JP6816523B2 - Continuous steel casting method - Google Patents

Continuous steel casting method Download PDF

Info

Publication number
JP6816523B2
JP6816523B2 JP2017005752A JP2017005752A JP6816523B2 JP 6816523 B2 JP6816523 B2 JP 6816523B2 JP 2017005752 A JP2017005752 A JP 2017005752A JP 2017005752 A JP2017005752 A JP 2017005752A JP 6816523 B2 JP6816523 B2 JP 6816523B2
Authority
JP
Japan
Prior art keywords
slab
casting
machine
continuous casting
roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017005752A
Other languages
Japanese (ja)
Other versions
JP2018114514A (en
Inventor
田島 直樹
直樹 田島
憲司 久保
憲司 久保
謙治 田口
謙治 田口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2017005752A priority Critical patent/JP6816523B2/en
Publication of JP2018114514A publication Critical patent/JP2018114514A/en
Application granted granted Critical
Publication of JP6816523B2 publication Critical patent/JP6816523B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Continuous Casting (AREA)

Description

本発明は、鋼の連続鋳造方法に関し、具体的には、連続鋳造機の機端以降でのバルジングを発生させることなく、定常的に機長限界速度を適用することにより生産能率を向上することができる鋼の連続鋳造方法に関する。 The present invention relates to a continuous steel casting method, and specifically, it is possible to improve production efficiency by constantly applying the machine length limit speed without causing bulging after the machine end of the continuous casting machine. Regarding the continuous casting method of steel that can be made.

図2は、鋼の連続鋳造を行う一般的な連続鋳造機100の概要を示す説明図である。図2を参照しながら、鋼の連続鋳造を説明する。 FIG. 2 is an explanatory diagram showing an outline of a general continuous casting machine 100 that continuously casts steel. Continuous casting of steel will be described with reference to FIG.

溶鋼の保持搬送機能を有する取鍋(図示しない)の下方に配置された連続鋳造機100の溶鋼容器であるタンディッシュ(図示しない)から、浸漬ノズル101を介して、水冷された鋳型102の内部へ溶鋼を供給し、鋳造方向下流に移動させる間に、外部から水スプレー等の冷却装置(図示しない)による冷却によって溶鋼を凝固させて鋳片107を製造する。鋳片107は、「鋼片」、「スラブ」などとも称される。 Inside a water-cooled mold 102 via a dipping nozzle 101 from a tundish (not shown), which is a molten steel container of a continuous casting machine 100 arranged below a ladle (not shown) having a function of holding and transporting molten steel. While the molten steel is supplied to the steel and moved downstream in the casting direction, the molten steel is solidified by cooling with a cooling device (not shown) such as a water spray from the outside to produce the slab 107. The slab 107 is also referred to as a "steel piece", a "slab", or the like.

連続鋳造機100の鋳型102の近傍では、鋳片107の表層のみが凝固しており(初期凝固)、サポートロール103に沿って鋳造方向下流へ向かうにつれて中心側に凝固層(固相)が進展して未凝固溶鋼106(液相)は小さくなる。鋳片107が鋳型102を通過した後、連続鋳造機100の機端外に出るまでに冷却水等による二次冷却が一般的に行われる。凝固が完了した鋳片107は、切断装置108によって所定の長さに調整されることにより、複数の鋳片が連続的に製造される。 In the vicinity of the mold 102 of the continuous casting machine 100, only the surface layer of the slab 107 is solidified (initial solidification), and the solidified layer (solid phase) develops toward the center as it goes downstream in the casting direction along the support roll 103. As a result, the unsolidified molten steel 106 (liquid phase) becomes smaller. After the slab 107 passes through the mold 102, secondary cooling with cooling water or the like is generally performed before the slab 107 goes out of the machine end of the continuous casting machine 100. The slab 107 that has been solidified is adjusted to a predetermined length by the cutting device 108, so that a plurality of slabs are continuously produced.

連続鋳造においては、連続鋳造機100の鋳造方向の最終サポートロール105の設置位置であって最終サポートロール105と鋳片107とが接する位置である機端110において鋳片107の凝固を完了させる必要がある。これは、凝固完了位置が機端110から鋳造方向下流側へ移動してしまうと、未凝固溶鋼に作用する静鉄圧の作用によってサポートロール103に支持されない部分の鋳片107が膨らむバルジングが発生し、鋳片107の内部品質の悪化や、鋳造停止といった連続鋳造操業の阻害を引き起こすためである。 In continuous casting, it is necessary to complete solidification of the slab 107 at the machine end 110, which is the installation position of the final support roll 105 in the casting direction of the continuous casting machine 100 and the position where the final support roll 105 and the slab 107 are in contact with each other. There is. This is because when the solidification completion position moves from the machine end 110 to the downstream side in the casting direction, bulging occurs in which the slab 107 of the portion not supported by the support roll 103 swells due to the action of the static iron pressure acting on the unsolidified molten steel. However, this is because the internal quality of the slab 107 deteriorates and the continuous casting operation is hindered such as stopping casting.

さらに、切断時に鋳片107の凝固が完了していない場合は、鋳片107の内部から未凝固溶鋼が噴出し、周辺設備の焼損により被害が拡大するおそれもある。したがって、一般的には、鋳造速度は連続鋳造機の冷却能力に応じた凝固速度を考慮して決定される。 Further, if the solidification of the slab 107 is not completed at the time of cutting, the unsolidified molten steel may be ejected from the inside of the slab 107, and the damage may be expanded due to the burning of peripheral equipment. Therefore, in general, the casting rate is determined in consideration of the solidification rate according to the cooling capacity of the continuous casting machine.

「機長限界速度」とは、連続鋳造機100が有する鋳型102や二次冷却帯の冷却能力およびサポートロール103の配置に準じて定められる安定鋳造可能な最大の鋳造速度を意味しており、具体的には、(1)式により算出される。
(1)式において、VcMAXは機長限界速度を示し、Lは鋳型溶鋼面から機端までの鋳造経路に沿った距離(機長)を示し、kは凝固係数を示し、Tは鋳片厚を示す。
The "machine length limit speed" means the maximum casting speed at which stable casting is possible, which is determined according to the cooling capacity of the mold 102 and the secondary cooling zone of the continuous casting machine 100 and the arrangement of the support roll 103. It is calculated by the equation (1).
In equation (1), Vc MAX indicates the machine length limit speed, L indicates the distance (machine length) along the casting path from the molten steel surface of the mold to the machine end, k indicates the solidification coefficient, and T indicates the slab thickness. Shown.

(1)式は、一般的な連続鋳造の関係を表す基礎式(例えば、第3版鉄鋼便覧II製銑・製鋼 丸善 1979年 624頁)の鋳造速度に機長限界速度VcMAXを、鋳造経路長さに機長Lをそれぞれ代入して得られる。連続鋳造における冷却が、鋳片全体にわたって均一であり、操業変動がない理想的な場合には(1)式が円滑に適用できる。 Equation (1) uses the machine length limit speed Vc MAX as the casting speed of the basic formula (for example, 3rd Edition Steel Handbook II Ironmaking / Steelmaking Maruzen, p. 624, 1979), which expresses the relationship of general continuous casting, and the casting path length. It is obtained by substituting the captain L for each. In the ideal case where the cooling in continuous casting is uniform throughout the slab and there is no operational fluctuation, equation (1) can be applied smoothly.

