Prior art keywords
wall
concrete
reinforcing bar
ridge
streak
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019077024A
Other languages
Japanese (ja)
Other versions
JP2020176375A (en
Inventor
清臣 金本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2019077024A priority Critical patent/JP7214546B2/en
Publication of JP2020176375A publication Critical patent/JP2020176375A/en
Application granted granted Critical
Publication of JP7214546B2 publication Critical patent/JP7214546B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

RC造の地中連続壁の施工方法として、地中に間隔をあけて先行して先行エレメントを設け、これらの先行エレメントの間に後行エレメントを設けて地中連続壁を構築する方法がある。先行エレメントと後行エレメントとの連結は、互いに荷重(面内せん断力)を伝達可能となるように一体に連結する場合(例えば、特許文献1-3参照)と、互いに接触させるが互いに荷重の伝達をしない状態に連結する場合とがある。 As a method for constructing RC diaphragm walls, there is a method in which preceding elements are provided in the ground at intervals, and trailing elements are provided between these preceding elements to construct a diaphragm wall. . The connection between the leading element and the trailing element is such that the load (in-plane shear force) can be transmitted to each other (see, for example, Patent Documents 1 to 3), and the case where they are in contact with each other but the load is not applied to each other. In some cases, it is connected to a state in which no transmission is performed.

先行エレメントと後行エレメントとの間で面内せん断力を伝達できるように両エレメントを互いに連結する場合に、先行エレメントと後行エレメントとの間の継手部を以下のようにすることが考えられる。
先行エレメントおよび後行エレメントの互いに連結される端面それぞれに壁厚さ方向(地中連続壁の厚さ方向)に延びる凸条部および凹条部を壁高さ方向(上下方向)に交互に形成し、先行エレメントの凹条部と後行エレメントの凸条部とを嵌合させ、先行エレメントの凸条部と後行エレメントの凹条部とを嵌合させ、継手部にシアキーを形成する。
When the leading and trailing elements are connected to each other so that in-plane shear forces can be transmitted between them, it is conceivable that the joints between the leading and trailing elements are: .
Protrusive streaks and recessed streaks extending in the wall thickness direction (thickness direction of the diaphragm wall) are alternately formed in the wall height direction (vertical direction) on each of the mutually connected end faces of the preceding element and the succeeding element. Then, the concave streak portion of the leading element and the protruding streak portion of the trailing element are fitted, and the protruding streak portion of the leading element and the recessed streak portion of the trailing element are fitted to form a shear key in the joint portion.

特許第3982327号公報Japanese Patent No. 3982327 特開2010-242318号公報JP 2010-242318 A 特開2017-179734号公報JP 2017-179734 A

しかしながら、先行エレメントと後行エレメントとの間に設計で想定している面内せん断力よりも大きなせん断力が作用すると、先行エレメントおよび後行エレメントの凹条部の角部にひび割れが生じ、このひび割れが先行エレメントと後行エレメントとのコンクリート打継ぎ面に沿って両エレメント側に進展して先行エレメントと後行エレメントと間の継手部がせん断破壊することが考えられる。 However, if a shear force greater than the in-plane shear force assumed in the design acts between the leading and trailing elements, cracks will occur at the corners of the recessed streaks of the leading and trailing elements. It is conceivable that cracks may develop along the joint surface of concrete between the leading element and the trailing element toward both elements, causing shear failure at the joint between the leading element and the trailing element.

そこで、本発明は、第1エレメント(先行エレメント)と第2エレメント(後行エレメント)とがせん断破壊することを防止できる地中連続壁のせん断破壊防止構造を提供することを目的とする。 SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a diaphragm wall shear failure prevention structure capable of preventing shear failure of a first element (preceding element) and a second element (following element).

上記目的を達成するため、本発明に係る地中連続壁のせん断破壊防止構造は、鉄筋コンクリート製の第1エレメントと第2エレメントとが隣接して設けられる地中連続壁における前記第1エレメントと前記第2エレメントとの継手部を介した前記第1エレメントと前記第2エレメントとのせん断破壊を防止するための地中連続壁のせん断破壊防止構造において、前記第1エレメントには、前記第2エレメント側の端面に、前記第1エレメントと前記第2エレメントが隣接する壁長さ方向に突出し、壁厚さ方向に延びる第1凸条部と、前記壁長さ方向に凹み、前記壁厚さ方向に延びる第1凹条部と、が壁高さ方向に交互に配列され、前記第2エレメントには、前記第1エレメント側の端面に、前記壁長さ方向に突出し、前記壁厚さ方向に延びる第2凸条部と、前記壁長さ方向に凹み、前記壁厚さ方向に延びる第2凹条部と、が前記壁高さ方向に交互に配列され、前記継手部では、前記第1凸条部と前記第2凹条部とが嵌合し、前記第1凹条部と前記第2凸条部とが嵌合し、前記第1エレメントには、前記第1凸条部および前記第1凹条部の凹凸に沿って第1補強筋が設けられ、前記第2エレメントには、前記第2凸条部および前記第2凹条部の凹凸に沿って第2補強筋が設けられており、前記第1補強筋は、前記壁高さ方向に複数配列され、前記第1凸条部に対応する第1屈曲部を有し、前記壁高さ方向に隣り合う前記第1補強筋は、上側の前記第1補強筋の前記第1屈曲部よりも下側の部分と、下側の前記第1補強筋の前記第1屈曲部よりも上側の部分とが同じ高さに配置され、前記第2補強筋は、前記壁高さ方向に複数配列され、前記第2凸条部に対応する第2屈曲部を有し、前記壁高さ方向に隣り合う前記第2補強筋は、上側の前記第2補強筋の前記第2屈曲部よりも下側の部分と、下側の前記第2補強筋の前記第2屈曲部よりも上側の部分とが同じ高さに配置されていることを特長とする。 In order to achieve the above object, a diaphragm wall shear failure prevention structure according to the present invention is a diaphragm wall in which a first element and a second element made of reinforced concrete are provided adjacent to each other. In the diaphragm wall shear failure prevention structure for preventing shear failure between the first element and the second element via a joint portion with the second element, the first element includes the second element on the side end face, a first ridge protruding in the wall length direction of the wall adjacent to the first element and the second element and extending in the wall thickness direction; are alternately arranged in the wall height direction, and the second element has, on the end face on the first element side, a projection in the wall length direction and a wall thickness direction. Extending second ridges and second ridges recessed in the wall length direction and extending in the wall thickness direction are alternately arranged in the wall height direction. The ridge portion and the second ridge portion are fitted together, the first ridge portion and the second ridge portion are fitted together, and the first element includes the first ridge portion and the second ridge portion. A first reinforcing bar is provided along the unevenness of the first grooved line, and the second element is provided with a second reinforcing bar along the unevenness of the second convex line and the second grooved line. and a plurality of the first reinforcing bars are arranged in the wall height direction, have first bending portions corresponding to the first ridges, and are adjacent to each other in the wall height direction. a portion of the upper first reinforcing bar below the first bent portion and a portion of the lower first reinforcing bar above the first bent portion are arranged at the same height. , the second reinforcing bars are arranged in a plurality in the wall height direction and have second bent portions corresponding to the second ridges; and the second reinforcing bars adjacent in the wall height direction are A portion of the second reinforcing bar on the upper side below the second bent portion and a portion of the second reinforcing bar on the lower side above the second bent portion are arranged at the same height . It is characterized by

