor beam 23 by the bolt 22, and the upper end of the column 21 is connected to the ceiling beam 25 by the bolt 24. It is joined. This allows
In the unit building 10, the column 21 of the inner unit 11 to which the column unit 13 is not attached is attached to the floor beam 23,
It can be removed from the ceiling beam 25.

【0028】以下、ユニット建物10の構築方法につい
て説明する。 (1) 複数のインナユニット11、アウタユニット12を
基礎上に吊り込み、1階層を構成するインナユニット1
1、アウタユニット12を水平方向に隣接配置する(図
1(A)、図7参照)。
A method of constructing the unit building 10 will be described below. (1) An inner unit 1 in which a plurality of inner units 11 and outer units 12 are suspended on a foundation to form one layer
1. The outer unit 12 is horizontally adjacently arranged (see FIG. 1A and FIG. 7).

【0029】(2) コラムユニット13を隣接配置された
インナユニット11、アウタユニット12のL型断面材
からなる柱21、31の、柱間領域に差し込む如くに配
置する(図1(B)参照)。
(2) The column unit 13 is arranged so as to be inserted into the inter-column region of the columns 21 and 31 made of the L-shaped cross-section material of the inner unit 11 and the outer unit 12 which are arranged adjacent to each other (see FIG. 1B). ).

【0030】(3) ガーダーユニット14を隣接配置され
たインナユニット11、アウタユニット12の天井梁2
5、32の梁間領域に配置する(図1(C)参照)。
(3) Ceiling beam 2 of inner unit 11 and outer unit 12 in which girder units 14 are arranged adjacent to each other
5 and 32 are arranged in the inter-beam region (see FIG. 1C).

【0031】(4) 柱梁接合ユニット15をコラムユニッ
ト13とガーダーユニット14の交差領域に配置する。
このとき、コラムユニット13のパイプ41上端ストレ
ート部に柱梁接合ユニット15のパイプ61下端受口部
68を嵌合せしめる。また、コラムユニット13の柱主
筋46と柱梁接合ユニット15の柱主筋64とを溶接、
特殊継手にて接合し、ガーダーユニット14の梁主筋5
6と柱梁接合ユニット15の梁主筋66とを溶接、特殊
継手にて接合する。
(4) The column-beam joint unit 15 is arranged in the intersection region of the column unit 13 and the girder unit 14.
At this time, the pipe 61 lower end receiving portion 68 of the column-beam joining unit 15 is fitted into the upper straight portion of the pipe 41 of the column unit 13. In addition, the column main bar 46 of the column unit 13 and the column main bar 64 of the column-beam joining unit 15 are welded,
Beam main bar 5 of girder unit 14 joined with a special joint
6 and the beam main reinforcement 66 of the beam-column joining unit 15 are welded and joined by a special joint.

【0032】(5) 上階層を構成するインナユニット1
1、アウタユニット12を上述(1) の下階層となるイン
ナユニット11、アウタユニット12の上部に隣接配置
する。
(5) Inner unit 1 constituting the upper layer
1. The outer unit 12 is arranged adjacent to the upper part of the inner unit 11 and the outer unit 12 which are lower layers of the above (1).

【0033】(6) 隣接配置されたインナユニット11、
アウタユニット12の柱21、31と、下階天井梁2
5、32と、上階床梁23、32を捨型枠とするととも
に、コラムユニット13、ガーダーユニット14に設け
た補助型枠43、52、53を捨型枠とし、1階層分の
コラムユニット13とガーダーユニット14にコンクリ
ートを打設し、コンクリート柱13A、コンクリート梁
14Aを形成する。このとき、上下階のコラムユニット
13のパイプ41は、上述(4) の柱梁接合ユニット15
のパイプ61を介して互いに連通せしめられており、コ
ンクリートは最下層のコラムユニット13のパイプ41
下部から充填され、今回打設階となっているコラムユニ
ット13のパイプ41回り、ガーダーユニット14、及
び柱梁接合ユニット15に打設される(図1(D)参
照)。
(6) Inner units 11 arranged adjacent to each other,
The pillars 21 and 31 of the outer unit 12 and the ceiling beam 2 on the lower floor
5 and 32 and upper floor floor beams 23 and 32 are scrap frames, and auxiliary molds 43, 52 and 53 provided in the column unit 13 and the girder unit 14 are scrap frames, and a column unit for one layer 13 and the girder unit 14 are poured with concrete to form concrete columns 13A and concrete beams 14A. At this time, the pipe 41 of the column unit 13 on the upper and lower floors is connected to the column-beam joining unit 15 of (4) above.
Are connected to each other through a pipe 61 of the pipe, and the concrete is the pipe 41 of the column unit 13 in the lowermost layer.
It is filled from the lower part and is placed around the pipe 41 of the column unit 13 which is the placement floor this time, the girder unit 14, and the beam-column joining unit 15 (see FIG. 1D).

