JPH05171619A - Setting of skew bridge cable - Google Patents

Setting of skew bridge cable

Info

Publication number
JPH05171619A
JPH05171619A JP34164591A JP34164591A JPH05171619A JP H05171619 A JPH05171619 A JP H05171619A JP 34164591 A JP34164591 A JP 34164591A JP 34164591 A JP34164591 A JP 34164591A JP H05171619 A JPH05171619 A JP H05171619A
Authority
JP
Japan
Prior art keywords
cable
bridge
crane
tower
erection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP34164591A
Other languages
Japanese (ja)
Inventor
Yasumi Wakabayashi
保美 若林
Norifumi Nishigaki
法文 西垣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Zosen Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP34164591A priority Critical patent/JPH05171619A/en
Publication of JPH05171619A publication Critical patent/JPH05171619A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE:To easily set a cable even for long skew bridges CONSTITUTION:Bridge towers 1 are erected, and a main cable 8 for crane is tensely set between the tops of the towers 1 or between the anchor 7 set on the ground 4 side and the tops of the towers 1. The middle of a cable 5 whose one end is connected to the towers 1 is lifted up to a setting position by a cable crane 21 under guidance of the main cable 8 when the other end of the cable 5 is pulled by a winch 19 on the connecting position to the bridge girder 1.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、斜張橋において橋塔と
橋桁との間に張設される架設ケーブルの架設方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing an erection cable stretched between a bridge tower and a bridge girder in a cable-stayed bridge.

【0002】[0002]

【従来の技術】斜張橋は、図8に示すように、橋塔41
を立設し、先端を移動式の防護工に支持させて橋塔41
から橋桁42を漸次延長させるとともに、一端が橋塔4
1の上部に連結された架設ケーブル43の他端を橋桁4
2の所定位置に連結して張設して構築していた。従来、
この架設ケーブル43を張設する際に、載荷のために補
強した橋桁42上に移動式ジブクレーン44を配置し、
一端部を橋塔41に連結した架設ケーブル43の他端
を、橋桁42に設けたケーブル引込みウインチ45によ
り引き込むとともに、架設ケーブル43の中間部をジブ
クレーン44により持ち上げて架設ケーブル43の弛み
を小さくし、ケーブル引込みウインチ45の引込み駆動
力を低減していた。
2. Description of the Related Art Cable-stayed bridges, as shown in FIG.
And the tip of the bridge is supported by a mobile protection worker.
The bridge girder 42 is gradually extended from the
The other end of the erection cable 43 connected to the upper part of 1 is connected to the bridge girder 4
It was connected to the predetermined position of 2 and stretched to construct it. Conventionally,
When this erection cable 43 is stretched, the mobile jib crane 44 is arranged on the bridge girder 42 reinforced for loading,
The other end of the erection cable 43 whose one end is connected to the bridge tower 41 is pulled in by the cable entry winch 45 provided in the bridge girder 42, and the middle portion of the erection cable 43 is lifted by the jib crane 44 to reduce the slack of the erection cable 43. The pull-in drive force of the cable pull-in winch 45 was reduced.

【0003】[0003]

【発明が解決しようとする課題】しかし上記のジブクレ
ーン44を使用する方法は、斜張橋が長大になると、架
設ケーブル43の張設位置が高くなり、大型のジブクレ
ーン44が必要になる。すると、橋桁42上の作業スペ
ースを更に制約を受けるとともに、作業性も悪くなり、
また橋桁44の補強程度も強大にする必要が生ずる。ま
た、さらに斜張橋の規模(橋桁スパン長)が大きくなっ
た場合にはそれに対応できる大型のジブクレーン44の
設置が困難になるという問題があった。
However, in the method of using the jib crane 44 described above, when the cable-stayed bridge becomes long, the position at which the erection cable 43 is stretched becomes high, and a large jib crane 44 is required. Then, the working space on the bridge girder 42 is further restricted, and the workability is deteriorated.
In addition, it is necessary to strengthen the bridge girder 44 to a large extent. Further, when the scale of the cable-stayed bridge (bridge girder span length) further increases, there is a problem that it is difficult to install a large jib crane 44 that can cope with it.

【0004】本発明は上記問題点を解決して、長大な斜
張橋であっても架設ケーブルを容易に張設できる斜張橋
ケーブルの架設方法を提供することを目的とする。
SUMMARY OF THE INVENTION It is an object of the present invention to solve the above problems and to provide a cable laying method for a cable-stayed bridge which allows the cable to be easily laid even in a long cable-stayed bridge.

【0005】[0005]

【課題を解決するための手段】上記問題点を解決するた
めに本発明の斜張橋ケーブルの架設方法は、橋塔を立設
した後、橋塔の頂部間、および陸地側に設置されたアン
カーと橋塔の頂部との間にクレーン用索体を張設すると
ともに、橋塔から橋桁を延設し、架設ケーブルの一端部
を橋塔に連結した後、他端部を橋桁の所定位置てケーブ
ル引込みウインチにより緊張させて連結する時に、前記
クレーン用索体に案内されて移動自在なケーブルクレー
ンにより、前記架設ケーブルの中間部を吊り上げてタグ
取りするものである。
In order to solve the above-mentioned problems, the cable-stayed bridge cable erection method of the present invention is installed between the tops of the bridge tower and on the land side after the bridge tower is erected. A crane rope is stretched between the anchor and the top of the bridge tower, a bridge girder is extended from the bridge tower, one end of the erection cable is connected to the bridge tower, and the other end is at a predetermined position of the bridge girder. When the cable pull-in winch is used to tighten and connect the cables, the cable crane that is movable by being guided by the crane rope is used to lift the middle portion of the erection cable to remove the tag.

