JPH0540336U - Anchor frame - Google Patents

Anchor frame

Info

Publication number
JPH0540336U
JPH0540336U JP9844791U JP9844791U JPH0540336U JP H0540336 U JPH0540336 U JP H0540336U JP 9844791 U JP9844791 U JP 9844791U JP 9844791 U JP9844791 U JP 9844791U JP H0540336 U JPH0540336 U JP H0540336U
Authority
JP
Japan
Prior art keywords
anchor
plate
anchor bolt
ground
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9844791U
Other languages
Japanese (ja)
Inventor
友明 鴻上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP9844791U priority Critical patent/JPH0540336U/en
Publication of JPH0540336U publication Critical patent/JPH0540336U/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

(57)【要約】 【目的】 現場溶接を不要とし、また捨コンクリートの
打設時にアンカーフレームの固定用部材を埋設すること
を不要とする。さらに、配筋作業が行い易いようにす
る。 【構成】 アンカープレート2と、その4隅に立設した
アンカーボルト3と、各アンカーボルト3に対して個別
に設けたアンカーボルト支持部材4とでアンカーフレー
ム1を構成する。アンカーボルト支持部材4は、アンカ
ーボルト3の上部を貫通させて支持する横向き支持突片
6を上端に有し、アンカープレート2の隅部に溶接され
る。アンカーボルト支持部材4は、アンカープレート2
よりも下方に突出し、その突出部分4a間に渡って接地
部材12を設けて固定脚11とする。接地部材12は、
長孔14に挿通した止めボルト15で高さ調整自在に固
定する。また、接地部材12には、ホールインアンカ2
0を挿通させる地盤固定孔13を設ける。
(57) [Abstract] [Purpose] No need for on-site welding, and no need to bury anchor members for anchor frames when pouring waste concrete. In addition, make the work of arranging easier. [Arrangement] An anchor frame 1 is composed of an anchor plate 2, anchor bolts 3 standing upright at the four corners thereof, and anchor bolt support members 4 provided individually for each anchor bolt 3. The anchor bolt support member 4 has a lateral support projection piece 6 that penetrates the upper portion of the anchor bolt 3 to support it, and is welded to a corner portion of the anchor plate 2. The anchor bolt support member 4 is the anchor plate 2
Further, the grounding member 12 is provided between the projecting portions 4a so as to form the fixed leg 11. The ground member 12 is
The height is freely adjusted and fixed with a fixing bolt 15 inserted into the long hole 14. In addition, the ground-in member 2 has a hole-in anchor 2
A ground fixing hole 13 through which 0 is inserted is provided.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、建物の柱脚等の固定に使用されるアンカーフレームに関するもの である。 The present invention relates to an anchor frame used for fixing a column base or the like of a building.

【0002】[0002]

【従来の技術】[Prior Art]

従来、アンカーボルトにPC鋼棒を使用し、このアンカーボルトに緊張力を与 えることにより、基礎コンクリートと柱脚部を圧着し一体化する露出型剛接合柱 脚構造が採用されている。 Conventionally, a PC steel rod is used for the anchor bolt, and by applying a tension force to this anchor bolt, an exposed type rigid-joint column base structure is adopted in which the concrete foundation and the column base are crimped and integrated.

【0003】 このような圧着工法におけるアンカーボルトの固定構造として、図3に示すア ンカーフレームが用いられている。このアンカーフレーム41は、基礎コンクリ ート40を挟み込むために下部に設けたアンカープレート42と、位置出し兼用 の天プレート44と、PC鋼棒からなる複数本のアンカーボルト43とでなり、 これら3者42〜44は分解状態で運搬されて現場組立てされる。An anchor frame shown in FIG. 3 is used as a fixing structure for anchor bolts in such a crimping method. The anchor frame 41 is composed of an anchor plate 42 provided at a lower part for sandwiching the basic concrete 40, a ceiling plate 44 also for positioning and a plurality of anchor bolts 43 made of PC steel rods. The persons 42 to 44 are transported in a disassembled state and assembled in the field.

