JP7340390B2 - Support structure for heavy construction equipment - Google Patents

Support structure for heavy construction equipment Download PDF

Info

Publication number
JP7340390B2
JP7340390B2 JP2019159565A JP2019159565A JP7340390B2 JP 7340390 B2 JP7340390 B2 JP 7340390B2 JP 2019159565 A JP2019159565 A JP 2019159565A JP 2019159565 A JP2019159565 A JP 2019159565A JP 7340390 B2 JP7340390 B2 JP 7340390B2
Authority
JP
Japan
Prior art keywords
floor
section
gantry
heavy construction
reinforcing column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019159565A
Other languages
Japanese (ja)
Other versions
JP2021038552A (en
Inventor
翼 志田
正則 篠原
貴秀 砂井
貴穂 河野
博人 熊谷
康大 前
昭次 山川
健太郎 石井
進一 谷田
裕介 中山
優子 津司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2019159565A priority Critical patent/JP7340390B2/en
Publication of JP2021038552A publication Critical patent/JP2021038552A/en
Application granted granted Critical
Publication of JP7340390B2 publication Critical patent/JP7340390B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、建設重機の支持構造に関する。 The present invention relates to a support structure for heavy construction equipment.

従来、ビルの如きコンクリート構造物を解体するための技術の一つとして、クレーンを床部に設置した状態で、クレーンを用いて壁部、柱部等を解体除去する技術が提案されている。また、このような従来の技術において、床部のうちクレーンの設置領域に対応する部分の強度が十分ではない場合には、当該部分及びその周辺部分に対してコンクリートをあらかじめ増し打ちすることにより、当該部分の必要強度を確保していた。 Conventionally, as one technique for dismantling concrete structures such as buildings, a technique has been proposed in which walls, columns, etc. are dismantled and removed using a crane with the crane installed on the floor. In addition, in such conventional technology, if the strength of the part of the floor corresponding to the crane installation area is not sufficient, by pouring additional concrete in advance in that part and the surrounding area, The required strength of the relevant part was ensured.

特開2003-253893号公報Japanese Patent Application Publication No. 2003-253893

しかしながら、上記従来の技術においては、床部に対するコンクリートの増し打ちを行う場合には、コンクリートの増し打ち作業に手間を要し、さらに床部の解体作業に手間を要することから、増し打ちされた床部の如き支持構造の設置性及び撤去性を高める観点からは改善の余地があった。 However, in the above-mentioned conventional technology, when additional concrete is placed on the floor, it takes time and effort to add more concrete, and furthermore, it takes time and effort to dismantle the floor. There was room for improvement from the viewpoint of improving the ease of installation and removal of support structures such as floors.

本発明は、上記に鑑みてなされたものであって、支持構造の設置性及び撤去性を高めることが可能となる、建設重機の支持構造を提供することを目的とする。 The present invention has been made in view of the above, and an object of the present invention is to provide a support structure for heavy construction equipment that can improve the ease of installation and removal of the support structure.

上述した課題を解決し、目的を達成するために、請求項1に記載の建設重機の支持構造は、既設の複数の床部を用いた工事において、建設重機を支持するための支持構造であって、前記複数の床部のうち最下方の床部以外の床部であって、前記建設重機を設置する対象となる床部である対象床部に対して取外し可能に設置される構台であって、前記建設重機を載置するための構台と、前記構台よりも下方に設けられる補強柱部であって、前記対象床部又は前記構台を補強するための補強柱部と、前記補強柱部に取付けられた振止め手段であって、当該補強柱部の振れを抑制するための振止め手段と、を備え、前記複数の床部のいずれかに、前記補強柱部を挿通する挿通孔を形成し、前記振止め手段は、前記挿通孔の近傍において相互に間隔を隔てて設けられ、且つ当該挿通孔が形成された前記床部に対して固定具で固定される一対の梁材のみを備える。 In order to solve the above problems and achieve the purpose, the support structure for heavy construction equipment according to claim 1 is a support structure for supporting heavy construction equipment in construction using a plurality of existing floors. and a gantry that is removably installed with respect to a target floor part other than the lowest floor part among the plurality of floor parts, which is the floor part on which the heavy construction equipment is installed. a pedestal for mounting the heavy construction equipment; a reinforcing column provided below the pedestal, the reinforcing column for reinforcing the target floor or the pedestal; and the reinforcing column. and a steadying means for suppressing vibration of the reinforcing column, which is attached to the reinforcing column, and has an insertion hole in one of the plurality of floor sections through which the reinforcing column is inserted. The steadying means includes only a pair of beam members that are provided at a distance from each other in the vicinity of the insertion hole and that are fixed with a fixture to the floor portion in which the insertion hole is formed. Be prepared.

請求項2に記載の建設重機の支持構造は、請求項1に記載の建設重機の支持構造において、前記補強柱部は、第1本体部と、前記第1本体部よりも下方に設けられる第2本体部と、前記第1本体部と前記第2本体部との相互間に設けられる位置調整部であり、前記第1本体部の高さ位置を調整するための位置調整部と、を備え、前記位置調整部を、前記振止め手段と接触しないように配置した。 The support structure for heavy construction equipment according to claim 2 is the support structure for heavy construction equipment according to claim 1, in which the reinforcing column portion includes a first main body portion and a first main body portion provided below the first main body portion. 2 main body parts, and a position adjustment part provided between the first main body part and the second main body part, and a position adjustment part for adjusting the height position of the first main body part. , the position adjusting section is arranged so as not to come into contact with the steadying means.

請求項3に記載の建設重機の支持構造は、請求項1又は2に記載の建設重機の支持構造において、前記構台を、少なくとも1つ以上の桁材を介して前記対象床部に設け、前記少なくとも1つ以上の桁材を、前記補強柱部に対応する位置に設けた。 The support structure for heavy construction equipment according to claim 3 is the support structure for heavy construction equipment according to claim 1 or 2 , in which the gantry is provided on the target floor via at least one or more girder members, and At least one or more girder members were provided at positions corresponding to the reinforcing column parts.

請求項4に記載の建設重機の支持構造は、請求項1から3のいずれか一項に記載の建設重機の支持構造において、前記複数の床部、又は前記複数の床部を備える建物を構成する複数の梁部は、前記対象床部よりも下方に位置する床部又は梁部であって、前記建設重機及び前記構台を支持できない床部又は梁部である第1床部又は第1梁部と、前記第1床部又は前記第1梁部よりも下方に位置する床部又は梁部であって、前記建設重機及び前記構台を支持可能な床部又は梁部である第2床部又は第2梁部と、を含み、前記補強柱部を、前記第1梁部又は前記第1床部に形成された挿通孔を介して前記第2梁部又は前記第2床部に載置した。 The support structure for heavy construction equipment according to claim 4 is the support structure for heavy construction equipment according to any one of claims 1 to 3, which constitutes the plurality of floors or a building including the plurality of floors. The plurality of beam portions are floor portions or beam portions located below the target floor portion, and are floor portions or beam portions that cannot support the heavy construction equipment and the gantry, a first floor portion or a first beam portion. and a second floor part that is a floor part or a beam part located below the first floor part or the first beam part, and is a floor part or a beam part that can support the heavy construction equipment and the gantry. or a second beam portion, and the reinforcing column portion is placed on the second beam portion or the second floor portion through an insertion hole formed in the first beam portion or the first floor portion. did.

請求項5に記載の建設重機の支持構造は、請求項1から4のいずれか一項に記載の建設重機の支持構造において、前記構台は、鋼製の覆工板である。 A support structure for heavy construction equipment according to a fifth aspect of the present invention is the support structure for heavy construction equipment according to any one of claims 1 to 4, wherein the gantry is a steel lining plate.

請求項1に記載の建設重機の支持構造によれば、複数の床部のうち最下方の床部以外の床部であって、建設重機を設置する対象となる床部である対象床部に対して取外し可能に設置される構台であって、建設重機を載置するための構台を備えるので、従来技術(コンクリートを増し打ちした床部にクレーンを設置する技術)に比べて、当該支持構造の設置作業及び撤去作業を簡易に行うことができ、当該支持構造の設置性及び撤去性を高めることが可能となる。
また、構台よりも下方に設けられる補強柱部であって、対象床部又は構台を補強するための補強柱部を備えるので、対象床部又は構台を補強することができ、対象床部又は構台の設置安定性を高めることができる。
また、補強柱部に取付けられた振止め手段であって、当該補強柱部の振れを抑制するための振止め手段を備えるので、補強柱部の振れを抑制でき、振止め手段を設けない場合に比べて補強柱部の設置安定性を高めやすくなる。
According to the support structure for heavy construction equipment according to claim 1, the target floor part other than the lowest floor part among the plurality of floor parts, which is the floor part on which the heavy construction equipment is installed, Since it is a gantry that is removably installed on the floor and is equipped with a gantry for placing heavy construction equipment, the support structure is The installation and removal work of the support structure can be easily performed, and the installation and removal properties of the support structure can be improved.
In addition, since the reinforcing column part is provided below the gantry and is provided with a reinforcing column part for reinforcing the target floor part or the gantry, the target floor part or the gantry can be reinforced, and the target floor part or the gantry can be reinforced. The installation stability can be increased.
In addition, since it is provided with a steadying means attached to the reinforcing column and for suppressing the shaking of the reinforcing column, the shaking of the reinforcing column can be suppressed, and when no steadying means is provided. It is easier to increase the installation stability of the reinforced column compared to the above.

請求項3に記載の建設重機の支持構造によれば、少なくとも1つ以上の桁材を、補強柱部に対応する位置に設けたので、補強柱部、対象床部、及び桁材を介して構台を支持でき、補強柱部及び対象床部を介して構台を設置する場合に比べて、構台の設置作業及び撤去作業を効率的に行うことができる。 According to the support structure for heavy construction equipment according to claim 3 , since at least one girder material is provided at a position corresponding to the reinforcing column part, the reinforcement column part, the target floor part, and the girder material can be connected to each other through the reinforcement column part, the target floor part, and the girder material. The gantry can be supported, and the installation and removal work of the gantry can be performed more efficiently than in the case where the gantry is installed via the reinforcing column and the target floor.

請求項4に記載の建設重機の支持構造によれば、補強柱部を、第1梁部又は第1床部に形成された挿通孔を介して第2梁部又は第2床部に載置したので、第1梁部又は第1床部の強度が比較的低い場合に、補強柱部を第2梁部又は第2床部に対して支持でき、補強柱部の設置安定性を高めることができる。 According to the support structure for heavy construction equipment according to claim 4 , the reinforcing column portion is placed on the second beam portion or the second floor portion through the insertion hole formed in the first beam portion or the first floor portion. Therefore, when the strength of the first beam part or the first floor part is relatively low, the reinforcing column part can be supported with respect to the second beam part or the second floor part, and the installation stability of the reinforcing column part can be improved. I can do it.

請求項5に記載の建設重機の支持構造によれば、構台が、鋼製の覆工板であるので、構台を簡易に構成でき、構台の製造性を高めることができる。 According to the support structure for heavy construction machinery according to the fifth aspect , since the gantry is a steel lining plate, the gantry can be easily constructed and the manufacturability of the gantry can be improved.

