Post for constructing concrete beam

Info

Publication number
JPH05125831A
JPH05125831A JP28870891A JP28870891A JPH05125831A JP H05125831 A JPH05125831 A JP H05125831A JP 28870891 A JP28870891 A JP 28870891A JP 28870891 A JP28870891 A JP 28870891A JP H05125831 A JPH05125831 A JP H05125831A
Authority
JP
Japan
Prior art keywords
unit
column
concrete beam
post
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28870891A
Other languages
Japanese (ja)
Inventor
Katsunori Onishi
克則 大西
Chika Iri
知香 伊理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP28870891A priority Critical patent/JPH05125831A/en
Publication of JPH05125831A publication Critical patent/JPH05125831A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE:To provide a post applied to various sizes for dispensing with the use of a strap material and reducing the manhours of execution by providing a lower surface support part for a lower form and a side surface support part for supporting a side form and adjusting an interval between supported beams on the post. CONSTITUTION:A post 100 is provided with a lower surface support part 104 for supporting the lower side part of the a ceiling beam 25 and a side surface support part 105 for supporting the upper side part of the ceiling beam 25 and adjusting an interval W between supported beams. Then, the post 100 is integrally expansibly connected with a lower side outer pipe 101 and upper side inner pipe 102 fitting each other. Also, the length of the post 100 is set by a nut 101B screwed o an upper end screw part 101A of the outer pipe 101 and an engaging pipe 102B engaged with a pin hole 102A in the inner pipe 102. Next, the post 100 is provided on the lower end with a base seat 103 crossing over an existing beam 14A and disposed on floor slabs 26 at both sides. An upper side new beam 14A is placed independently of a load acting on the post 100 before the lower side existing beam 14 is hardened. Thus, the number of days for execution can be shortened, workability can be improved and the manhours can be reduced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄筋又は鉄骨鉄筋コン
クリート構造の高層ユニット建物を構築する等に用いて
好適なコンクリート梁構築支柱に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete beam construction column suitable for use in constructing a high-rise unit building having a reinforcing bar or a steel frame reinforced concrete structure.

【0002】[0002]

【従来の技術】従来、コンクリート梁構築用支柱とし
て、実公平3-38363 号公報に記載の如くものがある。従
来の支柱は、型枠内に打設される上側新設コンクリート
梁を下方から仮支持するに際し、床面上に着座する台座
を支柱下端部に備えるとともに、該コンクリート梁の下
部型枠を支持する下面支持部を支柱上端部に備える。
2. Description of the Related Art Conventionally, as a pillar for constructing a concrete beam, there is one as described in Japanese Utility Model Publication 3-38363. In the conventional support pillar, when temporarily supporting the upper new concrete beam cast in the formwork from below, a pedestal seated on the floor is provided at the lower end of the support pillar and the lower formwork of the concrete beam is supported. The lower surface support portion is provided on the upper end portion of the column.

【0003】[0003]

【発明が解決しようとする課題】然るに、従来の支柱
は、コンクリート梁の下部型枠を支持する下面支持部を
備えるのみであり、該コンクリート梁の側部型枠を支持
する機能を全く備えていない。このため、従来技術で
は、コンクリート梁を構築するに際し、上述の支柱以外
に、該コンクリート梁の相対する側部型枠を互いに連結
して保持する緊結材を併せ用いることが必須となってお
り、該緊結材の取付け、取外し等、施工工数が多い。
However, the conventional columns have only the lower surface supporting portion for supporting the lower formwork of the concrete beam, and have the function of supporting the side formwork of the concrete beam at all. Absent. Therefore, in the prior art, when constructing a concrete beam, in addition to the above-mentioned stanchions, it is essential to also use a binding material that holds the opposite side formwork of the concrete beam by connecting them together. There are many construction man-hours such as attaching and detaching the binding material.

【0004】また、従来の支柱は、支柱下端部の台座を
下側既設コンクリート梁に着座せしめ、支柱に作用する
荷重を該既設コンクリート梁に伝えるようになってい
る。このため、従来技術では、支柱下端部の台座が着座
せしめられる下側既設コンクリート梁が完全に硬化し、
強度発現するまで、上側新設コンクリート梁の打設がで
きず、施工日数が長い。
Further, in the conventional pillar, the pedestal at the lower end of the pillar is seated on the existing concrete beam on the lower side, and the load acting on the pillar is transmitted to the existing concrete beam. Therefore, in the conventional technology, the lower existing concrete beam on which the pedestal at the lower end of the column is seated is completely cured,
Until the strength develops, the new concrete beam on the upper side cannot be placed and the construction days are long.

【0005】本発明は、コンクリート梁を構築するに際
し、施工工数を低減することを目的とする。
It is an object of the present invention to reduce the number of construction steps when constructing a concrete beam.

【0006】また、本発明は、コンクリート梁を構築す
るに際し、施工日数を短縮することを目的とする。
Another object of the present invention is to reduce the number of construction days when constructing a concrete beam.

【0007】[0007]

【課題を解決するための手段】請求項1に記載の本発明
は、型枠内に打設される上側新設コンクリート梁を下方
から仮支持するコンクリート梁構築用支柱において、支
柱上端部に、上側新設コンクリート梁の下部型枠を支持
する下面支持部を備えるとともに、下面支持部の側部
に、該コンクリート梁の側部型枠を支持する側面支持部
を備えるようにしたものである。
According to the present invention as set forth in claim 1, in a concrete beam construction strut for temporarily supporting an upper new concrete beam cast in a formwork from below, the upper end of the strut is provided with an upper side. A lower surface supporting portion for supporting a lower formwork of a new concrete beam is provided, and a side surface supporting portion for supporting a side formwork of the concrete beam is provided on a side portion of the lower surface support portion.