【0006】[0006]

【作用】上記構成によれば、橋塔を利用して、橋塔の頂
部間および橋塔の頂部と陸部のアンカーの間にクレーン
用索体を張設し、このクレーン用索体に移動自在なケー
ブルクレーンを設けて、このケーブルクレーンにより架
設ケーブルの中間部を吊り上げてタグを消去するので、
架設ケーブル緊張時のケーブル引込み力を減少すること
ができるとともに、従来のように橋桁に配置したジブク
レーンを使用するのに比べて、橋桁に負担を与えず、架
設済のケーブルとの干渉も少なく、橋桁の作業空間を占
有することもない。しかも、長大な斜張橋であっても高
い位置に架設ケーブルを吊り上げることができ、極めて
作業性がよい。
[Advantageous Effects] According to the above construction, by utilizing the bridge tower, the crane ropes are stretched between the tops of the bridge towers and between the tops of the bridge towers and the anchors on the land and moved to the crane ropes. A flexible cable crane is provided, and the tag is erased by lifting the middle part of the erection cable with this cable crane.
It is possible to reduce the cable pull-in force when the erection cable is strained, and as compared to using a jib crane arranged on the bridge girder as in the past, it does not burden the bridge girder and there is less interference with the installed cable, It does not occupy the working space of the bridge girder. Moreover, even on a long cable-stayed bridge, the erection cable can be hung up at a high position, and workability is extremely good.

【0007】[0007]

【実施例】以下、本発明に係る斜張橋ケーブルの架設方
法の一実施例を図1〜図7に基づいて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a cable-stayed bridge cable erection method according to the present invention will be described below with reference to FIGS.

【0008】図1〜図4において、1は基礎2上に立設
された橋塔で、橋桁3が陸部4から対岸の橋塔1に向か
って延設され、これら橋桁3は一端部が橋塔1に連結さ
れた複数の架設ケーブル5に支持されている。これら橋
塔1,1頂部の左右両側には、図5に示すように、側部
に突設する塔頂ブラケット6が設けられるとともに、両
岸の陸部4にはアンカー7が設置され、前記塔頂ブラケ
ット6間および塔頂ブラケット6とアンカー7の間には
それぞれクレーン用主索8が張設されている。
In FIGS. 1 to 4, 1 is a bridge tower standing on a foundation 2. A bridge girder 3 extends from a land portion 4 toward a bridge tower 1 on the opposite bank. It is supported by a plurality of erection cables 5 connected to the bridge tower 1. As shown in FIG. 5, on the left and right sides of the tops of these bridge towers 1 and 1, tower top brackets 6 projecting from the side are provided, and anchors 7 are installed on the land portions 4 on both sides. Main crane ropes 8 are stretched between the tower brackets 6 and between the tower brackets 6 and the anchors 7, respectively.

【0009】前記橋塔1には、橋桁3の支持部にケーブ
ル輸送台船11から架設ケーブル5などを橋桁3上に荷
揚げする水切りクレーン12が設置されるとともに、工
事用エレベーター13が設置されている。また、橋塔1
の中央から上部に架設ケーブル5を連結する塔付足場1
4が所定間隔毎に設けられ、橋塔1の頂部には架設ケー
ブル5の一端を引き上げたり、他の部材を吊り上げるた
めの塔頂クレーン15が配設されている。また、橋桁3
上には、リールに巻かれた架設ケーブル5を展開するア
ンリーラーおよびケーブル展開装置16やトラッククレ
ーン17、ケーブル架設用クレーン18、ケーブル引込
みウインチ19等が配置され、橋桁3の先端部は台船等
に足場を介して支持された移動式防護工20が配設され
ている。
In the bridge tower 1, a draining crane 12 for unloading the erection cable 5 and the like from the cable carrier 11 to the bridge girder 3 is installed on the bridge girder 3, and a construction elevator 13 is installed. There is. Also, bridge tower 1
Scaffold with tower 1 connecting the cable 5 from the center to the top
4 are provided at predetermined intervals, and a tower crane 15 is provided at the top of the bridge tower 1 for pulling up one end of the erection cable 5 and hoisting other members. Also, bridge girder 3
An unreeler and a cable unfolding device 16 for unfolding the erection cable 5 wound on a reel, a truck crane 17, a cable erection crane 18, a cable pull-in winch 19 and the like are arranged above the tip of the bridge girder 3 and the like. A mobile guard 20 supported by a scaffold is provided in the.

