JP7441752B2 - PC steel rod and construction method of PC steel rod - Google Patents

PC steel rod and construction method of PC steel rod Download PDF

Info

Publication number
JP7441752B2
JP7441752B2 JP2020138577A JP2020138577A JP7441752B2 JP 7441752 B2 JP7441752 B2 JP 7441752B2 JP 2020138577 A JP2020138577 A JP 2020138577A JP 2020138577 A JP2020138577 A JP 2020138577A JP 7441752 B2 JP7441752 B2 JP 7441752B2
Authority
JP
Japan
Prior art keywords
sheath
steel material
coupler
steel
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020138577A
Other languages
Japanese (ja)
Other versions
JP2022034738A (en
Inventor
悟 鹿子生
真沙人 福田
卓也 小泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Neturen Co Ltd
Original Assignee
Neturen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Neturen Co Ltd filed Critical Neturen Co Ltd
Priority to JP2020138577A priority Critical patent/JP7441752B2/en
Publication of JP2022034738A publication Critical patent/JP2022034738A/en
Application granted granted Critical
Publication of JP7441752B2 publication Critical patent/JP7441752B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Description

本発明は、PC鋼棒体及びPC鋼棒体の施工方法に関する。 The present invention relates to a PC steel bar and a method for constructing a PC steel bar.

従来、PC鋼材の端部がナットに螺合され、ナットと建築構造物等との間にアンカープレートが設けられており、シース管は、一端開口がアンカープレートに当接するシース本体を備え、シース管とPC鋼材との間にはグラウト材が充填されているPC鋼棒体が知られている(特許文献1、[図7]参照)。 Conventionally, the end of a PC steel material is screwed into a nut, and an anchor plate is provided between the nut and a building structure, etc., and a sheath tube has a sheath main body with one end opening abutting the anchor plate, and A PC steel bar body is known in which a grout material is filled between a pipe and a PC steel material (see FIG. 7 in Patent Document 1).

特開2018-184796号公報Japanese Patent Application Publication No. 2018-184796

このようなPC鋼棒体では、PC鋼材がシース管に対して軸方向に移動等した場合は、PC鋼材とシース管との間の隙間からグラウト材が漏出するおそれがある。 In such a PC steel bar body, if the PC steel material moves in the axial direction with respect to the sheath pipe, there is a risk that the grout material may leak from the gap between the PC steel material and the sheath pipe.

本発明の目的は、グラウト材がシース管から漏出することを防止できるPC鋼棒体及びPC鋼棒体の施工方法を提供することにある。 An object of the present invention is to provide a PC steel bar and a method for constructing a PC steel bar that can prevent grout from leaking from a sheath pipe.

本発明のPC鋼棒体は、第一PC鋼材と第二PC鋼材とがカプラで連結されたPC鋼棒と、前記第一PC鋼材及び第二PC鋼材をそれぞれ被覆し前記第一PC鋼材と前記第二PC鋼材の隙間に充填された防錆材を封止するシースと、前記第一PC鋼材と前記第二PC鋼材にそれぞれ設けられ前記防錆材の漏れを防止するブレーキングナットと、前記PC鋼棒のうち少なくとも前記カプラが内部に配置されグラウト材が充填されるシース管とを備え、前記シース管は、前記第一PC鋼材の端部を覆う第一カプラシース継手と、前記第二PC鋼材の端部を覆う第二カプラシース継手と、を有し、前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方と、前記シースとの間に、弾性を有する封止部材が設けられ、当該封止部材が前記ブレーキングナットを覆うように延設されていることを特徴とする。 The PC steel bar body of the present invention includes a PC steel bar in which a first PC steel material and a second PC steel material are connected by a coupler, and a PC steel bar that covers the first PC steel material and the second PC steel material, respectively, and the first PC steel material and the second PC steel material. a sheath that seals a rust preventive material filled in a gap between the second PC steel materials, and a braking nut provided on each of the first PC steel material and the second PC steel material to prevent leakage of the rust preventive material; The PC steel bar includes at least a sheath pipe in which the coupler is disposed and filled with grout, and the sheath pipe includes a first coupler sheath joint that covers an end of the first PC steel material, and a second coupler sheath joint that covers an end of the PC steel material, and an elastic sealing member is provided between the sheath and at least one of the first coupler sheath joint and the second coupler sheath joint. , wherein the sealing member extends to cover the braking nut.

本発明のPC鋼棒体の施工方法は、前述の構成のPC鋼棒体を施工する方法であって、前記第一PC鋼材と前記第二PC鋼材とを直列配置するとともに前記第一PC鋼材と前記第二PC鋼材とをカプラで連結し、前記第一PC鋼材の端部を前記第一カプラシース継手で覆うとともに、前記第二PC鋼材の端部を前記第二カプラシース継手で覆い、かつ、前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方と、前記シースとの間に前記封止部材を設け、前記第一カプラシース継手と前記第二カプラシース継手とを連結して前記シース管を形成し、前記シース管の内部にグラウト材を充填し、その後、前記PC鋼棒及び前記シース管の周囲にコンクリートを打設し、前記第一PC鋼材と前記第二PC鋼材とを軸方向に相対的に引張して前記PC鋼棒に緊張力を付与することを特徴とする。 The method for constructing a PC steel bar of the present invention is a method for constructing a PC steel bar having the above-described configuration, in which the first PC steel material and the second PC steel material are arranged in series, and the first PC steel material is and the second PC steel material with a coupler, an end of the first PC steel material is covered with the first coupler sheath joint, and an end of the second PC steel material is covered with the second coupler sheath joint, and The sealing member is provided between at least one of the first coupler sheath joint and the second coupler sheath joint and the sheath, and the first coupler sheath joint and the second coupler sheath joint are connected to connect the sheath pipe. The inside of the sheath pipe is filled with grout, and then concrete is placed around the PC steel rod and the sheath pipe, and the first PC steel material and the second PC steel material are axially aligned. It is characterized in that tension is applied to the PC steel rod by relatively pulling it.

本発明では、第一PC鋼材と第二PC鋼材とをカプラで連結し、第一PC鋼材の端部を第一カプラシース継手で覆うとともに、第二PC鋼材の端部を第二カプラシース継手で覆い、かつ、第一カプラシース継手と第二カプラシース継手との少なくとも一方とシースとの間に封止部材を設けておく。
さらに、第一カプラシース継手と第二カプラシース継手とを連結してシース管を形成しておく。その後、シース管の内部にグラウト材を充填する。これらの作業により、PC鋼棒体が組み立てられる。
さらに、コンクリートを打設した後、PC鋼棒に緊張力を付与してPC鋼棒体を施工する。
PC鋼棒に緊張力を付与するにあたり、シース管はコンクリートによって、動きが拘束されるのに対して、第一PC鋼材と第二PC鋼材とがシース管に対して相対的に軸方向に移動しようとする。しかしながら、第一カプラシース継手と第二カプラシース継手との少なくとも一方と、シースとの間に封止部材が設けられ、当該封止部材がブレーキングナットを覆うように延設されているので、封止部材がブレーキングナットの位置で径方向外側に張り出してシース継手に押し付けられる。これにより、シース管に対するPC鋼材の移動が抑制される上、封止部材がシース継手に密着してグラウト材の封止性が向上する。また、第一PC鋼材と第二PC鋼材の軸方向の移動により、シース管に充填されたグラウト材が漏出しようとしても、封止部材が弾性変形してシース管とPC鋼棒との間の隙間が封止されたままとなる。
従って、本発明では、コンクリート打設作業やPC鋼棒の緊張作業の前にシース管にグラウト材を充填するプレグラウトの場合に、PC鋼棒の緊張作業において、PC鋼棒がシース管に対して軸方向に移動しようとしても、封止部材がPC鋼棒とシースとの間を封止したままとなり、グラウト材がシース管から漏出することを防止できる。
In the present invention, the first PC steel material and the second PC steel material are connected by a coupler, and the end of the first PC steel material is covered with the first coupler sheath joint, and the end of the second PC steel material is covered with the second coupler sheath joint. , and a sealing member is provided between the sheath and at least one of the first coupler sheath joint and the second coupler sheath joint.
Furthermore, the first coupler sheath joint and the second coupler sheath joint are connected to form a sheath pipe. Thereafter, the inside of the sheath pipe is filled with grout material. Through these operations, a PC steel bar body is assembled.
Furthermore, after pouring concrete, a tension force is applied to the PC steel rod to construct the PC steel rod body.
When applying tension to the prestressed steel rod, the movement of the sheath pipe is restrained by the concrete, while the first prestressed steel material and the second prestressed steel material move in the axial direction relative to the sheath pipe. try to. However, since a sealing member is provided between the sheath and at least one of the first coupler sheath joint and the second coupler sheath joint, and the sealing member extends so as to cover the breaking nut, the sealing The member extends radially outward at the braking nut and is pressed against the sheath joint. As a result, movement of the PC steel material relative to the sheath pipe is suppressed, and the sealing member comes into close contact with the sheath joint, improving the sealing performance of the grout material. In addition, even if the grout filled in the sheath pipe attempts to leak due to the axial movement of the first PC steel material and the second PC steel material, the sealing member will be elastically deformed and the gap between the sheath pipe and the PC steel rod will be The gap remains sealed.
Therefore, in the present invention, in the case of pre-grouting, in which a sheath pipe is filled with grout material before concrete placing work or tensioning work of a PC steel bar, the PC steel bar is placed against the sheath pipe in the tensioning work of a PC steel bar. Even if an attempt is made to move in the axial direction, the sealing member remains sealed between the PC steel rod and the sheath, thereby preventing grout from leaking from the sheath pipe.

本発明のPC鋼棒体において、前記封止部材が設けられた前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方は、前記シースを挿通する小径部と前記小径部より大きな径の大径部とを有し、前記小径部の内径は前記ブレーキングナットの外径より大きい構成としてもよい。
この構成では、PC鋼棒体を組み立てるに際して、第一カプラシース継手と第二カプラシース継手との少なくとも一方の小径部、つまり、第一カプラシース継手の小径部、第二カプラシース継手の小径部、又は、第一カプラシース継手及び第二カプラシース継手の双方の小径部に、第一PC鋼材の端部、第二PC鋼材の端部、第一PC鋼材及び第二PC鋼材のそれぞれの端部を挿通する。ここで、これらのPC鋼材に設けられたブレーキングナットの外径より小径部の内径が大きいので、ブレーキングナットが小径部に対してスムーズに案内されることになり、PC鋼棒体の組立作業を容易に行うことができる。
In the PC steel bar body of the present invention, at least one of the first coupler sheath joint and the second coupler sheath joint provided with the sealing member has a small diameter portion through which the sheath is inserted and a diameter larger than the small diameter portion. The braking nut may have a diameter portion, and the inner diameter of the small diameter portion may be larger than the outer diameter of the braking nut.
In this configuration, when assembling the PC steel bar body, the small diameter portion of at least one of the first coupler sheath joint and the second coupler sheath joint, that is, the small diameter portion of the first coupler sheath joint, the small diameter portion of the second coupler sheath joint, or the small diameter portion of the second coupler sheath joint, or The end of the first PC steel material, the end of the second PC steel material, and the respective ends of the first PC steel material and the second PC steel material are inserted into the small diameter portions of both the first coupler sheath joint and the second coupler sheath joint. Here, since the inner diameter of the small diameter part is larger than the outer diameter of the braking nut provided on these PC steel materials, the braking nut is guided smoothly to the small diameter part, making it easier to assemble the PC steel rod. Work can be done easily.

