JPH0332677Y2 - - Google Patents

Info

Publication number
JPH0332677Y2
JPH0332677Y2 JP9598384U JP9598384U JPH0332677Y2 JP H0332677 Y2 JPH0332677 Y2 JP H0332677Y2 JP 9598384 U JP9598384 U JP 9598384U JP 9598384 U JP9598384 U JP 9598384U JP H0332677 Y2 JPH0332677 Y2 JP H0332677Y2
Authority
JP
Japan
Prior art keywords
formwork
concrete
formworks
utility
model registration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP9598384U
Other languages
Japanese (ja)
Other versions
JPS6111843U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP9598384U priority Critical patent/JPS6111843U/en
Publication of JPS6111843U publication Critical patent/JPS6111843U/en
Application granted granted Critical
Publication of JPH0332677Y2 publication Critical patent/JPH0332677Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【考案の詳細な説明】 (産業上の利用分野) 本考案は、潅慨等に使用される開水路あるいは
それに類する形状のコンクリート製水路を構築す
る際に、コンクリートを打設するのに使用される
装置である。
[Detailed description of the invention] (Field of industrial application) This invention is used for pouring concrete when constructing open channels used for irrigation, etc., or concrete channels of a similar shape. It is a device that

(従来の技術) 開水路の構築に使用するコンクリート打設装置
としては、従来は第6図、第7図に示すようなも
のがある。
(Prior Art) Conventionally, there are concrete placing devices used for constructing open channels, such as those shown in FIGS. 6 and 7.

これはノンテレスコピツクと呼ばれるものであ
り、台車Aとその両側に設けた二つの型枠B,C
とから構成されており、型枠B,Cと地面に掘削
した溝Dとの間の隙間Eにコンクリートを打設す
るようにしたものである。
This is called a non-telescopic truck, and it consists of a trolley A and two formworks B and C installed on both sides.
Concrete is poured into the gap E between the formworks B and C and a groove D excavated in the ground.

台車Aには車輪Fが取付けられており、その車
輪Fが溝Dの底面に施設されているレールGの上
を走行して溝Dを長手方向に移動できるようにし
てある。
Wheels F are attached to the trolley A, and the wheels F run on rails G installed on the bottom surface of the groove D so as to be able to move along the groove D in the longitudinal direction.

型枠B,Cは第7図の実線で示す位置から仮想
線で示す位置まで移動できるようにしてある。
Formworks B and C are movable from the position shown by the solid line in FIG. 7 to the position shown by the imaginary line.

これを使用するには型枠B,Cを第7図と実線
で示す位置にセツトし、この型枠B,Cと溝Dと
の間の隙間Eにコンクリートを打設し、コンクリ
ートが硬化してから第7図に仮想線で示すように
型枠B,Cを架台A側に引き起こして型枠B,C
を硬化したコンクリートから脱型する。
To use this, set formworks B and C in the positions shown by the solid lines in Figure 7, pour concrete into the gap E between formworks B and C and groove D, and let the concrete harden. Then, as shown by the imaginary lines in Fig. 7, raise the formworks B and C to the pedestal A side.
demolded from hardened concrete.

この状態で型枠B,Cを多少持上げて型枠B,
Cの底Ba,Caを溝Dのコンクリート製の底Daか
ら浮かせ、この状態で台車FをレールG上を走行
させて型枠B,Cを溝Dの長手方向に移動させ、
台車A及び型枠B,Cを次のコンクリートを打設
する位置に停止させる。
In this state, lift formworks B and C a little and formwork B,
The bottoms Ba and Ca of C are lifted from the concrete bottom Da of groove D, and in this state, trolley F is run on rail G to move formworks B and C in the longitudinal direction of groove D.
Stop truck A and forms B and C at the position where the next concrete will be poured.

次に型枠B,Cを降下させて溝D内の所定位置
にセツトし、その後で前回と同様に隙間Eにコン
クリートを打設する。これを繰返すことにより長
い開水路が形成されるようにしてある。
Next, formworks B and C are lowered and set at predetermined positions in groove D, and then concrete is poured into gap E in the same manner as before. By repeating this process, a long open channel is formed.

