JPH0316878Y2 - - Google Patents

Info

Publication number
JPH0316878Y2
JPH0316878Y2 JP1986107871U JP10787186U JPH0316878Y2 JP H0316878 Y2 JPH0316878 Y2 JP H0316878Y2 JP 1986107871 U JP1986107871 U JP 1986107871U JP 10787186 U JP10787186 U JP 10787186U JP H0316878 Y2 JPH0316878 Y2 JP H0316878Y2
Authority
JP
Japan
Prior art keywords
spreader
boom
arm
pin hole
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1986107871U
Other languages
Japanese (ja)
Other versions
JPS6313989U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1986107871U priority Critical patent/JPH0316878Y2/ja
Publication of JPS6313989U publication Critical patent/JPS6313989U/ja
Application granted granted Critical
Publication of JPH0316878Y2 publication Critical patent/JPH0316878Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【考案の詳細な説明】 (産業上の利用分野) 本考案はラチスブームを備えたクレーンにおい
て、ブーム分解、組立時に上部スプレツダを基本
ブームのスプレツダ取付ブラケツトに向けて移動
させる上部スプレツダの移動装置に関するもので
ある。
[Detailed description of the invention] (Field of industrial application) The present invention relates to an upper spretzer moving device for a crane equipped with a lattice boom, which moves the upper spretzer toward the spretzer mounting bracket of the basic boom during boom disassembly and assembly. It is.

(従来技術) ラチスブームを備えたクレーンの一般的構成を
第4図に示している。同図において、1はクレー
ン本体、2はブームで、このブーム2は基本ブー
ム2aと、一乃至複数段の中間ブーム2b(図で
は一般のみの場合を示す)と、先端ブーム2cと
によつて構成され、ブーム起伏ライン3によつて
起伏自在に支持される。ブーム起伏ライン3は、
クレーン本体1側に取付けられる下部スプレツダ
4と、上部スプレツダ5との間にブーム起伏ロー
プ6が掛け回され、かつ上部スプレツダ5と先端
ブーム2cの先端部との間にガイケーブル7が張
架されて構成される。
(Prior Art) A general configuration of a crane equipped with a lattice boom is shown in FIG. In the figure, 1 is the crane body, 2 is a boom, and this boom 2 is made up of a basic boom 2a, one or more intermediate booms 2b (the figure shows only the general case), and a tip boom 2c. It is supported by the boom hoisting line 3 so that it can be raised and lowered freely. Boom hoisting line 3 is
A boom hoisting rope 6 is stretched between the lower spreader 4 and the upper spreader 5, which are attached to the crane main body 1 side, and a guy cable 7 is stretched between the upper spreader 5 and the tip of the tip boom 2c. It consists of

このクレーンのブーム2は、輸送時には長さ制
限等から第5図イに示すように中間ブーム2bが
取外され、基本、先端両ブーム2a,2cが直結
された状態とされる。そして、現場到着後ブーム
2を再び組立てる場合には、第5図イ仮想線で示
すようにブーム起伏ロープ6をゆるめて上部スプ
レツダ5を自重により基本ブーム2aの上面まで
下降させた後、両スプレツダ5を基本ブーム2a
の先端部に止めつける。この状態で第5図ロに示
すように、基本ブーム2aを起伏調整しながら、
基本ブーム2aと中間ブーム2b、中間ブーム2
bと先端ブーム2cの連結を行なう。
When transporting the boom 2 of this crane, the intermediate boom 2b is removed as shown in FIG. 5A due to length limitations, etc., and the two end booms 2a and 2c are basically directly connected. When the boom 2 is to be reassembled after arriving at the site, the boom hoisting rope 6 is loosened as shown by the imaginary line in FIG. 5 as basic boom 2a
Attach it to the tip of the In this state, as shown in Figure 5B, while adjusting the elevation of the basic boom 2a,
Basic boom 2a, intermediate boom 2b, intermediate boom 2
b and the tip boom 2c are connected.

また、クレーン輸送に際してのブーム2の分解
も上記同様にして行なう。
Furthermore, the boom 2 is disassembled in the same manner as described above when being transported by crane.

