JPH0313614A - Operation pattern creating device for river system generator - Google Patents

Operation pattern creating device for river system generator

Info

Publication number
JPH0313614A
JPH0313614A JP14563989A JP14563989A JPH0313614A JP H0313614 A JPH0313614 A JP H0313614A JP 14563989 A JP14563989 A JP 14563989A JP 14563989 A JP14563989 A JP 14563989A JP H0313614 A JPH0313614 A JP H0313614A
Authority
JP
Japan
Prior art keywords
pattern
water level
day
operation pattern
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14563989A
Other languages
Japanese (ja)
Inventor
Hirohito Fujimoto
裕仁 藤本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP14563989A priority Critical patent/JPH0313614A/en
Publication of JPH0313614A publication Critical patent/JPH0313614A/en
Pending legal-status Critical Current

Links

Landscapes

  • Barrages (AREA)
  • Control Of Non-Electrical Variables (AREA)

Abstract

PURPOSE:To eliminate the need of an operator's judgement by collecting water level information such as a dam water level or the like to set constraint conditions on the water level, calculating the electric power quantity to create a virtual pattern, and correcting the virtual pattern at need to be made as the day's operation pattern. CONSTITUTION:A generator is provided on a dam 1, and river system information such as a water level of each dam 1 or the like are transmitted from child machines 3 of a remote supervisory control unit to a parent machine 4. Subsequently, the information is input from the parent machine 4 to an operation pattern creating device 5 to create an operation pattern, In the device 5, the water level information is collected by a data collecting and setting means 51 to set the next day's operation pattern, and the quantity of electric power generated on the next day is calculated by a scheduled day's quantity calculating means 52. Then a virtual pattern is created by selecting the basis among a lot of model patterns by a virtual pattern creating means 53. The virtual pattern is corrected at need by a virtual pattern correcting means 54, and the corrected virtual pattern is registered as the next day's basic operation pattern by a pattern registering means 55.

Description

【発明の詳細な説明】 〔発明の目的〕 (産業上の利用分野) この発明は、電力系統監視制御システムにおける水系発
電機の運転パターン(出力スケジュール)を作成する運
転パターン作成装置に関するものである。
[Detailed Description of the Invention] [Object of the Invention] (Industrial Application Field) This invention relates to an operation pattern creation device that creates an operation pattern (output schedule) for a water-based generator in a power system monitoring and control system. .

(従来の技術、及び発明が解決しようとする課届)電力
系統監視制御システムにおける発電機の運転パターンは
、従来、制御所の運転員がCRT表示装置から電子計算
機(以下、CPUという)1:発電機出力値及びその出
力時間帯を入力することにより作成していた。
(Prior Art and Section Problems to be Solved by the Invention) Conventionally, the operating pattern of a generator in a power system monitoring and control system is determined by an operator at a control center using a CRT display device (hereinafter referred to as a CPU) 1: It was created by inputting the generator output value and its output time period.

この運転パターンの作成においては、時々刻々変化する
ダムの水位、流入量の情報や過去の運用実績と併せて、
運転d自身の経験や判断を要素としていたため長時間を
要する他、誤判断のおそれがあった。
In creating this operation pattern, we use information on the dam's ever-changing water level and inflow volume, as well as past operational results.
Since the process was based on the driver's own experience and judgment, it took a long time and there was a risk of misjudgment.

特に、同一の河川に連接した多数の水力発電所群の運転
パターンの作成は極めて難しい作業でもあった。
In particular, creating operating patterns for a large group of hydroelectric power plants connected to the same river was an extremely difficult task.

この発明は上記の間頴点を解決するためになされたもの
で、運転員の難しい判断を不要化すると共に、発電機が
連接する場合でも容易に運転パターンを作成することの
できる水系発電機の運転パターン作成装置を得ることを
目的とする。
This invention was made in order to solve the above-mentioned problems, and it is a water-based generator that eliminates the need for operators to make difficult decisions and allows for easy creation of operating patterns even when generators are connected. The purpose is to obtain a driving pattern creation device.

