CN109919406A - The intelligent housekeeping arrangement method of the power distribution network method of operation - Google Patents

The intelligent housekeeping arrangement method of the power distribution network method of operation Download PDF

Info

Publication number
CN109919406A
CN109919406A CN201811551239.2A CN201811551239A CN109919406A CN 109919406 A CN109919406 A CN 109919406A CN 201811551239 A CN201811551239 A CN 201811551239A CN 109919406 A CN109919406 A CN 109919406A
Authority
CN
China
Prior art keywords
database
power
distribution network
data
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811551239.2A
Other languages
Chinese (zh)
Inventor
李�杰
曾振源
赵国伟
徐宏
朱鹏程
徐灵辰
陈燕萍
汤旭垚
李自明
徐久益
俞伟龙
盛奡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongxiang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Tongxiang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongxiang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Tongxiang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN201811551239.2A priority Critical patent/CN109919406A/en
Publication of CN109919406A publication Critical patent/CN109919406A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of intelligent housekeeping arrangement methods of power distribution network method of operation, solve the deficiencies in the prior art, technical solution are as follows: S1, Database step: foundation includes the basic database of mechanical floor, graph layer and program computation layer;Logic calculation step: S2 imports maintenance solution, according to database data, using power failure equipments as start node, various constraint conditions are added in sequential search associate device, and the calculating of tentative programme is completed by artificial intelligence mode;S3, realistically displayed step: carrying out realistically displayed to tentative programme, and artificial check is executed if realistically displayed is completed, otherwise re-executes logic calculation step;S4 manually checks step: executing current maintenance solution if current maintenance solution passes through in artificial check, and will use in this maintenance solution input database for self study, otherwise re-starts logic calculation step.