本発明の実施の形態に係る建物の支持構造を概念的に示す側面図である。1 is a side view conceptually showing a support structure for a building according to an embodiment of the present invention. 第1補強柱部の構成示す側面図である。FIG. 3 is a side view showing the configuration of the first reinforcing column portion. 第2補強柱部の構成示す側面図である。FIG. 3 is a side view showing the configuration of a second reinforcing column portion. 図3のA-A矢視断面図である。4 is a sectional view taken along the line AA in FIG. 3. FIG. 実施の形態に係る支持構造の施工方法の解体工程を示す側面図である。FIG. 3 is a side view showing a dismantling step of the support structure construction method according to the embodiment. 支持構造の施工方法の挿通孔形成工程を示す側面図である。It is a side view which shows the penetration hole formation process of the construction method of a support structure. 支持構造の施工方法の補強柱部設置工程を示す側面図である。It is a side view which shows the reinforcement column part installation process of the construction method of a support structure.

以下に添付図面を参照して、この発明に係る建設重機の支持構造の実施の形態を詳細に説明する。まず、〔I〕実施の形態の基本的概念を説明した後、〔II〕実施の形態の具体的内容について説明し、最後に、〔III〕実施の形態に対する変形例について説明する。ただし、実施の形態によって本発明が限定されるものではない。 DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of a support structure for heavy construction equipment according to the present invention will be described in detail below with reference to the accompanying drawings. First, [I] the basic concept of the embodiment will be explained, then [II] the specific contents of the embodiment will be explained, and finally [III] modifications to the embodiment will be explained. However, the present invention is not limited to the embodiments.

〔I〕実施の形態の基本的概念
まず、実施の形態の基本的概念について説明する。実施の形態は、概略的に、既設の複数の床部を用いた工事において、建設重機を支持するための支持構造に関する。ここで、「既設の複数の床部」を備える「建物」は、1つ以上の数の階層を有する建物であって、既設建物の一部が解体された後に一部新設される建物である。この「建物」は、例えば、アパートやマンションの如き集合住宅、オフィスビル、商業施設、公共施設、及び工場施設等を含む概念であるが、実施の形態では、地下階を有するオフィスビルであって、地下階を施工している途中のオフィスビルとして説明する。また、「既設の複数の床部」とは、上記建物を構成する床部のうち、建物の解体後に撤去されずに残された床部を意味する。また、「工事」とは、例えば、解体工事、新築工事、改修工事等を含む概念である。また、「建設重機」とは、例えば、解体重機(一例として、掘削機、コンクリート破砕機)、タワークレーン、運搬機械(一例として、トラック等)、地盤改良機等を含む概念であるが、実施の形態では、地盤改良機として説明する。
[I] Basic Concept of Embodiment First, the basic concept of the embodiment will be explained. The embodiments generally relate to a support structure for supporting heavy construction equipment during construction using a plurality of existing floors. Here, a "building" with "multiple existing floors" is a building with one or more floors, and is a building in which part of the existing building is partially demolished and then partially newly constructed. . This "building" is a concept that includes, for example, housing complexes such as apartments and condominiums, office buildings, commercial facilities, public facilities, factory facilities, etc., but in the embodiment, it is an office building with a basement floor. This will be explained as an office building whose basement floor is currently under construction. Moreover, "a plurality of existing floors" means, among the floors constituting the above-mentioned building, those that remain without being removed after the building is demolished. Furthermore, "construction" is a concept that includes, for example, demolition work, new construction work, repair work, and the like. In addition, "heavy construction equipment" is a concept that includes, for example, heavy demolition equipment (excavators, concrete crushers), tower cranes, transport machines (trucks, etc. as an example), ground improvement equipment, etc. In this form, it will be explained as a ground improvement machine.

〔II〕実施の形態の具体的内容
次に、実施の形態の具体的内容について説明する。
[II] Specific contents of the embodiment Next, specific contents of the embodiment will be described.

(構成)
最初に、実施の形態に係る建設重機CEの支持構造の構成と、当該支持構造40が適用される建物1の構成とについて説明する。
(composition)
First, the configuration of the support structure of the heavy construction equipment CE according to the embodiment and the configuration of the building 1 to which the support structure 40 is applied will be described.

(構成-建物)
まず、建物1の構成について説明する。図1は、本発明の実施の形態に係る建物1の支持構造40を概念的に示す側面図である。以下の説明では、図1のX方向を建物1の左右方向(-X方向を建物1の左方向、+X方向を建物1の右方向)、後述の図4のY方向を建物1の前後方向(+Y方向を建物1の前方向、-Y方向を建物1の後方向)、図1のZ方向を建物1の上下方向(+Z方向を建物1の上方向、-Z方向を建物1の下方向)と称する。
(Composition - Building)
First, the configuration of the building 1 will be explained. FIG. 1 is a side view conceptually showing a support structure 40 of a building 1 according to an embodiment of the present invention. In the following explanation, the X direction in FIG. 1 is the left-right direction of the building 1 (-X direction is the left direction of the building 1, the +X direction is the right direction of the building 1), and the Y direction in FIG. (+Y direction is the front of building 1, -Y direction is the back of building 1), Z direction in Figure 1 is the vertical direction of building 1 (+Z direction is above building 1, -Z direction is below building 1) direction).

建物1は、実施の形態では鉄筋コンクリート造の建物(具体的には、地上6階地下2階の建物)であり、所定の敷地内に設けられており、図1に示すように、床部10、柱部20、梁部30、及び壁部(図示省略)を備えている。 In the embodiment, the building 1 is a reinforced concrete building (specifically, a building with 6 floors above ground and 2 floors underground), and is located within a predetermined site, and as shown in FIG. , a column part 20, a beam part 30, and a wall part (not shown).

(構成-建物-床部)
床部10は、建物1の階層を構成するものであり、図1に示すように、相互に間隔を隔てて上下方向に向けて複数並設されている。また、複数の床部10は、少なくとも、地上1階側床部11、地下1階側床部12、地下2階側第1床部13a、地下2階側第2床部13b、及び基礎床部14を含んで構成されている。
(Composition - Building - Floor)
The floor sections 10 constitute the floors of the building 1, and as shown in FIG. 1, a plurality of floor sections 10 are arranged vertically in parallel at intervals. Further, the plurality of floor sections 10 include at least a floor section 11 on the first floor above ground side, a floor section 12 on the first floor basement side, a first floor section 13a on the second basement floor side, a second floor section 13b on the second basement floor side, and a foundation floor. It is configured to include a section 14.

このうち、地上1階側床部11は、建設重機CEを設置する対象となる対象床部であり、図1に示すように、建物1の地上1階1aに設けられている。また、地下1階側床部12は、地上1階側床部11よりも下方に位置する第1床部であって、建設重機CE及び後述する構台50を支持できない第1床部であり、図1に示すように、地下1階1bに設けられている。また、地下2階側第1床部13aは、地下1階側床部12よりも下方に位置する床部であって、建設重機CE及び後述する構台50を支持できない第1床部であり、図1に示すように、地下2階1cに設けられている。また、地下2階側第2床部13bは、地下1階側床部12よりも下方に位置する第2床部であって、建設重機CE及び後述する構台50を支持可能な第2床部であり、地下2階1cに設けられている。また、基礎床部14は、地下2階側第1床部13a及び地下2階側第2床部13bよりも下方に位置する第2床部であって、建設重機CE及び後述する構台50を支持可能であり、且つ建物1の基礎となる第2床部(いわゆる耐圧盤)であり、地下2階1cより下方位置において地盤Gの上面に載置されている。 Among these, the first floor above ground side floor section 11 is a target floor section on which the heavy construction equipment CE is installed, and is provided on the first floor above ground 1a of the building 1, as shown in FIG. In addition, the basement 1st floor side floor section 12 is a first floor section located below the ground floor 1st floor side floor section 11, and is a first floor section that cannot support heavy construction equipment CE and a gantry 50 described below. As shown in FIG. 1, it is located on the first basement floor 1b. In addition, the second basement floor side first floor section 13a is a floor section located below the basement first floor side floor section 12, and is a first floor section that cannot support heavy construction equipment CE and a gantry 50 described below. As shown in FIG. 1, it is located on the second basement floor 1c. Further, the second basement floor section 13b is a second floor section located below the first basement floor section 12, and is capable of supporting heavy construction equipment CE and a gantry 50 to be described later. It is located on the second basement floor 1c. Further, the foundation floor section 14 is a second floor section located below the first floor section 13a on the second basement floor side and the second floor section 13b on the second basement floor side, and is used for heavy construction machinery CE and a gantry 50 described below. It is a second floor part (so-called pressure board) that can be supported and serves as the foundation of the building 1, and is placed on the upper surface of the ground G at a position below the second basement floor 1c.

(構成-建物-柱部)
柱部20は、床部10を支持するものであり、床部10同士の相互間(すなわち、建物1の各階層の空間)に複数設けられている。
(Composition - Building - Column)
The pillar portions 20 support the floor portions 10, and a plurality of pillar portions 20 are provided between the floor portions 10 (that is, in the spaces of each floor of the building 1).

(構成-建物-梁部)
梁部30は、床部10を支持するものであり、各床部10の下面と当接するように複数設けられたり、又は同一階の床部10同士の相互間に設けられている。また、複数の梁部30は、図1に示すように、地上1階側梁部31、地下1階側第1梁部(図示省略)、地下1階側第2梁部32、及び地下2階側梁部33を含んで構成されている。
(Composition - Building - Beam)
The beam portions 30 support the floor portions 10, and a plurality of beam portions 30 are provided so as to contact the lower surface of each floor portion 10, or are provided between the floor portions 10 on the same floor. In addition, as shown in FIG. 1, the plurality of beam sections 30 include a beam section 31 on the first floor above ground side, a first beam section on the first floor underground (not shown), a second beam section 32 on the first floor underground, and a second beam section 32 on the underground second floor side. It is configured to include a floor side beam portion 33.

このうち、地上1階側梁部31は、地上1階側床部11に取付けられたものであり、図1に示すように、建物1の地上1階1aに設けられている。また、地下1階側第1梁部は、地上1階側床部11よりも下方に位置する第1梁部であって、建設重機CE及び後述する構台50を支持できない第1梁部であり、地下1階側床部12に設けられている。また、地下1階側第2梁部32は、地上1階側床部11よりも下方に位置するものであって、建設重機CE及び後述する構台50を支持可能なものであり、図1に示すように、地下1階側床部12に設けられている。また、地下2階側梁部33は、地下1階側第1梁部及び地下1階側第2梁部32よりも下方に位置する第2梁部であって、建設重機CE及び構台50を支持可能な第2梁部であり、図1に示すように、地下2階側第1床部13a又は地下2階側第2床部13bに設けられている。 Among these, the first floor above ground side beam section 31 is attached to the first floor side floor section 11, and as shown in FIG. 1, is provided on the first floor above ground 1a of the building 1. Moreover, the first beam part on the first basement floor side is a first beam part located below the floor part 11 on the first floor side above ground, and is a first beam part that cannot support the heavy construction equipment CE and the gantry 50 described later. , is provided on the floor section 12 of the first basement floor. Further, the second beam section 32 on the underground first floor side is located below the ground floor section 11 and is capable of supporting heavy construction equipment CE and a gantry 50 to be described later. As shown, it is provided on the floor section 12 on the basement first floor side. The second basement floor side beam portion 33 is a second beam portion located below the first basement floor side first beam portion and the first basement floor second beam portion 32, and is a second beam portion located below the first basement floor side beam portion 32, and is used for heavy construction machinery CE and the gantry 50. This is a supportable second beam section, and as shown in FIG. 1, it is provided on the first floor section 13a on the second basement floor side or the second floor section 13b on the second basement floor side.