本発明のPC鋼棒体において、前記小径部の内側断面は前記小径部の軸方向に沿って直線状に形成されている構成としてもよい。
この構成では、シースが第一PC鋼材や第二PC鋼材の表面形状に沿って雄ねじ状に形成されているとしても、小径部がストレート状の断面であるため、当該小径部を有する第一カプラシース継手や第二カプラシース継手が第一PC鋼材や第二PC鋼材に動きを規制されることが少ない。そのため、第一PC鋼材や第二PC鋼材が固定されているとしても、第一カプラシース継手や第二カプラシース継手をその軸方向や周方向に動かすことが可能となり、PC鋼棒体の組立作業をより容易に行うことができる。
In the PC steel rod of the present invention, the inner cross section of the small diameter portion may be formed linearly along the axial direction of the small diameter portion.
In this configuration, even if the sheath is formed into a male thread shape along the surface shape of the first PC steel material and the second PC steel material, since the small diameter part has a straight cross section, the first coupler sheath having the small diameter part The movement of the joint and the second coupler sheath joint is rarely restricted by the first PC steel material and the second PC steel material. Therefore, even if the first PC steel material and the second PC steel material are fixed, it is possible to move the first coupler sheath joint and the second coupler sheath joint in the axial direction and circumferential direction, simplifying the assembly work of the PC steel bar body. It can be done more easily.

本発明のPC鋼棒体において、前記封止部材はスポンジゴムである構成としてもよい。
この構成では、封止部材をスポンジゴムという簡易な構造で形成することができるので、グラウト材のシース管からの漏出を低コストで防止することができる。しかも、PC鋼棒の緊張時の移動に追従して封止部材が容易に変形するので、封止部材による封止性能を維持できる。
In the PC steel rod of the present invention, the sealing member may be made of sponge rubber.
With this configuration, the sealing member can be formed of a simple structure made of sponge rubber, so leakage of the grout material from the sheath pipe can be prevented at low cost. Moreover, since the sealing member easily deforms following the movement of the PC steel rod under tension, the sealing performance of the sealing member can be maintained.

本発明のPC鋼棒体において、前記第一PC鋼材及び前記第二PC鋼材は、それぞれ雄ねじ部を有し、前記カプラは、前記雄ねじ部に螺合する雌ねじ部を有し、前記第一PC鋼材は、コンクリートに埋設され、かつ、その端部側がアンカープレートを貫通し、前記第一PC鋼材の前記アンカープレートから突出した部分がナットに螺合され、前記第一PC鋼材の前記ナットから突出した部分は、前記第一カプラシース継手に覆われ、前記第一カプラシース継手は、前記ナットに当接し前記第一PC鋼材が貫通する底面部と、前記底面部に設けられ前記第一PC鋼材を覆う筒本体部とを有し、前記筒本体部は前記第二カプラシース継手に連結され、前記底面部は前記ナットに対して位置決め部材で位置決めされ、前記第二カプラシース継手と前記シースとの間には、前記封止部材が設けられている構成としてもよい。
この構成では、まず、コンクリートに第一PC鋼材を埋設するとともに、第一PC鋼材の端部をコンクリートに設けられたアンカープレートに貫通しておく。
そして、第一PC鋼材のアンカープレートに貫通した部分にナットを螺合し、さらに、第一PC鋼材に第一カプラシース継手を設置し、位置決め部材で第一カプラシース継手をナットに対して位置決めする。さらに、第二カプラシース継手と封止部材とを第二PC鋼材に設ける。第一PC鋼材と第二PC鋼材とをカプラで連結するとともに、第一カプラシース継手と第二カプラシース継手とを接続してシース管を形成し、このシース管にグラウト材を充填する。
グラウト材がシース管に充填されたら、別のコンクリートを打設し、その後、PC鋼棒を緊張する。PC鋼棒の緊張作業に伴って、PC鋼棒が軸方向に移動してシース管に充填されたグラウト材がシース管から漏出しようとするが、前述と同様に、グラウト材の漏出が封止部材によって阻止される。
本発明では、第一PC鋼材がコンクリートに定着した後、PC鋼棒を緊締する場合においても、シース管からのグラウト材の漏出を防止することができる。
In the PC steel bar body of the present invention, the first PC steel material and the second PC steel material each have a male threaded portion, the coupler has a female threaded portion that is screwed into the male threaded portion, and the first PC steel material and the second PC steel material each have a male threaded portion. The steel material is embedded in concrete, and its end side passes through the anchor plate, and a portion of the first PC steel material that protrudes from the anchor plate is screwed into a nut, and protrudes from the nut of the first PC steel material. The first coupler sheath joint has a bottom part that contacts the nut and through which the first PC steel material passes, and a bottom part that is provided on the bottom part and covers the first PC steel material. a cylinder main body part, the cylinder main body part is connected to the second coupler sheath joint, the bottom part is positioned with respect to the nut by a positioning member, and a space between the second coupler sheath joint and the sheath is , the sealing member may be provided.
In this configuration, first, a first PC steel material is buried in concrete, and an end portion of the first PC steel material is penetrated through an anchor plate provided in the concrete.
Then, a nut is screwed into the portion of the first PC steel material that penetrates the anchor plate, and a first coupler sheath joint is installed on the first PC steel material, and the first coupler sheath joint is positioned with respect to the nut using a positioning member. Furthermore, a second coupler sheath joint and a sealing member are provided on the second PC steel material. The first PC steel material and the second PC steel material are connected by a coupler, and the first coupler sheath joint and the second coupler sheath joint are connected to form a sheath pipe, and this sheath pipe is filled with grout material.
Once the sheath pipe is filled with grout, another layer of concrete is poured, and then the PC steel rods are tensioned. As the PC steel rod is tensioned, the PC steel rod moves in the axial direction and the grout filled in the sheath pipe tries to leak out from the sheath pipe, but as described above, the leakage of the grout is sealed. blocked by the member.
In the present invention, leakage of grout from the sheath pipe can be prevented even when tightening the PC steel rod after the first PC steel material is fixed on concrete.

本発明のPC鋼棒体において、前記位置決め部材と前記ナットとの間には硬質ゴムが設けられている構成としてもよい。
この構成では、位置決め部材とナットとの間に硬質ゴムが設けられているので、第二PC鋼材に第二カプラシース継手を位置決め部材で取り付ける際に、第二カプラシース継手の姿勢を保持することができ、これにより、第二カプラシース継手のナットへの装着作業が容易となる。
In the PC steel rod of the present invention, a hard rubber may be provided between the positioning member and the nut.
In this configuration, since the hard rubber is provided between the positioning member and the nut, the posture of the second coupler sheath joint can be maintained when the second coupler sheath joint is attached to the second PC steel material with the positioning member. This makes it easier to attach the second coupler sheath joint to the nut.

本発明のPC鋼棒体において、前記第一PC鋼材及び前記第二PC鋼材は、それぞれ雄ねじ部を有し、前記カプラは、前記雄ねじ部に螺合する雌ねじ部を有し、前記第一カプラシース継手と前記シースとの間、及び前記第二カプラシース継手と前記シースとの間には、それぞれ前記封止部材が設けられている構成としてもよい。
この構成では、封止部材と第一カプラシース継手が設けられた第一PC鋼材と、封止部材と第二カプラシース継手が設けられた第二PC鋼材とをカプラで連結するとともに、第一カプラシース継手と第二カプラシース継手とを接続してシース管を形成する。
その後、シース管にグラウト材を充填する。そして、コンクリートを打設し、PC鋼棒を緊張する。PC鋼棒を緊張するには、予め、第一PC鋼材と第二PC鋼材の一方を固定しておき、他方を一方に対して離すように引っ張る。
PC鋼棒の緊張作業に伴って、PC鋼棒が軸方向に移動してシース管に充填されたグラウト材がシース管から漏出しようとするが、前述と同様に、封止部材により阻止される。
本発明では、第一PC鋼材と第二PC鋼材とをカプラで単純連結する場合においても、シース管からのグラウト材の漏出を防止することができる。
In the PC steel bar body of the present invention, the first PC steel material and the second PC steel material each have a male threaded portion, the coupler has a female threaded portion that is screwed into the male threaded portion, and the first coupler sheath The sealing member may be provided between the joint and the sheath and between the second coupler sheath joint and the sheath.
In this configuration, the first PC steel material provided with the sealing member and the first coupler sheath joint and the second PC steel material provided with the sealing member and the second coupler sheath joint are connected by the coupler, and the first PC steel material provided with the first coupler sheath joint and a second coupler sheath joint to form a sheath tube.
Thereafter, the sheath tube is filled with grout material. Then, concrete is poured and the PC steel rods are tensioned. To tension the PC steel rod, first fix one of the first PC steel material and the second PC steel material, and then pull the other one away from the other.
As the PC steel rod is tensioned, the PC steel rod moves in the axial direction and the grout filled in the sheath pipe tries to leak out from the sheath pipe, but this is prevented by the sealing member as described above. .
In the present invention, even when the first PC steel material and the second PC steel material are simply connected using a coupler, leakage of the grout material from the sheath pipe can be prevented.

本発明のPC鋼棒体において、前記シースの端部は、前記ブレーキングナットの周面を覆って前記防錆材を封止する構成としてもよい。
この構成では、PC鋼棒の緊張作業に伴って、シースの内部に充填される防錆材に圧力がかかっても、シースの端部はブレーキングナットの周面を覆っているので、防錆材がシースの端部から漏れることがない。そのため、シース管の内部に充填されているグラウト材に防錆材が混入することがないので、防錆材がグラウト材に混入することに伴う不都合を回避できる。
In the PC steel rod of the present invention, the end portion of the sheath may be configured to cover the circumferential surface of the braking nut and seal the rust preventive material.
With this configuration, even if pressure is applied to the rust preventive material filled inside the sheath due to tensioning of the PC steel bar, the end of the sheath covers the circumferential surface of the braking nut, preventing rust. No material leaks from the ends of the sheath. Therefore, since the rust preventive material does not mix into the grout material filled inside the sheath pipe, it is possible to avoid the inconvenience caused by the rust preventive material mixing into the grout material.

具体的には、本発明のPC鋼棒体は、第一PC鋼材と第二PC鋼材とがカプラで連結された連結部を有するPC鋼棒と、前記連結部に対向する前記第一PC鋼材及び前記第二PC鋼材のそれぞれの対向側を被覆し、かつ、前記第一PC鋼材と前記第二PC鋼材とのそれぞれの隙間に充填された防錆材を封止するシースと、前記第一PC鋼材と前記第二PC鋼材にそれぞれ設けられ前記防錆材の漏れを防止するブレーキングナットと、前記PC鋼棒のうち前記連結部及び前記ブレーキングナットが内部に配置され、かつ、グラウト材が充填されるシース管とを備え、前記シースの端部は、前記ブレーキングナットの周面を覆って前記防錆材を封止し、前記シース管は、前記第一PC鋼材に設けられたブレーキングナットを少なくとも覆う第一カプラシース継手と、前記第二PC鋼材に設けられたブレーキングナットを少なくとも覆う第二カプラシース継手と、を有し、前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方と、前記シース及びブレーキングナットとの間に、前記グラウト材を封止する封止部材が設けられ、当該封止部材が前記ブレーキングナットを覆うように接触して延設されていることを特徴とする。
このようなPC鋼棒体では、上述したように、前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方と、前記シース及びブレーキングナットとの間に、前記グラウト材を封止する封止部材が設けられ、当該封止部材が前記ブレーキングナットを覆うように接触して延設されているため、PC鋼棒がシース管に対して軸方向に移動等しにくくなる。また、仮に移動した場合でも、PC鋼棒とシース管との間の隙間からグラウト材が漏出することを防止できる。
Specifically, the PC steel rod of the present invention includes a PC steel rod having a connecting portion in which a first PC steel material and a second PC steel material are connected by a coupler, and the first PC steel material facing the connecting portion. and a sheath that covers each opposing side of the second PC steel material and seals a rust preventive material filled in each gap between the first PC steel material and the second PC steel material; A braking nut provided on the PC steel material and the second PC steel material to prevent leakage of the rust preventive material, and a grout material in which the connecting portion and the braking nut of the PC steel rod are disposed inside, and a grouting material. a sheath tube filled with the braking nut, an end of the sheath covers the circumferential surface of the braking nut to seal the rust preventive material, and the sheath tube is provided on the first prestressing steel material. a first coupler sheath joint that at least covers the braking nut; and a second coupler sheath joint that covers at least the breaking nut provided on the second PC steel material, and the first coupler sheath joint and the second coupler sheath joint A sealing member for sealing the grout material is provided between at least one of the sheath and the braking nut, and the sealing member extends in contact with and covers the braking nut. It is characterized by
In such a PC steel bar body, as described above, a seal for sealing the grout material is provided between at least one of the first coupler sheath joint and the second coupler sheath joint, and the sheath and the braking nut. Since a sealing member is provided and extends in contact with the braking nut so as to cover it, it becomes difficult for the PC steel rod to move in the axial direction with respect to the sheath pipe. Moreover, even if it moves, it is possible to prevent the grout material from leaking from the gap between the PC steel rod and the sheath pipe.

