JPH03262894A - Tunnel face stabilization work method - Google Patents

Tunnel face stabilization work method

Info

Publication number
JPH03262894A
JPH03262894A JP6124390A JP6124390A JPH03262894A JP H03262894 A JPH03262894 A JP H03262894A JP 6124390 A JP6124390 A JP 6124390A JP 6124390 A JP6124390 A JP 6124390A JP H03262894 A JPH03262894 A JP H03262894A
Authority
JP
Japan
Prior art keywords
liquid chemical
face
pipe
chemical
injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6124390A
Other languages
Japanese (ja)
Other versions
JPH07122392B2 (en
Inventor
Yoshifumi Taguchi
善文 田口
Kazuo Kagawa
香川 和夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP6124390A priority Critical patent/JPH07122392B2/en
Publication of JPH03262894A publication Critical patent/JPH03262894A/en
Publication of JPH07122392B2 publication Critical patent/JPH07122392B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PURPOSE:To improve stability through the prevention of a face breakdown and the fall of the top, by inserting into the digging portion of a tunnel face an injection pipe arranged with liquid chemical injecting openings in three directions, pulling out the pipe as the liquid chemical is being jetted under high pressure, and inserting a reinforcement rod material. CONSTITUTION:The front of a face 3 is bored by about 3 meters from the inside of a tunnel 1 by means of a boring machine 2, and a liquid chemical injecting pipe 6 is inserted into a boring portion 5. Next, liquid chemical injecting openings are provided at the liquid chemical injecting pipe 6 in three directions meeting at right angles with the pipe center axis, and ground heap is dug by jetting under high pressure a ground improving liquid chemical while the injecting pipe 6 is being pulled out, and mixture in agitation with the liquid chemical is made. Next, as the injecting pipe 6 is being pulled out at a fixed speed, a liquid chemical injected improvement layer 8 whose length is about three meters and which is of an inverted T shape cross section, is formed, and then, instantly an iron bar 9 is inserted. And this process is repeated at a tunnel face 3 upper half portion of 120 degrees range. As a result, the breakdown of the face can be prevented.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は隨道工事やシールド工事において、砂質土を主
とした切羽の掘削作業に際し、切羽の崩壊や天端の崩落
を防止するための、トンネル切羽の安定工法に係るもの
である。
[Detailed Description of the Invention] (Industrial Application Field) The present invention is used to prevent the collapse of the face and the collapse of the top when excavating the face, which is mainly made of sandy soil, in tunnel construction and shield construction. This relates to a method of stabilizing the tunnel face.

(従来の技術) 従来この種のトンネル切羽の安定工法として、トンネル
孔(a)内より放射状に外周地山内に掘削機(b)によ
って掘削方向に対して斜め方向に削孔し、(第8図及び
第11図参照)次いで前記掘削II (b)による切羽
削孔部(C)に鋼製パイプ(イ)を挿入し、(第9図及
び第12図参照)前記パイプ(d)に設けた注入口より
地盤改良薬液注入装置(e)を介して切羽掘削部外周に
地盤改良薬液(f)を注入するパイプルーフ工法が適用
されている。(第10図及び第13図並に第14図参照
) なお第15図及び第16図は他の従来工法として薬液注
入工法による切羽の状態を示すものである。
(Prior art) Conventionally, as a stable construction method for this type of tunnel face, holes are drilled radially from inside the tunnel hole (a) into the outer surrounding ground using an excavator (b) in a diagonal direction with respect to the excavation direction. (see Fig. 9 and Fig. 11) Next, insert the steel pipe (a) into the face hole (C) formed by the excavation II (b), and (see Fig. 9 and Fig. 12) insert the steel pipe (a) into the pipe (d). A pipe roof construction method is used in which a soil improvement chemical solution (f) is injected into the outer periphery of the excavated face portion through a soil improvement chemical solution injection device (e) from an injection port. (See Figures 10, 13, and 14.) Figures 15 and 16 show the state of a face formed by a chemical injection method as another conventional construction method.

図中(8)は切羽、(ロ)はトンネル孔(a)のモルタ
ル吹付層である。
In the figure, (8) is the face, and (b) is the sprayed mortar layer of the tunnel hole (a).