(本考案が解決しようとする問題点) しかし従来の装置では、打設したコンクリート
が硬化するまで脱型できないため、型枠を移動す
るのに時間がかかり、長い開水路を形成する場合
は作業日時が非常に長くなる。
(Problem that the present invention aims to solve) However, with conventional equipment, it is not possible to remove the mold until the poured concrete has hardened, so it takes time to move the formwork, and when forming a long open channel, it is difficult to remove the mold. The date and time will be very long.

長い開水路をできるだけ短日時に完成するため
には型枠B,Cの長さが長くして一度にコンクリ
ートを打設できる長さを長くすればよい。そのた
め従来は長尺(通常10m〜20m程度)な型枠B,
Cが使用されている。
In order to complete a long open channel in as short a time as possible, formworks B and C should be made longer so that concrete can be poured at one time. Therefore, conventionally long formwork B (usually about 10m to 20m),
C is used.

しかし型枠B,Cを長くすると次に列挙するよ
うな各種の問題が生ずる。
However, if the forms B and C are lengthened, various problems will occur as listed below.

(1) 施工現場への型枠B,Cの輸送とか、現場に
おけるコンクリート硬化後の型枠B,Cの移動
が面倒になる。
(1) Transporting formworks B and C to the construction site and moving formworks B and C after concrete hardens at the site become troublesome.

(2) 開水路のカーブの部分にコンクリートを打設
するには、カーブ用のライナーフオームを併用
しているが、型枠B,Cが長尺になればなるほ
どなめらかなカーブを成形しにくくなる。また
型枠B,Cが長いと曲率半径の小さいカーブを
成形しにくい。
(2) In order to pour concrete into the curved part of the open channel, a liner form for curves is also used, but the longer forms B and C become, the more difficult it becomes to form a smooth curve. . Furthermore, if the molds B and C are long, it is difficult to form a curve with a small radius of curvature.

(3) 型枠B,Cの次の打設位置に移動させると
き、脱型するために型枠B,Cを架台側に引き
起こすため、その度毎に型枠B,Cと溝Dとの
間の隙間Eの幅が変化する。そのため型枠B,
Cを次に打設する位置にセツトする場合一々隙
間Eの間隔を調整しなければならないという面
倒がある。この場合型枠B,Cが長ければ長い
ほど調整が面倒になり、ひいてはコンクリート
打設作業の能率が低下する。
(3) When moving formworks B and C to the next casting position, in order to pull formworks B and C toward the stand side for demolding, the connection between formworks B and C and groove D is made each time. The width of the gap E between the two changes. Therefore, formwork B,
When setting C to the position where it will be poured next, there is the trouble of having to adjust the interval of the gap E each time. In this case, the longer the formworks B and C are, the more troublesome the adjustment becomes, which in turn reduces the efficiency of concrete pouring work.

(4) 台車Aと型枠B,Cが大型であるため、製作
費や購入費が高価となり、ひいてはその分だけ
開水路の工事費も高くなる。
(4) Since the trolley A and formworks B and C are large, the production and purchase costs are high, which in turn increases the construction cost of the open channel accordingly.

(本考案の目的) 本考案の目的は長さの短い多数の型枠を前後方
向に連結して、なめらかなカーブの開水路を形成
できるようにすることにある。
(Purpose of the present invention) The purpose of the present invention is to connect a large number of short formworks in the front-rear direction to form a smoothly curved open channel.

本考案の他の目的は、連結した多数の型枠のう
ち最後尾の型枠から順次脱型し、脱型した型枠を
打設方向先端の型枠の前に移動して連続的にコン
クリートを打設できるテレスコピツク型として使
用できるようにすることにある。
Another purpose of the present invention is to sequentially demold the formwork from the end of a large number of connected formworks, move the demolded formwork in front of the formwork at the tip in the pouring direction, and continuously concrete the formwork. The purpose is to enable it to be used as a telescopic mold that can be used for pouring.