〔発明の構成〕[Structure of the invention]

(課題を解決するための手段) この発明は、少なくともダムの水位情報の収集、水位の
制約条件の設定を行うデータ収集・設定手段と、収集、
設定された情報に基いて翌日の一日に発生する電力量を
演算する予定日m演算手段と、発電機を運転する複数の
モデルパターンを記憶すると共1こ、演算された前記予
定日量に対応する一つを選択して仮パターンを作成する
仮パターン作成手段と、作成された前記仮パターンでの
運転をシミュレーションし、水位制約が守られていると
き前記仮パターンを当日運転パターンとし、水位制約が
守られていないときに前記仮パターンを修正して当日運
転パターンとするパターン修正手段とを備えたことを特
徴とするものである。
(Means for Solving the Problems) The present invention provides a data collection/setting means for collecting at least dam water level information and setting water level constraints;
A scheduled day m calculation means for calculating the amount of electric power to be generated in the next day based on the set information, and a plurality of model patterns for operating the generator are stored. Temporary pattern creation means that selects a corresponding one and creates a temporary pattern, and simulates operation with the created temporary pattern, and when water level constraints are observed, sets the temporary pattern as the day's operation pattern and determines the water level. The present invention is characterized by comprising a pattern modifying means for modifying the temporary pattern to use the same day's driving pattern when constraints are not observed.

(作 用) この発明においては、ダム水位等の水位情報を収集する
と共に、水系運用方針に基くダム水位の制約条件の設定
すると、これらの情報に基いて翌日の一日に発生する電
力量が演算され、この電力量に対応して発電機出力と運
転時間とを表す仮パターンが作成される。続いて、シミ
ュレーションによりダム水位の上下限値を逸脱しないか
等の検証が行われ、必要に応じて仮パターンの修正を行
って当日運転パターンとしている。
(Function) In this invention, when water level information such as dam water level is collected and constraints on the dam water level are set based on the water system operation policy, the amount of electricity generated in the next day is calculated based on this information. The calculation is performed, and a temporary pattern representing the generator output and operating time is created in accordance with this amount of power. Next, a simulation is conducted to verify that the dam water level does not deviate from the upper and lower limits, and if necessary, the temporary pattern is revised to become the operating pattern for the day.

この結果、運転員の難しい判断が不要化されると共に、
発電機が連接する場合でも容易に運転パターンを作成す
ることができる。
As a result, difficult judgments by operators are no longer necessary, and
Operation patterns can be easily created even when generators are connected.

(実施例) 第1図はこの発明の一実施例を、水系と併せて示したブ
ロック図である。同図において、河川の上流と下流に建
設されたダム1にそれぞれ発電機2が設けられている。
(Embodiment) FIG. 1 is a block diagram showing an embodiment of the present invention together with a water system. In the figure, a generator 2 is provided at each of the dams 1 constructed upstream and downstream of the river.

各ダム1の水位等の水系情報が遠方監視制御装置の子機
3から親機4に伝送され、この親機4からCPUでなる
運転パターン作成装置5に人力され、ここで運転パター
ンが作成される。また、作成済みの運転パターンを表示
するためのCR7表示装置6が運転パターン作成装置5
に接続されている。
Water system information such as the water level of each dam 1 is transmitted from the slave unit 3 of the remote monitoring and control device to the base unit 4, and from this base unit 4 is manually inputted to the operation pattern creation device 5 consisting of a CPU, where an operation pattern is created. Ru. Further, the CR7 display device 6 for displaying the created driving pattern is connected to the driving pattern creation device 5.
It is connected to the.