【0004】 現場において、捨コンクリート45には打設時にアングル46を予め埋設して おく。このアングル46に、アンカープレート42の下面に設けられたアングル 47を載せ、アンカーフレーム41の位置出しを行った後、溶接部48で溶接し 固定する。At the site, an angle 46 is previously embedded in the waste concrete 45 at the time of pouring. An angle 47 provided on the lower surface of the anchor plate 42 is placed on the angle 46, the anchor frame 41 is positioned, and then welded at a welded portion 48 to be fixed.

【0005】[0005]

【考案が解決しようとする課題】[Problems to be solved by the device]

この構成のアンカーフレーム41によると、固定に際して前記のように溶接部 48の現場溶接が必要であるため、現場作業性が悪いうえに、熱的影響を与えて はいけないPC鋼棒のアンカーボルト41に熱が加わる可能性があり、強度低下 の危険性が高かった。 また、捨コンクリート45の打設時に、アングル46を埋設しておかなければ ならず、これによっても現場作業性が悪くなり、工期が長くなるという問題点が あった。 According to the anchor frame 41 having this configuration, since the welding portion 48 needs to be welded on site as described above for fixing, the workability at the site is poor and the anchor bolt 41 of the PC steel rod that should not be thermally affected. There is a possibility that heat will be applied to the product, and there was a high risk of strength deterioration. Further, the angle 46 must be buried when the waste concrete 45 is poured, which also causes a problem that the workability on site deteriorates and the construction period becomes long.

【0006】 さらに、上部に天プレート44があり、この天プレート44が複数本のアンカ ーボルト43に渡って結合されているために、配筋時に鉄筋を上方からアンカー ボルト43,43間に入れることができず、配筋作業の施工性が悪いという問題 点があった。Further, since the top plate 44 is provided on the upper portion and the top plate 44 is connected to the plurality of anchor bolts 43, it is necessary to insert the rebar between the anchor bolts 43, 43 from above when arranging. However, there was a problem that the workability of the bar arrangement work was poor.

【0007】 この考案の目的は、現場溶接が不要で、また捨コンクリートの打設時にアング ル材等を埋設することが不要で、作業性の向上、および工期の短縮が図れ、さら に配筋作業が行い易いアンカーフレームを提供することである。The object of the present invention is to eliminate the need for on-site welding and the need to bury an angle material or the like at the time of pouring of waste concrete, which can improve workability and shorten the construction period. An object is to provide an anchor frame that facilitates work.

【0008】[0008]

【課題を解決するための手段】[Means for Solving the Problems]

この考案のアンカーフレームは、複数本のアンカーボルトを立設したアンカー プレートに、前記各アンカーボルトの近傍でアンカーボルト支持部材を立設し、 これらアンカーボルト支持部材の上端に、アンカーボルトの上部を貫通させる横 向き支持突片を設けたものである。アンカープレートの下部には接地板部に地盤 固定孔を有する固定脚を設ける。 According to the anchor frame of the present invention, anchor bolt supporting members are erected in the vicinity of the anchor bolts on an anchor plate on which a plurality of anchor bolts are erected, and the upper portions of the anchor bolts are attached to the upper ends of the anchor bolt supporting members. It is provided with a lateral support projection that penetrates it. Below the anchor plate, a fixed leg with a ground fixing hole is provided in the grounding plate part.

【0009】[0009]

【作用】[Action]

この構成によると、アンカーボルトを現場等で組付けたアンカーフレームを、 固定脚で捨コンクリートに載せ、位置決めの後、固定脚の地盤固定孔でホールイ ンアンカ等により地盤に固定する。このように、現場溶接を必要とせずにアンカ ーフレームの固定が行われる。 アンカーボルト支持部材は、アンカーボルトの上部を支持してアンカーボルト の傾きを防止する。このアンカーボルト支持部材は、各アンカーボルトごとに独 立して設けてあり、複数のアンカーボルトの上端間に渡る部材を必要としない。 そのため、配筋は複数のアンカーボルトの間に上方から自由に出し入れすること ができ、配筋作業が容易に行える。 According to this structure, the anchor frame with the anchor bolts assembled on site is placed on the concrete with the fixed legs, positioned, and then fixed to the ground by the hole anchor etc. at the ground fixing holes of the fixed legs. In this way, anchor frames are fixed without the need for field welding. The anchor bolt support member supports the upper portion of the anchor bolt and prevents the anchor bolt from tilting. This anchor bolt support member is provided independently for each anchor bolt, and does not require a member extending between the upper ends of the plurality of anchor bolts. Therefore, the reinforcing bar can be freely inserted and withdrawn from above between the anchor bolts, and the reinforcing bar work can be performed easily.