Description

The intelligent housekeeping arrangement method of the power distribution network method of operation
Technical field
The present invention relates to a kind of efficiency data platforms, and in particular to a kind of intelligent housekeeping arrangement side of the power distribution network method of operation Method.
Background technique
In recent years since, power distribution network scale constantly expands, and new energy largely accesses, and the multi-voltage grades such as 10kV, 20kV are simultaneously deposited, So that distribution net work structure is increasingly complicated;At the same time, distribution project amount increases, but the available effective time subtracts relatively It is few, the raising of the job requirements such as amount when along with good service, power failure.These factors are arranged work band to the distribution method of operation Carry out great challenge, also brings risk.The power distribution network method of operation arrangement of power grid enterprises at present is manually to calculate mode Main, this traditional mode has been increasingly difficult to meet work of the modern energy service enterprise on lean distribution management and want It asks, distribution method of operation intelligence arrangement has become the developing direction of trend of the times.A kind of realization power distribution network method of operation arrangement Aided intelligent decision-making, by the power grid data integration of the records such as the cloud platform of operation power data at large database concept, with short circuit The power grids theoretical calculation such as calculating, Load flow calculation, load prediction is key foundation, using search strategy, node trace to the source etc. means into Row modeling deepens high-precision load prediction, three-dimensional meter while completing distribution method of operation intelligence arrangement solution formulation It draws balance, customize the functional applications such as power failure scheme, for promoting that distribution overall operation is horizontal, promotes good service work etc. all The method for providing strength support is imperative.
Summary of the invention
It is an object of the invention to solve the above-mentioned prior art lack it is a kind of by cloud platform of operation power data etc. record Power grid data integration at large database concept, using the power grids such as short circuit calculation, Load flow calculation, load prediction theoretical calculation as core base Plinth is modeled using search strategy, the node means such as trace to the source, arranges solution formulation completing the intelligence of the distribution method of operation Method provides a kind of intelligent housekeeping arrangement method of power distribution network method of operation.
The technical solution adopted by the present invention to solve the technical problems is: a kind of intelligence auxiliary peace of the power distribution network method of operation Discharge method, comprising the following steps:
S1, Database step: foundation includes the basic database of mechanical floor, graph layer and program computation layer;
Logic calculation step: S2 is imported maintenance solution, is sequentially searched according to database data using power failure equipments as start node Various constraint conditions are added in rope associate device, and the calculating of tentative programme is completed by artificial intelligence mode;
S3, realistically displayed step: carrying out realistically displayed to tentative programme, artificial check is executed if realistically displayed is completed, otherwise Re-execute logic calculation step;
S4 manually checks step: current maintenance solution is executed if current maintenance solution passes through in artificial check, and It will be used in this maintenance solution input database for self study, otherwise re-start logic calculation step.
Basic data main source is the cloud platform of operation power data, is electricity cloud platform in Zhejiang in Zhejiang Province, specific to wrap Include OPEN3000 system, OMS system, generalized information system and other related system data, in addition there are manual records outside system to go through History operation data (scheduling operation such as over the years instructs ticket, substation N-1 situation table, grid equipment Quota List).In specific data Hold includes configuration of power network, real-time device state, real-time and historical load information, Awaiting Overhaul facility information, load characteristic curve Deng can be needed to carry out data dilatation update according to function.
With reference to computer modeling and programming professional knowledge, 3 system layers are established --- mechanical floor, graph layer and program meter Calculate layer.Mechanical floor includes device data and relevant parameter model, describes the incidence relation between equipment.Main equipment is to influence system The formulation for the method for operation of uniting simultaneously influences such as arc suppression coil of system load flow distribution, generator, transformer, switch, bus key Property equipment;Other equipment information associated with main equipment should be stored in database profession, and be determined with the associate device of the main equipment Justice.Equipment layer data is the minor node in whole system.
Graph layer includes Drawing Object and its network topology, realizes map sheet management, result displaying and human-computer interaction etc. Function.Graph layer is to carry out search one by one to the minor node in mechanical floor to trace to the source, and passes through the electricity of " point, line, surface " between node Gas connects distribution relation, is layered and shows in visualization interface, forms the operation interface of daily applicable system.
Logical algorithm is arranged in the sequential operation layer of whole system, and using power failure equipments as start node, and its child node is then It for associate device, is solved according to search strategy, search order is node Drawing Object → line pattern object → picture pair As.The various constraint conditions such as stability, overvoltage, overload are added in calculating process, are finally completed calculating, generation type peace Arrange tentative programme.Final scheme is formed using realistically displayed, artificial check, implements and executes simultaneously input system learning database.Wherein Verification several times unacceptable all can return to modification.
The power distribution network method of operation arranges Aided intelligent decision-making that can export power grid from the cloud platform of operation power data Original data model carries out data modeling further according to each line load characteristic, photovoltaic capacity, microclimate, historical load etc., improves The route of load prediction precision, especially end access larger capacity photovoltaic user.High-precision load prediction helps to select Excellent arrangement load transfer mode avoids situations such as equipment is out-of-limit, line end low-voltage caused by mode adjusts.