(問題点を解決するための手段) 本考案は、開水路の形成方向に連結する型枠1
と、型枠1を第3図のように吊上げて後方の型枠
1aを最先端の型枠1nの前に移動させる架台2
とから構成され、型枠1の側面1A,1Bを下方
から上方に向けて次第に幅広くなるよう適宜の傾
斜角度に成形し、しかも型枠1を移動させるとき
に側面1A,1Bの傾斜角度を変えずにそのまま
の状態で吊上げて移動できるようにしたものであ
る。
(Means for solving the problem) The present invention provides formwork 1 connected in the direction of forming an open channel.
Then, as shown in Fig. 3, a frame 2 lifts the formwork 1 and moves the rear formwork 1a to the front of the most advanced formwork 1n.
The side surfaces 1A and 1B of the formwork 1 are formed at appropriate inclination angles so as to gradually become wider from the bottom to the top, and when the formwork 1 is moved, the inclination angles of the side surfaces 1A and 1B are changed. It is designed so that it can be lifted and moved as it is.

(実施例) 第1図、第2図は本考案に係る装置の一例を示
すものである。
(Example) FIGS. 1 and 2 show an example of an apparatus according to the present invention.

型枠1は第1図に示すように正面がほぼV字状
になるように成形され、長さは従来の型枠よりか
なり短かくして1.5〜6m程度に成形されている。
As shown in FIG. 1, the mold 1 is formed so that its front side is approximately V-shaped, and its length is approximately 1.5 to 6 m, which is considerably shorter than that of conventional molds.

各型枠1の前後方向両端上部の四ヶ所には、く
字形に成形された回動腕3が第2図の実線で示す
位置から仮想像で示す位置まで回動自在なるよう
取付けられており、この回動腕3は回動腕固定具
4により実線で示す位置と仮想線で示す位置に固
定できるようにしてある。
Rotating arms 3 formed in a dogleg shape are attached to four locations at the top of both front and back ends of each formwork 1 so that they can freely rotate from the position shown by the solid line in Fig. 2 to the position shown in the virtual image. , this rotating arm 3 can be fixed by a rotating arm fixing device 4 at the position shown by the solid line and the position shown by the imaginary line.

架台2は、長手方向体前後左右四ヶ所に支持脚
5が形成されており、その支持脚5が地面に形成
されている溝6の両側壁7a,7bの上に設置さ
れて架台2の支持部8が溝6を跨ぐようにしてあ
る。
The pedestal 2 has support legs 5 formed at four places on the front, rear, left and right sides of its longitudinal body, and the support legs 5 are installed on both side walls 7a and 7b of a groove 6 formed in the ground to support the pedestal 2. The portion 8 is arranged to straddle the groove 6.

支持脚5の下端には第2図に示すように走行輪
9が取付けられており、その走行輪9は両側壁7
a,7bの上に設置されているレール10の上を
往復走行自在なるようにしてあり、この走行によ
り架台2が開水路の形成方向に往復移動されるよ
うにしてある。
A running wheel 9 is attached to the lower end of the support leg 5 as shown in FIG.
It is designed to be able to freely travel back and forth on rails 10 installed on tops a and 7b, and as a result of this travel, the pedestal 2 is reciprocated in the direction in which the open channel is formed.

架台2には第2図に明示するように型枠1の高
さを調節する高さ調節装置11が形成されてい
る。これは支持脚5の下部に設置したジヤーナル
ジヤツキ12と、その上端に横向きに取付けたロ
ーラ13から構成されている。
A height adjusting device 11 for adjusting the height of the formwork 1 is formed on the pedestal 2, as clearly shown in FIG. This is composed of a journal jack 12 installed at the lower part of the support leg 5, and a roller 13 installed laterally at its upper end.