本発明のPC鋼棒体において、前記封止部材が設けられた前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方は、前記シースを挿通する小径部、前記小径部より大きな径の大径部及び前記小径部と前記大径部との間に設けられたテーパ部を有し、前記小径部の内径は前記ブレーキングナットの外径より大きく、前記シースは少なくとも前記小径部内に、前記ブレーキングナットは前記テーパ部内にそれぞれ配置され、前記封止部材は、前記小径部から前記テーパ部まで延設されていることが好ましい。
前記テーパ部とブレーキングナットとの間には狭い空間が発生し、この空間はグラウト材を充填した場合でも気泡が入りやすい。そこで、当該封止部材で当該空間を充填させることで、当該気泡の発生を抑制することができる。
In the PC steel rod of the present invention, at least one of the first coupler sheath joint and the second coupler sheath joint provided with the sealing member has a small diameter portion through which the sheath is inserted, and a diameter larger than the small diameter portion. a diameter portion and a tapered portion provided between the small diameter portion and the large diameter portion; the inner diameter of the small diameter portion is larger than the outer diameter of the braking nut; Preferably, the braking nuts are respectively disposed within the tapered portions, and the sealing member extends from the small diameter portion to the tapered portion.
A narrow space is created between the tapered portion and the braking nut, and even when filled with grout, air bubbles are likely to enter this space. Therefore, by filling the space with the sealing member, generation of the bubbles can be suppressed.

本発明の第1実施形態にかかるPC鋼棒体の断面図。FIG. 1 is a sectional view of a PC steel bar according to a first embodiment of the present invention. 本発明の第2実施形態にかかるPC鋼棒体の断面図。FIG. 3 is a sectional view of a PC steel bar according to a second embodiment of the present invention. 本発明の第3実施形態にかかるPC鋼棒体の断面図。FIG. 3 is a sectional view of a PC steel bar according to a third embodiment of the present invention. 本発明の第4実施形態にかかるPC鋼棒体の断面図。FIG. 4 is a sectional view of a PC steel bar according to a fourth embodiment of the present invention. 本発明の第5実施形態にかかるPC鋼棒体の断面図。FIG. 5 is a sectional view of a PC steel bar according to a fifth embodiment of the present invention. 本発明の第6実施形態にかかるPC鋼棒体の断面図。FIG. 6 is a sectional view of a PC steel bar according to a sixth embodiment of the present invention. 本発明の第7実施形態にかかるPC鋼棒体の断面図。A sectional view of a PC steel bar according to a seventh embodiment of the present invention.

本発明の実施形態を図面に基づいて説明する。ここで、各実施形態の説明において、同一構成要素は同一符号を付して説明を省略する。
[第1実施形態]
図1には本発明の第1実施形態が示されている。
第1実施形態は、2つのPC鋼材のうち予めコンクリートに定着されている一方のPC鋼材に対して、他方のPC鋼材を連結する例である。
(構成)
図1において、PC鋼棒体1は、それぞれ同芯上であって図中右側に配置された第一PC鋼材11と、同じく左側に配置された第二PC鋼材12と、これらの端部同士を連結するカプラ13とを有するPC鋼棒10を備えている。
Embodiments of the present invention will be described based on the drawings. Here, in the description of each embodiment, the same components are given the same reference numerals and the description thereof will be omitted.
[First embodiment]
FIG. 1 shows a first embodiment of the invention.
The first embodiment is an example in which one of two PC steel materials, which is fixed to concrete in advance, is connected to the other PC steel material.
(composition)
In FIG. 1, the PC steel rod 1 has a first PC steel material 11 that is concentric and placed on the right side in the figure, a second PC steel material 12 that is also placed on the left side, and their ends. A PC steel rod 10 having a coupler 13 connecting the two is provided.

第一PC鋼材11は、外周に雄ねじ部10Aを有する。
第一PC鋼材11の端部を除いた周囲を黒色のポリエチレンのシース10Bが覆っており、シース10Bの内部には防錆材Bが充填されている。雄ねじ部10Aには防錆材Bの漏れを防止するブレーキングナット10Cが螺合されている。シース10Bの外周には雄ねじが形成されている。シース10Bの端部は、防錆材Bを封止するために、ブレーキングナット10Cの周面を覆っている。
第二PC鋼材12は第一PC鋼材11と同様の構造である。
カプラ13は、第一PC鋼材11の端部と第二PC鋼材12の端部とを連結するものであり、雄ねじ部10Aに螺合する雌ねじ部(図示せず)を有する。
The first PC steel material 11 has a male threaded portion 10A on its outer periphery.
A black polyethylene sheath 10B covers the first PC steel material 11 except for its ends, and the inside of the sheath 10B is filled with a rust preventive material B. A braking nut 10C for preventing leakage of the rust preventive material B is screwed into the male threaded portion 10A. A male thread is formed on the outer periphery of the sheath 10B. The end of the sheath 10B covers the circumferential surface of the braking nut 10C in order to seal the rust preventive material B.
The second PC steel material 12 has the same structure as the first PC steel material 11.
The coupler 13 connects the end of the first PC steel material 11 and the end of the second PC steel material 12, and has a female threaded portion (not shown) that is screwed into the male threaded portion 10A.

第一PC鋼材11は、ブレーキングナット10Cの部分までが第一のコンクリート31に埋設されており、ブレーキングナット10Cは第一のコンクリート31に設けられたアンカープレート30に当接している。
第一PC鋼材11は、アンカープレート30を貫通しており、この貫通した部分の根元は、ナット41に螺合されている。
カプラ13を含み第一PC鋼材11のナット41から露出した部分と第二PC鋼材12の端部とがシース管20で覆われている。
The first PC steel material 11 is buried in the first concrete 31 up to the part of the braking nut 10C, and the braking nut 10C is in contact with an anchor plate 30 provided in the first concrete 31.
The first PC steel material 11 passes through the anchor plate 30, and the root of the penetrated portion is screwed into a nut 41.
A portion of the first PC steel material 11 including the coupler 13 exposed from the nut 41 and an end of the second PC steel material 12 are covered with a sheath pipe 20.

シース管20は、第一PC鋼材11を主に覆う第一カプラシース継手21と、第二PC鋼材12を主に覆う第二カプラシース継手22と、カプラ13を主に覆い第一カプラシース継手21と第二カプラシース継手22とを連結する連結シース継手23とを有するものであり、内部空間にグラウト材Gが充填される。
第一カプラシース継手21、第二カプラシース継手22及び連結シース継手23は、それぞれ高密度ポリエチレンから形成され、かつ、乳白色半透明とされている。
The sheath pipe 20 includes a first coupler sheath joint 21 that mainly covers the first PC steel material 11, a second coupler sheath joint 22 that mainly covers the second PC steel material 12, a first coupler sheath joint 21 that mainly covers the coupler 13, and a second coupler sheath joint 22 that mainly covers the second PC steel material 12. It has a connecting sheath joint 23 that connects the two coupler sheath joints 22, and the internal space is filled with grout G.
The first coupler sheath joint 21, the second coupler sheath joint 22, and the connecting sheath joint 23 are each made of high-density polyethylene and are milky white and translucent.

第一カプラシース継手21は、一端が連結シース継手23に接続される筒状本体部211と、筒状本体部211の他端開口部に嵌合される底面部212と、筒状本体部211の外周部に設けられた筒状部213とを有する。筒状部213は、その軸芯が斜め上方、つまり、鉛直と水平との間にある角度となるように、筒状本体部211に接合されている。即ち、筒状部213の内側開口は、筒状本体部211の最上部より下方に位置している。
底面部212は、その中心部に第一PC鋼材11が貫通する貫通孔が形成された円板部212Aと、円板部212Aの外周に折り曲げられて形成された縁部212Bとを有する。縁部212Bは、筒状本体部211の外周部に接合されている。
The first coupler sheath joint 21 includes a cylindrical main body part 211 whose one end is connected to the connecting sheath joint 23 , a bottom part 212 which is fitted into the opening at the other end of the cylindrical main body part 211 , and It has a cylindrical part 213 provided on the outer periphery. The cylindrical portion 213 is joined to the cylindrical main body portion 211 so that its axis is diagonally upward, that is, at an angle between the vertical and the horizontal. That is, the inner opening of the cylindrical portion 213 is located below the top of the cylindrical main body portion 211 .
The bottom surface portion 212 has a disk portion 212A in which a through hole through which the first PC steel material 11 passes is formed in the center thereof, and an edge portion 212B formed by being bent around the outer periphery of the disk portion 212A. The edge portion 212B is joined to the outer peripheral portion of the cylindrical main body portion 211.

第一PC鋼材11のカプラ13から離れた位置には、ナット状の位置決め部材42が螺合されている。位置決め部材42は、ナット41との間で底面部212を挟持して、第一カプラシース継手21を所定姿勢に保持する。
筒状部213は、図示しないホースと接続され、グラウト材Gをシース管20に充填する際の流路とされる。
ナット41及びシース管20の周囲は、図示しない第二のコンクリートが設けられている。
A nut-shaped positioning member 42 is screwed into the first PC steel material 11 at a position away from the coupler 13 . The positioning member 42 holds the bottom portion 212 between the nut 41 and the first coupler sheath joint 21 in a predetermined position.
The cylindrical portion 213 is connected to a hose (not shown) and serves as a flow path for filling the sheath pipe 20 with the grout material G.
A second concrete (not shown) is provided around the nut 41 and the sheath pipe 20.

第二カプラシース継手22は、シース10Bを挿通する小径部221と、小径部221より径の大きい大径部222と、小径部221と大径部222との間に設けられたテーパ部223と、テーパ部223に設けられた筒状部224とを有する。大径部222の端部には、ねじが形成されている。
小径部221の内径は、ブレーキングナット10Cの外径より大きい。
筒状部224の内側開口は、テーパ部223の最上部であって筒状部213の内側開口の位置より上方に位置している。
The second coupler sheath joint 22 includes a small diameter portion 221 through which the sheath 10B is inserted, a large diameter portion 222 having a larger diameter than the small diameter portion 221, and a tapered portion 223 provided between the small diameter portion 221 and the large diameter portion 222. It has a cylindrical part 224 provided in a tapered part 223. A thread is formed at the end of the large diameter portion 222.
The inner diameter of the small diameter portion 221 is larger than the outer diameter of the braking nut 10C.
The inner opening of the cylindrical portion 224 is located at the top of the tapered portion 223 and above the position of the inner opening of the cylindrical portion 213 .

