JP7287055B2 - ROPE WIRING METHOD AND GUIDE SHEAVE DEVICE FOR WORKING MACHINE - Google Patents

ROPE WIRING METHOD AND GUIDE SHEAVE DEVICE FOR WORKING MACHINE Download PDF

Info

Publication number
JP7287055B2
JP7287055B2 JP2019065356A JP2019065356A JP7287055B2 JP 7287055 B2 JP7287055 B2 JP 7287055B2 JP 2019065356 A JP2019065356 A JP 2019065356A JP 2019065356 A JP2019065356 A JP 2019065356A JP 7287055 B2 JP7287055 B2 JP 7287055B2
Authority
JP
Japan
Prior art keywords
reeving
rope
winch
boom
sheave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019065356A
Other languages
Japanese (ja)
Other versions
JP2020164278A (en
Inventor
伸広 ▲高▼松
拓則 山口
友鷹 三谷
泰彦 島津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP2019065356A priority Critical patent/JP7287055B2/en
Publication of JP2020164278A publication Critical patent/JP2020164278A/en
Application granted granted Critical
Publication of JP7287055B2 publication Critical patent/JP7287055B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

本発明は、作業機械のロープワイヤリング方法およびガイドシーブ装置に関する。 TECHNICAL FIELD The present invention relates to a rope wiring method and a guide sheave device for working machines.

従来、作業機械として、機体と、機体に対して起伏可能な起伏体と、を備えるクレーンが知られている。このようなクレーンは、作業場所等において作業可能な状態に組み立てられる。 Conventionally, as a work machine, a crane is known that includes a machine body and a hoisting body that can rise and fall with respect to the machine body. Such a crane is assembled in a workable state at a work place or the like.

上記のようなクレーンの組立作業では、巻上げロープ(メインロープ)のワイヤリング作業が含まれる。クレーンは、機体または起伏体の基端部に備えられたウインチ(メインウインチ)と、起伏体の先端部に備えられたアイドラシーブ(ポイントシーブ)と、シーブブロック(フックシーブ)を含むフックと、を更に有する。前記ワイヤリング作業では、ウインチから引き出された巻上げロープを、作業者が起伏体の基端部から先端部まで牽引した後、アイドラシーブとフックのシーブブロックとの間で複数回掛け渡す。このような巻上げロープは吊具を介して被搬送物を昇降させるためのものであり、巻上げロープの径および重量は比較的大きい。このため、作業者が起伏体上を基端部側から先端部側まで牽引する作業に必要な労力は非常に大きくなる。 The assembling work of the crane as described above includes the wiring work of the hoisting rope (main rope). The crane has a winch (main winch) provided at the base end of the machine body or the undulating body, an idler sheave (point sheave) provided at the tip of the undulating body, and a hook including a sheave block (hook sheave). have more. In the wiring work, the operator pulls the hoisting rope pulled out from the winch from the base end to the tip end of the undulating body, and then spans it between the idler sheave and the sheave block of the hook a plurality of times. Such a hoisting rope is used for lifting and lowering an object to be conveyed via a sling, and the diameter and weight of the hoisting rope are relatively large. For this reason, the labor required for the operator to pull the undulating body from the base end side to the tip end side becomes extremely large.

これに対して、特許文献1に開示されるように、巻上げロープよりも径および重量の小さいリービングロープを用いて巻上げロープをアイドラシーブとフックのシーブブロックとの間で掛け渡すことが行われている。 On the other hand, as disclosed in Patent Document 1, a reeving rope having a smaller diameter and weight than the hoisting rope is used to span the hoisting rope between the idler sheave and the sheave block of the hook. there is

特許文献1では、クレーンがリービングウインチを備えている。リービングウインチは、起伏体の基端部に設けられている。リービングウインチから引き出されたリービングロープは、起伏体の下方において起伏体の基端部から先端部に引き延ばされる。そして、前記リービングロープがアイドラシーブとフックのシーブブロックとの間で掛け渡された後、起伏体の先端部の上側(背面側)に備えられたシーブを経由して、起伏体の先端部から基端部に更に引き延ばされる。その後、リービングロープの先端部が、機体または起伏体の基端部に備えられたウインチから引き出された巻上げロープに接続される。そして、ウインチが巻上げロープを繰り出しながら、リービングウインチがリービングロープを巻き取ると、リービングロープが巻上げロープを案内し、巻上げロープが起伏体の先端部においてアイドラシーブとフックのシーブブロックとの間で掛け渡される。この結果、作業者が、大きな重量を備えた巻上げロープを起伏体の基端部から先端部まで牽引する必要がなく、作業者の負担が軽減される。 In Patent Literature 1, a crane is equipped with a reeving winch. A reeving winch is provided at the base end of the undulating body. The reeving rope pulled out from the reeving winch is stretched from the base end to the tip of the reeving body under the reeving body. After the reeving rope is stretched between the idler sheave and the sheave block of the hook, it passes through the sheave provided on the upper side (back side) of the tip of the undulating body, from the tip of the undulating body. The proximal end is further extended. After that, the tip of the reeving rope is connected to a hoisting rope pulled out from a winch provided at the base end of the fuselage or undulating body. When the reeving winch reels in the reeving rope while the winch is feeding out the hoisting rope, the reeving rope guides the hoisting rope, and the hoisting rope is hung between the idler sheave and the sheave block of the hook at the tip of the undulating body. Passed. As a result, the operator does not need to pull the heavy hoisting rope from the base end to the tip end of the undulating body, thereby reducing the burden on the operator.

特開2012-35937号公報JP 2012-35937 A

特許文献1に記載された技術では、作業者が巻上げロープを起伏体の基端部から基端部まで牽引する作業は軽減されるものの、作業者がリービングロープを起伏体の先端部と基端部との間で牽引する作業が必要となる。リービングロープは巻上げロープよりも軽いが、重量物であるため作業者の負担は大きい。また、起伏体がブームなどの長尺な部材である場合、作業者はリービングロープを保持した状態で数十メートルから100メートル前後にまで及ぶ距離を移動する必要がある。更に、作業者は、起伏体の先端部においてリービングロープをアイドラシーブとフックのシーブブロックとの間に掛け渡した後、リービングロープを把持した状態で起伏体の上面部を先端部から基端部まで移動しなければならない。この際、起伏体の上面部は地面から数メートルの高さにあるため、高所において高い注意力が必要となり作業者の負担が大きい。このように、従来のリービングウインチを用いた作業機械のワイヤリング方法においても、作業者の負担が大きいという問題があった。 In the technique described in Patent Document 1, although the work of pulling the hoisting rope from the base end portion of the undulating body to the base end portion by the operator is reduced, the operator must pull the reeving rope from the tip end of the undulation body to the base end. It is necessary to work to tow between departments. Although the reeving rope is lighter than the hoisting rope, it is heavy and places a heavy burden on the operator. In addition, when the undulating body is a long member such as a boom, the operator must move a distance ranging from several tens of meters to around 100 meters while holding the reeving rope. Further, after the reeving rope is stretched between the idler sheave and the sheave block of the hook at the leading end of the undulating body, the operator, while gripping the reeving rope, moves the upper surface of the undulating body from the leading end to the base end. have to move to At this time, since the upper surface of the undulating body is several meters above the ground, a high degree of caution is required at high altitudes, which imposes a heavy burden on the operator. As described above, even in the conventional method of wiring a work machine using a reeving winch, there is a problem that the burden on the operator is heavy.

本発明は、上記問題に鑑みてなされたものであり、メインウインチから引き出されたメインロープを起伏体の先端部のシーブに掛けるロープのワイヤリング作業における作業者の負担を低減することが可能な作業機械のロープワイヤリング方法およびガイドシーブ装置を提供することを目的とする。 SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and is capable of reducing the burden on the operator in the rope wiring work of hooking the main rope pulled out from the main winch to the sheave at the tip of the undulating body. The object is to provide a rope wiring method and a guide sheave device for a machine.

本発明の一の局面に係る作業機械のロープワイヤリング方法は、機体と、前記機体に起伏可能に装着される起伏体基端部とその反対の起伏体先端部とを含み前記機体から水平方向に沿って延びる水平姿勢を取ることが可能な起伏体と、前記起伏体基端部または前記機体に装着されメインロープの巻き取りおよび繰り出しを行うことが可能なメインウインチと、を有する作業機械において、前記メインウインチから繰り出された前記メインロープを前記起伏体先端部に掛け渡すための作業機械のロープワイヤリング方法であって、回転することによりリービングロープの巻き取りおよび繰り出しを行うことが可能なウインチドラムを有するリービングウインチを前記起伏体基端部に装着するウインチ装着工程と、地上を走行可能な走行部と、前記リービングロープの先端部と接続されることが可能な第1接続部と、前記水平姿勢とされた前記起伏体の上面部よりも上方に配置され前記リービングロープの先端部と接続されることが可能な第2接続部と、を有する作業補助装置を準備する準備工程と、前記起伏体基端部を前記機体に回動可能に連結することおよび前記起伏体を前記水平姿勢に配置することを含む起伏体配置工程と、前記起伏体配置工程のうち少なくとも前記起伏体基端部が前記機体に連結された後に、前記リービングウインチから前記リービングロープを前記起伏体基端部の下方に繰り出し、前記作業補助装置の前記第1接続部に前記リービングロープの前記先端部を接続するリービングロープ往路接続工程と、前記リービングウインチによって前記リービングロープを繰り出しながら、前記作業補助装置の前記走行部を前記起伏体の左側または右側で前記起伏体基端部から前記水平姿勢において前記起伏体先端部が配置される位置に向かって地上を走行させることで、前記リービングロープの前記先端部を前記起伏体先端部まで牽引するリービングロープ往路牽引工程と、前記作業補助装置の前記第1接続部から前記リービングロープの前記先端部を取り外し、前記起伏体先端部に配置された少なくとも一つのシーブに前記リービングロープを掛けるリービングロープワイヤリング工程と、前記リービングロープが前記少なくとも一つのシーブに掛けられた状態で前記リービングロープの前記先端部を前記作業補助装置の前記第2接続部に接続するリービングロープ復路接続工程と、前記リービングウインチによって前記リービングロープを更に繰り出しながら、前記第2接続部に接続された前記リービングロープの前記先端部が前記起伏体の上面部の上方を移動するように、前記作業補助装置の前記走行部を前記起伏体の左側または右側において前記起伏体先端部から前記起伏体基端部に向かって地上を走行させることで、前記リービングロープの前記先端部を前記起伏体先端部から少なくとも前記起伏体基端部まで牽引するリービングロープ復路牽引工程と、前記作業補助装置の前記第2接続部から前記リービングロープの前記先端部を取り外し、前記メインウインチから引き出された前記メインロープの先端部に前記リービングロープの前記先端部を接続するロープ接続工程と、前記メインウインチによって前記メインロープを繰り出しながら、前記リービングウインチによって前記リービングロープを巻き取ることで、前記リービングロープによって前記メインロープを前記起伏体基端部から前記起伏体先端部まで案内したのち前記少なくとも一つのシーブに掛けるメインロープワイヤリング工程と、を備える。 A rope wiring method for a work machine according to one aspect of the present invention includes a machine body, a base end of a hoisting body mounted on the machine body to be able to rise and fall, and a leading end of the hoisting body opposite thereto, and extends horizontally from the machine body. and a main winch attached to the base end of the undulating body or the fuselage and capable of winding and unreeling the main rope, A rope wiring method for a working machine for passing the main rope let out from the main winch to the tip of the undulating body, the winch drum being capable of winding and letting out the reeving rope by rotating. A winch mounting step of mounting a reeving winch having to the base end portion of the undulating body, a running portion capable of traveling on the ground, a first connection portion capable of being connected to the tip portion of the reeving rope, and the horizontal a preparation step of preparing a work assisting device having a second connecting portion which is arranged above the upper surface portion of the undulating body in the posture and is connectable to the tip portion of the reeving rope; an undulating body arranging step including rotatably connecting the body base end portion to the fuselage and arranging the undulating body in the horizontal posture; After being connected to the fuselage, the reeving rope is let out from the reeving winch below the base end of the undulating body, and the reeving rope is connected to the first connection portion of the work assisting device at the tip of the reeving rope. a forward connection step, while the reeving rope is paid out by the reeving winch, the traveling portion of the work auxiliary device is moved from the base end of the derricking body to the tip end of the derricking body in the horizontal position on the left or right side of the derricking body; A reeving rope outward pulling step of pulling the tip of the reeving rope to the tip of the undulating body by traveling on the ground toward the position where it is arranged; a reeving rope wiring step of removing the tip portion of the rope and hooking the reeving rope to at least one sheave arranged at the tip portion of the undulating body; a reeving rope return path connecting step of connecting the tip portion of the rope to the second connection portion of the work assisting device; and the reeving rope connected to the second connection portion while further reeling out the reeving rope by the reeving winch The traveling part of the work auxiliary device is moved from the tip end of the lifting body toward the base end of the lifting body on the left or right side of the lifting body so that the tip part of the work auxiliary device moves above the upper surface of the lifting body. a reeving rope return path pulling step of pulling the tip of the reeving rope from the tip of the leving body to at least the base of the leving body by traveling on the ground; a rope connecting step of removing the tip of the reeving rope and connecting the tip of the reeving rope to the tip of the main rope pulled out from the main winch; a main rope wiring step of winding the reeving rope by the reeving winch so that the reeving rope guides the main rope from the base end portion of the undulating body to the tip end portion of the undulating body, and then hooks the main rope to the at least one sheave; Prepare.

本方法によれば、作業補助装置の第1接続部または第2接続部にリービングロープを連結して走行部を走行させることで、リービングウインチから繰り出されたリービングロープを起伏体基端部から起伏体先端部まで牽引する作業、および少なくとも一つのシーブに掛けられたリービングロープを起伏体先端部から起伏体基端部まで牽引する作業を、作業者に代わって行うことができる。このため、メインロープのワイヤリング作業における作業者の負担を低減することが可能となる。また、作業補助装置の走行部は起伏体の左方または右方において地上を走行するため、起伏体が地上に載置されていても作業補助装置の走行によってロープのワイヤリング作業を効率的に行うことができる。 According to this method, the reeving rope is connected to the first connection portion or the second connection portion of the work auxiliary device and the traveling portion is caused to travel, whereby the reeving rope let out from the reeving winch is undulated from the base end of the undulating body. The work of pulling to the tip of the body and the work of pulling the reeving rope hooked on at least one sheave from the tip of the body to the base of the body can be performed instead of the operator. Therefore, it is possible to reduce the burden on the worker in the wiring work of the main rope. In addition, since the traveling part of the work auxiliary device travels on the ground on the left or right side of the undulating body, even when the undulating body is placed on the ground, the work auxiliary device travels to efficiently perform the rope wiring work. be able to.

上記の方法において、前記ウインチ装着工程は、前記起伏体基端部のうち当該起伏体基端部の左右方向の両端部よりも内側の位置であって左右方向において前記両端部よりも前記シーブに近い位置に、前記ウインチドラムが左右方向に延びる回転中心軸回りに回転可能となるように前記リービングウインチを装着することを含み、前記リービングロープ往路接続工程は、前記リービングウインチから前記リービングロープを前記起伏体基端部の下方に繰り出し、前記起伏体基端部の下面部のうち前記リービングウインチよりも前記起伏体先端部側かつ前記起伏体基端部の前記両端部よりも左右方向の内側に配置され上下方向に延びる回転中心軸回りに回転可能な第1ガイドシーブに前記リービングロープを掛けたのち、前記起伏体の左側および右側のうち前記作業補助装置が配置されている側の前記起伏体の外側に前記リービングロープを引き出し、前記作業補助装置の前記第1接続部に前記リービングロープの前記先端部を接続することを含み、前記リービングロープ往路牽引工程は、前記リービングウインチから繰り出され前記第1ガイドシーブを経由した前記リービングロープを前記作業補助装置によって前記起伏体先端部まで牽引することを含むものでもよい。 In the above method, in the winch mounting step, the winch mounting step is performed at a position inward of both lateral end portions of the undulating body base end portion of the undulating body base end portion and closer to the sheave than the both end portions in the lateral direction. mounting the reeving winch at a near position so that the winch drum is rotatable about a center axis of rotation extending in the left-right direction; Extending downward from the base end of the undulating body, the lower surface of the base end of the undulating body is positioned closer to the tip of the undulating body than the reeving winch and inward of the both ends of the base end of the undulating body in the left-right direction. After the reeving rope is hooked to a first guide sheave that is arranged and rotatable about a central axis of rotation that extends in the vertical direction, the levitating body on the left side or the right side of the levitating body on which the work assisting device is arranged. and connecting the tip of the reeving rope to the first connection portion of the work auxiliary device, wherein the reeving rope forward pulling step is paid out from the reeving winch and the second 1. The method may include pulling the reeving rope, which has passed through one guide sheave, to the leading end of the undulating body by the work auxiliary device.

本方法によれば、左右方向に延びる回転中心軸回りに回転するリービングウインチから繰り出したリービングロープを、上下方向に延びる回転中心軸回りに回転可能な第1ガイドシーブによって、起伏体の左右方向の外側に引き出すことができる。このため、リービングウインチの繰り出し動作を安定して維持しながら、起伏体の左側または右側において作業補助装置にリービングロープを容易に接続することが可能となり、作業補助装置がリービングロープを起伏体基端部から起伏体先端部まで安定して牽引することができる。 According to this method, the reeving rope let out from the reeving winch that rotates about the center axis of rotation extending in the left-right direction is moved by the first guide sheave rotatable about the center axis of rotation that extends in the up-down direction. You can pull it out. For this reason, it is possible to easily connect the reeving rope to the work auxiliary device on the left or right side of the levitating body while maintaining the reeling operation of the reeving winch stably, and the work auxiliary device connects the reeving rope to the base end of the levitating body. It can be stably towed from the part to the tip of the undulating body.