ところが、実際の連続鋳造の操業では、初期凝固や二次冷却に起因する不均一凝固がそのまま最終凝固プロフィールとして残留する。また、鋳片の冷却の意図しない過不足が生じると、想定した凝固完了位置通りにはならないことがある。 However, in the actual continuous casting operation, the non-uniform solidification caused by the initial solidification and the secondary cooling remains as it is as the final solidification profile. Further, if an unintended excess or deficiency of cooling of the slab occurs, the expected solidification completion position may not be achieved.

それに加えて、溶鋼過熱度の変化や鋳造速度の変動が発生した際は、凝固完了位置の正確な制御は困難である。よって、実際の鋳造における鋳造速度は、機長一杯での完全凝固を前提とした機長限界速度で設定できることは稀であり、安全代を加味して、内部品質の悪化や、鋳造停止といった連続鋳造操業の阻害を引き起こさない程度に、機端よりも上流側で完全凝固するように、機長限界速度より小さく設定することが行われてきた。すなわち、現実的には、(1)式において、凝固までの鋳造経路長さを機長Lより小さくするために、鋳造速度を機長限界速度VcMAXより小さくする。 In addition, when the degree of superheat of molten steel or the casting speed fluctuates, it is difficult to accurately control the solidification completion position. Therefore, it is rare that the casting speed in actual casting can be set at the captain's limit speed on the premise of complete solidification with the full captain, and in consideration of safety costs, continuous casting operations such as deterioration of internal quality and casting stoppage are performed. It has been set to be smaller than the captain's limit speed so as to completely solidify on the upstream side of the machine edge so as not to cause hindrance. That is, in reality, in the equation (1), the casting speed is made smaller than the machine length limit speed Vc MAX in order to make the casting path length until solidification smaller than the machine length L.

一方で、生産能率をできるだけ高めるためには、連続鋳造操業の阻害を引き起こさない前提で、鋳造速度は機長限界速度で定常的に鋳造できることが望ましい。 On the other hand, in order to increase the production efficiency as much as possible, it is desirable that the casting speed can be constantly cast at the machine length limit speed on the premise that the continuous casting operation is not hindered.

特許文献1,2には、連続鋳造鋳片の凝固完了位置の推定とその推定結果に伴う、鋳造速度の調整や二次冷却の設定調整方法が開示されている。 Patent Documents 1 and 2 disclose an estimation of the solidification completion position of a continuously cast slab and a method of adjusting the casting speed and setting and adjusting the secondary cooling according to the estimation result.

特許文献3には、連続鋳造機のロールの冷却能力を向上することにより、鋳造速度を向上する発明が開示されている。 Patent Document 3 discloses an invention in which the casting speed is improved by improving the cooling capacity of the roll of the continuous casting machine.

特許文献4には、連続鋳造時に断続的に圧下することにより、機械的な凝固完了点を作り出すことによって、凝固完了点にて未凝固溶鋼が分離された鋳片を製造することにより、鋳造上流側からの静圧が凝固完了点より鋳造下流側に伝わらないので、鋳片ガイド等を使用せずにバルジングを防止して、鋳造速度や冷却条件に影響されない鋳造方法が開示されている。 In Patent Document 4, the casting upstream is described by producing a slab from which unsolidified molten steel is separated at the solidification completion point by creating a mechanical solidification completion point by intermittently pressing during continuous casting. Since the static pressure from the side is not transmitted to the downstream side of the casting from the solidification completion point, a casting method that prevents bulging without using a slab guide or the like and is not affected by the casting speed or cooling conditions is disclosed.

さらに、特許文献5には、鋳片の中心固相率が0.8以上の時に鋳片を大圧下することにより、内質に優れた極厚鋼板用鋳片の製造方法が開示され、特許文献6には、未凝固大圧下中に連々鋳においても鋳造速度を低下させることなく鋳片圧下を継続して行うことできる鋳造方法が開示されており、安定した品質の鋳片を製造可能としている。 Further, Patent Document 5 discloses a method for producing a slab for an extra-thick steel sheet having excellent internal quality by significantly reducing the slab when the central solid phase ratio of the slab is 0.8 or more. Document 6 discloses a casting method capable of continuously performing slab reduction without lowering the casting speed even in continuous casting during unsolidified large reduction, and makes it possible to produce slabs of stable quality. There is.

特許第4474772号明細書Japanese Patent No. 4474772 特許第4453556号明細書Japanese Patent No. 4453556 特開2011−041960号公報Japanese Unexamined Patent Publication No. 2011-041960 特開平8−224646号公報Japanese Unexamined Patent Publication No. 8-224646 特許4296985号明細書Patent No. 4296985 特許5177067号明細書Japanese Patent No. 5177067

しかし、特許文献1,2により開示された発明では、安定して最大鋳造速度を維持できないことから、生産能率の低下は避けられない。 However, in the inventions disclosed in Patent Documents 1 and 2, since the maximum casting speed cannot be stably maintained, a decrease in production efficiency is unavoidable.

特許文献3により開示された発明を実施すると、特殊なロールの配備やそれに付随する周辺設備の追加により設備コストが嵩んでしまう。 When the invention disclosed in Patent Document 3 is carried out, the equipment cost increases due to the deployment of a special roll and the addition of peripheral equipment associated therewith.

特許文献4には、鋳片を凝固完了させるに必要な圧下設備の具体的な仕様が規定されておらず、少なくともスラブのような広幅鋳片を圧下するためには、高速で昇降する大径ロールを連続鋳造機内に配置する必要があり、設備コストが嵩む。また、凝固完了点に挟まれた鋳片の形状は少なくともその先端および後端では、厚みが極端に変動し得るため圧延工程で鋳片形状が問題になる可能性がある。 Patent Document 4 does not specify specific specifications of the reduction equipment required to complete solidification of the slab, and at least in order to reduce a wide slab such as a slab, a large diameter that moves up and down at high speed. It is necessary to arrange the rolls in the continuous casting machine, which increases the equipment cost. Further, the shape of the slab sandwiched between the solidification completion points can vary extremely in thickness at least at the front end and the rear end, so that the slab shape may become a problem in the rolling process.

さらに、特許文献5,6により開示されたいずれの発明も鋳造速度は0.7〜0.8m/分程度に留まっており、生産能率を考慮した大圧下設備の配置や大圧下操業の活用を十分に享受する方法は開示されていない。 Further, in all the inventions disclosed in Patent Documents 5 and 6, the casting speed is limited to about 0.7 to 0.8 m / min, and the arrangement of large reduction equipment and the utilization of large reduction operation in consideration of production efficiency can be utilized. There is no disclosure of how to fully enjoy it.

本発明は、従来の技術が有するこのような課題に鑑みてなされたものであり、連続鋳造において機長限界速度で鋳造する際に問題となる連続鋳造機の機端以降でのバルジングによる操業阻害を防止し、安定して生産能率の高い操業を行う技術を提供することを目的とする。 The present invention has been made in view of such problems of the prior art, and it prevents the operation hindrance due to bulging after the machine end of the continuous casting machine, which is a problem when casting at the machine length limit speed in continuous casting. The purpose is to provide technology for prevention and stable operation with high production efficiency.

本発明は以下に列記のとおりである。 The present invention is as listed below.