【0034】尚、上述(6) のコンクリート打設の前又は
後工程で、ガーダーユニット14に設けられている通線
パイプ54にダクト69を接続する(図1(E)参
照)。
The duct 69 is connected to the conduit pipe 54 provided in the girder unit 14 before or after the concrete pouring in (6) above (see FIG. 1 (E)).

【0035】(7) ユニット建物10にあっては、隣接す
るインナユニット11、アウタユニット12の全ての柱
間領域にコラムユニット13を配置することを必須とせ
ず、一部の柱間領域(図7に破線で示す柱21間領域)
については、コラムユニット13を配置しないこともで
きる。その場合には、上記(6) により、コラムユニット
13、ガーダーユニット14に打設されたコンクリート
柱13A、コンクリート壁14Aの硬化後、各階層の構
造耐力を確保した段階で、コラムユニット13が添設さ
れなかったインナユニット11の柱21を、ボルト2
2、24を取外すことにて、床梁23、天井梁25から
取外し撤去する。ここで、柱21を取外されたユニット
コーナー部において、相交差する床梁23と床梁23、
天井梁25と天井梁25は、それぞれ継なぎ材80にて
連結される(図8(B)、図9参照)。継なぎ材80に
より連結された床梁23、天井梁25は、それぞれ床小
梁、天井小梁として機能する。
(7) In the unit building 10, it is not essential to dispose the column units 13 in all the inter-pillar regions of the inner unit 11 and the outer unit 12 which are adjacent to each other. Area between columns 21 indicated by broken lines in 7)
For, it is possible not to arrange the column unit 13. In that case, by the above (6), after the column unit 13, the concrete column 13A cast on the girder unit 14 and the concrete wall 14A are hardened, the column unit 13 is added at the stage where the structural strength of each layer is secured. The pillar 21 of the inner unit 11 that was not installed was replaced with the bolt 2
By removing 2, 24, the floor beam 23 and the ceiling beam 25 are removed and removed. Here, in the unit corner part where the pillar 21 is removed, the floor beam 23 and the floor beam 23 that intersect each other,
The ceiling beam 25 and the ceiling beam 25 are connected to each other by a joint material 80 (see FIGS. 8B and 9). The floor girder 23 and the ceiling girder 25 connected by the joint material 80 function as a floor girder and a ceiling girder, respectively.

【0036】尚、上述(7) においては、柱21が取外さ
れた床梁23、天井梁25も撤去できる。
In the above (7), the floor beam 23 and the ceiling beam 25 from which the columns 21 have been removed can also be removed.

【0037】(8) ユニット建物10の各階について、上
述(1) 〜(7) を繰り返す。尚、ユニット建物10にあっ
ては、1階層分づつコンクリートを打設することを必須
とせず、複数階層分(全階層分であっても良い)のコラ
ムユニット13とガーダーユニット14に、一度にコン
クリートを打設するものとしても良い。
(8) The above steps (1) to (7) are repeated for each floor of the unit building 10. In addition, in the unit building 10, it is not indispensable to pour the concrete for each floor, and the column unit 13 and the girder unit 14 for a plurality of floors (all floors may be installed) at a time. It is also possible to place concrete.

【0038】次に、本実施例の作用について説明する。 インナユニット11の柱21に添設配置したコラムユ
ニット13と、梁23、25に添設配置したガーダーユ
ニット14のそれぞれに、コンクリートを打設すること
にて、コンクリート柱13Aとコンクリート梁14Aと
からなるRCラーメンを構成することとなる。
Next, the operation of this embodiment will be described. By placing concrete on each of the column unit 13 arranged along the column 21 of the inner unit 11 and the girder unit 14 arranged along the beams 23, 25, the concrete column 13A and the concrete beam 14A are separated from each other. It will be a RC ramen.

【0039】従って、建物ユニットの側壁間領域にコン
クリートを打設するものに比して、建物内部空間のプラ
ンをコンクリート壁の存在によって制約することなく、
構造耐力を確保できる。
Therefore, as compared with the case where concrete is placed in the region between the side walls of the building unit, the plan of the interior space of the building is not restricted by the presence of the concrete wall,
Structural strength can be secured.

【0040】上述のコンクリート打設後に、コンク
リートが添設されなかったインナユニット11の柱21
を床梁23と天井梁25とから取外し撤去することによ
り、建物内部空間から不要な柱を取外すことができる。
即ち、ユニット寸法に制約されない柱21間隔を選定で
き、建物内部空間のプラン自由度を高めることができ
る。
The pillars 21 of the inner unit 11 to which no concrete was added after the concrete was placed as described above.
By removing and removing the floor beam 23 and the ceiling beam 25, unnecessary columns can be removed from the internal space of the building.
That is, it is possible to select the interval between the pillars 21 which is not restricted by the unit size, and it is possible to increase the degree of freedom in planning the internal space of the building.