(構成-建物-壁部)
壁部は、床部10同士の相互間を仕切るためのものであり、床部10同士の相互間に複数設けられている。
(Composition - Building - Wall)
The wall portions are for partitioning the floor portions 10 from each other, and a plurality of wall portions are provided between the floor portions 10.

なお、実施の形態では、図1に示すように、これら床部10、柱部20、梁部30、及び壁部の各々の一部は、後述する重機HEによって解体されて撤去されているものとする。 In the embodiment, as shown in FIG. 1, a portion of each of the floor section 10, column section 20, beam section 30, and wall section has been dismantled and removed by heavy machinery HE to be described later. shall be.

(構成-建設重機の支持構造)
次に、建設重機CEの支持構造40について説明する。建設重機CEの支持構造40は、建物1における既設の複数の床部10を用いた工事において、建設重機CEを支持するための構造である。この支持構造40は、図1に示すように、地上1階1aから地下2階1cに至る範囲にわたって設けられており、構台50と、桁材60と、補強柱部70と、振止め部100とを備えている。
(Configuration - support structure for heavy construction equipment)
Next, the support structure 40 of the heavy construction equipment CE will be explained. The support structure 40 for the heavy construction equipment CE is a structure for supporting the heavy construction equipment CE during construction using the plurality of existing floors 10 in the building 1. As shown in FIG. 1, this support structure 40 is provided over a range from the first floor 1a above ground to the second floor 1c underground, and includes a gantry 50, a girder 60, a reinforcing column part 70, and a steady rest part 100. It is equipped with

(構成-建設重機の支持構造-構台)
構台50は、建設重機CEを載置するためのものである。この構台50は、複数の床部10のうち最下方の床部10(具体的には、基礎床部14)以外の床部10に設けられている。具体的には、図1に示すように、構台50は、地上1階側床部11に対して取外し可能に設置されており、より具体的には、少なくとも1つ以上の桁材60を介して地上1階側床部11に設けられている(すなわち、少なくとも1つ以上の桁材60の上面に載置されている)。
(Configuration - support structure for heavy construction equipment - gantry)
The gantry 50 is for placing heavy construction equipment CE. This gantry 50 is provided on a floor section 10 other than the lowest floor section 10 (specifically, the foundation floor section 14) among the plurality of floor sections 10. Specifically, as shown in FIG. 1, the gantry 50 is removably installed on the floor 11 of the first floor above ground, and more specifically, it It is provided on the floor section 11 of the first floor above ground (that is, it is placed on the upper surface of at least one girder member 60).

また、この構台50の具体的な構成については任意であるが、実施の形態では、公知の鋼製(例えば、スチール製又はステンレス製等)の覆工板(一例として、上面板と、上面板よりも下方に位置する下面板と、上面板と下面板との相互間に複数設けられた桁材60とを備える覆工板)等を用いて構成されている。具体的には、地上1階側床部11において、鋼製の覆工板を、相互に間隔を隔てることなく、左右方向及び前後方向に沿って複数並設することにより形成されている。これにより、構台50を簡易に構成でき、構台50の製造性を高めることができる。 Although the specific configuration of this gantry 50 is arbitrary, in the embodiment, a lining plate (for example, a top plate and a top plate) made of known steel (for example, steel or stainless steel) is used. It is constructed using a lining plate, etc., which includes a lower plate located below the upper plate and a plurality of girder members 60 provided between the upper plate and the lower plate. Specifically, in the floor section 11 on the first floor side above ground, a plurality of steel lining plates are arranged in parallel along the left-right direction and the front-rear direction without being spaced apart from each other. Thereby, the gantry 50 can be configured easily and the manufacturability of the gantry 50 can be improved.

また、この構台50の具体的な形状及び大きさについては、建物1における既設の複数の床部10を用いた工事において建設重機CEを用いた所定の作業を適切に実施することができる限り任意に設定できるが、実施の形態では、以下の通りとなる。すなわち、構台50の平面形状については、地上1階側床部11の平面形状と略同一の形状に設定している(ただし、これに限らず、地上1階側床部11の平面形状と異なる形状に設定してもよい)。また、構台50の左右方向の長さについては、地上1階側床部11の左右方向の長さよりも短い形状に設定している(ただし、これに限らず、地上1階側床部11の左右方向の長さと略同一の長さに設定してもよい)。また、構台50の前後方向の長さについては、地上1階側床部11の前後方向の長さよりも短い形状に設定している(ただし、これに限らず、地上1階側床部11の前後方向の長さと略同一の長さに設定してもよい)。また、構台50の上下方向の長さについては、地上1階側床部11の上下方向の長さと略同一に設定している(ただし、これに限らず、地上1階側床部11の上下方向の長さとは異なる長さに設定してもよい)。なお、上述した「所定の作業」とは、例えば、まず、地上1階側床部11の縁端部分を解体し、次に、基礎床部14に障害削孔を形成し、その後図示しない地盤改良体を設置すること等が該当する。 Further, the specific shape and size of this gantry 50 are arbitrary as long as they can appropriately carry out the prescribed work using heavy construction equipment CE in the construction using the plurality of existing floors 10 in the building 1. However, in the embodiment, the settings are as follows. That is, the planar shape of the gantry 50 is set to be approximately the same as the planar shape of the floor section 11 on the first floor side above ground (however, the planar shape is not limited to this, and the planar shape is different from the planar shape of the floor section 11 on the first floor side above ground level). (can also be set to shape). In addition, the length of the gantry 50 in the left and right direction is set to be shorter than the length of the floor part 11 on the first floor above ground side in the left and right direction (however, this is not limited to this. (The length may be set to be approximately the same as the length in the left-right direction.) Furthermore, the length of the gantry 50 in the front and back direction is set to be shorter than the length of the floor section 11 on the first floor side above ground in the front and back direction (however, this is not limited to this. (The length may be set to be approximately the same as the length in the front-back direction.) In addition, the length of the gantry 50 in the vertical direction is set to be approximately the same as the length in the vertical direction of the floor section 11 on the first floor side above ground (however, this is not limited to this. (The length may be set to be different from the length in the direction.) The above-mentioned "predetermined work" means, for example, first dismantling the edge portion of the floor 11 on the first floor above ground, then forming a hole in the foundation floor 14, and then demolishing the ground (not shown). This includes installing improved structures, etc.

(構成-建設重機の支持構造-桁材)
桁材60は、構台50及び建設重機CEの荷重を地上1階側床部11に伝達するためのものである。この桁材60は、例えば公知の鋼製の桁材(一例として、長尺なH形鋼)を用いて構成されており、図1に示すように、構台50と地上1階側床部11との相互間に少なくとも1つ以上設けられ、地上1階側床部11に対して固定具(例えば、アンカーボルト。なお、他の固定具についても同様とする)によって固定されている。
(Composition - Support structure for heavy construction equipment - Girder material)
The girder member 60 is for transmitting the load of the gantry 50 and the heavy construction equipment CE to the first floor side floor section 11 above the ground. The girder material 60 is constructed using, for example, a known steel girder material (elongated H-beam steel, for example), and as shown in FIG. and is fixed to the first floor side floor part 11 by a fixture (for example, an anchor bolt; the same applies to other fixtures).

また、桁材60の設置方法については任意であるが、実施の形態では、少なくとも1つ以上の桁材60を、補強柱部70に対応する位置に設けている。具体的には、図1に示すように、複数の桁材60は、複数の第1桁材61及び複数の第2桁材62を備えている。そして、複数の第1桁材61の下面が地上1階側床部11の上面における補強柱部70との重複部分と当接する位置に、複数の第1桁材61を相互に間隔を隔てて左右方向に沿って並設すると共に、複数の第2桁材62を、複数の第1桁材61の上面に載置し、且つ前後方向及び左右方向に沿って並設している(より具体的には、前後方向について相互に間隔を隔てて配置されている)。このような設置により、補強柱部70、地上1階側床部11、及び桁材60を介して構台50を支持でき、補強柱部70及び地上1階側床部11を介して構台50を設置する場合に比べて、構台50の設置作業及び撤去作業を効率的に行うことができる(特に、図1では、第1桁材61は、いわゆる大引き材として機能し、第2桁材62は、いわゆる根太材として機能することになる)。ただし、これに限らず、例えば、複数の第1桁材61のみを左右方向又は前後方向に沿って並設してもよい。 Further, although the method of installing the beam members 60 is arbitrary, in the embodiment, at least one beam member 60 is provided at a position corresponding to the reinforcing column portion 70. Specifically, as shown in FIG. 1, the plurality of beam members 60 include a plurality of first beam members 61 and a plurality of second beam members 62. Then, the plurality of first girder members 61 are spaced apart from each other at a position where the lower surface of the plurality of first girder members 61 abuts the overlapping portion with the reinforcing column portion 70 on the upper surface of the floor portion 11 on the first floor side above ground. They are arranged in parallel along the left-right direction, and a plurality of second spar members 62 are placed on the upper surface of the plurality of first spar members 61, and are arranged in parallel along the front-rear direction and the left-right direction (more specifically). (In general, they are spaced apart from each other in the front-back direction.) With such installation, the gantry 50 can be supported via the reinforcing column part 70, the floor part 11 on the first floor side above ground, and the girder 60, and the gantry 50 can be supported via the reinforcing column part 70 and the floor part 11 on the first floor side above ground. The installation work and removal work of the gantry 50 can be performed more efficiently than in the case where the gantry 50 is installed (especially in FIG. 1, the first girder material 61 functions as a so-called large pull material, will function as so-called joist material). However, the present invention is not limited to this, and for example, only the plurality of first beam members 61 may be arranged in parallel along the left-right direction or the front-back direction.

(構成-建設重機の支持構造-補強柱部)
補強柱部70は、地上1階側床部11又は構台50を補強するためのものである。この補強柱部70は、例えば鋼製の柱材を用いて構成され、図1に示すように、構台50よりも下方に設けられており、地下1階側第1補強柱部80a、地下2階側第1補強柱部80b、及び第2補強柱部90を備えている。
(Structure - Support structure for heavy construction equipment - Reinforcement column part)
The reinforcing column part 70 is for reinforcing the first floor side floor part 11 or the gantry 50. This reinforcing column part 70 is constructed using a steel column material, for example, and is provided below the gantry 50, as shown in FIG. It includes a floor-side first reinforcing column section 80b and a second reinforcing column section 90.

