JPH0583046U - Steel pile foundation - Google Patents

Steel pile foundation

Info

Publication number
JPH0583046U
JPH0583046U JP2991791U JP2991791U JPH0583046U JP H0583046 U JPH0583046 U JP H0583046U JP 2991791 U JP2991791 U JP 2991791U JP 2991791 U JP2991791 U JP 2991791U JP H0583046 U JPH0583046 U JP H0583046U
Authority
JP
Japan
Prior art keywords
steel pile
surface plate
support pole
plate
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2991791U
Other languages
Japanese (ja)
Other versions
JPH0645475Y2 (en
Inventor
彦逸 渡辺
Original Assignee
日本地工株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本地工株式会社 filed Critical 日本地工株式会社
Priority to JP2991791U priority Critical patent/JPH0645475Y2/en
Publication of JPH0583046U publication Critical patent/JPH0583046U/en
Application granted granted Critical
Publication of JPH0645475Y2 publication Critical patent/JPH0645475Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

(57)【要約】 (修正有) 【目的】縁石に近接した地盤中に各種の埋設物があって
も標識や街路灯の支持ポールを建柱できるようにした鋼
杭基礎を提供することを目的とする。 【構成】鋼杭2の頂端部に該鋼杭2の軸線2aから水平
方向にずらして定盤3を補強板4を介して固着し、定盤
3の上面側に所要箇所に支持ポール9を連結するための
固定ボルト6aを立設すると共に、この定盤3の上面側
に打込み用アタッチメント5を締結するための仮設ボル
ト6bを鋼杭2の略同軸上に立設し、アタッチメント5
はその底部に設けられた突起5aを定盤3の穿孔3aに
係止した状態で該定盤3に連結可能としたことにより、
定盤3の上面に固定ボルト6aを介して固設される支持
ポール9は鋼杭2の打設位置と異なる土壌面に建柱され
るから、支持ポール9の直下に土壌中の埋設物があって
も鋼杭2はこの埋設物を避けて打設することが可能とな
る。
(57) [Summary] (Modified) [Purpose] To provide a steel pile foundation that can be used as a support pole for signs and street lights even if there are various buried objects in the ground near the curb. To aim. [Structure] A surface plate 3 is fixed to a top end portion of a steel pile 2 horizontally from an axis 2a of the steel pile 2 via a reinforcing plate 4, and a support pole 9 is provided at a predetermined position on the upper surface side of the surface plate 3. A fixing bolt 6a for connecting is erected, and a temporary bolt 6b for fastening the driving attachment 5 is erected on the upper surface of the surface plate 3 substantially coaxially with the steel pile 2.
Since the protrusion 5a provided on the bottom of the plate can be connected to the surface plate 3 while being locked in the perforation 3a of the surface plate 3,
Since the support pole 9 fixedly mounted on the upper surface of the surface plate 3 via the fixing bolts 6a is built on a soil surface different from the position where the steel piles 2 are struck, there is no buried object in the soil immediately below the support pole 9. Even if there is, the steel pile 2 can be driven while avoiding this buried object.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、標識や街路灯の支持ポールを市街地の縁石付近に建てる際に有用な 鋼杭基礎に関する。 The present invention relates to a steel pile foundation useful when constructing a support pole for a sign or a street light near a curb in an urban area.

【0002】[0002]

【従来の技術】[Prior Art]

従来、標識や街路灯の支持ポールを建てるには、地盤を大きく掘り下げ、生コ ンを打込んで支持ポールを固定する方法が採られていたが、この建柱工法では、 工事スペースを広く取り、掘削、型枠組み立て、生コンの打ち込み、養生などの 時間のかかる作業が必要となるため、近年になって図2に示すような打設式の鋼 杭基礎が用いられるようになった。 Conventionally, in order to build a support pole for signs and street lights, a method of digging deep into the ground and driving a raw concrete to fix the support pole was adopted, but this construction pillar method requires a large construction space. Since time-consuming work such as excavation, formwork assembly, driving of raw concrete and curing is required in recent years, the driving type steel pile foundation as shown in Fig. 2 has been used.