小径部221とシース10Bとの間には、グラウト材Gをシース管20から外部へ漏出することを防止する弾性の封止部材4が設けられている。
封止部材4は、小径部221からテーパ部223にわたる領域でシース10Bに沿って設けられ、ブレーキングナット10Cを覆うように延設されている。封止部材4は、シース10BによるPC鋼材の被覆領域(本実施形態ではシース10Bによる第二PC鋼材12の被覆領域)を覆う第1被覆部4Aと、第1被覆部4Aよりも径が大きくされ、シース10Bによるブレーキングナット10Cの周面の被覆領域を覆う第2被覆部4Bとを備えている。
本実施形態では、封止部材4は、気泡が混入されたウレタンゴムやエチレンプロピレンゴム(EPDM)等から形成されるスポンジゴムである。気泡は独立気泡でも貫通気泡でもよい。
封止部材4は、シース10Bの外周面全体に渡って配置されるものが好ましい。封止部材4をシース10Bに装着するために、予め筒状に形成された封止部材4の一部にスリットを軸方向に形成してもよい。なお、封止部材4をシース10Bの一部分に装着するものでもよい。この場合、封止部材4の弾性力によって、小径部221の封止部材4が設けられていない部分(図1中上部)がシース10Bに押しつけられるので、封止効果を得ることができる。
An elastic sealing member 4 is provided between the small diameter portion 221 and the sheath 10B to prevent the grout G from leaking out from the sheath tube 20.
The sealing member 4 is provided along the sheath 10B in a region extending from the small diameter portion 221 to the tapered portion 223, and extends to cover the braking nut 10C. The sealing member 4 has a diameter larger than that of the first covering portion 4A that covers the area covered by the sheath 10B of the PC steel material (in this embodiment, the area covered by the second PC steel material 12 by the sheath 10B). and a second covering portion 4B that covers the covering area of the circumferential surface of the braking nut 10C by the sheath 10B.
In this embodiment, the sealing member 4 is sponge rubber made of urethane rubber, ethylene propylene rubber (EPDM), or the like with air bubbles mixed therein. The cells may be closed cells or penetrated cells.
The sealing member 4 is preferably disposed over the entire outer peripheral surface of the sheath 10B. In order to attach the sealing member 4 to the sheath 10B, a slit may be formed in a part of the sealing member 4, which is previously formed into a cylindrical shape, in the axial direction. Note that the sealing member 4 may be attached to a portion of the sheath 10B. In this case, the elastic force of the sealing member 4 presses the portion of the small diameter portion 221 where the sealing member 4 is not provided (the upper part in FIG. 1) against the sheath 10B, so that a sealing effect can be obtained.

筒状部224は図示しないホースと接続され、グラウト材Gがシース管20に充填される際に、空気が放出される流路とされる。
連結シース継手23の端部には、第一カプラシース継手21と第二カプラシース継手22の大径部222に螺合するねじ部が形成されている。
連結シース継手23は、第一カプラシース継手21及び第二カプラシース継手22と同じ材質から形成された筒状部材である。
連結シース継手23の端部には第一カプラシース継手21と第二カプラシース継手22の大径部222に螺合するねじ部が形成されている。
小径部221の開口端側とシース10Bの小径部221から露出している部分との間には、テーピング24が周方向に設けられている。
The cylindrical portion 224 is connected to a hose (not shown) and serves as a flow path through which air is released when the sheath pipe 20 is filled with the grout material G.
A threaded portion is formed at the end of the connecting sheath joint 23 to be screwed into the large diameter portions 222 of the first coupler sheath joint 21 and the second coupler sheath joint 22.
The connecting sheath joint 23 is a cylindrical member made of the same material as the first coupler sheath joint 21 and the second coupler sheath joint 22.
A threaded portion is formed at the end of the connecting sheath joint 23 to be screwed into the large diameter portions 222 of the first coupler sheath joint 21 and the second coupler sheath joint 22.
Taping 24 is provided in the circumferential direction between the open end side of the small diameter portion 221 and the portion of the sheath 10B exposed from the small diameter portion 221.

(施工方法)
第1実施形態のPC鋼棒体1の施工方法について説明する。
まず、第一のコンクリート31に埋設された第一PC鋼材11の端部を、アンカープレート30に貫通させておく。この状態は、第二PC鋼材12が第一のコンクリート31に定着された状態である。
そして、第一PC鋼材11のアンカープレート30に貫通した部分にナット41を螺合する。ここで、第一PC鋼材11の端部は、ナット41から突出している。
さらに、第一PC鋼材11に第一カプラシース継手21を設置し、位置決め部材42を第一PC鋼材11に対して螺合して第一カプラシース継手21をナット41に対して位置決めする。
(Construction method)
A construction method for the PC steel bar 1 of the first embodiment will be explained.
First, the end of the first PC steel material 11 buried in the first concrete 31 is passed through the anchor plate 30. In this state, the second PC steel material 12 is fixed to the first concrete 31.
Then, a nut 41 is screwed into the portion of the first PC steel material 11 that penetrates the anchor plate 30. Here, the end of the first PC steel material 11 protrudes from the nut 41.
Furthermore, the first coupler sheath joint 21 is installed on the first PC steel material 11 , and the positioning member 42 is screwed onto the first PC steel material 11 to position the first coupler sheath joint 21 with respect to the nut 41 .

そして、第二PC鋼材12のシース10Bの外周に封止部材4を這わせた状態で、あるいは、第二カプラシース継手22の小径部221の内周に封止部材4を這わせた状態で、第二PC鋼材12を小径部221に挿通する。この際、シース10Bによるブレーキングナット10Cの周面の被覆領域を封止部材4の第2被覆部4Bで覆う。なお、第2被覆部4Bは、予め形成されていてもよいし、シース10Bの外周に封止部材4を這わせる際、第1被覆部4Aの一部の径をブレーキングナット10Cの位置で広げて形成してもよい。その後、テーピング24を、小径部221とシース10Bの露出部分とに設ける。
さらに、連結シース継手23を第二カプラシース継手22の一方向にねじ込んでおき、カプラ13を第二PC鋼材12に先端が露出するまで一方向にねじ込んでおく。
この状態で、第一PC鋼材11と第二PC鋼材12との端部同士を突き合わせ、カプラ13を逆方向に回して第一PC鋼材11と第二PC鋼材12とを連結する。さらに、第一カプラシース継手21と連結シース継手23とを逆方向に回してシース管20を形成する。
シース管20の筒状部213,224に図示しないホースを接続し、ホースを通じてグラウト材Gを筒状部213からシース管20の内部に充填する。
Then, with the sealing member 4 extending around the outer periphery of the sheath 10B of the second PC steel material 12, or with the sealing member 4 extending around the inner periphery of the small diameter portion 221 of the second coupler sheath joint 22, The second PC steel material 12 is inserted into the small diameter portion 221. At this time, the area covered by the sheath 10B on the circumferential surface of the braking nut 10C is covered by the second covering portion 4B of the sealing member 4. The second covering portion 4B may be formed in advance, or when the sealing member 4 is placed around the outer periphery of the sheath 10B, the diameter of a portion of the first covering portion 4A may be adjusted at the position of the braking nut 10C. It may be formed by spreading it out. Thereafter, taping 24 is provided on the small diameter portion 221 and the exposed portion of the sheath 10B.
Further, the connecting sheath joint 23 is screwed into the second coupler sheath joint 22 in one direction, and the coupler 13 is screwed into the second PC steel material 12 in one direction until the tip is exposed.
In this state, the ends of the first PC steel material 11 and the second PC steel material 12 are butted against each other, and the coupler 13 is turned in the opposite direction to connect the first PC steel material 11 and the second PC steel material 12. Furthermore, the first coupler sheath joint 21 and the connecting sheath joint 23 are turned in opposite directions to form the sheath pipe 20.
A hose (not shown) is connected to the cylindrical parts 213 and 224 of the sheath pipe 20, and the grout material G is filled into the sheath pipe 20 from the cylindrical part 213 through the hose.

筒状部213から充填されるグラウト材Gは、シース管20の底部から溜まり始め、徐々に上昇する。グラウト材Gの充填に伴って、シース管20の上部に溜まっている空気は、筒状部224を通じて外部に排出される。グラウト材Gが筒状部213の内側開口に達しても、シース管20の最上部は筒状部224と連通しているので、空気の外部への排出が円滑に行われる。
ここで、シース管20に充填されたグラウト材Gは、シース管20の小径部221と第一PC鋼材11のシース10Bとの間に設けられた封止部材4によって、外部に漏出しない。仮に、グラウト材Gが封止部材4を通じて外部に漏出しようとしても、テーピング24により、グラウト材Gの外部への漏出が確実に阻止される。
グラウト材Gがシース管20に充填されたら、ホースを外し、必要に応じて、グラウト材Gがシース管20から漏れないようにするため筒状部213,224を封止する。
The grout material G filled from the cylindrical portion 213 begins to accumulate at the bottom of the sheath pipe 20 and gradually rises. As the grout material G is filled, air accumulated in the upper part of the sheath pipe 20 is discharged to the outside through the cylindrical part 224. Even when the grout material G reaches the inner opening of the cylindrical part 213, the uppermost part of the sheath tube 20 is in communication with the cylindrical part 224, so that air can be smoothly discharged to the outside.
Here, the grout material G filled in the sheath pipe 20 is prevented from leaking to the outside by the sealing member 4 provided between the small diameter portion 221 of the sheath pipe 20 and the sheath 10B of the first PC steel material 11. Even if the grout G tries to leak to the outside through the sealing member 4, the taping 24 reliably prevents the grout G from leaking to the outside.
Once the grout material G is filled into the sheath tube 20, the hose is removed, and the cylindrical portions 213 and 224 are sealed, if necessary, to prevent the grout material G from leaking from the sheath tube 20.

その後、PC鋼棒10及びシース管20の周囲に第二のコンクリートを打設する。
そして、PC鋼棒10の緊張作業をする。つまり、第一のコンクリート31で端部以外が固定された第二PC鋼材12に対して第一PC鋼材11を引っ張ることで、PC鋼棒10を緊張する。
このPC鋼棒10の緊張作業に伴って、PC鋼棒10が軸方向に移動してシース管20に充填されたグラウト材Gがシース管20の小径部221と第一PC鋼材11のシース10Bとの間から漏出しようとするが、これらの間に設けられた封止部材4が第一PC鋼材11の移動に伴って弾性変形するので、シース管20の外へのグラウト材Gの漏出が阻止される。
After that, second concrete is placed around the PC steel rod 10 and the sheath pipe 20.
Then, the PC steel rod 10 is tensioned. That is, the PC steel rod 10 is tensed by pulling the first PC steel material 11 against the second PC steel material 12, which is fixed with the first concrete 31 except for the ends.
As the PC steel bar 10 is tensioned, the PC steel bar 10 moves in the axial direction, and the grout G filled in the sheath pipe 20 is spread between the small diameter portion 221 of the sheath pipe 20 and the sheath 10B of the first PC steel material 11. However, since the sealing member 4 provided between them is elastically deformed as the first PC steel material 11 moves, the leakage of the grout material G to the outside of the sheath pipe 20 is prevented. thwarted.