【0010】前記クレーン用主索8にそれぞれ移動自在
に配置されるケーブルクレーン21は、図6,図7に示
すように、クレーン用主索8に移動自在に案内されるキ
ャリア22と、このキャリア22に昇降索23を介して
昇降自在に支持されたローディングブロック24と、こ
のローディングブロック24に吊り下げられたケーブル
吊上治具25とで構成される。前記キャリア22はクレ
ーン用主索8に案内される複数の走行シーブ26を具備
し、クレーン用主索8に沿って配設された走行駆動索2
7により往復移動される。また、キャリア22の吊下シ
ーブ28とローディングブロック24の支持シーブ29
に巻回された昇降索23はクレーン用主索8に沿って配
設され、この昇降索23と走行駆動索27はアンカー7
の設置部または橋塔1の頂部に設けられるクレーン駆動
装置(図示せず)により駆動されてケーブルクレーン2
1が操作される。前記ケーブル吊上治具25は、ローデ
ィングブロック24に吊り下げられる吊下フレーム31
と、連結材32により所定間隔をあけて互いに平行な連
結された左右一対の半円形板33と、半円形板33の周
縁から一定距離内側で周方向に一定間隔をあけて両半円
形板33間に設けられた複数のケーブル支持ロッド34
またはケーブル支持ローラーとで構成され、前記吊下フ
レーム26の下部が一方の半円形板33外面に接合され
た片持ち式となっている。したがって、昇降索23を伸
ばしてケーブル吊上治具25を橋桁3上に降下させた時
に、架設ケーブル5の中間部を半円形板33間のケーブ
ル支持ロッド34上に容易に掛止することができ、さら
に円弧上に配置されたケーブル支持ロッド34により下
方から支持することで、架設ケーブル5に無理な変形を
強いることなく、しかも架設ケーブル5の移動を妨げる
こともなく安定して架設ケーブル5の中間部を吊下支持
することができる。
As shown in FIGS. 6 and 7, a cable crane 21 movably arranged on each of the main crane ropes 8 has a carrier 22 movably guided to the main crane ropes 8 and this carrier. It is composed of a loading block 24, which is supported by 22 up and down via a hoisting cable 23, and a cable hoisting jig 25 suspended by the loading block 24. The carrier 22 includes a plurality of traveling sheaves 26 guided by the crane main ropes 8 and the traveling drive ropes 2 arranged along the crane main ropes 8.
It is reciprocated by 7. The suspension sheave 28 of the carrier 22 and the support sheave 29 of the loading block 24 are also provided.
The hoisting line 23 wound around the crane is arranged along the main crane rope 8, and the hoisting line 23 and the traveling drive rope 27 are attached to the anchor 7.
The cable crane 2 is driven by a crane driving device (not shown) installed at the installation part of the bridge or at the top of the bridge tower 1.
1 is operated. The cable hoisting jig 25 is a hoisting frame 31 that is hung on the loading block 24.
And a pair of left and right semi-circular plates 33 that are connected in parallel with each other at a predetermined interval by a connecting member 32, and both semi-circular plates 33 that are spaced a predetermined distance inward from the peripheral edge of the semi-circular plate 33 in the circumferential direction. A plurality of cable support rods 34 provided between
Alternatively, it is configured as a cable support roller, and is a cantilever type in which the lower portion of the suspension frame 26 is joined to the outer surface of one semi-circular plate 33. Therefore, when the hoisting cable 23 is extended and the cable hoisting jig 25 is lowered onto the bridge girder 3, the middle portion of the erected cable 5 can be easily hooked on the cable support rod 34 between the semicircular plates 33. Further, by supporting the cable support rods 34 arranged on the circular arc from below, the erection cable 5 can be stably supported without forcibly deforming the erection cable 5 and without hindering the movement of the erection cable 5. The intermediate part of can be suspended and supported.

【0011】次に上記ケーブル架設設備における斜張橋
ケーブルの架設方法を説明する。ケーブル輸送台船11
から水切りクレーン12により荷揚げされてケーブル展
開設備16に装填された架設ケーブル5をウインチによ
りケーブル展開設備16のリールから一端側を橋塔1側
に引出し、塔頂クレーン15によりこの一端部を橋塔1
に沿って上方に吊り上げ所定位置の塔付足場14から橋
塔1に固定する。つぎに、この架設ケーブル5の他端側
をケーブル引込みウインチ19等を用いて引込み緊張さ
せる。この時、ケーブルクレーン21を架設ケーブル5
の中間位置上方に配置し、図23に仮想線で示すよう
に、ローディングブロック24を橋桁3上まで降下させ
て架設ケーブル5の中間部をケーブル吊上治具25に掛
止させ、架設ケーブル5の中間部を架設ケーブル5の緊
張位置まで持ち上げてタグ取りを行う。これにより、架
設ケーブル5の引込み力が小さくても架設ケーブル5を
弛みのない緊張状態にすることができる。橋桁3上の設
備を使用して架設ケーブル5の他端橋桁3に固定した
後、ケーブル吊上治具25を降下させることにより、架
設ケーブル5からケーブル吊上治具25を離脱させ、次
の使用に備える。
Next, a method of laying a cable-stayed bridge cable in the above cable laying equipment will be described. Cable carrier 11
From the reel of the cable expansion equipment 16 one end side is pulled out to the bridge tower 1 side from the reel of the cable expansion equipment 16 by the winch, and the one end is bridged at this one end by the tower crane 15. 1
It is lifted up along and fixed to the bridge tower 1 from the scaffolding 14 with a tower at a predetermined position. Next, the other end of the erected cable 5 is pulled in and tensioned using a cable pull-in winch 19 or the like. At this time, the cable crane 21 is installed on the cable 5
23, the loading block 24 is lowered onto the bridge girder 3 and the middle portion of the erection cable 5 is hooked on the cable lifting jig 25, as shown by the phantom line in FIG. The tag is removed by lifting the middle part of the cable up to the tension position of the erection cable 5. Thereby, even if the pulling force of the erection cable 5 is small, the erection cable 5 can be brought into a tension state without slack. After fixing the other end of the erection cable 5 to the bridge girder 3 by using the equipment on the bridge girder 3, the cable hoisting jig 25 is lowered to separate the cable hoisting jig 25 from the erection cable 5, Prepare for use.

【0012】上記実施例によれば、 (1)大型のクレーンが不要となり、経済的なメリット
が大きい。 (2)橋桁3上の作業スペースが、大型のクレーンが不
要となる分、有効に利用できる。 (3)従来の大型のクレーンを使用するのに比べて、ケ
ーブルクレーン21と架設済の架設ケーブル5との接触
も少なく、ケーブルクレーン21の移動が容易となって
作業性が向上する。 (4)大型のクレーンを使用しないので、橋桁3の補強
が不要になる。 (5)支間(橋塔1間)が長大化しても充分に対処する
ことができる。 (6)このケーブルクレーン21は、架設ケーブル5の
タグ取りのほかに、分離された橋桁工区間の資材や機材
の運搬に共用することができ、極めて有用である。
According to the above-described embodiment, (1) a large crane is not required, which is economically advantageous. (2) The work space on the bridge girder 3 can be effectively used because a large crane is not required. (3) Compared to the case of using a conventional large-sized crane, contact between the cable crane 21 and the installed cable 5 is less, and the cable crane 21 can be easily moved to improve workability. (4) Since a large crane is not used, the bridge girder 3 does not need to be reinforced. (5) Even if the span (between the bridge towers 1) becomes large, it can be sufficiently dealt with. (6) The cable crane 21 is extremely useful because it can be used not only for removing the tags of the erection cable 5 but also for transporting materials and equipment in the separated bridge girder construction section.