本発明では、第1エレメントには第1凸条部および第1凹条部の凹凸に沿って第1補強筋を設けるため、第1エレメントと第2エレメントとの間に面内せん断力が作用した際に、第1エレメントに第1凹条部からひび割れが生じることを防止できる。第2エレメントには、第2凸条部および第2凹条部の凹凸に沿って第2補強筋を設けるため、第1エレメントと第2エレメントとの間に面内せん断力が作用した際に、第2エレメントに第2凹条部からひび割れが生じることを防止できる。
これらのことにより、第1エレメントと第2エレメントとの間に面内せん断力が作用した際に、第1エレメントおよび第2エレメントがせん断破壊することを防止することができる。
本発明では、地中連続壁の第1エレメントと第2エレメントが隣接する方向を壁長さ方向とし、地中連続壁の厚さ方向(第1エレメントおよび第2エレメントの厚さ方向)を壁厚さ方向とし、地中連続壁の高さ方向(第1エレメントおよび第2エレメントの高さ方向)を壁高さ方向とする。
In the present invention, since the first element is provided with the first reinforcing bars along the unevenness of the first protruded line and the first recessed line, an in-plane shear force acts between the first element and the second element. It is possible to prevent cracks from occurring in the first element from the first concave streak portion when the first element is formed. Since the second element is provided with the second reinforcing bars along the unevenness of the second protruded line and the second recessed line, when an in-plane shear force acts between the first element and the second element, , the second element can be prevented from being cracked from the second concave streak portion.
As a result, shear failure of the first element and the second element can be prevented when an in-plane shear force acts between the first element and the second element.
In the present invention, the direction in which the first element and the second element of the diaphragm wall are adjacent to each other is defined as the wall length direction, and the thickness direction of the diaphragm wall (thickness direction of the first element and the second element) is defined as the wall length direction. The thickness direction is defined as the wall height direction, and the height direction of the diaphragm wall (height direction of the first element and the second element) is defined as the wall height direction.

また、第1エレメントに第1凸条部および第1凹条部の凹凸に沿って第1補強筋を上下方向に隙間なく配筋することができ、第2エレメントに第2凸条部および第2凹条部の凹凸に沿って第2補強筋を上下方向に隙間なく配筋することができる。
Further , the first reinforcing bars can be arranged in the vertical direction without gaps along the unevenness of the first ridge and the first groove in the first element, and the second ridge and the second ridge can be arranged in the second element. The second reinforcing bars can be arranged vertically without gaps along the unevenness of the two grooved portions.

本発明によれば、第1エレメントと第2エレメントとがせん断破壊することを防止できる。 According to the present invention, shear failure of the first element and the second element can be prevented.

(a)は本発明の第1実施形態による地中連続壁のせん断破壊防止用の補強筋の配筋例を示すコンクリートを省略した平面図、(b)は本発明の第1実施形態による地中連続壁のせん断破壊防止用の補強筋の配筋例を示すコンクリートを省略した側面図、(c)は(b)のA-A線断面図、(d)は(b)のB-B線断面図である。(a) is a plan view omitting concrete showing an example of reinforcement bar arrangement for preventing shear failure of a diaphragm wall according to the first embodiment of the present invention; Side view omitting concrete showing an example of reinforcing bar arrangement for preventing shear failure of a continuous wall, (c) is a cross-sectional view along the line AA of (b), (d) is BB of (b) It is a line sectional view. (a)は本発明の第2実施形態による地中連続壁のせん断破壊防止用の補強筋の配筋例を示すコンクリートを省略した平面図、(b)は本発明の第2実施形態による地中連続壁のせん断破壊防止用の補強筋の配筋例を示すコンクリートを省略した側面図、(c)は(b)のC-C線断面図、(d)は(b)のD-D線断面図である。(a) is a plan view omitting concrete showing an example of reinforcement bar arrangement for preventing shear failure of a diaphragm wall according to the second embodiment of the present invention; Side view omitting concrete showing an example of reinforcing bar arrangement for preventing shear failure of a continuous wall. It is a line sectional view. (a)は本発明の実施形態の第1変形例による地中連続壁のせん断破壊防止用の補強筋の配筋例を示すコンクリートを省略した平面図、(b)は本発明の実施形態の第1変形例による地中連続壁のせん断破壊防用の補強筋の配筋例を示すコンクリートを省略した側面図、(c)は(b)のE-E線断面図、(d)は(b)のF-F線断面図である。(a) is a plan view omitting concrete showing an example of reinforcement bar arrangement for preventing shear failure of a diaphragm wall according to a first modification of the embodiment of the present invention; (b) is a plan view of the embodiment of the present invention; A side view omitting concrete showing an example of reinforcing bar arrangement for shear failure prevention of a diaphragm wall according to the first modification, (c) is a cross-sectional view along the EE line of (b), (d) is ( b) is a cross-sectional view taken along line FF. (a)は本発明の実施形態の第2変形例による地中連続壁のせん断破壊防止用の補強筋の配筋例を示すコンクリートを省略した平面図、(b)は本発明の実施形態の第2変形例による地中連続壁のせん断破壊防止用の補強筋の配筋例を示すコンクリートを省略した側面図、(c)は(b)のG-G線断面図、(d)は(b)のH-H線断面図である。(a) is a plan view omitting concrete showing an example of reinforcing bar arrangement for preventing shear failure of a diaphragm wall according to a second modification of the embodiment of the present invention; (b) is a plan view of the embodiment of the present invention; A side view omitting concrete showing an example of reinforcing bar arrangement for preventing shear failure of a diaphragm wall according to the second modification, (c) is a cross-sectional view along the GG line of (b), (d) is ( b) is a cross-sectional view taken along line HH.