(発明が解決しようとする課題) 前記従来のパイプルーフ工法は、切羽に指向して鋼製パ
イプが斜方向に打込まれるので、同パイプの先端に至る
に伴ってパイプ間隔が大きくなるため、鋼製パイプの打
設間隔が重要な要素であり、先#A薬液注入範囲を考慮
して注入間隔を決めるため、手前側では無駄な薬液を注
入することとなり、不経済であり、且つ余分な手間を要
した。また前記従来の薬液注入工法においては、薬液の
過不足が生じ、確実性に不安があった。
(Problems to be Solved by the Invention) In the conventional pipe roof construction method, the steel pipes are driven in an oblique direction toward the face, so the spacing between the pipes increases as it reaches the tip of the pipe. The spacing between steel pipes is an important factor, and since the injection interval is determined by taking into account the range of #A chemical injection, unnecessary chemical liquid will be injected on the front side, which is uneconomical and unnecessary. It took a lot of effort. In addition, in the conventional chemical injection method, there was a problem with the reliability of the chemical because there was an excess or shortage of the chemical.

本発明は前記従来工法の有する問題点に鑑みて提案され
たもので、その目的とする処は、従来工法より薬液注入
量が少なく、しかもより効果的に切羽の崩壊や天端の崩
落を防止するトンネル切羽の安定工法を提供する点にあ
る。
The present invention was proposed in view of the problems of the conventional construction method, and its purpose is to reduce the amount of chemical injection than the conventional construction method, and to more effectively prevent the collapse of the face and the top. The purpose of this invention is to provide a stable construction method for tunnel faces.

(!!題を解決するための手段) 前記の目的を達成するため、本発明に係るトンネル切羽
の安定工法によれば、***工事やシールド工事における
切羽の掘削作業において、掘削孔の外周に沿って放射状
に、掘削方向に対して斜め方向に削孔するとともに、同
各掘削部に、上下及び左右の3方向に薬液注入口が配設
された地盤改良薬液注入パイプを挿入し、前記削孔部の
外周地盤に前記各注入口より薬液を高圧噴射しながら引
抜いて前記外周地盤内に逆T形の薬液注入改良層を放射
状に造成するとともに、同逆T形の薬液性゛ 入改良層
内にその硬化前に補強筋材を挿入するものである。
(!!Means for Solving the Problem) In order to achieve the above object, according to the method for stabilizing a tunnel face according to the present invention, in tunnel face excavation work in shade tunnel construction or shield construction, along the outer periphery of the excavation hole. Holes are drilled radially diagonally to the excavation direction, and ground improvement chemical injection pipes with chemical injection ports arranged in three directions (up, down, left and right) are inserted into each of the excavated parts. A chemical solution is injected at high pressure into the outer circumferential ground of the area and pulled out from each of the injection ports to create an inverted T-shaped chemical injection improvement layer radially within the outer circumferential ground, and an inverted T-shaped chemical solution injection improvement layer is also formed inside the inverted T-shaped improvement layer. Reinforcing bars are inserted into the steel before it hardens.

(作用) 本発明によれば前記したように、トンネル切羽の掘削孔
の外周に沿って放射状に掘削方向と斜め方向に掘削した
削孔部に挿入された地盤改良薬液注入パイプより切羽に
、同パイプの上下及び左右の3方向に配設された薬液注
入口から地盤改良薬液を噴射注入することによって、同
地山内に従来の円形断面より力学的に有利な逆T形断面
形の地盤改良薬液注入改良層が順続して形威され、切羽
が効果的に補強される。
(Function) According to the present invention, as described above, a soil improvement chemical solution injection pipe inserted into a hole drilled radially along the outer periphery of the tunnel face in a direction diagonal to the excavation direction is used to inject the same into the tunnel face. By injecting soil improvement chemicals from the chemical injection ports arranged in three directions (up, down, left and right) of the pipe, we can create a ground improvement chemical with an inverted T-shaped cross section, which is mechanically more advantageous than the conventional circular cross section, into the same ground. The injection improvement layers are successively shaped, effectively reinforcing the face.

しかも本発明によれば前記地盤改良薬液注入改良層にそ
の硬化前に鉄筋、単管パイプ等の補強筋材が挿入される
ことによって引張強度が増大され、トンネル切羽の安定
化が図られる。
Furthermore, according to the present invention, reinforcing bars such as reinforcing bars and single pipes are inserted into the ground improvement chemical injection improvement layer before it hardens, thereby increasing the tensile strength and stabilizing the tunnel face.

(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.