架台2には第1図、第2図に示すように、ロー
ラ13に支持されている型枠1を溝6の幅方向に
移動させて左右の位置を調節する位置調節装置1
4が取付けられている。これは架台2の四本の支
持脚5に取付けた送りネジ15と、それを回転さ
せるハンドル16とから構成されている。
As shown in FIGS. 1 and 2, the frame 2 is equipped with a position adjustment device 1 that moves the formwork 1 supported by the rollers 13 in the width direction of the groove 6 to adjust the left and right positions.
4 is installed. This consists of a feed screw 15 attached to the four support legs 5 of the pedestal 2, and a handle 16 for rotating it.

架台2には型枠1を吊上げるチエーンブロツク
17と、架台2を走行させるモータ等の走行装置
18(第3図、第4図)と、型枠1を架台2に固
定する図示しない型枠固定具が取付けられてい
る。
The frame 2 includes a chain block 17 for hoisting the formwork 1, a traveling device 18 such as a motor for moving the frame 2 (FIGS. 3 and 4), and a formwork (not shown) for fixing the formwork 1 to the frame 2. Fixtures are installed.

(使用例) 本考案のコンクリート打設装置を使用するには
例えば第3図〜第5図のようにする。
(Example of use) The concrete placing device of the present invention can be used as shown in FIGS. 3 to 5, for example.

第3図に示すものはテレスコピツク型として使
用例である。これは型枠1を第3図のように溝6
内にセツトして多数連結し、連結した多数の型枠
1のうち最後尾の型枠1a側から先端の型枠1n
側に順次コンクリートを打設し、コンクリートが
先に硬化する最後尾の型枠1aから順に脱型し、
脱型した型枠1aを打設方向先端の型枠1nの前
に順次移動して連続的にコンクリートを打設でき
るようにしたものである。
The one shown in FIG. 3 is an example of use as a telescopic type. This is done by cutting the formwork 1 into the groove 6 as shown in Figure 3.
A large number of connected formworks 1 are set in the inside and connected, from the last formwork 1a side to the tip formwork 1n.
Concrete is poured on the sides one after another, and the mold is removed in order from the last formwork 1a where the concrete hardens first.
The demolded formwork 1a is sequentially moved in front of the formwork 1n at the leading end in the pouring direction so that concrete can be poured continuously.

型枠1を溝内6にセツトしてコンクリートを打
設するには次のようにする。
To set the formwork 1 in the trench 6 and pour concrete, proceed as follows.

型枠1の回動腕3を架台2の図示しない型枠
固定具により架台2に固定し、この状態で架台
2を走行装置18によりレール10の上を移動
させて型枠1を溝6内のセツト位置まで搬送す
る。
The rotating arm 3 of the formwork 1 is fixed to the frame 2 by a formwork fixture (not shown) of the frame 2, and in this state, the frame 2 is moved on the rail 10 by the traveling device 18 to move the formwork 1 into the groove 6. Transport it to the set position.

セツト位置まで搬送したら回動腕3から型枠
固定具を外し、その後で型枠1をチエーンブロ
ツク17で吊下げて下降させ、型枠1の回動腕
3を予めセツト位置より若干高くしてあるジヤ
ーナルジヤツキ12上のローラ13上にのせ
る。
After transporting to the set position, remove the formwork fixing tool from the rotating arm 3, and then suspend the formwork 1 with the chain block 17 and lower it, setting the rotating arm 3 of the formwork 1 slightly higher than the set position in advance. Place it on a roller 13 on a certain journal jack 12.

チエーンブロツク17を多少ゆるめてから、
位置調整具14によりローラ13上の型枠1を
溝6の幅方向に移動させて型枠1を溝6のセン
ターに合せる。
After loosening chain block 17 a little,
The formwork 1 on the roller 13 is moved in the width direction of the groove 6 by the position adjustment tool 14 to align the formwork 1 with the center of the groove 6.

センター合せがすんだらジヤーナルジヤツキ
12の高さを低くして左右のバランスを取りな
がら型枠1を所定のセツト位置まで下降させ
る。
After the center alignment is completed, the height of the journal jack 12 is lowered and the formwork 1 is lowered to a predetermined set position while keeping the right and left balance.