The power distribution network method of operation arrange Aided intelligent decision-making can according to data such as higher level's power grid yearly plan, monthly plans, Distribution work and major network work plan are voluntarily carried out longitudinally matched, assessment, make corresponding distribution work plan;Further according to Project amount, load prediction, meteorological data etc. carry out lateral rebalancing to distribution work plan and form optimal solution, by lateral and vertical To three-dimensional plan balance, make the scheme of " one stop being mostly used, energy band is not stopped ", reduce scope of power outage and frequency of power cut, keep away Exempt from user to repeat to have a power failure.
It can achieve " adhering to separately property of client has a power failure customizable " by the method, each client is to frequency of power cut, power off time The difference of susceptibility, and the power distribution network method of operation arranges Aided intelligent decision-making that can adopt from the cloud platform of operation power data Collect user information, carry out the division of user's susceptibility for different client, by distribution line block switch to power failure work into Row Cell and Time Distribution section lean arrangement forms and customizes power failure scheme, meets customer personalized demand, and good service is worked from confession Electric enterprise end extends to first section.Customer electricity Experience Degree is promoted, client's viscosity is increased.
Preferably, in step sl, establishing in the Database step has database facility layer, database figure Layer and the database program computation layer for executing logic calculation step,
Wherein, mechanical floor includes the device data for describing the incidence relation between equipment and relevant parameter model, main equipment are It influences the formulation of system operation mode and influences the key equipment of system load flow distribution;Equipment letter associated with main equipment Breath is stored in database profession, and is defined with the associate device of the main equipment;Equipment layer data is the minor node in whole system.
Preferably, the key equipment includes arc suppression coil, generator, transformer, switch and bus.
Preferably, the graph layer is to carry out search one by one to the minor node in mechanical floor to trace to the source, by between node Electrical connection distribution relation, in visualization interface be layered show.
Preferably, the database source is the cloud platform of operation power data, and the manual record that imports is gone through History operation data, including configuration of power network, real-time device state, in real time and historical load information, Awaiting Overhaul facility information and negative Lotus characteristic curve.
Preferably, the parameter model includes tide model, stable model and other models, the tide model includes The road model of nodal analysis method sum, the stable model include excitation model and PSS model, other described models include failure mould Type, output Controlling model and calculating Controlling model.
Preferably, negative according to each line load characteristic, photovoltaic capacity, microclimate and history in the logic calculation step Lotus carries out data modeling, and the circuit setting for being greater than the photovoltaic user of given threshold capacity to end access in calculating process weights Assignment carries out the arrangement of load transfer mode using the load prediction that self study mode obtains, if the maintenance solution in calculating process It is middle to occur because equipment caused by adjusting is out-of-limit and line end low voltage condition is then carried out from main modulation.
Preferably, in Database step, each client to the difference of frequency of power cut and power off time susceptibility, User information is acquired from the cloud platform of operation power data, the division of user's susceptibility is carried out for different clients, in logic It calculates in step, using distribution line block switch as separation, the arrangement of Cell and Time Distribution section is carried out to power failure work and is calculated, it is fixed to be formed Inhibition and generation power failure scheme.
Preferably, the maintenance solution not executed in step S3 and step S4 is as in denial plan input database It is used for self study.Artificial intelligence mode implementation method in the application uses existing artificial intelligence implementation, study The maintenance to fail during the source in library is by the scheme of the maintenance of the implementation of verification and in simulation process, desk checking Scheme, wherein the constraint condition in the present invention sets manually or determined by the parameter of equipment itself, interior joint weighting of the present invention The setting of data is set manually or by: each client to frequency of power cut and power off time susceptibility and load characteristic, negative Each environment factors such as period are carried to be configured.
Preferably, in step s 2, user can directly specify the priority or preferred value of adjustment data.The present invention The preferred value of middle adjustment data is realized by the adjustment mode of node valuation ratio, i.e., under original adjustment mode, refers to The adjustment assignment ratio for being set to the node relevant parameter of high priority is increased, and in the application, can be completed by graphic interface The priority that the interior equipment that draws the line is adjusted data adjusts, and in the application, can also be carried out by way of selected route Adjust the priority adjustment of data.
Preferably, in the priority set-up procedure for being adjusted data by way of selecting route, manually It actively selectes and is worth on the basis of the node valuation ratio of node, the node valuation ratio of arbitrary node passes through node on selected route It the weighted value of importance and is calculated with the equipment distance of manual mode actively selected node, wherein equipment distance is According to route by load quantity, size and type be determined.
Substantial effect of the invention is: by establishing intelligent auxiliary operation on the basis of large database concept, formation is taken into account The decision scheme of the functions such as method of operation arrangement, work plan integration, the customization of client differentiated.It is strong hand labor to be mitigated Degree promotes working efficiency and accuracy.It is adapted to the work of the fortune side under large capacity, fast pace background, is adapted to increasingly sophisticated Power grid framework is adapted to focus on the tendency of the day of good service.As the continuous improvement of distribution automation degree and route join Network mode is enriched constantly, Aided intelligent decision-making as described herein will can mature, and for reduce have a power failure, further Improve power supply reliability and customer satisfaction.