【0003】 図2の鋼杭基礎11は、H鋼杭12の頂端部に定盤13を溶着し、定盤13の 上面側の四隅とその内方に固定ボルト16aと仮設ボルト16bとを夫々植立状 態に固着して成るもので、この鋼杭基礎11を地盤10中に立てる際には、L字 形の打込みアタッチメント15の下面に突設した回止め用突起15aを定盤13 上の穿孔13aに係止すると共に、アタッチメント15に穿設したボルト孔15 bを定盤13上の仮設ボルト16bに挿通して締結する。そして、この定盤13 上に定着したアタッチメント15を不図示のバイブロハンマーで握持して打設す ることによりH鋼杭12の先端から所定の地盤中に貫入し、定盤13が地盤面に 達したところで貫入を止めて定盤13上の各固定ボルト16aに支持ポール9の 下端に固着したフランジ9aの穿孔を通してボルト締結し、次いで定盤13とフ ランジ9aとの周辺の掘削孔を結合部を生コン19で固める。In the steel pile foundation 11 shown in FIG. 2, the surface plate 13 is welded to the top end of the H steel pile 12, and the fixing bolts 16a and the temporary bolts 16b are provided at the four corners on the upper surface side of the surface plate 13 and inside thereof. When the steel pile foundation 11 is erected in the ground 10, a detent 15a protruding from the lower surface of the L-shaped driving attachment 15 is provided on the surface plate 13 when the steel pile foundation 11 is set up in the ground. The bolt hole 15b formed in the attachment 15 is inserted into the temporary bolt 16b on the surface plate 13 and fastened. Then, the attachment 15 fixed on the surface plate 13 is gripped by a vibro hammer (not shown) and driven to penetrate into the predetermined ground from the tip of the H steel pile 12, and the surface plate 13 is ground. At that point, the penetration is stopped and each fixing bolt 16a on the surface plate 13 is bolted through the holes in the flange 9a fixed to the lower end of the support pole 9, and then the drilling holes around the surface plate 13 and the flange 9a are secured. The joint is fixed with fresh concrete 19.

【0004】 この鋼杭基礎11によると打設工程が主体となり、地盤10の掘削は定盤13 と支持ポール9のフランジ9aとの結合部周辺ですむから、従来の建柱工法に比 べはるかに掘削土量が少なく、また工事スペースを広く取る必要がなく、型枠組 み立て、生コンの打ち込み、養生などの手間と時間が省略できるものである。According to this steel pile foundation 11, the placing process is mainly performed, and the excavation of the ground 10 is performed only around the joint between the surface plate 13 and the flange 9a of the support pole 9, so that it is far more than the conventional building pillar method. In addition, the amount of excavated soil is small, and there is no need to take a large construction space, and it is possible to save time and labor such as forming a formwork, driving in ready-mixed concrete, and curing.

【0005】[0005]

【考案が解決しようとする課題】[Problems to be solved by the device]

ところが、ガス管、水道管、各種ケーブル等の各種の埋設物16が入り組んだ 市街地において、この鋼杭基礎11を打設するには、これらの埋設物16を損傷 或は破壊することがないように避けて打設する必要があるが、縁石18に近接し た地盤中に埋設物16があると、その場所での打設工事自体が全くできなくなる という不都合があった。 However, in an urban area where various buried objects 16 such as gas pipes, water pipes, various cables, etc. are complicated, in order to drive this steel pile foundation 11, it is necessary to prevent the buried objects 16 from being damaged or destroyed. It is necessary to avoid it, but if there is an embedded object 16 in the ground near the curbstone 18, there was the inconvenience that the installation work itself could not be performed at that location.

【0006】 本考案は、このような事情に鑑みてなされたもので、縁石に近接した地盤中に 各種の埋設物があっても標識や街路灯の支持ポールを建柱できるようにした鋼杭 基礎を提供することを目的とする。[0006] The present invention has been made in view of the above circumstances, and is a steel pile capable of forming a support pole for a sign or a street light as a pillar even if there are various buried objects in the ground near the curb. The purpose is to provide the basis.