ここで、運転パターン作成装置5は、水位情報を収集し
たり、ダム水位の制約条件、発電機の運転時間等の情報
を設定したりするデータ収集・設定手段51と、収集、
設定された情報に基いて翌日の一日に発生する電力量を
演算する予定日m演算手段52と、発電機を運転する複
数のモデルパターンを記憶すると共に、演算された予定
11 fflに対応する一つを選択して仮パターンとす
る仮パターン作成手段53と、作成された仮パターンで
の運転をシミュレーションし、水位制約が守られていな
いときに仮パターンを修正するパターン修正手段54と
、この仮パターンを翌日の基本運転パターンとして登録
するパターン登録手段55と、最新の水系情報及び登録
された基本運転パターンに従って当日の運転をミュレー
ションし、水位制約が守られていないときに修正して当
日運転パターンとするパターン修正手段56と、この当
日運転パターンによりスケジュール運転を行う運転指令
手段57とで構成されている。
Here, the operation pattern creation device 5 includes a data collection/setting means 51 that collects water level information and sets information such as constraints on the dam water level and operating hours of the generator;
Scheduled date m calculation means 52 that calculates the amount of electric power to be generated on the next day based on the set information, and stores a plurality of model patterns for operating the generator, and corresponds to the calculated schedule 11ffl. Temporary pattern creation means 53 selects one pattern and makes it a temporary pattern; pattern modification means 54 simulates operation with the created temporary pattern and corrects the temporary pattern when water level constraints are not observed; A pattern registration means 55 registers the temporary pattern as the basic operation pattern for the next day, simulates the operation of the day according to the latest water system information and the registered basic operation pattern, and corrects when the water level constraints are not observed. It is comprised of a pattern correction means 56 which sets a driving pattern, and a driving command means 57 which performs scheduled driving according to this day's driving pattern.

上記のように構成された本実施例の動作を、CPUの処
理手順を示すフローチャートに従って説明する。
The operation of this embodiment configured as described above will be explained with reference to a flowchart showing the processing procedure of the CPU.

第2図は運転パターン作成装置5の全体的な処理手順を
示すもので、先ず、翌日運転パターンを自動的に作成す
る前準備としてデータの収集及び設定を行い(ステップ
101)、続いて、収集したデータをもとにして、−日
に発生する電力量、すなわち、発生予定日量を算出する
(ステップ102)。次に、発生予定日量に対応して、
CPUに記憶している多数のモデルパターンから基とな
るものを一つ選択し、これを加工して仮パターンを作成
する(ステップ103)。この場合、発電機の運転パタ
ーンは季節によって異なるため、モデルパターンの選択
はCP IJ l:記憶している中から季節に合ったも
のを選び、さらに、発生予定日量とモデルパターンの日
量との差分に応じてパターン配分及び削減を行う。次に
、仮パターンで発電をシミュレーションしくステップ1
04)、水位の制約条件が守られているか否かの検証を
行い(ステップ105)、その結果、第3図に示すよ・
うに、水位制約が守られていた場合にはこれをそのまま
基本運転パターンとし、水位制約が守られていないとき
には仮パターンの修正、すなわち、発電機出力配分を見
立して、例えば、第4図に示すような基本運転パターン
を作成する(ステップ106)。続いて、この基本運転
パターンを当日に運転する当日運転パターンとして登録
する(ステップ107)。
FIG. 2 shows the overall processing procedure of the driving pattern creation device 5. First, data is collected and set as a preparation for automatically creating the next day's driving pattern (step 101), and then data is collected and set. Based on the obtained data, the amount of electric power to be generated on -day, that is, the expected daily amount of electric power to be generated is calculated (step 102). Next, corresponding to the expected daily amount,
One of the many model patterns stored in the CPU is selected as a base, and this is processed to create a temporary pattern (step 103). In this case, since the operating pattern of the generator differs depending on the season, the model pattern selection is CP IJ l: Select the one that matches the season from among those stored, and then compare the expected daily amount generated and the daily amount of the model pattern. Pattern allocation and reduction are performed according to the difference between the patterns. Next, step 1 is to simulate power generation using a temporary pattern.
04), it is verified whether the water level constraint conditions are observed (step 105), and the results are as shown in Figure 3.
In other words, if the water level constraint is observed, this is used as the basic operation pattern, and if the water level constraint is not observed, the temporary pattern is modified, that is, considering the generator output distribution, for example, as shown in Fig. 4. A basic driving pattern as shown in (step 106) is created. Subsequently, this basic driving pattern is registered as the day's driving pattern to be driven on that day (step 107).

次に、登録されたパターンの運転当日になると、最新の
水系情報を収集・解析し、当日運転パターンをシミュレ
ーションしくステップ108)、水位の制約条件が守ら
れているか否かの検証を行い(ステップ109)、水位
の制約が守られていない場合には当日運転パターンを更
新する(ステップ110)。
Next, on the day of operation of the registered pattern, the latest water system information is collected and analyzed, the operation pattern of the day is simulated (step 108), and it is verified whether water level constraints are observed (step 108). 109), and if the water level constraints are not observed, the current day's driving pattern is updated (step 110).