Detailed description of the invention:
Fig. 1: overall flow figure of the invention.
Specific embodiment
Below by specific embodiment, in conjunction with attached drawing, technical scheme of the present invention will be further explained in detail.
Embodiment 1:
A kind of intelligent housekeeping arrangement method of the power distribution network method of operation, it is characterised in that: the following steps are included:
S1, Database step: foundation includes the basic database of mechanical floor, graph layer and program computation layer;
Logic calculation step: S2 is imported maintenance solution, is sequentially searched according to database data using power failure equipments as start node Various constraint conditions are added in rope associate device, and the calculating of tentative programme is completed by artificial intelligence mode;
S3, realistically displayed step: carrying out realistically displayed to tentative programme, artificial check is executed if realistically displayed is completed, otherwise Re-execute logic calculation step;
S4 manually checks step: current maintenance solution is executed if current maintenance solution passes through in artificial check, and It will be used in this maintenance solution input database for self study, otherwise re-start logic calculation step.
In step sl, establishing in the Database step has database facility layer, database graph layer and execution The database program computation layer of logic calculation step, mechanical floor include describe the incidence relation between equipment device data and Relevant parameter model, main equipment are the key equipment for influencing the formulation of system operation mode and influencing system load flow distribution;With The associated facility information of main equipment is stored in database profession, and is defined with the associate device of the main equipment;Equipment layer data is Minor node in whole system.
The key equipment includes arc suppression coil, generator, transformer, switch and bus.
The graph layer is to carry out search one by one to the minor node in mechanical floor to trace to the source, and passes through the electrical connection between node Distribution relation is layered in visualization interface and shows.
The database source is the cloud platform of operation power data, and the history run number of the manual record imported According to, including configuration of power network, real-time device state, real-time and historical load information, Awaiting Overhaul facility information and part throttle characteristics song Line.
The parameter model includes tide model, stable model and other models, and the tide model includes nodal analysis method The road model of sum, the stable model include excitation model and PSS model, other described models include fault model, output control Simulation and calculating Controlling model.
It is counted in the logic calculation step according to each line load characteristic, photovoltaic capacity, microclimate and historical load According to modeling, the circuit setting for being greater than the photovoltaic user of given threshold capacity to end access in calculating process weights assignment, adopts Carry out load transfer mode arrangement with the load prediction that self study mode obtains, if occur in maintenance solution in calculating process because Equipment caused by adjust is out-of-limit and line end low voltage condition is then carried out from main modulation.
In Database step, each client to have a power failure and power off time susceptibility difference, from operation power number According to cloud platform on acquire user information, carry out the division of user's susceptibility for different client, in logic calculation step, with Distribution line block switch is separation, carries out the arrangement of Cell and Time Distribution section to power failure work and calculates, is formed and customize power failure scheme.
In step S3 and step S4 not execute maintenance solution as in denial plan input database for self study It uses.
In the priority set-up procedure that the present embodiment is adjusted data by way of selecting route, lead manually It is worth on the basis of the node valuation ratio of dynamic selected node, the node valuation ratio of arbitrary node passes through node weight on selected route It the weighted value for the property wanted and is calculated with the equipment distance of manual mode actively selected node, wherein equipment distance is root According to route by load quantity, size and type be determined.
In step s 2, user can directly specify the priority or preferred value of adjustment data.Number is adjusted in the present invention According to preferred value realized by the adjustment mode of node valuation ratio, i.e., under original adjustment mode, be appointed as Gao You The adjustment assignment ratio of the node relevant parameter of first grade is increased, and in the application, can complete to draw the line by graphic interface The priority that interior equipment is adjusted data adjusts, and in the application, can also be adjusted data by way of selected route Priority adjustment.
Artificial intelligence mode implementation method in the present embodiment uses existing artificial intelligence implementation, learning database The side of the maintenance to fail during source is by the scheme of the maintenance of the implementation of verification and in simulation process, desk checking Case, wherein the constraint condition in the present invention sets manually or determined by the parameter of equipment itself, interior joint weighted number of the present invention According to setting set manually or by: each client to having a power failure and power off time susceptibility and load characteristic, load period It is configured etc. each environment factor.
The present embodiment by establishing intelligent auxiliary operation on the basis of large database concept, formation take into account method of operation arrangement, The decision scheme of the functions such as work plan integration, the customization of client differentiated.Labor intensity can be mitigated, promote working efficiency And accuracy.It is adapted to the work of the fortune side under large capacity, fast pace background, increasingly sophisticated power grid framework is adapted to, is adapted to Focus on the tendency of the day of good service.With distribution automation degree continuous improvement and route contact information it is continuous rich Richness, Aided intelligent decision-making as described herein will can mature, and for reduce have a power failure, further increase power supply reliability And customer satisfaction.
Above-mentioned embodiment is only a preferred solution of the present invention, not the present invention is made in any form Limitation, there are also other variations and modifications on the premise of not exceeding the technical scheme recorded in the claims.

Claims (9)

1. a kind of intelligent housekeeping arrangement method of power distribution network method of operation, it is characterised in that: the following steps are included:
S1, Database step: foundation includes the basic database of mechanical floor, graph layer and program computation layer;
Logic calculation step: S2 is imported maintenance solution, is sequentially searched according to database data using power failure equipments as start node Various constraint conditions are added in rope associate device, and the calculating of tentative programme is completed by artificial intelligence mode;
S3, realistically displayed step: carrying out realistically displayed to tentative programme, artificial check is executed if realistically displayed is completed, otherwise Re-execute logic calculation step;
S4 manually checks step: current maintenance solution is executed if current maintenance solution passes through in artificial check, and It will be used in this maintenance solution input database for self study, otherwise re-start logic calculation step.
2. the intelligent housekeeping arrangement method of the power distribution network method of operation according to claim 1, it is characterised in that: in step S1 In, establishing in the Database step has database facility layer, database graph layer and the number for executing logic calculation step According to library computation layer, mechanical floor includes describing the device data and relevant parameter model of the incidence relation between equipment, main Equipment is the key equipment for influencing the formulation of system operation mode and influencing system load flow distribution;It is associated with main equipment Facility information is stored in database profession, and is defined with the associate device of the main equipment;Equipment layer data is small in whole system Node.
3. the intelligent housekeeping arrangement method of the power distribution network method of operation according to claim 2, it is characterised in that: the pass Keyness equipment includes arc suppression coil, generator, transformer, switch and bus.
4. the intelligent housekeeping arrangement method of the power distribution network method of operation according to claim 2, it is characterised in that: the figure Layer is to carry out search one by one to the minor node in mechanical floor to trace to the source, by the electrical connection distribution relation between node, visual Change to be layered in interface and show.
5. the intelligent housekeeping arrangement method of the power distribution network method of operation according to claim 2, it is characterised in that: the data Library source is the cloud platform of operation power data, and the history data of the manual record imported, including configuration of power network, Real-time device state, real-time and historical load information, Awaiting Overhaul facility information and load characteristic curve.
6. the intelligent housekeeping arrangement method of the power distribution network method of operation according to claim 2, it is characterised in that: the parameter Model includes tide model, stable model and other models, and the tide model includes the road model of nodal analysis method sum, described steady Cover half type includes excitation model and PSS model, other described models include fault model, output Controlling model and calculating control mould Type.
7. the intelligent housekeeping arrangement method of the power distribution network method of operation according to claim 2, it is characterised in that: the logic It calculates in step and data modeling is carried out according to each line load characteristic, photovoltaic capacity, microclimate and historical load, in calculating process In to end access be greater than given threshold capacity photovoltaic user circuit setting weight assignment, obtained using self study mode Load prediction carries out the arrangement of load transfer mode, if occurring in maintenance solution in calculating process because equipment caused by adjusting is got over Limit and line end low voltage condition are then carried out from main modulation.
8. the intelligent housekeeping arrangement method of the power distribution network method of operation according to claim 5, it is characterised in that: in database In establishment step, each client is to the difference of frequency of power cut and power off time susceptibility, from the cloud platform of operation power data User information is acquired, the division of user's susceptibility is carried out for different clients and is segmented in logic calculation step with distribution line Switch is separation, carries out the arrangement of Cell and Time Distribution section to power failure work and calculates, is formed and customize power failure scheme.
9. the intelligent housekeeping arrangement method of the power distribution network method of operation according to claim 5, it is characterised in that: in step S3 It is used as in denial plan input database for self study with the maintenance solution not executed in step S4.
CN201811551239.2A 2018-12-18 2018-12-18 The intelligent housekeeping arrangement method of the power distribution network method of operation Pending CN109919406A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811551239.2A CN109919406A (en) 2018-12-18 2018-12-18 The intelligent housekeeping arrangement method of the power distribution network method of operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811551239.2A CN109919406A (en) 2018-12-18 2018-12-18 The intelligent housekeeping arrangement method of the power distribution network method of operation

Publications (1)

Publication Number Publication Date
CN109919406A true CN109919406A (en) 2019-06-21

Family

ID=66959889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811551239.2A Pending CN109919406A (en) 2018-12-18 2018-12-18 The intelligent housekeeping arrangement method of the power distribution network method of operation

Country Status (1)

Country Link
CN (1) CN109919406A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112347089A (en) * 2020-10-29 2021-02-09 广西电网有限责任公司电力科学研究院 Method for checking power supply reliability data quality of multiple systems

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955777A (en) * 2014-05-16 2014-07-30 天津大学 Photovoltaic power generation access power distribution network scheme design and analysis assessment auxiliary system
CN104573845A (en) * 2014-12-03 2015-04-29 国家电网公司 Auxiliary decision-making method for equipment state maintenance of information system
CN105743221A (en) * 2016-03-22 2016-07-06 国网山东省电力公司潍坊供电公司 Black-start comprehensive verification system of power system and method of black-start comprehensive verification system
CN106056349A (en) * 2016-05-18 2016-10-26 国网山东省电力公司经济技术研究院 Province-city-county three-level power grid programming GIS drawing system and method
CN106570567A (en) * 2016-10-26 2017-04-19 国家电网公司 Main network maintenance multi-constraint multi-target evaluation expert system and optimization method
CN206294207U (en) * 2016-12-30 2017-06-30 国网山西省电力公司 Grid power blackout proposed figures for the plan Optimization Platform based on " big operation " multi-constraint condition
CN107909295A (en) * 2017-12-08 2018-04-13 国网山东省电力公司电力科学研究院 A kind of outage information monitor and analysis system
CN108090679A (en) * 2017-12-20 2018-05-29 国网冀北电力有限公司承德供电公司 A kind of power failure service management and system based on user's power failure susceptibility
CN108491969A (en) * 2018-03-16 2018-09-04 国家电网公司 Spatial Load Forecasting model building method based on big data
CN108564254A (en) * 2018-03-15 2018-09-21 国网四川省电力公司绵阳供电公司 Controller switching equipment status visualization platform based on big data