上記の方法において、前記リービングロープ往路接続工程は、前記リービングウインチから前記リービングロープを前記起伏体基端部の下方に繰り出し、前記第1ガイドシーブに前記リービングロープを掛け、更に、前記起伏体基端部の下面部のうち前記第1ガイドシーブよりも前記起伏体先端部側かつ前記起伏体の左側および右側のうち前記作業補助装置が配置されている側の前記起伏体の端部の第1の位置に上下方向に延びる回転中心軸回りに回転可能に配置された第2ガイドシーブに前記リービングロープを掛けたのち、前記作業補助装置の前記第1接続部に前記リービングロープの先端部を接続することを含み、前記リービングロープ往路牽引工程は、前記リービングウインチから繰り出され前記第1ガイドシーブおよび前記第2ガイドシーブを経由した前記リービングロープを前記作業補助装置によって前記起伏体先端部まで牽引することを含むものでもよい。 In the above method, the reeving rope forward connection step includes feeding the reeving rope from the reeving winch downward to the base end of the leving body, hooking the reeving rope to the first guide sheave, and The first end portion of the undulating body on the side where the work assisting device is arranged among the left side and the right side of the undulating body, which is closer to the leading end portion of the undulating body than the first guide sheave in the lower surface portion of the end portion After the reeving rope is hooked to a second guide sheave that is rotatably arranged around the central axis of rotation that extends vertically at the position of , the tip of the reeving rope is connected to the first connecting portion of the work assisting device. In the reeving rope outward pulling step, the reeving rope that has been let out from the reeving winch and passed through the first guide sheave and the second guide sheave is pulled by the work auxiliary device to the tip of the undulating body. It may include

本方法によれば、第1ガイドシーブを経由して起伏体の左右方向の外側に引き出されたリービングロープの方向を、第2ガイドシーブによって起伏体先端部に向かって変更することができる。この結果、リービングウインチの繰り出し動作を安定して維持するとともに、起伏体の直下においてリービングロープの繰り出し経路が前方に移動することを抑止しつつ、起伏体の左側または右側においてリービングロープを起伏体基端部から起伏体先端部まで安定して牽引することができる。したがって、起伏体の下方においてリービングロープが他の部材と干渉することが抑止される。 According to this method, the direction of the reeving rope drawn outward in the left-right direction of the undulating body via the first guide sheave can be changed toward the tip of the undulating body by the second guide sheave. As a result, the feeding operation of the reeving winch is stably maintained, and the reeving rope feeding path is prevented from moving forward directly under the leving body, while the reeving rope is placed on the left or right side of the reeving body. It can be stably pulled from the end to the tip of the undulating body. Therefore, the reeving rope is prevented from interfering with other members below the undulating body.

上記の方法において、前記メインロープワイヤリング工程は、前記第2ガイドシーブの位置を前記リービングロープ往路接続工程において配置第2ガイドシーブが配置された前記第1の位置から前記起伏体基端部の下面部のうち当該起伏体基端部の左右方向の両端部よりも内側の第2の位置に変更しかつ前記第2ガイドシーブの回転中心軸の方向を左右方向から上下方向に変更することと、前記複数のシーブと前記リービングウインチとの間で、前記リービングロープを前記第1ガイドシーブおよび前記第2ガイドシーブによって支持することと、を含むものでもよい。 In the above method, the main rope wiring step moves the position of the second guide sheave from the first position where the second guide sheave is arranged in the outgoing reeving rope connecting step to the lower surface of the base end portion of the undulating body. changing to a second position inward of both lateral end portions of the base end of the undulating body, and changing the direction of the rotation center axis of the second guide sheave from the lateral direction to the vertical direction; supporting the reeving rope by the first guide sheave and the second guide sheave between the plurality of sheaves and the reeving winch.

本方法によれば、リービングロープ往路接続工程においてリービングロープを起伏体の左右方向の外側に案内するための第2ガイドシーブを、メインロープワイヤリング工程ではリービングロープを第1ガイドシーブに向かって案内するシーブとして使用することができる。この際、第1ガイドシーブおよび第2ガイドシーブがいずれも起伏体の左右方向の中央部に配置されているため、リービングロープを直線的に案内することが可能となり、リービングロープに係る負荷を低減することができる。 According to this method, the second guide sheave for guiding the reeving rope to the outside in the left-right direction of the undulating body is guided in the reeving rope outgoing connection step, and the reeving rope is guided toward the first guide sheave in the main rope wiring step. Can be used as a sieve. At this time, since both the first guide sheave and the second guide sheave are arranged in the center of the undulating body in the left-right direction, it is possible to guide the reeving rope in a straight line, thereby reducing the load on the reeving rope. can do.

上記の方法において、前記ウインチ装着工程は、前記起伏体基端部のうち当該起伏体基端部の左右方向の両端部よりも内側の位置であって左右方向において前記両端部よりも前記シーブに近い位置に前記リービングウインチを装着することを含み、前記準備工程は、前記ブームの左側または右側に位置する前記作業補助装置の前記走行部に対して前記第1接続部を前記ブームの下方に相対移動させることを含み、前記リービングロープ往路接続工程は、前記リービングウインチから前記リービングロープを前記起伏体基端部の下方に繰り出し、前記起伏体基端部の下面部のうち前記リービングウインチよりも前記起伏体先端部側かつ前記起伏体基端部のうち当該起伏体基端部の左右方向の両端部よりも内側の位置に配置された第1ガイドシーブに前記リービングロープを掛けたのち、前記第1接続部に前記リービングロープの先端部を接続することを含み、前記リービングロープ往路牽引工程は、前記リービングロープを前記第1接続部によって前記ブームの下方で保持しながら、前記走行部を前記起伏体の左側または右側において地上を走行させることを含むものでもよい。 In the above method, in the winch mounting step, the winch mounting step is performed at a position inward of both lateral end portions of the undulating body base end portion of the undulating body base end portion and closer to the sheave than the both end portions in the lateral direction. The preparatory step includes mounting the reeving winch at a position close to the boom, and the preparation step includes moving the first connecting portion relative to the traveling portion of the work auxiliary device positioned on the left or right side of the boom below the boom. In the reeving rope outgoing connection step, the reeving rope is paid out from the reeving winch to below the base end portion of the reeving body, and the lower surface portion of the base end portion of the reeving body is positioned above the reeving winch. After the reeving rope is hooked to a first guide sheave disposed at a position on the front end side of the undulating body and at a position inside the base end of the undulating body relative to both lateral ends of the base end of the undulating body, the reeving rope is The reeving rope forward pulling step includes connecting the leading end of the reeving rope to a connecting portion, wherein the reeving rope is held below the boom by the first connecting portion while the running portion is moved to the hoisting portion. It may involve running on the ground on the left or right side of the body.

本方法によれば、リービングロープ往路牽引工程において、起伏体の下方においてリービングロープを直線的に案内することが可能となり、リービングロープに係る負荷を低減することができる。 According to this method, it is possible to guide the reeving rope linearly under the undulating body in the forward pulling step of the reeving rope, so that the load on the reeving rope can be reduced.

上記の方法において、前記起伏体として、前記起伏体基端部と前記起伏体先端部との間に少なくとも一つの起伏体中間部を備え、前記起伏体基端部、前記少なくとも一つの起伏体中間部および前記起伏体先端部が互いに接続されることで前記起伏体が構成されるものを準備することを更に備え、前記起伏体配置工程は、前記起伏体基端部を前記機体に回動可能に連結した後、前記起伏体基端部の先端側に前記少なくとも一つの起伏体中間部および前記起伏体先端部を順に接続することで、前記起伏体を前記水平姿勢に配置することを含み、前記起伏体配置工程における前記起伏体の長さに応じて前記作業補助装置の前記走行部を走行させるように、前記起伏体配置工程と前記リービングロープ往路牽引工程とが並行して行われるものでもよい。 In the above method, as the undulating body, at least one undulating body intermediate portion is provided between the undulating body base end portion and the undulating body distal end portion, and and the hoisting body distal end portion is connected to each other to form the hoisting body. and then connecting the at least one intermediate portion of the undulating body and the distal end of the undulating body to the distal side of the base end of the undulating body, thereby arranging the undulating body in the horizontal posture, The undulating body arranging step and the reeving rope forward pulling step may be performed in parallel so that the traveling portion of the work auxiliary device travels according to the length of the undulating body in the undulating body arranging step. good.

上記の方法において、前記リービングロープ往路牽引工程において前記走行部を前記ブームの左側および右側のうちの一方で地上を走行させ、前記リービングロープ復路牽引工程において前記走行部を前記ブームの左側および右側のうちの他方で地上を走行させるものでもよい。 In the above method, in the reeving-rope outward towing step, the traveling portion is caused to travel on the ground on either the left or right side of the boom, and in the reeving-rope return-towing step, the traveling portion is caused to travel on the left or right side of the boom. The other of them may run on the ground.

本方法によれば、作業補助装置が往路において地上に引き回したリービングロープを復路において作業補助装置が踏むことが防止される。このため、リービングロープが絡まることや損傷することが抑止される。 According to this method, the work assisting device is prevented from stepping on the reeving rope that the work assisting device pulled to the ground on the outward travel. Therefore, the reeving rope is prevented from being entangled or damaged.

本発明の他の局面に係るガイドシーブ装置は、機体と、前記機体に起伏可能に装着される起伏体基端部とその反対の起伏体先端部とを含み前記機体から水平方向に沿って延びる水平姿勢を取ることが可能な起伏体と、前記起伏体基端部または前記機体に装着されメインロープの巻き取りおよび繰り出しを行うことが可能なメインウインチと、前記起伏体基端部に左右方向に延びる回転中心軸回りに回転可能に支持されリービングロープの巻き取りおよび繰り出しを行うことが可能なリービングウインチと、を有する作業機械において、前記メインウインチから繰り出された前記メインロープを前記起伏体先端部に掛け渡すロープワイヤリング作業を補助する、ガイドシーブ装置であって、前記水平姿勢とされた前記起伏体基端部の下面部のうち前記リービングウインチよりも前記起伏体先端部側かつ前記起伏体基端部の左右方向の両端部よりも内側の位置に上下方向に延びる回転中心軸回りに回転可能に装着され、前記リービングウインチから前記起伏体先端部に向かって繰り出される前記リービングロープの方向を前記起伏体の左右方向の外側に向かって変更するように前記リービングロープを支持しながら、当該リービングロープの進行を許容するように回転する第1ガイドシーブと、前記リービングウインチから繰り出され前記第1ガイドシーブを経由した前記リービングロープを支持することが可能な第2ガイドシーブと、前記第2ガイドシーブを第1支持状態で支持することが可能なシーブ支持部と、を備え、前記シーブ支持部は、前記第1支持状態では、前記第2ガイドシーブが、前記リービングウインチから繰り出され前記第1ガイドシーブを経由した前記リービングロープの方向を前記起伏体の左右方向の外側で前記起伏体先端部に向かって変更することが可能なように、前記水平姿勢とされた前記起伏体基端部のうちの前記第1ガイドシーブよりも前記起伏体先端部側の位置であってかつ前記起伏体基端部の下面部の左側端部または右側端部の位置において前記第2ガイドシーブが上下方向に沿って延びる回転中心軸回りに回転可能となるように、前記第2ガイドシーブを支持する。 A guide sheave device according to another aspect of the present invention includes a fuselage, a base end portion of a hoisting body and a distal end portion of the hoisting body oppositely attached to the fuselage so as to be able to rise and fall, and extends horizontally from the fuselage. A hoisting body capable of taking a horizontal posture, a main winch attached to the base end of the hoisting body or the fuselage and capable of winding and unwinding a main rope, and a hoisting body base end in a horizontal direction. a reeving winch that is rotatably supported around a central axis of rotation extending from the main winch and capable of winding and letting out a reeving rope, wherein the main rope let out from the main winch A guide sheave device for assisting a rope wiring operation to be laid over a section, wherein the lower surface portion of the base end of the undulating body in the horizontal posture is closer to the tip of the undulating body than the reeving winch and the undulating body It is mounted rotatably around a rotation center axis extending in the vertical direction at a position inside both lateral end portions of the base end portion, and the direction of the reeving rope paid out from the reeving winch toward the tip end portion of the undulating body is controlled. a first guide sheave that rotates to allow the reeving rope to advance while supporting the reeving rope so as to change outward in the lateral direction of the undulating body; a second guide sheave capable of supporting the reeving rope passing through the guide sheave; and a sheave supporting portion capable of supporting the second guide sheave in a first supporting state, wherein the sheave supporting portion In the first supported state, the second guide sheave is arranged so that the direction of the reeving rope that has been let out from the reeving winch and passed through the first guide sheave is positioned outside the undulating body in the left-right direction. A position closer to the distal end of the undulating body than the first guide sheave in the basal end of the undulating body in the horizontal posture so as to be able to change toward the base of the undulating body The second guide sheave is supported so that the second guide sheave is rotatable about a rotation center axis extending in the vertical direction at the left end or right end of the lower surface of the end portion.

本構成によれば、作業機械のメインロープのワイヤリング作業において、リービングウインチから起伏体先端部に向かって引き出されたリービングロープを第1ガイドシーブおよび第1支持状態とされた第2ガイドシーブに順に掛け渡すことができる。このため、リービングウインチの繰り出し動作を安定して維持しながら、リービングロープを起伏体の左右外側において起伏体先端部まで牽引することができる。また、起伏体の直下においてリービングロープの繰り出し経路が前方に移動することを抑止し、リービングロープが他の部材と干渉することを抑止することができる。 According to this configuration, in the wiring operation of the main rope of the working machine, the reeving rope pulled out from the reeving winch toward the tip of the undulating body is passed through the first guide sheave and the second guide sheave in the first supported state in this order. can be passed on. Therefore, the reeving rope can be pulled to the leading end of the levee on the left and right outer sides of the levee while the reeling operation of the reeving winch is stably maintained. Further, it is possible to prevent the reeving rope payout path from moving forward directly under the undulating body, and to prevent the reeving rope from interfering with other members.

上記の構成において、前記シーブ支持部は、前記第1支持状態と当該第1支持状態とは異なる状態で前記第2ガイドシーブを支持する第2支持状態との間で切換可能であり、前記シーブ支持部は、前記第2支持状態では、前記第2ガイドシーブが前記起伏体先端部と前記リービングウインチとの間で前記第1ガイドシーブとともに前記リービングロープを支持することが可能なように、前記水平姿勢とされた前記起伏体基端部のうちの前記第1ガイドシーブよりも前記起伏体先端部側の位置であってかつ前記起伏体基端部の下面部の左右方向の両端部よりも内側の位置において前記第2ガイドシーブが回転可能となるように、前記第2ガイドシーブを支持するものでもよい。 In the above configuration, the sheave support portion is switchable between the first support state and a second support state in which the second guide sheave is supported in a state different from the first support state, and The support portion is configured such that, in the second support state, the second guide sheave can support the reeving rope together with the first guide sheave between the tip portion of the undulating body and the reeving winch. In the base end of the undulating body in a horizontal posture, a position closer to the distal end of the undulating body than the first guide sheave and more than both lateral ends of the lower surface of the base end of the undulating body The second guide sheave may be supported such that the second guide sheave is rotatable in the inner position.

本構成によれば、メインウインチによってメインロープを繰り出しながらリービングウインチによってリービングロープを巻き取る際に、起伏体先端部から起伏体基端部のリービングウインチに向かうリービングロープを、第2支持状態とされた第2ガイドシーブおよび第1ガイドシーブによって起伏体の下面部に沿って導くことができる。このため、第2ガイドシーブが第1支持状態とされたままリービングロープが起伏体の側方を経由して巻き取られる場合と比較して、リービングロープをより大きな張力で巻き取ることが可能となる。 According to this configuration, when winding the reeving rope by the reeving winch while letting out the main rope by the main winch, the reeving rope directed from the tip end of the levee to the reeving winch at the base end of the levee is placed in the second supported state. It can be guided along the lower surface of the undulating body by the second guide sheave and the first guide sheave. Therefore, the reeving rope can be wound with a greater tension than the case where the reeving rope is wound along the side of the undulating body while the second guide sheave is in the first supported state. Become.

上記の構成において、前記シーブ支持部は、前記第2支持状態では、前記第2ガイドシーブが左右方向に沿って延びる回転中心軸回りに回転可能となるように、前記第2ガイドシーブを支持するものでもよい。 In the above configuration, the sheave support portion supports the second guide sheave so that in the second supported state, the second guide sheave is rotatable about a rotation center axis extending in the left-right direction. Anything is fine.

本構成によれば、リービングウインチによってリービングロープを巻き取る際に、第2ガイドシーブが上下方向に延びる回転中心軸回りに回転する場合と比較して、リービングロープをより大きな張力で巻き取ることができる。 According to this configuration, when the reeving rope is wound by the reeving winch, the reeving rope can be wound with a greater tension than when the second guide sheave rotates around the rotation center axis extending in the vertical direction. can.

本発明によれば、メインウインチから引き出されたメインロープを起伏体の先端部のシーブに掛けるロープのワイヤリング作業における作業者の負担を低減することが可能な作業機械のロープワイヤリング方法が提供される。 According to the present invention, there is provided a rope wiring method for a working machine capable of reducing the burden on an operator in the rope wiring work of hooking the main rope pulled out from the main winch to the sheave at the tip of the undulating body. .

本発明の一実施形態に係る作業機械においてメインロープのワイヤリング作業が行われている様子を示す側面図である。FIG. 3 is a side view showing a state in which a main rope wiring operation is being performed in the working machine according to one embodiment of the present invention. 本発明の一実施形態に係る作業機械においてメインロープのワイヤリング作業が行われている様子を示す平面図である。FIG. 2 is a plan view showing a state in which a main rope wiring operation is being performed in the working machine according to one embodiment of the present invention. 本発明の一実施形態に係る作業機械においてメインロープのワイヤリング作業が行われている様子を示す拡大側面図である。FIG. 4 is an enlarged side view showing a state in which a main rope is being wired in the working machine according to the embodiment of the present invention; 本発明の一実施形態に係る作業機械においてメインロープのワイヤリング作業が行われている様子を示す拡大側面図である。FIG. 4 is an enlarged side view showing a state in which a main rope is being wired in the working machine according to the embodiment of the present invention; 本発明の一実施形態に係る作業機械においてメインロープのワイヤリング作業が行われている様子を示す拡大側面図である。FIG. 4 is an enlarged side view showing a state in which a main rope is being wired in the working machine according to the embodiment of the present invention; 本発明の一実施形態に係る作業機械のメインロープのワイヤリング作業において、補助作業装置にリービングロープが接続された様子を示す背面図である。FIG. 4 is a rear view showing a state in which a reeving rope is connected to an auxiliary work device in wiring work of the main rope of the working machine according to one embodiment of the present invention. 本発明の一実施形態に係る作業機械のメインロープのワイヤリング作業において、作業機械の起伏体に備えられたリービングウインチからリービングロープが引き出された様子を示す平面図である。FIG. 4 is a plan view showing a state in which a reeving rope is pulled out from a reeving winch provided on the undulating body of the working machine in the wiring work of the main rope of the working machine according to one embodiment of the present invention. 本発明の一実施形態に係る作業機械のメインロープのワイヤリング作業において、作業機械の起伏体に備えられたリービングウインチからリービングロープが引き出された様子を示す側面図である。FIG. 4 is a side view showing a state in which a reeving rope is pulled out from a reeving winch provided on the undulating body of the working machine in the wiring work of the main rope of the working machine according to one embodiment of the present invention. 本発明の一実施形態に係る作業機械のメインロープのワイヤリング作業において、作業機械の起伏体に備えられたガイドシーブの配置を示す正面図である。FIG. 4 is a front view showing the arrangement of guide sheaves provided on the undulating body of the working machine in the wiring work of the main rope of the working machine according to one embodiment of the present invention. 本発明の一実施形態に係る作業機械のメインロープのワイヤリング作業において使用されるガイドシーブユニットの斜視図である。1 is a perspective view of a guide sheave unit used in wiring work of a main rope of a working machine according to one embodiment of the present invention; FIG. 本発明の一実施形態に係る作業機械のメインロープのワイヤリング作業において使用されるガイドシーブユニットの背面図である。FIG. 4 is a rear view of the guide sheave unit used in the wiring work of the main rope of the working machine according to one embodiment of the present invention; 本発明の一実施形態に係る作業機械のメインロープのワイヤリング作業において使用されるガイドシーブユニットの拡大背面図である。FIG. 4 is an enlarged rear view of the guide sheave unit used in the wiring work of the main rope of the working machine according to one embodiment of the present invention; 本発明の一実施形態に係る作業機械のメインロープのワイヤリング作業において使用されるガイドシーブユニットの拡大背面図である。FIG. 4 is an enlarged rear view of the guide sheave unit used in the wiring work of the main rope of the working machine according to one embodiment of the present invention; 本発明の変形実施形態に係る作業機械のメインロープのワイヤリング作業において、補助作業装置にリービングロープが接続された様子を示す背面図である。FIG. 11 is a rear view showing a state in which a reeving rope is connected to an auxiliary work device in wiring work of the main rope of the working machine according to the modified embodiment of the present invention;

以下、図面を参照しつつ、本発明の一実施形態について説明する。図1は、本実施形態に係るクレーン1(作業機械)において主巻ロープMW(メインロープ)のワイヤリング作業が行われている様子を示す側面図である。なお、以後、各図には、「上」、「下」、「左」、「右」、「前」および「後」の方向が示されているが、当該方向は、本実施形態に係るクレーン1のロープワイヤリング方法を説明するために便宜上示すものであり、本発明に係る作業機械のロープワイヤリング方法を限定するものではない。また、各図における「上」、「下」、「左」、「右」、「前」および「後」の方向は、クレーン1の運転席から見た各方向に相当するように示している。 An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a side view showing how a main hoist rope MW (main rope) is being wired in a crane 1 (work machine) according to the present embodiment. It should be noted that, hereinafter, directions of “up”, “down”, “left”, “right”, “front” and “back” are shown in each figure, but the directions are It is shown for convenience to explain the rope wiring method of the crane 1, and does not limit the rope wiring method of the work machine according to the present invention. Also, the directions of "up", "down", "left", "right", "front" and "back" in each drawing correspond to the directions viewed from the operator's seat of the crane 1. .