(1)連続鋳造機が安定鋳造可能な最大の鋳造速度である機長限界速度により鋳造した際の鋳片の厚み中心固相率が0.7となる位置から、連続鋳造機の鋳造方向の最終サポートロールの設置位置であって該最終サポートロールと鋳片とが接する位置である機端までの範囲内に配置された、ロール径が450〜600mmである1対の圧下ロールを用いて、鋳片を圧下し、前記機長限界速度の95%以上106%以下の鋳造速度で鋳造することを特徴とする鋼の連続鋳造方法。 (1) From the position where the thickness center solid phase ratio of the slab is 0.7 when casting at the machine length limit speed, which is the maximum casting speed at which the continuous casting machine can perform stable casting, the final casting direction of the continuous casting machine. Casting using a pair of reduction rolls having a roll diameter of 450 to 600 mm, which are arranged within the range up to the machine edge, which is the installation position of the support roll and the position where the final support roll and the slab are in contact with each other. A method for continuous casting of steel, which comprises pressing a piece and casting at a casting speed of 95% or more and 106% or less of the machine length limit speed.

以降、ロール径が450〜600mmである1対の圧下ロールを「大圧下ロール」と称することがある。 Hereinafter, a pair of reduction rolls having a roll diameter of 450 to 600 mm may be referred to as a "large reduction roll".

本発明において「中心固相率」とは、鋳片厚み中心の固相と液相の全体量に対する固相の割合を意味する。 In the present invention, the "central solid phase ratio" means the ratio of the solid phase at the center of the slab thickness to the total amount of the liquid phase.

(2)前記鋳片を二次冷却する際の比水量を0.6〜1.6L/kg−鋼で鋳造することを特徴とする1項に記載された鋼の連続鋳造方法。 (2) The method for continuously casting steel according to item 1, wherein the specific water amount at the time of secondary cooling of the slab is cast from 0.6 to 1.6 L / kg-steel.

(3)前記連続鋳造機の鋳造速度は、機長限界速度の95%以上106%以下であることを特徴とする1項または2項に記載された鋼の連続鋳造方法。 (3) The method for continuously casting steel according to item 1 or 2, wherein the casting speed of the continuous casting machine is 95% or more and 106% or less of the machine length limit speed.

また、本発明は以下のように列記することができる。 In addition, the present invention can be listed as follows.

(4)1項に記載された鋼の連続鋳造方法によって(3)式で定義される鋳片厚み中心のポロシティ欠陥評価指標を50%以上とすることを特徴とする鋼の連続鋳造方法。 (4) A method for continuously casting steel according to the method for continuously casting steel according to item 1, wherein the porosity defect evaluation index at the center of the slab thickness defined by the equation (3) is set to 50% or more.

ポロシティ欠陥評価指標(%)={(V0−V)/V0}×100 ・・・・(3)
ここで、V0(cm/g)は、前記圧下ロールで鋳片を圧下しなかった場合の鋳片幅方向の平均の鋳片厚み中心の単位質量あたりのポロシティ体積を示し、V(cm/g)は鋳片幅方向の平均の鋳片厚み中心の単位質量あたりのポロシティ体積を表す。
Porosity defect evaluation index (%) = {(V0-V) / V0} × 100 ... (3)
Here, V0 (cm 3 / g) indicates the porosity volume per unit mass of the average slab thickness center in the slab width direction when the slab is not reduced by the reduction roll, and is V (cm 3). / G) represents the porosity volume per unit mass of the average slab thickness center in the slab width direction.

ここで、「ポロシティ」とは、鋳片厚み中心部での凝固収縮および凝固後の熱収縮により生じる空孔のことをいう。一般的に、「センターポロシティ」とも呼称される。 Here, "porosity" refers to pores generated by solidification shrinkage at the center of the slab thickness and heat shrinkage after solidification. Generally, it is also called "Center Porosity".

(5)1項に記載された鋼の連続鋳造方法により製造され、(3)式により定義される鋳片厚み中心のポロシティ欠陥評価指標が50%以上であることを特徴とする連続鋳造鋳片。 (5) A continuously cast slab produced by the continuous steel casting method described in paragraph 1 and characterized in that the porosity defect evaluation index at the center of the slab thickness defined by the formula (3) is 50% or more. ..

ポロシティ欠陥評価指標(%)={(V0−V)/V0}×100 ・・・・(3)
ここで、V0(cm/g)は、前記圧下ロールで鋳片を圧下しなかった場合の鋳片幅方向の平均の鋳片厚み中心の単位質量あたりのポロシティ体積を示し、V(cm/g)は鋳片幅方向の平均の鋳片厚み中心の単位質量あたりのポロシティ体積を表す。
Porosity defect evaluation index (%) = {(V0-V) / V0} × 100 ... (3)
Here, V0 (cm 3 / g) indicates the porosity volume per unit mass of the average slab thickness center in the slab width direction when the slab is not reduced by the reduction roll, and is V (cm 3). / G) represents the porosity volume per unit mass of the average slab thickness center in the slab width direction.

本発明に係る鋼の連続鋳造方法によれば、連続鋳造において機長限界速度で鋳造する際に問題となる連続鋳造機の機端以降でのバルジングでの操業阻害を防止しつつ安定した高生産能率操業を実施することができる。 According to the continuous steel casting method according to the present invention, stable high production efficiency is prevented while preventing operation obstruction due to bulging after the machine end of the continuous casting machine, which is a problem when casting at the machine length limit speed in continuous casting. The operation can be carried out.

また、本発明の連続鋳造方法によれば、内部品質の悪化が抑制された鋼を提供することができる。 Further, according to the continuous casting method of the present invention, it is possible to provide steel in which deterioration of internal quality is suppressed.

図1は、本発明に係る連続鋳造機と大圧下ロールの配置の概要を示す説明図である。FIG. 1 is an explanatory diagram showing an outline of arrangement of a continuous casting machine and a large reduction roll according to the present invention. 図2は、鋼の連続鋳造を行う一般的な連続鋳造機の概要を示す説明図である。FIG. 2 is an explanatory diagram showing an outline of a general continuous casting machine that continuously casts steel.

以下、本発明を実施するための形態を、添付図面を参照しながら説明する。 Hereinafter, embodiments for carrying out the present invention will be described with reference to the accompanying drawings.

図1は、連続鋳造機0とロール径が450〜600mmである圧下ロール4(大圧下ロール4)の配置の概要を示す説明図である。符号1は浸漬ノズル、符号2は鋳型、符号3はサポートロール、符号4は大圧下ロール、符号5は機端(最終サポートロール)、符号6は鋳片内の未凝固溶鋼、符号7は凝固後の鋳片、符号8は切断装置(カッター)を示す。背景技術欄と重複する内容は、説明を省略する場合がある。 FIG. 1 is an explanatory diagram showing an outline of arrangement of a continuous casting machine 0 and a reduction roll 4 (large reduction roll 4) having a roll diameter of 450 to 600 mm. Reference numeral 1 is a dipping nozzle, reference numeral 2 is a mold, reference numeral 3 is a support roll, reference numeral 4 is a large reduction roll, reference numeral 5 is a machine end (final support roll), reference numeral 6 is unsolidified molten steel in a slab, and reference numeral 7 is solidification. Subsequent slabs, reference numeral 8, indicate a cutting device (cutter). The description of the content that overlaps with the background technology column may be omitted.