(構成-建設重機の支持構造-補強柱部-地下1階側第1補強柱部)
図2は、地下1階側第1補強柱部80a及び地下2階側第1補強柱部80bの構成を示す側面図である。地下1階側第1補強柱部80aは、地下1階1bに設けられるものである。この地下1階側第1補強柱部80aは、図2に示すように、地上1階側第1梁部と地下1階側第2梁部32との相互間に設けられており、本体部81及び位置調整部82を備えている。
(Configuration - Support structure for heavy construction equipment - Reinforcement column section - First reinforcement column section on the first basement floor side)
FIG. 2 is a side view showing the configuration of the first reinforcing column part 80a on the first basement floor side and the first reinforcing column part 80b on the second basement floor side. The first basement floor side first reinforcing column portion 80a is provided on the first basement floor 1b. As shown in FIG. 2, this first reinforcement column part 80a on the first basement floor side is provided between the first beam part on the first floor side above ground level and the second beam part 32 on the first basement floor side, and is provided in the main body. 81 and a position adjustment section 82.

本体部81は、地下1階側第1補強柱部80aの基本構造体である。この本体部81は、例えば公知の鋼製の支柱材(一例として、長尺なH形鋼)を用いて構成されており(なお、他の本体部についても同様とする)、図2に示すように、地上1階側第1梁部と地下1階側第2梁部32との相互間において、本体部81の長手方向が上下方向に沿うように配置され、地上1階側第1梁部に対して固定具によって固定されている。 The main body portion 81 is the basic structure of the first reinforcing column portion 80a on the underground first floor side. The main body part 81 is constructed using, for example, a known steel support (for example, a long H-shaped steel) (the same applies to other main body parts), and is shown in FIG. As shown in FIG. It is fixed to the part by a fixture.

位置調整部82は、本体部81の高さ位置を調整するためのものである。この位置調整部82は、例えば公知の位置調整器具(一例として、キリンジャッキ)等を用いて構成されており(なお、他の位置調整部についても同様とする)、図2に示すように、本体部81と地下1階側第2梁部32との相互間に配置され、本体部81及び地下1階側第2梁部32の各々に対して固定具によって固定されている。 The position adjustment section 82 is for adjusting the height position of the main body section 81. This position adjustment section 82 is configured using, for example, a known position adjustment instrument (for example, a Kirin jack) (the same applies to other position adjustment sections), and as shown in FIG. It is arranged between the main body part 81 and the second beam part 32 on the first basement floor side, and is fixed to each of the main body part 81 and the second beam part 32 on the first basement floor side by a fixture.

(構成-建設重機の支持構造-補強柱部-地下2階側第1補強柱部)
地下2階側第1補強柱部80bは、地下2階1cに設けられるものである。この地下2階側第1補強柱部80bは、地下1階側第1補強柱部80aの構成と略同一に構成されており、図2に示すように、地下1階側第2梁部32と地下2階側梁部33との相互間に設けられており、本体部81及び位置調整部82を備えている。
(Configuration - Support structure for heavy construction equipment - Reinforcement column section - First reinforcement column section on the second basement floor side)
The second basement floor side first reinforcing column portion 80b is provided on the second basement floor 1c. The first reinforcing column section 80b on the second basement floor side has substantially the same configuration as the first reinforcing column section 80a on the first basement floor side, and as shown in FIG. The main body part 81 and the position adjustment part 82 are provided between the side beam part 33 of the second basement floor and the main part 81 .

(構成-建設重機の支持構造-補強柱部-第2補強柱部)
図3は、第2補強柱部90の構成を示す側面図である。第2補強柱部90は、地下1階1bから地下2階1cにわたって設けられるものである。この第2補強柱部90は、図3に示すように、地上1階側床部11と地下2階側第1床部13a(又は基礎床部14)との相互間に設けられており(具体的には、地下2階側第1床部13a(又は基礎床部14)に載置されており)、第1本体部91、第1位置調整部92、第2本体部93、及び第2位置調整部94を備えている。なお、実施の形態では、第2補強柱部90のうち、地上1階側床部11と基礎床部14との相互間に設けられる第2補強柱部90は、地上1階側床部11と地下2階側第1床部13aとの相互間に設けられる第2補強柱部90と略同様に構成されているが、前者の第2補強柱部90の上下方向の長さは、後者の第2補強柱部90の上下方向の長さよりも短く設定されている。
(Composition - Support structure for heavy construction equipment - Reinforcement column section - Second reinforcement column section)
FIG. 3 is a side view showing the configuration of the second reinforcing column part 90. The second reinforcing column portion 90 is provided from the first basement floor 1b to the second basement floor 1c. As shown in FIG. 3, this second reinforcing column part 90 is provided between the floor part 11 on the first floor above ground side and the first floor part 13a (or foundation floor part 14) on the second basement floor side ( Specifically, it is placed on the first floor section 13a (or foundation floor section 14) on the second basement floor side), the first body section 91, the first position adjustment section 92, the second body section 93, and the A two-position adjustment section 94 is provided. In the embodiment, among the second reinforcing pillar parts 90, the second reinforcing pillar part 90 provided between the first floor side floor part 11 and the foundation floor part 14 is the second reinforcing pillar part 90 that is provided between the first floor side floor part 11 and the foundation floor part 14. The structure is substantially the same as the second reinforcing column section 90 provided between the first floor section 13a on the second basement floor side, but the length in the vertical direction of the second reinforcing column section 90 of the former is the same as that of the second reinforcing column section 90 of the former. The vertical length of the second reinforcing column portion 90 is set shorter than that of the second reinforcing column portion 90 .

第1本体部91は、第2補強柱部90の基本構造体の一部であり、図3に示すように、地上1階側床部11と地下1階側床部12との相互間において、第1本体部91の長手方向が上下方向に沿うように配置され、地上1階側床部11に形成された挿通孔H1(以下、「第1挿通孔H1」と称する)に挿通された状態で桁材60に対して固定具によって固定されている。 The first main body part 91 is a part of the basic structure of the second reinforcing column part 90, and as shown in FIG. , the first main body part 91 is arranged so that the longitudinal direction is along the vertical direction, and is inserted into the insertion hole H1 (hereinafter referred to as "first insertion hole H1") formed in the floor part 11 on the first floor side above ground. In this state, it is fixed to the beam member 60 by a fixture.

第1位置調整部92は、第1本体部91の高さ位置を調整するためのものであり、図3に示すように、第1本体部91と地上1階側床部11との相互間に配置され、第1本体部91に対して固定具によって固定されている。 The first position adjustment part 92 is for adjusting the height position of the first body part 91, and as shown in FIG. and is fixed to the first main body part 91 by a fixture.

第2本体部93は、第2補強柱部90の基本構造体の他の一部であり、図3に示すように、第1位置調整部92と地下2階側第1床部13a(又は基礎床部14)との相互間において、第2本体部93の長手方向が上下方向に沿うように配置され(具体的には、第2本体部93の上端部が地下2階側第1床部13aよりも上方に位置するように配置されている)、地下1階側床部12に形成された挿通孔H2(以下、「第2挿通孔H2」と称する)又は地下2階側第1床部13aに形成された挿通孔H3(以下、「第3挿通孔H3」と称する)に挿通された状態で第1位置調整部92に対して固定具によって固定されている。なお、第1挿通孔H1、第2挿通孔H2、及び第3挿通孔H3の径の大きさについては任意であるが、実施の形態では、それぞれ略同一の大きさに設定しているが、これに限らず、例えば、それぞれ異なる大きさに設定してもよい。 The second main body part 93 is another part of the basic structure of the second reinforcing column part 90, and as shown in FIG. The longitudinal direction of the second main body part 93 is arranged along the vertical direction between the foundation floor part 14) (specifically, the upper end of the second main body part 93 is connected to the first floor on the second basement floor side). part 13a), an insertion hole H2 (hereinafter referred to as "second insertion hole H2") formed in the floor part 12 on the first basement floor side, or a first insertion hole H2 on the second basement floor side. It is fixed to the first position adjustment part 92 by a fixture while being inserted into an insertion hole H3 (hereinafter referred to as "third insertion hole H3") formed in the floor part 13a. Note that the diameters of the first insertion hole H1, the second insertion hole H2, and the third insertion hole H3 are arbitrary, but in the embodiment, they are each set to approximately the same size. The size is not limited to this, and for example, the sizes may be set to be different from each other.

第2位置調整部94は、第2本体部93の高さ位置を調整するためのものであり、図3に示すように、第2本体部93と地下2階側第1床部13a(又は基礎床部14)との相互間に配置され、第2本体部93及び地下2階側第1床部13a(又は基礎床部14)の各々に対して固定具によって固定されている。 The second position adjustment part 94 is for adjusting the height position of the second main body part 93, and as shown in FIG. It is arranged between the base floor part 14) and is fixed to each of the second main body part 93 and the first floor part 13a (or the foundation floor part 14) on the second basement floor side by a fixture.

このような補強柱部70により、地上1階側床部11及び構台50を補強することができ、地上1階側床部11及び構台50の設置安定性を高めることができる。また、補強柱部70が、地下1階側第1補強柱部80a、地下2階側第1補強柱部80b、及び第2補強柱部90を備えるので、床部10、梁部30、及び桁材60の設置状況に応じた補強柱部70を用いることができ、補強柱部70の設置性を高めることができる。さらに、第2補強柱部90は、地下1階側床部12に形成された第2挿通孔H2を介して地下2階側第1床部13aに載置されたり、又は第2挿通孔H2及び地下2階側第1床部13aに形成された第3挿通孔H3を介して基礎床部14に載置されているので、地下1階側床部12又は地下2階側第1床部13aの強度が比較的低い場合に、第2補強柱部90を地下2階側第1床部13a(又は基礎床部14)に対して支持でき、第2補強柱部90の設置安定性を高めることができる。 With such a reinforcing column part 70, the first floor side floor part 11 and the gantry 50 can be reinforced, and the installation stability of the first floor side floor part 11 and the gantry 50 can be improved. Furthermore, since the reinforcing column section 70 includes the first reinforcing column section 80a on the first basement floor side, the first reinforcing column section 80b on the second basement floor side, and the second reinforcing column section 90, the floor section 10, the beam section 30, The reinforcing column part 70 can be used depending on the installation situation of the girder material 60, and the installation ease of the reinforcing column part 70 can be improved. Furthermore, the second reinforcing column part 90 is placed on the first floor part 13a on the second basement floor side through the second insertion hole H2 formed in the floor part 12 on the first basement floor side, or Since it is placed on the foundation floor part 14 through the third insertion hole H3 formed in the first floor part 13a on the second basement floor side, the first floor part 12 on the first basement floor side or the first floor part on the second basement floor side When the strength of the second reinforcing column 13a is relatively low, the second reinforcing column 90 can be supported on the second basement floor side first floor 13a (or the foundation floor 14), and the installation stability of the second reinforcing column 90 can be improved. can be increased.