次に、この当日運転パターンで運転されるような指令を
出力する(ステップ111)。
Next, a command for driving according to this day's driving pattern is output (step 111).

第5図はデータの収集及び設定手順(ステップ101)
の詳細を示したフローチャートで、最初に翌日の仕上り
水位を設定しくステップ1011)、これに続いて各ダ
ムの自流量、残流量の予測データを設定する(ステップ
1012)。次に、水系運用方針における水位制約で守
るべき水位、運転制約で守るべき運転時間幅を設定しく
ステップ1013)、最後に、作業予定(点検等)のあ
る発電機については、運転パターンから除外するべく、
例えば、その番号を設定する(ステップ1014)。
Figure 5 shows the data collection and setting procedure (step 101)
In the flowchart showing the details, first, the finishing water level for the next day is set (step 1011), and then predicted data of the own flow rate and remaining flow rate of each dam is set (step 1012). Next, set the water level that should be protected by water level constraints and the operating time range that should be protected by operation constraints in the water system operation policy (Step 1013).Finally, generators that are scheduled for work (inspections, etc.) are excluded from the operation pattern. As much as possible
For example, the number is set (step 1014).

第6図は1日の発生予定日量算出手順(ステップ102
)の詳細を示したフローチャート、第7図はこれに関連
する水位の変化を示した図である。
Figure 6 shows the procedure for calculating the expected daily amount generated per day (step 102).
), and FIG. 7 is a flowchart showing the details of this, and FIG. 7 is a diagram showing changes in the water level related to this.

ここでは、翌日の開始水位(第7図Cに示す当日の仕上
り水位)と翌日の仕上り水位(第7図d)との差(第7
図e)を求め、この水位差からH(水位) −V (貯
水ff1)変換により増分貯水容量を算出しくステップ
1021) 、さらに、この増分貯水容量と自流量から
一日の発電使用水量を算出しくステップ1022)、次
に、この発電使用水量から使用水量に対する電力の比、
すなわち、電水比によって発生予定日量を算出する(ス
テップ102B)。
Here, the difference between the next day's starting water level (the day's finishing water level shown in Figure 7C) and the next day's finishing water level (Figure 7D)
Figure e) is obtained, and from this water level difference, the incremental water storage capacity is calculated by converting H (water level) - V (storage water ff1) (step 1021).Furthermore, the daily water consumption for power generation is calculated from this incremental water storage capacity and the own flow rate. Step 1022), Next, from this amount of water used for power generation, the ratio of electric power to amount of water used,
That is, the expected daily amount of electricity generated is calculated based on the electric water ratio (step 102B).

第8図は仮パターン作成手順(ステップ103)の詳細
を示すフローチャート、第9図はこれに関連する発電機
出力変化を示す図である。この場合、発電機のモデルと
なる運転パターンは過去の実績により常に更新された形
でCPUに記憶されている。そこで、このモデル運転パ
ターンの中から翌日運転(需要)に見合ったパターンを
選択しくステップ1031)、続いて、翌日に発電機が
最大出力(第9図C)にて運転するピーク帯(第9図a
)及び発電機を停止させるボトム帯(第9図b)を設定
する(ステップ1032)。次に、翌1−1の発生予定
日量を発電機出力として時系列的に1「jのパターンを
組立て(ステップ1033)、最後に、第9図の破線A
に示すモデルパターンのLJuと翌日の日量との差分(
増減)をパターンに配分又は削減し、運転パターンの発
電出力を平滑化することにより第9図の実線Bに示す仮
パターンを作成する(ステップ1034)。
FIG. 8 is a flowchart showing details of the temporary pattern creation procedure (step 103), and FIG. 9 is a diagram showing changes in generator output related thereto. In this case, the operating pattern that serves as a model for the generator is stored in the CPU in a constantly updated form based on past results. Therefore, a pattern suitable for the next day's operation (demand) is selected from among these model operation patterns (step 1031), and then a peak period (step 1031) in which the generator is operated at maximum output (Fig. 9C) on the next day is selected. Diagram a
) and the bottom zone (FIG. 9b) for stopping the generator (step 1032). Next, a pattern of 1 "j is assembled in chronological order using the expected daily amount of generation of the next day 1-1 as the generator output (step 1033), and finally, the broken line A in FIG.
The difference between LJu of the model pattern shown in and the daily amount of the next day (
By allocating or reducing the amount (increase/decrease) to the pattern and smoothing the power generation output of the operation pattern, a temporary pattern shown as solid line B in FIG. 9 is created (step 1034).

