JPH021357U - - Google Patents

Info

Publication number
JPH021357U
JPH021357U JP7929188U JP7929188U JPH021357U JP H021357 U JPH021357 U JP H021357U JP 7929188 U JP7929188 U JP 7929188U JP 7929188 U JP7929188 U JP 7929188U JP H021357 U JPH021357 U JP H021357U
Authority
JP
Japan
Prior art keywords
horizontal pipe
bridge
rod
scaffolding
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7929188U
Other languages
Japanese (ja)
Other versions
JPH0618976Y2 (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP7929188U priority Critical patent/JPH0618976Y2/en
Publication of JPH021357U publication Critical patent/JPH021357U/ja
Application granted granted Critical
Publication of JPH0618976Y2 publication Critical patent/JPH0618976Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【図面の簡単な説明】[Brief explanation of drawings]

図は本考案の一実施例を示すものであつて、第
1図は第2図に於けるX―X線断面図、第2図は
本考案の平面図、第3図は同上側面図である。 A……端部ブリツジ部、1……端部側枠体、1
a……柱杆、1b……足場板架設杆、1c,1d
,1e……クランプ、2……連結側枠体、2a…
…柱杆、2b……足場板架設杆、2c,2d,2
e……クランプ、3……上位横パイプ、4……中
位横パイプ、5……下位横パイプ、6……支柱、
6a……高さ調節用孔、7……取付け金具、7a
……受け金具部、8……ピン金具、B……中間部
ブリツジ部、9……中央枠体、9a……柱杆、9
b……足場板架設杆、9c,9d,9e……クラ
ンプ、10……上位横パイプ、11……中位横パ
イプ、12……下位横パイプ、a……長さ調節用
孔、13……連結用ピン、14……足場板、15
……足場板、16……筋かい取付け用ピン、H…
…鉄骨梁材。
The drawings show one embodiment of the present invention, in which Fig. 1 is a sectional view taken along line X-X in Fig. 2, Fig. 2 is a plan view of the invention, and Fig. 3 is a side view of the same. be. A... End bridge part, 1... End side frame body, 1
a... Pillar rod, 1b... Scaffold board erection rod, 1c, 1d
, 1e... Clamp, 2... Connection side frame, 2a...
... Pillar rod, 2b ... Scaffolding board erection rod, 2c, 2d, 2
e... Clamp, 3... Upper horizontal pipe, 4... Middle horizontal pipe, 5... Lower horizontal pipe, 6... Support,
6a...Hole for height adjustment, 7...Mounting bracket, 7a
...Receiver fitting part, 8...Pin fitting, B...Intermediate bridge part, 9...Central frame body, 9a...Column rod, 9
b...Scaffold board erection rod, 9c, 9d, 9e...Clamp, 10...Upper horizontal pipe, 11...Medium horizontal pipe, 12...Lower horizontal pipe, a...Length adjustment hole, 13... ... Connecting pin, 14 ... Scaffolding board, 15
...Scaffolding board, 16...Brace attachment pin, H...
...Steel beam material.

補正 昭63.7.29 図面の簡単な説明を次のように補正する。Correction 1986.7.29 The brief description of the drawing has been amended as follows.