所定位置に型枠1をセツトしたら、その型枠
をその位置に保持して型枠1と溝6との間の間
隔Eが常に一定になるようにするスパツド19
(第2図、第4図)を型枠1に取付ける。
Once the formwork 1 is set in a predetermined position, a spud 19 is used to hold the formwork in that position so that the distance E between the formwork 1 and the groove 6 is always constant.
(Fig. 2, Fig. 4) is attached to the formwork 1.

コンクリートを打設したときに型枠1が浮上
するのを防止する側圧用アンカーボルト20、
浮力防止用アンカーボルト21(第1図、第2
図)を型枠1にセツトする。
lateral pressure anchor bolts 20 that prevent the formwork 1 from floating when concrete is poured;
Anchor bolt 21 for preventing buoyancy (Figs. 1 and 2)
(Fig.) is set in formwork 1.

回動腕3を上方(第1図の仮想線の位置)へ
回転させて高さ調節装置11のローラ13から
外し、その回動腕3を固定具4により型枠1に
固定する。
The rotating arm 3 is rotated upward (to the position indicated by the imaginary line in FIG. 1) and removed from the roller 13 of the height adjusting device 11, and the rotating arm 3 is fixed to the formwork 1 by the fixture 4.

上記のようにして一ヶの型枠1をセツトした
ら以後上記〜と同様にして他の型枠1をセ
ツトし、隣合う型枠同志を図示しない型枠連結
具で連結する。
After one formwork 1 is set as described above, other formworks 1 are set in the same manner as in ~ above, and adjacent formworks are connected by formwork connectors (not shown).

連結された型枠1と溝6との間の隙間Eに図
示しない検査窓からコンクリート22を投入
し、検査窓から管理しながら左右の隔間Eに交
互にコンクリートを打設する。この場合コンク
リート22は、連結されている型枠のうち最後
尾の型枠1aから先端の型枠方向に順次打設す
るのがよい。
Concrete 22 is poured into the gap E between the connected formwork 1 and the groove 6 through an inspection window (not shown), and concrete is placed alternately in the left and right gaps E while being controlled through the inspection window. In this case, the concrete 22 is preferably poured sequentially from the rearmost formwork 1a of the connected formworks toward the leading end formwork.

コンクリート22を打設し終えたらそれが凝
結する前にスパツド19を取外す。
After pouring the concrete 22, remove the spud 19 before it sets.

型枠1内に打設したコンクリート22が硬化し
たらその型枠を順次前に移動させる。打設された
コンクリート22は先に打設された最後尾の型枠
1a内のものから順次硬化するため、第3図に示
すように最後尾の型枠1aか順次脱型して移動さ
せる。
When the concrete 22 poured in the formwork 1 hardens, the formwork is sequentially moved forward. Since the poured concrete 22 hardens sequentially starting from the last cast form 1a, as shown in FIG. 3, the last form 1a is sequentially demolded and moved.

型枠を移動させるには次のようにする。 To move the formwork, do the following:

イ 移動する型枠1を連結されている他の型枠か
ら外す。
B. Remove the moving formwork 1 from the other connected formworks.

ロ 移動する型枠1からアンカーボルト20,2
1を取外す。
(b) Anchor bolts 20, 2 from the moving formwork 1
Remove 1.

ハ 移動する型枠1aの回動腕3を第2図に実線
で示すように水平位置に戻して固定具4により
その位置に固定する。
C. Return the rotating arm 3 of the moving formwork 1a to the horizontal position as shown by the solid line in FIG. 2 and fix it in that position with the fixture 4.

ニ 架台2に設けたチエーンブロツク17により
移動する型枠1aを吊上げて脱型する。
D. The moving formwork 1a is lifted up by the chain block 17 provided on the frame 2 and removed from the mold.

