Prior art keywords
segment
shield
plate
impermeable membrane
tail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP59021935A
Other languages
Japanese (ja)
Other versions
JPS60181496A (en
Inventor
Shinkichi Oooka
Sakae Sano
Hisashi Kitajima
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumuragumi KK
Original Assignee
Okumuragumi KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumuragumi KK filed Critical Okumuragumi KK
Priority to JP59021935A priority Critical patent/JPS60181496A/en
Publication of JPS60181496A publication Critical patent/JPS60181496A/en
Publication of JPH0423080B2 publication Critical patent/JPH0423080B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 本発明はシールドトンネル工法によりトンネル
を掘削するに際し、シールドセグメントの外周を
連続して不透水膜で被覆する工法及び該工法を実
施するための装置に関する。より詳しくは、この
工法及び装置において、地下水及び/又は充填材
が掘進機械内部へ侵入するのを防止するともに管
路外周に不透水膜を展延する際の破損を防止する
ための掘進機械後方部の改良に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for continuously covering the outer periphery of a shield segment with an impermeable membrane when excavating a tunnel by the shield tunnel method, and an apparatus for implementing the method. More specifically, in this construction method and equipment, the rear part of the excavating machine is used to prevent groundwater and/or filler from entering the inside of the excavating machine, and to prevent damage when spreading an impermeable membrane around the outer circumference of the pipe. Regarding improvements to the department.

シールドトンネル工法とは崩壊性の高い土質に
おいてトンネル掘削を行うに当つて、トンネル外
形よりわずかに大きい断面を有する「シールド掘
進機」と称する強固な鋼製の殻を地中に掘進させ
て、その内部で土砂の崩壊を防ぎながら安全に掘
削作業やセグメントの組立作業を行つてトンネル
を築造する工法である。
The shield tunnel method is used to excavate tunnels in highly collapsible soil by using a strong steel shell called a "shield tunneling machine" that has a cross section slightly larger than the tunnel's outer diameter to dig underground. This is a method of constructing a tunnel by safely performing excavation work and assembling segments while preventing the collapse of earth and sand inside.

上記工法を実施するには対象とする土質の種類
に対応して解放型シールド、密閉型シールド、閉
塞型シールド等の機種が存在するが、これらはい
ずれも掘進装置の形式に関するもので、シールド
で掘進した後、掘進機の後方部で、セグメント部
材(これはセグメントとして予め製作されてい
る)を組立て建設するトンネル構造体を取巻く地
山を支持するセグメント組立の工事については、
いずれの工法の場合も共通した方法が採用されて
いる。
To implement the above construction method, there are models such as open type shield, closed type shield, and closed type shield depending on the type of soil targeted, but all of these are related to the type of excavation equipment, and the shield is not used. After excavation, the segment members (prefabricated as segments) are assembled and constructed at the rear of the excavator. Regarding the segment assembly work that supports the ground surrounding the tunnel structure,
A common method is used in both construction methods.

このセグメント組立はシールドが掘進する毎
に、その後方部で既設のセグメントに随時結合さ
れてシールドトンネルを形成する工事であるが、
セグメントの組立ては狭いシールド構内で行なわ
れるため真円に組立てることが困難で、又重力や
地圧のため押し潰された状態になり易く、このた
めセグメントとセグメントのジヨイント部に種々
のシール材を使用して組立て接合しても〓間がで
きたり、セグメントのズレ、ジヨイント面の凸凹
のため、又セグメント運搬時や、組立時の若干の
損傷のため等の各種の条件により〓間の発生する
ことが極めて多い。シールド工法は地下水位下に
実施される場合が多いので、上記の原因からトン
ネル内に漏水が発生する。したがつて当然のこと
であるが、この漏水防止のためセグメントとセグ
メントとの間の継目をシール材、コーキング材等
でシールする方法が採用されているが完全なもの
ではなく、充分注意して施工しても、施工後漏水
が発生するのが実情である。
This segment assembly is a work in which each time the shield is excavated, it is connected to the existing segment at the rear to form a shield tunnel.
As the segments are assembled in a narrow shield area, it is difficult to assemble them in a perfect circle, and they tend to get crushed due to gravity and ground pressure. Therefore, various sealing materials are applied to the joints of the segments. Even when used and assembled and joined, gaps may be formed due to various conditions such as misalignment of the segments, unevenness of the joint surface, or slight damage during transportation or assembly of the segments. Very often. Since the shield construction method is often carried out below the groundwater level, water leakage occurs within the tunnel due to the above reasons. Naturally, to prevent this water leakage, methods are used to seal the joints between segments with sealants, caulking materials, etc., but this is not perfect and must be done with great care. The reality is that even after construction, water leakage occurs.

一方シールド工法においては、シールド掘進機
のなかでセグメントを組立てるためセグメント外
径よりもその外径が若干大きめの掘進機を使用し
なければならず、そのためセグメント外周部に余
掘り空間が形成され空〓として地中に残存する。
この空〓は掘進と並行して継続的に充填材を使用
して充填される。この充填材は余掘り空〓を充填
して、掘削後上方の地盤の崩壊や沈下を防止する
と共に地下水がトンネル内へ侵入するのを防止す
るものである。この充填材によつても時間の経過
と共に団結した充填材に亀裂が生じたり、充填材
が充填時に地下水等により希釈を受けたりするこ
とにより空〓を完全に充填するには至らず、或い
は充填時に充填材が掘進機内部へ侵入したりまた
他に漏洩して周辺地下水に環境を損う恐れもあ
る。又充填材の注入量は、地盤の柔軟部に集中し
たり、希釈されたり或いは流亡したりするため空
〓を充填するのに必要な量を注入すれば良いとい
うものではなく、空〓容積の180%〜400%という
莫大な量を使用しなければならないのが現状であ
る。
On the other hand, in the shield construction method, in order to assemble the segments in a shield excavation machine, it is necessary to use an excavation machine whose outer diameter is slightly larger than the outer diameter of the segment. 〓 remains underground as 〓.
This void is continuously filled with filler material in parallel with the excavation. This filling material fills the remaining excavation space and prevents the ground above from collapsing and subsidence after excavation, and also prevents groundwater from entering the tunnel. Even with this filling material, over time, cracks may occur in the consolidated filling material, or the filling material may be diluted by groundwater, etc. during filling, and the void may not be completely filled. There is also the risk that the filler material may enter the inside of the excavator or leak into other areas, causing environmental damage to the surrounding groundwater. Furthermore, the amount of filler to be injected does not mean that it is sufficient to inject only the amount necessary to fill the void, as it may concentrate in the soft parts of the ground, be diluted, or be washed away. Currently, a huge amount of 180% to 400% must be used.

以上のようにシールド工法によりトンネルを築
造した場合上記のように大きな問題点がある。
As mentioned above, when tunnels are constructed using the shield method, there are major problems as described above.