【0013】[0013]

【発明の効果】以上に述べたごとく本発明の斜張橋ケー
ブルの架設方法によれば、橋塔を利用して、橋塔の頂部
間および橋塔の頂部と陸部のアンカーの間にクレーン用
索体を張設し、このクレーン用索体を移動自在なケーブ
ルクレーンにより、架設ケーブルの中間部を吊り上げて
タグを消去するので、架設ケーブル緊張時のケーブル引
込み力を減少することができるとともに、従来の橋桁に
配置したジブクレーンを使用するのに比べて、橋桁に負
担を与えず、架設済のケーブルとの干渉も少なく橋桁の
作業空間を占有することがない。しかも、長大な斜張橋
であっても高い位置に架設ケーブルを吊り上げることが
でき、極めて作業性がよい。
As described above, according to the cable-stayed bridge cable erection method of the present invention, the crane is utilized between the tops of the bridge towers and between the tops of the bridge towers and the anchors on the land by utilizing the bridge towers. The cable rope is stretched, and the cable crane that can move the crane rope is used to lift the middle part of the erection cable to erase the tag, so that the cable pulling force when the erection cable is strained can be reduced. , Compared with using a conventional jib crane arranged on a bridge girder, the bridge girder is not burdened, and it does not occupy the working space of the bridge girder with little interference with the installed cables. Moreover, even on a long cable-stayed bridge, the erection cable can be hung up at a high position, and workability is extremely good.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るケーブル架設設備を示す全体側面
図である。
FIG. 1 is an overall side view showing a cable installation facility according to the present invention.

【図2】同ケーブル架設設備を示す部分拡大図である。FIG. 2 is a partially enlarged view showing the cable installation equipment.

【図3】図2の平面図である。FIG. 3 is a plan view of FIG.

【図4】同橋塔を示す正面図である。FIG. 4 is a front view showing the bridge tower.

【図5】同塔頂ブラケットを示す正面図である。FIG. 5 is a front view showing the tower top bracket.

【図6】同ケーブルクレーンを示す正面図である。FIG. 6 is a front view showing the cable crane.

【図7】同ケーブルクレーンを示す側面断面図である。FIG. 7 is a side sectional view showing the cable crane.

【図8】従来のケーブル架設設備を示す全体側面図であ
る。
FIG. 8 is an overall side view showing a conventional cable installation facility.

【符号の説明】[Explanation of symbols]

1 橋塔 3 橋桁 4 陸部 5 架設アンカー 6 塔頂ブラケット 7 アンカー 8 クレーン用主索 15 塔頂クレーン 16 ケーブル展開設備 18 ケーブル架設クレーン 19 ケーブル引込みウインチ 21 ケーブルクレーン 22 キャリア 23 昇降索 24 ローディングブロック 25 ケーブル吊上治具 1 bridge tower 3 bridge girder 4 land section 5 erection anchor 6 tower top bracket 7 anchor 8 main crane rope 15 tower overhead crane 16 cable laying equipment 18 cable erection crane 19 cable entry winch 21 cable crane 22 carrier 23 hoisting rope 24 loading block 25 Cable lifting jig

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成4年2月12日[Submission date] February 12, 1992

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Name of item to be corrected] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【書類名】 明細書[Document name] Statement

【発明の名称】 斜張橋ケーブルの架設方法[Title of Invention] Cable laying method for cable-stayed bridge

【特許請求の範囲】[Claims]

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、斜張橋において橋塔と
橋桁との間に張設されるケーブルの架設方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a cable stretched between a bridge tower and a bridge girder in a cable-stayed bridge.

【0002】[0002]

【従来の技術】斜張橋は、図8に示すように、橋塔41
を立設した後、橋塔41から橋桁42を漸次延長させる
とともに、一端が橋塔41の上部に連結されたケーブル
43の他端を橋桁42の所定位置に連結して張設して構
築していた。従来、このケーブル43を張設する際に、
載荷のために補強した橋桁42上に移動式ジブクレーン
44を配置し、一端部を橋塔41に連結したケーブル4
3の他端を、橋桁42に設けたケーブル引込み設備45
により引き込むとともに、ケーブル43の中間部を移動
式クレーン44により持ち上げてケーブル43の弛みを
小さくし、ケーブル引込み設備45の引込み駆動力を低
減していた。
2. Description of the Related Art Cable-stayed bridges, as shown in FIG.
After erection, the bridge girder 42 is gradually extended from the bridge tower 41, and the other end of the cable 43, one end of which is connected to the upper part of the bridge tower 41, is connected to a predetermined position of the bridge girder 42 and stretched. Was there. Conventionally, when the cable 43 is stretched,
A cable 4 in which a mobile jib crane 44 is arranged on the bridge girder 42 reinforced for loading and one end of which is connected to the bridge tower 41
The other end of 3 is the cable lead-in equipment 45 provided on the bridge girder 42.
In addition, the intermediate portion of the cable 43 is lifted by the mobile crane 44 to reduce the slack of the cable 43, and the pulling drive force of the cable pulling equipment 45 is reduced.