基本ブーム2aの先端部上面には、スプレツダ
取付ブラケツト8が固着され、第5図イ仮想線の
段階で、上部スプレツダ5がこのブラケツト8に
互いのピン孔(第6図に示す)9,10を介して
ピン11にて止めつけられる。この場合、上部ス
プレツダ5がスプレツダ取付ブラケツト8の位置
に下降するとは限らないため、両者のピン孔9,
10が一致するようにスプレツタ5を移動させる
必要がある。
A spreader mounting bracket 8 is fixed to the upper surface of the tip of the basic boom 2a, and at the stage shown by the imaginary line in FIG. It is fixed with pin 11 via. In this case, since the upper spreader 5 does not always descend to the position of the spreader mounting bracket 8, the pin holes 9,
It is necessary to move the spreader 5 so that the numbers 10 and 10 match.

従来、この種の装置として、第6図に示すよう
に基本ブーム上面におけるスプレツダ取付ブラケ
ツト8よりブーム基端側の位置に、先端部に二股
状の係合部12aが形成されたアーム12を水平
軸13を中心として起伏回動可能に取付け、一
方、上部スプレツダ5の側面にピン14を突設
し、スプレツダ下降時にこのピン14をアーム1
2の係合部12aに係合させた状態で、スプレツ
ダ自重または図示しない回動レバーの操作により
アーム12を起伏回動させてスプレツダ5を基本
ブーム上面に下降させ、スプレツダ5のピン孔
(ガイケーブル7取付ピン孔兼用)9をスプレツ
ダ取付ブラケツト8のピン孔10に一致させる構
成としたものが公知となつている(実開昭59−
173690号公報参照)。
Conventionally, as shown in FIG. 6, in this type of device, an arm 12 having a bifurcated engaging portion 12a formed at its tip is mounted horizontally at a position closer to the base end of the boom than the spreader mounting bracket 8 on the upper surface of the basic boom. It is mounted so that it can be rotated up and down about a shaft 13. On the other hand, a pin 14 is provided protruding from the side surface of the upper spreader 5, and this pin 14 is connected to the arm 1 when the spreader 5 is lowered.
2, the arm 12 is rotated up and down by the spreader's own weight or by operation of a rotation lever (not shown) to lower the spreader 5 to the upper surface of the basic boom, and the pin hole (guide) of the spreader 5 is lowered. A structure in which the cable 7 mounting pin hole (also used) 9 is aligned with the pin hole 10 of the spreader mounting bracket 8 is known (Utility Model Application No. 1983-1999).
(Refer to Publication No. 173690).

しかしこの従来装置によると、アーム12とピ
ン14とは、図の仮想線で示す取付位置と、同実
線で示す位置との間で係合したままの状態となる
ため、ブーム組立後、スプレツダ5が巻上げられ
ると、このスプレツダ5とともにアーム12が実
線位置まで起立した後、ピン14が係合部12a
から外れてアーム12が倒れ、これによつて基本
ブーム2aが損傷するおそれがある。また、この
後、クレーン作業に支障のないように、作業員が
基本ブーム2aに登つて、倒れたアーム12を固
定しなければならず、作業が面倒となるという欠
点があつた。
However, according to this conventional device, the arm 12 and the pin 14 remain engaged between the mounting position shown by the imaginary line in the figure and the position shown by the same solid line. When the arm 12 is wound up, the arm 12 stands up to the solid line position together with the spreader 5, and then the pin 14 engages the engaging portion 12a.
There is a risk that the arm 12 will come off and fall down, thereby damaging the basic boom 2a. Furthermore, after this, the worker has to climb onto the basic boom 2a and fix the fallen arm 12 so as not to interfere with the crane work, which makes the work cumbersome.

一方、実開昭58−158080号公報に示されている
ように、スプレツダを基本ブーム上面の受台に載
せた状態で、このスプレツダと基本ブーム上面と
の間に中折れ式に屈伸可能なリンク部材をへの字
形の屈折状態で取付け、このリンク部材を、直線
状となるように足等で押え込んでスプレツダをブ
ラケツト側に移動させるようにしたものも公知と
なつている。しかしこの装置によると、スプレツ
ダの移動を人力で行なうため、操作が困難である
とともに、危険であつた。
On the other hand, as shown in Japanese Utility Model Application Publication No. 58-158080, when the spreader is placed on a pedestal on the upper surface of the basic boom, there is a link that can be bent in the middle and extended between the spreader and the upper surface of the basic boom. It is also known that the link member is attached in a bent state in the shape of a square, and the spreader is moved toward the bracket by pressing the link member with a foot or the like so that the link member becomes straight. However, with this device, the spreader is moved manually, which makes it difficult and dangerous to operate.

(考案の目的) そこで本考案は、上部スプレツダの移動を簡単
かつ安全に行なうことができ、また上部スプレツ
ダ巻上時にブームの損傷等の不都合が生じないク
レーンにおける上部スプレツダの移動装置を提供
するものである。
(Purpose of the invention) Therefore, the present invention provides a device for moving the upper spretzer in a crane, which allows the upper spreader to be moved easily and safely, and which does not cause inconveniences such as damage to the boom when hoisting the upper spretder. It is.

(考案の構成) 本考案の特徴とするところは、基本ブームの上
面に、上部スプレツダが取付けられるスプレツダ
取付ブラケツトと、このブラケツトより基本ブー
ム基端側において前下がりに傾斜するスプレツダ
ガイド部材とが設けられ、上記上部スプレツダお
よびスプレツダ取付ブラケツトには取付ピンが挿
通されるピン孔が設けられ、一方、上部スプレツ
ダの側面に、上記スプレツダガイド部材の上面に
沿つて下降移動する突子が設けられ、上記スプレ
ツダガイド部材は、その上面に上記突子が接触し
た状態で上部スプレツダのピン孔がスプレツダ取
付ブラケツトのピン孔と合致しうるように位置設
定されてなるクレーンにおける上部スプレツダの
移動装置、にある。
(Structure of the invention) The features of the invention include: a spreader mounting bracket to which the upper spreader is attached to the upper surface of the basic boom; and a spreader guide member that slopes forward and downward from the bracket on the base end side of the basic boom. The upper spreader and the spreader mounting bracket are provided with a pin hole into which a mounting pin is inserted, and the upper spreader is provided with a protrusion that moves downwardly along the upper surface of the spreader guide member on the side surface thereof. , the above-mentioned spreader guide member is positioned so that the pin hole of the upper spreader can match the pin hole of the spreader mounting bracket with the above-mentioned protrusion in contact with the upper surface of the spreader guide member, an upper spreader moving device in a crane; It is in.

(実施例) 第1図乃至第3図に本考案の実施例を示してい
る。なお、この実施例において、第4図乃至第6
図と同一部分に同一符号を付して示し、その重複
説明を省略する。
(Embodiment) An embodiment of the present invention is shown in FIGS. 1 to 3. In addition, in this example, FIGS. 4 to 6
Components that are the same as those in the drawings are designated by the same reference numerals, and redundant explanation thereof will be omitted.

15は基本ブーム2aの上面に固着されたスプ
レツダ取付ブラケツト(以下、単にブラケツトと
いう)、16はこのブラケツト15に設けられた
スプレツダ取付用ピン孔、17は上部スプレツダ
(以下、単にスプレツダという)、18はこのスプ
レツダ17に設けられた取付用ピン孔、19はこ
の両ピン孔16,18にさし通されるスプレツダ
取付ピンである。
15 is a spreader mounting bracket (hereinafter simply referred to as a bracket) fixed to the upper surface of the basic boom 2a, 16 is a pin hole for installing a spreader provided in this bracket 15, 17 is an upper spreader (hereinafter simply referred to as a spreader), 18 is a mounting pin hole provided in this spreader 17, and 19 is a spreader mounting pin that is inserted through both pin holes 16 and 18.

ブラケツト15には、ピン孔16より下部の位
置において基本ブーム2aと平行にアーム取付フ
レーム20が固着され、このフレーム20にスプ
レツダガイド部材としてのガイドアーム21の基
端部が水平軸(ボルト)22まわりに回動可能に
取付けられている。アーム取付フレーム20に
は、基本ブーム2aと平行に(前後方向に)長孔
23が設けられ、上記水平軸22はこの長孔23
に沿つて前後移動しうるように、長孔23を貫通
する状態でアーム取付フレーム20に取付けられ
ている。こうしてガイドアーム21が、水平軸2
2を中心として起伏回動可能で、かつ前後に移動
(位置調整)可能に取付けられている。
An arm mounting frame 20 is fixed to the bracket 15 in parallel to the basic boom 2a at a position below the pin hole 16, and the base end of a guide arm 21 as a spreader guide member is attached to this frame 20 with a horizontal axis (bolt). It is rotatably attached around 22. The arm mounting frame 20 is provided with a long hole 23 parallel to the basic boom 2a (in the front-rear direction), and the horizontal shaft 22 is inserted into this long hole 23.
It is attached to the arm attachment frame 20 in a state where it passes through a long hole 23 so that it can move back and forth along. In this way, the guide arm 21
It is mounted so that it can be rotated up and down around 2 and can be moved back and forth (position adjustment).

なお、第3図において、22aは水平軸22を
回転操作するための平面加工部、24,24は水
平軸22をアーム取付フレーム20に位置固定す
るための固定ナツト、25は同水平軸抜止め用の
ナツトである。
In addition, in FIG. 3, 22a is a plane processing part for rotating the horizontal shaft 22, 24, 24 is a fixing nut for fixing the position of the horizontal shaft 22 on the arm mounting frame 20, and 25 is a retainer for the horizontal shaft. This is Natsuto.

ガイドアーム21は、使用時、すなわちスプレ
ツダ17をブラケツト15に向けて移動案内する
ときには、第1図に示すように前下がりに傾斜す
る起立姿勢とされ、不使用時は第2図に示すよう
に基本ブーム2aと平行な格納姿勢とされる。こ
のガイドアーム21の基端部には、ガイドアーム
21を上記起立姿勢に固定するための起立時ピン
孔21aと、格納姿勢に固定するための格納時ピ
ン孔21bとが設けられ、固定ピン26が、アー
ム取付フレーム20の長孔23とピン孔21a
(アーム起立時)またはピン孔21b(アーム格納
時)とに跨つてさし込まれる。
When in use, that is, when guiding the movement of the spreader 17 toward the bracket 15, the guide arm 21 is in an upright position tilting forward and downward as shown in FIG. 1, and when not in use, it is in an upright position as shown in FIG. The basic boom 2a is in a stored position parallel to the main boom 2a. The base end of the guide arm 21 is provided with an upright pin hole 21a for fixing the guide arm 21 in the upright position and a retraction pin hole 21b for fixing the guide arm 21 in the retracted position. However, the long hole 23 of the arm mounting frame 20 and the pin hole 21a
(when the arm is erected) or pin hole 21b (when the arm is retracted).

一方、スプレツダ17の側面における取付ピン
孔18より後側の位置にガイドピン27が水平に
突設され、このガイドピン27が、起立姿勢のガ
イドアーム21の上面に沿つて下降案内されるよ
うになつている。
On the other hand, a guide pin 27 is horizontally protruded from a position on the rear side of the mounting pin hole 18 on the side surface of the spreader 17, and the guide pin 27 is guided downward along the upper surface of the guide arm 21 in the upright position. It's summery.

なお、基本ブーム2a側のブラケツト15、ア
ーム取付フレーム20、ガイドアーム21、それ
にスプレツダ17のガイドピン27はそれぞれ左
右両側に対称に設けられ、スプレツダ17の移動
案内作用が左右両側で行なわれるようになつてい
る。
The bracket 15 on the basic boom 2a side, the arm mounting frame 20, the guide arm 21, and the guide pin 27 of the spreader 17 are provided symmetrically on both the left and right sides, so that the movement guiding action of the spreader 17 is performed on both the left and right sides. It's summery.