第10図は仮パターンを検証し、翌日の運転パターンを
作成する手順(ステップ104〜106)の詳細を示す
フローチャートである。これらの処理は水の流下遅れ時
間により発電機出力が目標値に達するまでの時間が正確
であるか、あるいは、発電機出力によってダムが溢水/
渇水することはないかを検証することがポイントである
FIG. 10 is a flowchart showing details of the procedure (steps 104 to 106) for verifying the temporary pattern and creating the next day's driving pattern. These processes are based on whether the time it takes for the generator output to reach the target value is accurate due to the water flow delay time, or whether the dam is overflowing or overflowing due to the generator output.
The key is to verify that there will be no water shortages.

そこで、先ず、上流ダムの発電使用水口から流下遅れ、
すなわち、上流発電所から上流のダムに流れ込むまでの
時間遅れを考慮して流入量を算出しくステップ1041
)、続いて、運転パターンの発生電力Pを発電使用水m
Qに変換しくステップ1042)、さらに、流入木瓜か
ら発電使用水口を引き算して増分貯水容量を算出する(
ステップ1043)。そして、この増分貯水量から水位
を算出する(ステップ1044)。次に、この水位を翌
日仕上り水位及び24時間通しての上下限水位について
判定する(ステップ105)。この判定により、翌日の
仕上り水位を満足し、かつ、24時間を通じて上下限水
位を逸脱していない場合には翌日の基本運転パターンが
完成される。これとは反対に翌日の仕上り水位を満足し
ないか、あるいは、24時間のどこかで上下限水位を逸
脱している場合にはパターンの発電機出力を調整しくス
テップ106)、再度、運転パターンのシミュレーショ
ンを実行する。この場合、水位制約条件が守られず、パ
ターンを修正するときの基本的な処理としては、水位が
高い場合に発電使用水量を増し、発電機出力を上げ、逆
に水位が低い場合には発電使用水量を減らし、発電機出
力を下げるようにする。
Therefore, first of all, there is a flow delay from the power generation water mouth of the upstream dam.
In other words, in step 1041, the amount of inflow must be calculated taking into account the time delay until it flows from the upstream power plant to the upstream dam.
), then the generated power P of the operation pattern is expressed as the power generation water m
Convert to Q (step 1042), and further calculate the incremental water storage capacity by subtracting the water outlet used for power generation from the inflowing quince (
step 1043). Then, the water level is calculated from this incremental water storage amount (step 1044). Next, this water level is determined for the next day's finishing water level and the upper and lower limit water levels for 24 hours (step 105). As a result of this determination, if the finished water level for the next day is satisfied and the water level does not deviate from the upper and lower limit water levels throughout 24 hours, the basic operation pattern for the next day is completed. On the other hand, if the finished water level for the next day is not satisfied, or if it deviates from the upper and lower limit water levels at some point during the 24 hours, the generator output of the pattern is adjusted (Step 106), and the operation pattern is changed again. Run the simulation. In this case, the water level constraint condition is not respected, and the basic process when modifying the pattern is to increase the amount of water used for power generation and increase the generator output when the water level is high, and conversely, when the water level is low, the water used for power generation is increased. Reduce water flow and reduce generator output.

このようにして、翌日の基本運転パターンが完成すると
、当日の運転パターンとして登録する。
When the basic driving pattern for the next day is completed in this way, it is registered as the driving pattern for that day.

この運転パターンは当日のオンラインによるスケジュー
ル運転に受渡しされる。
This driving pattern is passed on to the online scheduled driving for that day.

なお、当日の運転パターンの処理は、第5図、及び第1
0図を用いて説明したと同様で、この場合には最新の水
系情報を用いて運転パターンを自動修正し、その後スケ
ジュール運転として用いる。
The processing of the driving pattern for the day is shown in Figure 5 and Figure 1.
This is the same as explained using FIG.