図1を参照して、クレーン1は、下部走行体10と、上部旋回体12(機体)と、マスト14と、ブーム16と、主巻ウインチ18と、補巻ウインチ20と、ブーム起伏ウインチ22と、シーブ24と、シーブ26と、ブーム起伏ロープ28と、ガイライン30と、ガイリンク32と、バックスストップ34と、フック36と、リービングウインチ50と、を備える。 Referring to FIG. 1, the crane 1 includes a lower traveling body 10, an upper revolving body 12 (body), a mast 14, a boom 16, a main hoisting winch 18, an auxiliary hoisting winch 20, and a boom hoisting winch 22. , a sheave 24 , a sheave 26 , a boom hoisting rope 28 , a guy line 30 , a guy link 32 , a backstop 34 , a hook 36 and a reeving winch 50 .

下部走行体10は、地上を走行可能とされる。上部旋回体12は、下部走行体10に上下方向に延びる回転中心軸回りに旋回可能に支持されている。 The undercarriage 10 can travel on the ground. The upper revolving body 12 is supported by the lower traveling body 10 so as to be revolvable about a rotation center axis extending in the vertical direction.

マスト14は、上部旋回体12の前方部分において水平な回転中心軸回りに回動可能(起伏可能)に支持されている。 The mast 14 is supported at the front portion of the upper revolving body 12 so as to be rotatable (up and down) about a horizontal central axis of rotation.

ブーム16は、上部旋回体12のうちマスト14よりも前方部分において、マスト14の回転中心軸と平行な回転中心軸回りに回動可能(起伏可能)に支持されている。 The boom 16 is supported at a portion of the upper swing body 12 in front of the mast 14 so as to be rotatable (raising and lowering) about a rotation center axis parallel to the rotation center axis of the mast 14 .

主巻ウインチ18は、上部旋回体12のうちマスト14の直ぐ後側に配置されている。主巻ウインチ18は、主巻ロープMW(図2)(メインロープ)の巻き取り動作および繰り出し動作を行う。 The main hoist winch 18 is arranged in the upper revolving body 12 immediately behind the mast 14 . The main hoisting winch 18 performs a winding operation and a payout operation of the main hoisting rope MW (Fig. 2) (main rope).

補巻ウインチ20は、上部旋回体12のうち主巻ウインチ18の直ぐ後側に配置されている。補巻ウインチ20は、不図示の補巻ロープの巻き取り動作および繰り出し動作を行う。 The auxiliary hoisting winch 20 is arranged immediately behind the main hoisting winch 18 in the upper revolving body 12 . The auxiliary hoisting winch 20 performs a winding operation and a payout operation of an auxiliary hoisting rope (not shown).

ブーム起伏ウインチ22は、上部旋回体12のうち補巻ウインチ20の直ぐ後側に配置されている。ブーム起伏ウインチ22は、ブーム起伏ロープ28の巻き取り動作および繰り出し動作を行う。 The boom hoisting winch 22 is arranged immediately behind the auxiliary hoisting winch 20 in the upper rotating body 12 . The boom hoisting winch 22 performs winding operation and feeding operation of the boom hoisting rope 28 .

具体的に、上部旋回体12の後端部にはシーブ24およびシーブ26が配置されている。シーブ26はガイライン30によってマスト14の先端部に接続されている。また、マスト14の先端部はガイリンク32によってブーム16の先端部に接続されている。ブーム起伏ウインチ22から引き出されたブーム起伏ロープ28は、シーブ24とシーブ26との間に複数回掛け渡されている。この結果、ブーム起伏ウインチ22がブーム起伏ロープ28を繰り出すとシーブ24とシーブ26との距離が拡がり、マスト14が前方に回動することに連動して、ブーム16が前方に倒伏する。一方、ブーム起伏ウインチ22がブーム起伏ロープ28を巻き取るとシーブ24とシーブ26との距離が縮まり、マスト14が後方に回動することに連動して、ブーム16が起立する。バックストップ34は、ブーム16の起立動作に応じて上部旋回体12に当接し、ブーム16が更に後方に回動(転倒)することを防止する。 Specifically, a sheave 24 and a sheave 26 are arranged at the rear end of the upper rotating body 12 . Sheave 26 is connected to the tip of mast 14 by guy line 30 . Also, the tip of the mast 14 is connected to the tip of the boom 16 by a guy link 32 . A boom hoisting rope 28 pulled out from the boom hoisting winch 22 is stretched between the sheaves 24 and 26 a plurality of times. As a result, when the boom hoisting winch 22 draws out the boom hoisting rope 28, the distance between the sheaves 24 and 26 increases, and the boom 16 falls forward in conjunction with the forward rotation of the mast 14. - 特許庁On the other hand, when the boom hoisting winch 22 winds up the boom hoisting rope 28, the distance between the sheaves 24 and 26 is shortened, and the boom 16 is erected in conjunction with the rearward rotation of the mast 14. - 特許庁The backstop 34 abuts against the upper rotating body 12 in accordance with the erecting motion of the boom 16, and prevents the boom 16 from rotating further rearward (overturning).

図1を参照して、ブーム16は、下部ブーム16A(起伏体基端部)と、中間ブーム16Bと、中間ブーム16Cと、中間ブーム16Dと、上部ブーム16E(起伏体先端部)と、を有する。すなわち、ブーム16は、上部旋回体12に起伏可能に装着される下部ブーム16Aとその反対の上部ブーム16Eとを含み、図1に示すように上部旋回体12から水平方向に沿って延びる水平姿勢を取ることが可能とされている。 Referring to FIG. 1, the boom 16 includes a lower boom 16A (base end of the hoisting body), an intermediate boom 16B, an intermediate boom 16C, an intermediate boom 16D, and an upper boom 16E (tip of the hoisting body). have. That is, the boom 16 includes a lower boom 16A and an opposite upper boom 16E mounted on the upper revolving body 12 so as to be able to rise and fall, and as shown in FIG. It is possible to take

本実施形態では、ブーム16が、下部ブーム16Aと上部ブーム16Eとの間に3つ(少なくとも一つ)の中間ブーム(起伏体中間部)を備え、下部ブーム16A、3つの中間ブームおよび上部ブーム16Eが互いに接続されることでブーム16が構成される。ブーム16は、その長手方向と直交する断面で見た場合、矩形形状からなり、4本のメインパイプとメインパイプ同士を接続するラチスパイプとを含む。なお、中間ブームの数は上記に限定されるものではなく、また、中間ブームを備えないものでもよい。 In this embodiment, the boom 16 comprises three (at least one) intermediate booms (elliptic intermediate parts) between the lower boom 16A and the upper boom 16E, and the lower boom 16A, the three intermediate booms and the upper boom The boom 16 is configured by connecting 16E to each other. The boom 16 has a rectangular shape when viewed in a cross section orthogonal to its longitudinal direction, and includes four main pipes and a lattice pipe connecting the main pipes. Note that the number of intermediate booms is not limited to the above, and an intermediate boom may not be provided.

また、ブーム16の上部ブーム16Eは、第1ブームシーブ161と、第2ブームシーブ162(ポイントシーブ)と、を有する(図1)。第1ブームシーブ161は、図1のブーム16の上部ブーム16Eの上面部(起立したブーム16の上部ブーム16Eの後側部分)に回転可能に支持されている。一方、第2ブームシーブ162は、図1のブーム16の上部ブーム16Eの下面部(起立したブーム16の上部ブーム16Eの前側部分)に回転可能に支持されている。第1ブームシーブ161および第2ブームシーブ162は、主巻ロープMWまたはリービングロープLWを支持可能な外周面を有する。 Also, the upper boom 16E of the boom 16 has a first boom sheave 161 and a second boom sheave 162 (point sheave) (FIG. 1). The first boom sheave 161 is rotatably supported on the upper surface of the upper boom 16E of the boom 16 in FIG. 1 (the rear portion of the upper boom 16E of the upright boom 16). On the other hand, the second boom sheave 162 is rotatably supported on the lower surface of the upper boom 16E of the boom 16 in FIG. 1 (the front portion of the upper boom 16E of the upright boom 16). The first boom sheave 161 and the second boom sheave 162 have outer peripheral surfaces capable of supporting the main hoisting rope MW or the reeving rope LW.

フック36は、上部ブーム16Eから主巻ロープMWを介して吊り下げられることで、吊り荷に接続され前記吊り荷を吊り上げる。フック36は、複数のシーブが左右方向に隣接して配置されたシーブブロック361(フックシーブ)を有する。 The hook 36 is suspended from the upper boom 16E via the main hoisting rope MW, thereby being connected to the suspended load and lifting the suspended load. The hook 36 has a sheave block 361 (hook sheave) in which a plurality of sheaves are arranged adjacent to each other in the left-right direction.

リービングウインチ50は、下部ブーム16Aの基端部付近に装着されており、回転することによりリービングロープLWの巻き取りおよび繰り出しを行うことが可能なウインチドラムを有する。前記ウインチドラムは、水平な回転中心軸回りに回転する。なお、リービングウインチ50は、クレーン1の上部旋回体12の旋回フレームの前側部分やカーボディ、アスクルなどのクレーン本体側に配置されてもよい。 The reeving winch 50 is mounted near the base end of the lower boom 16A, and has a winch drum that can be rotated to wind up and let out the reeving rope LW. The winch drum rotates around a horizontal central axis of rotation. Note that the reeving winch 50 may be arranged on the front side portion of the revolving frame of the upper revolving body 12 of the crane 1 or on the side of the crane main body such as the car body or the axle.

リービングウインチ50を用いた主巻ロープMWのワイヤリング作業では、まずリービングウインチ50から下方に繰り出されたリービングロープLWの先端部がブーム16よりも低い位置を通って下部ブーム16Aから上部ブーム16Eまで牽引される。その後、上部ブーム16Eの周辺において、リービングロープLWがシーブブロック361と第2ブームシーブ162との間に複数回掛け渡されると、リービングロープLWの先端部が第1ブームシーブ161を経由して、上部ブーム16Eから下部ブーム16Aまで牽引される。この際、リービングロープLWはブーム16の上面部上を移動する。下部ブーム16A、更に上部旋回体12の先端部まで牽引されたリービングロープLWの先端部は、主巻ウインチ18から引き出された主巻ロープMWの先端部に接続される。そして、主巻ウインチ18が主巻ロープMWを繰り出しながら、リービングウインチ50がリービングロープLWを巻き取ると、リービングロープLWによって主巻ロープMWが下部ブーム16Aから上部ブーム16Eまで案内された後、シーブブロック361と第2ブームシーブ162との間に掛け渡される。その後、主巻ロープMWの先端部は、リービングロープLWの先端部から脱離され上部ブーム16Eに固定される。また、リービングロープLWはリービングウインチ50によって最後まで巻き取られる。この結果、重量物からなる主巻ロープMWの主巻ウインチ18から第2ブームシーブ162およびシーブブロック361までのワイヤリング作業が実現される。 In the wiring work of the main hoisting rope MW using the reeving winch 50, first, the tip of the reeving rope LW let out downward from the reeving winch 50 passes through a position lower than the boom 16 and is towed from the lower boom 16A to the upper boom 16E. be done. After that, when the reeving rope LW is stretched between the sheave block 361 and the second boom sheave 162 a plurality of times around the upper boom 16E, the tip of the reeving rope LW passes through the first boom sheave 161 and reaches the upper boom. Towed from 16E to lower boom 16A. At this time, the reeving rope LW moves on the upper surface of the boom 16 . The lower boom 16A and the leading end of the reeving rope LW pulled to the leading end of the upper rotating body 12 are connected to the leading end of the main hoisting rope MW pulled out from the main hoisting winch 18 . While the main hoisting winch 18 feeds out the main hoisting rope MW, the reeving winch 50 winds up the reeving rope LW. It is spanned between the block 361 and the second boom sheave 162 . After that, the tip of the main hoisting rope MW is detached from the tip of the reeving rope LW and fixed to the upper boom 16E. Also, the reeving rope LW is wound up by the reeving winch 50 to the end. As a result, wiring work from the main hoisting winch 18 of the main hoisting rope MW made of a heavy load to the second boom sheave 162 and the sheave block 361 is realized.

従来、上記のようなワイヤリング作業では、リービングウインチ50から引き出されたリービングロープLWを作業者が下部ブーム16Aから上部ブーム16Eに至るまで地上を移動しながら牽引するとともに、シーブブロック361と第2ブームシーブ162との間に掛け渡されたリービングロープLWの先端部を、作業者がブーム16上を移動しながら上部ブーム16Eから下部ブーム16Aまで牽引していた。本実施形態では、このような作業者の重作業を低減するために、作業装置90がリービングロープLWの牽引作業を実行する。 Conventionally, in the wiring work as described above, a worker pulls the reeving rope LW pulled out from the reeving winch 50 from the lower boom 16A to the upper boom 16E while moving on the ground, and the sheave block 361 and the second boom sheave are pulled. 162, while moving on the boom 16, the worker pulled the tip of the reeving rope LW from the upper boom 16E to the lower boom 16A. In the present embodiment, the work device 90 performs the pulling work of the reeving rope LW in order to reduce such heavy work of the worker.

図2は、本実施形態に係るクレーン1において主巻ロープMWのワイヤリング作業が行われている様子を示す平面図である。本実施形態では、リービングウインチ50から繰り出されたリービングロープLWの先端部が作業装置90に接続され、たとえばブーム16の左側において作業装置90が下部ブーム16Aから上部ブーム16Eまで地上を走行する(図2の矢印D1)。その後、リービングロープLWの先端部が作業装置90から取り外されると、リービングロープLWがシーブブロック361と第2ブームシーブ162との間で掛け渡される(図1)。この間、作業装置90は、ブーム16の先端部の右側に移動している(図2の矢印D2)。そして、リービングロープLWの先端部がシーブブロック361(図1)を経由して再び作業装置90に接続され、リービングロープLWがブーム16の上方を移動するように、作業装置90が上部ブーム16Eから下部ブーム16Aまで地上を走行する。その後、リービングロープLWの先端部と主巻ウインチ18から引き出された主巻ロープMWの先端部とが互いに接続された後、リービングウインチ50がリービングロープLWを巻き取る。この結果、主巻ロープMWが主巻ウインチ18からシーブブロック361および第2ブームシーブ162に案内され両シーブ間に掛け渡される。以下では、このようなワイヤリング方法を実施するためのクレーン1および作業装置90の構造について説明する。 FIG. 2 is a plan view showing how the main hoist rope MW is being wired in the crane 1 according to the present embodiment. In this embodiment, the tip of the reeving rope LW let out from the reeving winch 50 is connected to the working device 90, and the working device 90 travels on the ground from the lower boom 16A to the upper boom 16E on the left side of the boom 16, for example (Fig. 2 arrow D1). Thereafter, when the tip of the reeving rope LW is removed from the work device 90, the reeving rope LW is stretched between the sheave block 361 and the second boom sheave 162 (FIG. 1). During this time, the work device 90 is moving to the right of the tip of the boom 16 (arrow D2 in FIG. 2). Then, the tip of the reeving rope LW is connected to the working device 90 again via the sheave block 361 (FIG. 1), and the working device 90 is moved from the upper boom 16E so that the reeving rope LW moves above the boom 16. Travel on the ground to the lower boom 16A. Thereafter, after the tip of the reeving rope LW and the tip of the main hoisting rope MW drawn out from the main hoisting winch 18 are connected to each other, the reeving winch 50 winds up the reeving rope LW. As a result, the main hoisting rope MW is guided from the main hoisting winch 18 to the sheave block 361 and the second boom sheave 162 and stretched between both sheaves. The structures of the crane 1 and the working device 90 for carrying out such a wiring method will be described below.

図3乃至図5は、クレーン1において主巻ロープMWのワイヤリング作業が行われている様子を示す拡大側面図である。図6は、クレーン1の主巻ロープMWのワイヤリング作業において、作業装置90(補助作業装置)にリービングロープLWが接続された様子を示す背面図である。なお、図6において、カーボディ910、クローラユニット911およびクローラ912などの一部の部材は、その断面が描かれている。図7および図8は、クレーン1の主巻ロープMWのワイヤリング作業において、クレーン1のブーム16に備えられたリービングウインチ50からリービングロープLWが引き出された様子を示す平面図および側面図である。図9は、クレーン1の主巻ロープMWのワイヤリング作業において、クレーン1のブーム16に備えられたガイドシーブの配置を示す正面図である。 FIGS. 3 to 5 are enlarged side views showing how the main hoist rope MW is being wired in the crane 1. FIG. FIG. 6 is a rear view showing how the reeving rope LW is connected to the work device 90 (auxiliary work device) in the wiring work of the main hoist rope MW of the crane 1. FIG. In addition, in FIG. 6, the cross section of some members, such as the car body 910, the crawler unit 911, and the crawler 912, is drawn. 7 and 8 are a plan view and a side view showing how the reeving rope LW is pulled out from the reeving winch 50 provided on the boom 16 of the crane 1 during the wiring work of the main hoist rope MW of the crane 1. FIG. FIG. 9 is a front view showing the arrangement of guide sheaves provided on the boom 16 of the crane 1 in the wiring work of the main hoist rope MW of the crane 1. FIG.