(第1実施形態)
以下、本発明の第1実施形態による地中連続壁のせん断破壊防止構造について、図1に基づいて説明する。
図1に示すように、第1実施形態による地中連続壁1は、複数の壁状のエレメント2,3がそれぞれの端部を突き合わせて連結されている。地中連続壁1の壁面に直交する水平方向を壁厚さ方向とし、壁面に沿った方向で壁厚さ方向に直交する水平方向を壁長さ方向とし、壁厚さ方向および壁長さ方向に直交する方向を壁高さ方向または上下方向とする。
地中連続壁1を構成する複数のエレメント2,3は、先行して施工される先行エレメント(第1エレメント)2と、先行エレメント2の後に施工される後行エレメント(第2エレメント)3とから構成され、先行エレメント2と後行エレメント3とが壁長さ方向に配列されている。
先行エレメント2および後行エレメント3は、いずれも地盤11(図1参照)を掘削して構築されている。
(First embodiment)
Hereinafter, a diaphragm wall shear failure prevention structure according to a first embodiment of the present invention will be described with reference to FIG.
As shown in FIG. 1, a diaphragm wall 1 according to the first embodiment includes a plurality of wall-like elements 2 and 3 which are joined together by abutting their ends. The horizontal direction orthogonal to the wall surface of the diaphragm wall 1 is the wall thickness direction, and the horizontal direction along the wall surface and orthogonal to the wall thickness direction is the wall length direction. shall be the wall height direction or vertical direction.
A plurality of elements 2 and 3 that constitute the diaphragm wall 1 include a preceding element (first element) 2 that is constructed first, and a succeeding element (second element) 3 that is constructed after the preceding element 2. A leading element 2 and a trailing element 3 are arranged in the wall length direction.
Both the preceding element 2 and the succeeding element 3 are constructed by excavating the ground 11 (see FIG. 1).

先行エレメント2および後行エレメント3は、それぞれコンクリート21,31に縦筋22,32および横筋23,33が埋設されたRC造の壁体となっている。先行エレメント2と後行エレメント3とは、壁厚さ方向および上下方向の寸法が同じ寸法に設定され、それぞれの壁芯を一致させるように配列されている。先行エレメント2と後行エレメント3とは、それぞれの壁長さ方向の端部を突き合わせるように配置されている。先行エレメント2と後行エレメント3とが突き合わされている部分を継手部4とする。
以下では、継手部4の説明において、壁長さ方向のうち先行エレメント2に対して後行エレメント3が配置されている側を前側とし、後行エレメント3に対して先行エレメント2が配置されている側を後側とし、壁長さ方向を前後方向で表記することがある。
The preceding element 2 and the succeeding element 3 are RC wall bodies in which vertical reinforcements 22, 32 and horizontal reinforcements 23, 33 are embedded in concrete 21, 31, respectively. The leading element 2 and the trailing element 3 are set to have the same dimensions in the wall thickness direction and the vertical direction, and are arranged so that the respective wall centers are aligned. The leading element 2 and the trailing element 3 are arranged so that their ends in the wall length direction are butted against each other. A joint portion 4 is a portion where the leading element 2 and the trailing element 3 are butted against each other.
In the description of the joint portion 4 below, the side of the wall length direction where the trailing element 3 is arranged with respect to the leading element 2 is defined as the front side, and the leading element 2 is arranged with respect to the trailing element 3. The side on which the wall is located is referred to as the rear side, and the longitudinal direction of the wall is sometimes written as the front-back direction.

図1(b)に示すように、先行エレメント2の前端面には、壁厚さ方向に延びるコンクリート凹条部24(第1凹条部)とコンクリート凸条部25(第1凸条部)とが上下方向に交互に複数配列されていて凹凸が形成されている。換言すると、複数のコンクリート凸条部25が上下方向に配列されていて、上下方向に隣り合うコンクリート凸条部25の間にコンクリート凹条部24が形成されている。複数のコンクリート凸条部25は、それぞれ同じ断面形状に形成され、これらの間のコンクリート凹条部24もそれぞれ同じ断面形状に形成されている。 As shown in FIG. 1(b), on the front end face of the preceding element 2, there are a concrete concave streak portion 24 (first concave streak portion) and a concrete protruding streak portion 25 (first protruding streak portion) extending in the wall thickness direction. are arranged alternately in the vertical direction to form irregularities. In other words, a plurality of concrete protruding streaks 25 are arranged in the vertical direction, and the concrete recessed streaks 24 are formed between the concrete protruding streaks 25 adjacent to each other in the vertical direction. The plurality of concrete protruding streaks 25 are each formed with the same cross-sectional shape, and the concrete recessed streaks 24 therebetween are also formed with the same cross-sectional shape.

コンクリート凸条部25は、断面形状が三角形で、上面が前側に向かって漸次下側に向かう傾斜面に形成され、下面が前側に向かって漸次上側に向かう傾斜面に形成され、上面と下面の前端部が角部251を形成するように接続されている。コンクリート凸条部25の上面の傾斜面を第1傾斜面26とし、下面の傾斜面を第2傾斜面27とする。
上下方向に配列された上側のコンクリート凸条部25の第2傾斜面27の後端部と、下側のコンクリート凸条部25の第1傾斜面26の後端部とは、角部251を形成するように接続されている。第1傾斜面26とは第2傾斜面27とは交互に配列されている。
コンクリート凹条部24は、第1傾斜面26と第2傾斜面27との間に形成され、第1傾斜面26と第2傾斜面27との接続部分に角部241が形成されている。
コンクリート凹条部24の角部241およびコンクリート凸条部25の角部251は、いずれもほぼ直角となっている。
The concrete protruding portion 25 has a triangular cross-sectional shape, and the upper surface is formed as an inclined surface that gradually slopes downward toward the front side, and the lower surface is formed as an inclined surface that gradually slopes upward toward the front side. The front ends are connected to form a corner 251 . The inclined surface of the upper surface of the concrete protrusion 25 is referred to as a first inclined surface 26 and the inclined surface of the lower surface thereof is referred to as a second inclined surface 27 .
The rear ends of the second inclined surfaces 27 of the upper concrete ridges 25 arranged in the vertical direction and the rear ends of the first inclined surfaces 26 of the lower concrete ridges 25 form corners 251 . connected to form The first inclined surfaces 26 and the second inclined surfaces 27 are arranged alternately.
The concrete groove 24 is formed between the first slanted surface 26 and the second slanted surface 27 , and a corner 241 is formed at the connecting portion between the first slanted surface 26 and the second slanted surface 27 .
Both the corner 241 of the concrete concave streak 24 and the corner 251 of the concrete protruding streak 25 are substantially right-angled.