【0041】尚、コンクリートが添設されなかったイン
ナユニット11の柱21は、上述の撤去前に、輸送時の
ユニット形状保持機能、及びコンクリート梁14A打設
後硬化するまでの支柱的機能を果たす。
The pillars 21 of the inner unit 11 to which concrete is not added fulfill the function of retaining the unit shape during transportation and the function of pillars until the concrete beams 14A are set and hardened before the removal. ..

【0042】尚、本発明の実施において、ユニット建物
10は、柱梁接合ユニット15を用いることを必須とし
ない。柱梁接合ユニット15を用いない場合には、図4
(D)に示す如く、コラムユニット13の柱配筋42内
に、互いに交差するコラムユニット13の柱主筋46と
接合される柱主筋71を備え、且つ互いに交差するガー
ダーユニット14の梁主筋56と接合される梁主筋72
とを備えることとなる。
In the practice of the present invention, the unit building 10 does not necessarily use the beam-column joint unit 15. When the column-beam joining unit 15 is not used, the structure shown in FIG.
As shown in (D), the column reinforcements 42 of the column unit 13 are provided with the column reinforcements 71 that are joined to the column reinforcements 46 of the column units 13 that intersect with each other, and the beam reinforcements 56 of the girder unit 14 that intersect with each other. Beam main bar 72 to be joined
And will be equipped.

【0043】また、本発明の実施において、建物ユニッ
ト81は、図10(A)に示す如く、相交差する床梁8
2と床梁82とを予め継なぎ材83にボルト又は溶接等
にて接合一体化し、かつ相交差する天井梁84と天井梁
84とを継なぎ材85にてボルト又は溶接等にて接合一
体化し、両継なぎ材83、85に仮柱86の下端部と上
端部のそれぞれをボルト87により取外し可能に接合す
るものであっても良い。この場合、仮柱86はコラムユ
ニット13が添設されない部位に専用的に設置して用い
られることになる。尚、仮柱86は両端部に接合したエ
ンドプレート88をボルト89により、継なぎ材83、
85に取外し可能に接合されても良い(図10(B)参
照)。
Further, in the embodiment of the present invention, the building unit 81 has a floor beam 8 which intersects with each other as shown in FIG. 10 (A).
2 and the floor beam 82 are previously joined and integrated to the joint material 83 by bolts or welding, and the intersecting ceiling beams 84 and 84 are jointed and integrated by the joint material 85 by bolts or welding. Alternatively, the lower end portion and the upper end portion of the temporary column 86 may be detachably joined to the joint members 83 and 85 with bolts 87. In this case, the temporary column 86 is exclusively installed and used in a portion where the column unit 13 is not attached. In addition, the temporary pillars 86 are joined to the end plates 88 joined at both ends by bolts 89, and the joint material 83
It may be detachably joined to 85 (see FIG. 10B).

【0044】[0044]

【発明の効果】以上のように本発明によれば、建物ユニ
ットの柱と梁にコンクリート柱とコンクリート梁を添設
してなるユニット建物を構築するに際し、ユニット寸法
に制約されずに柱間隔を選定でき、建物内部空間のプラ
ン自由度を高めることができる。
As described above, according to the present invention, when constructing a unit building in which a concrete column and a concrete beam are attached to a column and a beam of a building unit, the column spacing is not restricted by the unit size. It can be selected and the degree of freedom in planning the interior space of the building can be increased.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は高層ユニット建物の施工手順を示す模式
図である。
FIG. 1 is a schematic diagram showing a construction procedure of a high-rise unit building.

【図2】図2はインナユニットを示す模式図である。FIG. 2 is a schematic diagram showing an inner unit.

【図3】図3はアウタユニットを示す模式図である。FIG. 3 is a schematic diagram showing an outer unit.

【図4】図4はコラムユニットを示す模式図である。FIG. 4 is a schematic view showing a column unit.

【図5】図5はガーダーユニットを示す模式図である。FIG. 5 is a schematic view showing a girder unit.

【図6】図6は柱梁接合ユニットを示す模式図である。FIG. 6 is a schematic view showing a beam-column joining unit.

【図7】図7は高層ユニット建物のユニット配置状態を
示す平面図である。
FIG. 7 is a plan view showing a unit arrangement state of a high-rise unit building.

【図8】図8はユニット建物における柱配置状態を示す
模式図である。
FIG. 8 is a schematic diagram showing a column arrangement state in a unit building.

【図9】図9はユニット建物における柱撤去構造を示す
模式図である。
FIG. 9 is a schematic view showing a pillar removal structure in a unit building.

【図10】図10は建物ユニットの仮柱取付け構造を示
す模式図である。
FIG. 10 is a schematic view showing a temporary column mounting structure of a building unit.

【符号の説明】[Explanation of symbols]

10 ユニット建物 11 インナユニット(建物ユニット) 13 コラムユニット 14 ガーダーユニット 21 柱 23 床梁 25 天井梁 42 柱配筋 51 梁配筋 10 unit building 11 inner unit (building unit) 13 column unit 14 girder unit 21 column 23 floor beam 25 ceiling beam 42 column reinforcement 51 beam reinforcement

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 柱と床梁と天井梁とを接合した箱形骨組
体からなる建物ユニットを水平及び鉛直方向に隣接配置
して構築されるユニット建物において、コンクリートが
打設可能とされる柱配筋を備え、建物ユニットの柱に添
設配置されるコラムユニットと、コンクリートが打設可
能とされる梁配筋を備え、建物ユニットの梁に添設配置
されるガーダーユニットとを有するとともに、コラムユ
ニットが添設されない建物ユニットの柱が床梁と天井梁
とから取外し可能とされることを特徴するユニット建
物。
1. A pillar in which concrete can be placed in a unit building constructed by horizontally and vertically adjoining building units composed of a box-shaped frame structure in which pillars, floor beams and ceiling beams are joined. With a bar arrangement, a column unit attached to the pillar of the building unit, and a beam reinforcement that allows concrete to be placed, and a girder unit attached to the beam of the building unit. A unit building in which a column of a building unit not provided with a column unit is removable from a floor beam and a ceiling beam.
【請求項2】 請求項1記載のユニット建物の構築方法
において、1階層を構成する建物ユニットを水平方向に
隣接配置する工程と、コラムユニットを建物ユニットの
柱に添設配置する工程と、ガーダーユニットを建物ユニ
ットの梁に添設配置する工程と、1階層分のコラムユニ
ットとガーダーユニットにコンクリートを打設する工程
と、コンクリート打設後に、コラムユニットが添設され
なかった建物ユニットの柱を床梁と天井梁とから取外し
撤去する工程とを有し、建物の各階について上記工程を
繰り返すことを特徴とするユニット建物の構築方法。
2. The method for constructing a unit building according to claim 1, wherein a step of horizontally arranging building units constituting one floor, a step of arranging a column unit along a pillar of the building unit, and a girder. The step of placing the unit on the beam of the building unit, the step of placing concrete on the column unit and the girder unit for one level, and the column of the building unit on which the column unit was not attached after placing the concrete A method of constructing a unit building, comprising the steps of removing and removing the floor beam and the ceiling beam, and repeating the above steps for each floor of the building.
JP3262122A 1991-10-09 1991-10-09 Unit building and its construction method Expired - Fee Related JP3045838B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3262122A JP3045838B2 (en) 1991-10-09 1991-10-09 Unit building and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3262122A JP3045838B2 (en) 1991-10-09 1991-10-09 Unit building and its construction method

Publications (2)

Publication Number Publication Date
JPH0598706A true JPH0598706A (en) 1993-04-20
JP3045838B2 JP3045838B2 (en) 2000-05-29

Family

ID=17371358

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3262122A Expired - Fee Related JP3045838B2 (en) 1991-10-09 1991-10-09 Unit building and its construction method

Country Status (1)

Country Link
JP (1) JP3045838B2 (en)

Also Published As

Publication number Publication date
JP3045838B2 (en) 2000-05-29

Similar Documents

Publication Publication Date Title
JP4316161B2 (en) Power plant construction method
JP2004027609A (en) Construction method for subterranean structure and subterranean structure
JP2928002B2 (en) Column formwork structure
JP3105044B2 (en) How to build a unit building
JPS6137692Y2 (en)
JP3045841B2 (en) Beam formwork structure for unit building
JP3045838B2 (en) Unit building and its construction method
JP3045839B2 (en) Method and apparatus for installing floor slab in unit building
JP3045836B2 (en) Unit building and its construction method
JP3045840B2 (en) Column formwork for unit buildings
JP3045835B2 (en) Unit building and its construction method
JP3207276B2 (en) How to build a unit building
JP3045837B2 (en) Unit building and its construction method
JPH05141044A (en) Bar arrangement unit
JP3105038B2 (en) Unit building
JPH0681463A (en) Building method for stair
JPH0598808A (en) Construction of unit building
JP3281421B2 (en) Construction method of horizontal beam erected on tower
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JP2972956B2 (en) Column and beam joining method and its structure
JPH05125831A (en) Post for constructing concrete beam
JP2023016370A (en) Construction method of structure
JPS63165634A (en) Construction of wall type building
JP2003213953A (en) Plant building constructing method
JP2023022563A (en) Concrete wall construction method

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080317

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090317

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees