JPH05179644A JP34730791A JP34730791A JPH05179644A JP H05179644 A JPH05179644 A JP H05179644A JP 34730791 A JP34730791 A JP 34730791A JP 34730791 A JP34730791 A JP 34730791A JP H05179644 A JPH05179644 A JP H05179644A
Authority
JP
Japan
Prior art keywords
steel
steel pile
pedestal
vertical posture
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP34730791A
Other languages
Japanese (ja)
Other versions
JP2786963B2 (en
Inventor
Mitsuo Yamamoto
光男 山本
Shoji Otaki
昭治 大滝
Yasuhiro Nakamura
安宏 中村
Takashi Otake
隆 大竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NAKAMURA KOGYO KK
Takenaka Komuten Co Ltd
Original Assignee
NAKAMURA KOGYO KK
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NAKAMURA KOGYO KK, Takenaka Komuten Co Ltd filed Critical NAKAMURA KOGYO KK
Priority to JP34730791A priority Critical patent/JP2786963B2/en
Publication of JPH05179644A publication Critical patent/JPH05179644A/en
Application granted granted Critical
Publication of JP2786963B2 publication Critical patent/JP2786963B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Shovels (AREA)

Abstract

PURPOSE:To erect a steel pipe without the need for a special heavy machine while maintaining a vertical posture even if there is an CONSTITUTION:A steel pile setting-up device M is installed at the arm 14 of a back hoe 12. The receiving deck 68 of the steel pile setting up device M can be moved in the right and left direction and around the axial center of an H steel 26 by hydraulic motors 34, 64 to a fixture 10. A guide roller 72 is disposed at the charging door 70 of the receiving deck 68 to maintain the vertical posture of an H type steel 26. The H type steel 26 freely falls into a hole H while the vertical posture is being maintained by the guide roller 72, the H type steel 26 is stopped by a pressing fitting which is installed at a traveling frame 84 when the top end hits an obstruction, and the traveling frame 84 is pressed down together with the pressing fitting by a hydraulic jack 78. It is therefore possible to press in the H type steel 26 while maintaining the vertical posture even when there is an obstruction inside the hole H.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、山止め工事等におい
て、地中に先掘りされた孔内へ鋼杭を建て込むために使
用される鋼杭建込み装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel pile erection device used for constructing a steel pile in a hole dug into the ground in a cliff work or the like.

【0002】[0002]

【従来の技術】建物の基礎や地下室を作るために地盤を
根切りする際、掘削面の土砂の崩壊を防ぐために山止め
工事を行なう必要がある。この山止め工事の内応力材と
してH鋼を建込み工法には、代表的なものとして、H鋼
横矢板工法、ソイル柱列工法がある。H鋼横矢板工法
は、通常、H鋼等の鋼杭を地中に先掘りされた孔内へ建
て込み、その後、掘削しながらこの鋼杭の間に横矢板を
嵌め込み、腹起し及び切張りで補強して、土砂を堰き止
める壁を構築するようになっている。また、ソイル柱列
工法では、オーガーマシンで先掘りされたセメントミル
ク柱列体の中にH鋼を建て込むようになっている。
2. Description of the Related Art When excavating the ground to make a foundation or a basement of a building, it is necessary to carry out a cliff work in order to prevent the collapse of the earth and sand on the excavated surface. Typical examples of the H steel building method as an internal stress material for the mountain retaining work include the H steel horizontal sheet pile method and the soil column method. The H-steel horizontal sheet pile method usually involves constructing a steel pile such as H-steel into a hole that has been dug into the ground, and then, while excavating, inserting a horizontal sheet pile between the steel piles, raising and cutting. It is designed to be reinforced with tension to build a wall that blocks the sediment. Further, in the soil column construction method, H steel is built in the cement milk column body previously excavated by the auger machine.

【0003】ところで、山止め工事を精度良く安全に進
めるには、鋼杭を地中へ鉛直に建て込まなければならな
い。
[0003] By the way, in order to proceed with the cliff work accurately and safely, steel piles must be vertically installed in the ground.

【0004】しかしながら、従来の施工方法では、クレ
ーン等で鋼杭の後端を吊り上げ、鋼杭の自重によって鉛
直を保ち孔内へ建て込んでいたので、鋼杭が揺動し、建
て込んだ鋼杭の姿勢にばらつきが生じていた。また、鋼
杭の先端が孔壁に接した場合や、根固めセメントミルク
等が硬練りの場合、鋼杭の自重では孔内への挿入が容易
でないため、一旦、鋼杭を持ち上げて自由落下させ、そ
の勢いで建て込む方法が取られる。このため、建て込み
に時間を要し、また鋼杭の鉛直姿勢を保持することがさ
らに困難となっていた。
However, in the conventional construction method, the rear end of the steel pile is hoisted by a crane and the steel pile is built vertically into the hole by the weight of the steel pile. There were variations in the posture of the piles. If the tip of the steel pile contacts the wall of the hole, or if cement cement milk is hardened, it is not easy to insert the steel pile into the hole by its own weight. Then, the method of building with that momentum is adopted. Therefore, it takes time to build the steel pile, and it is more difficult to maintain the vertical posture of the steel pile.

【0005】[0005]

【発明が解決しようとする課題】本発明は係る事実を考
慮し、特別な重機を必要とせず、孔内に障害物があって
も、鉛直姿勢を保持しながら鋼杭の建て込みを可能とす
る鋼杭建込み装置を提供することを目的とする。
SUMMARY OF THE INVENTION In consideration of the above facts, the present invention does not require a special heavy machine, and enables a steel pile to be built while maintaining a vertical posture even if there is an obstacle in the hole. It is an object of the present invention to provide a steel pile erection device that does.

【0006】[0006]

【課題を解決するための手段】本発明に係る鋼杭建込み
装置は、地中に先掘りされた孔内へ鋼杭を建て込むため
に使用される鋼杭建込み装置において、バックホウのア
ームへ連結される固定部材と、前記固定部材に対して前
記鋼杭を支持する受け台を鋼杭の軸芯廻りに回動可能に
連結する第1の位置調整手段と、前記固定部材に対して
前記受け台を左右横方向へ傾倒可能に連結する第2の位
置調整手段と、前記受け台に設けられ前記鋼杭の側面と
当接し鋼杭の位置決めをするガイドローラーと、前記受
け台の下方へ配設され受け台に接離可能に支持された移
動フレームと、前記移動フレームを前記受け台から押し
下げあるいは引き戻す押圧手段と、前記移動フレームに
取付けられ前記鋼杭を係止する係止手段と、を有するこ
とを特徴としている。
A steel pile erection device according to the present invention is a steel pile erection device used for erection of a steel pile in a hole previously dug into the ground. A fixing member connected to the fixing member, a first position adjusting means for connecting a pedestal supporting the steel pile to the fixing member so as to be rotatable around an axis of the steel pile, and the fixing member. Second position adjusting means for connecting the cradle so as to be tiltable laterally, a guide roller provided on the cradle for positioning the steel pile by contacting a side surface of the steel pile, and below the cradle. A moving frame that is supported by the pedestal so that it can be moved toward and away from the pedestal, a pressing means that pushes down or pulls back the moving frame from the pedestal, and a locking means that is attached to the moving frame and that locks the steel pile. Is characterized by having .

【0007】[0007]

【作用】上記構成の鋼杭建込み装置では、バッケットが
取り外されたバックホウのアームへ連結される固定部材
と、鋼杭を支持する受け台とが、第1の位置調整手段に
よって連結されている。この第1の位置調整手段は、固
定部材に対して受け台を、鋼杭の軸芯廻りに回動させ
る。これによって、鋼杭の軸心廻りの位置調整が可能と
なる。また、固定部材に対する鋼杭の前後方向の位置調
整は、アームの屈伸によって行なわれる。さらに、受け
台は第2の位置調整手段によって、固定部材に対して左
右横方向へ傾倒可能に連結されている。これによって、
鋼杭の左右横方向の位置調整が可能となる。
In the steel pile erection device having the above structure, the fixing member connected to the arm of the backhoe from which the bucket is removed and the pedestal supporting the steel pile are connected by the first position adjusting means. .. The first position adjusting means rotates the pedestal with respect to the fixing member around the axis of the steel pile. As a result, it is possible to adjust the position around the axis of the steel pile. Further, the position adjustment of the steel pile in the front-rear direction with respect to the fixing member is performed by bending and extending the arm. Further, the pedestal is connected to the fixing member by the second position adjusting means so as to be tiltable in the lateral direction. by this,
It is possible to adjust the horizontal position of the steel pile.

【0008】このように、鉛直に建て込まれた鋼杭は、
クレーンによる吊下状態を解除することによって、受け
台に設けられたガイドローラーに案内されながら、孔内
へ自由落下する。この自由落下時には、鋼杭はガイドロ
ーラーに案内されるので、鉛直姿勢が保持される。
As described above, the steel pile vertically built is
By releasing the suspended state by the crane, it is free to fall into the hole while being guided by the guide roller provided on the pedestal. During this free fall, the steel piles are guided by the guide rollers, so that the vertical posture is maintained.

【0009】ここで、鋼杭の先端が何らかの障害物に当
たって、所定量挿入できなかった場合、移動フレームに
設けられた係止手段で鋼杭を係止する。次に、押圧手段
で移動フレームを下方へ押し下げ、鋼杭を圧入する。こ
こで、押圧手段が押し下げ方向一杯に移動したなら、係
止手段を解除して、押圧手段を引き戻して移動フレーム
を上方に移動させる。次に、再び係止手段で鋼杭を係止
し、押圧手段で移動フレームを押し下げる。この作動を
繰り返すことによって、鋼杭は所定の位置まで圧入され
る。
If the tip of the steel pile hits an obstacle and a predetermined amount cannot be inserted, the steel pile is locked by the locking means provided on the moving frame. Next, the moving frame is pushed down by the pushing means, and the steel pile is press-fitted. Here, when the pressing means has fully moved in the pushing-down direction, the locking means is released and the pressing means is pulled back to move the moving frame upward. Next, the steel pile is again locked by the locking means, and the moving frame is pushed down by the pressing means. By repeating this operation, the steel pile is press-fitted to a predetermined position.

【0010】[0010]

【実施例】図1に示されるように、本実施例に係る鋼杭
建込み装置Mは、固定具10を介してバケットが取り外
されたバックホウ12のアーム14の先端に取付けられ
る。このため、鋼杭建込み装置Mを装着するための特別
な重機を必要としない。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS As shown in FIG. 1, a steel pile erection device M according to this embodiment is attached to the tip of an arm 14 of a backhoe 12 from which a bucket has been removed via a fixture 10. Therefore, a special heavy machine for mounting the steel pile erection device M is not required.

【0011】この固定具10は、図2及び図4に示され
るように、一対の向い合う略三角型の支持板16とこの
支持板16の側部に固定されるベース板18で構成され
ている。この支持板16の上下端部には、互いに向い合
う方向へ突出するボス20を備えた軸孔22が形成され
ている。この軸孔22にはシャフト24が挿通され、バ
ックホウ12のアーム14の先端へ固定具10が回動自
在に取付けられている。これによって、図1に示される
ように、アーム14をH鋼26に対して前後する方向へ
屈伸すれば、H鋼26の矢印A方向の鉛直位置決めが可
能となる。
As shown in FIGS. 2 and 4, the fixture 10 is composed of a pair of opposed substantially triangular support plates 16 and a base plate 18 fixed to a side portion of the support plate 16. There is. The upper and lower ends of the support plate 16 are formed with shaft holes 22 having bosses 20 projecting in mutually facing directions. A shaft 24 is inserted through the shaft hole 22, and the fixture 10 is rotatably attached to the tip of the arm 14 of the backhoe 12. As a result, as shown in FIG. 1, when the arm 14 is bent and stretched in the front-back direction with respect to the H steel 26, the H steel 26 can be vertically positioned in the arrow A direction.

【0012】図2及び図4に示されるように、固定具1
0を構成するベース板18の上端部には、水平方向へ向
う略三角形状のプレート材28が設けられている。また
ベース板18の下端部には、ハウス型のプレート材30
が設けられている。このプレート材30には、円弧状の
歯車32が固定されている。この歯車32は油圧モータ
ー34の回転軸に固定された駆動歯車36と噛み合って
いる。この油圧モーター34は、平面視にて半円形の支
持ブラケット38に固定されている。この支持ブラケッ
ト38は、四角形の取付板40の側面に固定されてい
る。この取付板40の上部には、矩形状の支持板42が
面接されている。この支持板42の上下端部には、水平
方向へ向かう一対のプレート材44が設けられている。
このプレート材44には、軸孔46が穿設されている。
この軸孔46と、プレート材28に穿設された軸孔48
及びプレート材30に穿設された軸孔50とへ、シャフ
ト52が挿通されている。これによって、取付板40は
シャフト52の廻りに回転可能とされている。従って、
油圧モーター34を駆動することによって、駆動歯車3
6の駆動力がプレート材30に固定された円弧状の歯車
32に伝達され、図4に示されるように、取付板40は
シャフト52を中心として固定具10に対して矢印B方
向に揺動可能とされる。すなわち、H鋼26はその軸芯
廻りの位置決めが可能となる。
As shown in FIGS. 2 and 4, the fixture 1
At the upper end of the base plate 18 forming 0, a plate member 28 having a substantially triangular shape facing in the horizontal direction is provided. In addition, at the lower end of the base plate 18, a house-shaped plate member 30
Is provided. An arcuate gear 32 is fixed to the plate member 30. The gear 32 meshes with a drive gear 36 fixed to the rotary shaft of a hydraulic motor 34. The hydraulic motor 34 is fixed to a semicircular support bracket 38 in plan view. The support bracket 38 is fixed to the side surface of a square mounting plate 40. A rectangular support plate 42 is in surface contact with the upper portion of the mounting plate 40. A pair of plate members 44 extending in the horizontal direction are provided at the upper and lower ends of the support plate 42.
A shaft hole 46 is formed in the plate material 44.
The shaft hole 46 and the shaft hole 48 formed in the plate material 28.
The shaft 52 is inserted through the shaft hole 50 formed in the plate member 30. As a result, the mounting plate 40 can rotate around the shaft 52. Therefore,
By driving the hydraulic motor 34, the drive gear 3
The driving force of 6 is transmitted to the arcuate gear 32 fixed to the plate member 30, and as shown in FIG. Made possible. That is, the H steel 26 can be positioned around its axis.

【0013】この取付板40の左側面中央部には、図2
に示されるように、軸部54が設けられている。この軸
部54は、連結ブラケット56の中央部に形成されたボ
ス58にベアリング60を介して連結されている。これ
によって、連結ブラケット56は、軸部54を中心に回
動可能とされている。一方、この連結ブラケット56の
右側外周部には、内歯車62が固定されている。この内
歯車62には、取付板40に取付けられた油圧モーター
64の駆動歯車66が噛み合っている。従って、油圧モ
ーター64を駆動すれば、駆動歯車66を介して内歯車
62が回動し、連結ブラケット56が、軸部54廻りに
回動する。すなわち、H鋼26は、左右方向(矢印C方
向)の鉛直位置決めが可能となる(図4参照)。
At the center of the left side surface of the mounting plate 40, as shown in FIG.
As shown in, a shaft portion 54 is provided. The shaft 54 is connected to a boss 58 formed in the center of the connecting bracket 56 via a bearing 60. As a result, the connecting bracket 56 is rotatable about the shaft portion 54. On the other hand, an internal gear 62 is fixed to the outer peripheral portion on the right side of the connecting bracket 56. A drive gear 66 of a hydraulic motor 64 mounted on the mounting plate 40 meshes with the internal gear 62. Therefore, when the hydraulic motor 64 is driven, the internal gear 62 rotates via the drive gear 66, and the connecting bracket 56 rotates around the shaft portion 54. That is, the H steel 26 can be vertically positioned in the left-right direction (direction of arrow C) (see FIG. 4).

【0014】なお、油圧モーター34、64は、バック
ホウ12に備えられた油圧ポンプで加圧した油を媒体と
して駆動される。このため、速度の制御が簡単で、少な
い部品で任意の箇所と方向に動力を伝えることができ、
比較的コンパクトに装置が構成できる。
The hydraulic motors 34, 64 are driven by using oil pressurized by a hydraulic pump provided in the backhoe 12 as a medium. Therefore, speed control is easy, and power can be transmitted to any location and direction with few parts,
The device can be constructed relatively compactly.

【0015】図4に示されるように、連結ブラケット5
6には、箱体で平面視にて略台形状の受け台68が固定
されている。この受け台68の中央部にはH鋼26を建
て込む矩形状の挿入口70が形成されている。この挿入
口70の内壁には平面視して、その回転軸が互いに直交
する方向へ配置された笠状の4つのガイドローラー72
が軸支されている。このガイドローラー72によって、
挿入口70に建て込まれたH鋼26のウエブ部26Aの
両面を挟持するようになっている。
As shown in FIG. 4, the connecting bracket 5
A receiving stand 68 having a box shape and a substantially trapezoidal shape is fixed to the box 6. A rectangular insertion port 70 for building the H steel 26 is formed in the center of the cradle 68. On the inner wall of the insertion opening 70, four shade-shaped guide rollers 72 are arranged so that their rotation axes are orthogonal to each other when seen in a plan view.
Is pivotally supported. With this guide roller 72,
Both sides of the web portion 26A of the H steel 26 built in the insertion opening 70 are sandwiched.

【0016】また、挿入口70の内壁間に架け渡された
軸材74には、押えローラー76が軸支されており、H
鋼26を建て込んた状態で、そのフランジ部26Bの外
面を押え付けるようになっている。
A pressing roller 76 is rotatably supported on the shaft member 74 spanned between the inner walls of the insertion opening 70.
With the steel 26 built in, the outer surface of the flange portion 26B is pressed.

【0017】受け台68の頂面には、矩形状の貫通孔7
6が、挿入口70の両側に形成されている。この貫通孔
76には、図3に示す一対の油圧ジャッキ78が挿入さ
れている。この油圧ジャッキ78のシリンダー部80
は、貫通孔76の縁部に固定されている。一方、ピスト
ン82の先端は、受け台68の下方に配置された移動フ
レーム84の上部に連結されている。これによって、移
動フレーム84は、油圧ジャッキ78の駆動によって、
受け台68に対して上下移動するようになっている。こ
の移動フレーム84には、ガイドロッド86の先端が固
定されている。このガイドロッド86は、受け台68を
貫通して取付けられたガイド筒88の中へ収容されてい
る。ガイドロッド86の上端部にはストッパー90が設
けられ、移動フレーム84が受け台68から抜け落ちな
いようにしている。
A rectangular through hole 7 is formed on the top surface of the cradle 68.
6 are formed on both sides of the insertion port 70. A pair of hydraulic jacks 78 shown in FIG. 3 are inserted into the through holes 76. Cylinder part 80 of this hydraulic jack 78
Are fixed to the edge of the through hole 76. On the other hand, the tip of the piston 82 is connected to the upper part of the moving frame 84 arranged below the pedestal 68. Thereby, the moving frame 84 is driven by the hydraulic jack 78.
It moves up and down with respect to the cradle 68. The tip of the guide rod 86 is fixed to the moving frame 84. The guide rod 86 is housed in a guide cylinder 88 that is attached to penetrate the pedestal 68. A stopper 90 is provided at the upper end of the guide rod 86 to prevent the moving frame 84 from falling off the pedestal 68.

【0018】また、移動フレーム84には、図2に示す
ように、半円形で円周部に歯形が形成された押え金具9
2がピン94で軸支されている。この押え金具92の下
部には、油圧ジャッキ96のピストン98が連結されて
いる。この油圧ジャッキ96のシリンダー部100は、
ピン102で回動可能に移動フレーム84に軸支されて
いる。これによって、油圧ジャッキ96を駆動し、矢印
D方向に押え金具92を押し出すと、ピン102を支点
として押え金具92が回動して、H鋼26のフランジ部
26Bに押え金具92の歯形が当たり、H鋼26を押え
ローラー76との間で挟持する。なお、この押え金具9
2は、ピン96を中心として回転しその半径の大きさ分
だけH鋼26側へ移動することとなるので、H鋼26の
サイズに関わらず、H鋼26を係止することができる。
Further, as shown in FIG. 2, the movable frame 84 is provided with a retainer fitting 9 having a semicircular shape and a tooth profile formed on the circumference thereof.
2 is pivotally supported by a pin 94. A piston 98 of a hydraulic jack 96 is connected to the lower portion of the pressing fitting 92. The cylinder portion 100 of the hydraulic jack 96 is
It is rotatably supported by a moving frame 84 by a pin 102. As a result, when the hydraulic jack 96 is driven and the pressing fitting 92 is pushed out in the direction of arrow D, the pressing fitting 92 rotates about the pin 102 as a fulcrum, and the tooth profile of the pressing fitting 92 abuts the flange portion 26B of the H steel 26. , H steel 26 is clamped between the pressing roller 76 and the H steel 26. In addition, this press fitting 9
Since 2 rotates around the pin 96 and moves to the H steel 26 side by the size of the radius, the H steel 26 can be locked regardless of the size of the H steel 26.

【0019】次に、本実施例に係る鋼杭建込み装置Mに
よって、地中に先掘りされた孔内HへH鋼26を建て込
む手順を説明する。
Next, the procedure for building the H steel 26 into the hole H previously dug in the ground by the steel pile building device M according to this embodiment will be described.

【0020】先ず、図1に示すように、バックホウ12
のアーム14の先端に取付けられた鋼杭建込み装置Mを
孔内Hの上方に配置する。次に、図示しないクレーン等
でH鋼26の後端部を吊下して、挿入口70へH鋼26
の先端部を挿入し、ガイドローラー72に間に嵌め込
む。次に、油圧ジャッキ96を駆動して押え金具92を
H鋼26のフランジ部26Bへ押し付け、H鋼26を押
えローラー76との間で挟持する。ここで、鋼杭建込み
装置Mに備えられた図示しない水準器でH鋼26が鉛直
に保持されているか検測する。このとき、図1に示され
るH鋼26の位置決めは、A方向の位置決めはバックホ
ウ12のアーム14の駆動によって、また、図4に示す
ように、B方向の位置決めは、油圧モーター34の駆動
によって、さらに、矢印C方向の位置決めは、油圧モー
ター64(図2参照)の駆動によって調整される。
First, as shown in FIG.
The steel pile erection device M attached to the tip of the arm 14 is disposed above the hole H. Next, the rear end of the H steel 26 is hung by a crane or the like (not shown) to the insertion port 70.
Insert the tip of the and insert into the guide roller 72. Next, the hydraulic jack 96 is driven to press the pressing fitting 92 against the flange portion 26B of the H steel 26, and the H steel 26 is clamped between the pressing roller 76. Here, it is measured whether or not the H steel 26 is held vertically by a level, not shown, provided in the steel pile building device M. At this time, the H steel 26 shown in FIG. 1 is positioned by driving the arm 14 of the backhoe 12 in the A direction, and as shown in FIG. 4, by positioning the hydraulic motor 34. Further, the positioning in the direction of arrow C is adjusted by driving the hydraulic motor 64 (see FIG. 2).

【0021】次に、H鋼26が鉛直姿勢が確保されたな
ら、図2に示す油圧ジャッキ96を駆動して押え金具9
2を引き戻し、その後クレーンによる吊下状態を解除し
て、H鋼26を自由落下させる。この落下状態では、ガ
イドローラー72によって、H鋼26の鉛直姿勢が確保
されるので、H鋼26が傾くことがない。
Next, when the H steel 26 is secured in the vertical posture, the hydraulic jack 96 shown in FIG.
2 is pulled back, then the suspended state by the crane is released, and the H steel 26 is allowed to fall freely. In this falling state, the guide roller 72 ensures the vertical posture of the H steel 26, so that the H steel 26 does not tilt.

【0022】次に、何らかの障害物に当たって、所定位
置までH鋼26が孔内Hへ挿入できなかった場合、油圧
ジャッキ96を駆動して、再び押え金具92をH鋼26
のフランジ部26Bへ押し付け、H鋼26を押えローラ
ー76との間で挟持する。ここで、油圧ジャッキ78を
駆動して、押え金具92と共に移動フレーム84を下方
へ押し下げる。この油圧ジャッキ78のピストン86が
ストロークエンドまできたなら、押え金具92を引き戻
して、油圧ジャッキ78で移動フレーム84を上方へ持
ち上げる。次に、再び押え金具92をH鋼26のフラン
ジ部26Bへ押し付け、H鋼26を押えローラー76と
の間で挟持し、移動フレーム84を油圧ジャッキ78で
下方へ押し下げる。この動作を繰り返すことによって、
H鋼26は所定位置まで挿入される。
Next, when the H steel 26 cannot be inserted into the hole H to a predetermined position due to hitting an obstacle, the hydraulic jack 96 is driven and the pressing fitting 92 is again pushed to the H steel 26.
Then, the H steel 26 is clamped between the pressing roller 76 and the flange portion 26B. Here, the hydraulic jack 78 is driven to push down the moving frame 84 together with the pressing fitting 92. When the piston 86 of the hydraulic jack 78 reaches the stroke end, the pressing fitting 92 is pulled back, and the hydraulic jack 78 lifts the moving frame 84 upward. Next, the retainer fitting 92 is again pressed against the flange portion 26B of the H steel 26, the H steel 26 is sandwiched between the retainer roller 76, and the moving frame 84 is pushed downward by the hydraulic jack 78. By repeating this operation,
The H steel 26 is inserted to a predetermined position.