かくして、この実施例によれば、水系発電機の水系情報
を基に、発電機の運転パターンの作成及びパターンの検
証が自動的に行われ、各発電所の発電機運転パターンを
運転員の要求によりCR7表示装置6に表示することが
できる。また、第2図に示すパターン作成処理を実行す
ることにより、連接した水力発電所への適用が可能とな
り、需要に応じた発電出力をパターン化することができ
る。
Thus, according to this embodiment, the generation of generator operation patterns and pattern verification are automatically performed based on the water system information of the water system generators, and the generator operation patterns of each power station are adjusted according to the operator's request. can be displayed on the CR7 display device 6. Moreover, by executing the pattern creation process shown in FIG. 2, it becomes possible to apply the present invention to connected hydroelectric power plants, and it is possible to pattern the power generation output according to demand.

〔発明の効果〕〔Effect of the invention〕

以上の説明によって明らかなようにこの発明によれば、
水系情報を収集すると共に、水位の制約条件等を設定す
ると、翌日の一日に発生する電力量が演算され、この電
力量に対応する仮パターンが作成され、次いで、シミュ
レーションによる検証でiパターンの修正により当日運
転パターンが自動的に作成されるため、運転員の難しい
判断が不要化されると共に、発電機が連接する場合でも
容易に運転パターンを作成することができるという効果
がある。
As is clear from the above explanation, according to this invention,
When water system information is collected and water level constraints are set, the amount of electricity generated for the next day is calculated, a temporary pattern corresponding to this amount of electricity is created, and then the i-pattern is verified by simulation. Since the current day's operation pattern is automatically created through modification, there is no need for operators to make difficult decisions, and the operation pattern can be easily created even when generators are connected.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の一実施例を、水系と併せて示したブ
ロック図、第2図、第5図、第6図、第8図、及び第1
0図はそれぞれ同実施例の動作を説明するためのフロー
チャート、第3図及び第7図は同実施例の動作を説明す
るために水位と時間との関係を示した線図、第4図及び
第9図は同実施例の動作を説明するために時間と発電機
出力との関係を示した線図である。 1・・・ダム、2・・・発電機、3・・・遠方監視制御
装置子機、4・・・遠方監視制御装置親機、5・・・運
転パターン作成装置、6・・・CRT表示装置、51・
・・データ収集・設定手段、52・・・予定日量演算手
段、53・・・仮パターン作成手段、54.56・・・
パターン修正手段、55・・・パターン登録手段、57
・・・運転指令手段。
Fig. 1 is a block diagram showing an embodiment of the present invention together with a water system, Fig. 2, Fig. 5, Fig. 6, Fig. 8, and Fig. 1
0 is a flowchart for explaining the operation of the same embodiment, FIGS. 3 and 7 are diagrams showing the relationship between water level and time for explaining the operation of the embodiment, and FIGS. FIG. 9 is a diagram showing the relationship between time and generator output to explain the operation of the same embodiment. 1... Dam, 2... Generator, 3... Remote monitoring and control device slave unit, 4... Remote monitoring and control device main unit, 5... Operation pattern creation device, 6... CRT display device, 51・
...Data collection/setting means, 52...Scheduled daily amount calculation means, 53...Temporary pattern creation means, 54.56...
Pattern correction means, 55... Pattern registration means, 57
...Operation command means.

Claims (1)