(構成-建設重機の支持構造-振止め部)
図4は、図3のA-A矢視断面図である。振止め部100は、第2補強柱部90の振れを抑制するための振止め手段である。この振止め部100は、図3、図4に示すように、溶接又は固定具(例えば、ネジ)等を介して第2補強柱部90に取付けられている。
(Configuration - Support structure of heavy construction equipment - Steady rest part)
FIG. 4 is a sectional view taken along the line AA in FIG. 3. The steadying part 100 is a steadying means for suppressing the swinging of the second reinforcing column part 90. As shown in FIGS. 3 and 4, this steadying portion 100 is attached to the second reinforcing column portion 90 via welding or a fixture (for example, a screw).

また、振止め部100の具体的な構成については任意であるが、実施の形態では、一対の梁材101を備えて構成されている。これら一対の梁材101は、例えば公知の鋼製の梁材等を用いて構成されており、具体的には、一対の梁材101の各々の長手方向の長さが第2挿通孔H2の径よりも長くなるように構成されている。また、図4に示すように、一対の梁材101は、第2挿通孔H2の近傍位置に設けられており、具体的には、地下1階側床部12の上面に当接するように配置され、地下1階側床部12に対して固定具等によって固定されている。 Further, although the specific configuration of the steadying portion 100 is arbitrary, in the embodiment, it is configured to include a pair of beam members 101. These pair of beam members 101 are constructed using, for example, known steel beam members, and specifically, the length in the longitudinal direction of each of the pair of beam members 101 is the same as that of the second insertion hole H2. It is configured to be longer than the diameter. Further, as shown in FIG. 4, the pair of beam members 101 are provided in the vicinity of the second insertion hole H2, and specifically, they are arranged so as to come into contact with the upper surface of the floor section 12 on the first basement floor side. It is fixed to the basement 1st floor side floor section 12 with a fixture or the like.

このような振止め部100により、第2補強柱部90の振れを抑制でき、振止め部100を設けない場合に比べて第2補強柱部90の設置安定性を高めやすくなる。 Such a steadying part 100 can suppress the swinging of the second reinforcing column part 90, and it becomes easier to improve the installation stability of the second reinforcing column part 90 compared to the case where the steadying part 100 is not provided.

以上のような建設重機CEの支持構造40により、従来技術(コンクリートを増し打ちした床部にクレーンを設置する技術)に比べて、当該支持構造40の設置作業及び撤去作業を簡易に行うことができ、当該支持構造40の設置性及び撤去性を高めることが可能となる。 With the support structure 40 of the heavy construction equipment CE as described above, the installation and removal work of the support structure 40 can be easily performed compared to the conventional technology (a technology in which a crane is installed on a floor where concrete is poured). This makes it possible to improve the ease of installation and removal of the support structure 40.

(建設重機の支持構造の施工方法)
続いて、実施の形態に係る建設重機CEの支持構造40の施工方法について説明する。図5は、実施の形態に係る支持構造40の施工方法の解体工程を示す側面図である。図6は、支持構造40の施工方法の挿通孔形成工程を示す側面図である。図7は、支持構造40の施工方法の補強柱部設置工程を示す側面図である。この施工方法は、解体工程、挿通孔形成工程、補強柱部設置工程、構台設置工程、及び撤去工程を含んでいる。
(Construction method of support structure for heavy construction machinery)
Next, a method for constructing the support structure 40 for heavy construction equipment CE according to the embodiment will be described. FIG. 5 is a side view showing a dismantling process of the construction method of the support structure 40 according to the embodiment. FIG. 6 is a side view showing the insertion hole forming step of the method for constructing the support structure 40. FIG. 7 is a side view showing a reinforcing column installation step in the construction method of the support structure 40. This construction method includes a dismantling process, an insertion hole forming process, a reinforcing column installation process, a gantry installation process, and a removal process.

(建設重機の支持構造の施工方法-解体工程)
最初に、解体工程について説明する。解体工程は、建物1の床部10、柱部20、梁部30、又は壁部を解体する工程である。
(Construction method of support structure for heavy construction equipment - demolition process)
First, the disassembly process will be explained. The demolition process is a process of dismantling the floor 10, pillars 20, beams 30, or walls of the building 1.

具体的には、まず、公知の搬送機DEを用いて、重機HE(例えば、油圧ショベル等)を建物1の外部から地下1階1b及び地下2階1cまで搬送する。次に、図5に示すように、地下1階1b及び地下2階1cの各々において、上記重機HEを用いて建物1の床部10、柱部20、梁部30、又は壁部を解体する。特に、実施の形態では、後述する障害削孔の数量が削減可能になるように、地下1階側床部12、地下2階側第1床部13a、及び地下2階側第2床部13bの各々の縁端部分を先行して解体した後に、柱部20、梁部30、又は壁部を解体することが望ましい。続いて、所定方法により、上記解体した床部10、柱部20、梁部30、又は壁部を建物1の外部へ搬送する。 Specifically, first, the heavy equipment HE (for example, a hydraulic excavator, etc.) is transported from the outside of the building 1 to the first basement floor 1b and the second basement floor 1c using a known transportation machine DE. Next, as shown in FIG. 5, the floor section 10, column section 20, beam section 30, or wall section of the building 1 is demolished using the heavy machinery HE on each of the first basement floor 1b and the second basement floor 1c. . In particular, in the embodiment, in order to be able to reduce the number of obstructed holes to be drilled, which will be described later, the first basement floor section 12, the second basement floor first floor section 13a, and the second basement floor section 13b It is desirable to first dismantle the edge portions of each of the pillars 20, beams 30, or walls. Subsequently, the dismantled floor section 10, column section 20, beam section 30, or wall section is transported to the outside of the building 1 by a predetermined method.

(建設重機の支持構造の施工方法-挿通孔形成工程)
次に、挿通孔形成工程について説明する。挿通孔形成工程は、解体工程の後に、第1挿通孔H1、第2挿通孔H2、及び第3挿通孔H3を床部10に形成する工程である。
(Construction method of support structure for heavy construction equipment - insertion hole formation process)
Next, the insertion hole forming step will be explained. The insertion hole forming step is a step of forming the first insertion hole H1, the second insertion hole H2, and the third insertion hole H3 in the floor portion 10 after the disassembly step.

具体的には、図6に示すように、地上1階側床部11において、公知の貫通孔形成器具HF(例えば、コア抜き機)等を用いて第1挿通孔H1を形成する。これと同様に、地下1階側床部12において第2挿通孔H2を形成し、地下2階側第1床部13aにおいて第3挿通孔H3を形成する。 Specifically, as shown in FIG. 6, a first insertion hole H1 is formed in the first floor side floor section 11 using a known through hole forming tool HF (for example, a core puncher). Similarly, a second insertion hole H2 is formed in the floor section 12 on the first basement floor side, and a third insertion hole H3 is formed in the first floor section 13a on the second basement floor side.

(建設重機の支持構造の施工方法-補強柱部設置工程)
次に、補強柱部設置工程について説明する。補強柱部設置工程は、挿通孔形成工程の後に、補強柱部70を設置する工程である。
(Construction method of support structure for heavy construction equipment - Reinforcement column installation process)
Next, the reinforcing column installation process will be explained. The reinforcing column part installation process is a process of installing the reinforcing column part 70 after the insertion hole forming process.

具体的には、図7に示すように、まず、図示しないクレーン等を用いて、第1挿通孔H1を介して地下1階側第1補強柱部80aを地下1階に搬送した後に、当該地下1階側第1補強柱部80aを地上1階側第1梁部と地下1階側第2梁部32との相互間に設置する。次に、上記クレーン等を用いて、第1挿通孔H1及び第2挿通孔H2を介して地下2階側第1補強柱部80bを地下2階1cに搬送した後に、当該地下2階側第1補強柱部80bを地下1階側第2梁部32と地下2階側梁部33との相互間に設置する(あるいは、地下2階側第1補強柱部80bを地下1階側第1補強柱部80aよりも先に設置してもよい)。続いて、上記クレーン等を用いて、第1挿通孔H1及び第2挿通孔H2(あるいは、第1挿通孔H1、第2挿通孔H2、及び第3挿通孔H3)を介して第2補強柱部90を地上1階1aよりも下方に搬送した後に、当該第2補強柱部90を地上1階側床部11から地下2階側第2床部13b(又は基礎床部14)との相互間に設置する。 Specifically, as shown in FIG. 7, first, using a crane or the like (not shown), the first reinforcing column part 80a on the basement 1st floor side is transported to the basement 1st floor via the first insertion hole H1, and then The first reinforcing column part 80a on the first basement floor side is installed between the first beam part on the first floor side above ground and the second beam part 32 on the first basement floor side. Next, using the above-mentioned crane or the like, after transporting the second underground floor side first reinforcing column part 80b to the second underground floor 1c via the first insertion hole H1 and the second insertion hole H2, The first reinforcing column section 80b is installed between the second beam section 32 on the first basement floor side and the second beam section 33 on the second basement floor side. (It may be installed before the reinforcing column part 80a). Next, using the crane or the like, the second reinforcing column is inserted through the first insertion hole H1 and the second insertion hole H2 (or the first insertion hole H1, the second insertion hole H2, and the third insertion hole H3). After transporting the part 90 below the first floor 1a above ground, the second reinforcing column part 90 is moved from the floor 11 on the first floor above ground to the second floor 13b (or foundation floor 14) on the second basement floor. be installed in between.

(建設重機の支持構造の施工方法-構台設置工程)
次いで、構台設置工程について説明する。構台設置工程は、補強柱部設置工程の後に、構台50を設置する工程である。
(Construction method of support structure for heavy construction equipment - gantry installation process)
Next, the gantry installation process will be explained. The gantry installation process is a process of installing the gantry 50 after the reinforcing column installation process.

具体的には、上記クレーン等を用いて、桁材60(具体的には、第1桁材61、第2桁材62)を地上1階側床部11の上面に複数設置する。次に、上記クレーン等を用いて、構台50を複数の桁材60の上面に載置する。その後、図1に示すように、上記クレーン等を用いて建設重機CEを構台50の上面に載置し、当該建設重機CEを用いて上述した所定の作業を行う。 Specifically, a plurality of girder members 60 (specifically, the first girder members 61 and the second girder members 62) are installed on the upper surface of the floor section 11 on the first floor side above ground using the above-mentioned crane or the like. Next, the gantry 50 is placed on the upper surface of the plurality of girder members 60 using the above-mentioned crane or the like. Thereafter, as shown in FIG. 1, the heavy construction equipment CE is placed on the upper surface of the gantry 50 using the crane or the like, and the above-described predetermined work is performed using the heavy construction equipment CE.

(建設重機の支持構造の施工方法-撤去工程)
続いて、撤去工程について説明する。撤去工程は、構台設置工程の後に、支持構造40を撤去する。
(Construction method of support structure for heavy construction equipment - removal process)
Next, the removal process will be explained. In the removal process, the support structure 40 is removed after the gantry installation process.