【0008】請求項2に記載の本発明は、請求項1に記
載の本発明において更に、前記側面支持部が下面支持部
の両側部に設けられ、相対する側面支持部の梁支持間隔
が調整できるようにしたものである。
According to a second aspect of the present invention, in addition to the first aspect of the present invention, the side surface supporting portions are provided on both sides of the lower surface supporting portion, and the beam supporting intervals of the opposing side surface supporting portions are adjusted. It was made possible.

【0009】請求項3に記載の本発明は、請求項1又は
2に記載の本発明において更に、前記支柱下端部に、下
側既設コンクリート梁をまたぎ、該コンクリート梁の両
側に配置されている床スラブに着座する台座を備えるよ
うにしたものである。
According to a third aspect of the present invention, in addition to the first or second aspect of the present invention, the lower end of the column straddles a lower existing concrete beam and is arranged on both sides of the concrete beam. It is provided with a pedestal for sitting on the floor slab.

【0010】[0010]

【作用】本発明によれば、下記〜の作用がある。 支柱が、コンクリート梁の下部型枠を支持する下面支
持部とともに、該コンクリート梁の側部型枠を支持する
側面支持部をも備える。このため、コンクリート梁を構
築するに際し、該コンクリート梁の相対する側部型枠を
互いに連結して保持する従来の緊結材を用いる必要がな
くなり、施工工数を低減できる。
According to the present invention, there are the following actions. The support column includes a lower surface support portion that supports a lower formwork of the concrete beam, and a side surface support portion that supports a side formwork of the concrete beam. For this reason, when constructing a concrete beam, it is not necessary to use a conventional binding material for connecting and holding opposite side formwork of the concrete beam, and the number of construction steps can be reduced.

【0011】相対する側面支持部の梁支持間隔が調整
できることにより、梁幅の異なる多様サイズのコンクリ
ート梁の構築に適用できる。
Since the beam supporting intervals of the opposing side supporting parts can be adjusted, it can be applied to the construction of concrete beams of various sizes having different beam widths.

【0012】支柱下端部に、下側既設コンクリート梁
をまたぎ、該コンクリート梁の両側に配置されている床
スラブに着座する台座を備えることにより、床スラブ部
分がPC等により構成されていて下側既設コンクリート
梁よりも早期に強度部材となる場合に、当該強度部材と
しての床スラブに上記台座を着座せしめ、支柱に作用す
る荷重を該床スラブに伝えることができる。これによ
り、下側既設コンクリート梁が完全に硬化し強度発現す
る以前に、上側新設コンクリート梁を打設でき、施工日
数を短縮できる。
At the lower end of the column, pedestals for straddling the lower existing concrete beam and seating on the floor slabs arranged on both sides of the concrete beam are provided, so that the floor slab portion is composed of a PC or the like. When the strength member becomes earlier than the existing concrete beam, the pedestal can be seated on the floor slab as the strength member, and the load acting on the column can be transmitted to the floor slab. As a result, the new upper concrete beam can be placed before the lower existing concrete beam is completely hardened and the strength is exhibited, and the number of construction days can be shortened.

【0013】[0013]

【実施例】図1は高層ユニット建物の施工手順を示す模
式図、図2はインナユニットを示す模式図、図3はアウ
タユニットを示す模式図、図4はコラムユニットを示す
模式図、図5はガーダーユニットを示す模式図、図6は
柱梁接合ユニットを示す模式図、図7は高層ユニット建
物のユニット配置状態を示す平面図、図8はコンクリー
ト梁構築用支柱の一例を示す模式図、図9はコンクリー
ト梁構築用支柱の他の例を示す模式図である。
EXAMPLE FIG. 1 is a schematic diagram showing a construction procedure of a high-rise unit building, FIG. 2 is a schematic diagram showing an inner unit, FIG. 3 is a schematic diagram showing an outer unit, FIG. 4 is a schematic diagram showing a column unit, and FIG. Is a schematic diagram showing a girder unit, FIG. 6 is a schematic diagram showing a column-beam joining unit, FIG. 7 is a plan view showing a unit arrangement state of a high-rise unit building, FIG. 8 is a schematic diagram showing an example of a pillar for constructing a concrete beam, FIG. 9 is a schematic view showing another example of a pillar for constructing a concrete beam.

【0014】ユニット建物10は、図1(A)〜(E)
に示す如く、基礎上に、複数の建物ユニットとしての、
建物内部空間を形成するインナユニット11、建物外周
部を形成するアウタユニット12を水平及び鉛直方向に
隣接配置して構築される。そして、ユニット建物10
は、後に詳述するように、隣接するインナユニット1
1、アウタユニット12の柱間領域に配置されるコラム
ユニット13と、梁間領域に配置されるガーダーユニッ
ト14と、コラムユニット13とガーダーユニット14
の交差領域に配置される柱梁接合ユニット15のそれぞ
れに、コンクリートを打設することにて、コンクリート
柱13Aとコンクリート梁14Aとを具備するRCラー
メンを構成するものである。
The unit building 10 is shown in FIGS. 1 (A) to 1 (E).
As shown in the figure, on the foundation, as a plurality of building units,
The inner unit 11 forming the interior space of the building and the outer unit 12 forming the outer peripheral portion of the building are adjacently arranged in the horizontal and vertical directions. And the unit building 10
As described later in detail, the adjacent inner units 1
1. The column unit 13 arranged in the inter-column region of the outer unit 12, the girder unit 14 arranged in the inter-beam region, the column unit 13 and the girder unit 14.
By concrete is poured into each of the beam-column joining units 15 arranged in the intersection region, the RC rigid frame including the concrete column 13A and the concrete beam 14A is configured.