図3を参照して、本実施形態において主巻ロープMWのワイヤリング作業に使用される作業装置90は、油圧ショベルからなる。作業装置90は、下部走行体91と、上部旋回体92と、キャブ93と、作業アタッチメント94と、往路ワイヤー接続部95(第1接続部)と、を有する。 Referring to FIG. 3, a working device 90 used for wiring the main hoisting rope MW in this embodiment is a hydraulic excavator. The working device 90 has a lower travel body 91, an upper revolving body 92, a cab 93, a work attachment 94, and a forward wire connection portion 95 (first connection portion).

下部走行体91は、地上を走行することが可能である。図6を参照して、下部走行体91は、カーボディ910と、左右一対のクローラユニット911と、左右一対のクローラ912と、を有する。なお、図6では、右側のクローラユニット911およびクローラ912のみが図示されている。 The lower running body 91 can run on the ground. Referring to FIG. 6 , the lower traveling body 91 has a car body 910 , a pair of left and right crawler units 911 , and a pair of left and right crawlers 912 . In addition, in FIG. 6, only the crawler unit 911 and the crawler 912 on the right side are illustrated.

上部旋回体92(図3)は、下部走行体91上において上下方向に延びる回転中心軸回りに旋回可能なように下部走行体91に支持されている。キャブ93は、上部旋回体92の左側前端部に配置されており、作業装置90を操作する作業者が内部に搭乗することを許容する。作業アタッチメント94は、上部旋回体92のうちキャブ93の右方において起伏可能に支持されている。また、作業アタッチメント94は、上部旋回体92とともに上下方向に延びる回転中心軸回りに旋回することも可能である(図3、図5参照)。なお、キャブ93および作業アタッチメント94の配置は、上記の態様に限定されるものではなく、両者の左右が入れ替わった態様でもよい。 The upper revolving body 92 (FIG. 3) is supported by the lower traveling body 91 so as to be able to revolve around a central axis of rotation extending vertically on the lower traveling body 91 . The cab 93 is arranged at the left front end portion of the upper revolving body 92 and allows a worker who operates the work device 90 to get on inside. The work attachment 94 is supported on the right side of the cab 93 in the upper revolving body 92 so as to be able to rise and fall. In addition, the work attachment 94 can also rotate around the rotation center axis extending in the vertical direction together with the upper rotating body 92 (see FIGS. 3 and 5). Note that the arrangement of the cab 93 and the work attachment 94 is not limited to the above mode, and the left and right of both may be reversed.

作業アタッチメント94は、ブームと、ブームの先端部に水平な回転中心軸回りに回動可能に支持されたアームと、アームの先端部に水平な回転中心軸回りに回動可能に支持されたバケットと、を含む。 The work attachment 94 includes a boom, an arm rotatably supported at the tip of the boom about a horizontal central axis of rotation, and a bucket supported at the tip of the arm rotatably about the central axis of horizontal rotation. and including.

往路ワイヤー接続部95は、前記水平姿勢とされたブーム16の下面部(図4)よりも下方に配置されリービングロープLWの先端部と接続されることが可能とされている。なお、他の実施形態において、往路ワイヤー接続部95は、前記水平姿勢とされたブーム16の下面部(図4)と略同じ高さに配置されてもよい。図6を参照して、往路ワイヤー接続部95は、ブラケット951と、フック952と、を有する。ブラケット951は、作業装置90の右側のクローラユニット911の側面から右方向に向かって突設されており、ブラケット951の先端部は下方に屈曲されている。フック952は、ブラケット951の先端部に固定されている。フック952は、図6に示すようにリービングロープLWの先端部を把持(固定)することができる。なお、ブラケット951の先端部は下方に屈曲される態様に限定されるものではなく、後方やブーム16側に屈曲されるものでもよい。 The outward wire connecting portion 95 is arranged below the lower surface portion ( FIG. 4 ) of the boom 16 in the horizontal position and can be connected to the tip portion of the reeving rope LW. In another embodiment, the outward wire connecting portion 95 may be arranged at substantially the same height as the lower surface portion (FIG. 4) of the boom 16 in the horizontal posture. Referring to FIG. 6 , forward wire connecting portion 95 has bracket 951 and hook 952 . The bracket 951 protrudes rightward from the side surface of the crawler unit 911 on the right side of the work device 90, and the tip of the bracket 951 is bent downward. Hook 952 is fixed to the tip of bracket 951 . The hook 952 can grip (fix) the tip of the reeving rope LW as shown in FIG. Note that the tip of the bracket 951 is not limited to being bent downward, and may be bent rearward or toward the boom 16 side.

また、作業アタッチメント94は、復路ワイヤー接続部94S(第2接続部)を有する(図5)。復路ワイヤー接続部94Sは、前記水平姿勢とされたブーム16の上面部(図5)よりも上方に配置されリービングロープLWの先端部と接続されることが可能とされている。復路ワイヤー接続部94Sは、作業アタッチメント94の前記バケットの側面に配置されている。作業アタッチメント94も、往路ワイヤー接続部95のフック952と同様の構造を有している。 The work attachment 94 also has a return wire connection portion 94S (second connection portion) (FIG. 5). The return wire connection portion 94S is arranged above the upper surface portion (FIG. 5) of the boom 16 in the horizontal posture and can be connected to the tip portion of the reeving rope LW. The return wire connection portion 94S is arranged on the side surface of the bucket of the work attachment 94 . The work attachment 94 also has the same structure as the hook 952 of the outward wire connection portion 95 .

一方、図7乃至図9を参照して、ブーム16の下部ブーム16Aは、前述のリービングウインチ50と、ガイドシーブ51(図8)と、第1ガイドシーブ52(ガイドシーブ装置)と、第2ガイドシーブ53を含むガイドシーブユニット53S(図10)(ガイドシーブ装置)とを有する。 On the other hand, referring to FIGS. 7 to 9, the lower boom 16A of the boom 16 includes the aforementioned reeving winch 50, guide sheave 51 (FIG. 8), first guide sheave 52 (guide sheave device), and second and a guide sheave unit 53S (FIG. 10) (guide sheave device) including the guide sheave 53. As shown in FIG.

リービングウインチ50は、下部ブーム16Aの基端部(ブーム16の回転中心軸)よりも前側(先端側)で下部ブーム16Aの左右のフレーム間を接続するように延びるシャフト50S(図7)に回転可能に支持されている。 The reeving winch 50 rotates on a shaft 50S (FIG. 7) extending to connect the left and right frames of the lower boom 16A on the front side (tip side) of the base end of the lower boom 16A (rotation center axis of the boom 16). supported as possible.

ガイドシーブ51(図8)は、下部ブーム16A(ブーム16)の下面部のうち前記リービングウインチ50よりも前方(上部ブーム16E側)かつ下部ブーム16Aの左右方向の中央部(下部ブーム16Aの左右両端部よりも内側の位置)に配置され、下部ブーム16Aに左右方向に延びる回転中心軸回りに回転可能に支持されている。 The guide sheave 51 (FIG. 8) is located forward of the reeving winch 50 (upper boom 16E side) in the lower surface of the lower boom 16A (boom 16) and in the center of the lower boom 16A in the left-right direction (right and left of the lower boom 16A). ), and is rotatably supported by the lower boom 16A about a rotation center axis extending in the left-right direction.

第1ガイドシーブ52は、下部ブーム16Aの下面部のうちリービングウインチ50およびガイドシーブ51よりも前方かつ下部ブーム16Aの左右方向の中央部(下部ブーム16Aの左右両端部よりも内側の位置)に配置され、上下方向に延びる回転中心軸回りに回転可能に支持されている。 The first guide sheave 52 is located forward of the reeving winch 50 and the guide sheave 51 on the lower surface of the lower boom 16A and at the center of the lower boom 16A in the left-right direction (inside the left and right ends of the lower boom 16A). It is arranged and rotatably supported around a rotation center axis extending in the vertical direction.

図10および図11は、本実施形態に係るクレーン1の主巻ロープMWのワイヤリング作業において使用されるガイドシーブユニット53Sの斜視図および背面図である。図12、図13は、ガイドシーブユニット53Sの拡大背面図である。 10 and 11 are a perspective view and a rear view of the guide sheave unit 53S used in the wiring work of the main hoist rope MW of the crane 1 according to this embodiment. 12 and 13 are enlarged rear views of the guide sheave unit 53S.

ガイドシーブユニット53Sは、下部ブーム16Aの先端部(図7の前端部)の下面部に固定されている。ガイドシーブユニット53Sは、第2ガイドシーブ53と、メインフレーム60と、ガイドプレート61と、支持ユニット62と、を有する(図10)。 The guide sheave unit 53S is fixed to the lower surface of the tip of the lower boom 16A (the front end in FIG. 7). The guide sheave unit 53S has a second guide sheave 53, a main frame 60, a guide plate 61, and a support unit 62 (Fig. 10).

第2ガイドシーブ53は、リービングウインチ50から繰り出されるリービングロープLWを支持することが可能な外周面を有する。 The second guide sheave 53 has an outer peripheral surface capable of supporting the reeving rope LW let out from the reeving winch 50 .

メインフレーム60、ガイドプレート61および支持ユニット62(シーブ支持部)は、第2ガイドシーブ53を第1ガイド位置および第2ガイド位置において回転可能に支持する。 The main frame 60, the guide plate 61 and the support unit 62 (sheave support) rotatably support the second guide sheave 53 at the first guide position and the second guide position.

メインフレーム60は、下部ブーム16Aの下面部において左右方向に沿って延びるメインパイプ16A1(図9)に固定されている。メインフレーム60は、底面部601と、メインパイプ16A1に固定される前面部602と、右側面部603と、左側面部604と、を有する。底面部601には、左右方向に沿って前後一対のガイド溝601Sが形成されている。ガイドプレート61は、底面部601の後端部から下方に延びるように配置されており、ガイド溝601Sに沿って左右方向に移動可能とされている。 The main frame 60 is fixed to a main pipe 16A1 (FIG. 9) extending in the left-right direction on the lower surface of the lower boom 16A. The main frame 60 has a bottom portion 601 , a front portion 602 fixed to the main pipe 16 A 1 , a right side portion 603 and a left side portion 604 . A pair of front and rear guide grooves 601S are formed in the bottom surface portion 601 along the left-right direction. The guide plate 61 is arranged to extend downward from the rear end portion of the bottom surface portion 601 and is movable in the left-right direction along the guide groove 601S.

支持ユニット62は、第2ガイドシーブ53を回転可能に支持するとともに、ガイドプレート61に2つの姿勢で着脱可能とされている。図13では、ガイドプレート61がガイド溝601Sの左端部に配置されるとともに、支持ユニット62が、P3、P4、P5の3箇所においてガイドプレート61にボルトで締結されている。この際の第2ガイドシーブ53の位置が第1ガイド位置と定義される。第2ガイドシーブ53が第1ガイド位置に配置されると、第2ガイドシーブ53は、下部ブーム16Aの下面部のうち第1ガイドシーブ52よりも上部ブーム16E側(前側)かつブーム16の左側(左側および右側のうち作業装置90が配置されている側)の端部に上下方向に延びる回転中心軸回りに回転可能に保持される。 The support unit 62 rotatably supports the second guide sheave 53 and is detachable from the guide plate 61 in two positions. In FIG. 13, the guide plate 61 is arranged at the left end of the guide groove 601S, and the support unit 62 is bolted to the guide plate 61 at three points P3, P4, and P5. The position of the second guide sheave 53 at this time is defined as the first guide position. When the second guide sheave 53 is arranged at the first guide position, the second guide sheave 53 is positioned closer to the upper boom 16E (front side) than the first guide sheave 52 in the lower surface of the lower boom 16A and to the left of the boom 16. (the side on which the working device 90 is arranged of the left side and the right side) is rotatably held around a rotation center axis extending in the vertical direction.

また、図12では、ガイドプレート61がガイド溝601Sの左端部に配置されるとともに、支持ユニット62が、P1、P2、P3の3箇所においてガイドプレート61にボルトで締結されている。この状態で、ガイドプレート61がガイド溝601Sの右端部に移動された状態の第2ガイドシーブ53の位置が第2ガイド位置と定義される。この際、第2ガイドシーブ53は下部ブーム16Aの左右方向の中央部(下部ブーム16Aの左右両端部よりも内側の位置)に配置される。第2ガイドシーブ53が第2ガイド位置に配置されると、第2ガイドシーブ53は下部ブーム16A(ブーム16)の下面部の左右方向の中央部において、左右方向に延びる回転中心軸回りに回転可能に保持される。このように、本実施形態では、第2ガイドシーブ53が左右方向に沿ってスライド移動することで、第1ガイド位置と第2ガイド位置との間で位置変更することが可能とされている。 In FIG. 12, the guide plate 61 is arranged at the left end of the guide groove 601S, and the support unit 62 is bolted to the guide plate 61 at three points P1, P2, and P3. In this state, the position of the second guide sheave 53 with the guide plate 61 moved to the right end of the guide groove 601S is defined as the second guide position. At this time, the second guide sheave 53 is arranged at the center portion in the left-right direction of the lower boom 16A (position inside the left and right end portions of the lower boom 16A). When the second guide sheave 53 is arranged at the second guide position, the second guide sheave 53 rotates about the center axis of rotation extending in the left-right direction at the center in the left-right direction of the lower surface of the lower boom 16A (boom 16). retained as possible. As described above, in the present embodiment, the second guide sheave 53 slides in the left-right direction so that the position can be changed between the first guide position and the second guide position.

<クレーンのロープワイヤリング方法>
図2乃至図13を参照して、本実施形態に係るクレーン1の主巻ロープMWのワイヤリング方法(ロープワイヤリング方法)について更に詳述する。本実施形態に係るワイヤリング方法は、ウインチ装着工程と、準備工程と、起伏体配置工程と、リービングロープ往路接続工程と、リービングロープ往路牽引工程と、リービングロープワイヤリング工程と、リービングロープ復路接続工程と、リービングロープ復路牽引工程と、ロープ接続工程と、メインロープワイヤリング工程と、を備える。
<Crane rope wiring method>
The wiring method (rope wiring method) of the main hoist rope MW of the crane 1 according to the present embodiment will be described in further detail with reference to FIGS. 2 to 13 . The wiring method according to the present embodiment includes a winch mounting process, a preparation process, an undulating body arrangement process, a reeving rope forward connecting process, a reeving rope forward pulling process, a reeving rope wiring process, and a reeving rope return connecting process. , a reeving rope homeward pulling step, a rope connecting step, and a main rope wiring step.

ウインチ装着工程では、作業者が、主巻ロープMWの巻き取りおよび繰り出しを可能とする主巻ウインチ18を上部旋回体12に装着するとともに、リービングロープLWの巻き取りおよび繰り出しを可能とするリービングウインチ50をブーム16の下部ブーム16Aに装着する。リービングウインチ50は、下部ブーム16Aの左右方向の両端部よりも内側であって、左右方向において前記両端部よりも第2ブームシーブ162に近い位置に配置される。この結果、リービングウインチ50と第2ブームシーブ162とを結ぶ直線が、ブーム16の長手方向(下部ブーム16Aと上部ブーム16Eとを結ぶ方向、前後方向)に沿って延びるため、後記のリービングウインチ50の巻き取り動作が安定して実行される。なお、主巻ウインチ18は、ブーム16の下部ブーム16Aに装着されてもよい。また、主巻ウインチ18およびリービングウインチ50は、主巻ロープMWのワイヤリング作業に先だってクレーン1に予め装着されているものでもよいし、クレーン1に予め固定されているものでもよい。 In the winch mounting step, an operator mounts a main hoisting winch 18 that enables winding and unwinding of the main hoisting rope MW to the upper rotating body 12, and a reeving winch that enables winding and unwinding of the reeving rope LW. 50 is attached to the lower boom 16A of the boom 16. The reeving winch 50 is arranged inside both lateral end portions of the lower boom 16A and closer to the second boom sheave 162 than the lateral end portions thereof in the lateral direction. As a result, the straight line connecting the reeving winch 50 and the second boom sheave 162 extends along the longitudinal direction of the boom 16 (the direction connecting the lower boom 16A and the upper boom 16E, the longitudinal direction). Winding operation is stably executed. Note that the main hoist winch 18 may be attached to the lower boom 16A of the boom 16 . Further, the main hoist winch 18 and the reeving winch 50 may be pre-mounted on the crane 1 prior to the wiring work of the main hoist rope MW, or may be pre-fixed to the crane 1 .

準備工程では、地上を走行可能な下部走行体91(走行部)と、水平姿勢とされたブーム16の下面部よりも下方に配置されリービングロープLWの先端部と接続されることが可能な往路ワイヤー接続部95と、水平姿勢とされたブーム16の上面部よりも上方に配置されリービングロープLWの先端部と接続されることが可能な復路ワイヤー接続部94Sと、を有する作業装置90が準備される。本実施形態では、図2、図3に示すように、作業装置90はブーム16の下部ブーム16Aまたは中間ブーム16Bの左方において地上に配置される。なお、ウインチ装着工程と準備工程の順番は特に限定されない。また、起伏体配置工程では、下部ブーム16Aを上部旋回体12に回動可能に連結することおよびブーム16を前記水平姿勢に配置することを含む。この際、ブーム16全体が上部旋回体12に連結されてもよく、下部ブーム16Aが上部旋回体12に連結された後、各ブーム部材が順に連結されてもよい。 In the preparation process, a lower traveling body 91 (traveling portion) capable of traveling on the ground is arranged below the lower surface portion of the boom 16 in a horizontal posture, and an outward path capable of being connected to the tip portion of the reeving rope LW. A work device 90 having a wire connection part 95 and a return wire connection part 94S that is arranged above the upper surface of the boom 16 in a horizontal posture and that can be connected to the tip part of the reeving rope LW is prepared. be done. In this embodiment, as shown in FIGS. 2 and 3, the working device 90 is arranged on the ground to the left of the lower boom 16A or middle boom 16B of the boom 16. As shown in FIGS. The order of the winch mounting process and the preparatory process is not particularly limited. In addition, the hoisting body placement step includes rotatably connecting the lower boom 16A to the upper revolving body 12 and placing the boom 16 in the horizontal posture. At this time, the entire boom 16 may be connected to the upper revolving body 12, or after the lower boom 16A is connected to the upper revolving body 12, each boom member may be connected in turn.