【0003】[0003]

【発明が解決しようとする課題】しかし上記の移動式ク
レーン44を使用する方法は、斜張橋が長大になると、
ケーブル43の張設位置が高くなり、大型の移動式クレ
ーン44が必要になる。すると、橋桁42上の作業スペ
ースを更に制約を受けるとともに、作業性も悪くなり、
また橋桁44の補強程度も強大にする必要が生ずる。ま
た、さらに斜張橋の規模(橋桁スパン長)が大きくなっ
た場合にはそれに対応できる大型の移動式クレーン44
の設置が困難になるという問題があった。
However, in the method using the mobile crane 44 described above, when the cable-stayed bridge becomes large,
The tension position of the cable 43 becomes high, and a large mobile crane 44 is required. Then, the working space on the bridge girder 42 is further restricted, and the workability is deteriorated.
In addition, it is necessary to strengthen the bridge girder 44 to a large extent. In addition, if the scale of the cable-stayed bridge (bridge girder span length) further increases, a large mobile crane 44 that can handle it
There was a problem that it would be difficult to install.

【0004】本発明は上記問題点を解決して、長大な斜
張橋であってもケーブルを容易に張設できる斜張橋ケー
ブルの架設方法を提供することを目的とする。
SUMMARY OF THE INVENTION It is an object of the present invention to solve the above problems and provide a method of laying a cable in a cable-stayed bridge which allows the cable to be easily laid even in a long cable-stayed bridge.

【0005】[0005]

【課題を解決するための手段】上記問題点を解決するた
めに本発明の斜張橋ケーブルの架設方法は、橋塔を立設
した後、橋塔の頂部間、および陸地側に設置されたアン
カーと橋塔の頂部との間にクレーン用索体を張設すると
ともに、橋塔から橋桁を延設し、ケーブルの一端部を橋
塔に連結した後、他端部を橋桁の所定位置てケーブル引
込み設備により緊張させて連結する時に、前記クレーン
用索体に案内されて移動自在なケーブルクレーンによ
り、前記ケーブルの中間部を吊り上げてサグ取りするも
のである。
In order to solve the above-mentioned problems, the cable-stayed bridge cable erection method of the present invention is installed between the tops of the bridge tower and on the land side after the bridge tower is erected. A crane rope is stretched between the anchor and the top of the bridge tower, a bridge girder is extended from the bridge tower, one end of the cable is connected to the bridge tower, and the other end is located at the predetermined position of the bridge tower. When tensioned and connected by a cable pulling facility, a cable crane that is movable by being guided by the crane rope is used to lift and sag the middle portion of the cable.

【0006】[0006]

【作用】上記構成によれば、橋塔を利用して、橋塔の頂
部間および橋塔の頂部と陸部のアンカーの間にクレーン
用索体を張設し、このクレーン用索体に移動自在なケー
ブルクレーンを設けて、このケーブルクレーンによりケ
ーブルの中間部を吊り上げてサグを消去するので、ケー
ブル緊張時のケーブル引込み力を減少することができる
とともに、従来のように橋桁に配置した移動式クレーン
を使用するのに比べて、橋桁に負担を与えず、架設済の
ケーブルとの干渉も少なく、橋桁の作業空間を占有する
こともない。しかも、長大な斜張橋であっても高い位置
にケーブルを吊り上げることができ、極めて作業性がよ
い。
[Advantageous Effects] According to the above construction, by utilizing the bridge tower, the crane ropes are stretched between the tops of the bridge towers and between the tops of the bridge towers and the anchors on the land and moved to the crane ropes. By providing a flexible cable crane and lifting the middle part of the cable by this cable crane to eliminate sags, it is possible to reduce the cable pulling force when the cable is strained, and it is also a mobile type that is arranged on the bridge girder as in the past. Compared to using a crane, the bridge girder is not burdened, there is little interference with installed cables, and the working space of the bridge girder is not occupied. Moreover, even on a long cable-stayed bridge, the cable can be hung up at a high position, and workability is extremely good.

【0007】[0007]

【実施例】以下、本発明に係る斜張橋ケーブルの架設方
法の一実施例を図1〜図7に基づいて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a cable-stayed bridge cable erection method according to the present invention will be described below with reference to FIGS.

【0008】図1〜図3において、1は基礎2上に立設
された橋塔で、橋桁3が陸部4から対岸の橋塔1に向か
って延設され、これら橋桁3は一端部が橋塔1に連結さ
れた複数のケーブル5に支持されている。これら橋塔
1,1頂部の左右両側には、図5に示すように、側部に
突設する塔頂ブラケット6が設けられるとともに、両岸
の陸部4にはアンカー7が設置され、前記塔頂ブラケッ
ト6間および塔頂ブラケット6とアンカー7の間にはそ
れぞれクレーン用主索8が張設されている。
1 to 3, reference numeral 1 is a bridge tower standing on a foundation 2, and a bridge girder 3 is extended from a land portion 4 toward a bridge tower 1 on the opposite bank. It is supported by a plurality of cables 5 connected to the bridge tower 1. As shown in FIG. 5, on the left and right sides of the tops of these bridge towers 1 and 1, tower top brackets 6 projecting from the side are provided, and anchors 7 are installed on the land portions 4 on both sides. Main crane ropes 8 are stretched between the tower brackets 6 and between the tower brackets 6 and the anchors 7, respectively.

【0009】前記橋塔1には、橋桁3の支持部にケーブ
ル輸送台船11からケーブル5などを橋桁3上に荷揚げ
する水切りクレーン12が設置されるとともに、工事用
エレベーター13が設置されている。また、橋塔1の中
央から上部にケーブル5を連結する塔付足場14が所定
間隔毎に設けられ、橋塔1の頂部にはケーブル5の一端
を引き上げたり、他の部材を吊り上げるための塔頂クレ
ーン15が配設されている。また、橋桁3上には、リー
ルに巻かれたケーブル5を展開するアンリーラーおよび
ケーブル展開装置16やトラッククレーン17、ケーブ
ル架設用クレーン18、ケーブル引込みウインチ19等
が配置され、橋桁3の先端部は移動式防護工20が配設
されている。
The bridge tower 1 is provided with a drainer crane 12 for unloading the cables 5 and the like from the cable carrier 11 to the bridge girder 3 on the bridge girder 3, and a construction elevator 13. .. Further, scaffolds 14 with towers for connecting the cables 5 are provided at predetermined intervals from the center to the upper part of the bridge tower 1, and a tower for pulling up one end of the cable 5 or hoisting other members at the top of the bridge tower 1. A top crane 15 is provided. Further, on the bridge girder 3, there are arranged an uncoiler and a cable expanding device 16 for expanding the cable 5 wound on the reel, a truck crane 17, a cable erection crane 18, a cable pull-in winch 19, etc. A mobile guard 20 is provided.

