Sheathing method and sheathing pile thereforInfo
- Publication number
- JPH0460022A JPH0460022A JP17208690A JP17208690A JPH0460022A JP H0460022 A JPH0460022 A JP H0460022A JP 17208690 A JP17208690 A JP 17208690A JP 17208690 A JP17208690 A JP 17208690A JP H0460022 A JPH0460022 A JP H0460022A
- Authority
- JP
- Japan
- Prior art keywords
- excavation area
- excavation
- piles
- earth retaining
- sheathing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 12
- 238000009412 basement excavation Methods 0.000 claims abstract description 78
- 239000012779 reinforcing material Substances 0.000 claims description 14
- 239000002689 soil Substances 0.000 claims 1
- 239000000463 material Substances 0.000 abstract description 15
- 230000002093 peripheral effect Effects 0.000 abstract description 5
- 238000010276 construction Methods 0.000 abstract description 3
- 230000002787 reinforcement Effects 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 description 5
- 230000003014 reinforcing effect Effects 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 239000000701 coagulant Substances 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は地盤の所定個所を掘削する際に、掘削域外の地
盤の崩壊を防止する土留方法と、その方法に使用する土
留杭に関するものである。[Detailed Description of the Invention] (Field of Industrial Application) The present invention relates to an earth retaining method for preventing the ground from collapsing outside the excavation area when excavating a predetermined location in the ground, and an earth retaining pile used in the method. be.
(従来の技術)
従来から、例えば、家屋等の建物に隣接した地盤を掘削
する場合、その掘削によって掘削域外の建物側の地盤が
弛緩したり崩壊して建物が傾く虞れがあるので、掘削域
の外周に沿って土留工を施工することが行われている。(Prior art) Conventionally, for example, when excavating the ground adjacent to a building such as a house, there is a risk that the ground on the side of the building outside the excavation area may loosen or collapse, causing the building to tilt. Earth retaining works are being constructed along the perimeter of the area.
このような土留工としては、従来から適宜長さを有する
H型鋼からなる親杭を掘削域の外周に沿って所定間隔毎
に地盤に埋設するまで打ち込み、しかるのち、掘削域内
の地盤を掘削しながら、その掘削によって露出する親杭
間に土留矢板を掛け渡し、土留壁を形成するという土留
方法を採用している。Conventionally, for such earth retaining works, parent piles made of H-beam steel having an appropriate length are driven into the ground at predetermined intervals along the outer periphery of the excavation area, and then the ground within the excavation area is excavated. However, an earth retaining method was adopted in which earth retaining sheet piles were strung between the parent piles exposed by the excavation to form an earth retaining wall.
(発明が解決しようとする課B)
しかしながら、このような土留方法によれば、掘削域内
の地盤の掘削が進行するに従って親杭に対する地盤の支
持力が弱くなり、掘削域外側からの地盤の圧力によって
親杭が掘削域内に傾く虞れが生じ、場合によっては親杭
が倒れて掘削域外の地盤が掘削域内に崩壊し、建物に悪
影響を及ぼすという問題点があった。(Problem B to be solved by the invention) However, according to this earth retaining method, as the excavation of the ground within the excavation area progresses, the supporting force of the ground for the parent pile becomes weaker, and the pressure of the ground from outside the excavation area weakens. This poses a problem in that the parent pile may tilt into the excavation area, and in some cases, the parent pile may fall, causing the ground outside the excavation area to collapse into the excavation area, which may have a negative impact on buildings.
このため、掘削域の外周に沿って形成される上記土留壁
の内周面に腹起こしを付設し、掘削空間を利用して対向
する土留壁の腹起こし間に切梁を架設すること番こより
、親杭の傾動を防止することが行われているが、該切梁
はこの掘削域に建物を築造する時に邪魔になり、作業能
率を低下させるという問題点がある。For this reason, it is necessary to attach a raised wall to the inner peripheral surface of the earth retaining wall that is formed along the outer periphery of the excavation area, and to use the excavation space to erect a strut between the raised walls of the opposing earth retaining wall. Although attempts have been made to prevent the parent pile from tilting, there is a problem in that the strut gets in the way when constructing a building in this excavation area, reducing work efficiency.