【図面の簡単な説明】 図は本考案の一実施例を示すものであつて、第
1図は第2図に於けるX―X線断面図、第2図は
本考案の平面図、第3図は同上側面図である。 A……端部ブリツジ部、1……端部側枠体、1
a……柱杆、1b……足場板架設杆、1c,1d
,1e……クランプ、2……連結側枠体、2a…
…柱杆、2b……足場板架設杆、2c,2d,2
e……クランプ、3……上位横パイプ、4……中
位横パイプ、5……下位横パイプ、6……支柱、
6a……高さ調節用孔、7……取付け金具、7a
……受け金具部、8……ピン金具、B……中間部
ブリツジ部、9……中央枠体、9a……柱杆、9
b……足場板架設杆、9c,9d,9e……クラ
ンプ、10……上位横パイプ、11……中位横パ
イプ、12……下位横パイプ、a……長さ調節用
孔、13……連結用ピン、14……足場板、15
……足場板、16……筋かい取付け用ピン、17
……脱落防止用巾木、
18……脱落防止用巾木、
H……鉄骨梁材。
[Brief Description of the Drawings] The figures show one embodiment of the present invention, in which Fig. 1 is a sectional view taken along line X--X in Fig. 2, Fig. 2 is a plan view of the invention, and Fig. 2 is a plan view of the invention. Figure 3 is a side view of the same as above. A... End bridge part, 1... End side frame body, 1
a... Pillar rod, 1b... Scaffold board erection rod, 1c, 1d
, 1e... Clamp, 2... Connection side frame, 2a...
... Pillar rod, 2b ... Scaffolding board erection rod, 2c, 2d, 2
e... Clamp, 3... Upper horizontal pipe, 4... Middle horizontal pipe, 5... Lower horizontal pipe, 6... Support,
6a...Hole for height adjustment, 7...Mounting bracket, 7a
...Receiver fitting part, 8...Pin fitting, B...Intermediate bridge part, 9...Central frame body, 9a...Column rod, 9
b...Scaffold board erection rod, 9c, 9d, 9e...Clamp, 10...Upper horizontal pipe, 11...Medium horizontal pipe, 12...Lower horizontal pipe, a...Length adjustment hole, 13... ... Connecting pin, 14 ... Scaffolding board, 15
...Scaffolding board, 16...Brace attachment pin, 17
... Baseboard to prevent falling off,
18... Baseboard to prevent falling off,
H... Steel beam material.

Claims (1)

【実用新案登録請求の範囲】 (1) 平行する柱杆1a,1aの下端寄りに足場
板架設杆1bを水平状に固設して成る端部側枠体
1と、平行する柱杆2a,2aの下端寄りに足場
板架設杆2bを水平状に固設して成る連結側枠体
2とを所定間隔を保つて対向させると共に、当該
柱杆1a,1a及び柱杆2a,2a間に、上位横
パイプ3、中位横パイプ4、下位横パイプ5を夫
々水平状に取付け、また、当該各パイプの後端を
連結側枠体2の位置より夫々突出させて連結用端
部とし、更に、鉄骨梁材Hに対する受け金具部7
aを具えた取付け金具7を下端部に固設した支柱
6を、上記した端部側枠体1における柱杆1a,
1aの下端に高さ調節可能に連結することに依り
、端部ブリツジ部Aを構成し、また、平行する柱
杆9a,9aの下端寄りに足場板架設杆9bを水
平状に固設して成る中央枠体9の当該柱杆9a,
9aに対し、上位横パイプ10、中位横パイプ1
1、下位横パイプ12を夫々水平状に取り付ける
と共に、当該各パイプの両端を、前述した端部ブ
リツジ部Aに於ける上位横パイプ3、中位横パイ
プ4、下位横パイプ5に対し長さ調節自在に夫々
嵌入して中間部ブリツジ部Bを構成し、更に、前
記中央枠体9に於ける足場板架設杆9bと、端部
ブリツジ部Aの連結側枠体2における足場板架設
杆2bとの間に足場板14…を架設すると共に、
端部ブリツジ部Aの端部側枠体1に於ける足場板
架設杆1bに一端を掛け止めた足場板15…の他
端を上記足場板架設杆2bに架設されている足場
板14…上に重ね合わせて固定するように構成し
たことを特徴とする足場用仮設ブリツジ。 (2) 両端に位置する端部ブリツジ部Aの間に、
単数の中間部ブリツジ部Bを形成して成る足場用
仮設ブリツジ。 (3) 両端に位置する端部ブリツジ部Aの間に、
複数単位の中間部ブリツジ部Bを形成して成る足
場用仮設ブリツジ。
[Scope of Claim for Utility Model Registration] (1) An end side frame body 1 consisting of parallel column rods 1a, a scaffold board erection rod 1b horizontally fixed near the lower end of 1a, a parallel column rod 2a, The connecting side frame body 2, which is formed by horizontally fixing a scaffold board erection rod 2b near the lower end of the scaffolding board 2a, is opposed to it with a predetermined interval maintained, and between the pillar rods 1a, 1a and the pillar rods 2a, 2a, The upper horizontal pipe 3, the middle horizontal pipe 4, and the lower horizontal pipe 5 are each installed horizontally, and the rear end of each pipe is made to protrude from the position of the connecting frame 2 to serve as a connecting end, and , the receiving metal part 7 for the steel beam material H
The column 6 with the mounting bracket 7 fixed to the lower end thereof is attached to the column rod 1a of the end side frame body 1 described above.
The end bridge part A is formed by connecting the lower end of 1a so that the height can be adjusted, and the scaffolding board erecting rod 9b is horizontally fixed near the lower end of the parallel column rods 9a, 9a. The pillar rod 9a of the central frame body 9 consisting of
For 9a, upper horizontal pipe 10, middle horizontal pipe 1
1. Attach the lower horizontal pipes 12 horizontally, and set the lengths of both ends of each pipe to the upper horizontal pipe 3, middle horizontal pipe 4, and lower horizontal pipe 5 in the end bridge section A described above. The scaffold board mounting rods 9b on the central frame 9 and the scaffold board mounting rods 2b on the connecting side frames 2 of the end bridge portions A are fitted into each other in a freely adjustable manner to constitute the intermediate bridge portion B. At the same time, a scaffold board 14 is erected between the
Scaffolding board 15, one end of which is hooked to the scaffolding board installation rod 1b of the end side frame 1 of the end bridge portion A...Scaffolding board 14, whose other end is erected to the scaffolding board installation rod 2b... A temporary bridge for scaffolding, characterized in that it is configured to be superimposed on and fixed to. (2) Between the end bridge parts A located at both ends,
A temporary bridge for scaffolding comprising a single intermediate bridge part B. (3) Between the end bridge parts A located at both ends,
A temporary bridge for scaffolding comprising a plurality of intermediate bridge parts B.
JP7929188U 1988-06-15 1988-06-15 Temporary scaffolding bridge Expired - Lifetime JPH0618976Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7929188U JPH0618976Y2 (en) 1988-06-15 1988-06-15 Temporary scaffolding bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7929188U JPH0618976Y2 (en) 1988-06-15 1988-06-15 Temporary scaffolding bridge