上記構成において、ブーム組立時等において、
スプレツダ17をブラケツト15に取付ける場合
は、第1図に示すようにガイドアーム21を起立
姿勢にセツトした状態で、ブーム起伏ロープ6を
ゆるめてスプレツダ17を自重により下降させ
る。このときスプレツダ17は、スプレツダ自体
の重心位置と、ブーム起伏ロープ6およびガイケ
ーブル7によるスプレツダ支持力との関係から、
第1図に示すようにやや前下がりに傾いた状態で
下降する。この下降時、スプレツダ17のガイド
ピン27がガイドアーム21の先端部上面に接触
し、以後、このアーム21の上面に沿つたガイド
ピン27の移動により、スプレツダ17がブラケ
ツト15に向かつて移動案内され、やがてスプレ
ツダ17のピン孔18がブラケツト5のピン孔1
6と合致する。いいかえれば、このようなスプレ
ツダ移動作用が行なわれるように、ガイドアーム
21の位置および傾斜角度、ガイドピン27の位
置等が設定される。
In the above configuration, when assembling the boom, etc.
When attaching the spreader 17 to the bracket 15, with the guide arm 21 set in the upright position as shown in FIG. 1, the boom hoisting rope 6 is loosened and the spreader 17 is lowered by its own weight. At this time, the spretsuda 17 has the following characteristics based on the relationship between the center of gravity of the spretsuda itself and the support force of the spretsuda by the boom hoisting rope 6 and the guy cable 7.
As shown in Figure 1, it descends with a slight forward tilt. During this lowering, the guide pin 27 of the spreader 17 comes into contact with the top surface of the tip of the guide arm 21, and thereafter, as the guide pin 27 moves along the top surface of the arm 21, the spreader 17 is guided to move toward the bracket 15. , eventually the pin hole 18 of the spreader 17 becomes the pin hole 1 of the bracket 5.
Matches 6. In other words, the position and inclination angle of the guide arm 21, the position of the guide pin 27, etc. are set so that such a spreader movement effect is performed.

この状態で、一致したピン孔16,18に取付
ピン19をさし込んで、スプレツダ17をブラケ
ツト15に固定すればよい。
In this state, the spreader 17 can be fixed to the bracket 15 by inserting the mounting pins 19 into the matching pin holes 16 and 18.

なお、ガイドアーム21は、アーム取付フレー
ム20の長孔23の範囲で前後移動させることが
できるため、スプレツダ17およびブラケツト1
5のサイズに応じた位置変更、およびピン孔18
の位置微調整を簡単に行なうことができる。すな
わちサイズの異なるスプレツダ、ブラケツトに対
して互換性を有するものとなる。
Note that the guide arm 21 can be moved back and forth within the range of the elongated hole 23 of the arm mounting frame 20, so the spreader 17 and the bracket 1
Change the position according to the size of 5, and pin hole 18
You can easily make fine adjustments to the position. In other words, it is compatible with spreaders and brackets of different sizes.

こうしてスプレツダ17をブラケツト15に取
付けた後は、ガイドアーム21を第2図に示す格
納姿勢とし、かつこの姿勢に固定する。そしてこ
の後、ブーム起伏ロープ6を巻上げると、ガイド
アーム21とは無関係にスプレツダ17のみが上
昇し、基本ブーム2aを起伏させうる状態とな
る。なお、ガイドアーム21を格納姿勢としない
場合でも、ガイドピン27がガイドアーム21に
沿つて上昇移動し、自動的にガイドアーム21か
ら離れるため、スプレツダ17の巻上げには何ら
支障は来たさない。但し、ガイドアーム21は、
スプレツダ巻上時、または巻上後におけるブーム
起伏ロープ6との干渉防止のため、またはクレー
ン輸送時の車高を低くするために格納姿勢として
おくのが望ましい。
After the spreader 17 is attached to the bracket 15 in this manner, the guide arm 21 is placed in the retracted position shown in FIG. 2 and fixed in this position. Thereafter, when the boom hoisting rope 6 is hoisted up, only the spreader 17 rises independently of the guide arm 21, and the basic boom 2a becomes ready to be hoisted. Note that even when the guide arm 21 is not in the retracted position, the guide pin 27 moves upward along the guide arm 21 and automatically separates from the guide arm 21, so there is no problem in hoisting the spreader 17. . However, the guide arm 21 is
It is desirable to keep it in the retracted position in order to prevent interference with the boom hoisting rope 6 during or after hoisting the spreader, or to lower the vehicle height during crane transportation.