【0023】このように、鉛直姿勢を確保しながら、油
圧ジャッキ78でH鋼26を押し下げることができるの
で、障害物や抵抗があっても容易に建て込みことができ
る。
As described above, since the H steel 26 can be pushed down by the hydraulic jack 78 while maintaining the vertical posture, the H steel 26 can be easily installed even if there is an obstacle or resistance.

【0024】[0024]

【発明の効果】本発明は上記構成としたので、特別な重
機を用いる必要がなく、孔内に障害物があっても、鉛直
姿勢を確保しながら鋼杭の建て込みができる。
EFFECTS OF THE INVENTION Since the present invention has the above structure, it is not necessary to use a special heavy machine, and even if there is an obstacle in the hole, the steel pile can be built while ensuring the vertical posture.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る鋼杭建込み装置がバックホウに装
着された状態を示す側面図である。
FIG. 1 is a side view showing a state where a steel pile building device according to the present invention is mounted on a backhoe.

【図2】本発明に係る鋼杭建込み装置の移動フレームが
持ち上げられた状態を示す一部断面図である。
FIG. 2 is a partial cross-sectional view showing a state where the moving frame of the steel pile building device according to the present invention is lifted.

【図3】本発明に係る鋼杭建込み装置の側面図である。FIG. 3 is a side view of the steel pile building device according to the present invention.

【図4】本発明に係る鋼杭建込み装置を示した平面図で
ある。
FIG. 4 is a plan view showing a steel pile building device according to the present invention.

【符号の説明】[Explanation of symbols]

10 固定具(固定部材) 32 歯車(第1の位置調整手段) 34 油圧モーター(第1の位置調整手段) 36 駆動歯車(第1の位置調整手段) 62 内歯車(第2の位置調整手段) 64 油圧モーター(第2の位置調整手段) 66 駆動歯車(第2の位置調整手段) 72 ガイドローラー 78 油圧ジャッキ(押圧手段) 84 移動フレーム 10 Fixture (Fixing Member) 32 Gear (First Position Adjusting Means) 34 Hydraulic Motor (First Position Adjusting Means) 36 Drive Gear (First Position Adjusting Means) 62 Internal Gear (Second Position Adjusting Means) 64 hydraulic motor (second position adjusting means) 66 drive gear (second position adjusting means) 72 guide roller 78 hydraulic jack (pressing means) 84 moving frame

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中村 安宏 福岡県福岡市中央区舞鶴3丁目2の6 中 村工業株式会社内 (72)発明者 大竹 隆 愛知県名古屋市中区丸の内三丁目7番7号 有限会社大竹技研内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yasuhiro Nakamura 3-6-2 Maizuru, Chuo-ku, Fukuoka City, Fukuoka Prefecture Nakamura Kogyo Co., Ltd. (72) Takashi Otake 3-7 Marunouchi, Naka-ku, Nagoya City, Aichi Prefecture No. 7 Otake Giken Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 地中に先掘りされた孔内へ鋼杭を建て込
むために使用される鋼杭建込み装置において、バックホ
ウのアームへ連結される固定部材と、前記固定部材に対
して前記鋼杭を支持する受け台を鋼杭の軸芯廻りに回動
可能に連結する第1の位置調整手段と、前記固定部材に
対して前記受け台を左右横方向へ傾倒可能に連結する第
2の位置調整手段と、前記受け台に設けられ前記鋼杭の
側面と当接し鋼杭の位置決めをするガイドローラーと、
前記受け台の下方へ配設され受け台に接離可能に支持さ
れた移動フレームと、前記移動フレームを前記受け台か
ら押し下げあるいは引き戻す押圧手段と、前記移動フレ
ームに取付けられ前記鋼杭を係止する係止手段と、を有
することを特徴とする鋼杭建込み装置。
1. A steel pile erection device used for erection of a steel pile in a hole dug in the ground, wherein a fixing member connected to an arm of a backhoe and the fixing member are provided. First position adjusting means for rotatably connecting a cradle supporting the steel pile around the axis of the steel pile, and second for connecting the cradle to the fixing member so as to be tiltable in the lateral direction. Position adjusting means, and a guide roller provided on the pedestal for positioning the steel pile by contacting the side surface of the steel pile,
A movable frame which is disposed below the pedestal and is supported by the pedestal so that the movable frame can be brought into contact with and separated from the pedestal, a pressing unit which pushes down or pulls back the movable frame from the pedestal, and the steel pile attached to the movable frame to lock the steel pile And a locking means for locking the steel pile erection device.
JP34730791A 1991-12-27 1991-12-27 Steel pile building equipment Expired - Lifetime JP2786963B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34730791A JP2786963B2 (en) 1991-12-27 1991-12-27 Steel pile building equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34730791A JP2786963B2 (en) 1991-12-27 1991-12-27 Steel pile building equipment