なお、連続鋳造機0としては、図1に示すものに限定されるわけではなく、一般的に用いられる連続鋳造機であればいずれにも適用してもよい。例えば、垂直型連続鋳造機、垂直曲げ型連続鋳造機、全湾曲型連続鋳造機等が挙げられる。また、一般的な連続鋳造機としては、鋳型断面の形状によりスラブ、ブルーム、ビレット、丸鋼片、ビームブランク等の製造に用いられる各種連続鋳造機があるが、本発明はそのいずれに適用してもよい。 The continuous casting machine 0 is not limited to the one shown in FIG. 1, and may be applied to any generally used continuous casting machine. For example, a vertical type continuous casting machine, a vertical bending type continuous casting machine, a fully curved type continuous casting machine and the like can be mentioned. Further, as a general continuous casting machine, there are various continuous casting machines used for manufacturing slabs, blooms, billets, round steel pieces, beam blanks, etc. depending on the shape of the mold cross section, and the present invention applies to any of them. You may.

本発明は、連々鋳造境界を含む溶鋼過熱度の変化や操業起因の鋳造速度の変動に対して、安定して機長限界速度での鋳造を可能とするものである。なお、「連々鋳」とは、同一のタンディッシュを使用する前提で、鋳造の進行によって溶鋼が空になった取鍋を、次の溶鋼が充填された取鍋に、連続鋳造の実施中に交換することにより、複数の取鍋の溶鋼を連続的に鋳造する操業形態をいう。 INDUSTRIAL APPLICABILITY The present invention enables stable casting at a machine length limit speed against changes in the superheat degree of molten steel including a continuous casting boundary and fluctuations in the casting speed due to operation. In addition, "continuous casting" is based on the premise that the same tundish is used, and the ladle whose molten steel has been emptied due to the progress of casting is put into the next ladle filled with molten steel during continuous casting. It refers to an operation mode in which molten steel in a plurality of ladle is continuously cast by exchanging.

本発明の鋼の連続鋳造方法によれば、大圧下ロール4,4を用いることにより、鋳造する鋳片7を圧下し、鋳片7内の未凝固溶鋼6の上下の固液界面を圧着して、強制的に凝固完了させることができるため、初期凝固や二次冷却に起因する幅方向の不均一凝固による未凝固部残存で生じる、連続鋳造機の機端以降で生じるバルジングを防止することができ、連続鋳造機の機長限界速度の95%以上106%以下の速度で連続鋳造することができる。 According to the continuous steel casting method of the present invention, the slabs 7 to be cast are reduced by using the large reduction rolls 4 and 4, and the solid-liquid interfaces above and below the unsolidified molten steel 6 in the slabs 7 are crimped. Since solidification can be forcibly completed, it is possible to prevent bulging that occurs after the end of the continuous casting machine, which occurs due to residual unsolidified part due to non-uniform solidification in the width direction due to initial solidification and secondary cooling. It is possible to continuously cast at a speed of 95% or more and 106% or less of the machine length limit speed of the continuous casting machine.

本発明に用いられる大圧下ロール4は、連続鋳造機が安定鋳造可能な最大の鋳造速度である機長限界速度により鋳造した際の鋳片の厚み中心固相率が0.7となる位置から、連続鋳造機の鋳造方向の最終サポートロールの設置位置であって該最終サポートロールと鋳片とが接する位置である機端までの範囲内に、ロールとロールが鋳片を挟み込むように1対で配置される。 The large reduction roll 4 used in the present invention is formed from a position where the thickness center solid phase ratio of the slab is 0.7 when the continuous casting machine is cast at the machine length limit speed, which is the maximum casting speed capable of stable casting. A pair of rolls and rolls sandwich the slab within the range up to the machine edge, which is the installation position of the final support roll in the casting direction of the continuous casting machine and the position where the final support roll and the slab are in contact with each other. Be placed.

言い換えると、例えば本発明に係る連続鋳造機0における機長Lが28.3mで鋳片の厚みが300mm、且つ溶鋼過熱度が45℃の場合、連続鋳造機0の機端5から鋳造方向上流側へ1.5m以内に大圧下ロール4を配する。 In other words, for example, when the machine length L of the continuous casting machine 0 according to the present invention is 28.3 m, the thickness of the slab is 300 mm, and the molten steel superheat degree is 45 ° C., the upstream side in the casting direction from the machine end 5 of the continuous casting machine 0. Place the large reduction roll 4 within 1.5 m.

大圧下ロール4の位置とは、大圧下ロール4と鋳片7とが接する位置を意味し、1対の大圧下ロール4,4の中心を結んだ位置である。 The position of the large reduction roll 4 means a position where the large reduction roll 4 and the slab 7 are in contact with each other, and is a position connecting the centers of the pair of large reduction rolls 4 and 4.

大圧下ロール4のロール径は、450mm以上600mm以下であることが好ましい。 The roll diameter of the large reduction roll 4 is preferably 450 mm or more and 600 mm or less.

大圧下ロール4のロール径を450mm以上とするのは、ロール径が小さいと十分な圧下量を確保できないからである。本発明において圧下不足が生じると、未凝固溶鋼によるバルジング発生が懸念されるため、圧下量の確保は極めて重要である。また、鋳片のポロシティ欠陥の残留が懸念される。 The reason why the roll diameter of the large reduction roll 4 is 450 mm or more is that if the roll diameter is small, a sufficient reduction amount cannot be secured. If the reduction is insufficient in the present invention, there is a concern that bulging may occur due to the unsolidified molten steel, so it is extremely important to secure the reduction amount. In addition, there is a concern that porosity defects in the slab may remain.

一方、大圧下ロール4のロール径の最大は600mmとする。大圧下ロール4のロール径が600mmより大きくなると、圧下反力が増大する等の設備的な障害要因が発生するので、連続鋳造機内に設置することに対して非現実的である。 On the other hand, the maximum roll diameter of the large reduction roll 4 is 600 mm. If the roll diameter of the large reduction roll 4 is larger than 600 mm, equipment obstacles such as an increase in the reduction reaction force occur, which is impractical for installation in a continuous casting machine.

また、大圧下ロール4によっては、中心固相率が1.0未満で圧下することがより好ましい。中心固相率を1.0未満で大圧下を行うことにより、鋳造段階での大圧下により、鋳片厚み中心の温度は高く鋳片表面に比べて変形抵抗が低位であるため、中心の圧下浸透がよくなるため、センターポロシティを効果的に低減することができる。さらに効果的なポロシティ低減のためには、中心固相率は0.8以上であることが望ましい。 Further, depending on the large phase rule roll 4, it is more preferable that the core solid phase ratio is less than 1.0. By performing a large reduction with a central solid phase ratio of less than 1.0, the temperature at the center of the thickness of the slab is high and the deformation resistance is low compared to the surface of the slab due to the large reduction at the casting stage. Since the penetration is improved, the center porosity can be effectively reduced. For more effective porosity reduction, it is desirable that the central solid phase ratio is 0.8 or more.

また、圧下量が3mm未満では鋳片のポロシティの軽減効果が期待できないため、3mm以上の圧下量を確保することが好ましい。さらに好ましくは、1対の大圧下ロール4による圧下量が10mm以上である。 Further, if the reduction amount is less than 3 mm, the effect of reducing the porosity of the slab cannot be expected, so it is preferable to secure a reduction amount of 3 mm or more. More preferably, the amount of reduction by the pair of large reduction rolls 4 is 10 mm or more.