又、掘削域の外側地盤に掘削域に沿って所望間隔毎にア
ースアンカーを打設し、このアースアンカーを介して前
記腹起こしを支持することも行われているが、このよう
な方法では敷地外にアースアンカーを打設することにな
って他の地下構造物の支障になるばかりでなく、掘削域
と隣接する家屋との間隔が狭い場所においては実施でき
ないものである。Also, earth anchors are installed in the ground outside the excavation area at desired intervals along the excavation area, and the above-mentioned raising is supported via the earth anchors. This method not only obstructs other underground structures by installing the earth anchor outside, but also cannot be carried out in places where the distance between the excavation area and adjacent houses is narrow.
本発明はこのような問題点に鑑みてなされたもので、切
梁やアースアンカーを採用することなく強固な土留めを
可能にし得る土留方法とその方法の実施に使用する土留
杭の提供を目的とするものである。The present invention has been made in view of these problems, and aims to provide an earth retaining method that enables strong earth retaining without employing struts or earth anchors, and an earth retaining pile used to carry out the method. That is.
(課題を解決するための手段)
上記目的を達成するために、本発明の土留方法は、まず
、掘削域の周縁地盤に該掘削域に沿って所定間隔毎に掘
削域の内外方向に長い長孔を計画掘削深さよりも深く穿
設する。(Means for Solving the Problems) In order to achieve the above object, the earth retaining method of the present invention first includes adding long lengths of material to the peripheral ground of an excavation area at predetermined intervals in the direction from the outside to the outside of the excavation area. Drill the hole deeper than the planned excavation depth.
次いで、これらの長孔内に、下端部に掘削域方向に補強
材を突設してなる土留杭を建込んだのち長孔を埋戻する
。Next, earth retaining piles having reinforcing materials protruding from the lower ends in the direction of the excavation area are erected in these long holes, and then the long holes are backfilled.
しかるのち、掘削域内の地盤を掘削しながらその掘削に
よって露出する土留杭間に土留矢板を掛け渡すことを特
徴とするものである。After that, while excavating the ground within the excavation area, the earth retaining sheet piles are laid between the earth retaining piles exposed by the excavation.
この土留方法に使用する上記土留杭は、垂直な杭材の下
端部に水平方向に突出する補強材を一体に設けてなるも
のである。The earth retaining pile used in this earth retaining method is formed by integrally providing a reinforcing member protruding in the horizontal direction at the lower end of a vertical pile material.
(作 用)
土留工を施工するに際して、まず、掘削域に沿って土留
杭の埋設用長孔を穿設するものであるから、土留杭はそ
の下端に突設した補強材を長孔方向に向けた状態にして
、二〇長孔に案内されながら地盤の所定深さまで正確且
つ容易に埋設させられる。(Function) When constructing an earth retaining structure, first a long hole for burying the earth retaining pile is bored along the excavation area, so the reinforcing material protruding from the lower end of the earth retaining pile is inserted in the direction of the long hole. It can be easily and accurately buried in the ground to a predetermined depth while being guided through a 20-long hole.
こうして土留杭を掘削域に沿って所定間隔毎に埋設した
のち、掘削域内の地盤を掘削すると、該土留杭が掘削の
進行に従って上端側から露出し、その露出した土留杭間
に土留矢板を掛け渡して土留壁を形成していくものであ
るが、土留杭が掘削域内に露出すると、掘削域内外の土
圧の均衡が保たれなくなって土留杭が掘削域内に向かっ
て傾動させられる方向にる押圧を受ける。After burying the earth retaining piles at predetermined intervals along the excavation area in this way, when the ground within the excavation area is excavated, the earth retaining piles are exposed from the upper end side as the excavation progresses, and earth retaining sheet piles are hung between the exposed earth retaining piles. When the earth retaining piles are exposed inside the excavation area, the balance of earth pressure inside and outside the excavation area is no longer maintained, causing the earth retention piles to tilt toward the inside of the excavation area. Under pressure.
