JP3705307B2 - Shield tunnel rehabilitation method, regenerative shield machine therefor, and segment for the rehabilitation method - Google Patents

Shield tunnel rehabilitation method, regenerative shield machine therefor, and segment for the rehabilitation method Download PDF

Info

Publication number
JP3705307B2
JP3705307B2 JP23416796A JP23416796A JP3705307B2 JP 3705307 B2 JP3705307 B2 JP 3705307B2 JP 23416796 A JP23416796 A JP 23416796A JP 23416796 A JP23416796 A JP 23416796A JP 3705307 B2 JP3705307 B2 JP 3705307B2
Authority
JP
Japan
Prior art keywords
segment
shield
existing
shield tunnel
shield machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP23416796A
Other languages
Japanese (ja)
Other versions
JPH1077783A (en
Inventor
博智 村上
修二 倉木
定雄 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sato Kogyo Co Ltd
Original Assignee
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sato Kogyo Co Ltd filed Critical Sato Kogyo Co Ltd
Priority to JP23416796A priority Critical patent/JP3705307B2/en
Publication of JPH1077783A publication Critical patent/JPH1077783A/en
Application granted granted Critical
Publication of JP3705307B2 publication Critical patent/JP3705307B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明はシールドトンネルの再生方法およびそのための再生用シールド機並びに同工法用セグメントに係るものである。
【0002】
【従来の技術】
シールドトンネルは、日本国内では昭和30年代より下水道・上水道・電力用・通信用および地下鉄用などの目的で、漸増的に建設されてきた。これらシールドトンネルの防水材は、当初よりブチルゴムを主体として使用されてきた。しかし、同防水材による防水は完全ではなく、それを補う手段として、二次覆工がなされてきた。
【0003】
その後、防水材は漸時改良されてきて、近年では水膨潤性ゴムが主流として使用されており、ほぼ完全な防水工が行われている工事区間も無しとはしない状況にある。
【0004】
【発明が解決しようとする課題】
しかしながら、これら防水材の長期安定性については、必ずしも十分明確になっているとはいい難く、今後漏水が発生する可能性も否定はできない。また、過去に築造されたシールドトンネルが、その後の地下水の汲み上げ規制により、地下水位の回復、それに伴う地下水圧の上昇によって、漏水が新たに生じ、その防止対策に多大の費用、および期間を要している事態も見受けられる。
【0005】
一方、鉄筋コンクリート構造物の耐久性は明確ではないが一般に100年前後といわれているなか、過去に築造された下水道トンネルや鉄道用トンネルの中には、既に築造後長期間経過しているものもあり、一次覆工である鉄筋コンクリート製セグメントの老朽化が、今後大きな問題となってくる。コンクリートセグメントの耐用年数は一般のコンクリート構造物と同様に不明であるが、多くのコンクリート構造物が既に耐用年数を過ぎ、取り壊されている現状では、地中の悪条件下にあるコンクリートセグメントがいずれこのような状況に陥るのは、明白であるといえる。
【0006】
そのため、老朽化したトンネルの替わりに、新たに他のルートにトンネルを新設することは、地下構造物が既に極度に輻輳して埋設されている中では土地利用の効率化の上から考えても、あまりにも多額の建設費が掛かると想定されるし、トンネル建設のための用地確保が困難であると想定される。このような現実を考えると、現存するトンネルの果たしている使命や機能をより長く維持するために、そのトンネルを活用しながら再生する技術が、今後必要となってくると想定される。
【0007】
本発明は、前述した既存のシールドトンネルの問題点を解決するものであり、既存のシールドトンネルの現在果たしている機能を損なうことなく、既存のトンネルの外周に、新たな再生用一次覆工材を設置することによって、既存のシールドトンネルの大幅な耐用年数の増大を図ることを目的とするものである。
【0008】
【課題を解決するための手段】
前記の目的を達成するために請求項1に係る本発明として、既存のシールドトンネルにおけるある一部区間に再生用シールド機の発進立坑を構築し、同発進立坑より既存のシールドトンネルの外周を包み込む形で、新たな再生用シールド機を設置し、同再生用シールド機の後部において新たに、内部に少なくとも掘削土砂の流体輸送に必要な送泥管路および排泥管路を備えた再生用一次覆工を組み立て、前記再生用一次覆工を推進することにより、掘削土砂を前記排泥管路から搬出しながら既存のシールドトンネルの外周部を前記再生用シールド機で掘削するとともに、順次新たな再生用一次覆工を組み立て、既存のシールドトンネルの外周に新たな再生用一次覆工を構築することを特徴とするシールドトンネル再生工法が提供される。
【0009】
請求項2に係る本発明として、前記請求項1記載のシールドトンネル再生工法に用いられる再生用シールド機であって、既存のシールドトンネルの外周を包み込むリング状のスキンプレートを備え、同シールド機前面に円周方向に回転して、土砂を掘削する回転式掘削機が備えられているとともに、該再生用シールド機の後部に組み立てられる前記再生用一次覆工内の送泥管路及び排泥管路に夫々接続される送泥管及び排泥管を有することを特徴とするシールドトンネル再生工法用シールド機が提供される。
【0010】
請求項3に係る本発明として、前記請求項1記載のシールドトンネル再生工法において再生用一次覆工を形成するためのセグメントであって、前記再生一次覆工用セグメントの内面に既設セグメントとの摩擦力を低減させるとともに、既設セグメントの変形防止用の突起が備えられ、さらにリング間継手、およびセグメント間継手がセグメントの外周面に設置されてなるとともに、周方向に閉合される1リング分のセグメント内に少なくとも掘削土砂の流体輸送に必要な送泥管路および排泥管路を備えていることを特徴とするシールドトンネル再生工法用セグメントが提供される。
【0011】
【発明の実施の形態】
次に本発明を図面に示す本発明の最も好適な実施の形態について説明する。図1は、既存のシールドトンネルに再生用一次覆工を構築するために、既存のシールドトンネル2のある一部区間に再生用シールド機の発進用立坑1を開削、構築し、再生用シールド機3を地山に貫入したトンネル縦断状況を示すものである。
【0012】