【0007】[0007]

【課題を解決するための手段】[Means for Solving the Problems]

本考案の課題を解決するための手段を、実施例に対応する図1に基づいて説明 すると、鋼杭2の頂端部に該鋼杭2の軸線2aから水平方向にずらして定盤3を 補強板4を介して固着し、前記定盤3の上面側に所要箇所に支持ポール9を連結 するための固定ボルト6aを立設すると共に、この定盤3の上面側に打込み用ア タッチメント5を締結するための仮設ボルト6bを前記鋼杭2の略同軸上に立設 し、前記アタッチメント5はその底部に設けられた突起5aを前記定盤3の穿孔 3aに係止した状態で該定盤3に連結可能としたことを特徴とする。 A means for solving the problems of the present invention will be described with reference to FIG. 1 corresponding to the embodiment. The surface plate 3 is reinforced by horizontally shifting the steel pile 2 from the axis 2a of the steel pile 2 at the top end portion thereof. A fixing bolt 6a for connecting the support pole 9 to a required position is erected on the upper surface side of the surface plate 3 and fixed to the upper surface side of the surface plate 3, and the attachment 5 for driving is mounted on the upper surface side of the surface plate 3. A temporary bolt 6b for fastening the bolt is erected substantially coaxially with the steel pile 2, and the attachment 5 is fixed in a state in which the protrusion 5a provided on the bottom of the attachment 5 is locked in the hole 3a of the surface plate 3. It is characterized in that it can be connected to the board 3.

【0008】[0008]

【作用】[Action]

上記構成において、定盤3を鋼杭2の軸線2aから所要間隔だけずらして該鋼 杭2の頂端部に定盤3を補強板4を介して固着したため、定盤3の上面に固定ボ ルト6aを介して固設される支持ポール9は鋼杭2の打設位置と異なる土壌面に 建柱されるから、支持ポール9の直下に土壌中の埋設物があっても鋼杭2はこの 埋設物を避けて打設することが可能となる。 In the above structure, the platen 3 is displaced from the axis 2a of the steel pile 2 by a required distance, and the platen 3 is fixed to the top end of the steel pile 2 via the reinforcing plate 4. Since the support pole 9 fixed via 6a is built on a soil surface different from the placement position of the steel pile 2, even if there is an embedded object in the soil directly below the support pole 9, It is possible to place the material while avoiding buried objects.

【0009】 また、鋼杭2を土壌中に埋設するのにバイブロハンマーで打設する場合、バイ ブロハンマーが握持する打込み用アタッチメント5は定盤3上の鋼杭2の略同軸 上に設けられた仮設ボルト6bに取り付けられるから、バイブロハンマーは鋼杭 2の軸心を打設することとなり、定盤3が鋼杭2の軸線からずれた位置にあって も打設効率は良好に保たれる。When the steel pile 2 is driven by a vibro hammer to be buried in the soil, the driving attachment 5 held by the vibro hammer is provided on the surface plate 3 substantially coaxially with the steel pile 2. Since it is attached to the temporary bolt 6b, the vibro hammer drives the shaft center of the steel pile 2 to maintain good driving efficiency even when the surface plate 3 is displaced from the axis of the steel pile 2. Be drunk

【0010】[0010]

【実施例】【Example】

以下、本考案の実施例を図面を参照しながら説明する。 Hereinafter, embodiments of the present invention will be described with reference to the drawings.

【0011】 図1(a) は本考案の定盤部周辺を示す部分斜視図、図1(b) は本考案の鋼杭基 礎に用いる打込み用アタッチメントの斜視図、図1(c) は鋼杭基礎の側面図及び 見下図、図1(d) は鋼杭基礎に支持ポールを連結した状態を示す施工状態の側方 図である。なお、これらの図面において、第5図と同一の部分には同一の符合が 付してある。FIG. 1 (a) is a partial perspective view showing the periphery of a surface plate portion of the present invention, FIG. 1 (b) is a perspective view of a driving attachment used for a steel pile foundation of the present invention, and FIG. 1 (c) is a steel plate. A side view and a bottom view of the pile foundation, and Fig. 1 (d) is a side view of the construction state in which the support pole is connected to the steel pile foundation. In these drawings, the same parts as those in FIG. 5 are designated by the same reference numerals.

【0012】 本実施例の鋼杭基礎1は、図1(a) に示すように、所要長さのH鋼からなる鋼 杭2の頂端部において該鋼杭2の軸線2aからずらした位置に定盤3を溶着する と共に、定盤3と鋼杭2の接合隅部に補強板4を溶着し、定盤3の上面側には、 四隅に固定ボルト6aを立設し、同じく定盤3の上面側において鋼杭2の略同軸 上に仮設ボルト6bを立設してなり、図1(b) に示す打込み用アタッチメント5 はその底部に設けられた回止め用の突起5aを定盤3の穿孔3aに係止した状態 でボルト孔5bを定盤3の仮設ボルト6bに挿通して不図示のナットで締結する 。従って、定盤3の仮設ボルト6bに挿通した打込み用アタッチメント5と鋼杭 2の軸線2aとは略一致するものである。As shown in FIG. 1 (a), the steel pile foundation 1 of this embodiment is located at a position displaced from the axis 2 a of the steel pile 2 at the top end of the steel pile 2 made of H steel having a required length. While the surface plate 3 is welded, the reinforcing plate 4 is welded to the joint corners of the surface plate 3 and the steel pile 2, and the fixing bolts 6a are erected at the four corners on the upper surface side of the surface plate 3, and the surface plate 3 is also fixed. On the upper surface side of the steel pile 2, a temporary bolt 6b is erected substantially coaxially with the steel pile 2, and the driving attachment 5 shown in FIG. 1 (b) has a protrusion 5a for stopping rotation which is provided on the bottom thereof. The bolt hole 5b is inserted into the temporary bolt 6b of the surface plate 3 while being locked in the hole 3a of FIG. Therefore, the driving attachment 5 inserted into the temporary bolt 6b of the surface plate 3 and the axis 2a of the steel pile 2 are substantially coincident with each other.

【0013】 このような構成からなる、鋼杭基礎1を沿道の敷石18付近に打設するには、 図1(d) に示すように、土壌中の埋設管16を探査した後、この埋設管16を避 けた位置の土壌表面を掘削し、鋼杭2の定盤3に固設した打込み用アタッチメン ト5を不図示のバイブロハンマーで握持して打込む。このとき、打込み用アタッ チメント5の突起5aは定盤3の穿孔3aに係止してあるため、打込み用アタッ チメント5がバイブロハンマーの振動によって離脱することがない。そして、定 盤3が地盤面からやや低い位置まで貫入したところで打込みを停止し、バイブロ ハンマーを取り除いて定盤3上の仮設ボルト6bから打込み用アタッチメント5 を離脱し、さらに仮設ボルト6bを切断し除去する。次いで、支持ポール9のフ ランジ9aに穿設されたボルト孔を定盤3上の固定ボルト6aに通してナットで で締着し、土壌表面の掘削箇所に生コンを打設して支持ポール9の建柱を終える 。In order to drive the steel pile foundation 1 having such a structure near the paving stones 18 along the road, as shown in FIG. 1D, after exploring the buried pipe 16 in the soil, The soil surface at a position away from the pipe 16 is excavated, and the driving attachment 5 fixed to the surface plate 3 of the steel pile 2 is gripped and driven by a vibro hammer not shown. At this time, since the projection 5a of the driving attachment 5 is locked in the hole 3a of the surface plate 3, the driving attachment 5 does not come off due to the vibration of the vibro hammer. Then, when the surface plate 3 penetrates to a position slightly lower than the ground surface, the driving is stopped, the vibro hammer is removed, the driving attachment 5 is detached from the temporary bolt 6b on the surface plate 3, and the temporary bolt 6b is further cut. Remove. Next, the bolt holes formed in the flange 9a of the support pole 9 are passed through the fixing bolts 6a on the surface plate 3 and fastened with nuts, and the ready-mixed concrete is placed at the excavated site on the soil surface to support the pole 9 Finish the building pillar of.

【0014】 このように、図1(d) に示すような縁石18或は側溝17と埋設物16とが接 近した場所に支持ポール9を建柱する場合、従来の鋼杭基礎であれば、鋼杭2の 直上に支持ポール9を建てようとすると縁石18に当たって建柱が不可能となる が、本実施例の鋼杭基礎1であれば、鋼杭2を埋設管16を避けた状態で打設し た後、次いでこの鋼杭2の上に立設する支持ポール9を縁石18を避けた状態で 連結することができるため、縁石18と埋設管16とが相当接近した場所であっ ても鋼杭2の打設及び支持ポール9の建柱が可能となる。しかも、本実施例にお いては、定盤3が鋼杭2の軸心からずれた位置に設けられているが、打込み用ア タッチメント5を締着するための仮設ボルト6bは鋼杭2の軸心2aと略一致し た位置に設けられているから、鋼杭2の打込みが効率よく行われる。As described above, when the support pole 9 is to be constructed at a place where the curb 18 or the gutter 17 and the buried object 16 are close to each other as shown in FIG. However, if the support pole 9 is to be built right above the steel pile 2, the curb 18 hits and the building pillar becomes impossible, but in the case of the steel pile foundation 1 of this embodiment, the steel pile 2 avoids the buried pipe 16. Since the support pole 9 standing upright on the steel pile 2 can be connected to the steel pile 2 while avoiding the curb 18, the curb 18 and the buried pipe 16 are close to each other. However, it is possible to drive the steel piles 2 and to construct the support poles 9. Moreover, in the present embodiment, the surface plate 3 is provided at a position deviated from the axial center of the steel pile 2, but the temporary bolt 6b for fastening the attachment 5 for driving is the steel pile 2. Since it is provided at a position that substantially coincides with the axis 2a of the steel pile 2, the steel pile 2 can be driven efficiently.