リービングロープ往路接続工程では、前記起伏体配置工程のうち少なくとも下部ブーム16Aが上部旋回体12に連結され水平姿勢とされた後に、リービングロープLWがリービングウインチ50から下部ブーム16Aの下方に繰り出される。そして、作業者が、作業装置90の往路ワイヤー接続部95にリービングロープLWの先端部を接続する。 In the reeving rope outgoing connection process, after at least the lower boom 16A is connected to the upper revolving body 12 in the hoisting body arrangement process and set in a horizontal posture, the reeving rope LW is let out from the reeving winch 50 below the lower boom 16A. Then, the operator connects the leading end of the reeving rope LW to the outward wire connecting portion 95 of the working device 90 .

なお、本実施形態では、図3に示すように、下部ブーム16Aが上部旋回体12に装着され、略水平姿勢とされる。一方、中間ブーム16Bは、下部ブーム16Aの前方において地上に配置された台座H上に載置される。 In this embodiment, as shown in FIG. 3, the lower boom 16A is attached to the upper revolving body 12 and is in a substantially horizontal posture. On the other hand, the intermediate boom 16B is mounted on a pedestal H arranged on the ground in front of the lower boom 16A.

リービングロープ往路牽引工程では、リービングウインチ50によってリービングロープLWを繰り出しながら、作業装置90の下部走行体91をブーム16の左側で下部ブーム16Aから水平姿勢において上部ブーム16Eが配置される位置に向かって地上を走行させることで、リービングロープLWの先端部を下部ブーム16Aから上部ブーム16Eまで牽引する。 In the forward pulling step of the reeving rope, while the reeving winch 50 is used to pay out the reeving rope LW, the lower traveling body 91 of the work device 90 is moved from the lower boom 16A on the left side of the boom 16 toward the position where the upper boom 16E is arranged in a horizontal posture. By traveling on the ground, the leading end of the reeving rope LW is towed from the lower boom 16A to the upper boom 16E.

なお、本実施形態では、図3に示される下部ブーム16Aが補助クレーンAC1によって吊り上げられ、中間ブーム16Bが補助クレーンAC2によって吊り上げられる。そして、下部ブーム16Aおよび中間ブーム16BのコネクタKがそれぞれ左右方向に延びる不図示の連結ピンによって互いに連結される。前記コネクタKには、連結ピンを受け入れるピン孔が開口されている。作業装置90は、リービングワイヤーLWを牽引しながら、ブーム16が組み立てられるに従って、徐々に前方に移動する。このため、下部ブーム16A、中間ブーム16B、16C、16Dおよび上部ブーム16Eが互いに連結される間、作業装置90は一時的に地上で停止し、ブーム16の長さに応じて走行する。なお、図4に示されるように、上部旋回体12に支持されたマスト14の先端部から延びるガイリンク32や不図示の吊りシリンダによってブーム16(下部ブーム16A、中間ブーム16B)が吊り上げられる態様でもよい。 In this embodiment, the lower boom 16A shown in FIG. 3 is lifted by the auxiliary crane AC1, and the intermediate boom 16B is lifted by the auxiliary crane AC2. The connectors K of the lower boom 16A and the intermediate boom 16B are connected to each other by connecting pins (not shown) extending in the left-right direction. The connector K has pin holes for receiving connecting pins. The working device 90 gradually moves forward while pulling the reeving wire LW as the boom 16 is assembled. Therefore, while the lower boom 16A, the intermediate booms 16B, 16C, 16D and the upper boom 16E are connected to each other, the working device 90 temporarily stops on the ground and travels according to the length of the boom 16. As shown in FIG. 4, the boom 16 (lower boom 16A, intermediate boom 16B) is lifted by guy links 32 extending from the tip of the mast 14 supported by the upper swing body 12 and lifting cylinders (not shown). It's okay.

次に、リービングロープワイヤリング工程において、作業者は作業装置90の往路ワイヤー接続部95からリービングロープLWの先端部を取り外し、上部ブーム16Eに配置された第2ブームシーブ162およびシーブブロック361(少なくとも一つのシーブ)にリービングロープLWを掛け渡す。この間、作業装置90は、上部ブーム16Eの右側の位置に移動する(図2の矢印D2)。なお、リービングワイヤーLWの繰り出し長さを確保し第2ブームシーブ162とシーブブロック361との間にリービングワイヤーLWを掛け回しやすくするために、作業装置90は上部ブーム16Eよりも更に前方まで走行してもよい。また、リービングロープLWは少なくとも一つのシーブに掛ける態様でもよい。 Next, in the reeving rope wiring process, the worker removes the leading end of the reeving rope LW from the outward wire connection portion 95 of the work device 90, and removes the second boom sheave 162 and the sheave block 361 (at least one of which are arranged on the upper boom 16E). Sheave) with the reeving rope LW. During this time, the working device 90 moves to the right side of the upper boom 16E (arrow D2 in FIG. 2). In order to ensure the length of the reeving wire LW to be paid out and to make it easier to hang the reeving wire LW between the second boom sheave 162 and the sheave block 361, the working device 90 travels further forward than the upper boom 16E. good too. Also, the reeving rope LW may be hung on at least one sheave.

次に、リービングロープ復路接続工程では、リービングロープLWが第2ブームシーブ162およびシーブブロック361に掛け渡された状態で、作業者がリービングロープLWの先端部を作業装置90の復路ワイヤー接続部94Sに接続する。この際、作業装置90の作業アタッチメント94が一時的に倒伏することで、リービングワイヤーLWの先端部を復路ワイヤー接続部94Sに容易に装着することができる。そして、リービングワイヤーLWの装着後、作業装置90の作業アタッチメント94(上部旋回体92)は、図5に示すように、下部走行体91に対して90度旋回した姿勢とされる。この結果、作業アタッチメント94の復路ワイヤー接続部94Sに装着されたリービングワイヤーLWの先端部が、ブーム16の上面部の直上に配置される。図5の状態から、作業装置90が下部ブーム16Aおよび上部旋回体12の近傍まで後方に移動する。 Next, in the reeving rope return connection step, while the reeving rope LW is stretched over the second boom sheave 162 and the sheave block 361, the operator connects the tip of the reeving rope LW to the return wire connection portion 94S of the work device 90. Connecting. At this time, the work attachment 94 of the work device 90 is temporarily laid down, so that the tip of the reeving wire LW can be easily attached to the return wire connection portion 94S. After the reeving wire LW is attached, the working attachment 94 (upper rotating body 92) of the working device 90 is turned 90 degrees with respect to the lower traveling body 91, as shown in FIG. As a result, the tip portion of the reeving wire LW attached to the return wire connection portion 94S of the work attachment 94 is arranged directly above the upper surface portion of the boom 16 . From the state of FIG. 5, the work device 90 moves rearward to the vicinity of the lower boom 16A and the upper swing body 12. As shown in FIG.

そして、ロープ接続工程では、上部旋回体12上の作業者が作業装置90の復路ワイヤー接続部94SからリービングロープLWの先端部を取り外し、主巻ウインチ18から引き出された主巻ロープMWの先端部にリービングロープLWの先端部を接続する。 In the rope connecting step, the operator on the upper revolving body 12 removes the tip of the reeving rope LW from the return wire connection 94S of the working device 90, and the tip of the main hoisting rope MW pulled out from the main hoisting winch 18 is removed. Connect the tip of the reeving rope LW to .

更に、メインロープワイヤリング工程では、主巻ウインチ18が主巻ロープMWを繰り出しながら、リービングウインチ50がリービングロープLWを巻き取ることで、主巻ロープMWがリービングロープLWによって下部ブーム16Aから上部ブーム16Eまで案内されのち第2ブームシーブ162およびシーブブロック361間に自動的に掛け渡される。その後、リービングワイヤーLWの先端部と主巻ロープMWの先端部とが分離され、主巻ロープMWの先端部は上部ブーム16Eの所定の箇所に固定される。一方、リービングワイヤーLWはリービングウインチ50によって最後まで巻き取られる。 Furthermore, in the main rope wiring process, the main hoisting winch 18 reels out the main hoisting rope MW, and the reeving winch 50 winds up the reeving rope LW. After being guided up to the second boom sheave 162 and the sheave block 361, it is automatically suspended. Thereafter, the tip of the reeving wire LW and the tip of the main hoisting rope MW are separated, and the tip of the main hoisting rope MW is fixed to a predetermined location on the upper boom 16E. On the other hand, the reeving wire LW is wound up by the reeving winch 50 to the end.

以上のように、本実施形態では、作業装置90の往路ワイヤー接続部95または復路ワイヤー接続部94SにリービングロープLWを連結して下部走行体91を走行させることで、リービングウインチ50から繰り出されたリービングロープLWを下部ブーム16Aから上部ブーム16Eまで牽引する作業、および少なくとも一つのシーブに掛けられたリービングロープLWを上部ブーム16Eから下部ブーム16Aまで牽引する作業を、作業者に代わって行うことができる。このため、主巻ウインチ18から引き出された主巻ロープMWを上部ブーム16Eの少なくとも一つのシーブに掛けるロープのワイヤリング作業における作業者の負担を低減することが可能となる。また、作業装置90の下部走行体91はブーム16の左方または右方において地上を走行するため、ブーム16が地上に載置されていても作業装置90の走行によって主巻ロープMWのワイヤリング作業を効率的に行うことができる。 As described above, in the present embodiment, the reeving rope LW is connected to the outgoing wire connection portion 95 or the return wire connection portion 94S of the work device 90 and the lower traveling body 91 is caused to travel, whereby the rope is let out from the reeving winch 50. The work of towing the reeving rope LW from the lower boom 16A to the upper boom 16E and the work of towing the reeving rope LW hung on at least one sheave from the upper boom 16E to the lower boom 16A can be performed on behalf of the operator. can. Therefore, it is possible to reduce the burden on the operator in the rope wiring work of hooking the main hoisting rope MW pulled out from the main hoisting winch 18 to at least one sheave of the upper boom 16E. In addition, since the lower traveling body 91 of the working device 90 travels on the ground on the left or right side of the boom 16, the wiring work of the main hoisting rope MW can be performed by the traveling of the working device 90 even when the boom 16 is placed on the ground. can be done efficiently.

また、本実施形態では、前記ウインチ装着工程が、下部ブーム16Aのうち当該下部ブーム16Aの左右方向の両端部よりも内側の位置であって左右方向において前記両端部よりも第2ブームシーブ162に近い位置に、前記ウインチドラムが左右方向に延びる回転中心軸回りに回転可能となるように前記リービングウインチ50を装着することを含む。また、前記リービングロープ往路接続工程では、リービングウインチ50からリービングロープLWが下部ブーム16Aの下方に繰り出され、下部ブーム16Aの下面部のうち前記リービングウインチ50よりも上部ブーム16E側かつ下部ブーム16Aの前記両端部よりも左右方向の内側(望ましくは下部ブーム16Aの左右方向の中央部)に配置され上下方向に延びる回転中心軸回りに回転可能な第1ガイドシーブ52にリービングロープLWが掛けられたのち、ブーム16の左側かつブーム16の左右方向の外側にリービングロープLWが引き出される。そして、作業者によって作業装置90の往路ワイヤー接続部95にリービングロープLWの先端部が接続される。更に、前記リービングロープ往路牽引工程は、リービングウインチ50から繰り出され第1ガイドシーブ52を経由したリービングロープLWを作業装置90が下部ブーム16Aから上部ブーム16Eまで牽引することを含む。 Further, in the present embodiment, the winch mounting step is performed at a position inside the lower boom 16A with respect to both lateral ends of the lower boom 16A and closer to the second boom sheave 162 than the lateral ends of the lower boom 16A. and mounting the reeving winch 50 such that the winch drum is rotatable about a center axis of rotation extending in the left-right direction. Further, in the reeving rope forward connecting step, the reeving rope LW is let out from the reeving winch 50 to the lower side of the lower boom 16A, and the lower boom 16A is positioned closer to the upper boom 16E than the reeving winch 50 in the lower surface of the lower boom 16A. A reeving rope LW is hung on a first guide sheave 52 that is arranged inside in the left-right direction from the both ends (preferably at the center in the left-right direction of the lower boom 16A) and that is rotatable about the central axis of rotation that extends in the vertical direction. After that, the reeving rope LW is pulled out to the left side of the boom 16 and to the outside of the boom 16 in the left-right direction. Then, the tip of the reeving rope LW is connected to the outward wire connection portion 95 of the working device 90 by the operator. Further, the reeving rope forward pulling process includes the working device 90 pulling the reeving rope LW that has been let out from the reeving winch 50 and passed through the first guide sheave 52 from the lower boom 16A to the upper boom 16E.

このような工程によれば、左右方向に延びる回転中心軸回りに回転するリービングウインチ50から繰り出されたリービングロープLWを、上下方向に延びる回転中心軸回りに回転可能な第1ガイドシーブ52によって、ブーム16の左右方向の外側に引き出すことができる。このため、リービングウインチ50の繰り出し動作を安定して維持しながら、ブーム16の左側において作業装置90にリービングロープLWを容易に接続することが可能となり、作業装置90がリービングワイヤーLWを下部ブーム16Aから上部ブーム16Eまで安定して牽引することができる。なお、リービングウインチ50が左右方向に沿って延びる回転中心軸回りに回転する場合、リービングウインチ50からリービングワイヤーLWが繰り出される位置は、リービングウインチ50のウインチドラム上を左右方向に沿って移動するものの上下方向に沿って移動しにくい。このため、ブーム16を上下から挟むように配設されるリービングワイヤーLWの張力は、リービングウインチ50の前記繰り出し位置が変化しても変動しにくい。一方、このようなリービングウインチ50では、前記ウインチドラムから前方(下部ブーム16Aから上部ブーム16Eに向かう方向)にリービングワイヤーLWが繰り出される必要がある。本実施形態では、当該リービングウインチ50によるリービングワイヤーLWの繰り出し方向を維持しつつ、第1ガイドシーブ52によってリービングワイヤーLWをブーム16の左右外側に引き出すことができる。この結果、上記のようにリービングウインチ50の繰り出し動作が安定して維持される。 According to such a process, the reeving rope LW let out from the reeving winch 50 rotating around the rotation center axis extending in the horizontal direction is moved by the first guide sheave 52 rotatable around the rotation center axis extending in the vertical direction. It can be pulled out to the outside of the boom 16 in the left-right direction. Therefore, it is possible to easily connect the reeving rope LW to the working device 90 on the left side of the boom 16 while maintaining the unreeling operation of the reeving winch 50 stably. to the upper boom 16E. Note that when the reeving winch 50 rotates around the central axis of rotation extending in the left-right direction, the position at which the reeving wire LW is let out from the reeving winch 50 moves along the winch drum of the reeving winch 50 along the left-right direction. Difficult to move vertically. Therefore, the tension of the reeving wire LW arranged to sandwich the boom 16 from above and below is less likely to fluctuate even if the reeling-out position of the reeving winch 50 changes. On the other hand, in such a reeving winch 50, the reeving wire LW needs to be let out forward (in the direction from the lower boom 16A to the upper boom 16E) from the winch drum. In this embodiment, the reeving wire LW can be pulled out to the left and right outside of the boom 16 by the first guide sheave 52 while maintaining the direction in which the reeving wire LW is let out by the reeving winch 50 . As a result, the extension operation of the reeving winch 50 is stably maintained as described above.

また、本実施形態では、前記リービングロープ往路接続工程において、リービングロープLWがリービングウインチ50から下部ブーム16Aの下方に繰り出されガイドシーブ51および第1ガイドシーブ52に掛けられる。更に、下部ブーム16Aの下面部のうち第1ガイドシーブ52よりも上部ブーム16E側かつブーム16の左側端部(第1の位置)に上下方向に延びる回転中心軸回りに回転可能に配置された第2ガイドシーブ53にリービングロープLWが掛けられたのち、地上においてブーム16の左側に配置された作業装置90の往路ワイヤー接続部95にリービングロープLWの先端部が接続される。更に、前記リービングロープ往路牽引工程では、リービングウインチ50から繰り出されガイドシーブ51、第1ガイドシーブ52および第2ガイドシーブ53を経由したリービングロープLWが作業装置90によって下部ブーム16Aから上部ブーム16Eまで牽引される。 In the present embodiment, the reeving rope LW is let out from the reeving winch 50 below the lower boom 16A and is hung on the guide sheave 51 and the first guide sheave 52 in the reeving rope outgoing connection process. In addition, on the lower surface of the lower boom 16A, on the upper boom 16E side of the first guide sheave 52 and on the left side end (first position) of the boom 16, it is arranged rotatably around the rotation center axis extending in the vertical direction. After the reeving rope LW is hung on the second guide sheave 53, the leading end of the reeving rope LW is connected to the outward wire connection portion 95 of the working device 90 arranged on the left side of the boom 16 on the ground. Further, in the reeving rope outward pulling process, the reeving rope LW that is let out from the reeving winch 50 and passes through the guide sheave 51, the first guide sheave 52 and the second guide sheave 53 is moved from the lower boom 16A to the upper boom 16E by the working device 90. towed.

このような工程によれば、第1ガイドシーブ52を経由してブーム16の左右方向の外側に引き出されたリービングロープLWの方向を、第2ガイドシーブ53によって上部ブーム16Eに向かって変更することができる。このため、第1ガイドシーブ52と第2ガイドシーブ53との間でリービングロープLWの配設経路が安定して維持されるため、ブーム16の直下においてリービングロープLWの繰り出し経路が前方に移動することを抑止しつつ、リービングワイヤーLWがブーム16の下面部に配置される部材と干渉することが抑止される。この結果、リービングウインチ50の繰り出し動作を安定して維持するとともに、ブーム16の左側において作業装置90がリービングロープLWを下部ブーム16Aから上部ブーム16Eまで安定して牽引することができる。 According to such a process, the direction of the reeving rope LW drawn outward in the lateral direction of the boom 16 via the first guide sheave 52 is changed by the second guide sheave 53 toward the upper boom 16E. can be done. Therefore, since the arrangement route of the reeving rope LW is stably maintained between the first guide sheave 52 and the second guide sheave 53, the payout route of the reeving rope LW moves forward directly under the boom 16. While preventing this, the reeving wire LW is prevented from interfering with members arranged on the lower surface of the boom 16 . As a result, the reeving winch 50 can be stably extended, and the work device 90 can stably pull the reeving rope LW from the lower boom 16A to the upper boom 16E on the left side of the boom 16.