しかしながら、土留杭はその下端部に掘削域方向に向か
って補強材を突設しているので、この補強材によって土
圧を強固に受止し、切梁やアースアンカー等を用いなく
ても傾く虞れがないものである。However, the earth retaining pile has a reinforcing material protruding toward the excavation area at its lower end, so this reinforcing material firmly absorbs the earth pressure and prevents it from tilting without using struts or earth anchors. There is no danger.
(実 施 例)
本発明の実施例を図面について説明すると、(1)は地
盤に平面矩形状等のピットを所望深さまで掘削すべき掘
削域であり、(2)は該掘削域の外側地盤である。(Embodiment) To explain the embodiment of the present invention with reference to drawings, (1) is an excavation area in which a rectangular pit or the like is to be excavated to a desired depth, and (2) is an excavation area in which a pit having a planar rectangular shape is to be excavated to a desired depth. It is.
、まず、上記掘削域(1)内を掘削する前に、該掘削域
(1)の縁辺に沿った地盤に第1図に示すように、所定
間隔毎に掘削域(1)の内外方向に長い長孔(3)(3
)・・・(3)を穿設する。, First, before excavating the excavation area (1), as shown in Figure 1, the ground along the edge of the excavation area (1) is drilled in the inner and outer directions of the excavation area (1) at predetermined intervals. Long slot (3) (3
)...Drill (3).
この長孔(3)は、例えば、オーガスクリユーを複数本
、回転自在に並設してなる掘削機(図示せず)を使用し
、その並設方向を掘削域(1)の縁辺に対して直角方向
に向けた状態で外端が掘削域(1)の縁辺に接するよう
に掘削域(1)内に所定深さまで穿設されるものであり
、その深さは、掘削域(1)の計画掘削深さよりも深く
なるように垂直方向に穿設される。This elongated hole (3) is formed, for example, by using an excavator (not shown) in which a plurality of auger screws are rotatably arranged side by side, and the direction of the parallel arrangement is set relative to the edge of the excavation area (1). The excavation area (1) is drilled to a predetermined depth with the outer end touching the edge of the excavation area (1) with the outer end facing at right angles to the excavation area (1). The tunnel will be drilled vertically to a depth greater than the planned excavation depth.
次いで、各長孔(3)に長さが該長孔(3)の深さに略
等しい土留杭(4)を挿入して建て込む。Next, earth retaining piles (4) whose lengths are approximately equal to the depth of the long holes (3) are inserted and built into each long hole (3).
この土留杭(4)は第6図に示すように、太さが長孔(
3)の幅と同等ないしはや\小さいH型鋼からなる垂直
な杭材(4a)と、該杭材(4a)の下端内側フランジ
面に前記長孔(3)の長さに略等しいH型鋼からなる水
平補強材(4b)の端面を一体に固着して該水平補強材
(4b)を前記長孔(3)の長さ方向に向かうように突
設した全体がL字形状に形成されてあり、必要に応して
杭材(4a)の下部内側面と水平補強材(4b)の先端
部上面間に補強斜杆(4c)を連結しである。As shown in Figure 6, this earth retaining pile (4) has a long hole (
A vertical pile material (4a) made of H-shaped steel with a width equal to or slightly smaller than the width of 3), and a vertical pile material (4a) made of H-shaped steel with a width approximately equal to the length of the long hole (3) on the inner flange surface of the lower end of the pile material (4a). The end surfaces of the horizontal reinforcing material (4b) are fixed together, and the horizontal reinforcing material (4b) is protruded in the length direction of the elongated hole (3), so that the whole is formed into an L-shape. If necessary, a reinforcing diagonal rod (4c) is connected between the lower inner surface of the pile material (4a) and the upper surface of the tip of the horizontal reinforcing material (4b).