発進立坑1は、既存のシールドトンネル2の機能を損なわないよう、予めその周囲を薬液注入工法等で地盤改良を行い、開削工法等で構築する。その際、立坑部分の既存のトンネルは露出されるため、露出してもトンネルが破損しないよう、補強を実施する。再生用シールド機3の発進は、前記発進立坑1内で既存のシールドトンネル2を囲繞するように再生用シールド機3を組み立てた後、既知のシールド機の発進と同様に、坑口部に地盤改良薬液注入法等による発進防護用の地盤改良、およびエントランスパッキン5等を設置して行う。この際、坑口と反対側の土留壁には、再生用シールド機3の推進反力を受けるための反力壁6を設置し、同反力壁6で、既知の推進工法と同様に、発進立坑1部分に設けたシールド機推進装置の推進時に生ずる反力を受ける。
【0013】
この推進装置を伸長することによって再生用シールド機3を前進させ、その後、推進装置を退縮することによって生じる空間に順次新たな再生用セグメントを組み立てながら、以後この作業を繰り返し行うことによって、再生用シールド機を推進させていくものである。図1に示す実施例では、発進立坑1から左側にシールド機は推進しているが、既知のシールド工法や推進工法と同様に、前記立坑から左右両方向に発進せしめてもよい。
【0014】
図2は、再生用シールド機がある程度推進し、一部再生用セグメントが構築された状況を示しており、図3は図2のA−A矢視図を示している。図4は、再生用シールド機3の縦断面図、図5は図4のB−B矢視図である。再生用シールド機3の前面には、円周方向に回転するリング状の面盤9もしくはスポークが装備されており、同面盤9に設置されているカッタービット10によって通常のシールド機と同様に地山を切削する。この面盤9もしくはスポークを、左右両方向何れにも回転させるために、複数個のカッター駆動モーター12を円周上に設置している。図中11はスキンプレートである。
【0015】
また、このカッター駆動モーター12間には、掘削土砂を流体輸送で搬出するための送泥管13、排泥管14およびアジテーターがそれぞれ複数設置されており、既知の泥水式シールド工法と同様の機構で切羽の安定保持、および掘削土砂の搬出を行うことができる。さらに、本再生用シールド機3内側における既存のシールドトンネル2との接触面には、既知のシールド機のテールシールと同じテールシール15を複数段設置しており、これでチャンバー内泥水がシールド機後方に漏出するのを防止している。一方、本再生用シールド機3は発進立坑1部分に設けた元押し装置で推進するために、通常のシールド機に装備されているシールド推進ジャッキは装備していない。
【0016】
図6は、本工法に用いる再生用セグメント4で、同セグメント4は公知のRCセグメントと同様に、1リングが数ピースに分割されており、各々のピースはリング間およびセグメント間とも、セグメントの外周面に設置したボルトボックス部で、ボルトにより結合されている。このセグメントには、予め中空の円管が埋設されており、セグメントを組み立てたときには、この円管がトンネル軸方向に繋がり、シールド発進立坑1と、再生シールド機のチャンバー室が、この円管を通して貫通する(図7参照)。
【0017】
この円管は、使用目的に応じて必要な内径のものを多数設置しておき、掘削土砂の流体輸送に必要な送泥管13および排泥管14として使用する。また、裏込注入管、セグメント推進時に地山と再生セグメントの摩擦力を低減するための潤材注入管、再生一次覆工と既存一次覆工との空隙をモルタル充填するためのモルタル注入管19、およびシールド機の動力線の設置スペース等として使用することができる。このうち、裏込モルタル注入管および潤材注入管18は、管の先端をシールド機チャンバー室ではなく、再生セグメント外側地山面に貫通させる(図8参照)。また、モルタル注入管19は管の先端を再生用セグメント4内側の既設トンネル面に貫通させる(図9参照)。
【0018】
さらに、これらの管は再生用セグメント4の構築が終了した時点で、必要に応じて鉄筋等で補強し、モルタルを充填して、再生用セグメント4本体の強度の増加を図るものとする。
【0019】
また、再生セグメント4の内側には数個の突起20を設けておき、同各突起20は再生セグメント4を組み立てたときに、再生セグメント4と既設のセグメントが面接触するのを防止することによって再生セグメント4と既設のセグメント間の摩擦力をほとんど無くすことができる。これによりシールド機の推進力の低減が図れるので、小規模な推進設備で長距離の推進が可能となる。さらに、この突起20により既設セグメントの移動・変形を、再生用セグメント4によって拘束することができ、再生用セグメント4構築時の既設セグメントの破損を防止することができる。
【0020】
【発明の効果】
本発明によれば前記したように、既存のシールドトンネルにおけるある一部区間に再生用シールド機の発進立坑を設置し、既存のシールドトンネルの外周を包み込む形で新たな再生用シールド機を設置し、同再生用シールド機を設置し、同再生用シールド機の後部に新たに再生一次覆工を構築することによって、既存のシールドトンネルの外側に新たに一次覆工を構築することにより、覆工部材の再生が図られ、トンネルの耐用年数の増大が図られる。
【0021】
また、再生一次覆工が既存の覆工部材と重合され、全体として外圧に抵抗することから、覆工全体の強度増加が図られ、耐震性の向上が図られる。更に本発明によればトンネル内部に二次覆工を構築するなど、既存トンネルの内空断面を損失させることなく、完全な漏水防止策が図られる。
【0022】
また、再生一次覆工を築造したのち、既存の覆工部材を撤去すると、トンネル内空断面の拡大が図られ、トンネルの機能が向上される。
【図面の簡単な説明】
【図1】 再生用シールド機の発進立坑の構築状況を示す縦断面図である。
【図2】 再生用シールド機の推進状況を示す断面図である。
【図3】 図2の矢視A−A図である。
【図4】 図2の要部拡大断面図である。
【図5】 図4の矢視B−B図である。
【図6】 再生用セグメントの斜視図である。
【図7】 再生用セグメントの取付状況を示す縦断面図である。
【図8】 図7に示すセグメントからの滑材注入状況を示す断面図である。
【図9】 図7に示すセグメントからのモルタル注入状況を示す断面図である。
【符号の説明】
1…発進立坑、2…既存のシールドトンネル、3…再生用シールド機、4…再生用セグメント、5…エントランスパッキン、6…反力壁、7…推進装置、8…土留壁、9…面盤、10…カッタービット、11…スキンプレート、12…カッター駆動用モーター、13…送泥管、14…排泥管、15…テールシール、16…リング間継手、17…セグメント間継手、18…裏込モルタル注入管および潤材注入管、19…モルタル注入管、20…突起
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a shield tunnel regeneration method, a regeneration shield machine therefor, and a segment for the same construction method .
[0002]
[Prior art]
Shield tunnels have been gradually built in Japan for the purposes of sewerage, waterworks, power, communications, and subways since 1950s. Waterproof materials for these shield tunnels have been used mainly from butyl rubber from the beginning. However, the waterproofing by the waterproof material is not perfect, and secondary lining has been made as a means to supplement it.
[0003]