トンネル穴(1)内より地盤に応してウォータージェッ
ト、ボーリングマシン、オーガー等の削孔機械(2)に
よって切羽(3)前方を5〜lO°の角度で長さ3m程
度に削孔する。(第1図参照) 図中(4)は削孔1m 械(2)の支持用H形鋼である
From inside the tunnel hole (1), a hole of about 3 m in length is drilled in front of the face (3) at an angle of 5 to 10° using a drilling machine (2) such as a water jet, a boring machine, or an auger depending on the ground. (See Figure 1) In the figure, (4) is the H-shaped steel for supporting the 1m hole drilling machine (2).

かくしてトンネル穴(1)外周部に放射状に設けられた
削孔部(5)に、地盤改良薬液注入装置に接続された薬
液注入パイプ(6)を挿入する。(第2図参照)通常は
削孔後、前記削孔機械(2)のロンドをそのまま薬液注
入パイプに転用する。
In this manner, a chemical injection pipe (6) connected to a soil improvement chemical injection device is inserted into the drilled holes (5) provided radially around the outer circumference of the tunnel hole (1). (See Figure 2) After drilling, the rond of the drilling machine (2) is usually used as a chemical injection pipe.

前記薬液注入パイプ(6)には、第6図に示すように、
同パイプ(6)の中心軸線に対して互いにほぼ直交する
3方向に幕液注入口(7)が配設されている。
As shown in FIG. 6, the drug solution injection pipe (6) includes:
Curtain liquid inlets (7) are arranged in three directions substantially orthogonal to each other with respect to the central axis of the pipe (6).

次いで、同注入パイプ(6)を所定の速度で引抜きなが
ら所定量の地盤改良薬液、例えば水ガラスとセメントミ
ルクとの混合液を200〜400kgf/cj程度で高
圧噴射して地山を切削し、薬液と撹拌混合する。(第3
図参照) この際切削能力を向上するためにエアーを低圧で噴射す
る。
Next, while pulling out the injection pipe (6) at a predetermined speed, a predetermined amount of a ground improvement chemical, such as a mixture of water glass and cement milk, is injected at high pressure of about 200 to 400 kgf/cj to cut the ground, Stir and mix with the chemical solution. (3rd
(See figure) At this time, air is injected at low pressure to improve cutting ability.

而して前記薬液注入バイブ(6)はその中心軸線に対し
て互いにほぼ直交する3方向に薬液注入口(7)が設け
られているので、同各注入口(7)から地中に噴射され
た薬液は光拡がりの逆T形断面の固結体よりなる薬液注
入改良層(8)を形威する。
Since the chemical liquid injection vibrator (6) is provided with chemical liquid injection ports (7) in three directions substantially orthogonal to each other with respect to its central axis, chemical liquid is injected into the ground from each of the chemical liquid injection ports (7). The chemical liquid formed forms a chemical liquid injection improving layer (8) consisting of a solid body with an inverted T-shaped cross section that spreads light.

而して前記注入パイプ(6)を第3図に示すように一定
の速度で引抜きながら、長さ3m程度の逆T形断面の薬
液注入改良層(8)を形威したのち、瞬時に鉄筋(9)
または単管バイブを挿入する。
While pulling out the injection pipe (6) at a constant speed as shown in Fig. 3, a chemical injection improvement layer (8) with an inverted T-shaped cross section of about 3 m in length is formed, and then the reinforcing steel is instantly removed. (9)
Or insert a single tube vibrator.

更に第4図及び第5図に示すように、トンネル切羽(3
)の上半部120°の範囲で前記の工程を反覆して、鉄
筋(9)または単管バイブで補強された逆T形断面の薬
液注入改良層(8)によるアーチ型の固結層を形威し、
切羽の安定性を保持し、トンネル掘進に伴なう地表の沈
下を防止する。
Furthermore, as shown in Figures 4 and 5, the tunnel face (3
) The above process is repeated in the 120° range of the upper half of ) to form an arch-shaped consolidated layer made of a chemical injection improvement layer (8) with an inverted T-shaped cross section reinforced with reinforcing bars (9) or a single tube vibrator. Prestigious,
Maintains the stability of the face and prevents subsidence of the ground surface due to tunnel excavation.

なお第4図中(1′)は次位の掘削部を示す。Note that (1') in Figure 4 shows the next excavation part.