【0010】[0010]

【実施例】【Example】

この考案の一実施例を図1および図2に基づいて説明する。このアンカーフレ ーム1は、方形のアンカープレート2と、このアンカープレート2の各隅の各々 に立設した4本のアンカーボルト3および4本のアンカーボルト支持部材4とで 構成され、アンカープレート2の下部に一対の固定脚11が設けられている。 An embodiment of this invention will be described with reference to FIGS. This anchor frame 1 is composed of a square anchor plate 2, four anchor bolts 3 and four anchor bolt support members 4 which are provided upright at each corner of the anchor plate 2, A pair of fixed legs 11 is provided in the lower part of 2.

【0011】 アンカープレート2は、中央にエアー抜き孔5を有する厚板状のものであり、 4隅の近傍にアンカーボルト挿通孔8(図2)が形成してある。 アンカーボルト支持部材4は、アングル材の上端に平形鋼からなる横向き支持 突片6を溶接したものであり、下端近傍でアンカープレート2の端面に内向きに 溶接されている。横向き支持突片6にはアンカーボルト挿通孔7が形成してある 。The anchor plate 2 is a thick plate having an air vent hole 5 in the center, and anchor bolt insertion holes 8 (FIG. 2) are formed near the four corners. The anchor bolt support member 4 is formed by welding a horizontal support projection piece 6 made of flat steel to the upper end of an angle member, and is inwardly welded to the end face of the anchor plate 2 near the lower end. An anchor bolt insertion hole 7 is formed in the lateral support protrusion 6.

【0012】 アンカーボルト3は、PC鋼棒の上下端に雄ねじ部3a,3bを形成したもの であり、表面には基礎コンクリートとの付着性を低下させるためのアンボンドコ ーティングが施してある。各アンカーボルト3は、アンカーボルト支持部材4の 横向き支持突片6およびアンカープレート2のアンカーボルト挿通孔7,8に挿 通され、下部の雄ねじ部3bに螺着した2個のナット9と座金10とでアンカー プレート2を表裏から挟み込むことにより、アンカープレート2に固定されてい る。The anchor bolt 3 has male and female threads 3a and 3b formed on the upper and lower ends of a PC steel rod, and the surface thereof is unbonded to reduce the adhesion to the basic concrete. Each of the anchor bolts 3 is inserted into the lateral support projections 6 of the anchor bolt support member 4 and the anchor bolt insertion holes 7 and 8 of the anchor plate 2, and the two nuts 9 and washers that are screwed into the lower male screw portion 3b. It is fixed to the anchor plate 2 by sandwiching the anchor plate 2 from the front and back sides with 10.

【0013】 固定脚11は、アンカーボルト支持部材4のアンカープレート2よりも下方に 突出した部分4aと、隣合う下方突出部分4a,4a間に設けた接地部材12と で構成される。接地部材12はアングル材からなり、その横向きのフランジ部分 で接地板部12aが構成される。この接地板部12aに、複数の地盤固定孔13 が形成されている。アンカーボルト支持部材4の下方突出部分4aには上下方向 に伸びる長孔14が設けてあり、接地部材12は、前記長孔14に挿通される高 さ調整止めボルト15と、ナット16および座金17とで下方突出部分4aに固 定される。The fixed leg 11 is composed of a portion 4a of the anchor bolt support member 4 which projects downward from the anchor plate 2, and a ground member 12 which is provided between the adjacent downward projecting portions 4a and 4a. The grounding member 12 is made of an angle material, and the lateral flange portion constitutes the grounding plate portion 12a. A plurality of ground fixing holes 13 1 are formed in the ground plate portion 12a. The downward protruding portion 4a of the anchor bolt support member 4 is provided with an elongated hole 14 extending in the vertical direction. The grounding member 12 has a height adjusting stopper bolt 15 inserted into the elongated hole 14, a nut 16 and a washer 17. And are fixed to the downward protruding portion 4a.

【0014】 次に施工方法を説明する。アンカーフレーム1は、アンカーボルト支持部材4 が予め工場で溶接されたアンカープレート2と、アンカーボルト3と、接地部材 12とに分解した状態で現場に運搬され、現場でこれら各部材2,3,12の組 立が行われる。この組立の後、アンカーフレーム1を地盤18(図1)の捨コン クリート19上に固定脚11で載置し、位置出しを行う。Next, a construction method will be described. The anchor frame 1 is transported to the site in a state in which the anchor bolt support member 4 is decomposed into an anchor plate 2 pre-welded in a factory, an anchor bolt 3, and a grounding member 12, and each of these members 2, 3, 2 is transported on site. Twelve organizations are organized. After this assembly, the anchor frame 1 is placed on the waste concrete 19 of the ground 18 (FIG. 1) with the fixed legs 11 and positioned.

【0015】 アンカーフレーム1のレベル調整は、固定脚11の長孔14において、接地部 材12のアンカーボルト支持部材4に対する取付位置を調整することにより行う 。このレベル調整は、アンカーフレーム1の据え付け後に行っても良い。The level of the anchor frame 1 is adjusted by adjusting the mounting position of the ground member 12 with respect to the anchor bolt support member 4 in the elongated hole 14 of the fixed leg 11. This level adjustment may be performed after the anchor frame 1 is installed.

【0016】 前記のように位置出しを行った後、固定脚11の各地盤固定孔13に固着具で あるホールインアンカ20を挿通して固定脚8を捨コンクリート13に据え付け る。ホールインアンカ20は、捨コンクリート9に設けた孔内に挿入されて、上 方からの引っ張り操作により孔内で一部が広がって固定されるものであり、ウェ ジット形式のものや、内面が雌ねじ部に形成されたスリーブ形式のもの等が用い られる。ホールインアンカ20は、孔を開けながら挿入される自穿式のものであ っても良い。After performing the positioning as described above, the hole-in anchor 20 which is a fixing tool is inserted into each board fixing hole 13 of the fixed leg 11 and the fixed leg 8 is installed on the waste concrete 13. The hole-in anchor 20 is inserted into a hole provided in the waste concrete 9 and partially expanded and fixed in the hole by a pulling operation from above. A sleeve type or the like formed on the female screw portion is used. The hole-in anchor 20 may be a self-piercing type one that is inserted while opening a hole.

【0017】 アンカーフレーム1の据え付けの後、基礎コンクリート(図示せず)をアンカ ーボルト支持部材4が埋まる所定高さまで打設し、硬化後に柱脚のベースプレー ト(図示せず)を基礎コンクリートに載せて各アンカーボルト3に締付け固定す る。After the anchor frame 1 is installed, a foundation concrete (not shown) is cast to a predetermined height so that the anchor bolt support member 4 is embedded, and after hardening, a base plate (not shown) of the column base is set on the foundation concrete. Place it and tighten it on each anchor bolt 3.

【0018】 このアンカーフレーム1は、このように現場溶接を行うことなく地盤18に据 え付けることができる。そのため、PC鋼棒からなるアンカーボルト3を溶接熱 で劣化させて引っ張り耐力を低下させる恐れがなく、安定した施工品質が得られ る。また、溶接不要のために現場施工性も向上する。しかも、固定脚11の地盤 固定孔13でホールインアンカ20により地盤18に固定することができ、従来 のように捨コンクリートにアンカーフレーム固定用のアングル材等を予め埋設す る必要がない。そのため、より一層現場作業性が向上する。The anchor frame 1 can be installed on the ground 18 without performing in-situ welding as described above. Therefore, there is no fear that the anchor bolt 3 made of a PC steel rod will be deteriorated by welding heat to lower the tensile strength, and stable construction quality can be obtained. In addition, on-site workability is improved because welding is unnecessary. Moreover, it can be fixed to the ground 18 by the hole-in anchor 20 in the ground fixing hole 13 of the fixed leg 11, and it is not necessary to previously bury the angle member for fixing the anchor frame in the waste concrete unlike the conventional case. Therefore, workability on site is further improved.