鋳片の、大圧下ロール4による圧下とサポートは、位置センサーが付随した大圧下ロール4を油圧昇降させて実施することが例示される。その際、大圧下ロール4は未凝固部分を圧着することに相当する圧下量で圧下することで、鋳片の未凝固界面を強制圧着する。大圧下ロール4の鋳片厚さ方向の位置は、当該位置センサーによって、初期状態と現在状態の位置情報から算出することにより把握することができる。したがって、鋳片を挟んで上下に配された大圧下ロール4,4のロール間隔を把握した上で、連続鋳造操業を実施できる。 It is exemplified that the reduction and support of the slab by the large reduction roll 4 is carried out by hydraulically raising and lowering the large reduction roll 4 with the position sensor. At that time, the large reduction roll 4 is forcibly crimped to the unsolidified interface of the slab by reducing the amount of reduction corresponding to crimping the unsolidified portion. The position of the large reduction roll 4 in the slab thickness direction can be grasped by calculating from the position information of the initial state and the current state by the position sensor. Therefore, the continuous casting operation can be carried out after grasping the roll intervals of the large reduction rolls 4 and 4 arranged vertically with the slab sandwiched between them.

なお、中心固相率fsは、溶鋼の液相線温度TLと固相線温度Tsと厚さ中心の温度Tから、fs=(TL−T)/(TL−Ts)で求めることができる。なお、鋳片の厚さ中心の温度Tが溶鋼の液相線温度TL以上の場合はfs=0であり、前記厚さ中心の温度Tが溶鋼の固相線温度Tsより小さい場合はfs=1.0であるとする。また、鋳片の厚さ中心の温度Tは、鋳造速度、鋳片の表面冷却、鋳造鋼種の物性等を考慮した鋳片厚さ方向一次元の一般的な伝熱解析計算によって求めることができる。 The central solid phase ratio fs can be obtained by fs = (TL-T) / (TL-Ts) from the liquidus phase line temperature TL of the molten steel, the solid phase line temperature Ts, and the temperature T at the center of the thickness. When the temperature T at the center of the thickness of the slab is equal to or higher than the liquidus temperature TL of the molten steel, fs = 0, and when the temperature T at the center of the thickness is smaller than the solidus temperature Ts of the molten steel, fs = It is assumed to be 1.0. Further, the temperature T at the center of the thickness of the slab can be obtained by a general one-dimensional heat transfer analysis calculation in the slab thickness direction in consideration of the casting speed, surface cooling of the slab, physical properties of the cast steel type, and the like. ..

機長Lが28.3mの場合、本発明で想定する機長限界速度と同一の鋳造速度で鋳造した際に、大圧下ロール4を機端から1.5mよりも鋳造上流側に設置すると、圧下時の中心固相率が0.7未満となり、鋳片圧下量が増加し鋳片厚が薄くなるため、好ましくない。当該鋳片厚に対する(1)式で算出される機長限界速度は実質上昇するため、機長限界速度で効率よく操業できるという本発明の効果が得られない。また、ポロシティ低減効果が減じるため内部品質の悪化を招来してしまう可能性があるため、好ましくない。 When the machine length L is 28.3 m, when casting at the same casting speed as the machine length limit speed assumed in the present invention, if the large reduction roll 4 is installed on the casting upstream side of 1.5 m from the machine end, the reduction occurs. The central solid phase ratio of the slab is less than 0.7, the amount of slab reduction is increased, and the slab thickness is reduced, which is not preferable. Since the machine length limit speed calculated by the equation (1) with respect to the slab thickness is substantially increased, the effect of the present invention that the operation can be efficiently performed at the machine length limit speed cannot be obtained. In addition, the porosity reduction effect is reduced, which may lead to deterioration of internal quality, which is not preferable.

一方、大圧下ロール4を設置する本発明においては、機端5のロールはサポートロールに限定される必要はなく大圧下ロール4でもよいため、その場合、機端5から大圧下ロール4までの距離の下限は0mとなる。 On the other hand, in the present invention in which the large reduction roll 4 is installed, the roll of the machine end 5 does not have to be limited to the support roll and may be the large reduction roll 4, so in that case, from the machine end 5 to the large reduction roll 4. The lower limit of the distance is 0 m.

また、本発明の連続鋳造方法において、鋳片を二次冷却する際の比水量は0.6〜1.6L/kg−鋼の範囲とすることが好ましい。0.6L/kg−鋼未満では、本発明の鋳造方法の前提となる圧下時の中心固相率を得ることが困難であるからである。つまり、冷却不足により中心固相率が低下し、鋳片圧下量が増加し鋳片厚が薄くなるため、好ましくない。また、1.6L/kg−鋼を超えると、鋳片の冷却強度が局所的に過度に大きくなるからである。特に冷却が進行し易い鋳片コーナー部位では、過冷却による変形抵抗増加により、圧下量が確保できなくなるおそれがある。二次冷却比水量は、0.8〜1.4L/kg−鋼がより好ましい。 Further, in the continuous casting method of the present invention, the specific water content when the slab is secondarily cooled is preferably in the range of 0.6 to 1.6 L / kg-steel. This is because if it is less than 0.6 L / kg-steel, it is difficult to obtain the central solid phase ratio at the time of reduction, which is the premise of the casting method of the present invention. That is, it is not preferable because the central solid phase ratio decreases due to insufficient cooling, the amount of slab reduction increases, and the slab thickness decreases. Further, if it exceeds 1.6 L / kg-steel, the cooling strength of the slab becomes excessively large locally. In particular, at the corners of the slab where cooling tends to proceed, the amount of reduction may not be secured due to the increase in deformation resistance due to supercooling. The secondary cooling ratio water amount is more preferably 0.8 to 1.4 L / kg-steel.

以上の説明では、図1に示すようにセグメント型の圧下設備の場合を例示して説明を行ったが、本発明はこの態様に限定されるわけではない。 In the above description, the case of the segment type reduction equipment has been illustrated as shown in FIG. 1, but the present invention is not limited to this aspect.

「セグメント型の圧下設備」とは、連続鋳造機を構成するセグメントと呼ばれるロール対を鋳造方向に配列した構造の圧下設備のことをいい、本発明では、ロール対の中に、大圧下ロール4が配置された構造の圧下設備である。本発明は、例えば、「スタンド型の圧下設備」においても適用可能であることは言うまでもない。「スタンド型の圧下設備」とは、セグメント間もしくは機端の鋳造下流側にロール対が単独で配置され、ロール自体の昇降が可能な構造の圧下設備である。なお、スタンド型の圧下設備については、これ自体に鋳片引抜を行う駆動力が付与されている、もしくはその鋳造下流側に鋳片引抜を目的とした引抜ロールを配することが望ましい。 The "segment type reduction equipment" refers to a reduction equipment having a structure in which roll pairs called segments constituting a continuous casting machine are arranged in the casting direction. In the present invention, the large reduction roll 4 is contained in the roll pairs. It is a reduction equipment with a structure in which. Needless to say, the present invention can also be applied to, for example, "stand-type reduction equipment". The "stand-type reduction equipment" is a reduction equipment having a structure in which a roll pair is independently arranged between segments or on the downstream side of casting at the machine end, and the roll itself can be raised and lowered. It is desirable that the stand-type reduction equipment itself is provided with a driving force for drawing slabs, or a drawing roll for drawing slabs is arranged on the downstream side of the casting.

また、例えば、最大鋳造速度を得るために、機端(最終ロール)5よりも鋳造下流側にスタンド型の圧下設備をさらに配置することも可能である。 Further, for example, in order to obtain the maximum casting speed, it is possible to further arrange a stand-type reduction facility on the downstream side of casting from the machine end (final roll) 5.