【0015】[0015]

【考案の効果】[Effect of the device]

以上説明したように、本考案の鋼杭基礎によれば、鋼杭の軸心からずれた位置 に支持ポールを連結することができるから、複雑に埋設物が入り組んだ市街地の 縁石付近であっても支持ポールが縁石に当たらない位置であれば埋設物を避けて 鋼杭を打設することができ、従来施行不可能であった箇所での標識や街路灯等の 設置が可能となる。 As explained above, according to the steel pile foundation of the present invention, since the support pole can be connected at a position deviated from the axial center of the steel pile, it can be used in the vicinity of the curb in the city where complicated buried objects are complicated. However, if the support pole does not hit the curb, it is possible to drive steel piles while avoiding buried objects, and it is possible to install signs and street lights at locations that were not possible in the past.

【0016】 しかも、本考案は、打込み用アタッチメントが鋼杭の軸線と略一致した位置に 取り付けられ、バイブロハンマーを用いて効率よく打設することができるから、 掘削土量が少なくてすみ、また工事スペースを広く取る必要がない、また型枠組 み立て、生コンの打ち込み、養生などの手間と時間が省略できる等の上記した従 来の打設式鋼杭基礎の利点はすべて満足することができる。Moreover, according to the present invention, since the driving attachment is mounted at a position substantially aligned with the axis of the steel pile and can be efficiently driven by using the vibro hammer, the amount of excavated soil can be small, and It is not necessary to take a large construction space, and it is possible to satisfy all the advantages of the above-mentioned conventional castable steel pile foundations, such as the time and effort required for forming the frame, driving the ready-mixed concrete, and curing. ..

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は本考案の鋼杭基礎を示す図であり、図1
(a) はその定盤部周辺を示す部分斜視図、図1(b) は鋼
杭基礎に用いる打込み用アタッチメントの斜視図、図1
(c) は鋼杭基礎の側面図及び見下図、図1(d) は鋼杭基
礎に支持ポールを連結した状態を示す施行状態の側方図
である。
FIG. 1 is a view showing a steel pile foundation of the present invention.
1 (a) is a partial perspective view showing the periphery of the platen, FIG. 1 (b) is a perspective view of a driving attachment used for a steel pile foundation, FIG.
(c) is a side view and a bottom view of the steel pile foundation, and Fig. 1 (d) is a side view of the steel pile foundation in a working state showing a support pole connected to the steel pile foundation.

【図2】図2は従来の鋼杭基礎を示す図であり、図2
(a) はその定盤部周辺を示す部分斜視図、図2(b) は鋼
杭基礎に用いる打込み用アタッチメントの斜視図、図2
(c) は鋼杭基礎の側面図及び見下図、図2(d) は鋼杭基
礎に支持ポールを連結した状態を示す施行状態の側方図
である。
FIG. 2 is a view showing a conventional steel pile foundation.
(a) is a partial perspective view showing the periphery of the surface plate part, and FIG. 2 (b) is a perspective view of a driving attachment used for a steel pile foundation.
(c) is a side view and bottom view of the steel pile foundation, and FIG. 2 (d) is a side view of the steel pile foundation in a working state showing a support pole connected to the steel pile foundation.