具体的には、まず、上記クレーン等を用いて、建設重機CEを図示しない撤去位置(例えば、建物1の近傍に位置する撤去場所等)まで搬送する。次に、上記クレーン等を用いて、構台50を所定の撤去位置まで搬送する。次いで、上記クレーン等を用いて、桁材60を所定の撤去位置まで搬送する。続いて、上記クレーン等を用いて、第1挿通孔H1又は第2挿通孔H2を介して地下1階側第1補強柱部80a、地下2階側第1補強柱部80b、及び第2補強柱部90を地上1階1aまで搬送し、その後所定の撤去位置まで搬送する。これにより、地上1階側床部11から地下2階側第1床部13aにわたる状態が図6に示す状態になる(ただし、貫通孔形成器具HFは除かれる)。 Specifically, first, the heavy construction equipment CE is transported to a removal position (for example, a removal location located near the building 1) (not shown) using the crane or the like. Next, the gantry 50 is transported to a predetermined removal position using the crane or the like. Next, the girder 60 is transported to a predetermined removal position using the crane or the like. Subsequently, using the above-mentioned crane or the like, the first reinforcing column part 80a on the first basement floor side, the first reinforcing column part 80b on the second basement floor side, and the second reinforcement The column part 90 is transported to the first floor 1a above ground level, and then transported to a predetermined removal position. As a result, the state extending from the floor section 11 on the first floor above ground side to the first floor section 13a on the second floor underground becomes the state shown in FIG. 6 (however, the through-hole forming instrument HF is excluded).

以上のような施工方法により、実施の形態に係る支持構造40の設置作業及び撤去作業を簡易に行うことができ、当該支持構造40の設置性及び撤去性を高めることができる。 With the construction method described above, the installation work and removal work of the support structure 40 according to the embodiment can be easily performed, and the installation and removal properties of the support structure 40 can be improved.

(実施の形態の効果)
このように実施の形態によれば、複数の床部10のうち最下方の床部10以外の床部10であって、建設重機CEを設置する対象となる床部10である対象床部に対して取外し可能に設置される構台50であって、建設重機CEを載置するための構台50を備えるので、従来技術(コンクリートを増し打ちした床部にクレーンを設置する技術)に比べて、当該支持構造40の設置作業及び撤去作業を簡易に行うことができ、当該支持構造40の設置性及び撤去性を高めることが可能となる。
(Effects of embodiment)
As described above, according to the embodiment, the target floor 10 other than the lowest floor 10 among the plurality of floors 10 is the target floor 10 on which the heavy construction equipment CE is installed. Since the gantry 50 is removably installed on the other hand and includes the gantry 50 for placing the heavy construction equipment CE, compared to the conventional technology (technology of installing a crane on the floor where additional concrete is poured), The installation work and removal work of the support structure 40 can be easily performed, and the installation and removal properties of the support structure 40 can be improved.

また、構台50よりも下方に設けられる補強柱部70であって、対象床部又は構台50を補強するための補強柱部70を備えるので、対象床部又は構台50を補強することができ、対象床部又は構台50の設置安定性を高めることができる。 In addition, since the reinforcing column part 70 is provided below the gantry 50 and is for reinforcing the target floor part or the gantry 50, the target floor part or the gantry 50 can be reinforced. The installation stability of the target floor or gantry 50 can be improved.

また、少なくとも1つ以上の桁材60を、補強柱部70に対応する位置に設けたので、補強柱部70、対象床部、及び桁材60を介して構台50を支持でき、補強柱部70及び対象床部を介して構台50を設置する場合に比べて、構台50の設置作業及び撤去作業を効率的に行うことができる。 Furthermore, since at least one girder 60 is provided at a position corresponding to the reinforcing column 70, the pedestal 50 can be supported via the reinforcing column 70, the target floor, and the girder 60, and the reinforcing column Compared to the case where the gantry 50 is installed via the gantry 70 and the target floor, the installation work and the removal work of the gantry 50 can be performed more efficiently.

また、第2補強柱部90を、第1床部に形成された挿通孔を介して第2床部に載置したので、第1床部の強度が比較的低い場合に、第2補強柱部90を第2床部に対して支持でき、第2補強柱部90の設置安定性を高めることができる。 Moreover, since the second reinforcing column part 90 is placed on the second floor part through the insertion hole formed in the first floor part, when the strength of the first floor part is relatively low, the second reinforcing column part 90 The section 90 can be supported on the second floor section, and the installation stability of the second reinforcing column section 90 can be improved.

また、第2補強柱部90に取付けられた振止め部100であって、当該第2補強柱部90の振れを抑制するための振止め部100を備えるので、第2補強柱部90の振れを抑制でき、振止め部100を設けない場合に比べて第2補強柱部90の設置安定性を高めやすくなる。 In addition, since the steady-stop part 100 attached to the second reinforcing column part 90 is provided for suppressing the shake of the second reinforcing column part 90, the shake of the second reinforcing column part 90 is provided. This makes it easier to increase the installation stability of the second reinforcing column section 90 compared to the case where the steadying section 100 is not provided.

また、構台50が、鋼製の覆工板であるので、構台50を簡易に構成でき、構台50の製造性を高めることができる。 Further, since the gantry 50 is a steel lining plate, the gantry 50 can be easily constructed and the manufacturability of the gantry 50 can be improved.

〔III〕実施の形態に対する変形例
以上、本発明の実施の形態について説明したが、本発明の具体的な構成及び手段は、特許請求の範囲に記載した各発明の技術的思想の範囲内において、任意に改変及び改良することができる。以下、このような変形例について説明する。
[III] Modifications to the Embodiments The embodiments of the present invention have been described above, but the specific configuration and means of the present invention are within the scope of the technical idea of each invention described in the claims. , can be modified and improved as desired. Hereinafter, such a modified example will be explained.

(解決しようとする課題や発明の効果について)
まず、発明が解決しようとする課題や発明の効果は、前記した内容に限定されるものではなく、本発明によって、前記に記載されていない課題を解決したり、前記に記載されていない効果を奏することもでき、また、記載されている課題の一部のみを解決したり、記載されている効果の一部のみを奏することがある。
(About the problems to be solved and the effects of the invention)
First, the problems to be solved by the invention and the effects of the invention are not limited to the above-mentioned contents, and the present invention can solve problems not described above or achieve effects not described above. In addition, it may solve only a part of the described problem or produce only a part of the described effect.

(形状、数値、構造、時系列について)
実施の形態や図面において例示した構成要素に関して、形状、数値、又は複数の構成要素の構造若しくは時系列の相互関係については、本発明の技術的思想の範囲内において、任意に改変及び改良することができる。
(About shape, numbers, structure, time series)
With respect to the components illustrated in the embodiments and drawings, the shape, numerical values, structure or chronological relationship of multiple components may be arbitrarily modified and improved within the scope of the technical idea of the present invention. I can do it.

(建物について)
上記実施の形態では、建物1が、地下2階側第1床部13a及び地下2階側第2床部13bを備えていると説明したが、これに限らず、例えば、地下2階側第1床部13a又は地下2階側第2床部13bのいずれか一方を省略してもよい。また、上記実施の形態では、建物1が、地下1階側第1梁部及び地下1階側第2梁部32を備えていると説明したが、これに限らず、例えば、地下1階側第1梁部又は地下1階側第2梁部32のいずれか一方を省略してもよい
(About the building)
In the above embodiment, it has been explained that the building 1 includes the first floor section 13a on the second basement floor side and the second floor section 13b on the second basement floor side. Either one of the first floor section 13a or the second basement floor section 13b may be omitted. Further, in the above embodiment, it has been explained that the building 1 includes the first beam section on the first basement floor side and the second beam section 32 on the first basement floor side, but the present invention is not limited to this. Either the first beam portion or the second beam portion 32 on the first basement floor side may be omitted.

(支持構造について)
上記実施の形態では、建設重機CEの支持構造40が、地上1階1aから地下2階1cに至る範囲に設けられていると説明したが、これに限らず、例えば、上記範囲以外の範囲に設けられてもよい。一例として、図示しない地上2階から地下2階1cに至る範囲に設けられてもよく、あるいは、図示しない地上2階から地下1階1bに至る範囲に設けられてもよい。
(About support structure)
In the above embodiment, it has been explained that the support structure 40 of the heavy construction equipment CE is provided in the range from the first floor 1a above ground to the second floor 1c underground, but the structure is not limited to this, and for example, it can be provided in a range other than the above range. may be provided. As an example, it may be provided in a range from the second floor above ground to the second basement floor 1c (not shown), or may be provided in a range from the second floor above ground to the first basement floor 1b (not shown).

また、上記実施の形態では、建設重機CEの支持構造40が、桁材60、補強柱部70、及び振止め部100を備えていると説明したが、例えば、桁材60、補強柱部70、又は振止め部100の少なくともいずれか一方を省略してもよい。ここで、桁材60を省略する場合には、構台50が地上1階側床部11と当接するように配置されてもよい。また、第2補強柱部90の第1本体部91は、第1挿通孔H1に挿通された状態で構台50に対して固定具によって固定されてもよい。あるいは、桁材60、補強柱部70、及び振止め部100を省略する場合(すなわち、支持構造40が構台50のみを備える場合)には、支持構造40の施工方法において解体工程、挿通孔形成工程、及び補強柱部設置工程を省略してもよい。 Further, in the above embodiment, it has been explained that the support structure 40 of the heavy construction equipment CE includes the girder material 60, the reinforcing column part 70, and the steadying part 100. , or at least one of the steady rest parts 100 may be omitted. Here, when the girder 60 is omitted, the gantry 50 may be arranged so as to be in contact with the floor section 11 on the first floor side above ground. Further, the first main body portion 91 of the second reinforcing column portion 90 may be fixed to the gantry 50 with a fixture while being inserted into the first insertion hole H1. Alternatively, in the case where the girder 60, the reinforcing column part 70, and the steady rest part 100 are omitted (that is, when the support structure 40 includes only the gantry 50), the construction method of the support structure 40 includes a dismantling process, insertion hole formation, etc. This step and the reinforcing column installation step may be omitted.

(構台について)
上記実施の形態では、構台50が、鋼製の覆工板であると説明したが、これに限らず、例えば、コンクリート製又は木製の覆工板であってもよい。
(About the gantry)
In the above embodiment, it has been explained that the gantry 50 is a steel lining plate, but is not limited thereto, and may be a concrete or wooden lining plate, for example.

(補強柱部について)
上記実施の形態では、補強柱部70が、地下1階側第1補強柱部80a、地下2階側第1補強柱部80b、及び第2補強柱部90を備えていると説明したが、これに限らない。例えば、地下1階側第1補強柱部80a及び地下2階側第1補強柱部80bのみを備えてもよく、又は第2補強柱部90のみを備えてもよい。
(About the reinforcement column)
In the above embodiment, it has been explained that the reinforcing column section 70 includes the first reinforcing column section 80a on the first basement floor side, the first reinforcing column section 80b on the second basement floor side, and the second reinforcing column section 90. It is not limited to this. For example, only the first reinforcing column part 80a on the first basement floor side and the first reinforcing column part 80b on the second basement floor side may be provided, or only the second reinforcing column part 90 may be provided.

また、上記実施の形態では、地下1階側第1補強柱部80a、地下2階側第1補強柱部80b、及び第2補強柱部90の各々が、位置調整部を備えていると説明したが、これに限らず、例えば、位置調整部を省略してもよい。 Furthermore, in the embodiment described above, each of the first reinforcement column part 80a on the first basement floor side, the first reinforcement column part 80b on the second basement floor side, and the second reinforcement column part 90 is provided with a position adjustment part. However, the present invention is not limited to this, and for example, the position adjustment section may be omitted.