Thereafter, the waterproof material has been gradually improved, and in recent years, water-swellable rubber has been used as a mainstream, and there is no situation where there is no work section where almost complete waterproofing is performed.
[0004]
[Problems to be solved by the invention]
However, it is hard to say that the long-term stability of these waterproof materials is sufficiently clear, and the possibility of water leakage in the future cannot be denied. In addition, since shield tunnels built in the past are subject to subsequent groundwater pumping regulations, new water leaks will occur due to the recovery of groundwater level and the accompanying increase in groundwater pressure. You can also see the situation.
[0005]
On the other hand, the durability of reinforced concrete structures is not clear, but it is generally said that it is around 100 years old. Some sewer tunnels and railway tunnels that have been built in the past have already been built for a long time. Yes, the aging of the reinforced concrete segment, which is the primary lining, will become a big problem in the future. The useful life of concrete segments is unknown, as is the case with ordinary concrete structures, but many concrete structures have already exceeded their useful lives and have been demolished. It is obvious that this situation will occur.
[0006]
Therefore, in place of an aging tunnel, the construction of a new tunnel on another route can be considered from the viewpoint of increasing the efficiency of land use when underground structures are already extremely congested and buried. It is assumed that too much construction cost will be required, and it will be difficult to secure land for tunnel construction. Given this reality, in order to maintain the mission and functions of existing tunnels for a longer period of time, it is expected that technology to regenerate while utilizing such tunnels will be required in the future.
[0007]
The present invention solves the problems of the existing shield tunnel described above, and a new primary primary lining material for regeneration is provided on the outer periphery of the existing tunnel without impairing the function currently performed by the existing shield tunnel. The purpose is to greatly increase the useful life of existing shield tunnels.
[0008]
[Means for Solving the Problems]
In order to achieve the above object, as the present invention according to claim 1, a starting shaft of a regenerative shield machine is constructed in a certain section of an existing shield tunnel, and the outer periphery of the existing shield tunnel is wrapped around the starting shaft. In this form, a new regenerative shield machine is installed, and at the rear of the regenerative shield machine, a renewal primary equipped with a mud supply pipe and a mud discharge pipe necessary for transporting at least the excavated soil fluid inside. assembled lining, by promoting the regeneration primary lining, with drilling drilling sand in the reproduction shield machine outer peripheral portion of the existing shield tunnel while carried out from the exhaust mud pipe, successively new assembly primary lining for reproduction, the shield tunneling reproduction method characterized that you build primary lining for the new reproduction on the outer periphery of the existing shield tunnel is provided.
[0009]