【0015】インナユニット11は、図2(A)〜
(E)に示す如く、4本の鋼板製柱21と、柱21の下
端部にボルト22により接合される4本の鋼板製床梁2
3と、柱21の上端部にボルト24により接合される4
本の鋼板製天井梁25とを有して構成された箱形骨組体
である。尚、インナユニット11は、床スラブ26、床
下地27、天井根太28、天井ボード29、更には給排
水、光熱配線、配管通信設備等の内装を工場で施された
後、建築現場に搬入され、据付けられる。
The inner unit 11 is shown in FIG.
As shown in (E), four steel plate columns 21 and four steel plate floor beams 2 joined to the lower ends of the columns 21 by bolts 22.
3 and 4 which are joined to the upper ends of the pillars 21 by bolts 4
It is a box-shaped skeleton configured with a steel plate ceiling beam 25 of a book. In addition, the inner unit 11 is carried into the construction site after the floor slab 26, the floor base 27, the ceiling joist 28, the ceiling board 29, the interior of the water supply / drainage, the photothermal wiring, the piping communication equipment, etc. are applied in the factory. Installed.

【0016】アウタユニット12は、図3に示す如く、
鋼板製柱31と、鋼板製梁32とを有して構成された骨
組体であり、外壁33、開口部34等の外装を工場で施
された後、建築現場に搬入され、据付けられる。
The outer unit 12 is, as shown in FIG.
It is a skeleton body having a steel plate column 31 and a steel plate beam 32, and is exteriorized such as an outer wall 33 and an opening 34 in a factory, and then carried into a construction site and installed.

【0017】ここで、インナユニット11、アウタユニ
ット12の柱21、31は、柱間領域に対して凹状をな
すL型断面材にて構成されている。尚、柱21、31の
L型断面の両端部は、コラムユニット13の後述する補
助型枠43の両端折り曲げ係合部43Aと係合し得る折
り曲げ係合部21Aを備えている。
Here, the columns 21 and 31 of the inner unit 11 and the outer unit 12 are formed of L-shaped cross-section members which are concave with respect to the inter-column region. Both ends of the L-shaped cross sections of the columns 21 and 31 are provided with bending engaging portions 21A that can engage with both-end bending engaging portions 43A of an auxiliary mold 43 of the column unit 13 described later.

【0018】コラムユニット13は、図4(A)、
(B)に示す如く、横断面中心部を貫通する鋼管製パイ
プ41を備えるとともに、コンクリートを打設可能とさ
れる柱配筋42を上記パイプ41回りに備える。また、
コラムユニット13は、隣接するインナユニット11、
アウタユニット12の柱間領域回りの、複数の柱間隙に
設置される鋼板製補助型枠43を備えており、相対する
補助型枠43、43を互いに継なぎ筋44にて連結して
いる。尚、継なぎ筋44は、各補助型枠43に溶接され
ている棒鋼製補強リブ45に溶接されている。
The column unit 13 is shown in FIG.
As shown in (B), a pipe 41 made of steel pipe that penetrates through the central portion of the cross section is provided, and column reinforcements 42 that allow concrete to be placed are provided around the pipe 41. Also,
The column unit 13 includes the adjacent inner units 11 and
The outer unit 12 is provided with a steel plate auxiliary mold 43 installed in a plurality of pillar gaps around the inter-columnar region, and the opposing auxiliary molds 43, 43 are connected to each other by a splice 44. The joint bar 44 is welded to a steel bar reinforcing rib 45 which is welded to each auxiliary form 43.

【0019】ここで、コラムユニット13の柱配筋42
は、柱長手方向に延びる柱主筋46と、各柱主筋46を
囲む如くに配設される補強筋47と、上述の継なぎ筋4
4とから構成されている。尚、補助型枠43は両端部に
折り曲げ係合部43Aを備えており、柱21、31の折
り曲げ係合部21Aと係合し得るようになっている。
Here, the column arrangement 42 of the column unit 13
Is a column main bar 46 extending in the column longitudinal direction, a reinforcing bar 47 arranged so as to surround each column main bar 46, and the above-mentioned joint line 4.
4 and. The auxiliary mold 43 is provided with bending engaging portions 43A at both ends so that it can be engaged with the bending engaging portions 21A of the columns 21 and 31.

【0020】即ち、ユニット建物10にあっては、隣接
するインナユニット11、アウタユニット12の柱2
1、31と、それら柱間隙に設置される補助型枠43と
が、コラムユニット13へのコンクリート柱13A打設
のための捨型枠を構成するようになっている。
That is, in the unit building 10, the pillar 2 of the inner unit 11 and the outer unit 12 which are adjacent to each other.
1, 31 and the auxiliary formwork 43 installed in the space between the columns form a scrap formwork for placing the concrete column 13A on the column unit 13.