(実施形態の効果)
第1実施形態では、次の効果を奏することができる。
(1)直列に配置された第一PC鋼材11と第二PC鋼材12とをカプラ13で連結してPC鋼棒10を構成し、第一PC鋼材11の端部を覆う第一カプラシース継手21と、第二PC鋼材12の端部及びカプラ13を覆う第二カプラシース継手22とを備えてシース管20を構成し、第二カプラシース継手22と第二PC鋼材12のシース10Bとの間に、弾性を有する封止部材4を設け、当該封止部材4をブレーキングナット10Cを覆うように延設した。そのため、シース管20の内部にグラウト材Gを充填し、コンクリートを打設した後、PC鋼棒10に緊張力を付与した場合、第二PC鋼材12がシース管20に対して相対的に軸方向に移動しようしても、ブレーキングナット10Cの位置で径方向外側に張り出した封止部材4により、シース管20に対する第二PC鋼材12の移動が抑制される上、封止部材4が第二カプラシース継手22に密着してグラウト材Gの封止性が向上する。また、第二PC鋼材12の軸方向の移動により、シース管20に充填されたグラウト材Gが漏出しようとしても、封止部材4が弾性変形してシース管20とPC鋼棒10との間の隙間が封止されたままとなる。従って、グラウト材Gがシース管20から漏出することを防止できる。
(Effects of embodiment)
In the first embodiment, the following effects can be achieved.
(1) The first PC steel material 11 and the second PC steel material 12 arranged in series are connected by a coupler 13 to form the PC steel rod 10, and the first coupler sheath joint 21 covers the end of the first PC steel material 11. and a second coupler sheath joint 22 that covers the end of the second PC steel material 12 and the coupler 13 to constitute a sheath pipe 20, and between the second coupler sheath joint 22 and the sheath 10B of the second PC steel material 12, A sealing member 4 having elasticity was provided, and the sealing member 4 was extended to cover the braking nut 10C. Therefore, when tension is applied to the PC steel rod 10 after filling the inside of the sheath pipe 20 with grout G and placing concrete, the second PC steel material 12 is axially relative to the sheath pipe 20. Even if the second PC steel material 12 attempts to move in the direction, the sealing member 4 protruding radially outward at the position of the braking nut 10C suppresses the movement of the second PC steel material 12 with respect to the sheath pipe 20, and the sealing member 4 also The sealing performance of the grout material G is improved by closely contacting the two-coupler sheath joint 22. Furthermore, even if the grout G filled in the sheath pipe 20 attempts to leak due to the movement of the second PC steel material 12 in the axial direction, the sealing member 4 is elastically deformed and the space between the sheath pipe 20 and the PC steel rod 10 is The gap remains sealed. Therefore, leakage of the grout material G from the sheath pipe 20 can be prevented.

(2)第二カプラシース継手22は、シース10Bを挿通する小径部221と大径部222とを有し、小径部221の内径はブレーキングナット10Cの外径より大きいので、ブレーキングナット10Cが小径部221に対してスムーズに案内されることになり、PC鋼棒体1の組立作業を容易に行うことができる。 (2) The second coupler sheath joint 22 has a small diameter portion 221 and a large diameter portion 222 through which the sheath 10B is inserted, and the inner diameter of the small diameter portion 221 is larger than the outer diameter of the braking nut 10C. The PC steel rod body 1 can be easily assembled because it is guided smoothly to the small diameter portion 221.

(3)小径部221の内側断面は直線状に形成されているから、第一PC鋼材11及び第二PC鋼材12が固定されている状態で、第二カプラシース継手22をその軸方向や周方向に動かすことが可能となり、PC鋼棒体1の組立作業をより容易に行うことができる。 (3) Since the inner cross section of the small diameter portion 221 is formed in a straight line, the second coupler sheath joint 22 can be moved in the axial direction or circumferential direction while the first PC steel material 11 and the second PC steel material 12 are fixed. This makes it possible to assemble the PC steel bar 1 more easily.

(4)封止部材4をスポンジゴムという簡易な構造で形成したから、グラウト材Gのシース管20からの漏出防止を低コストで実現することができる。
(5)封止部材4をブレーキングナット10Cを覆うように延設したことにより、第二PC鋼材12のシース10Bと第二カプラシース継手22のテーパ部223との間の隅部の隙間を極力埋めることができ、当該隅部に気泡が残存することを抑制できる。
(6)シース10Bの端部は、ブレーキングナット10Cの周面を覆って防錆材Bを封止するので、防錆材Bがシース管20の内部に充填されているグラウト材Gに混入することがないので、防錆材Bがグラウト材Gに混入することに伴う不都合を回避できる。
(4) Since the sealing member 4 is formed of a simple structure made of sponge rubber, leakage of the grout material G from the sheath pipe 20 can be prevented at low cost.
(5) By extending the sealing member 4 to cover the braking nut 10C, the gap at the corner between the sheath 10B of the second PC steel material 12 and the tapered part 223 of the second coupler sheath joint 22 is minimized. The corners can be filled in, and bubbles can be prevented from remaining in the corners.
(6) Since the end of the sheath 10B covers the circumferential surface of the braking nut 10C and seals the rust preventive material B, the rust preventive material B mixes into the grout material G filled inside the sheath pipe 20. Therefore, the inconvenience caused by the rust preventive material B being mixed into the grout material G can be avoided.

(7)第一PC鋼材11は、第一のコンクリート31に埋設され、かつ、その端部側がアンカープレート30を貫通するとともにナット41に螺合される。第一PC鋼材11のナット41から突出した部分が第一カプラシース継手21に覆われている。第一カプラシース継手21は、ナット41に当接し、第一PC鋼材11が貫通する底面部212と、底面部212に設けられ第一PC鋼材11を覆い第二カプラシース継手22に連結シース継手23を介して連結される筒状本体部211とを有し、底面部212はナット41に対して位置決め部材42で位置決めされている。以上の構成から、第二PC鋼材12が第一のコンクリート31に定着した後にPC鋼棒10の緊締作業を行う場合においても、シース管20からのグラウト材Gの漏出を防止することができる。 (7) The first PC steel material 11 is buried in the first concrete 31, and its end side passes through the anchor plate 30 and is screwed into the nut 41. A portion of the first PC steel material 11 that protrudes from the nut 41 is covered by the first coupler sheath joint 21. The first coupler sheath joint 21 has a bottom part 212 that contacts the nut 41 and is penetrated by the first PC steel material 11, and a sheath joint 23 that is provided on the bottom part 212 and covers the first PC steel material 11 and connects to the second coupler sheath joint 22. The bottom surface portion 212 is positioned with respect to the nut 41 by a positioning member 42. With the above configuration, leakage of the grout material G from the sheath pipe 20 can be prevented even when the tightening work of the PC steel rod 10 is performed after the second PC steel material 12 is fixed on the first concrete 31.

[第2実施形態]
次に、本発明の第2実施形態を図2に基づいて説明する。
(構成)
第2実施形態は、封止部材4の構成が第1実施形態と相違するものであり、他の構成は第1実施形態と同じである。
図2において、封止部材4は、第1実施形態よりもブレーキングナット10Cの軸方向の端面側に延設され、ブレーキングナット10Cの当該端面を覆っている。
封止部材4は、第1被覆部4Aと、第2被覆部4Bと、第2被覆部4Bから内側に折り返され、ブレーキングナット10Cの軸方向の端面を覆う第3被覆部4Cとを備えている。
[Second embodiment]
Next, a second embodiment of the present invention will be described based on FIG. 2.
(composition)
The second embodiment differs from the first embodiment in the configuration of the sealing member 4, and the other configurations are the same as the first embodiment.
In FIG. 2, the sealing member 4 extends closer to the end surface of the braking nut 10C in the axial direction than in the first embodiment, and covers the end surface of the braking nut 10C.
The sealing member 4 includes a first covering part 4A, a second covering part 4B, and a third covering part 4C that is folded back inward from the second covering part 4B and covers the end surface of the braking nut 10C in the axial direction. ing.

(施工方法)
第2実施形態のPC鋼棒体1の施工方法は第1実施形態とほぼ同じであるが、封止部材4の設置方法が第1実施形態と一部異なる。
つまり、第二PC鋼材12のシース10Bの外周に封止部材4を這わせた状態で、第二PC鋼材12を小径部221に挿通し、封止部材4を設置する。
(Construction method)
The method of constructing the PC steel bar 1 of the second embodiment is almost the same as that of the first embodiment, but the method of installing the sealing member 4 is partially different from the first embodiment.
That is, with the sealing member 4 extending around the outer periphery of the sheath 10B of the second PC steel material 12, the second PC steel material 12 is inserted into the small diameter portion 221, and the sealing member 4 is installed.

(実施形態の効果)
第2実施形態では、第1実施形態の(1)~(7)の効果を奏することができる他、次の効果を奏することができる。
(8)封止部材4がブレーキングナット10Cの軸方向の端面を覆っているため、防錆材Bがシース管20の内部に充填されているグラウト材Gに混入することを確実に防止できる。
(Effects of embodiment)
In addition to the effects (1) to (7) of the first embodiment, the second embodiment can also provide the following effects.
(8) Since the sealing member 4 covers the end surface of the braking nut 10C in the axial direction, it is possible to reliably prevent the rust preventive material B from getting mixed into the grout material G filled inside the sheath pipe 20. .

[第3実施形態]
次に、本発明の第3実施形態を図3に基づいて説明する。
(構成)
第3実施形態は、第一カプラシース継手の構成と、第一カプラシース継手を第一PC鋼材11に取り付ける構成とが第1実施形態と相違するものであり、他の構成は第1実施形態と同じである。
図3において、PC鋼棒体2は、PC鋼棒10と、PC鋼棒10に設けられたシース管50と、第二PC鋼材12に設けられた封止部材4と、第一PC鋼材11にそれぞれ螺合されたナット41及び位置決め部材42と、位置決め部材42とナット41との間に設けられた硬質ゴム43とを備えている。
[Third embodiment]
Next, a third embodiment of the present invention will be described based on FIG. 3.
(composition)
The third embodiment is different from the first embodiment in the configuration of the first coupler sheath joint and the configuration in which the first coupler sheath joint is attached to the first PC steel material 11, and the other configurations are the same as the first embodiment. It is.
In FIG. 3, the PC steel bar body 2 includes a PC steel bar 10, a sheath pipe 50 provided on the PC steel bar 10, a sealing member 4 provided on the second PC steel material 12, and a first PC steel material 11. A nut 41 and a positioning member 42 are screwed into each other, and a hard rubber 43 is provided between the positioning member 42 and the nut 41.

シース管50は、第一カプラシース継手51と、第二カプラシース継手22とを備えている。
第一カプラシース継手51は、筒状本体部211と、筒状本体部211より小径の小径筒部512と、小径筒部512と筒状本体部211とを接続するテーパ部513とを有する。
小径筒部512はナット41に当接している。
The sheath tube 50 includes a first coupler sheath joint 51 and a second coupler sheath joint 22.
The first coupler sheath joint 51 includes a cylindrical main body portion 211 , a small diameter cylindrical portion 512 having a smaller diameter than the cylindrical main body portion 211 , and a tapered portion 513 that connects the small diameter cylindrical portion 512 and the cylindrical main body portion 211 .
The small diameter cylindrical portion 512 is in contact with the nut 41.

硬質ゴム43の材料としては、エチレンプロピレンゴム(EPDM)、クロロピレン(CR)ゴム、MBゴム等を例示できる。
硬質ゴム43は、小径筒部512の内部に収納される筒状部431と、筒状部431に一体形成されたテーパ部432とを有するものであり、第二PC鋼材12を挿通する孔部が軸芯に沿って形成されている。
テーパ部432は、その外周面がテーパ部513の内周面と当接しており、その平面が位置決め部材42と当接している。
図3では、連結シース継手23が省略されており、第一カプラシース継手51と第二カプラシース継手22とが直接螺合されている状態が図示されているが、第3実施形態では、第1実施形態と同様に、第一カプラシース継手51と第二カプラシース継手22との間に連結シース継手23を設ける構成としてもよい。
Examples of the material of the hard rubber 43 include ethylene propylene rubber (EPDM), chloropylene (CR) rubber, and MB rubber.
The hard rubber 43 has a cylindrical part 431 housed inside the small-diameter cylindrical part 512 and a tapered part 432 integrally formed with the cylindrical part 431, and has a hole through which the second PC steel material 12 is inserted. is formed along the axis.
The outer circumferential surface of the tapered portion 432 is in contact with the inner circumferential surface of the tapered portion 513, and the flat surface thereof is in contact with the positioning member 42.
In FIG. 3, the connecting sheath joint 23 is omitted and a state in which the first coupler sheath joint 51 and the second coupler sheath joint 22 are directly screwed together is illustrated. Similarly to the embodiment, a connecting sheath joint 23 may be provided between the first coupler sheath joint 51 and the second coupler sheath joint 22.