ホ この型枠1aを第4図に仮想線で示すよう
に、チエーンブロツク17により架台2の上端
まで吊上げて、図示しない型枠固定金具の架台
2に固定する。
E. This formwork 1a is lifted up to the upper end of the pedestal 2 by the chain block 17, as shown by the imaginary line in FIG. 4, and fixed to the pedestal 2 of a formwork fixing fitting (not shown).

ヘ 移動する型枠1a以外の型枠1の回動腕3が
架台2の移路上にない(回動腕3が第2図に仮
想線で示すように上方へはね上げられている)
ことを確認してから、架台2を設走行装置18
によりレール10に沿つて前進させ、その型枠
1aを他の型枠1の上を通過させて連結されて
いる先端の型枠1nの前まで搬送する。
F. The rotating arm 3 of the formwork 1 other than the moving formwork 1a is not on the movement path of the frame 2 (the rotating arm 3 is flipped upward as shown by the imaginary line in Fig. 2).
After confirming that
The mold 1a is moved forward along the rails 10, passing over other molds 1, and transported to the front of the connected mold 1n at the tip.

ト 以下前記した〜と同様の操作を行なつて
移動した型枠1aを溝6内の所定位置にセツト
し、その後でコンクリートを打設する。
G. The same operations as those described in ~ above are performed to set the moved formwork 1a at a predetermined position within the groove 6, and then concrete is poured.

チ 以後順次最後尾の型枠を先端の型枠の前に移
動させて移動された型枠と溝6との間の隙間E
内にコンクリートを打設し、この操作を繰返す
ことにより、開水路のコンクリート壁を連続的
に形成することができる。
H. Thereafter, the last formwork is sequentially moved in front of the leading formwork, and the gap E between the moved formwork and the groove 6 is
By pouring concrete inside and repeating this operation, the concrete wall of the open channel can be continuously formed.

本考案の装置はノンテレスコピツク型としても
使用することができる。この場合は打設されたコ
ンクリート22が全部硬化するまで型枠を移動さ
せずにそのままにしておき、コンクリート22が
全部硬化してから第5図に示すように先端の型枠
1aから順に全部の型枠を前方へ移動させる。
The device according to the invention can also be used as a non-telescopic type. In this case, the formwork is left as it is without moving until the poured concrete 22 has completely hardened, and after the concrete 22 has completely hardened, as shown in Fig. 5, all the formwork 1a is Move the formwork forward.

(本発明の効果) 本考案のコンクリート打設装置には次のような
各種効果がある。
(Effects of the present invention) The concrete placing device of the present invention has the following various effects.

(1) 個々の型枠1は、長さが数mと短かく、小型
であるため現場の輸送や現場における移動が容
易となり、取扱いが容易になる。
(1) Each formwork 1 has a short length of several meters and is small, making it easy to transport and move around the site, making it easy to handle.

(2) 個々の型枠1の長さが従来のこの種型枠より
かなり短いため、開水路のカーブの部分を滑ら
かなカーブに仕上げることができる。
(2) Since the length of each formwork 1 is considerably shorter than that of conventional formworks of this type, the curved portion of the open channel can be finished into a smooth curve.

(3) 架台2により各型枠1を吊下げて移動できる
ようにし、しかも型枠1の側面1A,1Bの傾
斜角度を変えることなく移動できるようにして
あるため、硬化したコンクリートから脱型して
移動した型枠1を溝6内にセツトする場合に、
型枠1の側面1A,1Bの傾斜角度を調節する
必要がないため型枠1のセツトが非常に容易に
なる。
(3) Each formwork 1 is suspended from the frame 2 and can be moved without changing the inclination angles of the sides 1A and 1B of the formwork 1, so that it is possible to remove the formwork from the hardened concrete. When setting the formwork 1 that has been moved into the groove 6,
Since there is no need to adjust the inclination angles of the side surfaces 1A and 1B of the formwork 1, the formwork 1 can be set very easily.