先行エレメント2には、前端面の凹凸に沿って第1補強筋28が複数配筋されている。
第1補強筋28は、コンクリート凸条部25の角部251と同じ角度に折り曲げられた第1屈曲部281を有している。第1補強筋28は、第1屈曲部281がコンクリート凸条部25の角部251の後側に位置するように配置されている。第1補強筋28は、壁厚さ方向から見ると第1屈曲部281が略直角に曲がったL字形となっていて、第1屈曲部281の上側の部分が上側に向かって漸次後側に向かうように傾斜して延び、第1屈曲部281の下側の部分が下側に向かって漸次後側に向かうように傾斜して延びている。
A plurality of first reinforcing bars 28 are arranged along the unevenness of the front end surface of the leading element 2 .
The first reinforcing bar 28 has a first bent portion 281 bent at the same angle as the corner portion 251 of the concrete ridge portion 25 . The first reinforcing bar 28 is arranged such that the first bent portion 281 is located behind the corner portion 251 of the concrete ridge portion 25 . When viewed from the wall thickness direction, the first reinforcing bar 28 has an L shape in which the first bent portion 281 is bent at a substantially right angle, and the upper portion of the first bent portion 281 gradually extends upward and backward. The lower portion of the first bent portion 281 extends obliquely downward and gradually toward the rear side.

第1補強筋28は、上端部282が第1屈曲部281の前側に位置するコンクリート凸条部25のすぐ上側に位置するコンクリート凸条部25の角部251よりもやや上側の高さに配置され、下端部283が第1屈曲部281の前側に位置するコンクリート凸条部25のすぐ下側に位置するコンクリート凸条部25の角部251よりもやや下側の高さに配置されている。
第1補強筋28は、上下方向に配列された複数のコンクリート凸条部25それぞれに対応するように複数設けられ、上下方向に配列されている。上下方向に隣り合う第1補強筋28は、上側の第1補強筋28の下端部分と下側の第1補強筋28の上端部分とが同じ高さに配置されている。
なお、上下方向に隣り合う第1補強筋28,28は、干渉しないように壁厚さ方向にずらした位置に配置されている。
The first reinforcing bar 28 is arranged at a height slightly above the corner 251 of the concrete ridge 25 positioned immediately above the concrete ridge 25 whose upper end 282 is positioned on the front side of the first bent portion 281 . The lower end portion 283 is arranged at a height slightly lower than the corner portion 251 of the concrete protruding streak portion 25 positioned immediately below the concrete protruding streak portion 25 positioned on the front side of the first bent portion 281. .
A plurality of first reinforcing bars 28 are arranged in the vertical direction so as to correspond to each of the plurality of concrete ridges 25 arranged in the vertical direction. In the vertically adjacent first reinforcing bars 28, the lower end portion of the upper first reinforcing bar 28 and the upper end portion of the lower first reinforcing bar 28 are arranged at the same height.
The vertically adjacent first reinforcing bars 28, 28 are arranged at positions shifted in the wall thickness direction so as not to interfere with each other.

本実施形態では、先行エレメント2の壁厚さ方向の両端部分それぞれに縦筋22および横筋23が配筋され、壁厚さ方向の一方側の端部分に配筋された縦筋22および横筋23と他方側の端部分に配筋された縦筋22および横筋23との間における壁厚さ方向の両側それぞれに第1補強筋28が設けられている。 In this embodiment, vertical reinforcements 22 and horizontal reinforcements 23 are arranged at both end portions of the preceding element 2 in the wall thickness direction, respectively, and vertical reinforcements 22 and horizontal reinforcements 23 are arranged at one end portion in the wall thickness direction. A first reinforcing bar 28 is provided on both sides in the wall thickness direction between the vertical bar 22 and the horizontal bar 23 arranged at the end portion on the other side.

後行エレメント3の後端面には、壁厚さ方向に延びるコンクリート凹条部34(第2凹条部)とコンクリート凸条部35(第2凸条部)とが上下方向に交互に複数配列されていて凹凸が形成されている。換言すると、複数のコンクリート凸条部35が上下方向に配列されていて、上下方向に隣り合うコンクリート凸条部35の間にコンクリート凹条部24が形成されている。複数のコンクリート凸条部35は、それぞれ同じ断面形状に形成され、これらの間のコンクリート凹条部34もそれぞれ同じ断面形状に形成されている。 On the rear end surface of the trailing element 3, a plurality of concrete recessed streaks 34 (second recessed streaks) extending in the wall thickness direction and concrete protruding streaks 35 (second protrusive streaks) are arranged alternately in the vertical direction. and unevenness is formed. In other words, a plurality of concrete protruding streaks 35 are arranged in the vertical direction, and the concrete recessed streaks 24 are formed between the concrete protruding streaks 35 adjacent to each other in the vertical direction. The plurality of concrete protruding streaks 35 are formed with the same cross-sectional shape, and the concrete recessed streaks 34 therebetween are also formed with the same cross-sectional shape.

コンクリート凸条部35は、断面形状が三角形で、上面が後側に向かって漸次下側に向かう傾斜面に形成され、下面が後側に向かって漸次上側に向かう傾斜面に形成され、上面と下面の後端部が角部351を形成するように接続されている。コンクリート凸条部35の上面の傾斜面を第3傾斜面36とし、下面の傾斜面を第4傾斜面37とする。
上下方向に配列された上側のコンクリート凸条部35の第4傾斜面37の前端部と、下側のコンクリート凸条部35の第3傾斜面36の前端部とは、角部351を形成するように接続されている。第3傾斜面36とは第4傾斜面37とは交互に配列されている。
コンクリート凹条部34は、第3傾斜面36と第4傾斜面37との間に形成され、第3傾斜面36と第4傾斜面37との接続部分に角部341が形成されている。
コンクリート凹条部34の角部341およびコンクリート凸条部35の角部351は、いずれもほぼ直角となっている。
The concrete protruding portion 35 has a triangular cross-sectional shape, and the upper surface is formed to be an inclined surface gradually downward toward the rear side, and the lower surface is formed to be an inclined surface gradually upward toward the rear side. The rear ends of the lower surfaces are connected to form corners 351 . The inclined surface of the upper surface of the concrete ridge 35 is referred to as a third inclined surface 36 , and the inclined surface of the lower surface thereof is referred to as a fourth inclined surface 37 .
The front end of the fourth inclined surface 37 of the upper concrete ridge 35 arranged in the vertical direction and the front end of the third inclined surface 36 of the lower concrete ridge 35 form a corner 351. connected as follows. The third inclined surfaces 36 and the fourth inclined surfaces 37 are arranged alternately.
The concrete groove 34 is formed between the third slanted surface 36 and the fourth slanted surface 37 , and a corner 341 is formed at the connecting portion between the third slanted surface 36 and the fourth slanted surface 37 .
A corner portion 341 of the concrete grooved portion 34 and a corner portion 351 of the concrete convex portion 35 are both substantially right angles.