他の実施例 () ガイドアーム21を、上記実施例のよう
な直線状でなく、ブラケツト15側に膨らむ円
弧状に湾曲形成してもよい。こうすれば、アー
ム基端側に向かつてアーム傾斜角度が漸増する
(鉛直に近くなる)ことにより、スプレツダ1
7がブラケツト15に近づくにつれ下降しやす
くなるため、ブーム起伏ロープ6またはガイケ
ーブル7が先に基本ブーム上面に達した場合
に、これらによつてスプレツダ17が押上げら
れる形で下降停止するおそれがなくなる。
Other Embodiments (2) The guide arm 21 may be curved into an arc shape that bulges toward the bracket 15, instead of being linear as in the above embodiment. By doing this, the arm inclination angle gradually increases (becomes close to vertical) toward the arm base end, and the spreader 1
7 becomes easier to descend as it approaches the bracket 15, so if the boom hoisting rope 6 or the guy cable 7 reaches the top of the basic boom first, there is a risk that the spreader 17 will be pushed up and stop descending. It disappears.

() ガイドアーム21を起立姿勢に固定する
手段として、上記固定ピン26による手段に代
えて、たとえば起立させたアーム21と基本ブ
ーム上面との間にステーを斜めにかけ渡す手段
をとつてもよい。
() As a means for fixing the guide arm 21 in the upright position, instead of using the fixing pin 26 described above, for example, a means for diagonally extending a stay between the upright arm 21 and the upper surface of the basic boom may be used.

() スプレツダ側面の突子として、上記実施
例のガイドピン27に代えて回転自在なローラ
を用いてもよい。
() A rotatable roller may be used as the protrusion on the side surface of the spreader in place of the guide pin 27 of the above embodiment.

(考案の効果) 上記のように本考案によるときは、スプレツダ
の移動を、人力に頼らずに自動的に簡単に、そし
て安全に行なうことができる。また、スプレツダ
に設けた突子を、基本ブーム側に設けた前下がり
に傾斜するガイドアームの上面に沿つて移動させ
ることによつてスプレツダを移動案内する構成と
したから、スプレツダ巻上時に、アームの回動を
利用する従来装置の場合のようにアームが倒れて
ブーム上面が損傷する等のおそれも、またスプレ
ツダ巻上後、改めてアームを固定する面倒もなく
なる。
(Effects of the invention) As described above, according to the invention, the spreader can be moved automatically, easily, and safely without relying on human power. In addition, since the structure is such that the movement of the spretsuda is guided by moving the protrusion provided on the spretsuda along the upper surface of the guide arm provided on the basic boom side and tilted forward and downward, the arm There is no risk of the arm falling over and damaging the upper surface of the boom, which is the case with conventional devices that utilize the rotation of the spreader, and there is also no need to fix the arm again after hoisting the spreader.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案の実施例にかかるスプレツダ移
動装置の使用状態、第2図は同格納状態をそれぞ
れ示す側面図、第3図は第1図−線拡大断面
図、第4図はクレーンの一般的構成を示す側面
図、第5図イ,ロは同クレーンのブーム組立手順
を説明するための側面図、第6図は従来装置を示
す側面図である。 2a……基本ブーム、15……スプレツダ取付
ブラケツト、16……同ブラケツトのピン孔、1
7……上部スプレツダ、18……同スプレツダの
ピン孔、19……取付ピン、21……ガイドアー
ム(スプレツダガイド部材)、27……ガイドピ
ン(突子)。
Fig. 1 is a side view showing the spreader moving device according to the embodiment of the present invention in its used state, Fig. 2 is a side view showing the same storage state, Fig. 3 is an enlarged cross-sectional view taken along the line of Fig. 1, and Fig. 4 is a view of the crane. FIG. 5A and FIG. 5B are side views for explaining the procedure for assembling the boom of the same crane, and FIG. 6 is a side view showing the conventional device. 2a... Basic boom, 15... Spreader mounting bracket, 16... Pin hole of the same bracket, 1
7... Upper spreader, 18... Pin hole of the same spreader, 19... Mounting pin, 21... Guide arm (spreader guide member), 27... Guide pin (protrusion).