【0019】 さらに、アンカーボルト3の上部は、各アンカーボルト3毎にアンカーボルト 支持部材4で支持するようにしたため、複数のアンカーボルト3の上部間に渡る 部材がなく、配筋を複数のアンカーボルト3,3の間に上方から自由に出し入れ できる。そのため配筋作業が容易に行える。 これらのため、作業性の向上効果が大きく、工期の短縮および施工コストの低 減が図れる。Further, since the upper portion of the anchor bolt 3 is supported by the anchor bolt support member 4 for each anchor bolt 3, there is no member extending between the upper portions of the plurality of anchor bolts 3, and the reinforcement is arranged in a plurality of anchors. It can be freely inserted and removed between the bolts 3 and 3 from above. Therefore, the work of arranging can be performed easily. For these reasons, the workability is greatly improved, the construction period can be shortened and the construction cost can be reduced.

【0020】 なお、前記各実施例ではアンカーボルト3にPC鋼棒を使用したが、鉄筋等に 用いられている異形鋼棒を使用しても良い。Although the PC bolts are used for the anchor bolts 3 in each of the above-mentioned embodiments, deformed steel rods used for reinforcing bars and the like may be used.

【0021】[0021]

【考案の効果】[Effect of the device]

この考案のアンカーフレームは、地盤固定孔の設けられた接地板部を有する固 定脚をアンカープレートに設けたため、現場溶接を行うことなく地盤への固定が 行える。そのため、溶接熱でアンカーボルトを劣化させることがなく、また現場 作業性が向上する。しかも、接地板部の地盤固定孔で地盤に固定することができ て、捨コンクリート等に予めアングル材等を埋設する必要がなく、これによって も現場作業性が向上する。 Since the anchor frame of this invention is provided with the fixed leg having the ground plate portion provided with the ground fixing hole on the anchor plate, the anchor frame can be fixed to the ground without performing on-site welding. Therefore, the anchor bolt is not deteriorated by welding heat, and the workability on site is improved. Moreover, since it can be fixed to the ground with the ground fixing hole of the grounding plate portion, it is not necessary to bury an angle member or the like in the waste concrete in advance, which also improves the workability on site.

【0022】 また、アンカーボルトの上部は、各アンカーボルト毎にアンカープレートに立 設したアンカーボルト支持部材で支持するようにしたため、複数のアンカーボル トの上端間に渡る部材がなく、配筋を複数のアンカーボルトの間に上方から自由 に出し入れでき、そのため配筋作業が容易に行える。 これらのため、作業性の向上効果が大きく、工期の短縮および施工コストの低 減が図れる。Further, since the upper portion of the anchor bolt is supported by the anchor bolt support member which is erected on the anchor plate for each anchor bolt, there is no member extending between the upper ends of the plurality of anchor bolts, and the reinforcement bar is arranged. The anchor bolts can be freely inserted and removed from above between the anchor bolts, which facilitates the reinforcement work. For these reasons, the workability is greatly improved, the construction period can be shortened and the construction cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案の一実施例のアンカーフレームを示す
斜視図である。
FIG. 1 is a perspective view showing an anchor frame according to an embodiment of the present invention.

【図2】その分解斜視図である。FIG. 2 is an exploded perspective view thereof.

【図3】従来例の破断正面図である。FIG. 3 is a cutaway front view of a conventional example.

【符号の説明】[Explanation of symbols]

1…アンカーフレーム、2…アンカープレート、3…ア
ンカーボルト、4…アンカーボルト支持部材、6…横向
き支持突片、7,8…アンカーボルト挿通孔、11…固
定脚、12…接地部材、12a…接地板部、13…地盤
固定孔、14…長孔、15…高さ調整止めボルト、20
…ホールインアンカ
DESCRIPTION OF SYMBOLS 1 ... Anchor frame, 2 ... Anchor plate, 3 ... Anchor bolt, 4 ... Anchor bolt support member, 6 ... Lateral support projecting piece, 7, 8 ... Anchor bolt insertion hole, 11 ... Fixed leg, 12 ... Grounding member, 12a ... Ground plate portion, 13 ... Ground fixing hole, 14 ... Long hole, 15 ... Height adjustment stop bolt, 20
… Hole in anchor