【特許請求の範囲】[Claims] 少なくともダムの水位情報の収集、水位の制約条件の設
定を行うデータ収集・設定手段と、収集、設定された情
報に基いて翌日の一日に発生する電力量を演算する予定
日量演算手段と、発電機を運転する複数のモデルパター
ンを記憶すると共に、演算された前記予定日量に対応す
る一つを選択して仮パターンを作成する仮パターン作成
手段と、作成された前記仮パターンでの運転をシミュレ
ーションし、水位制約が守られているとき前記仮パター
ンを当日運転パターンとし、水位制約が守られていない
ときに前記仮パターンを修正して当日運転パターンとす
るパターン修正手段とを備えたことを特徴とする水系発
電機の運転パターン作成装置。
Data collection/setting means for collecting at least dam water level information and setting water level constraints, and scheduled daily amount calculation means for calculating the amount of electricity to be generated for the next day based on the collected and set information. , temporary pattern creation means for storing a plurality of model patterns for operating the generator and selecting one corresponding to the calculated scheduled daily amount to create a temporary pattern; and pattern correction means for simulating the operation and setting the temporary pattern as the day's operation pattern when water level constraints are observed, and correcting the temporary pattern to make it the day's operation pattern when the water level constraints are not observed. An operating pattern creation device for a water-based generator, characterized by the following.
JP14563989A 1989-06-08 1989-06-08 Operation pattern creating device for river system generator Pending JPH0313614A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14563989A JPH0313614A (en) 1989-06-08 1989-06-08 Operation pattern creating device for river system generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14563989A JPH0313614A (en) 1989-06-08 1989-06-08 Operation pattern creating device for river system generator

Publications (1)

Publication Number Publication Date
JPH0313614A true JPH0313614A (en) 1991-01-22

Family

ID=15389666

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14563989A Pending JPH0313614A (en) 1989-06-08 1989-06-08 Operation pattern creating device for river system generator

Country Status (1)

Country Link
JP (1) JPH0313614A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6176840B1 (en) 1997-08-11 2001-01-23 Matsushita Electric Works, Ltd. Ultrasonic cosmetic treatment device
JP2007282431A (en) * 2006-04-10 2007-10-25 Chugoku Electric Power Co Inc:The Hydro-electric power generation planning method and hydro-electric power generation planning device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6176840B1 (en) 1997-08-11 2001-01-23 Matsushita Electric Works, Ltd. Ultrasonic cosmetic treatment device
JP2007282431A (en) * 2006-04-10 2007-10-25 Chugoku Electric Power Co Inc:The Hydro-electric power generation planning method and hydro-electric power generation planning device
JP4514726B2 (en) * 2006-04-10 2010-07-28 中国電力株式会社 Hydroelectric power generation plan creation method and hydroelectric power generation plan creation device

Similar Documents

Publication Publication Date Title
Shoults et al. Multi-area adaptive LFC developed for a comprehensive AGC simulator
CN104102212B (en) Dispatching method, apparatus and system for gas and steam system in iron and steel enterprises
CN107256005A (en) A kind of reinforcing steel bar numerical control processing method and equipment based on BIM technology
O'brien et al. An interactive approach to computer aided facility layout
CN101692575B (en) Method for processing data for real-time load flow calculation in large electric systems
CN106786558B (en) Flexible load regulation and control simulation system and method based on dispatching automation master station system
CN106355344A (en) Method for robustly and optimally operating micro-grids on basis of orthogonal arrays
CN103138256A (en) New energy electric power reduction panorama analytic system and method
CN104217056A (en) Rapid design and management method for spacecraft device installation fasteners
EP2339418A1 (en) Method and device for enhancing production facility performances
EP2608123B1 (en) System for distributing electrical energy over a cluster of electrical devices, method for distributing electrical energy over a cluster of electrical devices of such a system and controller for use in such a system
CN103577942A (en) Decision support system and method for coordinated development of water resources and economy
JP2005285032A (en) Daily power generation planning system for hydroelectric power station group
JPH0313614A (en) Operation pattern creating device for river system generator
JP7040676B2 (en) Energy supply and demand operation guidance device and energy supply and demand operation method in steelworks
JP4463065B2 (en) Water distribution control system
Rau et al. A model for economy energy exchanges in interconnected power systems
CN112764400A (en) Online automatic control quality evaluation and optimization system and method
JP2011248614A (en) System and method for evaluating utility loss amount of production line
JPH0916069A (en) Creating method for process design and device thereof
CN110445131A (en) A kind of transmission and distribution network coordinated planning method counted and power distribution network equivalence optimizes
JPH08292974A (en) Method and device for compound generatl analysis of control system, electric circuit, and duct network
CN102929217A (en) Single generator set reliability on-line monitoring device and method
CN109919406A (en) The intelligent housekeeping arrangement method of the power distribution network method of operation
CN114415498B (en) Off-line setting method for PID parameters of generator excitation device