(4) 連結した多数の型枠のうち後方の型枠を、そ
れより前方の型枠1の上を通過させて先方に移
動させることができるため、コンクリートが硬
化したらその部分の型枠を逐次脱型して前方に
移動し、移動した型枠に順次コンクリートを打
設して連続的に開水路を形成することができ、
コンクリート打設作業の能率が非常に向上す
る。
(4) The rear formwork among the many linked formworks can be moved forward by passing over the formwork 1 in front of it, so once the concrete has hardened, the formwork for that part can be moved one after the other. It is possible to remove the mold, move it forward, and pour concrete into the moved formwork one after another to form a continuous open channel.
The efficiency of concrete pouring work is greatly improved.

(5) 本考案の装置はテレスコピツク式としても、
ノンテレスコピツク方式としても使用すること
ができるため、現場の状況やその他の状況に応
じて最適な方法で施工することができる。
(5) The device of the present invention can also be used as a telescopic type.
Since it can also be used as a non-telescopic method, construction can be carried out in the most suitable manner depending on the site and other conditions.

(6) 型枠が小型であり、架台はその型枠を一つず
つ搬送できるものであればよいためこがたのも
のでよく、従つて架台の製作費も易くなる。
(6) Since the formwork is small and the frame only needs to be of a small size as long as it can transport the formwork one by one, the manufacturing cost of the frame is also low.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案に係る装置の正面図、第2図は
同装置の部分説明図、第3図イ〜ハは本考案に係
る装置をテレスコピツク型として使用した場合の
説明図、第4図は同装置の使用説明図、第5図イ
〜ニは同装置をノンテレスコピツク型として使用
した場合の説明図、第6図は従来のコンクリート
打設装置の概略側面図、第7図は第6図のX−X
線断面図である。 1は型枠、1A,1Bは型枠の側面、2は架
台、11は高さ調節装置、14は位置調節装置、
18は走行装置。
Fig. 1 is a front view of the device according to the present invention, Fig. 2 is a partial explanatory diagram of the same device, Fig. 3 A to C are explanatory diagrams when the device according to the present invention is used as a telescopic type, and Fig. 4 is an explanatory diagram of the use of the same device, Figures 5A to 5D are explanatory diagrams when the same device is used as a non-telescopic type, Figure 6 is a schematic side view of a conventional concrete pouring device, and Figure 7 is a diagram showing the use of the same device. XX in Figure 6
FIG. 1 is a formwork, 1A and 1B are sides of the formwork, 2 is a pedestal, 11 is a height adjustment device, 14 is a position adjustment device,
18 is a traveling device.

Claims (1)

【実用新案登録請求の範囲】 (1) 側面が下方から上方に向けて次第に幅広くな
るよう適宜の角度に傾斜する二以上の型枠と、
開水路の長手方向に往復移動自在とし且つ型枠
をそのままの傾斜角度で吊上げてそれを他の型
枠の上方を通過させて先端の型枠の前に移動さ
せる架台とから構成される開水路等の構築用コ
ンクリート打設装置。 (2) 架台に、少なくとも、型枠の高さを調節する
高さ調節装置と、型枠を溝の幅方向へ横移動さ
せる横位置調節装置と、走行装置とが形成され
ている実用新案登録請求の範囲第1項に記載の
開水路等の構築用コンクリート打設装置。 (3) 型枠に、架台に支持される位置から架台から
外れる位置まで回動自在とした回動腕が形成さ
れている実用新案登録請求の範囲第1項に記載
の開水路等の構築用コンクリート打設装置。 (4) 型枠の長さを約数mとしてなる実用新案登録
請求の範囲第1項に記載の開水路等の構築用コ
ンクリート打設装置。
[Scope of claims for utility model registration] (1) Two or more formworks that are inclined at appropriate angles so that the sides gradually become wider from the bottom to the top;
An open channel consisting of a stand that can freely move back and forth in the longitudinal direction of the open channel, and that lifts the formwork at the same inclination angle, passes it above other formworks, and moves it in front of the formwork at the tip. Concrete placement equipment for construction, etc. (2) Utility model registration in which the frame is formed with at least a height adjustment device for adjusting the height of the formwork, a lateral position adjustment device for moving the formwork laterally in the width direction of the groove, and a traveling device. A concrete placing device for constructing open channels, etc. according to claim 1. (3) For construction of open channels, etc. as set forth in claim 1 of the utility model registration claim, in which the formwork is formed with a pivoting arm that can freely rotate from the position supported by the pedestal to the position removed from the pedestal. Concrete placement equipment. (4) A concrete casting device for constructing open channels, etc., as set forth in claim 1 of the utility model registration claim, in which the length of the formwork is approximately several meters.
JP9598384U 1984-06-26 1984-06-26 Concrete pouring equipment for constructing open channels, etc. Granted JPS6111843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9598384U JPS6111843U (en) 1984-06-26 1984-06-26 Concrete pouring equipment for constructing open channels, etc.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9598384U JPS6111843U (en) 1984-06-26 1984-06-26 Concrete pouring equipment for constructing open channels, etc.

Publications (2)

Publication Number Publication Date
JPS6111843U JPS6111843U (en) 1986-01-23
JPH0332677Y2 true JPH0332677Y2 (en) 1991-07-11

Family

ID=30655280

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9598384U Granted JPS6111843U (en) 1984-06-26 1984-06-26 Concrete pouring equipment for constructing open channels, etc.

Country Status (1)

Country Link
JP (1) JPS6111843U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9242026B2 (en) 2008-06-27 2016-01-26 Sofradim Production Biosynthetic implant for soft tissue repair
US9308068B2 (en) 2007-12-03 2016-04-12 Sofradim Production Implant for parastomal hernia

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4645612B2 (en) * 2007-03-28 2011-03-09 孝夫 杉本 Construction equipment for concrete buildings
JP6529379B2 (en) * 2015-07-30 2019-06-12 大成建設株式会社 Invert formwork

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9308068B2 (en) 2007-12-03 2016-04-12 Sofradim Production Implant for parastomal hernia
US9242026B2 (en) 2008-06-27 2016-01-26 Sofradim Production Biosynthetic implant for soft tissue repair

Also Published As

Publication number Publication date
JPS6111843U (en) 1986-01-23

Similar Documents

Publication Publication Date Title
US3744945A (en) Apparatus for modular concrete constructions
CN110513125B (en) Inner and outer mould trolley lining system for open cut underdrain
CN109577303B (en) Movable formwork system for ship lock water delivery gallery and working method thereof
JPH0332677Y2 (en)
CN211850891U (en) Concrete wall continuous pouring device
CN210422637U (en) A concreting system for full section concrete of circular tunnel
CN110821527A (en) Tunnel groove forming die trolley
CN115637762A (en) Pouring method for side wall movable formwork of road drainage ditch
CN210637087U (en) Inner and outer mould trolley lining system for open-cut underground canal
CN213382182U (en) Annular full-automatic production line transportation platform
CN210217762U (en) Combined template system for circular tunnel concrete pouring
CN209798958U (en) Pouring system for drainage ditch of bottom plate post-cast strip and shaping hanging die for drainage ditch
CN112536898A (en) Adjustable general stair mold
JP3046517B2 (en) Short line type precast block manufacturing equipment
CN211116037U (en) Tunnel groove forming die trolley
CN205712138U (en) A kind of tunnel inside groove channel forming machinery
CN211230496U (en) Movable formwork for tunnel cable trench construction
CN211116038U (en) Groove die position adjusting structure for die trolley and die trolley
CN217150096U (en) Slip form device for construction of side wall of ditch
JPH0639878B2 (en) Moving mechanism for mobile formwork for lining
CN218932805U (en) Self-propelled integral demolding equipment
CN210217763U (en) Slip form system for circular tunnel concrete pouring
CN211258633U (en) Tunnel groove die and die trolley
CN219605289U (en) Variable intermediate wall template trolley suitable for bifurcation tunnel multi-arch section
CN214273670U (en) Lifting type ditch cable trough trolley