According to a second aspect of the present invention, there is provided a regenerative shield machine used in the shield tunnel reconstructing method according to the first aspect , comprising a ring-shaped skin plate that wraps the outer periphery of an existing shield tunnel, and the front surface of the shield machine A rotary excavator that rotates in the circumferential direction and excavates the earth and sand, and a mud pipe and a drain pipe in the primary lining for regeneration assembled at the rear part of the shield for regeneration There is provided a shield machine for a shield tunnel regeneration method characterized by having a mud pipe and a mud pipe connected to a road, respectively .
[0010]
The present invention according to claim 3 is a segment for forming a primary lining for regeneration in the shield tunnel reclaim method according to claim 1, wherein an inner surface of the reclaimed primary lining segment is provided with an existing segment. In addition to reducing the frictional force, a protrusion for preventing deformation of the existing segment is provided, and the joint between rings and the joint between segments are installed on the outer peripheral surface of the segment, and the ring is closed in the circumferential direction. There is provided a segment for a shield tunnel rehabilitation method characterized in that the segment is provided with at least a mud supply pipe and a mud discharge pipe required for fluid transport of excavated sediment.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Next, the most preferred embodiment of the present invention shown in the drawings will be described. FIG. 1 shows the construction of a reclamation shield machine for excavating and constructing a starting shaft 1 for a reclamation shield machine in a certain section of an existing shield tunnel 2 in order to construct a primary lining for reclamation in an existing shield tunnel. This shows the tunnel longitudinal situation where No. 3 penetrated the ground.
[0012]
The start shaft 1 is constructed in advance by ground improvement using a chemical solution injection method or the like, so as not to impair the function of the existing shield tunnel 2, and constructed by an open-cut method or the like. At that time, since the existing tunnel in the shaft portion is exposed, reinforcement is performed so that the tunnel will not be damaged even if exposed. For the start of the regenerative shield machine 3, the reconstructed shield machine 3 is assembled so as to surround the existing shield tunnel 2 in the start shaft 1, and then the ground is improved at the wellhead in the same manner as the start of the known shield machine. The ground improvement for starting protection by chemical injection method etc. and the entrance packing 5 etc. are installed. At this time, a reaction force wall 6 for receiving the propulsion reaction force of the regeneration shield machine 3 is installed on the earth retaining wall opposite to the wellhead, and the reaction force wall 6 is started in the same manner as a known propulsion method. It receives the reaction force generated during the propulsion of the shield machine propulsion device provided in the shaft 1 part.
[0013]
The regenerative shield machine 3 is moved forward by extending the propulsion device, and then a new regenerative segment is sequentially assembled in the space generated by retracting the propulsion device. The shield machine will be promoted. In the embodiment shown in FIG. 1, the shield machine is propelled to the left side from the start shaft 1, but it may be started from the shaft in both the left and right directions as in the known shield method and propulsion method.