この場合においては、バックアップロール方式を採用すれば圧下反力増大による圧下ロール径の下限は特に限定されないが、例えば、ロール径の下限は200mm程度に設定することができる。圧下ロールの上限に関しては、ロールピッチが大きくなることによるロール間バルジングが懸念されるため、最大でも600mmのロール径が妥当である。 In this case, if the backup roll method is adopted, the lower limit of the reduction roll diameter due to the increase in the reduction reaction force is not particularly limited, but for example, the lower limit of the roll diameter can be set to about 200 mm. Regarding the upper limit of the rolling roll, a roll diameter of 600 mm at the maximum is appropriate because there is a concern about bulging between rolls due to an increase in the roll pitch.

本発明における鋳造速度は、機長限界速度を求める(1)式によると、機長にのみ制約される。すなわち、機端圧下設備で強制的に凝固完了させるため、例えば冷却能力を増強することなく、安定鋳造可能な最大の鋳造速度を機長限界速度の106%まで増加することが可能である。 The casting speed in the present invention is limited only to the machine length according to the equation (1) for obtaining the machine length limit speed. That is, since solidification is forcibly completed by the machine end reduction equipment, it is possible to increase the maximum casting speed at which stable casting is possible up to 106% of the machine length limit speed, for example, without increasing the cooling capacity.

また、本発明の連続鋳造方法によれば、このような機長限界速度程度の鋳造速度における連続鋳造時においても、内部品質の悪化を抑制した鋼を提供することができる。 Further, according to the continuous casting method of the present invention, it is possible to provide steel in which deterioration of internal quality is suppressed even during continuous casting at such a casting speed of about the machine length limit speed.

具体的には、下記(3)式で定義される鋳片厚み中心のポロシティ欠陥評価指標が50%以上である連続鋳造鋳片を提供することができる。
ポロシティ欠陥評価指標(%)={(V0−V)/V0}×100 ・・・・(3)
ここで、V0(cm/g)は、圧下ロールで鋳片を圧下しなかった場合の鋳片幅方向の平均の鋳片厚み中心の単位質量あたりのポロシティ体積を示し、V(cm/g)は鋳片幅方向の平均の鋳片厚み中心の単位質量あたりのポロシティ体積を表す。すなわち、ポロシティ欠陥評価指標は、圧下ロールにより鋳片を圧下する操作によるポロシティ減少率を表し、ポロシティが消滅(=0)した理想的な場合に100(%)となる指標である。
Specifically, it is possible to provide a continuously cast slab having a porosity defect evaluation index of 50% or more at the center of the slab thickness defined by the following equation (3).
Porosity defect evaluation index (%) = {(V0-V) / V0} × 100 ... (3)
Here, V0 (cm 3 / g) represents the porosity volume per unit mass of the slab thickness center average of slab width direction when no pressure the slab at a reduction roll, V (cm 3 / g) represents the porosity volume per unit mass of the average slab thickness center in the slab width direction. That is, the porosity defect evaluation index represents the porosity reduction rate due to the operation of reducing the slab by the reduction roll, and is an index of 100 (%) in the ideal case where the porosity disappears (= 0).

[実施例1]
<鋳片の作成>
本発明者らは、機長L:28.3mである垂直曲げ型連続鋳造機を用いて、鋳型溶鋼面から27.2mであって機端から1.1m上流側の鋳造長位置に、直径470mmの1対の大圧下ロールを配して、連続鋳造操業を実施した。
[Example 1]
<Creation of slabs>
Using a vertical bending type continuous casting machine with a machine length L: 28.3 m, the present inventors have a diameter of 470 mm at a casting length position 27.2 m from the molten steel surface of the mold and 1.1 m upstream from the machine end. A pair of large reduction rolls was arranged to carry out a continuous casting operation.

本実施例の凝固係数は26.0であり、(1)式から算出できるように、機長限界速度は鋳片厚250mm厚みでは1.22m/分であり、鋳片厚300mm厚みでは0.85m/分である。 The solidification coefficient of this example is 26.0, and as can be calculated from Eq. (1), the machine length limit speed is 1.22 m / min for a slab thickness of 250 mm and 0.85 m for a slab thickness of 300 mm. / Minute.

連続鋳造に用いた鋼の成分は、C:0.15〜0.16%、Si:0.17〜0.22%、Mn:0.90〜0.98%、P:0.020%以下、S:0.0060%以下を含有し、残部がFeおよび不純物からなる組成であり、厚鋼板として用いられている鋼種で実施した。なお、鋼の成分を表示する「%」は質量%である。 The components of the steel used for continuous casting are C: 0.15 to 0.16%, Si: 0.17 to 0.22%, Mn: 0.99 to 0.98%, P: 0.020% or less. , S: 0.0060% or less, the balance of which is composed of Fe and impurities, and was carried out with a steel grade used as a thick steel sheet. In addition, "%" indicating the composition of steel is mass%.

上記の成分を有する溶鋼を、前述の連続鋳造機により、厚み250,300mm、幅2300mmの鋳片に鋳造した。タンディッシュ内の溶鋼過熱度、鋳造速度、二次冷却の比水量は、表1に記載した各条件により操業を行った。 The molten steel having the above components was cast into a slab having a thickness of 250,300 mm and a width of 2300 mm by the above-mentioned continuous casting machine. The degree of superheat of molten steel in the tundish, the casting speed, and the specific amount of water for secondary cooling were operated under the conditions shown in Table 1.

「溶鋼過熱度」とは、実際にタンディッシュ内で測定される溶鋼温度から平衡状態図等により求められる液相線温度を減じた温度差を意味する。 The “molten steel superheat degree” means a temperature difference obtained by subtracting the liquidus temperature obtained from an equilibrium state diagram or the like from the molten steel temperature actually measured in the tundish.

「二次冷却の比水量」とは、鋳片が鋳型を通過した後、連続鋳造機の機端外に出るまでに使用される冷却のための水の合計量を鋳片単位重さ当たりで表したものであり、単位時間当たりの2次冷却水量(L/min)を、[単位長さ当たりの鋳片の重量(kg/m)×鋳造速度(m/min)]で除した指数である。 "Secondary cooling specific water amount" is the total amount of cooling water used from the time the slab passes through the mold to the outside of the end of the continuous casting machine, per unit weight of the slab. It is expressed as an index obtained by dividing the amount of secondary cooling water (L / min) per unit time by [weight of slab (kg / m) x casting speed (m / min) per unit length]. is there.

大圧下ロールの配置位置の各中心固相率は、表1に示す通りであった。なお、中心固相率は前述の方法により求められた。 The solid phase ratio at each center of the arrangement position of the large phase rule was as shown in Table 1. The central solid phase ratio was determined by the above method.

大圧下ロールによる圧下は、表1に示す各圧下量で、鋳片先端が大圧下ロール位置を通過後から開始した。鋳片先端の長さは、鋳造初期の機長限界速度未満での鋳造部分の範囲内とした。なお、鋳片の圧下量は位置センサーにより大圧下ロールのロール間隔と大圧下直前のサポートロールのロール間隔の差から算出した。 The reduction by the large reduction roll was started after the tip of the slab passed the large reduction roll position at each reduction amount shown in Table 1. The length of the tip of the slab was set within the range of the cast portion below the machine length limit speed at the initial stage of casting. The amount of reduction of the slab was calculated from the difference between the roll interval of the large reduction roll and the roll interval of the support roll immediately before the large reduction by the position sensor.