【0010】前記クレーン用主索8にそれぞれ移動自在
に配置されるケーブルクレーン21は、図6,図7に示
すように、クレーン用主索8に移動自在に案内されるキ
ャリア22と、このキャリア22に昇降索23を介して
昇降自在に支持されたローディングブロック24と、こ
のローディングブロック24に吊り下げられたケーブル
吊上治具25とで構成される。前記キャリア22はクレ
ーン用主索8に案内される複数の走行シーブ26を具備
し、クレーン用主索8に沿って配設された走行駆動索2
7により往復移動される。また、キャリア22の吊下シ
ーブ28とローディングブロック24の支持シーブ29
に巻回された昇降索23はクレーン用主索8に沿って配
設され、この昇降索23と走行駆動索27は橋桁3上に
設けられるクレーン駆動装置(図示せず)により駆動さ
れてケーブルクレーン21が操作される。前記ケーブル
吊上治具25は、ローディングブロック24に吊り下げ
られる吊下フレーム31と、連結材32により所定間隔
をあけて互いに平行な連結された左右一対の半円形板3
3と、半円形板33の周縁から一定距離内側で周方向に
一定間隔をあけて両半円形板33間に設けられた複数の
ケーブル支持ロッドまたはケーブル支持ローラー34と
で構成され、前記吊下フレーム26の下部が一方の半円
形板33外面に接合された片持ち式となっている。した
がって、昇降索23を伸ばしてケーブル吊上治具25を
橋桁3上に降下させた時に、ケーブル5の中間部を半円
形板33間のケーブル支持ロッド34上に容易に掛止す
ることができ、さらに円弧上に配置されたケーブル支持
ロッド34により下方から支持することで、ケーブル5
に無理な変形を強いることなく、しかもケーブル5の移
動を妨げることもなく安定してケーブル5の中間部を吊
下支持することができる。
As shown in FIGS. 6 and 7, a cable crane 21 movably arranged on each of the main crane ropes 8 has a carrier 22 movably guided to the main crane ropes 8 and this carrier. The loading block 24 is supported by the lifting block 22 so as to be lifted and lowered, and the cable lifting jig 25 is suspended from the loading block 24. The carrier 22 includes a plurality of traveling sheaves 26 guided by the crane main ropes 8 and the traveling drive ropes 2 arranged along the crane main ropes 8.
It is reciprocated by 7. The suspension sheave 28 of the carrier 22 and the support sheave 29 of the loading block 24 are also provided.
The hoisting line 23 wound around the cable is arranged along the main crane rope 8, and the hoisting line 23 and the traveling drive line 27 are driven by a crane drive device (not shown) provided on the bridge girder 3 to drive the cable. The crane 21 is operated. The cable lifting jig 25 includes a hanging frame 31 that is hung from the loading block 24, and a pair of left and right semi-circular plates 3 that are connected in parallel with each other by a connecting member 32 at a predetermined interval.
3 and a plurality of cable support rods or cable support rollers 34 provided between both semi-circular plates 33 at regular intervals in the circumferential direction on the inner side of the peripheral edge of the semi-circular plate 33. The lower part of the frame 26 is a cantilever type in which the outer surface of one of the semicircular plates 33 is joined. Therefore, when the hoisting cable 23 is extended and the cable lifting jig 25 is lowered onto the bridge girder 3, the middle portion of the cable 5 can be easily hooked on the cable supporting rod 34 between the semicircular plates 33. , The cable 5 is supported by the cable support rod 34 arranged on the arc from below.
It is possible to stably suspend and support the intermediate portion of the cable 5 without forcibly deforming the cable 5 and without hindering the movement of the cable 5.

【0011】次に上記ケーブル架設設備における斜張橋
ケーブルの架設方法を説明する。ケーブル輸送台船11
から水切りクレーン12により荷揚げされてケーブル展
開設備16に装填されたケーブル5をウインチによりケ
ーブル展開設備16のリールから一端側を橋塔1側に引
出し、塔頂クレーン15によりこの一端部を橋塔1に沿
って上方に吊り上げ所定位置の塔付足場14から橋塔1
に固定する。つぎに、このケーブル5の他端側をケーブ
ル引込みウインチ19等を用いて引込み緊張させる。こ
の時、ケーブルクレーン21をケーブル5の中間位置上
方に配置し、図23に仮想線で示すように、ローディン
グブロック24を橋桁3上まで降下させてケーブル5の
中間部をケーブル吊上治具25に掛止させ、ケーブル5
の中間部をケーブル5の緊張位置まで持ち上げてサグ取
りを行う。これにより、ケーブル5の引込み力が小さく
てもケーブル5を弛みのない緊張状態にすることができ
る。橋桁3上の設備を使用してケーブル5の他端橋桁3
に固定した後、ケーブル吊上治具25を降下させること
により、ケーブル5からケーブル吊上治具25を離脱さ
せ、次の使用に備える。
Next, a method of laying a cable-stayed bridge cable in the above cable laying equipment will be described. Cable carrier 11
From the reel of the cable expansion equipment 16 to the bridge tower 1 side, the cable 5 unloaded by the drainer crane 12 and loaded in the cable expansion equipment 16 is pulled out to the bridge tower 1 side by the winch, and the overhead crane 15 connects the one end to the bridge tower 1 Suspended upwards along the scaffold 14 with a tower at a predetermined position from the bridge tower 1
Fixed to. Next, the other end of the cable 5 is pulled in and tensioned by using a cable pull-in winch 19 or the like. At this time, the cable crane 21 is arranged above the intermediate position of the cable 5, and the loading block 24 is lowered to above the bridge girder 3 so that the intermediate portion of the cable 5 is moved to the cable lifting jig 25 as shown by the phantom line in FIG. Cable 5
The intermediate portion of the cable is lifted to the tensioned position of the cable 5 to remove the sag. Thereby, even if the pulling force of the cable 5 is small, the cable 5 can be in a tension state without slack. The other end of the cable 5 using the equipment on the bridge girder 3
Then, the cable hoisting jig 25 is lowered, so that the cable hoisting jig 25 is detached from the cable 5 to prepare for the next use.

【0012】上記実施例によれば、 (1)大型のクレーンが不要となり、経済的なメリット
が大きい。 (2)橋桁3上の作業スペースが、大型のクレーンが不
要となる分、有効に利用できる。 (3)従来の大型のクレーンを使用するのに比べて、ケ
ーブルクレーン21と架設済のケーブル5との接触も少
なく、ケーブルクレーン21の移動が容易となって作業
性が向上する。 (4)大型のクレーンを使用しないので、橋桁3の補強
が不要になる。 (5)支間(橋塔1間)が長大化しても充分に対処する
ことができる。 (6)このケーブルクレーン21は、ケーブル5のサグ
取りのほかに、分離された橋桁工区間の資材や機材の運
搬に共用することがてき、極めて有用である。
According to the above-described embodiment, (1) a large crane is not required, which is economically advantageous. (2) The work space on the bridge girder 3 can be effectively used because a large crane is not required. (3) Compared to the case of using a conventional large-sized crane, the contact between the cable crane 21 and the installed cable 5 is small, and the movement of the cable crane 21 is facilitated to improve the workability. (4) Since a large crane is not used, the bridge girder 3 does not need to be reinforced. (5) Even if the span (between the bridge towers 1) becomes large, it can be sufficiently dealt with. (6) The cable crane 21 is extremely useful because it can be used not only for sagging the cable 5 but also for transporting materials and equipment in the separated bridge girder construction section.

【0013】[0013]

【発明の効果】以上に述べたごとく本発明の斜張橋ケー
ブルの架設方法によれば、橋塔を利用して、橋塔の頂部
間および橋塔の頂部と陸部のアンカーの間にクレーン用
索体を張設し、このクレーン用索体を移動自在なケーブ
ルクレーンにより、ケーブルの中間部を吊り上げてサグ
を消去するので 、ケーブル緊張時のケーブル引込み力
を減少することがてきるとともに、従来の橋桁に配置し
た移動式クレーンを使用するのに比べて、橋桁に負担を
与えず、架設済のケーブルとの干渉も少なく橋桁の作業
空間を占有することがない。しかも、長大な斜張橋であ
っても高い位置にケーブルを吊り上げることができ、極
めて作業性がよい。
As described above, according to the cable-stayed bridge cable erection method of the present invention, the crane is utilized between the tops of the bridge towers and between the tops of the bridge towers and the anchors on the land by utilizing the bridge towers. The cable rope is stretched, and the cable crane that can move the crane rope is used to lift the middle portion of the cable to eliminate the sag, which reduces the cable pulling force when the cable is strained. Compared to using a conventional mobile crane arranged on the bridge girder, the bridge girder is not burdened, and there is little interference with installed cables, so that the working space of the bridge girder is not occupied. Moreover, even on a long cable-stayed bridge, the cable can be hung up at a high position, and workability is extremely good.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るケーブル架設設備を示す全体側面
図である。
FIG. 1 is an overall side view showing a cable installation facility according to the present invention.

【図2】同ケーブル架設設備を示す部分拡大図である。FIG. 2 is a partially enlarged view showing the cable installation equipment.

【図3】図2の平面図である。FIG. 3 is a plan view of FIG.

【図4】同橋塔を示す正面図である。FIG. 4 is a front view showing the bridge tower.

【図5】同塔頂ブラケットを示す正面図である。FIG. 5 is a front view showing the tower top bracket.

【図6】同ケーブルクレーンを示す正面図である。FIG. 6 is a front view showing the cable crane.

【図7】同ケーブルクレーンを示す側面断面図である。FIG. 7 is a side sectional view showing the cable crane.

【図8】従来のケーブル架設設備を示す全体側面図であ
る。
FIG. 8 is an overall side view showing a conventional cable installation facility.

【符号の説明】 1 橋塔 3 橋桁 4 陸部 5 架設アンカー 6 塔頂ブラケット 7 アンカー 8 クレーン用主索 15 塔頂クレーン 16 ケーブル展開設備 18 ケーブル架設クレーン 19 ケーブル引込みウインチ 21 ケーブルクレーン 22 キャリア 23 昇降索 24 ローディングブロック 25 ケーブル吊上治具 ─────────────────────────────────────────────────────
[Explanation of symbols] 1 Bridge tower 3 Bridge girder 4 Land portion 5 Construction anchor 6 Tower top bracket 7 Anchor 8 Main rope for crane 15 Tower crane 16 Cable deployment equipment 18 Cable erection crane 19 Cable entry winch 21 Cable crane 22 Carrier 23 Lifting Cable 24 Loading block 25 Cable lifting jig ───────────────────────────────────────── ─────────────

【手続補正書】[Procedure amendment]

【提出日】平成4年2月12日[Submission date] February 12, 1992

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図1[Name of item to be corrected] Figure 1

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図1】 [Figure 1]