後行エレメント3には、後端面の凹凸に沿って第2補強筋38が複数配筋されている。
第2補強筋38は、コンクリート凸条部35の角部351と同じ角度に折り曲げられた第2屈曲部381を有している。第2補強筋38は、第2屈曲部381がコンクリート凸条部35の角部351の前側に位置するように配置されている。第2補強筋38は、壁厚さ方向から見ると第2屈曲部381が略直角に曲がったL字形となっていて、第2屈曲部381の上側の部分が上側に向かって漸次前側に向かうように傾斜して延び、第2屈曲部381の下側の部分が下側に向かって漸次前側に向かうように傾斜して延びている。
A plurality of second reinforcing bars 38 are arranged along the unevenness of the rear end surface of the trailing element 3 .
The second reinforcing bar 38 has a second bent portion 381 bent at the same angle as the corner portion 351 of the concrete ridge portion 35 . The second reinforcing bar 38 is arranged so that the second bent portion 381 is positioned in front of the corner portion 351 of the concrete ridge portion 35 . When viewed from the wall thickness direction, the second reinforcing bar 38 has an L shape in which the second bent portion 381 is bent at a substantially right angle, and the upper portion of the second bent portion 381 gradually moves forward toward the upper side. , and the lower portion of the second bent portion 381 extends obliquely downward and gradually toward the front side.

第2補強筋38は、上端部382が第2屈曲部381の後側に位置するコンクリート凸条部35のすぐ上側に位置するコンクリート凸条部35の角部351よりもやや上側の高さに配置され、下端部383が第2屈曲部381の後側に位置するコンクリート凸条部35のすぐ下側に位置するコンクリート凸条部35の角部351よりもやや下側の高さに配置されている。
第2補強筋38は、上下方向に配列された複数のコンクリート凸条部35それぞれに対応するように複数設けられ、上下方向に配列されている。上下方向に隣り合う第2補強筋38は、上側の第2補強筋38の下端部分と下側の第2補強筋38の上端部分とが同じ高さに配置されている。
なお、上下方向に隣り合う第2補強筋38,38は、干渉しないように壁厚さ方向にずらした位置に配置されている。
The second reinforcing bar 38 has a height slightly above the corner 351 of the concrete ridge 35 positioned just above the concrete ridge 35 whose upper end 382 is positioned on the rear side of the second bent portion 381 . The lower end portion 383 is arranged at a height slightly lower than the corner portion 351 of the concrete protruding streak portion 35 positioned immediately below the concrete protruding streak portion 35 positioned on the rear side of the second bent portion 381 . ing.
A plurality of second reinforcing bars 38 are arranged in the vertical direction so as to correspond to each of the plurality of concrete ridges 35 arranged in the vertical direction. The second reinforcing bars 38 adjacent to each other in the vertical direction are arranged such that the lower end portion of the second reinforcing bar 38 on the upper side and the upper end portion of the second reinforcing bar 38 on the lower side are at the same height.
The vertically adjacent second reinforcing bars 38, 38 are arranged at positions shifted in the wall thickness direction so as not to interfere with each other.

本実施形態では、後行エレメント3の壁厚さ方向の両端部分それぞれに縦筋32および横筋33が配筋され、壁厚さ方向の一方側の端部分に配筋された縦筋32および横筋33と他方側の端部分に配筋された縦筋32および横筋33との間における壁厚さ方向の両側それぞれに第2補強筋38が設けられている。
第1補強筋28と第2補強筋38とは、壁長さ方向に対向する位置に配置される。
第1補強筋28および第2補強筋38の定着長さは、既往の基準に従って設定する。
In this embodiment, vertical reinforcements 32 and horizontal reinforcements 33 are arranged at both end portions of the trailing element 3 in the wall thickness direction, respectively, and vertical reinforcements 32 and horizontal reinforcements 33 are arranged at one end portion in the wall thickness direction. Second reinforcing bars 38 are provided on both sides in the wall thickness direction between 33 and the vertical bars 32 and horizontal bars 33 arranged at the other end portion.
The first reinforcing bar 28 and the second reinforcing bar 38 are arranged at positions opposed to each other in the wall length direction.
The fixing lengths of the first reinforcing bar 28 and the second reinforcing bar 38 are set according to existing standards.

次に、上述した第1実施形態による地中連続壁のせん断破壊防止構造の作用・効果について図面を用いて説明する。
上述した第1実施形態による地中連続壁のせん断破壊防止構造では、先行エレメント2にはコンクリート凸条部25およびコンクリート凹条部24の凹凸に沿って第1補強筋28を設けるため、先行エレメント2と後行エレメント3との間に面内せん断力が作用した際に、先行エレメント2にコンクリート凹条部24からひび割れが生じることを防止できる。
後行エレメント3には、コンクリート凸条部35およびコンクリート凹条部34の凹凸に沿って第2補強筋38を設けるため、先行エレメント2と後行エレメント3との間に面内せん断力が作用した際に、後行エレメント3にコンクリート凹条部34からひび割れが生じることを防止できる。
これらのことにより、先行エレメント2と後行エレメント3との間に面内せん断力が作用した際に、先行エレメント2および後行エレメント3がせん断破壊することを防止することができる。
Next, the operation and effects of the diaphragm wall shear failure prevention structure according to the first embodiment described above will be described with reference to the drawings.
In the above-described diaphragm wall shear failure prevention structure according to the first embodiment, since the preceding element 2 is provided with the first reinforcing bars 28 along the unevenness of the concrete protruded streak 25 and the concrete recessed streak 24, the preceding element 2 and the trailing element 3, cracks can be prevented from occurring in the leading element 2 from the concrete groove 24 when an in-plane shear force acts between the trailing element 3 and the leading element 2. - 特許庁
Since the trailing element 3 is provided with the second reinforcing bars 38 along the unevenness of the concrete ridges 35 and concrete grooves 34, an in-plane shear force acts between the leading element 2 and the trailing element 3. It is possible to prevent the trailing element 3 from being cracked from the concrete recessed streak portion 34 when the concrete groove 34 is formed.
As a result, when an in-plane shear force acts between the leading element 2 and the trailing element 3, the leading element 2 and the trailing element 3 can be prevented from shear failure.