<鋳片内部品質の評価>
鋳造された鋳片は、鋳片横断面から鋳片厚み中心を基準として、幅方向に均等に16箇所から、垂直方向へ50mm×幅方向へ100mm×厚み方向へ7mmのサンプルを採取し、それらの密度を、JIS−Z8807:2012(固体の密度及び比重の測定方法)に準じて測定した。16箇所の密度を平均して、1/2厚部の鋳片密度ρ(g/cm)を決定した。同様に、鋳片の1/4厚み位置からも同一形状のサンプルを幅方向へ均等に5箇所採取し、それらの密度を測定した。
<Evaluation of slab internal quality>
For the cast slabs, samples of 50 mm in the vertical direction × 100 mm in the width direction × 7 mm in the thickness direction were collected evenly from 16 locations in the width direction based on the slab thickness center from the slab cross section. Was measured according to JIS-Z8807: 2012 (method for measuring the density and specific gravity of a solid). By averaging the densities of 16 points, the slab density ρ (g / cm 3 ) of 1/2 thick part was determined. Similarly, samples of the same shape were evenly collected at 5 locations in the width direction from the 1/4 thickness position of the slab, and their densities were measured.

1/4厚部では、通常、ポロシティ欠陥が存在せず、健全であるため、5箇所の平均値から、ポロシティの存在しない鋳片の基準密度ρstd.(g/cm)を決定した。このとき、スラブ鋳片厚み中心部の単位重量あたりのポロシティ体積Vを、(2)式に示すように、1/2厚部のサンプルの密度ρの逆数と1/4厚部のサンプルの基準密度ρstd.の逆数の差から、算出した。 In the 1/4 thick part, there is usually no porosity defect and it is sound. Therefore, from the average value of 5 points, the reference density of the slab without porosity ρ std. (G / cm 3 ) was determined. At this time, the porosity volume V per unit weight of the central portion of the slab slab thickness is the reciprocal of the density ρ of the sample of 1/2 thickness and the reference of the sample of 1/4 thickness as shown in equation (2). Density ρ std. It was calculated from the difference of the reciprocals of.

V=1/ρ−1/ρstd. ・・・・(2)
大圧下ロールで、連続鋳造鋳片を圧下しなかった場合の鋳片厚み中心の単位重量あたりのポロシティ体積V0(cm/g)を基準とし、(3)式によるポロシティ体積の減少率を、ポロシティ欠陥の評価指標とした。
V = 1 / ρ-1 / ρ std.・ ・ ・ ・ (2)
Based on the porosity volume V0 (cm 3 / g) per unit weight at the center of the thickness of the slab when the continuously cast slab is not reduced with a large reduction roll, the reduction rate of the porosity volume according to equation (3) is calculated. It was used as an evaluation index for porosity defects.

ポロシティ欠陥評価指標(%)={(V0−V)/V0}×100 ・・・・(3)
ポロシティ欠陥評価指標の算出に際しては、大圧下ロールによる圧下を実施していない比較例2におけるポロシティ体積2.6をV0とした。
Porosity defect evaluation index (%) = {(V0-V) / V0} × 100 ... (3)
In calculating the porosity defect evaluation index, the porosity volume of 2.6 in Comparative Example 2 in which reduction by a large reduction roll was not performed was set to V0.

以上の結果を表1に示す。なお、鋳造速度欄の括弧内の値は、機長限界速度に対する比(百分率)を示す。また、比較例1、2については大圧下ロールで圧下を行わなかったため、それらのポロシティ体積はV0の欄に記した。 The above results are shown in Table 1. The value in parentheses in the casting speed column indicates the ratio (percentage) to the machine length limit speed. Further, in Comparative Examples 1 and 2, since the reduction was not performed by the large reduction roll, their porosity volumes are described in the column of V0.

本発明例1〜4は、鋳造速度は機長限界速度の96〜106%、中心固相率は0.75〜0.90の範囲、そして大圧下ロールでの圧下量は10〜12mmであった。特に、発明例1と2は、ポロシティ欠陥評価指標が58%であった。 In Examples 1 to 4 of the present invention, the casting speed was 96 to 106% of the machine length limit speed, the central solid phase ratio was in the range of 0.75 to 0.90, and the reduction amount in the large reduction roll was 10 to 12 mm. .. In particular, Invention Examples 1 and 2 had a porosity defect evaluation index of 58%.

一方、比較例1は、大圧下ロールでの圧下量0mmとあるように、大圧下を実施していない。鋳造速度は機長限界速度の92%であり安全代を加味した従来技術レベルであるが、内部品質指標であるポロシティ体積は2.1であった。 On the other hand, in Comparative Example 1, the large reduction was not carried out as the reduction amount of the large reduction roll was 0 mm. The casting speed was 92% of the machine length limit speed, which was the level of the conventional technology in consideration of the safety allowance, but the porosity volume, which is an internal quality index, was 2.1.

比較例2は、比較例1と同様に大圧下を実施せずに、鋳造速度を本発明で規定する範囲内である機長限界速度の96%としたが、内部品質指標であるポロシティ体積は2.6であった。 In Comparative Example 2, the casting speed was set to 96% of the machine length limit speed within the range specified in the present invention without performing a large reduction as in Comparative Example 1, but the porosity volume, which is an internal quality index, was 2. It was 0.6.

本発明例1〜3によると、鋳造速度が機長限界速度の95%以上でありながらも、(96%から106%の範囲)、中心固相率が1.00未満(0.75から0.90の範囲)であり、圧下量が3mm以上(10mmから12mmの範囲)である場合、機端付近でのバルジングが発生せず、鋳片を圧下しない場合のポロシティ体積V0に対して、ポロシティ体積Vの低下が確認できた。 According to Examples 1 to 3 of the present invention, the central solid phase ratio is less than 1.00 (0.75 to 0.) while the casting speed is 95% or more of the machine length limit speed (range of 96% to 106%). When the reduction amount is 3 mm or more (range of 10 mm to 12 mm), bulging does not occur near the machine edge, and the porosity volume is relative to the porosity volume V0 when the slab is not reduced. A decrease in V was confirmed.

特に、本発明例1,2のポロシティ欠陥評価指標は58%となり、中心固相率が0.85以上、1.00未満である範囲において圧下を行うことによって、さらにポロシティ体積を低下することが確認できる。また、本発明例3,4もポロシティ欠陥評価指標は42%であって、鋳片を圧下しない場合に対して改善効果が見られる。 In particular, the porosity defect evaluation index of Examples 1 and 2 of the present invention is 58%, and the porosity volume can be further reduced by performing reduction in the range where the central solid phase ratio is 0.85 or more and less than 1.00. You can check. Further, in Examples 3 and 4 of the present invention, the porosity defect evaluation index is 42%, and an improvement effect can be seen when the slab is not pressed down.

[実施例2]
実施例1と同じ連続鋳造機を使用して、実施例1と同じ成分範囲にある溶鋼について、連々鋳を実施した。
[Example 2]
Using the same continuous casting machine as in Example 1, molten steel in the same composition range as in Example 1 was continuously cast.

結果を表2に示す。 The results are shown in Table 2.

本発明例は連々鋳における実施例であり、本発明例4が本発明例5の連続鋳造の前であり、本発明例6が本発明例5の連続鋳造の後であり、本発明例4〜6全体として一連の連々鋳を実施していることを示している。同様に、本発明例7〜9が別の一連の連々鋳を示す。 An example of the present invention is an example in continuous casting, in which Example 4 of the present invention is before the continuous casting of Example 5 of the present invention, Example 6 of the present invention is after the continuous casting of Example 5 of the present invention, and Example 4 of the present invention. ~ 6 It shows that a series of continuous casting is carried out as a whole. Similarly, Examples 7-9 of the present invention show another series of continuous castings.