【符合の説明】[Explanation of sign]

1…鋼杭基礎、2…鋼杭、2a…鋼杭の軸線、3…定
盤、3a…穿孔、4…補強板、5…打込み用アタッチメ
ント、5a…回止め用の突起、5b…ボルト孔、6a…
固定ボルト、6b…仮設ボルト、9…支持ポール、16
…埋設管、18…縁石。
1 ... Steel pile foundation, 2 ... Steel pile, 2a ... Steel pile axis line, 3 ... Plate, 3a ... Perforation, 4 ... Reinforcing plate, 5 ... Attachment for attachment, 5a ... Projection for stopping rotation, 5b ... Bolt hole , 6a ...
Fixing bolt, 6b ... Temporary bolt, 9 ... Support pole, 16
… Buried pipes, 18… curbs.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】鋼杭2の頂端部に該鋼杭2の軸線2aから
水平方向にずらして定盤3を補強板4を介して固着し、
前記定盤3の上面側に所要箇所に支持ポール9を連結す
るための固定ボルト6aを立設すると共に、この定盤3
の上面側に打込み用アタッチメント5を締結するための
仮設ボルト6bを前記鋼杭2の略同軸上に立設し、前記
アタッチメント5はその底部に設けられた突起5aを前
記定盤3の穿孔3aに係止した状態で該定盤3に連結可
能としたことを特徴とする鋼杭基礎。
1. A platen 3 is fixed to a top end portion of a steel pile 2 by horizontally shifting it from an axis 2a of the steel pile 2 via a reinforcing plate 4,
Fixing bolts 6a for connecting the support poles 9 are erected on the upper surface side of the surface plate 3 at required positions, and the surface plate 3 is also fixed.
A temporary bolt 6b for fastening the driving attachment 5 is erected substantially coaxially with the steel pile 2, and the attachment 5 has a projection 5a provided at the bottom thereof for drilling 3a of the surface plate 3. A steel pile foundation characterized by being connectable to the surface plate 3 in a state of being locked to.
JP2991791U 1991-04-03 1991-04-03 Steel pile foundation Expired - Lifetime JPH0645475Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2991791U JPH0645475Y2 (en) 1991-04-03 1991-04-03 Steel pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2991791U JPH0645475Y2 (en) 1991-04-03 1991-04-03 Steel pile foundation

Publications (2)

Publication Number Publication Date
JPH0583046U true JPH0583046U (en) 1993-11-09
JPH0645475Y2 JPH0645475Y2 (en) 1994-11-24

Family

ID=12289351

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2991791U Expired - Lifetime JPH0645475Y2 (en) 1991-04-03 1991-04-03 Steel pile foundation

Country Status (1)

Country Link
JP (1) JPH0645475Y2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101137974B1 (en) * 2009-07-20 2012-04-20 한동흔 Method for foundation construction structure of pedestal
KR101482584B1 (en) * 2013-07-08 2015-01-29 (주) 성우미래산업 Post foundation block structure for avoiding undergroung laying object

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101137974B1 (en) * 2009-07-20 2012-04-20 한동흔 Method for foundation construction structure of pedestal
KR101482584B1 (en) * 2013-07-08 2015-01-29 (주) 성우미래산업 Post foundation block structure for avoiding undergroung laying object

Also Published As

Publication number Publication date
JPH0645475Y2 (en) 1994-11-24

Similar Documents

Publication Publication Date Title
JP3095376B2 (en) Construction method of building foundation
JP2010043421A (en) Member for foundation framework of snow fence, foundation of snow fence using the member, and method for constructing the foundation
JP2006207265A (en) Joining method of pile and column and its structure
JPH0645475Y2 (en) Steel pile foundation
JP3486602B2 (en) Pier foundation method and pier foundation structure
JPH0258610A (en) Repair of median strip and fender block used therefor
KR101163293B1 (en) pole base
CN215669558U (en) Front-mounted inclined pile of foundation pit supporting system
JP3166007B2 (en) Underground structure and its construction method
JP3390081B2 (en) How to build an underground parking
JPH10317371A (en) Method for erecting pile-column in building using pile as column, and pile-column support band for use therein
JP7084712B2 (en) Steel foundation members for road guard fences, road guard fences, and their construction methods
KR20120020739A (en) Pillar foundation structure having expanded upper part of street facility and construction method thereof
JP2966765B2 (en) Underground construction members burying method
JPS63280153A (en) Underground inverted lining method
JP3105706B2 (en) Construction method of piled raft foundation using existing foundation
JPH10131217A (en) Underground structure such as shaft and construction method therefor
KR200240016Y1 (en) Structure of reclamation type's for dection soil
JPH0119045Y2 (en)
JPH06257169A (en) Small-scale basement
JP3383610B2 (en) Establishment method of pillars such as fences, pillars and equipment
JPH076363Y2 (en) Fixture for concrete formwork
JPH05302338A (en) Underground construction method
JP2620035B2 (en) Construction method and structure of gas station office building
JPH11193529A (en) Earth retaining method for underground work, and building method for underground structure

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term