また、本実施形態では、上下方向に隣り合う第1補強筋28は、上側の第1補強筋28の下端部分と下側の第1補強筋28の上端部分とが同じ高さに配置され、上下方向に隣り合う第2補強筋38は、上側の第2補強筋38の下端部分と下側の第2補強筋38の上端部分とが同じ高さに配置されている。これにより、先行エレメント2にコンクリート凸条部25およびコンクリート凹条部24の凹凸に沿って第1補強筋28を上下方向に隙間なく配筋することができ、後行エレメント3にコンクリート凸条部35およびコンクリート凹条部34の凹凸に沿って第2補強筋38を上下方向に隙間なく配筋することができる。 In addition, in the present embodiment, the first reinforcing bars 28 adjacent in the vertical direction are arranged such that the lower end portion of the upper first reinforcing bar 28 and the upper end portion of the lower first reinforcing bar 28 are at the same height, The second reinforcing bars 38 adjacent to each other in the vertical direction are arranged such that the lower end portion of the second reinforcing bar 38 on the upper side and the upper end portion of the second reinforcing bar 38 on the lower side are at the same height. As a result, the first reinforcing bars 28 can be arranged in the vertical direction without gaps along the unevenness of the concrete ridges 25 and the concrete grooves 24 in the leading element 2 , and the concrete ridges in the trailing element 3 can be arranged. The second reinforcing bars 38 can be arranged in the vertical direction without gaps along the unevenness of the concave streaks 35 and the concrete grooves 34 .

(第2実施形態)
次に、他の実施形態について、添付図面に基づいて説明するが、上述の第1実施形態と同一又は同様な部材、部分には同一の符号を用いて説明を省略し、第1実施形態と異なる構成について説明する。
図2に示すように、第2実施形態による地中連続壁のせん断破壊防止構造では、第1実施形態による地中連続壁1と比べて、地中連続壁1Bの先行エレメント2Bの第1、第2傾斜面26B,27Bおよび後行エレメント3Bの第2、第4傾斜面36B,37Bが上下方向および壁長さ方向に長く、コンクリート凹条部24B,34Bおよびコンクリート凸条部25B,35Bが大きく形成されている。
第2実施形態では、第1補強筋28Bは、上端部282Bが第1屈曲部281Bの前側に位置するコンクリート凸条部25Bの上側に位置するコンクリート凸条部25Bの角部251Bよりもやや下側の高さに配置され、下端部283Bが第1屈曲部281Bの前側に位置するコンクリート凸条部25Bの下側に位置するコンクリート凸条部25Bの角部251Bよりもやや上側の高さに配置されている。上下方向に隣り合う第1補強筋28B,28Bは、上側の第1補強筋28Bの下端部分と下側の第1補強筋28Bの上端部分とが同じ高さに配置されている。
第2補強筋38Bは、上端部382Bが第2屈曲部381Bの後側に位置するコンクリート凸条部35Bの上側に位置するコンクリート凸条部35Bの角部351Bよりもやや下側の高さに配置され、下端部383Bが第2屈曲部381Bの後側に位置するコンクリート凸条部35Bの下側に位置するコンクリート凸条部35Bの角部351Bよりもやや上側の高さに配置されている。上下方向に隣り合う第2補強筋38B,38Bは、上側の第2補強筋38Bの下端部分と下側の第2補強筋38Bの上端部分とが重なっている。
(Second embodiment)
Next, another embodiment will be described with reference to the accompanying drawings. The same or similar members and portions as those of the first embodiment are denoted by the same reference numerals, and the description thereof will be omitted. Different configurations are described.
As shown in FIG. 2, in the diaphragm wall shear failure prevention structure according to the second embodiment, compared with the diaphragm wall 1 according to the first embodiment, the first and second elements 2B of the preceding element 2B of the diaphragm wall 1B The second slanted surfaces 26B, 27B and the second and fourth slanted surfaces 36B, 37B of the trailing element 3B are elongated in the vertical direction and the wall length direction. formed large.
In the second embodiment, the upper end portion 282B of the first reinforcing bar 28B is slightly below the corner portion 251B of the concrete ridge portion 25B located above the concrete ridge portion 25B located on the front side of the first bent portion 281B. The lower end portion 283B is located at a height slightly above the corner portion 251B of the concrete protruding portion 25B positioned below the concrete protruding portion 25B positioned on the front side of the first bent portion 281B. are placed. As for the vertically adjacent first reinforcing bars 28B, 28B, the lower end portion of the upper first reinforcing bar 28B and the upper end portion of the lower first reinforcing bar 28B are arranged at the same height.
The second reinforcing bar 38B has a height slightly below the corner 351B of the concrete ridge 35B positioned above the concrete ridge 35B whose upper end 382B is positioned behind the second bent portion 381B. The lower end portion 383B is arranged at a height slightly above the corner portion 351B of the concrete protruding streak portion 35B positioned below the concrete protruding streak portion 35B positioned on the rear side of the second bent portion 381B. . In the vertically adjacent second reinforcing bars 38B, 38B, the lower end portion of the upper second reinforcing bar 38B and the upper end portion of the lower second reinforcing bar 38B overlap.

上述した第2実施形態による地中連続壁のせん断破壊防止構造では、第1実施形態と同様の効果を奏する。 In the above-described diaphragm wall shear fracture prevention structure according to the second embodiment, the same effects as those of the first embodiment are obtained.