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図2[Name of item to be corrected] Figure 2

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図2】 [Fig. 2]

【手続補正3】[Procedure 3]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図4[Name of item to be corrected] Fig. 4

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図4】 [Figure 4]

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 橋塔を立設した後、橋塔の頂部間、およ
び陸地側に設置されたアンカーと橋塔の頂部との間にク
レーン用索体を張設するとともに、橋塔から橋桁を延設
し、架設ケーブルの一端部を橋塔に連結した後、他端部
を橋桁の所定位置てケーブル引込みウインチにより緊張
させて連結する時に、前記クレーン用索体に案内されて
移動自在なケーブルクレーンにより、前記架設ケーブル
の中間部を吊り上げてタグ取りすることを特徴とする斜
張橋ケーブルの架設方法。
1. After the bridge tower is erected, a crane rope is stretched between the tops of the bridge tower and between the anchors installed on the land side and the top of the bridge tower, and the bridge girder is extended from the bridge tower. After connecting one end of the erection cable to the bridge tower and connecting the other end by tensioning with a cable pull-in winch at a predetermined position of the bridge girder, it is guided by the crane rope and is movable. A cable-stayed bridge cable erection method, characterized in that a cable crane is used to lift the middle portion of the erection cable to remove the tag.
JP34164591A 1991-12-25 1991-12-25 Setting of skew bridge cable Pending JPH05171619A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34164591A JPH05171619A (en) 1991-12-25 1991-12-25 Setting of skew bridge cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34164591A JPH05171619A (en) 1991-12-25 1991-12-25 Setting of skew bridge cable

Publications (1)

Publication Number Publication Date
JPH05171619A true JPH05171619A (en) 1993-07-09

Family

ID=18347698

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34164591A Pending JPH05171619A (en) 1991-12-25 1991-12-25 Setting of skew bridge cable

Country Status (1)

Country Link
JP (1) JPH05171619A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100969005B1 (en) * 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor
WO2012030018A1 (en) * 2010-09-02 2012-03-08 지에스건설 주식회사 Partially/completely earth-anchored and cable-stayed bridge using a main span tension means, and method for constructing same
WO2013179549A1 (en) * 2012-06-01 2013-12-05 株式会社Ihiインフラシステム Method for swapping stay cable, and temporary hanger for replacing stay cable

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5137699A (en) * 1974-09-26 1976-03-30 Sharp Kk
JPS61106808A (en) * 1984-10-29 1986-05-24 神鋼鋼線工業株式会社 Costruction of cable

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5137699A (en) * 1974-09-26 1976-03-30 Sharp Kk
JPS61106808A (en) * 1984-10-29 1986-05-24 神鋼鋼線工業株式会社 Costruction of cable

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100969005B1 (en) * 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor
WO2011055996A3 (en) * 2009-11-06 2011-09-22 동아대학교 산학협력단 Method for constructing a suspension bridge using temporary cables under tensionless stay cable conditions, and temporary cable for same
CN102713071A (en) * 2009-11-06 2012-10-03 东亚大学校产学协力团 Method for constructing a suspension bridge using temporary cables under tensionless stay cable conditions, and temporary cable for same
US8627530B2 (en) 2009-11-06 2014-01-14 Dong-A University Research Foundation For Industry-Academy Cooperation Constructing method of cable-stayed bridge and temporary cable therefor
CN102713071B (en) * 2009-11-06 2014-12-10 东亚大学校产学协力团 Method for constructing a suspension bridge using temporary cables under tensionless stay cable conditions, and temporary cable for same
WO2012030018A1 (en) * 2010-09-02 2012-03-08 지에스건설 주식회사 Partially/completely earth-anchored and cable-stayed bridge using a main span tension means, and method for constructing same
WO2013179549A1 (en) * 2012-06-01 2013-12-05 株式会社Ihiインフラシステム Method for swapping stay cable, and temporary hanger for replacing stay cable
JP2013249678A (en) * 2012-06-01 2013-12-12 Ihi Infrastructure Systems Co Ltd Replacement method of oblique cable and temporary hanger for replacing oblique cable
US9021644B2 (en) 2012-06-01 2015-05-05 Ihi Infrastructure Systems Co., Ltd. Method for replacing sloped cables, and temporary hanger for replacing sloped cables

Similar Documents

Publication Publication Date Title
JP2006348691A (en) System for working on exterior wall part of building
KR101405010B1 (en) Lifting Gantry for Girder Erection Works of Suspension Bridges
JP2008248664A (en) Hoisting method of curtain wall
JP2009060770A (en) Electric wire replacement method
JPH09302919A (en) Transfer platform for columnar body
JPH05171619A (en) Setting of skew bridge cable
CA2515710C (en) Hoist for construction material
JP2001049622A (en) Bridge erecting apparatus and bridge erecting method
JPH10195826A (en) Bridge construction method and device thereof
JP5027015B2 (en) Cable conveyor
JPH05147884A (en) Dismountable jib crane
JP2720339B2 (en) Cable laying method
CN117513764B (en) Sliding method with installation position lower than sliding rail
CN210366709U (en) Suspension device and suspension equipment
JP2009007129A (en) Climbing crane
JPH01263305A (en) Multipoint suspension erection method for cable strand
SU1344725A1 (en) Self-mounting tower crane
JPH10182066A (en) Vertical conveying device
JPH07304582A (en) Carrying-in and carrying-out method for escalator truss and device therefor
JPH09279518A (en) King post used for cable trussed bridge and erection method thereof
JP2858263B2 (en) Vertical drifting device
KR910004264Y1 (en) Lift-apparatus for construction
CN110578302A (en) Construction method for dismantling main cable catwalk in suspension bridge space
JPH07145607A (en) Portable scaffold for maintenance and inspection of bridge
CN112456330A (en) Hoisting method for large-span steel structure gallery crossing river channel