Publications (2)

Publication Number Publication Date
JPH05179644A true JPH05179644A (en) 1993-07-20
JP2786963B2 JP2786963B2 (en) 1998-08-13

Family

ID=18389333

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34730791A Expired - Lifetime JP2786963B2 (en) 1991-12-27 1991-12-27 Steel pile building equipment

Country Status (1)

Country Link
JP (1) JP2786963B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITMI20091166A1 (en) * 2009-07-01 2011-01-02 Csp Prefabbricati S P A APPARATUS FOR THE VERTICAL POSITIONING OF PILLARS IN "TOP-DOWN" UNDERGROUND BUILDINGS
KR101230946B1 (en) * 2012-08-01 2013-02-07 주식회사 금호메카텍 Pipe guide device for incline casing
KR101382967B1 (en) * 2012-01-12 2014-04-09 엄광수 pipe guide device for incline casing
JP6063538B1 (en) * 2015-09-17 2017-01-18 株式会社ミック Hydraulic press-fitting and drawing device for steel sheet pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITMI20091166A1 (en) * 2009-07-01 2011-01-02 Csp Prefabbricati S P A APPARATUS FOR THE VERTICAL POSITIONING OF PILLARS IN "TOP-DOWN" UNDERGROUND BUILDINGS
KR101382967B1 (en) * 2012-01-12 2014-04-09 엄광수 pipe guide device for incline casing
KR101230946B1 (en) * 2012-08-01 2013-02-07 주식회사 금호메카텍 Pipe guide device for incline casing
JP6063538B1 (en) * 2015-09-17 2017-01-18 株式会社ミック Hydraulic press-fitting and drawing device for steel sheet pile

Also Published As

Publication number Publication date
JP2786963B2 (en) 1998-08-13

Similar Documents

Publication Publication Date Title
KR100962081B1 (en) Vibro hammer
KR102525965B1 (en) File construction apparatus capable of simultaneous achievement of hole-boring work and vibrating
US8534960B2 (en) Piling device
US7591612B2 (en) Piling device
JPH05179644A (en) Steel pipe setting-up device
KR102357072B1 (en) auxiliary boom unit and pile drawing method using thereof
CN211395670U (en) Piling device for building construction
JP2786964B2 (en) Steel pile building equipment
CN210421090U (en) Middle-arranged inclined pile pressing machine
JP3404680B2 (en) Drilling direction correction device for excavating work rod in excavator
JP3295928B2 (en) Mobile formwork for construction of shade concrete blocks
JPH0223669Y2 (en)
JPH08209718A (en) Erection and adjustment device for structural center column
CN220246917U (en) Steel pipe pile driving device
JPH11229740A (en) Subsoil excavation method and device
KR102623214B1 (en) Pile driver capable of vertical construction of piles and vertical construction method of piles using the same
KR102586201B1 (en) File construction apparatus
CN114657987B (en) Construction method for inserting cement soil pile into steel pipe without shock sensation
RU2808206C1 (en) Pile hammer suitable for vertical installation of piles
KR102477996B1 (en) Side grip type vibratory pile driver
JP2592257B2 (en) Rotary press-in type pile driving device
JP3676856B2 (en) Low head pile driving method
JPS5849246Y2 (en) Seat Pile Notch Wrestling
JP2908738B2 (en) Sheet pile press-in / draw-out device