以上、本発明による地中連続壁のせん断破壊防止構造の実施形態について説明したが、本発明は上記の実施形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。
例えば、先行エレメント2のコンクリート凹条部24およびコンクリート凸条部25の形状、後行エレメント3のコンクリート凹条部34およびコンクリート凸条部35の形状、は上記以外であってもよい。
上記の実施形態では、地中連続壁1のコンクリート凹条部24,34の角部341,351およびコンクリート凸条部25,35の角部251,351はほぼ直角であったが、図3に示す地中連続壁のせん断破壊防止構造のように、地中連続壁1Cの先行エレメント2Cのコンクリート凹条部24Cの角部241Cおよびコンクリート凸条部25Cの角部251C、後行エレメント3Cのコンクリート34Cの角部341Cおよびコンクリート凸条部35Cの角部351Cのように鈍角であってもよい。
このような場合も、コンクリート凸条部25C,35Cの角部351C,351Cに対応するように第1補強筋28Cおよび第2補強筋38Cを設ける。
Although the embodiment of the shear failure prevention structure for a diaphragm wall according to the present invention has been described above, the present invention is not limited to the above-described embodiment, and can be modified as appropriate without departing from the scope of the invention.
For example, the shapes of the concrete recessed streak portion 24 and the concrete protruding streak portion 25 of the preceding element 2 and the shapes of the concrete recessed streak portion 34 and the concrete protrusive streak portion 35 of the succeeding element 3 may be other than those described above.
In the above-described embodiment, the corners 341, 351 of the concrete recessed streaks 24, 34 and the corners 251, 351 of the concrete protruding streaks 25, 35 of the diaphragm wall 1 are substantially right angles. As in the diaphragm wall shear failure prevention structure shown, the corners 241C and 251C of the concrete ridges 25C of the leading element 2C of the diaphragm wall 1C and the concrete of the trailing element 3C The corner 341C of 34C and the corner 351C of the concrete ridge 35C may have an obtuse angle.
Also in such a case, the first reinforcing bars 28C and the second reinforcing bars 38C are provided so as to correspond to the corners 351C, 351C of the concrete ridges 25C, 35C.

また、図4に示す地中連続壁のせん断破壊防止構造のように、地中連続壁1Dの先行エレメント2Dのコンクリート凹条部24D,コンクリート凸条部25D、および後行エレメント3Dのコンクリート凹条部34D、コンクリート凸条部35Dの断面形状が台形で、1つのコンクリート凹条部24D,34Dに角部241D,341Dが2つ設けられ、1つのコンクリート凸条部25D,35Dに角部251D,351Dが2つ設けられていてもよい。
このような場合も、コンクリート凸条部25D,35Dの角部351D,351Dに対応するように第1補強筋28Dおよび第2補強筋38Dを設ける。
Moreover, like the shear failure prevention structure of the diaphragm wall shown in FIG. The cross-sectional shape of the portion 34D and the concrete protruding streak portion 35D is trapezoidal. Two 351D may be provided.
Also in such a case, the first reinforcing bar 28D and the second reinforcing bar 38D are provided so as to correspond to the corners 351D, 351D of the concrete ridges 25D, 35D.

また、上記の実施形態では、先行エレメント2には1つのコンクリート凸条部25に対応するように1つの第1屈曲部281を有する第1補強筋28が上下方向に複数配列されているが、複数のコンクリート凸条部25に対応するように複数の屈曲部を有する第1補強筋が配筋されていてもよい。また、後行エレメント3には、1つのコンクリート凸条部35に対応するように1つの第2屈曲部381を有する第2補強筋38が上下方向に複数配列されているが、複数のコンクリート凸条部35に対応するように複数の屈曲部を有する第2補強筋が配筋されていてもよい。 Further, in the above-described embodiment, the preceding element 2 has a plurality of first reinforcing bars 28 having one first bent portion 281 arranged in the vertical direction so as to correspond to one concrete ridge portion 25. A first reinforcing bar having a plurality of bent portions may be arranged so as to correspond to the plurality of concrete ridges 25 . Further, in the trailing element 3, a plurality of second reinforcing bars 38 having one second bent portion 381 are arranged in the vertical direction so as to correspond to one concrete ridge portion 35. A second reinforcing bar having a plurality of bent portions may be arranged so as to correspond to the streak portion 35 .

1,1B-1D 地中連続壁
2 先行エレメント(第1エレメント)
3 後行エレメント(第2エレメント)
4,4B-4D 継手部
24,24C,24C,24D コンクリート凹条部(第1凹条部)
25,25B,25C,25D コンクリート凸条部(第1凸条部)
26 第1傾斜面
27 第2傾斜面
28 第1補強筋
34,34C,34C,34D コンクリート凹条部(第2凹条部)
35,35B,35C,35D コンクリート凸条部(第2凸条部)
36 第3傾斜面
37 第4傾斜面
38 第2補強筋
281 第1屈曲部
381 第2屈曲部
1, 1B-1D Diaphragm wall 2 Leading element (first element)
3 trailing element (second element)
4, 4B-4D Joint part 24, 24C, 24C, 24D Concrete concave streak part (first concave streak part)
25, 25B, 25C, 25D Concrete ridge (first ridge)
26 First inclined surface 27 Second inclined surface 28 First reinforcing bar 34, 34C, 34C, 34D Concrete concave streak (second concave streak)
35, 35B, 35C, 35D Concrete ridges (second ridges)
36 third inclined surface 37 fourth inclined surface 38 second reinforcing bar 281 first bent portion 381 second bent portion

Claims (1)