[0014]
FIG. 2 shows a situation in which the playback shield machine has been propelled to some extent and a part of the playback segment has been constructed, and FIG. 3 shows the AA arrow view of FIG. FIG. 4 is a longitudinal sectional view of the regenerative shield machine 3, and FIG. 5 is a view taken along the line BB in FIG. The front surface of the regenerative shield machine 3 is equipped with a ring-shaped face plate 9 or spoke that rotates in the circumferential direction, and the cutter bit 10 installed on the same face plate 9 is used in the same way as a normal shield machine. Cutting natural ground. In order to rotate the face plate 9 or the spoke in both the left and right directions, a plurality of cutter drive motors 12 are installed on the circumference. In the figure, 11 is a skin plate.
[0015]
In addition, a plurality of mud pipes 13, mud pipes 14 and agitators are installed between the cutter drive motors 12 for transporting excavated earth and sand by fluid transportation, and the mechanism is similar to that of the known mud-water shield method. Can stably hold the face and carry out excavated sediment. Furthermore, a plurality of stages of the same tail seal 15 as the tail seal of the known shield machine are installed on the contact surface with the existing shield tunnel 2 inside the shield machine 3 for regeneration, so that the muddy water in the chamber is removed from the shield machine. Prevents leaking backwards. On the other hand, since this regenerative shield machine 3 is propelled by a main pushing device provided in the start shaft 1 portion, it is not equipped with a shield propulsion jack equipped in a normal shield machine.
[0016]
FIG. 6 shows a reproduction segment 4 used in this construction method. The segment 4 is divided into several pieces in the same manner as the known RC segment, and each piece is divided between the ring and between the segments. It is a bolt box part installed on the outer peripheral surface and is connected by bolts. A hollow circular tube is embedded in this segment in advance. When the segment is assembled, this circular tube is connected in the tunnel axial direction, and the shield start shaft 1 and the chamber chamber of the regenerative shield machine pass through this circular tube. It penetrates (see FIG. 7).
[0017]
Many circular pipes having a necessary inner diameter are installed according to the purpose of use, and are used as a mud pipe 13 and a mud pipe 14 necessary for fluid transportation of excavated earth and sand . Also , a back-filling pipe, a lubricant filling pipe for reducing the frictional force between the ground and the reclaimed segment during segment propulsion, and a mortar filling pipe 19 for filling the gap between the regenerated primary lining and the existing primary lining with mortar , and it can be used as an installation space or the like of the power lines of the shield machine. Of these, the back-filling mortar injection pipe and the lubricant injection pipe 18 penetrate the tip of the pipe not into the shield chamber chamber but through the regeneration segment outer ground surface (see FIG. 8). Further, the mortar injection pipe 19 penetrates the tip of the pipe through the existing tunnel surface inside the regeneration segment 4 (see FIG. 9).
[0018]