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955777A (en) * 2014-05-16 2014-07-30 天津大学 Photovoltaic power generation access power distribution network scheme design and analysis assessment auxiliary system
CN104573845A (en) * 2014-12-03 2015-04-29 国家电网公司 Auxiliary decision-making method for equipment state maintenance of information system
CN105743221A (en) * 2016-03-22 2016-07-06 国网山东省电力公司潍坊供电公司 Black-start comprehensive verification system of power system and method of black-start comprehensive verification system
CN106056349A (en) * 2016-05-18 2016-10-26 国网山东省电力公司经济技术研究院 Province-city-county three-level power grid programming GIS drawing system and method
CN106570567A (en) * 2016-10-26 2017-04-19 国家电网公司 Main network maintenance multi-constraint multi-target evaluation expert system and optimization method
CN206294207U (en) * 2016-12-30 2017-06-30 国网山西省电力公司 Grid power blackout proposed figures for the plan Optimization Platform based on " big operation " multi-constraint condition
CN107909295A (en) * 2017-12-08 2018-04-13 国网山东省电力公司电力科学研究院 A kind of outage information monitor and analysis system
CN108090679A (en) * 2017-12-20 2018-05-29 国网冀北电力有限公司承德供电公司 A kind of power failure service management and system based on user's power failure susceptibility
CN108564254A (en) * 2018-03-15 2018-09-21 国网四川省电力公司绵阳供电公司 Controller switching equipment status visualization platform based on big data
CN108491969A (en) * 2018-03-16 2018-09-04 国家电网公司 Spatial Load Forecasting model building method based on big data

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112347089A (en) * 2020-10-29 2021-02-09 广西电网有限责任公司电力科学研究院 Method for checking power supply reliability data quality of multiple systems

Similar Documents

Publication Publication Date Title
CN103150600B (en) A kind of power grid security analysis system
CN103296677B (en) A kind of online bulk power grid recovers aid decision-making system
CN105932666A (en) Complex distribution network multi-time-scale digital-analog hybrid simulation system and simulation method therefor
CN107516895A (en) Power distribution network rapid simulation method and device, storage medium and computer equipment thereof
CN108122068A (en) A kind of power distribution network risk-averse retailer method and system
CN104598671A (en) Digital power grid construction method based on on-line data
CN103455554B (en) A kind of intelligent power distribution network model base system
CN106356850B (en) The generation method of safety and stability control device failure Off-line control Policy model
CN111967658B (en) Comprehensive power failure analysis method based on marketing and distribution information integration platform
CN103996147A (en) Comprehensive evaluation method for power distribution network
CN109145362A (en) A kind of power network modeling method and system
CN103199521A (en) Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation
CN112260322B (en) Source network load storage simulation platform, method and system
CN106875086A (en) A kind of electric network data modeling method and its system based on graphical interactive operation
Hewes et al. Development of a dynamic model of the European transmission system using publicly available data
Dechamps et al. Interactive computer program for planning the expansion of meshed transmission networks
CN115622053A (en) Automatic load modeling method and device for considering distributed power supply
CN108347048B (en) Planning method adapting to transregional and transnational scheduling modes
CN106709619A (en) Method for generating energy efficiency monitoring system by applying common information model configuration
CN109919406A (en) The intelligent housekeeping arrangement method of the power distribution network method of operation
CN103886514A (en) Power grid development assessment method with economical efficiency and security considered
Wang et al. A bilevel EV charging station and DC fast charger planning model for highway network considering dynamic traffic demand and user equilibrium
CN116995682B (en) Adjustable load participation active power flow continuous adjustment method and system
CN116599160B (en) Active sensing method and system for new energy station cluster and new energy station
CN103296678B (en) A kind of online bulk power grid recovers aid decision-making method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621