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 アンカープレートと、このアンカープレ
ートに立設した複数本のアンカーボルトと、前記アンカ
ープレートに前記各アンカーボルトの近傍で各々立設さ
れて上端に前記アンカーボルトの上部を貫通させる横向
き支持突片を有する複数のアンカーボルト支持部材と、
前記アンカープレートの下部に設けられて接地板部に地
盤固定孔を有する固定脚とを具備したアンカーフレー
ム。
1. An anchor plate, a plurality of anchor bolts that are erected on the anchor plate, and a horizontal direction that is erected on the anchor plate in the vicinity of each of the anchor bolts and has an upper end that penetrates an upper portion of the anchor bolt. A plurality of anchor bolt support members having support protrusions,
An anchor frame, which is provided below the anchor plate, and includes a fixed leg having a ground fixing hole in a ground plate portion.
JP9844791U 1991-11-01 1991-11-01 Anchor frame Pending JPH0540336U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9844791U JPH0540336U (en) 1991-11-01 1991-11-01 Anchor frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9844791U JPH0540336U (en) 1991-11-01 1991-11-01 Anchor frame

Publications (1)

Publication Number Publication Date
JPH0540336U true JPH0540336U (en) 1993-06-01

Family

ID=14219991

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9844791U Pending JPH0540336U (en) 1991-11-01 1991-11-01 Anchor frame

Country Status (1)

Country Link
JP (1) JPH0540336U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012207473A (en) * 2011-03-30 2012-10-25 Nippon Steel & Sumikin Metal Products Co Ltd Frame for anchor box

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5586295A (en) * 1978-12-23 1980-06-28 Toshiba Corp Condenser type microphone
JPS6293945A (en) * 1985-10-21 1987-04-30 Nec Corp Substrate cleaning device
JPS64648B2 (en) * 1981-04-22 1989-01-09 Tokyo Tatsuno Kk
JPH01146026A (en) * 1987-11-30 1989-06-08 Hitachi Metals Ltd Anchor bolt fixing device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5586295A (en) * 1978-12-23 1980-06-28 Toshiba Corp Condenser type microphone
JPS64648B2 (en) * 1981-04-22 1989-01-09 Tokyo Tatsuno Kk
JPS6293945A (en) * 1985-10-21 1987-04-30 Nec Corp Substrate cleaning device
JPH01146026A (en) * 1987-11-30 1989-06-08 Hitachi Metals Ltd Anchor bolt fixing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012207473A (en) * 2011-03-30 2012-10-25 Nippon Steel & Sumikin Metal Products Co Ltd Frame for anchor box

Similar Documents

Publication Publication Date Title
US8141320B2 (en) Construction connector anchor cage system
JPH0713416B2 (en) Anchor frame positioning tool
JPH0540336U (en) Anchor frame
JPH0633043Y2 (en) Support structure for pillar
JP3453895B2 (en) How to install anchor bolts on large steel frames
JP2006328845A (en) Earthquake-resistant reinforcing frame for wooden building and earthquake-resistant reinforcing construction method by earthquake-resistant reinforcing frame
JPH0733690B2 (en) Anchor frame and its fixing jig
JPH0540335U (en) Anchor frame
JP2750338B2 (en) Anchor frame
KR100453952B1 (en) fixing construction of anchor bolt for laying
JP2878800B2 (en) Anchor bolt fixing device
KR100466695B1 (en) Structure and method for joining between roof and wall of set building
JP2694431B2 (en) Construction method of anchor bolt
JPH0115774Y2 (en)
JPH0539616A (en) Reinforcing steel basket for foundation having reinforcing steel anchor frame
KR200262035Y1 (en) fixing construction of anchor bolt for laying
JPH10325178A (en) Connecting hardware for steel pedestal and fixing method of steel pedestal
JPH0447300Y2 (en)
JPH0410282Y2 (en)
JP2537475B2 (en) Strut reinforcement method
JPH0715923Y2 (en) Strut fastening device for wooden buildings
JP2649216B2 (en) Anchor frame
JPH09165753A (en) Anchor bolt set up device of structure
JPH0721627Y2 (en) Anchor bolt fixing device
JP3875910B2 (en) Connection structure of basic reinforcing steel / steel core unit and basic reinforcing steel / steel core unit