(施工方法)
第3実施形態のPC鋼棒体2の施工方法は第1実施形態とほぼ同じであるが、第一カプラシース継手51の設置方法が第1実施形態と異なる。
つまり、第一PC鋼材11の端部がナット41から突出している状態で、第一PC鋼材11に第一カプラシース継手51を設置する。そのため、第一カプラシース継手51の小径筒部512に硬質ゴム43を収納し、位置決め部材42を第一PC鋼材11に螺合して第一カプラシース継手51をナット41に対して位置決めする。位置決め部材42を螺合することで、硬質ゴム43のテーパ部432が第一カプラシース継手51のテーパ部513の内周面に当接する。
(Construction method)
The method of constructing the PC steel bar 2 of the third embodiment is almost the same as that of the first embodiment, but the method of installing the first coupler sheath joint 51 is different from the first embodiment.
That is, the first coupler sheath joint 51 is installed on the first PC steel material 11 with the end of the first PC steel material 11 protruding from the nut 41. Therefore, the hard rubber 43 is housed in the small diameter cylindrical portion 512 of the first coupler sheath joint 51, and the positioning member 42 is screwed onto the first PC steel material 11 to position the first coupler sheath joint 51 with respect to the nut 41. By screwing the positioning member 42 together, the tapered portion 432 of the hard rubber 43 comes into contact with the inner peripheral surface of the tapered portion 513 of the first coupler sheath joint 51.

(実施形態の効果)
第3実施形態では、第1実施形態の(1)~(7)の効果を奏することができる他、次の効果を奏することができる。
(9)位置決め部材42とナット41との間に硬質ゴム43が設けられているから、第一PC鋼材11に第一カプラシース継手51を位置決め部材42で取り付ける際に、第一カプラシース継手51の姿勢を保持することができる。そのため、第一カプラシース継手51のナット41への装着作業が容易となる。
(Effects of embodiment)
In addition to the effects (1) to (7) of the first embodiment, the third embodiment can also provide the following effects.
(9) Since the hard rubber 43 is provided between the positioning member 42 and the nut 41, the posture of the first coupler sheath joint 51 when attaching the first coupler sheath joint 51 to the first PC steel material 11 with the positioning member 42 is can be retained. Therefore, the work of attaching the first coupler sheath joint 51 to the nut 41 becomes easy.

(10)硬質ゴム43は、第一カプラシース継手51の小径筒部512の内部に収納される筒状部431と、筒状部431に一体形成され外周面がテーパ部513の内周面と当接するテーパ部432とを有する。そのため、硬質ゴム43の第一カプラシース継手51からの抜け止めを図ることができる。 (10) The hard rubber 43 has a cylindrical portion 431 housed inside the small-diameter cylindrical portion 512 of the first coupler sheath joint 51, and is integrally formed with the cylindrical portion 431 so that its outer peripheral surface is in contact with the inner peripheral surface of the tapered portion 513. It has a tapered portion 432 that is in contact with it. Therefore, it is possible to prevent the hard rubber 43 from coming off from the first coupler sheath joint 51.

[第4実施形態]
(構成)
第4実施形態は、図4に示すように、封止部材4を第2実施形態と同様に構成したことが第3実施形態と相違し、他の構成は第3実施形態と同じである。
[Fourth embodiment]
(composition)
As shown in FIG. 4, the fourth embodiment differs from the third embodiment in that the sealing member 4 is configured similarly to the second embodiment, and the other configurations are the same as the third embodiment.

(施工方法)
第4実施形態のPC鋼棒体2の施工方法は、封止部材4の設置方法を除き第3実施形態と同じであり、封止部材4の設置方法は、第2実施形態と同じである。
(Construction method)
The method of constructing the PC steel rod body 2 of the fourth embodiment is the same as that of the third embodiment except for the method of installing the sealing member 4, and the method of installing the sealing member 4 is the same as that of the second embodiment. .

(実施形態の効果)
第4実施形態では、第1実施形態の(1)~(7)の効果、第2実施形態の(8)の効果、および第3実施形態の(9)、(10)の効果を奏することができる。
(Effects of embodiment)
The fourth embodiment provides the effects (1) to (7) of the first embodiment, the effect (8) of the second embodiment, and the effects (9) and (10) of the third embodiment. Can be done.

[第5実施形態]
次に、本発明の第5実施形態を図5に基づいて説明する。
(構成)
第5実施形態は、シース管の構成と、第一カプラシース継手を第一PC鋼材11に取り付ける構成とが第1実施形態と相違するものであり、他の構成は第1実施形態と同じである。
図5において、PC鋼棒体3は、PC鋼棒10と、PC鋼棒10に設けられたシース管60と、PC鋼棒10に設けられた2つの封止部材4とを備えている。PC鋼棒体3は図示しないコンクリートに設けられている。
シース管60は、第一PC鋼材11の端部を覆う第一カプラシース継手61と、第二PC鋼材12の端部を覆う第二カプラシース継手22と、第一カプラシース継手61と第二カプラシース継手22とを連結する連結シース継手23とを有する。
第一カプラシース継手61は、第二カプラシース継手22と同じ構造である。
つまり、シース管60は、連結シース継手23を中心として左右が対象となる構成である。なお、図5では、第一カプラシース継手61の筒状部224は、第二カプラシース継手22の筒状部224とは反対側に向いた状態が示されているが、想像線に示される通り、第1実施形態の筒状部213と同様の方向を向いているものでもよい。
第一カプラシース継手61及び第二カプラシース継手22の小径部221と、シース10Bとの間には封止部材4が設けられている。
[Fifth embodiment]
Next, a fifth embodiment of the present invention will be described based on FIG. 5.
(composition)
The fifth embodiment is different from the first embodiment in the configuration of the sheath pipe and the configuration in which the first coupler sheath joint is attached to the first PC steel material 11, and the other configurations are the same as the first embodiment. .
In FIG. 5, the PC steel rod body 3 includes a PC steel rod 10, a sheath pipe 60 provided on the PC steel rod 10, and two sealing members 4 provided on the PC steel rod 10. The PC steel rod body 3 is provided on concrete (not shown).
The sheath pipe 60 includes a first coupler sheath joint 61 that covers the end of the first PC steel material 11, a second coupler sheath joint 22 that covers the end of the second PC steel material 12, and the first coupler sheath joint 61 and the second coupler sheath joint 22. and a connecting sheath joint 23 that connects the two.
The first coupler sheath joint 61 has the same structure as the second coupler sheath joint 22.
That is, the sheath tube 60 has a configuration in which the left and right sides are symmetrical with respect to the connecting sheath joint 23. In addition, in FIG. 5, the cylindrical part 224 of the first coupler sheath joint 61 is shown facing the opposite side from the cylindrical part 224 of the second coupler sheath joint 22, but as shown in the imaginary line, It may be oriented in the same direction as the cylindrical portion 213 of the first embodiment.
A sealing member 4 is provided between the small diameter portions 221 of the first coupler sheath joint 61 and the second coupler sheath joint 22 and the sheath 10B.

(施工方法)
まず、封止部材4と第一カプラシース継手61とを第一PC鋼材11に設け、封止部材4と第二カプラシース継手22とを第二PC鋼材12に設けておく。さらに、連結シース継手23を第二カプラシース継手22に一方向にねじ込み、カプラ13を第二PC鋼材12に一方向にねじ込んでおく。
そして、第一PC鋼材11と第二PC鋼材12との端部同士を突き当てるとともに、カプラ13を逆方向にねじ込んで第一PC鋼材11と第二PC鋼材12とを連結する。さらに、連結シース継手23を逆方向にねじ込んで第一カプラシース継手61に接続してシース管60を形成する。
そして、シース管60にグラウト材Gを充填する。グラウト材Gのシース管60への充填方法等は第1実施形態と同じである。なお、シース管60に充填されたグラウト材Gは、第一カプラシース継手61の小径部221と第一PC鋼材11のシース10Bとの間に設けられた封止部材4と、第二カプラシース継手22の小径部221と第二PC鋼材12のシース10Bとの間に設けられた封止部材4とによって、外部に漏出することが阻止される。
(Construction method)
First, the sealing member 4 and the first coupler sheath joint 61 are provided on the first PC steel material 11, and the sealing member 4 and the second coupler sheath joint 22 are provided on the second PC steel material 12. Further, the connecting sheath joint 23 is screwed into the second coupler sheath joint 22 in one direction, and the coupler 13 is screwed into the second PC steel material 12 in one direction.
Then, the ends of the first PC steel material 11 and the second PC steel material 12 are butted against each other, and the coupler 13 is screwed in the opposite direction to connect the first PC steel material 11 and the second PC steel material 12. Furthermore, the connecting sheath joint 23 is screwed in the opposite direction and connected to the first coupler sheath joint 61 to form the sheath pipe 60.
Then, the sheath pipe 60 is filled with grout material G. The method of filling the sheath pipe 60 with the grout material G is the same as in the first embodiment. Note that the grout G filled in the sheath pipe 60 is attached to the sealing member 4 provided between the small diameter portion 221 of the first coupler sheath joint 61 and the sheath 10B of the first PC steel material 11, and the second coupler sheath joint 22. The sealing member 4 provided between the small diameter portion 221 of and the sheath 10B of the second PC steel material 12 prevents leakage to the outside.

そして、コンクリートを打設し、その後、PC鋼棒10を緊張させる。PC鋼棒10を緊張させるにあたり、予め、第一PC鋼材11と第二PC鋼材12の一方、例えば、第二PC鋼材12の一部を固定しておき、他方、例えば、第一PC鋼材11を第二PC鋼材12から離すように引っ張る。
PC鋼棒10の緊張作業に伴って、第一PC鋼材11と第二PC鋼材12が軸方向に移動し、コンクリートでシース管60の動きが拘束されるので、第一PC鋼材11と第二PC鋼材12の移動に伴ってシース管60に充填されたグラウト材Gがシース管60から漏出しようとするが、封止部材4により阻止される。
Then, concrete is poured, and then the PC steel rod 10 is tensioned. In tensioning the PC steel bar 10, one of the first PC steel material 11 and the second PC steel material 12, for example, a part of the second PC steel material 12, is fixed in advance, and the other, for example, the first PC steel material 11 is fixed. is pulled away from the second PC steel material 12.
As the PC steel bar 10 is tensioned, the first PC steel material 11 and the second PC steel material 12 move in the axial direction, and the movement of the sheath pipe 60 is restrained by the concrete, so that the first PC steel material 11 and the second PC steel material 12 move in the axial direction. As the PC steel material 12 moves, the grout G filled in the sheath pipe 60 tries to leak out from the sheath pipe 60, but this is prevented by the sealing member 4.

(実施形態の効果)
第5実施形態では、第1実施形態の(1)~(6)の効果を奏することができる他、次の効果を奏することができる。
(11)第一カプラシース継手61と第二カプラシース継手22とは、それぞれ封止部材4が設けられているから、第一PC鋼材11と第二PC鋼材12とをカプラ13で単純連結する場合においても、シース管60からのグラウト材Gの漏出を防止することができる。
(Effects of embodiment)
In addition to the effects (1) to (6) of the first embodiment, the fifth embodiment can also provide the following effects.
(11) Since the first coupler sheath joint 61 and the second coupler sheath joint 22 are each provided with the sealing member 4, when simply connecting the first PC steel material 11 and the second PC steel material 12 with the coupler 13, Also, leakage of the grout material G from the sheath pipe 60 can be prevented.

[第6実施形態]
(構成)
第6実施形態は、図6に示すように、封止部材4を第2実施形態と同様に構成したことが第5実施形態と相違し、他の構成は第5実施形態と同じである。
[Sixth embodiment]
(composition)
As shown in FIG. 6, the sixth embodiment differs from the fifth embodiment in that the sealing member 4 is configured similarly to the second embodiment, and the other configurations are the same as the fifth embodiment.