鉄筋コンクリート製の第1エレメントと第2エレメントとが隣接して設けられる地中連続壁における前記第1エレメントと前記第2エレメントとの継手部を介した前記第1エレメントと前記第2エレメントとのせん断破壊を防止するための地中連続壁のせん断破壊防止構造において、
前記第1エレメントには、前記第2エレメント側の端面に、前記第1エレメントと前記第2エレメントが隣接する壁長さ方向に突出し、壁厚さ方向に延びる第1凸条部と、前記壁長さ方向に凹み、前記壁厚さ方向に延びる第1凹条部と、が壁高さ方向に交互に配列され、
前記第2エレメントには、前記第1エレメント側の端面に、前記壁長さ方向に突出し、前記壁厚さ方向に延びる第2凸条部と、前記壁長さ方向に凹み、前記壁厚さ方向に延びる第2凹条部と、が前記壁高さ方向に交互に配列され、
前記継手部では、前記第1凸条部と前記第2凹条部とが嵌合し、前記第1凹条部と前記第2凸条部とが嵌合し、
前記第1エレメントには、前記第1凸条部および前記第1凹条部の凹凸に沿って第1補強筋が設けられ、
前記第2エレメントには、前記第2凸条部および前記第2凹条部の凹凸に沿って第2補強筋が設けられており、
前記第1補強筋は、前記壁高さ方向に複数配列され、前記第1凸条部に対応する第1屈曲部を有し、
前記壁高さ方向に隣り合う前記第1補強筋は、上側の前記第1補強筋の前記第1屈曲部よりも下側の部分と、下側の前記第1補強筋の前記第1屈曲部よりも上側の部分とが同じ高さに配置され、
前記第2補強筋は、前記壁高さ方向に複数配列され、前記第2凸条部に対応する第2屈曲部を有し、
前記壁高さ方向に隣り合う前記第2補強筋は、上側の前記第2補強筋の前記第2屈曲部よりも下側の部分と、下側の前記第2補強筋の前記第2屈曲部よりも上側の部分とが同じ高さに配置されていることを特長とする地中連続壁のせん断破壊防止構造。
Shearing of the first element and the second element via the joint part of the first element and the second element in the diaphragm wall in which the first element and the second element made of reinforced concrete are provided adjacently. In the shear failure prevention structure of the diaphragm wall to prevent failure,
The first element includes, on the end face on the side of the second element, a first ridge protruding in the length direction of the wall where the first element and the second element are adjacent and extending in the thickness direction of the wall; First grooves recessed in the length direction and extending in the wall thickness direction are alternately arranged in the wall height direction,
The second element has, on the end face on the first element side, a second protruding portion that protrudes in the wall length direction and extends in the wall thickness direction; and second grooves extending in the direction of the wall are arranged alternately in the wall height direction,
In the joint portion, the first ridge portion and the second ridge portion are fitted, the first ridge portion and the second ridge portion are fitted,
The first element is provided with a first reinforcing bar along the unevenness of the first protruded streak and the first recessed streak,
The second element is provided with a second reinforcing bar along the unevenness of the second protruded streak and the second recessed streak ,
a plurality of the first reinforcing bars arranged in the wall height direction and having a first bent portion corresponding to the first ridge;
The first reinforcing bars adjacent in the wall height direction are a portion below the first bent portion of the first reinforcing bar on the upper side and the first bent portion of the first reinforcing bar on the lower side. are arranged at the same height as the upper part of
a plurality of the second reinforcing bars arranged in the wall height direction and having second bent portions corresponding to the second ridges;
The second reinforcing bars adjacent to each other in the wall height direction are a portion below the second bent portion of the second reinforcing bar on the upper side and the second bent portion of the second reinforcing bar on the lower side. A structure for preventing shear failure of a diaphragm wall, characterized in that the upper part of the diaphragm wall is arranged at the same height .
JP2019077024A 2019-04-15 2019-04-15 Shear failure prevention structure for diaphragm wall Active JP7214546B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019077024A JP7214546B2 (en) 2019-04-15 2019-04-15 Shear failure prevention structure for diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019077024A JP7214546B2 (en) 2019-04-15 2019-04-15 Shear failure prevention structure for diaphragm wall

Publications (2)

Publication Number Publication Date
JP2020176375A JP2020176375A (en) 2020-10-29
JP7214546B2 true JP7214546B2 (en) 2023-01-30

Family

ID=72937313

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019077024A Active JP7214546B2 (en) 2019-04-15 2019-04-15 Shear failure prevention structure for diaphragm wall

Country Status (1)

Country Link
JP (1) JP7214546B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017179734A (en) 2016-03-28 2017-10-05 大成建設株式会社 Construction joint structure of underground continuous wall

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5231647B2 (en) * 1972-01-27 1977-08-16
JPS5336915A (en) * 1976-09-16 1978-04-05 Kouichi Sueyoshi Method of constructing earthquakeeproof underground wall
JPS5988533A (en) * 1982-11-15 1984-05-22 Penta Ocean Constr Co Ltd Coupling steel member of underground continuous wall
JP2698959B2 (en) * 1993-06-15 1998-01-19 安藤建設株式会社 Rigid joint of underground continuous wall
JP3746876B2 (en) * 1997-06-26 2006-02-15 鹿島建設株式会社 Construction method of underground continuous wall

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017179734A (en) 2016-03-28 2017-10-05 大成建設株式会社 Construction joint structure of underground continuous wall

Also Published As

Publication number Publication date
JP2020176375A (en) 2020-10-29

Similar Documents

Publication Publication Date Title
JP5055028B2 (en) Precast slab joint structure
KR100775580B1 (en) Precast concrete deck module being connected by roof steel and precast concrete deck having such module
JP7402100B2 (en) Concrete member joints and concrete member connection methods
JP7214546B2 (en) Shear failure prevention structure for diaphragm wall
JPH10231694A (en) Structure of coupling
JP6778484B2 (en) Flushing for synthetic slabs, joint structure between synthetic slabs and beams, and synthetic slabs
JP7169152B2 (en) Joint structure of precast concrete members
JP2018053441A (en) Precast concrete floor slab provided with loop-like joint
JP6738599B2 (en) Joint structure of precast concrete plates
KR20150088049A (en) A steel form assembly for atypical concrete structures
JP7219651B2 (en) Concrete member joint and method for manufacturing concrete member joint
JPH09242022A (en) Joint structure
JP6643851B2 (en) Precast concrete member joining method
KR101788079B1 (en) Blockout connecting apparatus for precast structure and construction method therefor
JP7300841B2 (en) JOINT STRUCTURE OF DIAMOND WALL AND CONSTRUCTION METHOD OF DIAMOND WALL
KR102035495B1 (en) Double Wall Structure with Resisting Shear Force Member
KR200450841Y1 (en) Joint structure of precast box culvert unit with anti-sedimentation configuration by inserting precast concrete box culvert unit on both sides of connecting anchor bar
JP7515334B2 (en) Floor structure in which steel floor plates are engaged
KR101825375B1 (en) FRC Precast Slab, and Method for Combing FRC Precast Slab with In-situ Concrete Member
JP7223656B2 (en) Precast concrete members, foundation structures and slab structures
JP7374735B2 (en) Reinforcement structure of underground continuous wall
JP6851658B2 (en) Log material
JP7342344B2 (en) Precast beam joint structure
JP7390909B2 (en) Continuous underground walls and construction methods for continuous underground walls
JP7275368B2 (en) Composite structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220202

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221031

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221101

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221219

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230110

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230118

R150 Certificate of patent or registration of utility model

Ref document number: 7214546

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150