このように形成している土留杭(4)を第2図に示すよ
うに、その杭材(4a)を長孔(3)の外端側(掘削域
(1)の周縁側)に位置させ、水平補強材(4b)を内
端側に指向させた状態で長孔(3)内に挿入するもので
あり、その際、水平補強材(4b)が長孔(3)の平面
形状と略同形に形成されているので、長孔(3)の内壁
に沿って容易に且つ正確に挿入することができる。As shown in Fig. 2, the retaining pile (4) thus formed is positioned with its pile material (4a) on the outer end side of the long hole (3) (on the periphery side of the excavation area (1)). , the horizontal reinforcing material (4b) is inserted into the elongated hole (3) with the horizontal reinforcing material (4b) oriented toward the inner end. Since they are formed in the same shape, they can be easily and accurately inserted along the inner wall of the elongated hole (3).
長孔(3)内に挿入された土留杭(4)は、その補強斜
杆(4c)が掘削域(1)の計画掘削深さよりも深い孔
上端部内に配設されてあり、挿入後、液孔(3)内に土
砂等を埋め戻して各土留杭(4)を埋設する。The earth retaining pile (4) inserted into the long hole (3) has its reinforcing diagonal rod (4c) located in the upper end of the hole deeper than the planned excavation depth of the excavation area (1), and after insertion, The liquid hole (3) is backfilled with earth and sand, and each earth retaining pile (4) is buried.
なお、長孔(3)の下端部内に必要に応じて前記補強斜
杆(4c)が埋設する高さまでモルタル等の適宜な凝固
剤を注入、固化させておき、土留杭(4)にょる土留力
を一層強固に発揮させるようにしておいてもよい。In addition, if necessary, a suitable coagulant such as mortar is injected into the lower end of the long hole (3) up to the height where the reinforcing diagonal rod (4c) is buried and solidified. It may be arranged so that the force is exerted even more strongly.
この土留杭(4)の埋設作業が全て完了すれば、次に、
掘削域(1)内の地盤を適宜な掘削装置を使用して掘削
、排除する。Once the burying of this earth retaining pile (4) is completed, next
The ground within the excavation area (1) is excavated and removed using an appropriate excavation device.
この時、掘削が進行するに従って、掘削域(1)の周縁
に沿って埋設している土留杭(4)の杭材(4a)の内
側面がその上端側から徐々に露出する。At this time, as the excavation progresses, the inner surface of the pile material (4a) of the retaining pile (4) buried along the periphery of the excavation area (1) is gradually exposed from its upper end side.
杭材(4a)は上述したように、H型鋼から形成されて
いるので、そのウェブとフランジとによって隣接する対
向側面に溝部(5)を有しており、掘削による杭材(4
a)の露出に従って、第3図に示すように、その露出し
た隣接する杭材(4a) (4a)の対向溝部(5)(
5)間に横長長方形状の土留矢板(6)を順次、架設し
てこれらの土留矢板(6)による土留壁を形成していく
。As described above, the pile material (4a) is made of H-shaped steel, so it has a groove (5) on the opposite side surface adjacent to the web and the flange, and the pile material (4a) is formed by excavation.
According to the exposure of a), as shown in FIG.
5) Horizontally long rectangular earth retaining sheet piles (6) are successively erected in between to form an earth retaining wall using these earth retaining sheet piles (6).
上端から適宜高さ部分まで土留矢Fi(6)による土留
壁が形成されると、複数本の杭材(4a)の露出内面間
を腹起こし部材(7)で連結する。When the earth retaining wall is formed by earth retaining arrows Fi (6) from the upper end to a suitable height part, the exposed inner surfaces of the plurality of pile materials (4a) are connected with the raised member (7).
こうして、土留壁を形成しながら、掘削域(1)内の地
盤を所定深さまで掘削、排除して該掘削域(1)内に深
さが補強斜杆(4c)の上端近傍部に達する、建物等の
築造用ビットを形成するものである。In this way, while forming an earth retaining wall, the ground within the excavation area (1) is excavated and removed to a predetermined depth, and the depth within the excavation area (1) reaches the vicinity of the upper end of the reinforcing diagonal rod (4c). This is used to form construction bits for buildings, etc.
なお、第5図に示すように、掘削域(1)の周縁に沿っ
て上記土留杭(4)とH型鋼からなる直状の抗(8)と
を交互に一定間隔毎に埋設し、隣接する土留杭(4)と
直状抗(8)との対向面の溝部(5)(5)間に土留矢
板(6)を架設するようにしてもよく、要するに、上記
り字状の土留杭(4)を使用して土留壁の強度を増大さ
せればよいものである。As shown in Fig. 5, the earth retaining piles (4) and straight shafts (8) made of H-beam steel are alternately buried at regular intervals along the periphery of the excavation area (1). An earth retaining sheet pile (6) may be constructed between the grooves (5) (5) on the opposing surfaces of the earth retaining pile (4) and the straight shaft (8). It is sufficient to use (4) to increase the strength of the retaining wall.
(発明の効果)
以上のように本発明の土留方法によれば、掘削域の周縁
地盤に該掘削域に沿って所定間隔毎に掘削域の内外方向
に長い長孔を計画掘削深さよりも深く穿設し、これらの
長孔内に、下端部に掘削域方向に補強材を突設してなる
土留杭を建込んだのち長孔を埋戻し、しかるのち、掘削
域内の地盤を掘削しながらその掘削によって露出する土
留杭間に土留矢板を掛け渡すことを特徴とするものであ
るから、まず、掘削域に沿って土留杭の埋設用長孔を穿
設するので、土留杭の下端に突設した補強材を長孔方向
に向けた状態にして、二〇長孔に案内させなから土留杭
を地盤の所定深さまで正確且つ容易に埋設することがで
きるものであり、このように土留杭の下端に突設した補
強材を掘削域内側に突出させた状態で埋設するので、掘
削域内の地盤の掘削に従って露出する土留杭間に土留矢
板を掛け渡すことによって土留壁を形成した際に、この
補強材によって掘削域外側からの土圧を強固に受止させ
ることができ、土留杭の傾動をなくすことができるもの
である。(Effects of the Invention) As described above, according to the earth retaining method of the present invention, long holes are drilled in the peripheral ground of the excavation area at predetermined intervals in the direction of the inside and outside of the excavation area, deeper than the planned excavation depth. After drilling and erecting earth retaining piles in these long holes with reinforcing materials protruding toward the excavation area at their lower ends, the long holes are backfilled, and then, while excavating the ground within the excavation area, Since the feature is that the earth retaining sheet piles are laid between the earth retaining piles exposed by the excavation, first, long holes for burying the earth retaining piles are drilled along the excavation area, so that the lower ends of the earth retaining piles are protruded. The earth retaining pile can be accurately and easily buried to a predetermined depth in the ground by keeping the reinforced material facing the long hole and guiding it through the 20 long hole. Since the reinforcing material protruding from the lower end of the is buried so as to protrude inside the excavation area, when the retaining wall is formed by spanning the retaining sheet piles between the retaining piles that are exposed as the ground in the excavation area is excavated, This reinforcing material can firmly absorb the earth pressure from outside the excavation area and eliminate tilting of the earth retaining pile.
さらに、対向する土留壁間に切梁を架設する必要をなく
することができるで経済的であるばかりでなく、作業空
間が広くなって能率よ(作業が行えて工期の短縮を図る
ことができるものである。Furthermore, it is not only economical because it eliminates the need to erect struts between opposing retaining walls, but it also increases efficiency by increasing the work space (allowing work to be carried out and shortening the construction period). It is something.