本発明者等はトンネル内外への漏水防止の完全
化及び充填材使用量の適正化を目的として鋭意検
討の結果、本願発明を完成したものであつて、そ
の要旨とするところは、セグメント外周を被覆す
るための筒状の不透水膜を圧縮して格納する格納
装置をシールド掘進機械のスキンプレートの内周
に沿つて設け、スキンプレートの後部のテールプ
レート内でセグメントを組立てながら、シールド
掘進機械を掘進させることによつて、セグメント
外周を前記筒状の不透水膜で連続的に被覆するシ
ールドトンネル工法において、テールプレートの
後方に、該プレートの後端から円環状の間〓を介
して、テールプレートの外径より小なる円環をテ
ールプレート内部に形成した円筒端部又は前記不
透水膜格納装置の内周を延伸した端部に、装着す
るとともに円環内周にはテールシールを設け、前
記不透水膜を前記間〓より引き出して、組み立て
られたセグメント外周を被覆し、該セグメントと
不透水膜との間に注入する充填材のシールド掘進
機械側への侵入を防止するようになしたことを特
徴とするシールドトンネル工法、並びにセグメン
ト外周を被覆するための筒状の不透水膜を圧縮し
て格納する格納装置をシールド掘進機械のスキン
プレートの内周に沿つて設け、スキンプレート後
部のテールプレート内でセグメントを組立てなが
ら、シールド掘進機械を推進させることによつて
組み立てられたセグメント外周を前記筒状の不透
水膜で連続的に被覆するシールドトンネル工法を
実施するための装置において、テールプレートの
後方に、該プレートの後端から円環状の間〓を介
して、テールプレートの外径より小なる円環を、
テールプレート内部に形成した内筒端部又は前記
不透水膜格納装置の内周を延伸した端部に、装着
するとともに、円環内周にテールシールを設けた
ことを特徴とするシールドトンネル工法を実施す
るための装置にある。
The present inventors completed the present invention as a result of intensive studies aimed at perfecting the prevention of water leakage inside and outside the tunnel and optimizing the amount of filler used. A storage device for compressing and storing a cylindrical impermeable membrane for covering is provided along the inner circumference of the skin plate of the shield excavation machine, and while assembling the segments within the tail plate at the rear of the skin plate, the shield excavation machine In the shield tunnel construction method, in which the outer periphery of the segment is continuously covered with the cylindrical impermeable membrane by excavating, the cylindrical impermeable membrane is applied to the rear of the tail plate through an annular space from the rear end of the plate. A ring smaller than the outer diameter of the tail plate is attached to the end of a cylinder formed inside the tail plate or to an end extending from the inner periphery of the impermeable membrane storage device, and a tail seal is provided on the inner periphery of the ring. , the impermeable membrane is pulled out from the gap and covers the outer periphery of the assembled segment to prevent a filler to be injected between the segment and the impermeable membrane from entering the shield excavation machine side. A shield tunnel construction method characterized by In an apparatus for carrying out a shield tunnel construction method in which the outer periphery of the assembled segments is continuously covered with the cylindrical impermeable membrane by propelling a shield excavation machine while assembling the segments in the tail plate of At the rear of the tail plate, a ring smaller than the outer diameter of the tail plate is inserted from the rear end of the plate through an annular space.
A shield tunnel construction method characterized in that the tail plate is attached to an end of an inner cylinder formed inside the tail plate or an end extending from the inner periphery of the impermeable membrane storage device, and a tail seal is provided on the inner periphery of the ring. It is in the equipment for carrying out.

以下本発明工法並びに装置を図示の実施例に基
づいて詳述する。
The construction method and apparatus of the present invention will be explained in detail below based on the illustrated embodiments.

第1図は本願発明の概要を説明する断面要部図
で、第2図はジヤツキにより掘進機械が前進した
状態を示す部分断面図である。
FIG. 1 is a cross-sectional view of essential parts for explaining the outline of the present invention, and FIG. 2 is a partial cross-sectional view showing a state in which the excavation machine is advanced by jacking.

第1図においてシールド掘進機械1は矢印方向
へ掘進により前進するが、その掘進機のスキンプ
レート2の内周には、これに沿つて筒状の不透水
膜5を引出し延伸可能な状態で圧縮し格納するた
めの不透水膜格納装置4がリング状に設けられ、
該装置に不透水膜5(この不透水膜の材質は柔軟
性、展性、延性の点から合成樹脂が良く、経済性
の点から塩ビが好ましく、かつ膜はトンネル内に
地下水等の侵入を防止するため及び膜と組立てら
れたセグメントの間に注入した充填材の地山側へ
の流失を防止するための円形に設けられたセグメ
ント外周を被覆するものであるから円筒状に成形
又は加工したものであることが好ましく、又その
厚みは各種条件によつて適宜決定される)が圧縮
して保管されている。
In FIG. 1, a shield excavation machine 1 moves forward by digging in the direction of the arrow, and a cylindrical impermeable membrane 5 is pulled out along the inner periphery of the skin plate 2 of the excavation machine and compressed in a stretchable state. An impermeable membrane storage device 4 for storing the water is provided in a ring shape,
An impermeable membrane 5 (the material of this impermeable membrane is preferably synthetic resin from the point of view of flexibility, malleability, and ductility, and preferably PVC from the economic point of view, and the membrane prevents the intrusion of groundwater etc. into the tunnel. It is molded or processed into a cylindrical shape because it covers the outer periphery of the circular segment to prevent the filling material injected between the membrane and the assembled segment from flowing away to the ground side. (the thickness is determined appropriately depending on various conditions) is compressed and stored.