また、上記実施の形態では、第2補強柱部90が、2つの位置調整部(第1位置調整部92、第2位置調整部94)を備えていると説明したが、これに限らず、例えば、1つの位置調整部のみを備えてもよい。 Further, in the above embodiment, it has been explained that the second reinforcing column part 90 includes two position adjustment parts (the first position adjustment part 92 and the second position adjustment part 94), but the invention is not limited to this. For example, only one position adjustment section may be provided.

また、上記実施の形態では、第2補強柱部90が、地下1階側床部12に形成された第2挿通孔H2を介して地下2階側第1床部13aに載置されたり、又は当該第2挿通孔H2及び地下2階側第1床部13aに形成された第3挿通孔H3を介して基礎床部14に載置されていると説明したが、これに限らない。例えば、第2補強柱部90は、地下1階側床部12に形成された第2挿通孔H2を介して地下2階側梁部33に載置されてもよい。また、第2補強柱部90は、地下1階側第1梁部に形成された第2挿通孔H2を介して地下2階側第1床部13a又は地下2階側梁部33に載置されたり、又は当該第2挿通孔H2及び地下2階側第1床部13aに形成された第3挿通孔H3を介して基礎床部14に載置されてもよい。 Further, in the embodiment described above, the second reinforcing column part 90 is placed on the first floor part 13a on the second basement floor side through the second insertion hole H2 formed in the floor part 12 on the first basement floor side, Although it has been described that the second insertion hole H2 and the third insertion hole H3 formed in the first floor part 13a on the second basement floor side are placed on the foundation floor 14, the present invention is not limited thereto. For example, the second reinforcing column portion 90 may be placed on the second basement floor side beam portion 33 via the second insertion hole H2 formed in the first basement floor side floor portion 12. Further, the second reinforcing column part 90 is placed on the second basement floor side first floor part 13a or the second basement floor side beam part 33 through the second insertion hole H2 formed in the first basement floor side first beam part. Alternatively, it may be placed on the foundation floor 14 through the second insertion hole H2 and the third insertion hole H3 formed in the first floor 13a on the second basement floor side.

また、上記実施の形態では、第2補強柱部90の第1本体部91が、第1挿通孔H1に挿通された状態で枠材に対して固定具によって固定されていると説明したが、これに限らない。例えば、この第1本体部91及び桁材60が床部10に対して固定することが可能な場合には、第1挿通孔H1を設けることなく、これら第1本体部91及び桁材60を床部10に対して固定してもよい。 Further, in the above embodiment, it has been explained that the first main body part 91 of the second reinforcing column part 90 is fixed to the frame material by a fixture while being inserted into the first insertion hole H1. It is not limited to this. For example, if the first body part 91 and the beam material 60 can be fixed to the floor part 10, the first body part 91 and the beam material 60 can be fixed without providing the first insertion hole H1. It may be fixed to the floor 10.

(桁材について)
上記実施の形態では、桁材60が、補強柱部70に対応する位置に設けられていると説明したが、これに限らず、例えば、当該対応する位置に加えて、補強柱部70に対応しない位置に設けられてもよい。
(About girder material)
In the above embodiment, it has been explained that the girder member 60 is provided at a position corresponding to the reinforcing column part 70, but the present invention is not limited to this. It may also be provided in a position where it does not.

(振止め部について)
上記実施の形態では、振止め部100が、第2挿通孔H2の近傍位置に設けられていると説明したが、これに限らない。例えば、第2補強柱部90が、第2挿通孔H2及び第3挿通孔H3を介して基礎床部14に載置される場合には、第2挿通孔H2及び第3挿通孔H3にそれぞれ設けられてもよい。
(About the steady rest part)
In the embodiment described above, it has been explained that the steadying portion 100 is provided in the vicinity of the second insertion hole H2, but the present invention is not limited thereto. For example, when the second reinforcing column part 90 is placed on the foundation floor part 14 through the second insertion hole H2 and the third insertion hole H3, the second reinforcement column part 90 is inserted into the second insertion hole H2 and the third insertion hole H3, respectively. may be provided.

また、上記実施の形態では、振止め部100の梁材101の設置数が2つであると説明したが、これに限らない。例えば1つのみであってもよい。あるいは、3つ以上であってもよい。この場合に、振止め部100の梁材101の設置方法については、一部の梁材101が他の一部の梁材101に対して非平行となるように、3つ以上の梁材101を設置してもよい。 Further, in the above embodiment, it has been explained that the number of beam members 101 of the steady rest part 100 is two, but the number is not limited to this. For example, there may be only one. Alternatively, there may be three or more. In this case, the method for installing the beams 101 of the steadying part 100 is such that three or more beams 101 are installed so that some of the beams 101 are non-parallel to other beams 101. may be installed.

(建設重機の支持構造の施工方法について)
上記実施の形態では、支持構造40の施工方法が、解体工程及び撤去工程を含むと説明したが、これに限らない。例えば、建物1の床部10、柱部20、梁部30、又は壁部を解体する必要がない場合には、解体工程を省略してもよい。また、構台設置工程の後に、設置した支持構造40を撤去する必要がない場合には、撤去工程を省略してもよい。
(About construction methods for support structures for heavy construction machinery)
In the above embodiment, it has been explained that the construction method of the support structure 40 includes a disassembly process and a removal process, but the method is not limited thereto. For example, if there is no need to dismantle the floor 10, pillars 20, beams 30, or walls of the building 1, the dismantling step may be omitted. Further, after the gantry installation process, if there is no need to remove the installed support structure 40, the removal process may be omitted.

(付記)
付記1の建設重機の支持構造は、既設の複数の床部を用いた工事において、建設重機を支持するための支持構造であって、前記複数の床部のうち最下方の床部以外の床部であって、前記建設重機を設置する対象となる床部である対象床部に対して取外し可能に設置される構台であって、前記建設重機を載置するための構台を備える。
(Additional note)
The support structure for heavy construction equipment in Appendix 1 is a support structure for supporting heavy construction equipment in construction using a plurality of existing floors, and is a support structure for supporting heavy construction equipment in construction using a plurality of existing floors. The construction equipment is a gantry that is removably installed on a target floor, which is a floor on which the heavy construction equipment is installed, and includes a gantry on which the heavy construction equipment is placed.

付記2の建設重機の支持構造は、付記1に記載の建設重機の支持構造において、前記構台よりも下方に設けられる補強柱部であって、前記対象床部又は前記構台を補強するための補強柱部を備える。 The support structure for heavy construction equipment in Appendix 2 is a reinforcement column provided below the gantry in the support structure for heavy construction equipment in Supplementary Note 1, and is a reinforcement column for reinforcing the target floor or the gantry. Equipped with a column.

付記3の建設重機の支持構造は、付記2に記載の建設重機の支持構造において、前記構台を、少なくとも1つ以上の桁材を介して前記対象床部に設け、前記少なくとも1つ以上の桁材を、前記補強柱部に対応する位置に設けた。 The support structure for heavy construction equipment according to appendix 3 is the support structure for heavy construction equipment according to appendix 2, in which the gantry is provided on the target floor via at least one or more girders, and the at least one or more girder A material was provided at a position corresponding to the reinforcing column portion.

付記4の建設重機の支持構造は、付記2又は3に記載の建設重機の支持構造において、前記複数の床部、又は前記複数の床部を備える建物を構成する複数の梁部は、前記対象床部よりも下方に位置する床部又は梁部であって、前記建設重機及び前記構台を支持できない床部又は梁部である第1床部又は第1梁部と、前記第1床部又は前記第1梁部よりも下方に位置する床部又は梁部であって、前記建設重機及び前記構台を支持可能な床部又は梁部である第2床部又は第2梁部と、を含み、前記補強柱部を、前記第1梁部又は前記第1床部に形成された挿通孔を介して前記第2梁部又は前記第2床部に載置した。 In the support structure for heavy construction equipment according to appendix 4, in the support structure for heavy construction equipment according to appendix 2 or 3, the plurality of floor sections or the plurality of beam sections constituting the building including the plurality of floor sections are a first floor or first beam that is a floor or beam that is located below the floor and cannot support the heavy construction equipment and the gantry; a second floor or beam located below the first beam and capable of supporting the heavy construction equipment and the gantry; , the reinforcing column part was placed on the second beam part or the second floor part through an insertion hole formed in the first beam part or the first floor part.

付記5の建設重機の支持構造は、付記2から4のいずれか一項に記載の建設重機の支持構造において、前記補強柱部に取付けられた振止め手段であって、当該補強柱部の振れを抑制するための振止め手段を備えた。 The support structure for heavy construction equipment according to appendix 5 is the support structure for heavy construction equipment according to any one of appendices 2 to 4, which is a sway prevention means attached to the reinforcing column, which prevents the vibration of the reinforcing column. Equipped with a steadying means to suppress the vibration.

付記6の建設重機の支持構造は、付記1から5のいずれか一項に記載の建設重機の支持構造において、前記構台は、鋼製の覆工板である。 The support structure for heavy construction equipment according to appendix 6 is the support structure for heavy construction equipment according to any one of appendices 1 to 5, in which the gantry is a steel lining plate.

(付記の効果)
付記1に記載の建設重機の支持構造によれば、複数の床部のうち最下方の床部以外の床部であって、建設重機を設置する対象となる床部である対象床部に対して取外し可能に設置される構台であって、建設重機を載置するための構台を備えるので、従来技術(コンクリートを増し打ちした床部にクレーンを設置する技術)に比べて、当該支持構造の設置作業及び撤去作業を簡易に行うことができ、当該支持構造の設置性及び撤去性を高めることが可能となる。
(Effect of appendix)
According to the support structure for heavy construction equipment described in Supplementary Note 1, for a target floor that is a floor other than the lowest floor among a plurality of floors and is the floor on which heavy construction equipment is installed, Since it is a gantry that is removably installed and is equipped with a gantry for placing heavy construction equipment, the support structure is easier to install than the conventional technology (a technology in which a crane is installed on a floor made of additional concrete). Installation work and removal work can be performed easily, and it becomes possible to improve the installation and removal properties of the support structure.

付記2に記載の建設重機の支持構造によれば、構台よりも下方に設けられる補強柱部であって、対象床部又は構台を補強するための補強柱部を備えるので、対象床部又は構台を補強することができ、対象床部又は構台の設置安定性を高めることができる。 According to the support structure for heavy construction equipment described in Appendix 2, the reinforcement column section is provided below the gantry and is provided with a reinforcement column section for reinforcing the target floor section or gantry, so that the target floor section or gantry can be reinforced, and the installation stability of the target floor or gantry can be increased.

付記3に記載の建設重機の支持構造によれば、少なくとも1つ以上の桁材を、補強柱部に対応する位置に設けたので、補強柱部、対象床部、及び桁材を介して構台を支持でき、補強柱部及び対象床部を介して構台を設置する場合に比べて、構台の設置作業及び撤去作業を効率的に行うことができる。 According to the support structure for heavy construction machinery described in Appendix 3, at least one girder material is provided at a position corresponding to the reinforcing column part, so that the gantry can be connected to the gantry via the reinforcing column part, the target floor, and the girder material. can be supported, and the installation and removal work of the gantry can be performed more efficiently than in the case where the gantry is installed via the reinforcing column part and the target floor part.