また、本実施形態では、前記メインロープワイヤリング工程において、作業者は、前記第2ガイドシーブ53の位置を前記リービングロープ往路接続工程において第2ガイドシーブが配置された前記第1の位置から下部ブーム16Aの下面部のうち当該下部ブーム16Aの左右方向の両端部よりも内側(第2の位置、望ましくは下部ブーム16Aの左右方向の中央部)に変更し、かつ、前記第2ガイドシーブ53の回転中心軸の方向を左右方向から上下方向に変更する。換言すれば、作業者は、下部ブーム16Aの下面部の左側端部に配置された第2ガイドシーブ53を、ガイド溝601Sに沿って下部ブーム16Aの下面部の左右方向の中央部に移動させ、左右方向に延びる回転中心軸回りに回転可能なように第2ガイドシーブ53をブーム16に装着する。そして、前記メインロープワイヤリング工程では、第2ブームシーブ162およびシーブブロック361とリービングウインチ50との間で、リービングロープLWを第1ガイドシーブ52および第2ガイドシーブ53によって支持する。この結果、リービングウインチ50の巻き取り力によって第2ブームシーブ162およびシーブブロック361を経由したリービングロープLWが第2ガイドシーブ53によって第1ガイドシーブ52に向かって案内される。 In this embodiment, in the main rope wiring process, the operator moves the position of the second guide sheave 53 from the first position where the second guide sheave is arranged in the outward connecting process of the reeving rope to the lower boom. 16A of the bottom surface of the lower boom 16A inside (second position, preferably the center of the lower boom 16A in the left-right direction), and the second guide sheave 53 Change the direction of the center axis of rotation from the horizontal direction to the vertical direction. In other words, the operator moves the second guide sheave 53 arranged at the left end of the lower surface of the lower boom 16A to the center of the lower surface of the lower boom 16A in the left-right direction along the guide groove 601S. , the second guide sheave 53 is mounted on the boom 16 so as to be rotatable about a central axis of rotation extending in the left-right direction. In the main rope wiring step, the reeving rope LW is supported by the first guide sheave 52 and the second guide sheave 53 between the second boom sheave 162 and sheave block 361 and the reeving winch 50 . As a result, the reeving rope LW that has passed through the second boom sheave 162 and the sheave block 361 is guided toward the first guide sheave 52 by the second guide sheave 53 due to the winding force of the reeving winch 50 .

このような工程によれば、リービングロープ往路接続工程においてリービングロープLWをブーム16の左右方向の外側に案内するための第2ガイドシーブ53を、メインロープワイヤリング工程ではリービングロープLWを第1ガイドシーブ52に向かって案内するシーブとして使用することができる。この際、第1ガイドシーブ52および第2ガイドシーブ53がいずれもブーム16の左右方向の中央部付近に左右方向に延びる回転中心軸回りに回転可能に配置されているため、平面視でリービングロープLWを直線的に案内することが可能となり、リービングロープLWに係る負荷を低減することができるとともに、第2ブームシーブ162への負荷も低減できる。より詳しくは、リービングウインチ50でリービングロープLWを巻き取る際に、リービングロープLWが各シーブで横に離されていると、ロープテンションが掛かっているため、シーブ抵抗が高まり巻取り負荷が増大する。更に、リービングロープLWはブーム16の先端部に配置された第2ブームシーブ162を経由しているため、当該第2ブームシーブ162には斜めにリービングロープLWが掛かり、同様に負荷が掛かる。一方、上記の態様では、このような第2ブームシーブ162への負荷を低減することができる。 According to such a process, the second guide sheave 53 for guiding the reeving rope LW to the outside of the boom 16 in the left-right direction in the reeving rope outward connection process, and the reeving rope LW as the first guide sheave in the main rope wiring process. It can be used as a sheave guiding towards 52. At this time, both the first guide sheave 52 and the second guide sheave 53 are arranged near the center of the boom 16 in the left-right direction so as to be rotatable about the central axis of rotation extending in the left-right direction. The LW can be guided linearly, the load on the reeving rope LW can be reduced, and the load on the second boom sheave 162 can also be reduced. More specifically, when the reeving rope LW is wound by the reeving winch 50, if the reeving rope LW is laterally separated from each sheave, the rope tension is applied, so that the sheave resistance increases and the winding load increases. . Furthermore, since the reeving rope LW passes through the second boom sheave 162 arranged at the tip of the boom 16, the reeving rope LW is diagonally applied to the second boom sheave 162, and the load is similarly applied. On the other hand, in the above aspect, such a load on the second boom sheave 162 can be reduced.

また、本実施形態では、起伏体として、下部ブーム16Aと上部ブーム16Eとの間に少なくとも一つの中間ブームを備え、下部ブーム16A、前記少なくとも一つの中間ブームおよび上部ブーム16Eが互いに接続されることでブーム16が構成されるものが準備される。そして、前記起伏体配置工程は、下部ブーム16Aが上部旋回体12に回動可能に連結された後、下部ブーム16Aの先端側に前記少なくとも一つの中間ブームおよび上部ブーム16Eを順に接続することで、ブーム16が前記水平姿勢に配置される。また、ブーム16の長さに応じて作業装置90の下部走行体91をブーム16の左側において下部ブーム16Aから上部ブーム16Eに向かって地上を走行させるように、前記起伏体配置工程と前記リービングロープ往路牽引工程とが並行して行われる。 In addition, in this embodiment, at least one intermediate boom is provided between the lower boom 16A and the upper boom 16E as the hoisting body, and the lower boom 16A, the at least one intermediate boom and the upper boom 16E are connected to each other. , the boom 16 is prepared. In the hoisting body placement step, after the lower boom 16A is rotatably connected to the upper revolving body 12, the at least one middle boom and the upper boom 16E are connected in order to the tip side of the lower boom 16A. , the boom 16 is arranged in the horizontal position. In addition, according to the length of the boom 16, the lower traveling body 91 of the work device 90 travels on the ground from the lower boom 16A to the upper boom 16E on the left side of the boom 16, and the reeving rope is arranged. The outbound towing process is performed in parallel.

このような工程によれば、ブーム16を組み立てる作業と並行してリービングロープ往路牽引工程を行うことができる。 According to such a process, the reeving rope forward pulling process can be performed in parallel with the work of assembling the boom 16 .

また、本実施形態では、前記リービングロープ往路牽引工程において下部走行体91がをブーム16の左側および右側のうちの一方で地上を走行し、前記リービングロープ復路牽引工程において下部走行体91がブーム16の左側および右側のうちの他方で地上を走行する。 Further, in the present embodiment, the lower traveling body 91 travels on either the left or right side of the boom 16 in the reeving rope outward towing process, and the lower traveling body 91 travels on the boom 16 in the reeving rope homeward towing process. drive on the ground on the other of the left and right sides of the

このような工程によれば、作業装置90が往路において地上に引き回したリービングロープLWを復路において作業装置90が踏むことが防止される。このため、リービングロープLWが絡まることや損傷することが抑止される。 According to such a process, the working device 90 is prevented from stepping on the reeving rope LW that the working device 90 pulled on the ground in the outward trip. Therefore, the reeving rope LW is prevented from being entangled or damaged.

また、本実施形態では、クレーン1が第1ガイドシーブ52およびガイドシーブユニット53S(いずれもガイドシーブ装置)を備える。第1ガイドシーブ52およびガイドシーブユニット53Sは、上部旋回体12と、上部旋回体12に起伏可能に装着される下部ブーム16Aとその反対の上部ブーム16Eとを含み上部旋回体12から水平方向に沿って延びる水平姿勢を取ることが可能なブーム16と、下部ブーム16Aまたは上部旋回体12に装着され主巻ロープMWの巻き取りおよび繰り出しを行うことが可能な主巻ウインチ18と、下部ブーム16Aに左右方向に延びる回転中心軸回りに回転可能に支持されリービングロープLWの巻き取りおよび繰り出しを行うことが可能なリービングウインチ50と、を有するクレーン1のロープワイヤリングを補助する機能を有する。 Further, in this embodiment, the crane 1 includes the first guide sheave 52 and the guide sheave unit 53S (both of which are guide sheave devices). The first guide sheave 52 and the guide sheave unit 53S include an upper swing structure 12, and a lower boom 16A and an opposite upper boom 16E mounted on the upper swing structure 12 so as to be able to rise and fall, and extend horizontally from the upper swing structure 12. a boom 16 that can take a horizontal posture extending along the main hoisting winch 18 that is attached to the lower boom 16A or the upper revolving body 12 and capable of winding and unwinding the main hoisting rope MW; and the lower boom 16A. and a reeving winch 50 that is rotatably supported around a central axis of rotation extending in the left-right direction and capable of winding and unreeling the reeving rope LW.

第1ガイドシーブ52は、前記水平姿勢とされた下部ブーム16Aの下面部のうちリービングウインチ50よりも上部ブーム16E側かつ下部ブーム16Aの左右方向の両端部よりも内側の位置に上下方向に延びる回転中心軸回りに回転可能に装着され、リービングウインチ50から上部ブーム16Eに向かって繰り出されるリービングロープLWの方向をブーム16の左右方向の外側に向かって変更するようにリービングロープLWを支持しながら、当該リービングロープLWの進行を許容するように回転する。 The first guide sheave 52 extends vertically to a position on the lower surface of the horizontally positioned lower boom 16A on the upper boom 16E side of the reeving winch 50 and on the inner side of both lateral ends of the lower boom 16A. While supporting the reeving rope LW so as to change the direction of the reeving rope LW that is rotatably mounted around the rotation center axis and let out from the reeving winch 50 toward the upper boom 16E toward the outside in the lateral direction of the boom 16. , to allow the reeving rope LW to advance.

ガイドシーブユニット53Sは、第2ガイドシーブ53と、メインフレーム60と、ガイドプレート61と、支持ユニット62(シーブ支持部)と、有する。第2ガイドシーブ53は、リービングウインチ50から繰り出され第1ガイドシーブ52を経由したリービングロープLWを支持することが可能な外周面を有する。また、支持ユニット62は、メインフレーム60およびガイドプレート61を介してブーム16に装着される。支持ユニット62は、第2ガイドシーブ53を支持する第1支持状態と当該第1支持状態とは異なる状態で前記第2ガイドシーブ53を支持する第2支持状態との間で切換可能である。前記第1支持状態では、第2ガイドシーブ53が、リービングウインチ50から繰り出され第1ガイドシーブ52を経由したリービングロープLWの方向をブーム16の左右方向の外側で上部ブーム16Eに向かって変更することが可能なように、前記水平姿勢とされた下部ブーム16Aのうちの第1ガイドシーブ52よりも上部ブーム16E側の位置であってかつ下部ブーム16Aの下面部の左側端部または右側端部の位置において第2ガイドシーブ53が上下方向に沿って延びる回転中心軸回りに回転可能となるように、支持ユニット62が第2ガイドシーブ53を支持する。 The guide sheave unit 53S has a second guide sheave 53, a main frame 60, a guide plate 61, and a support unit 62 (sheave support section). The second guide sheave 53 has an outer peripheral surface capable of supporting the reeving rope LW that is let out from the reeving winch 50 and passes through the first guide sheave 52 . Also, the support unit 62 is attached to the boom 16 via the main frame 60 and the guide plate 61 . The support unit 62 is switchable between a first support state in which the second guide sheave 53 is supported and a second support state in which the second guide sheave 53 is supported in a state different from the first support state. In the first supported state, the second guide sheave 53 changes the direction of the reeving rope LW that is let out from the reeving winch 50 and passes through the first guide sheave 52 toward the upper boom 16E outside the boom 16 in the lateral direction. The left end or the right end of the lower surface of the lower boom 16A is positioned closer to the upper boom 16E than the first guide sheave 52 of the lower boom 16A in the horizontal posture so that The support unit 62 supports the second guide sheave 53 so that the second guide sheave 53 is rotatable about the central axis of rotation extending in the vertical direction at the position of .

本構成によれば、クレーン1において主巻ロープMWのワイヤリング作業を行う際に、リービングウインチ50から上部ブーム16Eに向かって引き出されたリービングロープLWを第1ガイドシーブ52および第1支持状態とされた第2ガイドシーブ53に順に掛け渡すことができる。このため、リービングウインチ50の繰り出し動作を安定して維持しながら、リービングロープLWをブーム16の左右外側において上部ブーム16Eまで牽引することができる。また、ブーム16の直下においてリービングロープLWの繰り出し経路が前方に移動することを抑止し、リービングロープLWが他の部材と干渉することを抑止することができる。 According to this configuration, when wiring the main hoisting rope MW in the crane 1, the reeving rope LW pulled out from the reeving winch 50 toward the upper boom 16E is placed in the first guide sheave 52 and the first supported state. It can be successively hung over the second guide sheave 53 . Therefore, the reeving rope LW can be towed to the upper boom 16E on the left and right outer sides of the boom 16 while maintaining the unreeling operation of the reeving winch 50 stably. In addition, it is possible to prevent the reeving rope LW from moving forward directly under the boom 16 and prevent the reeving rope LW from interfering with other members.

また、本実施形態では、前記第2支持状態では、第2ガイドシーブ53が上部ブーム16Eとリービングウインチ50との間で第1ガイドシーブ52とともにリービングロープLWを支持することが可能なように、前記水平姿勢とされた下部ブーム16Aのうちの第1ガイドシーブ52よりも上部ブーム16E側の位置であってかつ下部ブーム16Aの下面部の左右方向の両端部よりも内側の位置(望ましくは下部ブーム16Aの左右方向の中央部)において第2ガイドシーブ53が回転可能となるように、支持ユニット62が第2ガイドシーブ53を支持する。すなわち、第2ガイドシーブ53は、下部ブーム16Aの左右方向に端部の第1ガイド位置と下部ブーム16Aの左右方向の略中央部の第2ガイド位置とに選択的に装着される。 Further, in this embodiment, in the second support state, the second guide sheave 53 can support the reeving rope LW together with the first guide sheave 52 between the upper boom 16E and the reeving winch 50. A position (preferably, a lower The support unit 62 supports the second guide sheave 53 so that the second guide sheave 53 is rotatable at the center of the boom 16A in the left-right direction. That is, the second guide sheave 53 is selectively mounted at a first guide position at the end of the lower boom 16A in the left-right direction and a second guide position at a substantially center portion in the left-right direction of the lower boom 16A.

本構成によれば、主巻ウインチ18によって主巻ロープMWを繰り出しながらリービングウインチ50によってリービングロープLWを巻き取る際に、上部ブーム16Eから下部ブーム16Aのリービングウインチ50に向かうリービングロープLWを、第2支持状態とされた第2ガイドシーブ53および第1ガイドシーブ52によってブーム16の下面部に沿って導くことができる。このため、第2ガイドシーブ53が第1支持状態とされたままリービングロープLWがブーム16の側方を経由して巻き取られる場合と比較して、リービングロープLWをより大きな張力で巻き取ることが可能となる。 According to this configuration, when the main hoisting winch 18 pays out the main hoisting rope MW and the reeving winch 50 reels in the reeving rope LW, the reeving rope LW directed from the upper boom 16E to the reeving winch 50 of the lower boom 16A is set to the third position. It can be guided along the lower surface of the boom 16 by the second guide sheave 53 and the first guide sheave 52 which are in the two-supported state. Therefore, compared to the case where the reeving rope LW is wound up via the side of the boom 16 while the second guide sheave 53 is in the first supported state, the reeving rope LW can be wound with a greater tension. becomes possible.

また、本実施形態では、支持ユニット62は、前記第2支持状態では、第2ガイドシーブ53を左右方向に沿って延びる回転中心軸回りに回転可能となるように第2ガイドシーブ53を支持する。 In the present embodiment, the support unit 62 supports the second guide sheave 53 so as to be rotatable about the central axis of rotation extending in the left-right direction in the second support state. .

本構成によれば、リービングウインチ50によってリービングロープLWを巻き取る際に、第2ガイドシーブ53が上下方向に延びる回転中心軸回りに回転する場合と比較して、リービングロープLWをより大きな張力で巻き取ることができる。特に、リービングウインチ50がリービングワイヤーLWを巻き取る際には、ブーム16を上下から挟むように、リービングワイヤーLWおよび主巻ロープMWに張力が付与される。このため、第2ガイドシーブ53が左右方向に延びる回転中心軸回りに回転することで、上記の張力を安定して維持することができる。 According to this configuration, when the reeving rope LW is wound by the reeving winch 50, the reeving rope LW is applied with a greater tension than when the second guide sheave 53 rotates around the rotation center axis extending in the vertical direction. can be rolled up. In particular, when the reeving winch 50 winds the reeving wire LW, tension is applied to the reeving wire LW and the main hoisting rope MW so as to sandwich the boom 16 from above and below. Therefore, the tension can be stably maintained by rotating the second guide sheave 53 around the center axis of rotation extending in the left-right direction.

以上、本発明の各実施形態に係る作業機械のロープワイヤリング方法およびガイドシーブユニット53Sについて説明した。なお、本発明はこれらの形態に限定されるものではない。本発明は、以下のような変形実施形態が可能である。 The rope wiring method for the work machine and the guide sheave unit 53S according to each embodiment of the present invention have been described above. In addition, this invention is not limited to these forms. The present invention can be modified as follows.

(1)上記の実施形態では、作業機械として、クレーン1を用いて説明したが、本発明はこれに限定されるものではない。本発明に係る作業機械は、破砕機、掘削機などその他の態様からなるものでもよい。また、作業機械は、下部走行体10および上部旋回体12を有するものに限定されず、その他の機体を有するものでもよい。更に、起伏体はブーム16に限定されるものでなく、ジブ、マストなど他の起伏体であってもよい。 (1) In the above embodiment, the crane 1 was used as the working machine, but the present invention is not limited to this. The working machine according to the present invention may be of other forms, such as a crusher, an excavator, or the like. Further, the work machine is not limited to having the lower traveling body 10 and the upper revolving body 12, and may have other bodies. Furthermore, the undulating body is not limited to the boom 16, but may be other undulating bodies such as a jib and a mast.

(2)また、上記の実施形態では、図2に示すように、作業装置90がブーム16の左側を走行することで下部ブーム16Aから上部ブーム16Eに至り、作業装置90がブーム16の右側を走行することで上部ブーム16Eから下部ブーム16Aに至る態様にて説明したが、本発明はこれに限定されるものではない。作業装置90がブーム16の右側を走行することで下部ブーム16Aから上部ブーム16Eに至り、作業装置90がブーム16の左側を走行することで上部ブーム16Eから下部ブーム16Aに至る態様でもよい。 (2) In the above embodiment, as shown in FIG. 2, the work device 90 travels on the left side of the boom 16 to reach the upper boom 16E from the lower boom 16A, and the work device 90 moves on the right side of the boom 16. Although the embodiment has been described in which the robot moves from the upper boom 16E to the lower boom 16A, the present invention is not limited to this. The work device 90 may travel on the right side of the boom 16 to reach the upper boom 16E from the lower boom 16A, and travel on the left side of the boom 16 to reach the upper boom 16E to the lower boom 16A.

また、リービングロープ往路牽引工程および前記リービングロープ復路牽引工程において、作業装置90の下部走行体91がブーム16の左側および右側のうちの同じ側で地上を走行する態様でもよい。 Further, in the reeving-rope outward towing process and the reeving-rope homeward towing process, the lower traveling body 91 of the work device 90 may travel on the ground on the same side of the boom 16, either the left side or the right side.