なお、膜の圧縮保管の形態は蛇腹状、ロール
状、折りたたみ状など、いずれにしても圧縮した
状態であればよい。
Note that the membrane may be stored in a compressed form such as a bellows shape, a roll shape, or a folded shape, as long as it is in a compressed state.

又膜格納装置4の内側には複数個の推進ジヤツ
キ3がリング状に附設されているが(2個のみ図
示)、これら推進ジヤツキ3の軸はシールドの長
手方向軸線と平行に設けられ、セグメント6が組
立てられ真円状となつたセグメント部を既設のセ
グメント7に押圧する作用及びセグメントを押圧
する反力により掘進機械1を前進させる作用をす
る。このジヤツキの作動はシールド内に設置され
た液圧ポンプ等により駆動される。
Furthermore, a plurality of propulsion jacks 3 are attached in a ring shape inside the membrane storage device 4 (only two are shown), but the axes of these propulsion jacks 3 are provided parallel to the longitudinal axis of the shield, and the segments The excavation machine 1 is moved forward by the action of pressing the assembled segment 6 into a perfect circular shape against the existing segment 7 and the reaction force of pushing the segment. The operation of this jack is driven by a hydraulic pump or the like installed within the shield.

図の状態はジヤツキ3が新しく組立てられた真
円状のライニング部を押圧する状態を示すもので
あるが、ジヤツキロツド3′がライニング部を押
圧するに従い、その反力で掘進機1は前進し、そ
れとともに膜格納装置4も前進するので膜5は引
き出されて延伸し、スキンプレート2の内周に布
設される。第2図は推進ジヤツキ3のロツド3′
がライニングを押圧してシールド全体が前進し、
膜格納装置4より膜5が引出されてスキンプレー
ト2の内周に布設された状態を示す。膜5が布設
されると新しいセグメントが、膜の内側内面に真
円状に組立てられ、次いで推進ジヤツキ3によ
り、既設のセグメント部に押圧結合されて、膜で
被覆した状態の新しいセグメント部が構成され
る。したがつてこの作業を繰返すことにより、セ
グメント部の外周は連続して不透水膜で被覆され
た状態で構成されることになる。新しい膜の補充
の際には膜を連続させるため新しい膜は使用中の
膜の端部に熱による溶着か、接着剤により楔着さ
れるが、単に端部をオーバラツプさせるようにし
ても良い。新しいセグメント部が構成されるとセ
グメントに設けられた充填孔8を介してポンプ等
により充填材が注入されるが、注入量は膜5によ
りその逸出が防止されるので余掘空間を充填する
程度の量で充分で、従来に比しその量が大幅に低
下する。かつ地下水の侵入による充填材の流出又
は希釈がないので充分に充填材としての機能を果
すことができる。
The state shown in the figure shows the state in which the jack 3 presses the newly assembled perfectly circular lining part. As the jack rod 3' presses the lining part, the excavator 1 moves forward due to the reaction force. At the same time, the membrane storage device 4 also moves forward, so that the membrane 5 is pulled out, stretched, and laid on the inner periphery of the skin plate 2. Figure 2 shows the rod 3' of the propulsion jack 3.
presses the lining and the entire shield moves forward,
A state in which the membrane 5 is pulled out from the membrane storage device 4 and laid around the inner periphery of the skin plate 2 is shown. Once the membrane 5 is installed, a new segment is assembled in a perfect circle on the inner surface of the membrane, and then press-bonded to the existing segment by the propelling jack 3 to form a new segment covered with the membrane. be done. Therefore, by repeating this operation, the outer periphery of the segment portion will be continuously covered with the water-impermeable membrane. When replenishing a new membrane, the new membrane is welded by heat or wedged with an adhesive to the edge of the membrane in use in order to make the membrane continuous, but it is also possible to simply overlap the edges. When a new segment is constructed, filler is injected by a pump or the like through the fill hole 8 provided in the segment, but the amount of filler is prevented from escaping by the membrane 5, so that it fills the excess excavation space. A small amount is sufficient, and the amount is significantly reduced compared to the conventional method. Moreover, since the filling material does not flow out or dilute due to the intrusion of groundwater, it can sufficiently function as a filling material.

しかしながら、この状態ではセグメント7と膜
5の間に注入された充填材の掘進機方向への侵入
防止手段が設けられていないので、掘進機内部へ
侵入するおれがあるが、この防止手段が特に本願
発明の特徴とする部分である。この防止手段を本
願発明装置の1実施例及び他の実施例で、これら
の部分断面図である第3図及び第4図に基いて説
明する。
However, in this state, there is no means to prevent the filler injected between the segments 7 and the membrane 5 from entering the machine, so there is a possibility that the filler may enter the machine. This is a characteristic feature of the present invention. This preventing means will be explained in one embodiment and another embodiment of the device of the present invention based on FIGS. 3 and 4, which are partial sectional views thereof.

1実施例である第3図において、スキンプレー
ト2の後方部分のテールプレート10の後方に
は、該プレートの後端から円環状の間〓12を介
して、テールプレート10の外径より小なる径の
円環13が、テールプレート10の内部に形成さ
れた円筒14の端部に装着され、その円環13の
内周にはセグメント7に密接するように弾性部材
よりなるテールシール11が設けられている。一
方スキンプレート2の内周に沿つて不透水膜5を
圧縮して格納する不透水膜格納装置4が設けられ
て、前述したように掘進機の前進にともなつて、
即ち推進ジヤツキ3のジヤツキロツド3′が既設
セグメントの末端を押し、掘進機が前進するにと
もなつて、膜格納装置4より膜5はノズル9を経
て、テールプレート10と内筒14の間をとお
り、間〓12より地山側に引き出されて円環13
の外周を覆つて滑り、既設のセグメント7の外周
面に密接することなく、余裕をもつて接し、その
外周面を連続して被覆するようになつている。こ
の場合円環13の外径はテールプレート10の外
径より小さく、膜5が地山側に接してこすれ破損
することのないように配慮されている。又円環1
3はテールシール11を設けるためのものである
から、その前後方向の幅は必然的に短かく形成さ
れている。したがつて円環13の径を小さく形成
したことと相俟つて、引き出された膜5が地山側
に直接触れることがないので、破れるようなこと
はない。さらに円環13の内周にはセグメント7
の外周に摺接するように弾性部材例えばゴム材か
らなるテールシール11が2重に設けられて、前
述の第1図において説明したようにセグメント7
に設けられた充填孔8を介して注入した充填材が
掘進機内へ侵入するのを完全に防止するようにな
つている。
In FIG. 3, which is an embodiment, at the rear of the tail plate 10 in the rear part of the skin plate 2, a ring having a diameter smaller than the outer diameter of the tail plate 10 is provided from the rear end of the skin plate 2 through an annular gap 12. A circular ring 13 having a large diameter is attached to the end of a cylinder 14 formed inside the tail plate 10, and a tail seal 11 made of an elastic member is provided on the inner periphery of the circular ring 13 so as to be in close contact with the segment 7. It is being On the other hand, an impermeable membrane storage device 4 is provided along the inner circumference of the skin plate 2 to compress and store the impermeable membrane 5, and as described above, as the excavator moves forward,
That is, the jack rod 3' of the propulsion jack 3 pushes the end of the existing segment, and as the excavator moves forward, the membrane 5 is passed from the membrane storage device 4 through the nozzle 9 and between the tail plate 10 and the inner cylinder 14. , the ring 13 is pulled out from the interval 12 to the ground side.
The segment 7 slides over the outer circumference of the existing segment 7 and comes into contact with the outer circumference of the existing segment 7 without coming into close contact with it, so that the outer circumference of the existing segment 7 is continuously covered. In this case, the outer diameter of the ring 13 is smaller than the outer diameter of the tail plate 10 to prevent the membrane 5 from coming into contact with the ground and being damaged by rubbing. Also circular ring 1
3 is for providing the tail seal 11, so its width in the front-rear direction is necessarily formed short. Therefore, in combination with the fact that the diameter of the ring 13 is made small, the pulled out membrane 5 does not come into direct contact with the ground, so it will not be torn. Furthermore, a segment 7 is provided on the inner circumference of the ring 13.
As explained in FIG.
The filling material injected through the filling hole 8 provided in the excavator is completely prevented from entering into the excavator.

他の実施例である第4図においてはスキンプレ
ート2の後端のテールプレート10の内側に膜格
納装置4が設けられており、その内周15を後方
に延伸した端部に円環13が装着されている点が
前例と異なるのみであるので説明は省略するが、
この例の場合、引き出された膜5は直接円環13
の外面を経由してセグメント7の面に展延される
のでより機能的である。
In another embodiment shown in FIG. 4, a membrane storage device 4 is provided inside the tail plate 10 at the rear end of the skin plate 2, and a ring 13 is provided at the end of the inner periphery 15 extending rearward. The only difference from the previous example is that it is installed, so the explanation will be omitted, but
In this example, the drawn membrane 5 is directly attached to the ring 13
It is more functional because it extends to the surface of the segment 7 via the outer surface of the segment 7.

なお膜格納装置は着脱可能とすることもでき、
不透水膜を円筒状とせず、タンザク型にして複数
の格納装置に装入しタンザク型の膜を取り出した
後、接合して筒状とすることも可能である。
The membrane storage device can also be made removable,
Instead of making the water-impermeable membrane cylindrical, it is also possible to make the impermeable membrane into a cylindrical shape, insert it into a plurality of storage devices, take out the tanzak-shaped membranes, and then join them to form a cylindrical shape.

以上の次第で本願発明工法及び装置においてテ
ールプレートの後端に間〓を介して、その径より
小さい円環を設け、その間〓から不透水膜を引き
出すようにしたので、膜は地山側と円環外周面の
間にできた〓間をとおることになり破損すること
がなくなつた。したがつて本願発明工法及び装置
によるときは、地下水及び/又は充填材のトンネ
ル内への侵入、或いは充填材の余掘り空〓外への
流亡を完全に防止できるので、トンネルの使用目
的での合理的管理に大きな貢献が期待されるとと
もに、前述したように充填材が他に漏洩して周辺
地下水に影響することがないので公害防止対策に
も大きく寄与するものである。又、結果として地
盤沈下による公的損害の防止、さらに又トンネル
が下水道であつた場合、地下水の侵入が防止され
るので処理汚水量の減少により汚水処理の効率的
運営等その効果ははかり知れないものがある。
As described above, in the construction method and device of the present invention, a ring smaller in diameter than the ring is provided at the rear end of the tail plate with a gap between the rings, and the impermeable membrane is pulled out from between the gaps, so that the membrane is connected to the ground side and the ring. It passed through the gap formed between the outer peripheral surfaces of the ring and was no longer damaged. Therefore, when the construction method and device of the present invention are used, it is possible to completely prevent groundwater and/or filler from entering the tunnel, or from flowing out of the filler to the outside of the excavation space. It is expected to make a significant contribution to rational management, and as mentioned above, the filling material will not leak to other areas and affect surrounding groundwater, so it will also make a significant contribution to pollution prevention measures. In addition, as a result, public damage due to ground subsidence is prevented, and if the tunnel is used as a sewer system, underground water intrusion is prevented, so the amount of treated sewage is reduced, resulting in efficient operation of sewage treatment, etc. The effects are immeasurable. There is something.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本願発明の概要を説明するシールドに
よる掘進方向の断面要部図。第2図はジヤツキに
より掘進機が前進した状態を示す部分断面図。第
3図及び第4図は本願発明にかかる装置の実施例
及び他の実施例を示す部分断面図である。 1…掘進機、2…スキンプレート、3…推進ジ
ヤツキ、3′…ジヤツキロツド、4…不透水膜格
納装置、5…不透水膜、6,7…セグメント、8
…充填孔、9…ノズル、10…テールプレート、
11…テールシール、12…間〓、13…円環、
14…内筒、15…内周。
FIG. 1 is a cross-sectional view of main parts in the direction of excavation by a shield, explaining the outline of the present invention. FIG. 2 is a partial sectional view showing the state in which the excavator has moved forward due to jacking. 3 and 4 are partial sectional views showing an embodiment and other embodiments of the apparatus according to the present invention. DESCRIPTION OF SYMBOLS 1... Tunnel machine, 2... Skin plate, 3... Propulsion jack, 3'... Jack rod, 4... Impermeable membrane storage device, 5... Impermeable membrane, 6, 7... Segment, 8
... Filling hole, 9... Nozzle, 10... Tail plate,
11... Tail seal, 12... Interval, 13... Circular ring,
14...Inner cylinder, 15...Inner periphery.

Claims (1)

【特許請求の範囲】 1 セグメント外周を被覆するための筒状の不透
水膜を圧縮して格納する格納装置をシールド掘進
機械のスキンプレートの内周に沿つて設け、スキ
ンプレートの後部のテールプレート内でセグメン
トを組立てながら、シールド掘進機械を推進させ
ることによつて、セグメント外周を前記筒状の不
透水膜で連続的に被覆するシールドトンネル工法
において、 テールプレートの後方に、該プレートの後端か
ら円環状の間〓を介して、テールプレートの外径
より小なる円環を、テールプレート内部に形成し
た内筒端部又は前記不透水膜格納装置の内周を延
伸した端部に、装着するとともに円環内周にはテ
ールシールをも設け、前記不透水膜を前記間〓よ
り前記円環外周面に引き出して、組み立てられた
セグメント外周を被覆し、該セグメントと不透水
膜との間に注入する充填材のシールド掘進機械側
への進入を防止するようになしたことを特徴とす
るシールドトンネル工法。 2 セグメント外周を被覆するための筒状の不透
水膜を圧縮して格納する格納装置をシールド掘進
機械のスキンプレートの内周に沿つて設け、スキ
ンプレート後部のテールプレート内でセグメント
を組立てながら、シールド掘進機械を推進させる
ことによつて、組み立てられたセグメント外周を
前記筒状の不透水膜で連続的に被覆するシールド
トンネル工法を実施するための装置において、 テールプレートの後方に、該プレートの後端か
ら円環状の間〓を介して、テールプレートの外径
より小なる円環を、テールプレート内部に形成し
た内筒端部又は前記不透水膜格納装置の内周を延
伸した端部に、装着するとともに、円環内周にテ
ールシールを設けたことを特徴とするシールドト
ンネル工法を実施するための装置。
[Claims] 1. A storage device for compressing and storing a cylindrical impermeable membrane for covering the outer periphery of the segment is provided along the inner periphery of the skin plate of the shield excavation machine, and a storage device is provided along the inner periphery of the skin plate of the shield excavation machine. In the shield tunnel construction method, in which the outer periphery of the segment is continuously covered with the cylindrical impermeable membrane by propelling a shield excavation machine while assembling the segment in the tunnel, the rear end of the plate is placed behind the tail plate. Attach an annular ring smaller than the outer diameter of the tail plate to the end of the inner cylinder formed inside the tail plate or to the end extending the inner periphery of the impermeable membrane storage device through an annular gap between At the same time, a tail seal is also provided on the inner periphery of the annular ring, and the water-impermeable membrane is pulled out from the gap to the outer periphery of the annular ring to cover the outer periphery of the assembled segments, and a tail seal is provided between the segment and the water-impermeable membrane. A shield tunnel construction method characterized by preventing filler injected into the shield tunnel from entering the shield excavation machine side. 2. A storage device for compressing and storing a cylindrical impermeable membrane for covering the outer periphery of the segment is provided along the inner periphery of the skin plate of the shield excavation machine, and while assembling the segment within the tail plate at the rear of the skin plate, In a device for carrying out a shield tunnel construction method in which the outer periphery of the assembled segments is continuously covered with the cylindrical impermeable membrane by propelling a shield excavation machine, the plate is attached behind the tail plate. A ring smaller than the outer diameter of the tail plate is attached to the end of the inner cylinder formed inside the tail plate or to the end extending from the inner periphery of the impermeable membrane storage device through an annular gap from the rear end. , a device for carrying out the shield tunnel construction method, characterized in that it is installed and a tail seal is provided on the inner periphery of the ring.
JP59021935A 1984-02-10 1984-02-10 Shield tunnel construction method and apparatus Granted JPS60181496A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59021935A JPS60181496A (en) 1984-02-10 1984-02-10 Shield tunnel construction method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59021935A JPS60181496A (en) 1984-02-10 1984-02-10 Shield tunnel construction method and apparatus