図面は本発明の実施例を示すもので、第1図は掘削域周
縁番こ長孔を穿設した状態を示す簡略斜視図、第2図ば
長孔に土留杭を挿入した状態の簡略斜視図、第3図は掘
削域内を掘削した状態を示す一部の斜視図、第4図はそ
の簡略縦断側面図、第5図は土留杭と直状杭とを使用し
た場合の掘削域の一部簡略斜視図、第6図は土留杭の斜
視図である。
(1)・・・掘削域、(2)・・・外側地盤、(3)・
・・長孔、(4)・・・土留杭、(4a)・・・杭材、
(4b)・・・補強材、(6)・・・土留矢板。
2ぺ
外へ
シベ
ルヘThe drawings show an embodiment of the present invention, and Fig. 1 is a simplified perspective view showing a state in which a slotted hole has been drilled around the circumference of an excavation area, and Fig. 2 is a simplified perspective view showing a state in which a retaining pile has been inserted into the slotted hole. Figure 3 is a perspective view of a portion of the excavated area, Figure 4 is a simplified longitudinal side view, and Figure 5 is a partial perspective view of the excavated area when earth retaining piles and straight piles are used. FIG. 6 is a perspective view of a retaining pile. (1)... Excavation area, (2)... Outer ground, (3)...
... Long hole, (4) ... Earth retaining pile, (4a) ... Pile material,
(4b)... Reinforcement material, (6)... Earth retaining sheet pile. 2 pe outside to shiver
Claims (2)
毎に掘削域の内外方向に長い長孔を計画掘削深さよりも
深く穿設し、これらの長孔内に、下端部に掘削域方向に
補強材を突設してなる土留杭を建込んだのち長孔を埋戻
し、しかるのち、掘削域内の地盤を掘削しながらその掘
削によって露出する土留杭間に土留矢板を掛け渡すこと
を特徴とする土留方法。(1) Long holes are drilled deeper than the planned excavation depth at predetermined intervals along the excavation area in the ground around the excavation area, and inside these long holes, the lower end After erecting earth retaining piles with reinforcing material protruding in the direction of the excavation area, the long holes are backfilled, and then, while excavating the ground within the excavation area, earth retaining sheet piles are laid between the earth retaining piles exposed by the excavation. A soil retaining method characterized by:
材を一体に設けてなることを特徴とする土留杭。(2) An earth retaining pile characterized in that a horizontally protruding reinforcing material is integrally provided at the lower end of a vertical pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17208690A JPH0768705B2 (en) | 1990-06-28 | 1990-06-28 | Soil retaining method and its retaining pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17208690A JPH0768705B2 (en) | 1990-06-28 | 1990-06-28 | Soil retaining method and its retaining pile |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0460022A true JPH0460022A (en) | 1992-02-26 |
JPH0768705B2 JPH0768705B2 (en) | 1995-07-26 |
Family
ID=15935284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP17208690A Expired - Lifetime JPH0768705B2 (en) | 1990-06-28 | 1990-06-28 | Soil retaining method and its retaining pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0768705B2 (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040050137A (en) * | 2002-12-09 | 2004-06-16 | 주식회사 스마텍엔지니어링 | Panel Assembly A Breast Wall to increase supporting power |
KR100477623B1 (en) * | 2004-12-22 | 2005-03-23 | (주) 파주서원종합건축사사무소 | Suppotrer wall sturcture of underground construction for building |
KR100520480B1 (en) * | 2004-11-23 | 2005-10-11 | (주)삼원기술단 | Breast wall structure of embankment for road |
JP2010265610A (en) * | 2009-05-12 | 2010-11-25 | Ohbayashi Corp | Earth retaining wall structure and construction method for the earth retaining wall structure |
US7862010B2 (en) * | 2007-07-30 | 2011-01-04 | Jorge Antonio Saura Sotillos | High impact resistant barrier/fence |
KR20200029078A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Construction method for earth self-retaining wall using reinforcing member and SCW construction method |
KR20200029077A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Pile for earth self-retaining wall using cast in place concrete pile with double I beam |
KR20200029076A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Construction method for earth self-retaining wall using reinforcing member and Soil retaining plate construction method |
KR20200029080A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Construction method for earth self-retaining wall using reinforcing member and PHC pile |
KR20200029075A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Pile for Earth self-retaining wall using double I beam |