このような工程によれば、作業装置90の走行路としてブーム16に対して左右一方のスペースを確保すればよいため、ブーム16の周辺のスペースを他の作業や部材置き場として有効利用することができる。 According to such a process, it is only necessary to secure a space on either the left or right side of the boom 16 as a travel path for the working device 90, so the space around the boom 16 can be effectively used for other work or for storing parts. can.

(3)また、上記の実施形態では、ブーム16の下部ブーム16A、中間ブーム16B、16C、16Dおよび上部ブーム16Eが順に接続されながら、作業装置90が下部ブーム16Aから上部ブーム16Eに向かって併走する態様にて説明したが、本発明はこれに限定されるものではない。 (3) In the above embodiment, the lower boom 16A, the intermediate booms 16B, 16C, 16D and the upper boom 16E of the boom 16 are connected in order, while the working device 90 travels from the lower boom 16A toward the upper boom 16E. However, the present invention is not limited to this.

すなわち、前記リービングロープ往路接続工程において、下部ブーム16Aおよび上部ブーム16Eを含むブーム16全体が予め上部旋回体12に装着され水平姿勢とされた状態で、リービングウインチ50からリービングロープLWが下部ブーム16Aの下方に繰り出され、作業装置90の往路ワイヤー接続部95にリービングロープLWの先端部が接続される態様でもよい。 That is, in the reeving rope outgoing connection process, the entire boom 16 including the lower boom 16A and the upper boom 16E is mounted in advance on the upper rotating body 12 and placed in a horizontal position, and the reeving rope LW is extended from the reeving winch 50 to the lower boom 16A. , and the leading end of the reeving rope LW may be connected to the outward wire connection portion 95 of the work device 90 .

本構成によれば、ブーム16全体が上部旋回体12に装着された状態で、リービングロープLWおよびリービングウインチ50を用いて主巻ロープMWのワイヤリング作業を短時間で行うことができる。 According to this configuration, the wiring work of the main hoisting rope MW can be performed in a short time using the reeving rope LW and the reeving winch 50 while the entire boom 16 is attached to the upper swing body 12 .

(4)また、上記の実施形態では、図6に示すように、下部ブーム16A(ブーム16)の左方(側方)に配置される往路ワイヤー接続部95によってリービングロープLWを保持し牽引する態様にて説明したが、本発明はこれに限定されるものではない。 (4) In the above embodiment, as shown in FIG. 6, the reeving rope LW is held and towed by the outward wire connecting portion 95 arranged on the left side (side) of the lower boom 16A (boom 16). Although the embodiments have been described, the present invention is not limited thereto.

図14は、本発明の変形実施形態に係るクレーン1の主巻ロープMWのワイヤリング作業において、作業装置90A(作業補助装置)にリービングロープLWが接続された様子を示す背面図である。なお、図14において、カーボディ910、クローラユニット911およびクローラ912などの一部の部材は、その断面が描かれている。本変形実施形態では、作業装置90Aは、下部走行体91(走行部)と、作業アタッチメント94と、を備える。 FIG. 14 is a rear view showing how the reeving rope LW is connected to the work device 90A (work auxiliary device) in the wiring work of the main hoist rope MW of the crane 1 according to the modified embodiment of the present invention. In addition, in FIG. 14, the cross section of some members, such as the car body 910, the crawler unit 911, and the crawler 912, is drawn. In this modified embodiment, the work device 90A includes a lower running body 91 (running portion) and a work attachment 94 .

下部走行体91は、カーボディ910と、左右一対のクローラユニット911と、左右一対のクローラ912と、を有する。 The lower traveling body 91 has a car body 910 , a pair of left and right crawler units 911 , and a pair of left and right crawlers 912 .

作業アタッチメント94は、第1アーム941と、第2アーム942と、を有する。第1アーム941は、前後方向に延びる回転軸94P回りに回動可能なように下部走行体91に支持されている。第2アーム942は、上下方向に延びる回転軸94Q回りに回動可能なように第1アーム941の先端部に支持されている。第2アーム942の先端部には、ワイヤー保持部94R(第1接続部)が配置されている。ワイヤー保持部94Rは、リービングロープLWの先端部を把持することができる。なお、図14において、第1アーム941は、クローラユニット911から延びるように配設されるものでもよい。 The working attachment 94 has a first arm 941 and a second arm 942 . The first arm 941 is supported by the lower traveling body 91 so as to be rotatable around a rotating shaft 94P extending in the front-rear direction. The second arm 942 is supported by the tip of the first arm 941 so as to be rotatable around a rotation shaft 94Q extending in the vertical direction. A wire holding portion 94R (first connecting portion) is arranged at the tip of the second arm 942 . The wire holding portion 94R can hold the tip portion of the reeving rope LW. In addition, in FIG. 14 , the first arm 941 may be arranged so as to extend from the crawler unit 911 .

このような作業装置90Aによれば、先の実施形態における前記ウインチ装着工程において、下部ブーム16Aのうち当該下部ブーム16Aの左右方向の両端部よりも内側の位置であって左右方向において前記両端部よりも第2ブームシーブ162に近い位置(望ましくは下部ブーム16Aの左右方向の中央部)に前記リービングウインチ50が装着される。また、前記準備工程では、ブーム16の左側または右側に位置する作業装置90の下部走行体91に対してワイヤー保持部94Rがブーム16の下方に相対移動される。更に、前記リービングロープ往路接続工程では、前記リービングウインチ50から前記リービングロープLWが下部ブーム16Aの下方に繰り出される。そして、下部ブーム16Aの下面部のうち前記リービングウインチ50よりも上部ブーム16E側かつ下部ブーム16Aのうち当該下部ブーム16Aの左右方向の両端部よりも内側の位置(望ましくは下部ブーム16Aの左右方向の中央部)に配置されたガイドシーブ51および第1ガイドシーブ52にリービングロープLWが掛けられる。更に、作業装置90Aのワイヤー保持部94RにリービングロープLWの先端部が接続される。更に、前記リービングロープ往路牽引工程において、ワイヤー保持部94RがリービングロープLWをブーム16の下方で保持しながら、下部走行体91がブーム16の左側または右側において下部ブーム16Aから上部ブーム16Eまで地上を走行する。なお、その他の工程については、先の実施形態と同様である。 According to such a working device 90A, in the winch mounting process in the previous embodiment, the lower boom 16A is positioned inside both lateral ends of the lower boom 16A and both lateral ends of the lower boom 16A are installed. The reeving winch 50 is mounted at a position closer to the second boom sheave 162 (preferably at the center in the left-right direction of the lower boom 16A). Further, in the preparatory step, the wire holding portion 94R is relatively moved below the boom 16 with respect to the lower traveling body 91 of the work device 90 positioned on the left or right side of the boom 16 . Further, in the reeving rope forward connecting step, the reeving rope LW is let out from the reeving winch 50 to the lower side of the lower boom 16A. Then, a position on the lower surface of the lower boom 16A on the side of the upper boom 16E from the reeving winch 50 and on the inner side of both ends in the left and right direction of the lower boom 16A on the lower boom 16A (preferably in the left and right direction of the lower boom 16A). A reeving rope LW is hung on the guide sheave 51 and the first guide sheave 52 arranged in the central part of the belt. Furthermore, the tip of the reeving rope LW is connected to the wire holding portion 94R of the working device 90A. Further, in the reeving rope forward pulling process, the wire holding part 94R holds the reeving rope LW below the boom 16, and the lower traveling body 91 moves on the ground from the lower boom 16A to the upper boom 16E on the left or right side of the boom 16. run. Other steps are the same as in the previous embodiment.

このような工程によれば、リービングロープ往路牽引工程において、ブーム16の下方でリービングロープLWを直線的に案内しリービングロープLWに係る負荷を低減することができるとともに、ブーム16の先端側の第2ブームシーブ162への負荷も低減することができる。更に、本変形実施形態では、図3において水平に配置される第2ガイドシーブ53が不要となり、クレーン1のコストや各シーブに掛かる抵抗を低減することができる。 According to such a process, the reeving rope LW can be guided linearly below the boom 16 in the forward hauling process of the reeving rope to reduce the load on the reeving rope LW. The load on the two boom sheaves 162 can also be reduced. Furthermore, in this modified embodiment, the second guide sheave 53 arranged horizontally in FIG. 3 becomes unnecessary, and the cost of the crane 1 and the resistance applied to each sheave can be reduced.

(5)また、上記の実施形態では作業装置90が油圧ショベルからなる態様にて説明したが作業装置90はその他の走行体でもよい。なお、作業装置90の作業アタッチメント94の先端部に連結ピンを着脱することが可能なピン着脱ユニットが装着されてもよい。この場合、図3、図4に示すように作業装置90が各ブーム部材の連結作業(ピン挿入作業)を行いながらリービングワイヤーLWを牽引してもよい。また、図5に示される復路では、ブーム16の上面部に分割して載置されるガイリンク32を上記のピン着脱ユニットによってピン接続しながら、リービングワイヤーLWを牽引してもよい。すなわち、作業装置90がリービングワイヤーLWを牽引する機能、ブーム16のブーム部材同士を連結する機能およびガイリンク32を接続する機能を兼ね備えてもよい。 (5) In the above embodiment, the working device 90 is a hydraulic excavator, but the working device 90 may be another traveling body. A pin attachment/detachment unit capable of attaching and detaching a connecting pin may be attached to the tip of the work attachment 94 of the work device 90 . In this case, as shown in FIGS. 3 and 4, the work device 90 may tow the reeving wire LW while performing the work of connecting the boom members (the work of inserting the pin). In the return trip shown in FIG. 5, the reeving wire LW may be towed while the guy links 32 placed separately on the upper surface of the boom 16 are pin-connected by the above-described pin attachment/detachment unit. That is, the work device 90 may have the function of pulling the reeving wire LW, the function of connecting the boom members of the boom 16 and the function of connecting the guy link 32 .

(6)また、前述のロープ接続工程においてリービングワイヤーLWの先端部と主巻ロープMWの先端部とが接続されると、ブーム16が上部旋回体12に対して起立姿勢とされた後に、主巻ロープMWのワイヤリング工程が行われてもよい。また、ブーム16を構成する各ブーム部材がそれぞれ地上の台座H上に載置され互いに接続されていない状態または一部のコネクタK同士が接続された状態で、リービングワイヤーLWの牽引作業が行われてもよい。 (6) Further, when the tip of the reeving wire LW and the tip of the main hoisting rope MW are connected in the rope connection step described above, after the boom 16 is in the standing posture with respect to the upper rotating body 12, the main A wiring step of the wound rope MW may be performed. The reeving wire LW is towed in a state in which the boom members constituting the boom 16 are respectively placed on the pedestals H on the ground and are not connected to each other or in a state in which some of the connectors K are connected to each other. may

1 クレーン
10 下部走行体
12 上部旋回体(機体)
14 マスト
16 ブーム(起伏体)
16A 下部ブーム
16A1 メインパイプ
16B、16C、16D 中間ブーム
16E 上部ブーム
161 第1ブームシーブ
162 第2ブームシーブ
18 主巻ウインチ(メインウインチ)
20 補巻ウインチ
22 ブーム起伏ウインチ
24、26 シーブ
28 ブーム起伏ロープ
30 ガイライン
32 ガイリンク
36 フック
361 シーブブロック
50 リービングウインチ
51 ガイドシーブ
52 第1ガイドシーブ(ガイドシーブ装置)
53 第2ガイドシーブ
53S ガイドシーブユニット(ガイドシーブ装置)
60 メインフレーム
61 ガイドプレート
62 支持ユニット(シーブ支持部)
90、90A 作業装置(作業補助装置)
91 下部走行体(走行部)
910 カーボディ
911 クローラユニット
912 クローラ
92 上部旋回体
93 キャブ
94 作業アタッチメント
94P 第1支点部
94Q 第2支点部
94R ワイヤー保持部(第1接続部)
94S 復路ワイヤー接続部(第2接続部)
95 往路ワイヤー接続部(第1接続部)
951 ブラケット
952 フック
AC1 補助クレーン
AC2 補助クレーン
H 台座
K コネクタ
LW リービングロープ
MW 主巻ロープ(メインロープ)
1 crane 10 lower running body 12 upper revolving body (fuselage)
14 mast 16 boom (rolling body)
16A Lower boom 16A1 Main pipes 16B, 16C, 16D Intermediate boom 16E Upper boom 161 First boom sheave 162 Second boom sheave 18 Main winch (main winch)
20 auxiliary hoisting winch 22 boom hoisting winch 24, 26 sheave 28 boom hoisting rope 30 guy line 32 guy link 36 hook 361 sheave block 50 reeving winch 51 guide sheave 52 first guide sheave (guide sheave device)
53 Second guide sheave 53S Guide sheave unit (guide sheave device)
60 main frame 61 guide plate 62 support unit (sheave support)
90, 90A work device (work auxiliary device)
91 lower running body (running part)
910 car body 911 crawler unit 912 crawler 92 upper revolving body 93 cab 94 work attachment 94P first fulcrum 94Q second fulcrum 94R wire holding portion (first connecting portion)
94S return wire connection (second connection)
95 outward wire connection (first connection)
951 Bracket 952 Hook AC1 Auxiliary crane AC2 Auxiliary crane H Pedestal K Connector LW Leaving rope MW Main winding rope (main rope)

Claims (10)