Publications (2)

Publication Number Publication Date
JPS60181496A JPS60181496A (en) 1985-09-17
JPH0423080B2 true JPH0423080B2 (en) 1992-04-21

Family

ID=12068903

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59021935A Granted JPS60181496A (en) 1984-02-10 1984-02-10 Shield tunnel construction method and apparatus

Country Status (1)

Country Link
JP (1) JPS60181496A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0310238Y2 (en) * 1985-07-02 1991-03-13

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS501306A (en) * 1973-04-11 1975-01-08
JPS57155498A (en) * 1981-03-23 1982-09-25 Kajima Corp Method of protecting tail seal in method of construction of shielding excavation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS501306A (en) * 1973-04-11 1975-01-08
JPS57155498A (en) * 1981-03-23 1982-09-25 Kajima Corp Method of protecting tail seal in method of construction of shielding excavation

Also Published As

Publication number Publication date
JPS60181496A (en) 1985-09-17

Similar Documents

Publication Publication Date Title
JP3890528B2 (en) Tunnel construction method
JPH0423080B2 (en)
JPH0517359B2 (en)
JPS5927095A (en) Method of shield tunnel construction
JPH0261600B2 (en)
JP2933278B1 (en) Underground junction type shield machine
JPH0310238Y2 (en)
JPH0232438B2 (en)
JP3705307B2 (en) Shield tunnel rehabilitation method, regenerative shield machine therefor, and segment for the rehabilitation method
JP3231289B2 (en) Underground junction type shield machine
KR102207553B1 (en) Tube propulsion apparatus capable of arrival directly in the underground structure
JP3323178B2 (en) Underground joining type shield machine and underground joining method
JPH0439350Y2 (en)
JP2558168B2 (en) Backfill injection method of segment in shield method
JPH0369438B2 (en)
JPS6059399B2 (en) Expandable flexible pipe construction method underground
JPH0423994Y2 (en)
JP3487645B2 (en) Underground joining structure and underground joining method of different diameter shield machine
JP3347312B2 (en) Underground joining type shield machine and underground joining method
JP3293804B2 (en) Branch shield excavation method and shield excavator capable of branch excavation
JP2652314B2 (en) Sealing method and device in shield machine
JP3347311B2 (en) Underground junction type shield machine
JP3178357B2 (en) Construction method of large section tunnel
JPH0649662Y2 (en) Underground joining device for shield machine
JPH0431594A (en) Underground tunnel connecting work and shaft structure therefor

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term