KR20200029079A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Construction method for Eearth self-retaining wall using reinforcing member and CIP construction method |
CN112796187A (en) * | 2021-03-22 | 2021-05-14 | 余志鹏 | Highway subgrade side slope antiskid |
-
1990
- 1990-06-28 JP JP17208690A patent/JPH0768705B2/en not_active Expired - Lifetime
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040050137A (en) * | 2002-12-09 | 2004-06-16 | 주식회사 스마텍엔지니어링 | Panel Assembly A Breast Wall to increase supporting power |
KR100520480B1 (en) * | 2004-11-23 | 2005-10-11 | (주)삼원기술단 | Breast wall structure of embankment for road |
KR100477623B1 (en) * | 2004-12-22 | 2005-03-23 | (주) 파주서원종합건축사사무소 | Suppotrer wall sturcture of underground construction for building |
US7862010B2 (en) * | 2007-07-30 | 2011-01-04 | Jorge Antonio Saura Sotillos | High impact resistant barrier/fence |
JP2010265610A (en) * | 2009-05-12 | 2010-11-25 | Ohbayashi Corp | Earth retaining wall structure and construction method for the earth retaining wall structure |
KR20200029078A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Construction method for earth self-retaining wall using reinforcing member and SCW construction method |
KR20200029077A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Pile for earth self-retaining wall using cast in place concrete pile with double I beam |
KR20200029076A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Construction method for earth self-retaining wall using reinforcing member and Soil retaining plate construction method |
KR20200029080A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Construction method for earth self-retaining wall using reinforcing member and PHC pile |
KR20200029075A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Pile for Earth self-retaining wall using double I beam |
KR20200029079A (en) * | 2018-09-07 | 2020-03-18 | 주식회사 도건이엔텍 | Construction method for Eearth self-retaining wall using reinforcing member and CIP construction method |
CN112796187A (en) * | 2021-03-22 | 2021-05-14 | 余志鹏 | Highway subgrade side slope antiskid |
Also Published As
Publication number | Publication date |
---|---|
JPH0768705B2 (en) | 1995-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102009077B1 (en) | Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type | |
KR101901392B1 (en) | A Micropile and Retaining Wall Method by using Micropile | |
JPH0460022A (en) | Sheathing method and sheathing pile therefor | |
KR20180124795A (en) | An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same | |
JP4485006B2 (en) | Construction method for underground structures | |
GB1603637A (en) | Supporting building structures | |
JP2868651B2 (en) | Earth retaining method above existing underground structure | |
JP2017197910A (en) | Construction method of earth retaining wall structure, and earth retaining wall structure | |
JP2832508B2 (en) | Retaining wall structure and retaining method | |
KR100401330B1 (en) | A method of construction for earth-protection walls of building | |
KR100429283B1 (en) | Construction Method using Precast Concrete for Diaphragm Wall | |
JPH0613770B2 (en) | Method of constructing mountain retaining wall with parent pile | |
JP3076827B2 (en) | Seismic support pile | |
JPS5920822B2 (en) | Seismic reinforcement method for embankments | |
US11613864B2 (en) | Secant concrete shoring using helical piles for depth | |
KR102626431B1 (en) | Thumb pile using guide bracket and bottom part of drilling diameter ground anchor and construction method for retaining temporary facility using the same | |
KR102597314B1 (en) | the improved retaining wall structure reduced its thickness | |
JP7516864B2 (en) | Earth retaining structure and construction method thereof | |
JPS6018769B2 (en) | Construction method of underground structure | |
KR102341509B1 (en) | Thumb pile for diaghragm wall and retaining wall construction method using of the same | |
JPH0343518A (en) | Continuous underground wall having enlarged bottom | |
JPS6128774B2 (en) | ||
JP2675858B2 (en) | Vertical shaft excavation method | |
JPS6272817A (en) | Construction of retaining wall concurrently serving as sheathing | |
JPS5985022A (en) | Underground continuous wall constructing work |