(発明の効果) 本発明によれば前記したように、***工事やシールド工
事における切羽の掘削作業において、掘削孔の外周に沿
って放射状に掘削方向に対して斜め方向に削孔し、同各
削孔部に、中心軸線に対して上下及び左右の3方向に薬
液注入口が配設された地盤改良薬液注入パイプを挿入し
て削孔部外用地盤に前記各注入口より地盤改良薬液を高
圧噴射しながら引抜いて、同外周地盤内に逆T形の薬液
注入改良層を放射状に造成するとともに、同薬液注入改
良層内にその硬化前に補強筋材を挿入して、削孔部外周
地盤改良薬液層を造成することによって、切羽の崩壊や
天端の崩落を防止するものである。
(Effects of the Invention) According to the present invention, as described above, in the excavation work of the face in tunnel construction or shield construction, the holes are drilled radially along the outer periphery of the excavation hole in a diagonal direction with respect to the excavation direction. A soil improvement chemical injection pipe with chemical injection ports arranged in three directions (up, down, left and right with respect to the central axis) is inserted into the drilled hole, and soil improvement chemicals are injected at high pressure into the ground for external use in the drilled area from each injection port. By pulling it out while spraying, an inverted T-shaped chemical injection improvement layer is created radially in the ground around the outer periphery of the hole, and reinforcing bars are inserted into the chemical injection improvement layer before it hardens to improve the ground around the drilling area. By creating an improved chemical layer, it prevents the face from collapsing and the crown from collapsing.

また本発明の方法によって外周地盤に造成される逆T形
断面の薬液注入改良層は前記従来工法において造成され
る円形断面の薬液注入層より力学的に有利であって、従
って前記従来工法に比して地盤改良薬液の注入量が少な
くて済み、同薬液の注入による地山の膨脹の影響が小さ
く、都市型トンネルを施工する場合には、近隣の他の構
築物に対する影響が少ない。
Furthermore, the improved chemical injection layer with an inverted T-shaped cross section created on the outer peripheral ground by the method of the present invention is mechanically more advantageous than the chemical injection layer with a circular cross section created by the conventional method, and therefore, compared to the conventional method. As a result, the amount of ground improvement chemicals injected is small, and the influence of expansion of the ground due to the injection of the same chemicals is small, and when constructing urban tunnels, there is little impact on other nearby structures.

更に本発明によれば前記薬液注入改良層に補強筋材が挿
入されることによって引張強度が増大され、トンネル切
羽の安定性がより向上される。
Furthermore, according to the present invention, reinforcing bars are inserted into the chemical injection improving layer, thereby increasing the tensile strength and further improving the stability of the tunnel face.

【図面の簡単な説明】[Brief explanation of drawings]

第1図乃至第4図は本発明に係るトンネル切羽の安定工
法の一実施例の工程を示す縦断側面図、第5図は本発明
の方法で施工された切羽の状態を示す縦断側面図、第6
図は施工状況を示す部分拡大縦断正面図、第7図は薬液
注入改良層の縦断正面図、第8図乃至第10図は従来の
バイプルーフ工法の工程を示す縦断側面図、第11図及
び第12図は夫々第1図並に第9図の縦断面図、第13
図及び第14図は夫々第10図の矢視X−X図並に矢視
Y−Y図、第15図は従来の薬液注入工法による切羽の
状態を示す縦断側面図、第16図は第15図の矢視2−
2図である。 (1) ・・・トンネル孔、  (2)−・・削孔機械
、(3)−・・切羽、     (5)・・・削孔部、
(6)・・・薬液注入パイプ、(7)・・・薬液注入口
、(8)・・・薬液注入改良層、(9)・・・鉄筋。
1 to 4 are longitudinal side views showing the steps of an embodiment of the tunnel face stabilization method according to the present invention, and FIG. 5 is a longitudinal side view showing the state of the tunnel face constructed by the method of the present invention. 6th
The figure is a partially enlarged vertical front view showing the construction situation, Figure 7 is a vertical front view of the chemical injection improvement layer, Figures 8 to 10 are vertical side views showing the steps of the conventional bi-proof construction method, Figures 11 and 10 are Figure 12 is a vertical cross-sectional view of Figure 1 and Figure 9, respectively.
14 and 14 are a view taken along arrows XX and Y-Y in FIG. Arrow view 2- in Figure 15
This is Figure 2. (1)...Tunnel hole, (2)--Drilling machine, (3)--Face, (5)...Drilling part,
(6)...Chemical liquid injection pipe, (7)...Chemical liquid injection port, (8)...Chemical liquid injection improvement layer, (9)...Reinforcing bar.

Claims (1)

【特許請求の範囲】[Claims] (1)除道工事やシールド工事における切羽の掘削作業
において、掘削孔の外周に沿って放射状に、掘削方向に
対して斜め方向に削孔するとともに、同各掘削部に、上
下及び左右の3方向に薬液注入口が配設された地盤改良
薬液注入パイプを挿入し、前記削孔部の外周地盤に前記
各注入口より薬液を高圧噴射しながら引抜いて前記外周
地盤内に逆T形の薬液注入改良層を放射状に造成すると
ともに、同逆T形の薬液注入改良層内にその硬化前に補
強筋材を挿入することを特徴とするトンネル切羽の安定
工法。
(1) When excavating a face during road clearing work or shield work, holes are drilled radially along the outer periphery of the excavation hole and diagonally to the excavation direction. Insert a soil improvement chemical injection pipe with chemical injection ports arranged in the direction, and pull it out while injecting high-pressure chemical liquid from each injection port into the outer circumferential ground of the hole to inject an inverted T-shaped chemical into the outer circumferential ground. A method for stabilizing a tunnel face, which is characterized by forming injection improvement layers radially and inserting reinforcing bars into the same inverted T-shaped chemical injection improvement layer before it hardens.
JP6124390A 1990-03-14 1990-03-14 Stabilization method of tunnel face Expired - Fee Related JPH07122392B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6124390A JPH07122392B2 (en) 1990-03-14 1990-03-14 Stabilization method of tunnel face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6124390A JPH07122392B2 (en) 1990-03-14 1990-03-14 Stabilization method of tunnel face

Publications (2)

Publication Number Publication Date
JPH03262894A true JPH03262894A (en) 1991-11-22
JPH07122392B2 JPH07122392B2 (en) 1995-12-25

Family

ID=13165597

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6124390A Expired - Fee Related JPH07122392B2 (en) 1990-03-14 1990-03-14 Stabilization method of tunnel face

Country Status (1)

Country Link
JP (1) JPH07122392B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0640091U (en) * 1992-10-27 1994-05-27 日東鐵工株式会社 Rock bolt for mirror surface reinforcement
WO2022058885A1 (en) * 2020-09-21 2022-03-24 Hypertunnel Ip Limited Tunnelling shield

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0640091U (en) * 1992-10-27 1994-05-27 日東鐵工株式会社 Rock bolt for mirror surface reinforcement
WO2022058885A1 (en) * 2020-09-21 2022-03-24 Hypertunnel Ip Limited Tunnelling shield

Also Published As

Publication number Publication date
JPH07122392B2 (en) 1995-12-25

Similar Documents

Publication Publication Date Title
CN109371980A (en) The inverse Extra-Deep Foundation Pit construction method for making to combine with Percussion Piles of spray anchor
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN107542469A (en) A kind of underground mould bag stake method for protecting support
KR101855413B1 (en) Hardener injection equipment for deep mixing method of soil stabiliazation and construction method using same
JP2019039140A (en) Method for constructing ground improvement body and method for constructing pile
KR102325623B1 (en) Construction method of retaining wall
JPH03262894A (en) Tunnel face stabilization work method
JPH09317373A (en) Method of shaft construction
JP3200240B2 (en) Filling method of self-hardening material in ground reinforcement method
JP2955893B2 (en) Ground reinforcement method
GB2137678A (en) Method and apparatus for pile construction
JPH0313689A (en) Construction method for tunnel
JPH04115024A (en) Sheathing method
JPH09111754A (en) Soldier pile cut-of wall construction method
KR102117392B1 (en) Method for constructing earth retaining wall
JPH01247611A (en) Construction and device for foundation improvement with the joint use of agitator and jet
JPS6124491B2 (en)
JP2527893B2 (en) Reinforcement of existing foundation
JP3672266B2 (en) Jet grout method
JP2002147164A (en) Tunnel construction method and tunnel
JP2002021063A (en) Method for constructing earth retaining wall
JPH02252891A (en) Stable working method for facing of tunnel
JPH03197794A (en) Chemical grouting method
JPS62215716A (en) Burying of pile
JPH07109885A (en) Stable construction method for tunnel working face

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071225

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081225

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091225

Year of fee payment: 14

LAPS Cancellation because of no payment of annual fees