【0021】ガーダーユニット14は図5(A)、
(B)に示す如く、コンクリートを打設可能とされる梁
配筋51を備える。また ガーダーユニット14は、隣
接するインナユニット11、アウタユニット12の梁間
領域回りの、複数の梁間隙に設置される鋼板製補助型枠
52、53を備えており、相対する両側面の補助型枠5
2、52を互いに通線パイプ54にて連結し、底面の補
助型枠53を梁配筋51の継なぎ筋55により支持して
いる。補助型枠52は上階インナユニット11の床梁2
3と下階インナユニット11の天井梁25との梁間隙に
設置され、補助型枠53は左右のインナユニット11の
天井梁25の梁間隙に設置される。尚、通線パイプ5
4、継なぎ筋55は、各補助型枠52、53に溶接され
ている。
The girder unit 14 is shown in FIG.
As shown in (B), it is provided with a beam reinforcement 51 capable of placing concrete. Further, the girder unit 14 includes steel plate auxiliary molds 52 and 53 installed in a plurality of beam gaps around the inter-beam regions of the adjacent inner unit 11 and outer unit 12, and the auxiliary molds on the opposite side surfaces are opposed to each other. 5
The two and 52 are connected to each other by a conduit pipe 54, and the auxiliary formwork 53 on the bottom surface is supported by the splice lines 55 of the beam arrangement 51. The auxiliary formwork 52 is the floor beam 2 of the upper floor inner unit 11.
3 and the ceiling beam 25 of the lower inner unit 11 are installed in the beam gap, and the auxiliary formwork 53 is installed in the beam gap of the ceiling beams 25 of the left and right inner units 11. In addition, line pipe 5
4. The joint line 55 is welded to each auxiliary formwork 52, 53.

【0022】ここで、ガーダーユニット14の梁配筋5
1は、梁長手方向に延びる梁主筋56と、各梁主筋56
を囲む如くの補強筋57と、上述の継なぎ筋55とから
構成されている。尚、補助型枠52は下端部に下階イン
ナユニット11の天井梁25に載る折り曲げ部52Aを
備え、上端部に上階インナユニット11の床梁23を支
える折り曲げ部52Bを備えている。また、補助型枠5
3は両端部に折り曲げ係合部53Aを備えており、天井
梁25の折り曲げ係合部25Aと係合し得るようになっ
ている。
Here, the beam reinforcement 5 of the girder unit 14
1 is a beam main bar 56 extending in the beam longitudinal direction and each beam main bar 56
It is composed of a reinforcing bar 57 which surrounds the above and the above-mentioned connecting bar 55. The auxiliary form 52 has a bent portion 52A on the ceiling beam 25 of the lower inner unit 11 at the lower end, and a bent portion 52B that supports the floor beam 23 of the upper inner unit 11 at the upper end. Also, the auxiliary formwork 5
3 is provided with bending engaging portions 53A at both ends, and can be engaged with the bending engaging portions 25A of the ceiling beam 25.

【0023】即ち、ユニット建物10にあっては、隣接
するインナユニット11、アウタユニット12の床梁2
3、天井梁25、梁32と、それら梁間隙に設置される
補助型枠52、53とが、ガーダーユニット14へのコ
ンクリート梁14A打設のための捨型枠を構成するよう
になっている。
That is, in the unit building 10, the floor beams 2 of the inner unit 11 and the outer unit 12 which are adjacent to each other.
3, the ceiling beam 25, the beam 32, and the auxiliary formwork 52, 53 installed in the beam gap constitute a scrap formwork for placing the concrete beam 14A on the girder unit 14. ..

【0024】柱梁接合ユニット15は、図6(A)、
(B)に示す如く、横断面中心部を貫通する鋼管製中間
パイプ61を備えるとともに、コンクリートを打設可能
とされる柱配筋62と梁配筋63とを備える。
The column-beam joining unit 15 is shown in FIG.
As shown in (B), it is provided with a steel pipe intermediate pipe 61 that penetrates through the central portion of the cross section, and is provided with a column reinforcing bar 62 and a beam reinforcing bar 63 in which concrete can be placed.

【0025】ここで、柱梁接合ユニット15の柱配筋6
2は、柱長手方向に延びる柱主筋64と、各柱主筋64
を囲む如くに配設される補強筋65とから構成されてい
る。また、柱梁接合ユニット15の梁配筋63は、梁長
手方向に延びる梁主筋66と、各梁主筋66を囲む如く
に配設される補強筋67とから構成されている。
Here, the column arrangement 6 of the column-beam joining unit 15
2 is a column main bar 64 extending in the column longitudinal direction, and each column main bar 64
And a reinforcing bar 65 arranged so as to surround the. The beam reinforcement 63 of the beam-column joining unit 15 is composed of a beam main reinforcement 66 extending in the beam longitudinal direction and a reinforcing reinforcement 67 arranged so as to surround each beam main reinforcement 66.

【0026】尚、上下に隣接するインナユニット11、
アウタユニット12のコラムユニット13を柱梁接合ユ
ニット15により接合するに際し、上下階のコラムユニ
ット13のパイプ41は、図4(C)に示す如く、柱梁
接合ユニット15のパイプ61を介して互いに連通せし
められる。このとき、パイプ41、61の上端部はスト
レート状であるのに対し、それらの下端部は受口部68
を備えており、後述する如くにパイプ41、61内を圧
送されるコンクリートが付着残留しにくいパイプ41、
61の上端部ストレート形状を備えるとともに、下階側
のパイプ41、61の上端部に対して嵌合し易いパイプ
41、61の下端部受口形状を備えることとしている。
The inner units 11, which are vertically adjacent to each other,
When the column unit 13 of the outer unit 12 is joined by the beam-column joining unit 15, the pipes 41 of the column units 13 on the upper and lower floors are mutually connected via the pipe 61 of the column-beam joining unit 15 as shown in FIG. 4C. Can communicate. At this time, the upper ends of the pipes 41 and 61 are straight, whereas the lower ends of the pipes 41 and 61 are in the receiving portion 68.
As will be described later, the pipe 41, 61 is less likely to adhere and remain with the concrete to be pumped in the pipe 41, 61,
In addition to the straight shape of the upper end portion of 61, the lower end portion of the pipes 41 and 61 that are easily fitted to the upper end portions of the pipes 41 and 61 on the lower floor side are provided.