(施工方法)
第6実施形態のPC鋼棒体3の施工方法は、封止部材4の設置方法を除き第5実施形態と同じであり、封止部材4の設置方法は、第2実施形態と同じである。
(Construction method)
The construction method of the PC steel bar body 3 of the sixth embodiment is the same as that of the fifth embodiment except for the method of installing the sealing member 4, and the method of installing the sealing member 4 is the same as that of the second embodiment. .

(実施形態の効果)
第6実施形態では、第1実施形態の(1)~(6)の効果、第2実施形態の(8)の効果、および第5実施形態の(11)の効果を奏することができる。
(Effects of embodiment)
In the sixth embodiment, the effects (1) to (6) of the first embodiment, the effect (8) of the second embodiment, and the effect (11) of the fifth embodiment can be achieved.

[第7実施形態]
(構成)
第7実施形態は、図7に示すように、封止部材4を第一カプラシース継手61の小径部221からシース10Bに接触させながら露出させて、当該露出した封止部材4を覆うように、テーピング24を配置する構成が第6実施形態と相違し、他の構成は第6実施形態と同じである。
[Seventh embodiment]
(composition)
In the seventh embodiment, as shown in FIG. 7, the sealing member 4 is exposed from the small diameter portion 221 of the first coupler sheath joint 61 while being in contact with the sheath 10B, and the exposed sealing member 4 is covered. The configuration in which the taping 24 is arranged is different from the sixth embodiment, and the other configurations are the same as in the sixth embodiment.

(施工方法)
第7実施形態のPC鋼棒体3の施工方法は、封止部材4の設置方法を除き第6実施形態と同じであり、封止部材4の設置方法は、第2実施形態と同じである。
(Construction method)
The method of constructing the PC steel rod body 3 of the seventh embodiment is the same as that of the sixth embodiment except for the method of installing the sealing member 4, and the method of installing the sealing member 4 is the same as that of the second embodiment. .

(実施形態の効果)
第7実施形態では、第1実施形態の(1)~(6)の効果、第2実施形態の(8)の効果、および第5実施形態の(11)の効果を奏することができ、他の実施形態より、より高いグラウト材Gの封止効果を得ることができる。
(Effects of embodiment)
The seventh embodiment can achieve the effects (1) to (6) of the first embodiment, the effect (8) of the second embodiment, and the effect (11) of the fifth embodiment, and others. A higher sealing effect of the grout material G can be obtained than in the embodiment.

より詳しくは、本発明(PC鋼棒体)の実施形態は、図1から図7を見てもわかるように、具体的には、第一PC鋼材11と第二PC鋼材12とがカプラ13で連結された連結部を有するPC鋼棒10と、前記連結部に対向する前記第一PC鋼材11及び前記第二PC鋼材12のそれぞれの対向側を被覆し、かつ、前記第一PC鋼材11と前記第二PC鋼材12とのそれぞれの隙間に充填された防錆材Bを封止するシース10Bと、前記第一PC鋼材11と前記第二PC鋼材12にそれぞれ設けられ前記防錆材Bの漏れを防止するブレーキングナット10Cと、前記PC鋼棒10のうち前記連結部(カプラ13)及び前記ブレーキングナット10Cが内部に配置され、かつ、グラウト材Gが充填されるシース管20、50、60とを備え、前記シース10Bの端部は、前記ブレーキングナット10Cの周面を覆って前記防錆材Bを封止し、前記シース管20、50、60は、前記第一PC鋼材11に設けられたブレーキングナット10Cを少なくとも覆う第一カプラシース継手21、51、61と、前記第二PC鋼材12に設けられたブレーキングナット10Cを少なくとも覆う第二カプラシース継手22と、を有し、前記第一カプラシース継手21、51、61と前記第二カプラシース継手22との少なくとも一方と、前記シース10B及びブレーキングナット10Cとの間に、前記グラウト材Gを封止する封止部材4が設けられ、当該封止部材4が前記ブレーキングナット10Cを覆うように接触して延設されていることを特徴とする。 More specifically, in the embodiment of the present invention (PC steel bar), as can be seen from FIGS. 1 to 7, specifically, the first PC steel material 11 and the second PC steel material 12 are A PC steel rod 10 having a connecting portion connected by a PC steel rod 10, and a PC steel rod 10 that covers the opposing sides of the first PC steel material 11 and the second PC steel material 12 facing the connecting portion, and and a sheath 10B that seals the rust preventive material B filled in the gaps between the first PC steel material 11 and the second PC steel material 12, and the rust preventive material B provided in the first PC steel material 11 and the second PC steel material 12, respectively. a sheath pipe 20 in which the connecting portion (coupler 13) and the braking nut 10C of the PC steel rod 10 are disposed and filled with grout G; 50, 60, the end of the sheath 10B covers the circumferential surface of the braking nut 10C to seal the rust preventive material B, and the sheath pipes 20, 50, 60 It has a first coupler sheath joint 21, 51, 61 that at least covers the braking nut 10C provided on the steel material 11, and a second coupler sheath joint 22 that covers at least the breaking nut 10C provided on the second PC steel material 12. and a sealing member 4 for sealing the grout material G between at least one of the first coupler sheath joints 21, 51, 61 and the second coupler sheath joint 22, and the sheath 10B and breaking nut 10C. is provided, and the sealing member 4 extends in contact with and covers the braking nut 10C.

このようなPC鋼棒体では、上述したように、前記第一カプラシース継手21、51、61と前記第二カプラシース継手22との少なくとも一方と、前記シース10B及びブレーキングナット10Cとの間に、前記グラウト材Gを封止する封止部材4が設けられ、当該封止部材4が前記ブレーキングナット10Cを覆うように接触して延設されているため、PC鋼棒10がシース管20、50、60に対して軸方向に移動等しにくくなる。また、仮に移動した場合でも、封止部材4が前記ブレーキングナット10Cを覆うように接触して延設されているため、当該移動した場合でも封止部材4が存在することになる。したがって、前記PC鋼棒10とシース管20、50、60との間の隙間からグラウト材Gが漏出することを防止できる。 In such a PC steel bar body, as described above, between at least one of the first coupler sheath joint 21, 51, 61 and the second coupler sheath joint 22, and the sheath 10B and the breaking nut 10C, A sealing member 4 for sealing the grout material G is provided, and the sealing member 4 extends in contact with the braking nut 10C so as to cover it, so that the PC steel rod 10 is connected to the sheath pipe 20, 50 and 60, it becomes difficult to move in the axial direction. Further, even if it moves, the sealing member 4 is extended so as to cover the braking nut 10C, so even if it moves, the sealing member 4 will still be present. Therefore, it is possible to prevent the grout material G from leaking from the gap between the PC steel rod 10 and the sheath pipes 20, 50, and 60.

本発明のPC鋼棒体において、前記封止部材4が設けられた前記第一カプラシース継手21、51、61と前記第二カプラシース継手22との少なくとも一方は、前記シース10Bを挿通する小径部221、前記小径部221より大きな径の大径部222及び前記小径部221と前記大径部222との間に設けられたテーパ部223とを有し、前記小径部221の内径は前記ブレーキングナット10Cの外径より大きく、前記シース10Bは少なくとも前記小径部221内に、前記ブレーキングナット10Cは前記テーパ部223内にそれぞれ配置され、前記封止部材4は、前記小径部221から前記テーパ部223まで延設されていることが好ましい。
前記テーパ部223とブレーキングナット10Cと間には狭い空間が発生し、この空間はグラウト材Gを充填した場合でも気泡が入りやすい。そこで、当該封止部材4で当該空間を充填させることで、当該気泡の発生を抑制することができる。
In the PC steel bar of the present invention, at least one of the first coupler sheath joint 21, 51, 61 and the second coupler sheath joint 22 provided with the sealing member 4 has a small diameter portion 221 through which the sheath 10B is inserted. , a large diameter part 222 having a larger diameter than the small diameter part 221, and a tapered part 223 provided between the small diameter part 221 and the large diameter part 222, and the inner diameter of the small diameter part 221 is the same as that of the braking nut. 10C, the sheath 10B is disposed at least within the small diameter section 221, the braking nut 10C is disposed within the tapered section 223, and the sealing member 4 extends from the small diameter section 221 to the tapered section. It is preferable that it extends up to 223.
A narrow space is generated between the taper portion 223 and the braking nut 10C, and even when filled with the grout material G, air bubbles are likely to enter this space. Therefore, by filling the space with the sealing member 4, the generation of bubbles can be suppressed.

より具体的には、前記シース10Bの一部は前記小径部221内に、前記シース10Bの他の一部及び前記ブレーキングナット10Cは前記テーパ部223内にそれぞれ配置され、前記封止部材4は、前記小径部221から前記テーパ部223まで延設されている。
このような場合、前記シース10Bの他の一部と前記テーパ部223との間に、更に、狭い空間が発生するため、グラフト材を充填してもより気泡が入りやすい。そこで、当該封止部材4で当該空間を充填させることで、より当該気泡の発生を抑制することができる。
More specifically, a part of the sheath 10B is arranged in the small diameter part 221, another part of the sheath 10B and the braking nut 10C are arranged in the tapered part 223, and the sealing member 4 extends from the small diameter portion 221 to the tapered portion 223.
In such a case, an even narrower space is generated between the other part of the sheath 10B and the tapered part 223, so that even if the graft material is filled, air bubbles are more likely to enter. Therefore, by filling the space with the sealing member 4, the generation of bubbles can be further suppressed.

なお、本発明は前述の各実施形態に限定されるものではなく、本発明の目的を達成できる範囲での変形、改良等は本発明に含まれるものである。
例えば、前記各実施形態では、封止部材4をスポンジゴムから構成するものとしたが、本発明では、これに限定されるものではなく、例えば、布や紙等から構成するものでもよい。
また、第7実施形態(図7)に示したような、封止部材4を第一カプラシース継手61の小径部221からシース10Bに接触させながら露出させて、当該露出した封止部材4を覆うように、テーピング24を配置する構成を、第1から第6実施形態に適用することもできる。
It should be noted that the present invention is not limited to the above-described embodiments, and the present invention includes modifications, improvements, etc. within a range that can achieve the object of the present invention.
For example, in each of the embodiments described above, the sealing member 4 is made of sponge rubber, but the present invention is not limited to this, and may be made of cloth, paper, or the like.
Further, as shown in the seventh embodiment (FIG. 7), the sealing member 4 is exposed from the small diameter portion 221 of the first coupler sheath joint 61 while being in contact with the sheath 10B, and the exposed sealing member 4 is covered. The configuration in which the taping 24 is arranged can also be applied to the first to sixth embodiments.

さらに、前記各実施形態では、第一カプラシース継手21の小径部221には、シース10Bの雄ねじに螺合する雌ねじを形成するものとしてもよい。
また、第2実施形態において、硬質ゴム43は、テーパ部432が省略された筒状部材としてもよい。
Furthermore, in each of the embodiments described above, the small diameter portion 221 of the first coupler sheath joint 21 may be formed with a female thread that is screwed into the male thread of the sheath 10B.
Further, in the second embodiment, the hard rubber 43 may be a cylindrical member in which the tapered portion 432 is omitted.