Publications (2)

Publication Number Publication Date
JPH021357U true JPH021357U (en) 1990-01-08
JPH0618976Y2 JPH0618976Y2 (en) 1994-05-18

Family

ID=31304175

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7929188U Expired - Lifetime JPH0618976Y2 (en) 1988-06-15 1988-06-15 Temporary scaffolding bridge

Country Status (1)

Country Link
JP (1) JPH0618976Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010185185A (en) * 2009-02-10 2010-08-26 Sekisui House Ltd Temporary handrail and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010185185A (en) * 2009-02-10 2010-08-26 Sekisui House Ltd Temporary handrail and its construction method

Also Published As

Publication number Publication date
JPH0618976Y2 (en) 1994-05-18

Similar Documents

Publication Publication Date Title
US4083156A (en) Apparatus for bracing a tilt-up wall panel
JPH021357U (en)
JPH0246595Y2 (en)
KR20010069576A (en) Traffic signal post
JP3899608B2 (en) Handrail for temporary scaffold
JPS5923161Y2 (en) Concrete formwork support fittings
JPH0311299Y2 (en)
JPH0643335Y2 (en) Handrail railing support device
JPS6128832Y2 (en)
JPH0738555Y2 (en) Beam formwork support frame
JPS6136651Y2 (en)
JPS608037Y2 (en) Supporting hardware for temporary scaffolding boards
JP3034570U (en) Handrail support device
JPH0332675Y2 (en)
JPH0211549Y2 (en)
JPH0213643Y2 (en)
JPH0263723U (en)
JP2502950Y2 (en) Hanging metal fittings such as gondola
JPS5836739Y2 (en) Handrail unit mounting structure
JPH0636196Y2 (en) Panel fence
JPS6236883Y2 (en)
KR910000372Y1 (en) Device for assembly of baffle of heat exchanger
JPH01171846U (en)
JPS627684Y2 (en)
JPH0714531Y2 (en) Handrail support device