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 基本ブームの上面に、上部スプレツダが取付け
られるスプレツダ取付ブラケツトと、このブラケ
ツトより基本ブーム基端側において前下がりに傾
斜するスプレツダガイド部材とが設けられ、上記
上部スプレツダおよびスプレツダ取付ブラケツト
には取付ピンが挿通されるピン孔が設けられ、一
方、上部スプレツダの側面に、上記スプレツダガ
イド部材の上面に沿つて下降移動する突子が設け
られ、上記スプレツダガイド部材は、その上面に
上記突子が接触した状態で上部スプレツダのピン
孔がスプレツダ取付ブラケツトのピン孔と合致し
うるように位置設定されてなることを特徴とする
クレーンにおける上部スプレツダの移動装置。
The upper surface of the basic boom is provided with a spreader mounting bracket to which the upper spreader is attached, and a spreader guide member that slopes forward and downward from this bracket toward the base end of the basic boom. A pin hole is provided through which the upper spreader is inserted, and a protrusion is provided on the side surface of the upper spreader, and a protrusion that moves downward along the upper surface of the spreader guide member is provided on the upper surface of the spreader guide member. 1. A moving device for an upper spreader in a crane, characterized in that the upper spreader is positioned such that a pin hole in the upper spreader can match a pin hole in a spreader mounting bracket when the upper spreader is in contact with the pin hole in the spreader mounting bracket.
JP1986107871U 1986-07-14 1986-07-14 Expired JPH0316878Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1986107871U JPH0316878Y2 (en) 1986-07-14 1986-07-14

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1986107871U JPH0316878Y2 (en) 1986-07-14 1986-07-14

Publications (2)

Publication Number Publication Date
JPS6313989U JPS6313989U (en) 1988-01-29
JPH0316878Y2 true JPH0316878Y2 (en) 1991-04-10

Family

ID=30984547

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1986107871U Expired JPH0316878Y2 (en) 1986-07-14 1986-07-14

Country Status (1)

Country Link
JP (1) JPH0316878Y2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6315030B2 (en) * 2016-06-09 2018-04-25 コベルコ建機株式会社 Link device
JP7476812B2 (en) * 2021-01-26 2024-05-01 コベルコ建機株式会社 Upper spreader guide

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6146990B2 (en) * 1978-10-11 1986-10-16 Nippon Electric Co

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5995083U (en) * 1982-12-17 1984-06-28 日立建機株式会社 Crane boom bridle moving device
JPS6146990U (en) * 1984-08-31 1986-03-28 日立建機株式会社 Crane hoisting rope loosening prevention device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6146990B2 (en) * 1978-10-11 1986-10-16 Nippon Electric Co

Also Published As

Publication number Publication date
JPS6313989U (en) 1988-01-29

Similar Documents

Publication Publication Date Title
JPH0316878Y2 (en)
JPH0967099A (en) Carrying load detecting device of vehicle for high lift work
JP2558161Y2 (en) Mobile crane elevating ladder
JPH0132159B2 (en)
JPH10180665A (en) Working arm
JPH0643110Y2 (en) Aerial work vehicle
JP3446090B2 (en) Simple crane for truck
JP3696325B2 (en) Pile driver leader undulation method and apparatus
WO2022163500A1 (en) Upper spreader guide device
JPS6341427Y2 (en)
JP3496082B2 (en) Simple crane for trucks
JP2541697Y2 (en) Pillar assist device
JP3693471B2 (en) Sub boom enclosure
JPH07206380A (en) Jib swing stop device for tower crane
JPH0729109Y2 (en) crane
JPS5844155Y2 (en) Counterweight attachment/detachment device
JPH0242712Y2 (en)
JPH1143290A (en) Boom hoisting device for crane and boom hoisting method
JPS586862Y2 (en) slide jib
JP2000188808A (en) Hot stick retainer
JP2541687Y2 (en) Crane equipment for working at height
JPH0524715Y2 (en)
JPH0316877Y2 (en)
JP4766753B2 (en) Second telescopic boom operating range regulating device for aerial work platforms
JPH09277183A (en) Working arm