Furthermore, when the construction of the regeneration segment 4 is completed, these pipes are reinforced with a reinforcing bar or the like as necessary and filled with mortar to increase the strength of the regeneration segment 4 body.
[0019]
In addition, several protrusions 20 are provided inside the reproduction segment 4, and each protrusion 20 prevents the reproduction segment 4 and the existing segment from being in surface contact when the reproduction segment 4 is assembled. The frictional force between the reproduction segment 4 and the existing segment can be almost eliminated. As a result, the propulsive force of the shield machine can be reduced, and long-distance propulsion is possible with a small propulsion facility. Furthermore, the movement and deformation of the existing segment can be restrained by the reproduction segment 4 by the projection 20, and the existing segment can be prevented from being damaged when the reproduction segment 4 is constructed.
[0020]
【The invention's effect】
As described above, according to the present invention, a starter shaft of a regeneration shield machine is installed in a certain section of an existing shield tunnel, and a new regeneration shield machine is installed so as to wrap around the outer periphery of the existing shield tunnel. By installing the regenerative shield machine and constructing a new primary primary lining at the rear of the regenerative shield machine, constructing a new primary lining outside the existing shield tunnel, The members are regenerated, and the useful life of the tunnel is increased.
[0021]
In addition, since the recycled primary lining is superposed with the existing lining member and resists external pressure as a whole, the strength of the entire lining is increased and the earthquake resistance is improved. Further, according to the present invention, a complete water leakage prevention measure can be achieved without losing the internal cross section of the existing tunnel, such as constructing a secondary lining inside the tunnel.
[0022]
In addition, if the existing lining member is removed after constructing the recycled primary lining, the empty section in the tunnel is enlarged, and the function of the tunnel is improved.
[Brief description of the drawings]
FIG. 1 is a longitudinal sectional view showing a construction status of a starting shaft of a regeneration shield machine.
FIG. 2 is a cross-sectional view showing a propulsion state of the regeneration shield machine.
FIG. 3 is an AA view of FIG.
4 is an enlarged cross-sectional view of a main part of FIG.
FIG. 5 is a view taken along the line B-B in FIG. 4;
FIG. 6 is a perspective view of a reproduction segment.
FIG. 7 is a longitudinal sectional view showing a state of attaching a reproduction segment.
FIG. 8 is a cross-sectional view showing a state in which the lubricant is injected from the segment shown in FIG.
9 is a cross-sectional view showing a state of mortar injection from the segment shown in FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Start shaft, 2 ... Existing shield tunnel, 3 ... Regeneration shield machine, 4 ... Regeneration segment, 5 ... Entrance packing, 6 ... Reaction wall, 7 ... Propulsion device, 8 ... Earth retaining wall, 9 ... Face board DESCRIPTION OF SYMBOLS 10 ... Cutter bit, 11 ... Skin plate, 12 ... Cutter drive motor, 13 ... Mud pipe, 14 ... Mud pipe, 15 ... Tail seal, 16 ... Inter-ring joint, 17 ... Inter-segment joint, 18 ... Back Mortar injection pipe and lubricant injection pipe, 19 ... mortar injection pipe, 20 ... projection