【0027】以下、ユニット建物10の構築方法につい
て説明する。 (1) 複数のインナユニット11、アウタユニット12を
基礎上に吊り込み、1階層を構成するインナユニット1
1、アウタユニット12を水平方向に隣接配置する(図
1(A)、図7参照)。
A method of constructing the unit building 10 will be described below. (1) An inner unit 1 in which a plurality of inner units 11 and outer units 12 are suspended on a foundation to form one layer
1. The outer unit 12 is horizontally adjacently arranged (see FIG. 1A and FIG. 7).

【0028】(2) コラムユニット13を隣接配置された
インナユニット11、アウタユニット12のL型断面材
からなる柱21、31の、柱間領域に差し込む如くに配
置する(図1(B)参照)。
(2) The column unit 13 is arranged so as to be inserted into the inter-column region of the columns 21 and 31 made of the L-shaped cross-section members of the inner unit 11 and the outer unit 12 which are arranged adjacent to each other (see FIG. 1B). ).

【0029】(3) ガーダーユニット14を隣接配置され
たインナユニット11、アウタユニット12の天井梁2
5、32の梁間領域に配置する(図1(C)参照)。
(3) Ceiling beam 2 of inner unit 11 and outer unit 12 in which girder units 14 are arranged adjacent to each other
5 and 32 are arranged in the inter-beam region (see FIG. 1C).

【0030】(4) 柱梁接合ユニット15をコラムユニッ
ト13とガーダーユニット14の交差領域に配置する。
このとき、コラムユニット13のパイプ41上端ストレ
ート部に柱梁接合ユニット15のパイプ61下端受口部
68を嵌合せしめる。また、コラムユニット13の柱主
筋46と柱梁接合ユニット15の柱主筋64とを溶接、
特殊継手にて接合し、ガーダーユニット14の梁主筋5
6と柱梁接合ユニット15の梁主筋66とを溶接、特殊
継手にて接合する。
(4) The beam-column joining unit 15 is arranged in the intersection region of the column unit 13 and the girder unit 14.
At this time, the pipe 61 lower end receiving portion 68 of the column-beam joining unit 15 is fitted into the upper straight portion of the pipe 41 of the column unit 13. In addition, the column main bar 46 of the column unit 13 and the column main bar 64 of the column-beam joining unit 15 are welded,
Beam main bar 5 of girder unit 14 joined with a special joint
6 and the beam main reinforcement 66 of the beam-column joining unit 15 are welded and joined by a special joint.

【0031】(5) 上階層を構成するインナユニット1
1、アウタユニット12を上述(1) の下階層となるイン
ナユニット11、アウタユニット12の上部に隣接配置
する。 (6) 隣接配置されたインナユニット11、アウタユニッ
ト12の柱21、31と、下階天井梁25、32と、上
階床梁23、32を捨型枠とするとともに、コラムユニ
ット13、ガーダーユニット14に設けた補助型枠4
3、52、53を捨型枠とし、1階層分のコラムユニッ
ト13とガーダーユニット14にコンクリートを打設
し、コンクリート柱13A、コンクリート梁14Aを形
成する。このとき、上下階のコラムユニット13のパイ
プ41は、上述(4) の柱梁接合ユニット15のパイプ6
1を介して互いに連通せしめられており、コンクリート
は最下層のコラムユニット13のパイプ41下部から充
填され、今回打設階となっているコラムユニット13の
パイプ41回り、ガーダーユニット14、及び柱梁接合
ユニット15に打設される(図1(D)参照)。
(5) Inner unit 1 constituting the upper layer
1. The outer unit 12 is arranged adjacent to the upper part of the inner unit 11 and the outer unit 12 which are lower layers of the above (1). (6) The pillars 21 and 31, the lower floor ceiling beams 25 and 32, and the upper floor floor beams 23 and 32 of the inner unit 11 and the outer unit 12 that are arranged adjacent to each other are used as a scrap frame, and the column unit 13 and the girder are used. Auxiliary formwork 4 provided in the unit 14
Using 3, 52 and 53 as scrap frames, concrete is placed in the column unit 13 and the girder unit 14 for one floor to form concrete columns 13A and concrete beams 14A. At this time, the pipe 41 of the column unit 13 on the upper and lower floors is the pipe 6 of the column-beam joining unit 15 described in (4) above.
1, the concrete is filled from the lower part of the pipe 41 of the column unit 13 of the lowermost layer, around the pipe 41 of the column unit 13 which is the pouring floor this time, the girder unit 14, and the pillar beam. It is placed on the joining unit 15 (see FIG. 1D).

【0032】尚、上述(6) のコンクリート打設の前又は
後工程で、ガーダーユニット14に設けられている通線
パイプ54にダクト69を接続する(図1(E)参
照)。
The duct 69 is connected to the conduit pipe 54 provided in the girder unit 14 before or after the concrete pouring in (6) above (see FIG. 1E).

【0033】(7) ユニット建物10の各階について、上
述(1) 〜(6) を繰り返す。尚、ユニット建物10にあっ
ては、隣接するインナユニット11、アウタユニット1
2の全ての柱間領域にコラムユニット13を配置するこ
とを必須とせず、一部の柱間領域(図7に破線で示す柱
21間領域)については、コラムユニット13を配置し
ないこともできる。その場合には、各階のコンクリート
打設完了により、各階層の構造耐力を確保した段階で、
コラムユニット13の柱21を撤去し、広い居室空間等
を得ることができる。尚、柱21は、床梁23、天井梁
25との接合部からボルト22、24を取外すことにて
撤去できる。
(7) The above (1) to (6) are repeated for each floor of the unit building 10. In addition, in the unit building 10, the inner unit 11 and the outer unit 1 that are adjacent to each other
It is not necessary to arrange the column units 13 in all the inter-pillar regions of No. 2, and the column units 13 may not be arranged in some of the inter-pillar regions (inter-pillar 21 inter-regions shown by broken lines in FIG. 7). .. In that case, at the stage of securing the structural strength of each floor by completing the concrete pouring on each floor,
The pillar 21 of the column unit 13 can be removed to obtain a large living room space or the like. The pillar 21 can be removed by removing the bolts 22 and 24 from the joint between the floor beam 23 and the ceiling beam 25.

【0034】また、ユニット建物10にあっては、1階
層分づつコンクリートを打設することを必須とせず、複
数階層分(全階層分であっても良い)のコラムユニット
13とガーダーユニット14に、一度にコンクリートを
打設するものとしても良い。
In addition, in the unit building 10, it is not essential to pour concrete for each floor, but the column unit 13 and the girder unit 14 for a plurality of floors (all floors may be used). , It is also possible to place concrete at once.

【0035】然るに、本発明にあっては、上述(6) のコ
ンクリート梁14Aの構築に際し、図8に示す如くの支
柱100を用いる。
However, in the present invention, the pillar 100 as shown in FIG. 8 is used in the construction of the concrete beam 14A described in (6) above.

【0036】支柱100は、捨型枠となる下階天井梁2
5、上階床梁23、ガーダーユニット14の補助型枠5
2、53の内部に打設される上側新設コンクリート梁1
4Aを下方から仮支持する。
The pillar 100 is a ceiling beam 2 on the lower floor, which serves as a scrap frame.
5, upper floor floor beam 23, auxiliary formwork 5 of girder unit 14
Upper new concrete beam 1 placed inside 2, 53
4A is temporarily supported from below.

【0037】このとき、支柱100は、互いに嵌合する
下側外管101と上側内管102とを伸縮自在に一体結
合し、下側外管101の下端部に台座103を備え、上
側内管102の上端部に下面支持部104、及び側面支
持部105とを備えている。尚、支柱100の長さは、
外管101の上端ねじ部101Aに螺着したナット10
1Bに、内管102の軸方向複数位置に設けたピン孔1
02Aに係入した係合ピン102Bを支持することにて
決定される。また、上端ねじ部101Aに対するナット
101Bの螺合位置を調整することにより、支柱100
の長さを微調整できる。支柱100の長さ調整構造は、
上記以外の各種公知構造を採用できる。
At this time, the support column 100 has a lower outer pipe 101 and an upper inner pipe 102, which are fitted to each other, which are expandably and integrally joined together, and has a pedestal 103 at a lower end portion of the lower outer pipe 101. A lower surface support portion 104 and a side surface support portion 105 are provided at the upper end portion of the 102. The length of the pillar 100 is
The nut 10 screwed onto the upper end thread portion 101A of the outer tube 101.
1B, pin holes 1 provided at a plurality of axial positions of the inner pipe 102
It is decided to support the engaging pin 102B engaged with 02A. Further, by adjusting the screwing position of the nut 101B with respect to the upper end threaded portion 101A, the support 100
You can fine-tune the length of. The length adjustment structure of the pillar 100 is
Various known structures other than the above can be adopted.

【0038】然るに、支柱100の下端部に設けた台座
103は、下側既設コンクリート梁14Aをまたぎ、該
コンクリート梁14Aの両側に配置されている床スラブ
26に着座し得るように構成されている。
Therefore, the pedestal 103 provided at the lower end of the column 100 is constructed so as to straddle the lower existing concrete beam 14A and to be able to sit on the floor slabs 26 arranged on both sides of the concrete beam 14A. ..

【0039】また、支柱100の上端部に設けた下面支
持部104は、上側新設コンクリート梁14Aの下部型
枠としての下階天井梁25の下辺部及び補助型枠53を
支持する。
Further, the lower surface support portion 104 provided on the upper end portion of the pillar 100 supports the lower side portion of the lower floor ceiling beam 25 and the auxiliary formwork 53 as the lower formwork of the upper new concrete beam 14A.

【0040】また、下面支持部104の両側部に設けた
側面支持部105は、上側新設コンクリート梁14Aの
側部型枠としての下階天井梁25の上辺部を支持する。
尚、コンクリート梁14Aの側部型枠としての補助型枠
52は、この実施例では、通線パイプ54の存在によ
り、相対する他の補助型枠52と緊結されているから、
側面支持部105は下階天井梁25の上辺部のみを支持
し補助型枠52を支持していない。
The side surface supporting portions 105 provided on both sides of the lower surface supporting portion 104 support the upper side portion of the lower floor ceiling beam 25 as a side portion form of the upper new concrete beam 14A.
In this embodiment, the auxiliary formwork 52 as the side formwork of the concrete beam 14A is tightly connected to the other auxiliary formwork 52 opposite thereto due to the presence of the conduit pipe 54.
The side surface support portion 105 supports only the upper side portion of the lower floor ceiling beam 25 and does not support the auxiliary formwork 52.

【0041】尚、下面支持部104の両側部に設けられ
る各側面支持部105は、支持部104、105の梁幅
方向の複数位置に、それぞれ上下一対をなすように設け
られるピン孔104A、105Aのいずれかに、U字状
ピン106を選択的に係脱することにより、相対する側
面支持部105の梁支持間隔Wを調整できる。
The side surface support portions 105 provided on both sides of the lower surface support portion 104 are provided at a plurality of positions in the beam width direction of the support portions 104, 105 so as to form a pair of upper and lower pin holes 104A, 105A, respectively. By selectively engaging and disengaging the U-shaped pin 106 with any of the above, the beam supporting interval W of the opposing side surface supporting portions 105 can be adjusted.

【0042】次に、本実施例の作用について説明する。 支柱100が、コンクリート梁14Aの下部型枠(天
井梁25の下辺部)を支持する下面支持部104ととも
に、該コンクリート梁14Aの側部型枠(天井梁25の
上辺部)を支持する側面支持部105をも備える。この
ため、コンクリート梁14Aを構築するに際し、該コン
クリート梁14Aの相対する側部型枠(天井梁25の上
辺部)を互いに連結して保持する従来の緊結材を用いる
必要がなくなり、施工工数を低減できる。
Next, the operation of this embodiment will be described. The support 100 supports the lower formwork of the concrete beam 14A (the lower side of the ceiling beam 25) and the side support which supports the side formwork (the upper side of the ceiling beam 25) of the concrete beam 14A. The unit 105 is also provided. For this reason, when constructing the concrete beam 14A, it is not necessary to use a conventional binding material for connecting and holding the opposite side formwork (upper side portion of the ceiling beam 25) of the concrete beam 14A to each other. It can be reduced.

【0043】相対する側面支持部105の梁支持間隔
Wが調整できることにより、梁幅の異なる多様サイズの
コンクリート梁14Aの構築に適用できる。
Since the beam supporting distance W between the opposing side supporting portions 105 can be adjusted, it can be applied to the construction of concrete beams 14A of various sizes having different beam widths.

【0044】支柱100下端部に、下側既設コンクリ
ート梁14Aをまたぎ、該コンクリート梁14Aの両側
に配置されている床スラブ26に着座する台座103を
備えることにより、床スラブ26部分がPC等により構
成されていて下側既設コンクリート梁14Aよりも早期
に強度部材となる場合に、当該強度部材としての床スラ
ブ26に上記台座103を着座せしめ、支柱100に作
用する荷重を該床スラブ26に伝えることができる。こ
れにより、下側既設コンクリート梁14Aが完全に硬化
し強度発現する以前に、上側新設コンクリート梁14A
を打設でき、施工日数を短縮できる。
At the lower end of the pillar 100, a pedestal 103 that straddles the lower existing concrete beam 14A and sits on the floor slabs 26 arranged on both sides of the concrete beam 14A is provided. When it is constructed and becomes a strength member earlier than the lower existing concrete beam 14A, the pedestal 103 is seated on the floor slab 26 as the strength member, and the load acting on the column 100 is transmitted to the floor slab 26. be able to. As a result, before the lower existing concrete beam 14A is completely hardened and strength is developed, the upper new concrete beam 14A is
Can be placed and the number of construction days can be shortened.

【0045】図9の支柱110が上記支柱100と異な
る点は、コンクリート梁14Aを下部型枠111、両側
の側部型枠112の内部に打設するに際し、支柱110
の上端部に、コンクリート梁14Aの下部型枠111を
支持する下面支持部113を備えるとともに、下面支持
部113の両側部に、コンクリート梁14Aの側部型枠
112の略全長を支持する側面支持部114を備えたこ
とにある。
The pillar 110 in FIG. 9 is different from the pillar 100 in that when the concrete beam 14A is placed inside the lower mold 111 and the side molds 112 on both sides, the pillar 110 is different.
Is provided with a lower surface support portion 113 that supports the lower formwork 111 of the concrete beam 14A, and side surfaces that support substantially the entire length of the side formwork 112 of the concrete beam 14A on both sides of the lower surface support portion 113. It is provided with the part 114.

【0046】尚、本発明の実施において、ユニット建物
10は、柱梁接合ユニット15を用いることを必須とし
ない。柱梁接合ユニット15を用いない場合には、図4
(D)に示す如く、コラムユニット13の柱配筋42内
に、互いに交差するコラムユニット13の柱主筋46と
接合される柱主筋71を備え、且つ互いに交差するガー
ダーユニット14の梁主筋56と接合される梁主筋72
とを備えることとなる。
In the practice of the present invention, the unit building 10 does not necessarily use the beam-column joint unit 15. When the column-beam joining unit 15 is not used, the structure shown in FIG.
As shown in (D), the column reinforcements 42 of the column unit 13 are provided with the column reinforcements 71 that are joined to the column reinforcements 46 of the column units 13 that intersect with each other, and the beam reinforcements 56 of the girder unit 14 that intersect with each other. Beam main bar 72 to be joined
And will be equipped.

【0047】[0047]

【発明の効果】以上のように本発明によれば、コンクリ
ート梁を構築するに際し、施工工数を低減することがで
きる。
As described above, according to the present invention, the number of construction steps can be reduced when constructing a concrete beam.

【0048】また、本発明によれば、コンクリート梁を
構築するに際し、施工日数を短縮することができる。
Further, according to the present invention, the number of construction days can be shortened when constructing a concrete beam.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は高層ユニット建物の施工手順を示す模式
図である。
FIG. 1 is a schematic diagram showing a construction procedure of a high-rise unit building.

【図2】図2はインナユニットを示す模式図である。FIG. 2 is a schematic diagram showing an inner unit.

【図3】図3はアウタユニットを示す模式図である。FIG. 3 is a schematic diagram showing an outer unit.

【図4】図4はコラムユニットを示す模式図である。FIG. 4 is a schematic view showing a column unit.

【図5】図5はガーダーユニットを示す模式図である。FIG. 5 is a schematic diagram showing a girder unit.

【図6】図6は柱梁接合ユニットを示す模式図である。FIG. 6 is a schematic view showing a beam-column joining unit.

【図7】図7は高層ユニット建物のユニット配置状態を
示す平面図である。
FIG. 7 is a plan view showing a unit arrangement state of a high-rise unit building.

【図8】図8はコンクリート梁構築用支柱の一例を示す
模式図である。
FIG. 8 is a schematic view showing an example of a pillar for constructing a concrete beam.

【図9】図9はコンクリート梁構築用支柱の他の例を示
す模式図である。
FIG. 9 is a schematic view showing another example of a pillar for constructing a concrete beam.

【符号の説明】[Explanation of symbols]

14A コンクリート梁 下部型枠(天井梁25の下辺部) 側部型枠(天井梁25の上辺部) 100 支柱 103 台座 104 下面支持部 105 側面支持部 14A Concrete beam Lower formwork (bottom side of ceiling beam 25) Side formwork (upper side of ceiling beam 25) 100 Struts 103 Pedestal 104 Lower surface support 105 Side support

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 型枠内に打設される上側新設コンクリー
ト梁を下方から仮支持するコンクリート梁構築用支柱に
おいて、支柱上端部に、上側新設コンクリート梁の下部
型枠を支持する下面支持部を備えるとともに、下面支持
部の側部に、該コンクリート梁の側部型枠を支持する側
面支持部を備えることを特徴とするコンクリート梁構築
用支柱。
1. A pillar for constructing a concrete beam for temporarily supporting an upper new concrete beam to be cast in a formwork from below, wherein a lower surface support portion for supporting a lower formwork of the upper new concrete beam is provided at an upper end portion of the pillar. A pillar for constructing a concrete beam, which comprises a side surface supporting portion for supporting a side form of the concrete beam, on a side portion of the lower surface supporting portion.
【請求項2】 前記側面支持部が下面支持部の両側部に
設けられ、相対する側面支持部の梁支持間隔が調整でき
る請求項1記載のコンクリート梁構築用支柱。
2. The pillar for constructing a concrete beam according to claim 1, wherein the side surface supporting portions are provided on both sides of the lower surface supporting portion, and a beam supporting interval of the opposing side surface supporting portions can be adjusted.
【請求項3】 前記支柱下端部に、下側既設コンクリー
ト梁をまたぎ、該コンクリート梁の両側に配置されてい
る床スラブに着座する台座を備える請求項1又は2記載
のコンクリート梁構築用支柱。
3. The pillar for constructing a concrete beam according to claim 1, further comprising a pedestal at a lower end portion of the pillar that straddles a lower existing concrete beam and sits on floor slabs arranged on both sides of the concrete beam.
JP28870891A 1991-11-05 1991-11-05 Post for constructing concrete beam Pending JPH05125831A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28870891A JPH05125831A (en) 1991-11-05 1991-11-05 Post for constructing concrete beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28870891A JPH05125831A (en) 1991-11-05 1991-11-05 Post for constructing concrete beam

Publications (1)

Publication Number Publication Date
JPH05125831A true JPH05125831A (en) 1993-05-21

Family

ID=17733661

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28870891A Pending JPH05125831A (en) 1991-11-05 1991-11-05 Post for constructing concrete beam

Country Status (1)

Country Link
JP (1) JPH05125831A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014201932A (en) * 2013-04-03 2014-10-27 清水建設株式会社 Member holding device for cutting demolition and method of demolishing building using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014201932A (en) * 2013-04-03 2014-10-27 清水建設株式会社 Member holding device for cutting demolition and method of demolishing building using the same

Similar Documents

Publication Publication Date Title
JP4316161B2 (en) Power plant construction method
JPH05125831A (en) Post for constructing concrete beam
JPH0434161A (en) Centrifugally molded hollow pc concrete column and column construction method
JP2928002B2 (en) Column formwork structure
JP3105044B2 (en) How to build a unit building
JP3045839B2 (en) Method and apparatus for installing floor slab in unit building
JP2674457B2 (en) Building structure
JP3045841B2 (en) Beam formwork structure for unit building
JP2000160686A (en) Composite structure of reinforced concrete column and steel frame beam, and its execution
JP3045840B2 (en) Column formwork for unit buildings
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JP3207276B2 (en) How to build a unit building
JP3045836B2 (en) Unit building and its construction method
JP2759361B2 (en) Pillar support members for building reinforced concrete buildings
JP3045838B2 (en) Unit building and its construction method
JPH05141044A (en) Bar arrangement unit
JP2002194892A (en) Construction method of building
JP3105038B2 (en) Unit building
JP3045837B2 (en) Unit building and its construction method
JP3045835B2 (en) Unit building and its construction method
JP2759360B2 (en) Construction method of reinforced concrete building
JP2984626B2 (en) PC pillar construction method and its PC pillar
JPH0790972A (en) Construction of building and lightweight floor slab
JPH0674615B2 (en) Construction method of bearing floor
JPH0598739A (en) Concrete pole