付記4に記載の建設重機の支持構造によれば、補強柱部を、第1梁部又は第1床部に形成された挿通孔を介して第2梁部又は第2床部に載置したので、第1梁部又は第1床部の強度が比較的低い場合に、補強柱部を第2梁部又は第2床部に対して支持でき、補強柱部の設置安定性を高めることができる。 According to the support structure for heavy construction equipment described in Appendix 4, the reinforcing column part is placed on the second beam part or the second floor part through the insertion hole formed in the first beam part or the first floor part. Therefore, when the strength of the first beam part or the first floor part is relatively low, the reinforcing column part can be supported against the second beam part or the second floor part, and the installation stability of the reinforcing column part can be improved. can.

付記5に記載の建設重機の支持構造によれば、補強柱部に取付けられた振止め手段であって、当該補強柱部の振れを抑制するための振止め手段を備えるので、補強柱部の振れを抑制でき、振止め手段を設けない場合に比べて補強柱部の設置安定性を高めやすくなる。 According to the support structure for heavy construction equipment described in Appendix 5, since the support structure for heavy construction equipment is provided with the steadying means attached to the reinforcing column part and for suppressing the shaking of the reinforcing column part, Shaking can be suppressed, and the installation stability of the reinforcing column can be increased more easily than in the case where no shaking preventing means is provided.

付記6に記載の建設重機の支持構造によれば、構台が、鋼製の覆工板であるので、構台を簡易に構成でき、構台の製造性を高めることができる。 According to the support structure for heavy construction machinery described in Appendix 6, since the gantry is a steel lining plate, the gantry can be easily constructed and the manufacturability of the gantry can be improved.

1 建物
1a 地上1階
1b 地下1階
1c 地下2階
10 床部
11 地上1階側床部
12 地下1階側床部
13a 地下2階側第1床部
13b 地下2階側第2床部
14 基礎床部
20 柱部
30 梁部
31 地上1階側梁部
32 地下1階側第2梁部
33 地下2階側梁部
40 支持構造
50 構台
60 桁材
61 第1桁材
62 第2桁材
70 補強柱部
80a 地下1階側第1補強柱部
80b 地下2階側第1補強柱部
81 本体部
82 位置調整部
90 第2補強柱部
91 第1本体部
92 第1位置調整部
93 第2本体部
94 第2位置調整部
100 振止め部
101 梁材
CE 建設重機
DE 搬送機
G 地盤
H1 第1挿通孔
H2 第2挿通孔
H3 第3挿通孔
HE 重機
HF 貫通孔形成器具
1 Building 1a 1st floor above ground 1b 1st basement floor 1c 2nd basement floor 10 Floor section 11 Floor section on the 1st floor side above ground 12 Floor section on the 1st basement floor side 13a 1st floor section on the 2nd basement floor side 13b 2nd floor section on the 2nd basement floor side 14 Foundation floor section 20 Column section 30 Beam section 31 Side beam section on the first floor above ground 32 Second beam section on the first basement floor side 33 Side beam section on the second basement floor section 40 Support structure 50 Pedestal 60 Girder material 61 First girder material 62 Second girder material 70 Reinforcement column section 80a First reinforcement column section on the first basement floor side 80b First reinforcement column section on the second basement floor side 81 Main body section 82 Position adjustment section 90 Second reinforcement column section 91 First main body section 92 First position adjustment section 93 2 main body part 94 2nd position adjustment part 100 Steady part 101 Beam material CE Heavy construction equipment DE Transport machine G Ground H1 1st insertion hole H2 2nd insertion hole H3 3rd insertion hole HE Heavy equipment HF Through hole forming instrument

Claims (5)

既設の複数の床部を用いた工事において、建設重機を支持するための支持構造であって、
前記複数の床部のうち最下方の床部以外の床部であって、前記建設重機を設置する対象となる床部である対象床部に対して取外し可能に設置される構台であって、前記建設重機を載置するための構台と、
前記構台よりも下方に設けられる補強柱部であって、前記対象床部又は前記構台を補強するための補強柱部と、
前記補強柱部に取付けられた振止め手段であって、当該補強柱部の振れを抑制するための振止め手段と、を備え、
前記複数の床部のいずれかに、前記補強柱部を挿通する挿通孔を形成し、
前記振止め手段は、前記挿通孔の近傍において相互に間隔を隔てて設けられ、且つ当該挿通孔が形成された前記床部に対して固定具で固定される一対の梁材のみを備える、
建設重機の支持構造。
A support structure for supporting heavy construction machinery in construction using multiple existing floors,
A gantry that is removably installed on a target floor that is a floor other than the lowest floor among the plurality of floors and is a floor on which the heavy construction equipment is installed, a gantry for mounting the heavy construction equipment ;
a reinforcing column section provided below the gantry, the reinforcing column section for reinforcing the target floor section or the gantry;
A steadying means attached to the reinforcing column, the steadying means for suppressing vibration of the reinforcing column,
forming an insertion hole through which the reinforcing column part is inserted in any of the plurality of floor parts;
The vibration prevention means includes only a pair of beam members that are provided at a distance from each other in the vicinity of the insertion hole and are fixed to the floor portion in which the insertion hole is formed with a fixture.
Support structure for heavy construction equipment.
前記補強柱部は、
第1本体部と、
前記第1本体部よりも下方に設けられる第2本体部と、
前記第1本体部と前記第2本体部との相互間に設けられる位置調整部であり、前記第1本体部の高さ位置を調整するための位置調整部と、を備え、
前記位置調整部を、前記振止め手段と接触しないように配置した、
請求項1に記載の建設重機の支持構造。
The reinforcing column portion is
a first main body;
a second main body section provided below the first main body section;
a position adjustment section provided between the first main body section and the second main body section, and a position adjustment section for adjusting the height position of the first main body section;
The position adjusting section is arranged so as not to come into contact with the steadying means.
The support structure for heavy construction equipment according to claim 1.
前記構台を、少なくとも1つ以上の桁材を介して前記対象床部に設け、The gantry is provided on the target floor via at least one girder,
前記少なくとも1つ以上の桁材を、前記補強柱部に対応する位置に設けた、the at least one girder member is provided at a position corresponding to the reinforcing column portion;
請求項1又は2に記載の建設重機の支持構造。The support structure for heavy construction equipment according to claim 1 or 2.
前記複数の床部、又は前記複数の床部を備える建物を構成する複数の梁部は、
前記対象床部よりも下方に位置する床部又は梁部であって、前記建設重機及び前記構台を支持できない床部又は梁部である第1床部又は第1梁部と、
前記第1床部又は前記第1梁部よりも下方に位置する床部又は梁部であって、前記建設重機及び前記構台を支持可能な床部又は梁部である第2床部又は第2梁部と、を含み、
前記補強柱部を、前記第1梁部又は前記第1床部に形成された挿通孔を介して前記第2梁部又は前記第2床部に載置した、
請求項1から3のいずれか一項に記載の建設重機の支持構造。
The plurality of floor sections or the plurality of beam sections constituting the building including the plurality of floor sections,
a first floor part or a first beam part that is a floor part or a beam part located below the target floor part and which cannot support the heavy construction equipment and the gantry;
A second floor part or a beam part located below the first floor part or the first beam part, which is a floor part or a beam part that can support the heavy construction equipment and the gantry. including a beam part;
The reinforcing column part is placed on the second beam part or the second floor part through an insertion hole formed in the first beam part or the first floor part.
The support structure for heavy construction equipment according to any one of claims 1 to 3 .
前記構台は、鋼製の覆工板である、
請求項1から4のいずれか一項に記載の建設重機の支持構造。
The gantry is a steel lining plate,
The support structure for heavy construction equipment according to any one of claims 1 to 4 .
JP2019159565A 2019-09-02 2019-09-02 Support structure for heavy construction equipment Active JP7340390B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019159565A JP7340390B2 (en) 2019-09-02 2019-09-02 Support structure for heavy construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019159565A JP7340390B2 (en) 2019-09-02 2019-09-02 Support structure for heavy construction equipment

Publications (2)

Publication Number Publication Date
JP2021038552A JP2021038552A (en) 2021-03-11
JP7340390B2 true JP7340390B2 (en) 2023-09-07

Family

ID=74848353

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019159565A Active JP7340390B2 (en) 2019-09-02 2019-09-02 Support structure for heavy construction equipment

Country Status (1)

Country Link
JP (1) JP7340390B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016108875A (en) 2014-12-09 2016-06-20 株式会社大林組 Demolition system and demolition method
JP2017020265A (en) 2015-07-13 2017-01-26 大成建設株式会社 Underground skeleton construction method
JP2017193946A (en) 2016-04-14 2017-10-26 三同建設株式会社 Heavy equipment support mechanism

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016108875A (en) 2014-12-09 2016-06-20 株式会社大林組 Demolition system and demolition method
JP2017020265A (en) 2015-07-13 2017-01-26 大成建設株式会社 Underground skeleton construction method
JP2017193946A (en) 2016-04-14 2017-10-26 三同建設株式会社 Heavy equipment support mechanism

Also Published As

Publication number Publication date
JP2021038552A (en) 2021-03-11

Similar Documents

Publication Publication Date Title
EP2251503B1 (en) Method for replacing a loadbearing wall
KR101727518B1 (en) Floor system for reducing story height in top down method and top down method using the same
CN111305221A (en) Method for replacing inner support of foundation pit
JP4235079B2 (en) Structure of joint between reinforced concrete column and steel beam
JP7029901B2 (en) Dismantling method
KR101414155B1 (en) Self-supported shoring structure using shelf and construction method using the relieving platform
JP7340390B2 (en) Support structure for heavy construction equipment
CN211340840U (en) Tower crane foundation of internal climbing tower crane
CN101153492B (en) Horizontal frame construction and underground fending method using the same
JP4362824B2 (en) Reverse strike method
CN207974142U (en) A kind of building hoist basis
JP2016223084A (en) Construction method of underground structure by inverted construction method
JP2020060000A (en) Skeleton construction method
JP2017031676A (en) Earthquake resistant reinforcement method and reinforcement device of existing building
KR100650134B1 (en) Early remove support method
KR100615149B1 (en) A method of construction top-down for the ground fabric construction
KR101481073B1 (en) Method for removing underground structure
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
JPH11140892A (en) Method for excavating ground and method for constructing underground structure using the same
JP2019143302A (en) Formation method
KR100593203B1 (en) a deck supportframe and a construction methed
JP6529241B2 (en) Building foundation structure and construction method of building foundation structure
JP7418296B2 (en) Building relocation method
KR102614628B1 (en) Reinforcement structure for building remodeling construction, building remodeling construction structure and method for building remodeling construction
JP7129290B2 (en) Building floor structure for rebuilding

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220623

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230323

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230411

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230428

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230801

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230828

R150 Certificate of patent or registration of utility model

Ref document number: 7340390

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150