1,2,3…PC鋼棒体、10…PC鋼棒、10A…雄ねじ部、10B…シース、10C…ブレーキングナット、11…第一PC鋼材、12…第二PC鋼材、13…カプラ、20、50,60…シース管、21,51,61…第一カプラシース継手、22…第二カプラシース継手、221…小径部、222…大径部、223…テーパ部、224…筒状部、211…筒状本体部、212…底面部、30…アンカープレート、4…封止部材、41…ナット、42…位置決め部材、43…硬質ゴム、B…防錆材、G…グラウト材 1, 2, 3...PC steel rod body, 10...PC steel bar, 10A...male thread part, 10B...sheath, 10C...braking nut, 11...first PC steel material, 12...second PC steel material, 13...coupler, 20, 50, 60...Sheath tube, 21,51,61...First coupler sheath joint, 22...Second coupler sheath joint, 221...Small diameter part, 222...Large diameter part, 223...Tapered part, 224...Cylindrical part, 211 ...Cylindrical body part, 212...Bottom part, 30...Anchor plate, 4...Sealing member, 41...Nut, 42...Positioning member, 43...Hard rubber, B...Rust prevention material, G...Gouting material

Claims (6)

第一PC鋼材と第二PC鋼材とがカプラで連結されたPC鋼棒と、
前記第一PC鋼材及び前記第二PC鋼材をそれぞれ被覆し前記第一PC鋼材と前記第二PC鋼材それぞれの隙間に充填された防錆材を封止するシースと、
前記第一PC鋼材と前記第二PC鋼材にそれぞれ設けられ前記防錆材の漏れを防止するブレーキングナットと、
前記PC鋼棒のうち少なくとも前記カプラが内部に配置されグラウト材が充填されるシース管とを備え、
前記シース管は、前記第一PC鋼材の端部を覆う第一カプラシース継手と、前記第二PC鋼材の端部を覆う第二カプラシース継手と、を有し、
前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方と、前記シースとの間に、弾性を有する封止部材が設けられ、当該封止部材が前記ブレーキングナットを覆うように延設されている
ことを特徴とするPC鋼棒体。
A PC steel rod in which a first PC steel material and a second PC steel material are connected by a coupler;
a sheath that covers each of the first PC steel material and the second PC steel material and seals a rust preventive material filled in each gap between the first PC steel material and the second PC steel material;
a braking nut provided on each of the first PC steel material and the second PC steel material to prevent leakage of the rust preventive material;
A sheath pipe in which at least the coupler is disposed inside the PC steel rod and filled with grout material,
The sheath pipe has a first coupler sheath joint that covers an end of the first PC steel material, and a second coupler sheath joint that covers an end of the second PC steel material,
An elastic sealing member is provided between at least one of the first coupler sheath joint and the second coupler sheath joint and the sheath, and the sealing member extends to cover the breaking nut. A PC steel bar body characterized by:
請求項1に記載されたPC鋼棒体において、
前記封止部材が設けられた前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方は、前記シースを挿通する小径部と前記小径部より大きな径の大径部とを有し、前記小径部の内径は前記ブレーキングナットの外径より大きい
ことを特徴とするPC鋼棒体。
In the PC steel bar according to claim 1,
At least one of the first coupler sheath joint and the second coupler sheath joint provided with the sealing member has a small diameter portion through which the sheath is inserted and a large diameter portion having a larger diameter than the small diameter portion, and the small diameter A PC steel bar body, wherein the inner diameter of the braking nut is larger than the outer diameter of the braking nut.
請求項1又は請求項2に記載されたPC鋼棒体において、
前記シースの端部は、前記ブレーキングナットの周面を覆って前記防錆材を封止する
ことを特徴とするPC鋼棒体。
In the PC steel bar according to claim 1 or claim 2,
A PC steel bar body, wherein an end of the sheath covers the circumferential surface of the braking nut and seals the rust preventive material.
第一PC鋼材と第二PC鋼材とがカプラで連結された連結部を有するPC鋼棒と、
前記連結部に対向する前記第一PC鋼材及び前記第二PC鋼材のそれぞれの対向側を被覆し、かつ、前記第一PC鋼材と前記第二PC鋼材とのそれぞれの隙間に充填された防錆材を封止するシースと、
前記第一PC鋼材と前記第二PC鋼材にそれぞれ設けられ前記防錆材の漏れを防止するブレーキングナットと、
前記PC鋼棒のうち前記連結部及び前記ブレーキングナットが内部に配置され、かつ、グラウト材が充填されるシース管とを備え、
前記シースの端部は、前記ブレーキングナットの周面を覆って前記防錆材を封止し、
前記シース管は、前記第一PC鋼材に設けられたブレーキングナットを少なくとも覆う第一カプラシース継手と、前記第二PC鋼材に設けられたブレーキングナットを少なくとも覆う第二カプラシース継手と、を有し、
前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方と、前記シース及びブレーキングナットとの間に、前記グラウト材を封止する封止部材が設けられ、当該封止部材が前記ブレーキングナットを覆うように接触して延設されている
ことを特徴とするPC鋼棒体。
A PC steel rod having a connecting portion where a first PC steel material and a second PC steel material are connected by a coupler;
Rust prevention coating the opposing sides of the first PC steel material and the second PC steel material facing the connecting portion, and filling the gaps between the first PC steel material and the second PC steel material. a sheath that seals the material;
a braking nut provided on each of the first PC steel material and the second PC steel material to prevent leakage of the rust preventive material;
Of the PC steel rod, the connecting portion and the braking nut are arranged inside, and a sheath pipe is filled with grout material,
The end of the sheath covers the circumferential surface of the braking nut and seals the rust preventive material,
The sheath pipe includes a first coupler sheath joint that at least covers a breaking nut provided on the first PC steel material, and a second coupler sheath joint that covers at least a breaking nut provided on the second PC steel material. ,
A sealing member for sealing the grout is provided between at least one of the first coupler sheath joint and the second coupler sheath joint, and the sheath and the braking nut, and the sealing member seals the grout. A PC steel bar characterized by extending in contact with and covering a nut.
請求項4に記載されたPC鋼棒体において、
前記封止部材が設けられた前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方は、前記シースを挿通する小径部、前記小径部より大きな径の大径部及び前記小径部と前記大径部との間に設けられたテーパ部を有し、前記小径部の内径は前記ブレーキングナットの外径より大きく、
前記シースは少なくとも前記小径部内に、前記ブレーキングナットは前記テーパ部内にそれぞれ配置され、
前記封止部材は、前記小径部から前記テーパ部まで延設されている
ことを特徴とするPC鋼棒体。
In the PC steel bar according to claim 4,
At least one of the first coupler sheath joint and the second coupler sheath joint provided with the sealing member includes a small diameter portion through which the sheath is inserted, a large diameter portion having a larger diameter than the small diameter portion, and a portion between the small diameter portion and the large diameter portion. a tapered part provided between the braking nut and the braking nut, the inner diameter of the small diameter part being larger than the outer diameter of the braking nut;
The sheath is disposed at least within the small diameter section, and the braking nut is disposed within the tapered section,
The said sealing member is extended from the said small diameter part to the said taper part. The PC steel bar characterized by the above-mentioned.
請求項1ないし請求項5のいずれか1項に記載されたPC鋼棒体を施工する方法であって、
前記第一PC鋼材と前記第二PC鋼材とを直列配置するとともに前記第一PC鋼材と前記第二PC鋼材とをカプラで連結し、
前記第一PC鋼材の端部を前記第一カプラシース継手で覆うとともに、前記第二PC鋼材の端部を前記第二カプラシース継手で覆い、かつ、前記第一カプラシース継手と前記第二カプラシース継手との少なくとも一方と、前記シースとの間に前記封止部材を設け、
前記第一カプラシース継手と前記第二カプラシース継手とを連結して前記シース管を形成し、
前記シース管の内部にグラウト材を充填し、
その後、前記PC鋼棒及び前記シース管の周囲にコンクリートを打設し、
前記第一PC鋼材と前記第二PC鋼材とを軸方向に相対的に引張して前記PC鋼棒に緊張力を付与する
ことを特徴とするPC鋼棒体の施工方法。
A method for constructing a PC steel bar according to any one of claims 1 to 5, comprising:
arranging the first PC steel material and the second PC steel material in series, and connecting the first PC steel material and the second PC steel material with a coupler;
An end of the first PC steel material is covered with the first coupler sheath joint, an end of the second PC steel material is covered with the second coupler sheath joint, and the first coupler sheath joint and the second coupler sheath joint are connected to each other. providing the sealing member between at least one and the sheath;
connecting the first coupler sheath joint and the second coupler sheath joint to form the sheath pipe;
Filling the inside of the sheath pipe with grout material,
After that, concrete is placed around the PC steel rod and the sheath pipe,
A method for constructing a PC steel bar, comprising: applying tension to the PC steel bar by relatively stretching the first PC steel material and the second PC steel material in the axial direction.
JP2020138577A 2020-08-19 2020-08-19 PC steel rod and construction method of PC steel rod Active JP7441752B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020138577A JP7441752B2 (en) 2020-08-19 2020-08-19 PC steel rod and construction method of PC steel rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020138577A JP7441752B2 (en) 2020-08-19 2020-08-19 PC steel rod and construction method of PC steel rod

Publications (2)

Publication Number Publication Date
JP2022034738A JP2022034738A (en) 2022-03-04
JP7441752B2 true JP7441752B2 (en) 2024-03-01

Family

ID=80443138

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020138577A Active JP7441752B2 (en) 2020-08-19 2020-08-19 PC steel rod and construction method of PC steel rod

Country Status (1)

Country Link
JP (1) JP7441752B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006124964A (en) 2004-10-27 2006-05-18 Nippon Splice Sleeve Kk Sleeve type reinforcement joint structure and connecting structure between members by sleeve type reinforcement joint structure structure
JP2009035892A (en) 2007-07-31 2009-02-19 High Frequency Heattreat Co Ltd Leakage prevention tube, its coating method, and prestressing steel bar anchoring structure
JP2018184796A (en) 2017-04-27 2018-11-22 高周波熱錬株式会社 Filling evaluation method of grout material and filling evaluation member of grout material
JP2019094651A (en) 2017-11-21 2019-06-20 株式会社アクト Irregular-shape bar steel connection structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006124964A (en) 2004-10-27 2006-05-18 Nippon Splice Sleeve Kk Sleeve type reinforcement joint structure and connecting structure between members by sleeve type reinforcement joint structure structure
JP2009035892A (en) 2007-07-31 2009-02-19 High Frequency Heattreat Co Ltd Leakage prevention tube, its coating method, and prestressing steel bar anchoring structure
JP2018184796A (en) 2017-04-27 2018-11-22 高周波熱錬株式会社 Filling evaluation method of grout material and filling evaluation member of grout material
JP2019094651A (en) 2017-11-21 2019-06-20 株式会社アクト Irregular-shape bar steel connection structure

Also Published As

Publication number Publication date
JP2022034738A (en) 2022-03-04

Similar Documents

Publication Publication Date Title
US20110091301A1 (en) Screw grommet
JP7441752B2 (en) PC steel rod and construction method of PC steel rod
JP5026154B2 (en) Grouthole watertight test structure and watertight test method
JP7030071B2 (en) Construction method of PC steel rod and PC steel rod
JP4294707B2 (en) Wall waterproofing device, waterproofing member, connecting bracket and waterproofing method
CA2853160A1 (en) Compound anchor
JP2020159180A (en) Cut-off member for segment and cut-off structure for segment
JP7441745B2 (en) PC steel bar
JP7348111B2 (en) Water-stopping member for joint-like parts and water-stopping structure for joint-like parts
JPH0533557Y2 (en)
JP3405441B2 (en) Liquid leakage prevention cap
JPS61142223A (en) Prevention of corrosion of permanent anchor head
JPH11172672A (en) Waterproof tension method and device for ground anchor
KR102603099B1 (en) Waterproof fastener assembly for water tank
JPH03223596A (en) Leakage preventive device for tube
KR100586415B1 (en) Branch sewer pipe connecting device
JPH0336587Y2 (en)
JP2593489Y2 (en) Protection cover for underground piping
JP4360641B2 (en) Mounting structure of receiving joint to wiring box and method of preventing misalignment or deformation of attached receiving joint
KR100718590B1 (en) Manhole and Connecting structure between manhole and distributing pipe
JP6611314B2 (en) Injection structure and injection method
JPH0518319Y2 (en)
JP3669763B2 (en) Flexible box culvert
JPH0544409Y2 (en)
EP1983125A2 (en) Sealing device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230302

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231205

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240219

R150 Certificate of patent or registration of utility model

Ref document number: 7441752

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150