連々鋳前後も含め鋳造速度は機長限界速度の95%以上でありながらも(100%から106%の範囲)、機端付近でのバルジングが発生せず、中心固相率は1.0未満(0.71から0.90の範囲)であり、圧下量は3mm以上(10mmから13mmの範囲)であった。ポロシティ欠陥評価指標は、発明例7,8を除き50%以上であった。発明例7と8においてもそれぞれ42%、31%となり、大圧下ロールによる圧下によって、改善効果が見られる。 Although the casting speed including before and after continuous casting is 95% or more of the machine length limit speed (range from 100% to 106%), bulging does not occur near the machine edge and the central solid phase ratio is less than 1.0 (the central solid phase ratio is less than 1.0). It was in the range of 0.71 to 0.90), and the reduction amount was 3 mm or more (range of 10 mm to 13 mm). The porosity defect evaluation index was 50% or more except for Invention Examples 7 and 8. Also in Invention Examples 7 and 8, the percentages are 42% and 31%, respectively, and the improvement effect can be seen by the reduction by the large reduction roll.

取鍋内の溶鋼は鋳造の進行による溶鋼重量の低下や時間経過による抜熱とともに溶鋼温度が低下する傾向にある。一方で、連々鋳を実施すると、前チャージの取鍋内の溶鋼をタンディッシュ内に供給することを停止した後、後チャージの取鍋内の溶鋼をタンディッシュ内に供給することで、取鍋のチャージ変更による温度変更を反映して、鋳造中の溶鋼温度は上昇する場合もある。実施例2によれば、そのような溶鋼温度が変化する操業形態においても、本発明は適用可能であり、機長限界速度の95%以上で操業可能であることが確認できた。 The temperature of the molten steel in the ladle tends to decrease as the weight of the molten steel decreases as the casting progresses and the heat is removed over time. On the other hand, when continuous casting is carried out, the molten steel in the pre-charged ladle is stopped from being supplied into the tundish, and then the molten steel in the post-charged ladle is supplied into the tundish. The molten steel temperature during casting may rise to reflect the temperature change due to the charge change. According to Example 2, it was confirmed that the present invention can be applied even in such an operation mode in which the molten steel temperature changes, and that the operation can be performed at 95% or more of the machine length limit speed.

1:浸漬ノズル
2:鋳型
3:サポートロール
4:大圧下ロール
5:機端(最終サポートロール)
6:鋳片内の未凝固溶鋼
7:凝固後の鋳片
8:切断装置(カッター)

1: Immersion nozzle 2: Mold 3: Support roll 4: Large reduction roll 5: Machine end (final support roll)
6: Unsolidified molten steel in the slab 7: Shard after solidification 8: Cutting device (cutter)

Claims (3)

連続鋳造機が安定鋳造可能な最大の鋳造速度である機長限界速度により鋳造した際の鋳片の厚み中心固相率が0.7となる位置から、連続鋳造機の鋳造方向の最終サポートロールの設置位置であって該最終サポートロールと鋳片とが接する位置である機端までの範囲内に配置されたロール径が450〜600mmである1対の圧下ロールを用いて、鋳片を圧下することを特徴とする鋼の連続鋳造方法。 From the position where the central solid phase ratio of the thickness of the slab is 0.7 when casting at the machine length limit speed, which is the maximum casting speed at which the continuous casting machine can perform stable casting, the final support roll in the casting direction of the continuous casting machine The slab is crushed using a pair of reduction rolls having a roll diameter of 450 to 600 mm arranged within the range up to the machine edge, which is the installation position where the final support roll and the slab are in contact with each other. A method for continuous casting of steel. 前記鋳片を二次冷却する際の比水量を0.6〜1.6L/kg−鋼で鋳造することを特徴とする請求項1に記載された鋼の連続鋳造方法。 The continuous casting method for steel according to claim 1, wherein the specific water amount at the time of secondary cooling of the slab is cast with 0.6 to 1.6 L / kg-steel. 前記連続鋳造機の鋳造速度は、機長限界速度の95%以上106%以下であることを特徴とする請求項1または2に記載された鋼の連続鋳造方法。 The method for continuously casting steel according to claim 1 or 2, wherein the casting speed of the continuous casting machine is 95% or more and 106% or less of the machine length limit speed.
JP2017005752A 2017-01-17 2017-01-17 Continuous steel casting method Active JP6816523B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017005752A JP6816523B2 (en) 2017-01-17 2017-01-17 Continuous steel casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017005752A JP6816523B2 (en) 2017-01-17 2017-01-17 Continuous steel casting method

Publications (2)

Publication Number Publication Date
JP2018114514A JP2018114514A (en) 2018-07-26
JP6816523B2 true JP6816523B2 (en) 2021-01-20

Family

ID=62984760

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017005752A Active JP6816523B2 (en) 2017-01-17 2017-01-17 Continuous steel casting method

Country Status (1)

Country Link
JP (1) JP6816523B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110181016B (en) * 2019-05-27 2024-03-29 北京首钢国际工程技术有限公司 2+8 roller combined thick plate blank large-pressure casting and rolling machine

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4830612B2 (en) * 2006-04-28 2011-12-07 住友金属工業株式会社 Continuous casting method for slabs for extra heavy steel plates
JP5131662B2 (en) * 2008-06-20 2013-01-30 新日鐵住金株式会社 Continuous casting method for slabs
WO2014203902A1 (en) * 2013-06-18 2014-12-24 新日鐵住金株式会社 Continuous casting method for casting for extra thick steel sheet
CA2947828C (en) * 2014-05-14 2019-01-15 Nippon Steel & Sumitomo Metal Corporation Method for continuous-casting slab

Also Published As

Publication number Publication date
JP2018114514A (en) 2018-07-26

Similar Documents

Publication Publication Date Title
JP6115735B2 (en) Steel continuous casting method
KR20160143721A (en) Continuous casting method for slab
JP5835531B2 (en) Continuous casting method for slabs for extra heavy steel plates
JP6816523B2 (en) Continuous steel casting method
JP3427794B2 (en) Continuous casting method
JP5045408B2 (en) Manufacturing method of continuous cast slab
JPH036855B2 (en)
JP4205652B2 (en) Method for producing bloom slab with few cracks
JP5018441B2 (en) Method of drawing slab after completion of casting in continuous casting
JP7226043B2 (en) Continuous casting method
JP2000317582A (en) Method for continuously casting beam blank
JP5476959B2 (en) Continuous casting method under light pressure
JP6784222B2 (en) Manufacturing method of thin-walled slabs
JP2020171954A (en) Continuous casting method for steel
JP2007268546A (en) Method for producing steel material
JP3402291B2 (en) Continuously cast slab, method for continuously casting the same, and method for producing a thick steel plate
JP3111954B2 (en) Continuous casting method
JP7273307B2 (en) Steel continuous casting method
JP5195636B2 (en) Manufacturing method of continuous cast slab
JP2532306B2 (en) Continuous casting method
JP7332870B2 (en) Extraction method of slab
JP5691949B2 (en) Continuous casting method for large-section slabs
JP3275828B2 (en) Continuous casting method
JP3394730B2 (en) Continuous casting method of steel slab
JP2593377B2 (en) Continuous casting method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190904

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200605

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200714

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201124

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201207

R151 Written notification of patent or utility model registration

Ref document number: 6816523

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151