Claims (3)

既存のシールドトンネルにおけるある一部区間に再生用シールド機の発進立坑を構築し、同発進立坑より既存のシールドトンネルの外周を包み込む形で、新たな再生用シールド機を設置し、同再生用シールド機の後部において新たに、内部に少なくとも掘削土砂の流体輸送に必要な送泥管路および排泥管路を備えた再生用一次覆工を組み立て、前記再生用一次覆工を推進することにより、掘削土砂を前記排泥管路から搬出しながら既存のシールドトンネルの外周部を前記再生用シールド機で掘削するとともに、順次新たな再生用一次覆工を組み立て、既存のシールドトンネルの外周に新たな再生用一次覆工を構築することを特徴とするシールドトンネル再生工法。A reclamation shaft for a regenerative shield machine is built in a section of the existing shield tunnel, and a new regenerative shield machine is installed in the form of wrapping the outer periphery of the existing shield tunnel. newly at the rear of the machine, assembled at least Okudoro pipe and the waste sludge line reproduction for primary lining having a required fluid transport drilling sand therein, by promoting the regeneration primary lining, While excavating earth and sand from the drainage pipe, the outer periphery of the existing shield tunnel is excavated with the regeneration shield machine, and a new primary primary lining is sequentially assembled, and a new outer lining is constructed on the outer periphery of the existing shield tunnel. shield tunnel reproduction method characterized that you build primary lining for playback. 前記請求項1記載のシールドトンネル再生工法に用いられる再生用シールド機であって、既存のシールドトンネルの外周を包み込むリング状のスキンプレートを備え、同シールド機前面に円周方向に回転して、土砂を掘削する回転式掘削機が備えられているとともに、該再生用シールド機の後部に組み立てられる前記再生用一次覆工内の送泥管路及び排泥管路に夫々接続される送泥管及び排泥管を有することを特徴とするシールドトンネル再生工法用シールドA shield machine for regeneration used in the shield tunnel reclamation method according to claim 1, comprising a ring-shaped skin plate that wraps around the outer periphery of an existing shield tunnel, rotating in the circumferential direction on the front surface of the shield machine, A mud pipe provided with a rotary excavator for excavating earth and sand and connected to a mud pipe line and a mud pipe line in the primary lining for regeneration assembled at the rear of the shield machine for regeneration and the shield tunnel reproducing method shield machine and having a waste sludge tube. 前記請求項1記載のシールドトンネル再生工法において再生用一次覆工を形成するためのセグメントであって、前記再生一次覆工用セグメントの内面に既設セグメントとの摩擦力を低減させるとともに、既設セグメントの変形防止用の突起が備えられ、さらにリング間継手、およびセグメント間継手がセグメントの外周面に設置されてなるとともに、周方向に閉合される1リング分のセグメント内に少なくとも掘削土砂の流体輸送に必要な送泥管路および排泥管路を備えていることを特徴とするシールドトンネル再生工法用セグメント A segment for forming a primary lining for reproduction in shield tunnel reproducing method of claim 1, as well as to reduce the frictional force between the existing segments on the inner surface of the segment for the reproduction primary lining, the existing segment In addition, a ring-to-ring joint and an inter-segment joint are provided on the outer peripheral surface of the segment, and at least excavated soil fluid transports in one ring segment closed in the circumferential direction. Segment for shield tunnel rehabilitation method, which is equipped with the necessary mud supply and drainage pipes .
JP23416796A 1996-09-04 1996-09-04 Shield tunnel rehabilitation method, regenerative shield machine therefor, and segment for the rehabilitation method Expired - Fee Related JP3705307B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23416796A JP3705307B2 (en) 1996-09-04 1996-09-04 Shield tunnel rehabilitation method, regenerative shield machine therefor, and segment for the rehabilitation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23416796A JP3705307B2 (en) 1996-09-04 1996-09-04 Shield tunnel rehabilitation method, regenerative shield machine therefor, and segment for the rehabilitation method