機体と、前記機体に起伏可能に装着される起伏体基端部とその反対の起伏体先端部とを含み前記機体から水平方向に沿って延びる水平姿勢を取ることが可能な起伏体と、前記起伏体基端部または前記機体に装着されメインロープの巻き取りおよび繰り出しを行うことが可能なメインウインチと、を有する作業機械において、前記メインウインチから繰り出された前記メインロープを前記起伏体先端部に掛け渡すための作業機械のロープワイヤリング方法であって、
回転することによりリービングロープの巻き取りおよび繰り出しを行うことが可能なウインチドラムを有するリービングウインチを前記起伏体基端部に装着するウインチ装着工程と、
地上を走行可能な走行部と、前記リービングロープの先端部と接続されることが可能な第1接続部と、前記水平姿勢とされた前記起伏体の上面部よりも上方に配置され前記リービングロープの先端部と接続されることが可能な第2接続部と、を有する作業補助装置を準備する準備工程と、
前記起伏体基端部を前記機体に回動可能に連結することおよび前記起伏体を前記水平姿勢に配置することを含む起伏体配置工程と、
前記起伏体配置工程のうち少なくとも前記起伏体基端部が前記機体に連結された後に、前記リービングウインチから前記リービングロープを前記起伏体基端部の下方に繰り出し、前記作業補助装置の前記第1接続部に前記リービングロープの前記先端部を接続するリービングロープ往路接続工程と、
前記リービングウインチによって前記リービングロープを繰り出しながら、前記作業補助装置の前記走行部を前記起伏体の左側または右側で前記起伏体基端部から前記水平姿勢において前記起伏体先端部が配置される位置に向かって地上を走行させることで、前記リービングロープの前記先端部を前記起伏体先端部まで牽引するリービングロープ往路牽引工程と、
前記作業補助装置の前記第1接続部から前記リービングロープの前記先端部を取り外し、前記起伏体先端部に配置された少なくとも一つのシーブに前記リービングロープを掛けるリービングロープワイヤリング工程と、
前記リービングロープが前記少なくとも一つのシーブに掛けられた状態で前記リービングロープの前記先端部を前記作業補助装置の前記第2接続部に接続するリービングロープ復路接続工程と、
前記リービングウインチによって前記リービングロープを更に繰り出しながら、前記第2接続部に接続された前記リービングロープの前記先端部が前記起伏体の上面部の上方を移動するように、前記作業補助装置の前記走行部を前記起伏体の左側または右側において前記起伏体先端部から前記起伏体基端部に向かって地上を走行させることで、前記リービングロープの前記先端部を前記起伏体先端部から少なくとも前記起伏体基端部まで牽引するリービングロープ復路牽引工程と、
前記作業補助装置の前記第2接続部から前記リービングロープの前記先端部を取り外し、前記メインウインチから引き出された前記メインロープの先端部に前記リービングロープの前記先端部を接続するロープ接続工程と、
前記メインウインチによって前記メインロープを繰り出しながら、前記リービングウインチによって前記リービングロープを巻き取ることで、前記リービングロープによって前記メインロープを前記起伏体基端部から前記起伏体先端部まで案内したのち前記少なくとも一つのシーブに掛けるメインロープワイヤリング工程と、
を備える、作業機械のロープワイヤリング方法。
a hoisting body capable of assuming a horizontal posture extending horizontally from the fuselage, including a fuselage, a base end of the hoisting body mounted on the fuselage so as to be hoistable, and a tip end of the hoisting body opposite thereto; In a working machine having a base end of the undulating body or a main winch attached to the machine body and capable of winding and unwinding a main rope, the main rope unwound from the main winch is attached to the tip end of the undulating body. A work machine rope wiring method for hanging over a
a winch mounting step of mounting a reeving winch having a winch drum capable of winding and unwinding a reeving rope by rotating to the base end of the undulating body;
a running portion capable of traveling on the ground; a first connection portion capable of being connected to the tip portion of the reeving rope; a preparation step of preparing a work assistance device having a second connection part that can be connected to the tip of the
a hoisting body arrangement step including rotatably connecting the base end of the hoisting body to the fuselage and arranging the hoisting body in the horizontal posture;
After at least the base end of the undulating body is connected to the fuselage in the structuring step, the reeving rope is let out from the reeving winch below the base end of the undulating body, and the first a reeving rope forward connection step of connecting the tip portion of the reeving rope to a connection portion;
While the reeving winch is used to let out the reeving rope, the traveling part of the work auxiliary device is moved from the base end of the hoisting body to the tip of the hoisting body in the horizontal position on the left or right side of the hoisting body. A reeving rope forward pulling step of pulling the tip of the reeving rope to the tip of the undulating body by traveling on the ground toward the reeving rope;
a reeving rope wiring step of removing the tip portion of the reeving rope from the first connection portion of the work assisting device and hooking the reeving rope to at least one sheave disposed at the tip portion of the undulating body;
a reeving rope return path connecting step of connecting the tip portion of the reeving rope to the second connection portion of the work assisting device while the reeving rope is hung on the at least one sheave;
While further reeling out the reeving rope by the reeving winch, the traveling of the work assisting device is performed so that the tip portion of the reeving rope connected to the second connection portion moves above the upper surface portion of the undulating body. by running on the ground on the left or right side of the undulating body from the leading end of the undulating body toward the base end of the undulating body, the leading end of the reeving rope is moved from the leading end of the undulating body to at least the undulating body. a reeving rope return path pulling step for pulling to the base end;
a rope connecting step of removing the tip portion of the reeving rope from the second connection portion of the work assisting device and connecting the tip portion of the reeving rope to the tip portion of the main rope pulled out from the main winch;
By winding the reeving rope by the reeving winch while letting out the main rope by the main winch, the main rope is guided by the reeving rope from the base end of the undulating body to the tip end of the undulating body, and then at least A main rope wiring process to hang on one sheave,
A work machine rope wiring method comprising:
前記ウインチ装着工程は、前記起伏体基端部のうち当該起伏体基端部の左右方向の両端部よりも内側の位置であって左右方向において前記両端部よりも前記シーブに近い位置に、前記ウインチドラムが左右方向に延びる回転中心軸回りに回転可能となるように前記リービングウインチを装着することを含み、
前記リービングロープ往路接続工程は、前記リービングウインチから前記リービングロープを前記起伏体基端部の下方に繰り出し、前記起伏体基端部の下面部のうち前記リービングウインチよりも前記起伏体先端部側かつ前記起伏体基端部の前記両端部よりも左右方向の内側に配置され上下方向に延びる回転中心軸回りに回転可能な第1ガイドシーブに前記リービングロープを掛けたのち、前記起伏体の左側および右側のうち前記作業補助装置が配置されている側の前記起伏体の外側に前記リービングロープを引き出し、前記作業補助装置の前記第1接続部に前記リービングロープの前記先端部を接続することを含み、
前記リービングロープ往路牽引工程は、前記リービングウインチから繰り出され前記第1ガイドシーブを経由した前記リービングロープを前記作業補助装置によって前記起伏体先端部まで牽引することを含む、請求項1に記載の作業機械のロープワイヤリング方法。
In the winch mounting step, the winch is installed at a position inward of both lateral end portions of the undulating body base end portion of the undulating body base end portion and closer to the sheave than the both end portions in the lateral direction. Mounting the reeving winch so that the winch drum can rotate around a center axis of rotation extending in the left-right direction;
In the reeving rope outgoing connection step, the reeving rope is paid out from the reeving winch to the lower side of the reeving body base end portion, and the lower surface portion of the reeving body base end portion is closer to the reeving body distal end portion than the reeving winch. After the reeving rope is hooked to a first guide sheave that is arranged laterally inward of the both ends of the base end of the undulating body and that is rotatable about a central axis of rotation that extends in the vertical direction, the left and right sides of the undulating body are pulling out the reeving rope to the outside of the undulating body on the right side on which the work assistance device is arranged, and connecting the tip of the reeving rope to the first connection portion of the work assistance device. ,
2. The work according to claim 1, wherein the reeving rope forward pulling step includes pulling the reeving rope, which has been let out from the reeving winch and passed through the first guide sheave, to the leading end of the undulating body by the work auxiliary device. Machine rope wiring method.
前記リービングロープ往路接続工程は、前記リービングウインチから前記リービングロープを前記起伏体基端部の下方に繰り出し、前記第1ガイドシーブに前記リービングロープを掛け、更に、前記起伏体基端部の下面部のうち前記第1ガイドシーブよりも前記起伏体先端部側かつ前記起伏体の左側および右側のうち前記作業補助装置が配置されている側の前記起伏体の端部の第1の位置に上下方向に延びる回転中心軸回りに回転可能に配置された第2ガイドシーブに前記リービングロープを掛けたのち、前記作業補助装置の前記第1接続部に前記リービングロープの先端部を接続することを含み、
前記リービングロープ往路牽引工程は、前記リービングウインチから繰り出され前記第1ガイドシーブおよび前記第2ガイドシーブを経由した前記リービングロープを前記作業補助装置によって前記起伏体先端部まで牽引することを含む、請求項2に記載の作業機械のロープワイヤリング方法。
In the reeving rope forward connecting step, the reeving rope is let out from the reeving winch downwardly from the base end of the undulating body, the reeving rope is hooked to the first guide sheave, and the lower surface of the base end of the reeving body in the vertical direction at the first position at the end of the undulating body on the side where the work assisting device is arranged, which is closer to the tip of the undulating body than the first guide sheave and which of the left and right sides of the undulating body is located. After the reeving rope is hung on a second guide sheave rotatably arranged around a rotation center axis extending in the direction of the reeving rope, the tip of the reeving rope is connected to the first connection portion of the work assistance device;
The reeving rope forward pulling step includes pulling the reeving rope, which is let out from the reeving winch and passed through the first guide sheave and the second guide sheave, to the leading end of the undulating body by the work assisting device. Item 3. A work machine rope wiring method according to item 2.
前記メインロープワイヤリング工程は、
前記第2ガイドシーブの位置を前記リービングロープ往路接続工程において配置第2ガイドシーブが配置された前記第1の位置から前記起伏体基端部の下面部のうち当該起伏体基端部の左右方向の両端部よりも内側の第2の位置に変更しかつ前記第2ガイドシーブの回転中心軸の方向を左右方向から上下方向に変更することと、
前記複数のシーブと前記リービングウインチとの間で、前記リービングロープを前記第1ガイドシーブおよび前記第2ガイドシーブによって支持することと、
を含む、請求項3に記載の作業機械のロープワイヤリング方法。
The main rope wiring process includes:
The position of the second guide sheave is arranged in the forward connecting step of the reeving rope from the first position where the second guide sheave is arranged in the lateral direction of the base end of the undulating body on the lower surface of the base end of the undulating body. and changing the direction of the center axis of rotation of the second guide sheave from the horizontal direction to the vertical direction;
supporting the reeving rope by the first guide sheave and the second guide sheave between the plurality of sheaves and the reeving winch;
4. The work machine rope wiring method of claim 3, comprising:
前記ウインチ装着工程は、前記起伏体基端部のうち当該起伏体基端部の左右方向の両端部よりも内側の位置であって左右方向において前記両端部よりも前記シーブに近い位置に前記リービングウインチを装着することを含み、
前記準備工程は、前記ブームの左側または右側に位置する前記作業補助装置の前記走行部に対して前記第1接続部を前記ブームの下方に相対移動させることを含み、
前記リービングロープ往路接続工程は、前記リービングウインチから前記リービングロープを前記起伏体基端部の下方に繰り出し、前記起伏体基端部の下面部のうち前記リービングウインチよりも前記起伏体先端部側かつ前記起伏体基端部のうち当該起伏体基端部の左右方向の両端部よりも内側の位置に配置された第1ガイドシーブに前記リービングロープを掛けたのち、前記第1接続部に前記リービングロープの先端部を接続することを含み、
前記リービングロープ往路牽引工程は、前記リービングロープを前記第1接続部によって前記ブームの下方で保持しながら、前記走行部を前記起伏体の左側または右側において地上を走行させることを含む、
請求項1に記載の作業機械のロープワイヤリング方法。
In the winch mounting step, the reeving is carried out at a position inward of both lateral end portions of the undulating body base end portion of the undulating body base end portion and closer to the sheave than the both end portions in the lateral direction. including installing a winch;
The preparation step includes relatively moving the first connecting portion downward of the boom with respect to the travel portion of the work auxiliary device positioned on the left or right side of the boom,
In the reeving rope outgoing connection step, the reeving rope is paid out from the reeving winch to the lower side of the reeving body base end portion, and the lower surface portion of the reeving body base end portion is closer to the reeving body distal end portion than the reeving winch. After the reeving rope is hooked to a first guide sheave disposed at a position on the inner side of both lateral end portions of the base end portion of the undulating body, the reeving rope is attached to the first connecting portion. including connecting the ends of the rope;
The step of towing the reeving rope onward includes holding the reeving rope below the boom by the first connecting portion while allowing the running portion to travel on the ground on the left or right side of the undulating body.
A rope wiring method for a work machine according to claim 1.
前記起伏体として、前記起伏体基端部と前記起伏体先端部との間に少なくとも一つの起伏体中間部を備え、前記起伏体基端部、前記少なくとも一つの起伏体中間部および前記起伏体先端部が互いに接続されることで前記起伏体が構成されるものを準備することを更に備え、
前記起伏体配置工程は、前記起伏体基端部を前記機体に回動可能に連結した後、前記起伏体基端部の先端側に前記少なくとも一つの起伏体中間部および前記起伏体先端部を順に接続することで、前記起伏体を前記水平姿勢に配置することを含み、
前記起伏体配置工程における前記起伏体の長さに応じて前記作業補助装置の前記走行部を走行させるように、前記起伏体配置工程と前記リービングロープ往路牽引工程とが並行して行われる、請求項1乃至5の何れか1項に記載の作業機械のロープワイヤリング方法。
As the undulating body, at least one undulating body intermediate part is provided between the undulating body base end part and the undulating body tip part, and the undulating body base end part, the at least one undulating body intermediate part and the undulating body Further comprising preparing the undulating body configured by connecting the tip parts to each other,
In the undulating body arrangement step, after the undulating body base end portion is rotatably connected to the fuselage, the at least one undulating body intermediate portion and the undulating body tip end portion are arranged on the tip side of the undulating body base end portion. placing said undulating body in said horizontal position by connecting in sequence;
The undulating body arranging step and the reeving rope forward pulling step are performed in parallel so that the traveling portion of the work auxiliary device travels according to the length of the undulating body in the undulating body arranging step. Item 6. A work machine rope wiring method according to any one of Items 1 to 5.
前記リービングロープ往路牽引工程において前記走行部を前記ブームの左側および右側のうちの一方で地上を走行させ、前記リービングロープ復路牽引工程において前記走行部を前記ブームの左側および右側のうちの他方で地上を走行させることを更に備える、請求項1乃至6の何れか1項に記載の作業機械のロープワイヤリング方法。 In the reeving-rope forward towing step, the traveling portion is caused to travel on the ground on one of the left and right sides of the boom, and in the reeving-rope return trip towing step, the traveling portion is caused to travel on the ground on the other of the left and right sides of the boom. The work machine rope wiring method according to any one of claims 1 to 6, further comprising running a rope. 機体と、前記機体に起伏可能に装着される起伏体基端部とその反対の起伏体先端部とを含み前記機体から水平方向に沿って延びる水平姿勢を取ることが可能な起伏体と、前記起伏体基端部または前記機体に装着されメインロープの巻き取りおよび繰り出しを行うことが可能なメインウインチと、前記起伏体基端部に左右方向に延びる回転中心軸回りに回転可能に支持されリービングロープの巻き取りおよび繰り出しを行うことが可能なリービングウインチと、を有する作業機械において、前記メインウインチから繰り出された前記メインロープを前記起伏体先端部に掛け渡すロープワイヤリング作業を補助する、ガイドシーブ装置であって、
前記水平姿勢とされた前記起伏体基端部の下面部のうち前記リービングウインチよりも前記起伏体先端部側かつ前記起伏体基端部の左右方向の両端部よりも内側の位置に上下方向に延びる回転中心軸回りに回転可能に装着され、前記リービングウインチから前記起伏体先端部に向かって繰り出される前記リービングロープの方向を前記起伏体の左右方向の外側に向かって変更するように前記リービングロープを支持しながら、当該リービングロープの進行を許容するように回転する第1ガイドシーブと、
前記リービングウインチから繰り出され前記第1ガイドシーブを経由した前記リービングロープを支持することが可能な第2ガイドシーブと、
前記第2ガイドシーブを第1支持状態で支持することが可能なシーブ支持部と、
を備え、
前記シーブ支持部は、前記第1支持状態では、前記第2ガイドシーブが、前記リービングウインチから繰り出され前記第1ガイドシーブを経由した前記リービングロープの方向を前記起伏体の左右方向の外側で前記起伏体先端部に向かって変更することが可能なように、前記水平姿勢とされた前記起伏体基端部のうちの前記第1ガイドシーブよりも前記起伏体先端部側の位置であってかつ前記起伏体基端部の下面部の左側端部または右側端部の位置において前記第2ガイドシーブが上下方向に沿って延びる回転中心軸回りに回転可能となるように、前記第2ガイドシーブを支持する、ガイドシーブ装置。
a hoisting body capable of assuming a horizontal posture extending horizontally from the fuselage, including a fuselage, a base end of the hoisting body mounted on the fuselage so as to be hoistable, and a tip end of the hoisting body opposite thereto; A main winch attached to the base end of the undulating body or the machine body and capable of winding and unwinding the main rope; A guide sheave for assisting a rope wiring operation of passing the main rope let out from the main winch over the tip of the undulating body in a working machine having a reeving winch capable of winding and letting out a rope. a device,
In the lower surface of the base end portion of the hoisting body in the horizontal posture, the hoisting body tip portion side of the reeving winch and the inner side of both the left and right ends of the base end portion of the hoisting body are vertically positioned. The reeving rope is mounted rotatably around an extending central axis of rotation, and the reeving rope is fed out from the reeving winch toward the tip end of the reeving body so as to change the direction of the reeving rope outward in the left-right direction of the reeving body. a first guide sheave that rotates to allow the reeving rope to advance while supporting the
a second guide sheave capable of supporting the reeving rope let out from the reeving winch and passing through the first guide sheave;
a sheave supporting portion capable of supporting the second guide sheave in a first supporting state;
with
In the first supported state, the sheave support portion is configured such that the second guide sheave extends from the reeving winch and directs the direction of the reeving rope that has passed through the first guide sheave to the outside in the left-right direction of the undulating body. A position closer to the distal end of the undulating body than the first guide sheave in the basal end of the undulating body in the horizontal position so as to be able to change toward the distal end of the undulating body; The second guide sheave is arranged so as to be rotatable around a central axis of rotation extending in the vertical direction at the left end or right end of the lower surface of the base end of the undulating body. Supporting guide sheave device.
前記シーブ支持部は、前記第1支持状態と当該第1支持状態とは異なる状態で前記第2ガイドシーブを支持する第2支持状態との間で切換可能であり、
前記シーブ支持部は、前記第2支持状態では、前記第2ガイドシーブが前記起伏体先端部と前記リービングウインチとの間で前記第1ガイドシーブとともに前記リービングロープを支持することが可能なように、前記水平姿勢とされた前記起伏体基端部のうちの前記第1ガイドシーブよりも前記起伏体先端部側の位置であってかつ前記起伏体基端部の下面部の左右方向の両端部よりも内側の位置において前記第2ガイドシーブが回転可能となるように、前記第2ガイドシーブを支持する、請求項8に記載のガイドシーブ装置。
the sheave support portion is switchable between the first support state and a second support state in which the second guide sheave is supported in a state different from the first support state;
The sheave support portion is configured such that, in the second support state, the second guide sheave can support the reeving rope together with the first guide sheave between the tip portion of the undulating body and the reeving winch. , both lateral ends of the bottom surface of the base end of the hoisting body, which are positioned closer to the tip end of the hoisting body than the first guide sheave in the base end of the hoisting body in the horizontal posture; 9. The guide sheave device according to claim 8, wherein said second guide sheave is supported so that said second guide sheave is rotatable at a position inside thereof.
前記シーブ支持部は、前記第2支持状態では、前記第2ガイドシーブが左右方向に沿って延びる回転中心軸回りに回転可能となるように、前記第2ガイドシーブを支持する、請求項9に記載のガイドシーブ装置。 10. The method according to claim 9, wherein the sheave support portion supports the second guide sheave so that in the second supported state, the second guide sheave is rotatable about a central axis of rotation extending in the left-right direction. Guide-sheave device as described.
JP2019065356A 2019-03-29 2019-03-29 ROPE WIRING METHOD AND GUIDE SHEAVE DEVICE FOR WORKING MACHINE Active JP7287055B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019065356A JP7287055B2 (en) 2019-03-29 2019-03-29 ROPE WIRING METHOD AND GUIDE SHEAVE DEVICE FOR WORKING MACHINE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019065356A JP7287055B2 (en) 2019-03-29 2019-03-29 ROPE WIRING METHOD AND GUIDE SHEAVE DEVICE FOR WORKING MACHINE

Publications (2)

Publication Number Publication Date
JP2020164278A JP2020164278A (en) 2020-10-08
JP7287055B2 true JP7287055B2 (en) 2023-06-06

Family

ID=72715767

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019065356A Active JP7287055B2 (en) 2019-03-29 2019-03-29 ROPE WIRING METHOD AND GUIDE SHEAVE DEVICE FOR WORKING MACHINE

Country Status (1)

Country Link
JP (1) JP7287055B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117430034B (en) * 2023-10-09 2024-04-05 黄岛海关综合技术服务中心 Hoisting tool for food turnover box

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011006199A (en) 2009-06-25 2011-01-13 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Leaving device, crane, and rope wiring method
US20160002010A1 (en) 2014-07-01 2016-01-07 Marvin M. May Stabilization and control of a crane load
JP2018167972A (en) 2017-03-30 2018-11-01 コベルコ建機株式会社 Wiring method and crane

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2583277B2 (en) * 1988-06-10 1997-02-19 古河電気工業株式会社 Self-propelled vehicle with cable laying pilot wire
JPH0255508A (en) * 1988-08-15 1990-02-23 Nippon Telegr & Teleph Corp <Ntt> Method of leading cable tow rope

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011006199A (en) 2009-06-25 2011-01-13 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Leaving device, crane, and rope wiring method
US20160002010A1 (en) 2014-07-01 2016-01-07 Marvin M. May Stabilization and control of a crane load
JP2018167972A (en) 2017-03-30 2018-11-01 コベルコ建機株式会社 Wiring method and crane

Also Published As

Publication number Publication date
JP2020164278A (en) 2020-10-08

Similar Documents

Publication Publication Date Title
JP5693031B2 (en) Assembly method of mobile lift crane
JP5687828B2 (en) Boom hoist transport system and crane using the same
US9206021B2 (en) Crane and crane assembling method
JP2007302352A (en) Crane, and crane boom derricking device
JP6834789B2 (en) How to raise struts, and cranes
JP6645222B2 (en) How to attach a crane jib
JP7287055B2 (en) ROPE WIRING METHOD AND GUIDE SHEAVE DEVICE FOR WORKING MACHINE
JP2018167973A (en) Uprising method of derricking member and crane
JP6638434B2 (en) Crane boom mounting method
JP7298419B2 (en) Crane assembly method and crane
JP6787223B2 (en) Wiring method and crane
JP5847694B2 (en) Construction machinery
JP6969281B2 (en) Crane and crane disassembly method
JP2019112152A (en) Crane and crane assembling method
JP7447613B2 (en) working machine
JP6579172B2 (en) Crane and crane strut raising method
JP6658020B2 (en) Crane and crane assembling method
JP2019199310A (en) Specification changing method of crane and specification-changeable crane
JP6561574B2 (en) Mobile crane and method for raising or lowering an attachment in a mobile crane
JP7167741B2 (en) ROPE FEEDING DEVICE AND ROPE WINDING METHOD FOR WINCH DRUM OF WORK MACHINE
JP7392820B2 (en) Crane connecting beam installation method
JP7416034B2 (en) How to assemble the crane
WO2024018913A1 (en) Crane and crane assembly method
WO2021020291A1 (en) Crane
JP7163607B2 (en) Crane and crane assembly method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211215

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221027

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230425

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230508

R150 Certificate of patent or registration of utility model

Ref document number: 7287055

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150