Publications (2)

Publication Number Publication Date
JPH1077783A JPH1077783A (en) 1998-03-24
JP3705307B2 true JP3705307B2 (en) 2005-10-12

Family

ID=16966720

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23416796A Expired - Fee Related JP3705307B2 (en) 1996-09-04 1996-09-04 Shield tunnel rehabilitation method, regenerative shield machine therefor, and segment for the rehabilitation method

Country Status (1)

Country Link
JP (1) JP3705307B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756907B (en) * 2018-08-09 2024-01-30 北京崇建工程有限公司 Tunnel top shield guniting equipment
CN109060395B (en) * 2018-08-27 2023-12-05 郑州大学 Test system platform for shield underpass cutting composite foundation pile body
CN113006808A (en) * 2021-04-23 2021-06-22 中铁六局集团有限公司交通工程分公司 Construction method for viscous geological shield initial section to penetrate shallow soil-covered river channel downwards

Also Published As

Publication number Publication date
JPH1077783A (en) 1998-03-24

Similar Documents

Publication Publication Date Title
JPH0462292A (en) Diameter widening method and reducing method of tunnel
JP2003206691A (en) Shield machine arrival construction method
JP3705307B2 (en) Shield tunnel rehabilitation method, regenerative shield machine therefor, and segment for the rehabilitation method
JP3170215B2 (en) Pipe burial method
JP2738940B2 (en) Annular double drilling rig
JP3401177B2 (en) Sewer renewal shield excavator
JP3616898B2 (en) Method for joining underground structures using propulsion device
JPH037797B2 (en)
JP2578184B2 (en) Ring drilling rig
JP3403340B2 (en) Renewal shield method
JP4451016B2 (en) Tunnel laying replacement method
JPH0369438B2 (en)
JP3651970B2 (en) Start / arrival method of branch shield machine and lining structure used therefor
JP3347311B2 (en) Underground junction type shield machine
JP2712686B2 (en) Shield machine
JP3380220B2 (en) Shield excavator capable of branch excavation
JP3122362B2 (en) Wellhead packing mounting structure
JP2712685B2 (en) Shield machine
JP2620133B2 (en) Shield machine
JP4172022B2 (en) Tunnel widening method and tunnel narrowing method
JPS5927095A (en) Method of shield tunnel construction
JP3293804B2 (en) Branch shield excavation method and shield excavator capable of branch excavation
JPH0978981A (en) Tunnel outside lining method
JPH07127384A (en) Small-sized pipe jacking and layout device
JPH01230896A (en) Preventing device for land subsidence behind shield excavator

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040401

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050411

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050610

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050715

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050719

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080805

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090805

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100805

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100805

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110805

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120805

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120805

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130805

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130805

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140805

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees