JP6719669B2 - Control device, power management system, device control method and program - Google Patents

Control device, power management system, device control method and program Download PDF

Info

Publication number
JP6719669B2
JP6719669B2 JP2019524591A JP2019524591A JP6719669B2 JP 6719669 B2 JP6719669 B2 JP 6719669B2 JP 2019524591 A JP2019524591 A JP 2019524591A JP 2019524591 A JP2019524591 A JP 2019524591A JP 6719669 B2 JP6719669 B2 JP 6719669B2
Authority
JP
Japan
Prior art keywords
amount
power
water heater
communication
period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019524591A
Other languages
Japanese (ja)
Other versions
JPWO2018229861A1 (en
Inventor
雄喜 小川
雄喜 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of JPWO2018229861A1 publication Critical patent/JPWO2018229861A1/en
Application granted granted Critical
Publication of JP6719669B2 publication Critical patent/JP6719669B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Selective Calling Equipment (AREA)

Description

本発明は、制御装置、電力管理システム、機器の制御方法及びプログラムに関する。 The present invention relates to a control device, a power management system, a device control method, and a program.

近年、太陽光及び風力に代表される自然エネルギーによって発電する発電設備を、電力需要家自身が所有するケースが増えている。このような電力需要家は、発電設備による発電電力を自ら消費することによって、商用電力系統から購入する電力を減少させることができる。 In recent years, there are an increasing number of cases in which electric power consumers themselves own power generation facilities that generate power using natural energy such as sunlight and wind power. Such an electric power consumer can reduce the electric power purchased from the commercial electric power system by consuming the electric power generated by the electric power generation equipment.

例えば、特許文献1は、太陽光発電による余剰電力で湯をわき上げる貯湯式給湯システムを開示している。特許文献1に開示された貯湯式給湯システムは、翌日の余剰電力を予測し、翌日の余剰電力が多いと予測される場合には、翌日の余剰電力が少ないと予測される場合に比べて、夜間わき上げ量を少なくする。これにより、余剰電力を有効に利用することができ、また夜間わき上げ運転に使用する電力を低減させることができる。 For example, Patent Document 1 discloses a hot water storage type hot water supply system in which hot water is heated by surplus power generated by solar power generation. The hot water storage type hot water supply system disclosed in Patent Document 1 predicts the surplus power of the next day, and when the surplus power of the next day is predicted to be large, compared with the case where the surplus power of the next day is predicted to be low. Reduce the amount of night lifting. As a result, the surplus power can be effectively used, and the power used for the nightside driving operation can be reduced.

特開2013−148287号公報JP, 2013-148287, A

上記のような余剰電力を利用する技術において、制御対象の機器と制御元との間で通信可能な電文が異なる場合、制御対象の機器を的確に動作させることができずに、余剰電力を有効に利用できないことがある。そのため、制御対象の機器と制御元との間で通信可能な電文が異なる場合であっても、余剰電力を有効に利用することが求められている。 In the technology that uses surplus power as described above, when the communicable telegram between the control target device and the control source is different, the control target device cannot be operated properly, and the surplus power is effective. May not be available for. Therefore, it is required to effectively use the surplus power even if the communicable message between the device to be controlled and the control source is different.

本発明は、上述のような課題を解決するためになされたものであり、余剰電力を有効に利用することが可能な制御装置等を提供することを目的とする。 The present invention has been made to solve the above problems, and an object thereof is to provide a control device and the like that can effectively use surplus power.

上記目的を達成するため、本発明に係る制御装置は、
電力需要家の発電設備によって生じた余剰電力で機器を動作させる制御装置であって、
前記機器と通信する通信手段と、
前記機器が第1の電文での通信に対応している場合、前記通信手段に前記第1の電文で前記機器と通信させることにより、第1の期間において前記余剰電力で前記機器に第1の量の動作させ、前記機器が前記第1の電文での通信に対応していない場合、前記通信手段に第2の電文で前記機器と通信させることにより、前記第1の期間において前記余剰電力で前記機器に前記第1の量の動作させる動作制御手段と、を備え
前記動作制御手段は、前記第1の期間より前の第2の期間において前記機器が動作する第2の量を、前記第1の量に基づいて設定し、前記通信手段に前記第1の電文又は前記第2の電文で前記機器と通信させることにより、前記機器に、前記第2の期間において前記第2の量の動作をさせ、
前記動作制御手段は、前記機器が前記第1の電文での通信に対応していない場合、規定量から前記第1の量を減じた量を、前記第2の量として設定する。
In order to achieve the above object, the control device according to the present invention,
A control device for operating equipment with surplus power generated by a power generation facility of a power consumer,
Communication means for communicating with the device;
When the device is compatible with the communication in the first telegram, the communication means is caused to communicate with the device in the first telegram so that the surplus power is applied to the device in the first period in the first period. Amount of operation , and when the device does not support communication in the first telegram, by causing the communication means to communicate with the device in the second telegram, the surplus power is generated in the first period. in and an operation control means for the operation of the first amount to said equipment,
The operation control means sets a second amount by which the device operates in a second period before the first period based on the first amount, and causes the communication means to have the first electronic message. Alternatively, by causing the device to communicate with the device by the second telegram, the device is caused to perform the second amount of operation in the second period,
The operation control unit sets an amount obtained by subtracting the first amount from a specified amount as the second amount when the device does not support communication in the first electronic message.

本発明は、機器が第1の電文での通信に対応している場合、第1の電文での通信によって余剰電力で機器を動作させ、機器が第1の電文での通信に対応していない場合、第2の電文での通信によって余剰電力で機器を動作させる。従って、本発明によれば、余剰電力を有効に利用することができる。 According to the present invention, when the device supports communication in the first message, the device operates the surplus power by the communication in the first message, and the device does not support communication in the first message. In this case, the device is operated with the surplus power by the communication in the second telegram. Therefore, according to the present invention, the surplus power can be effectively used.

本発明の実施の形態1に係る電力管理システムの全体構成を示す図The figure which shows the whole structure of the power management system which concerns on Embodiment 1 of this invention. 実施の形態1において発電電力及び消費電力の推移の例を示す図FIG. 3 is a diagram showing an example of transitions of generated power and power consumption in Embodiment 1. 実施の形態1に係る給湯機に備えられたヒートポンプユニットの構成を示す図The figure which shows the structure of the heat pump unit with which the water heater which concerns on Embodiment 1 was equipped. 実施の形態1に係る制御装置のハードウェア構成を示すブロック図Block diagram showing the hardware configuration of the control device according to the first embodiment エコーネットライトにおける電文の構成を示す図Diagram showing the structure of electronic messages in Echonet Lite 実施の形態1に係る管理サーバのハードウェア構成を示すブロック図Block diagram showing the hardware configuration of the management server according to the first embodiment 実施の形態1に係る電力管理システムの機能的な構成を示すブロック図Block diagram showing the functional configuration of the power management system according to the first embodiment 実施の形態1におけるデータベースに記憶される情報を示す図FIG. 3 is a diagram showing information stored in the database according to the first embodiment. 実施の形態1における予測電力量の一例を示す図The figure which shows an example of the estimated electric energy in Embodiment 1. 実施の形態1に係る給湯機の湯量の推移の例を示す図The figure which shows the example of transition of the amount of hot water of the water heater which concerns on Embodiment 1. 実施の形態1における昼間わき上げの設定画面の一例を示す図The figure which shows an example of the setting screen of daytime armpit in Embodiment 1. 実施の形態1における昼間わき上げ制御時の表示画面の一例を示す図The figure which shows an example of the display screen at the time of daytime arm raising control in Embodiment 1. 実施の形態1に係る電力管理システムにおいて実行される処理の概要を示すシーケンス図Sequence diagram showing an outline of processing executed in the power management system according to the first embodiment 実施の形態1に係る管理サーバによって実行される余剰電力予測処理の流れを示すフローチャートFlowchart showing the flow of surplus power prediction processing executed by the management server according to the first embodiment 実施の形態1に係る制御装置によって実行される昼間わき上げ調整処理の流れを示すフローチャートThe flowchart which shows the flow of the daytime armrest adjustment processing performed by the control apparatus which concerns on Embodiment 1. 実施の形態1に係る制御装置によって実行される夜間及び昼間わき上げ処理の流れを示すフローチャートFlowchart showing a flow of nighttime and daytime arm-raising processing executed by the control device according to the first embodiment 実施の形態2に係る電力管理システムの機能的な構成を示すブロック図Block diagram showing a functional configuration of a power management system according to a second embodiment 実施の形態2に係る電力管理システムにおいて実行される処理の概要を示すシーケンス図Sequence diagram showing an outline of processing executed in the power management system according to the second embodiment 実施の形態3に係る電力管理システムの機能的な構成を示すブロック図A block diagram showing a functional configuration of a power management system according to a third embodiment. 実施の形態4に係る制御装置によって実行される夜間及び昼間わき上げ処理の流れを示すフローチャートThe flowchart which shows the flow of the nighttime and daytime arm-raising processing performed by the control apparatus which concerns on Embodiment 4.

以下、本発明の実施の形態について、図面を参照しながら詳細に説明する。なお、図中同一又は相当部分には同一符号を付す。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. The same or corresponding parts in the drawings are designated by the same reference numerals.

(実施の形態1)
図1に、実施の形態1に係る電力管理システム1の全体構成を示す。電力管理システム1は、家屋Hで消費される電力を管理する、いわゆるHEMS(Home Energy Management System)と呼ばれるシステムである。家屋Hは、いわゆる一般的な住宅建物であって、商用電力系統8と発電設備3とから供給される電力の需要地及び消費地である。図1に示すように、電力管理システム1は、発電設備3と、電力計測装置4と、給湯機6と、複数の電気機器7(7a、7b、…)と、制御装置20と、操作端末30と、管理サーバ40と、気象サーバ50と、を備える。
(Embodiment 1)
FIG. 1 shows the overall configuration of a power management system 1 according to the first embodiment. The power management system 1 is a so-called HEMS (Home Energy Management System) system that manages the power consumed in the house H. The house H is a so-called general residential building, and is a demand area and a consumption area of electric power supplied from the commercial electric power system 8 and the power generation facility 3. As illustrated in FIG. 1, the power management system 1 includes a power generation facility 3, a power measuring device 4, a water heater 6, a plurality of electric devices 7 (7a, 7b,... ), a control device 20, and an operation terminal. 30, a management server 40, and a weather server 50.

<発電設備3>
発電設備3は、家屋Hに設置され、自然エネルギーである太陽光によって発電する自家発電設備である。商用電力系統8が家屋Hを含む不特定多数の電力消費地に電力を供給するのに対して、発電設備3は、特定の電力需要家によって所有され、特定の電力消費地である家屋Hに電力を供給する。発電設備3は、分散型電源とも呼ぶ。
<Power generation equipment 3>
The power generation facility 3 is a private power generation facility that is installed in the house H and that generates electricity using sunlight, which is natural energy. While the commercial power system 8 supplies power to an unspecified number of power consumption areas including the house H, the power generation facility 3 is owned by a specific power consumer and is supplied to the house H which is a specific power consumption area. Supply power. The power generation facility 3 is also called a distributed power source.

発電設備3は、太陽光発電(PV:Photovoltaic)するPVパネル10と、パワーコンディショニングシステムであるPV−PCS11と、を備える。PVパネル10は、例えば多結晶シリコン型のソーラーパネルである。PVパネル10は、家屋Hの屋根の上に設置され、太陽光エネルギーを電気エネルギーに変換することで太陽光発電する。 The power generation facility 3 includes a PV panel 10 that performs photovoltaic power generation (PV: Photovoltaic) and a PV-PCS 11 that is a power conditioning system. The PV panel 10 is, for example, a polycrystalline silicon type solar panel. The PV panel 10 is installed on the roof of the house H and converts solar energy into electric energy to generate solar power.

PV−PCS11は、PVパネル10において発電された電力の供給を受け、供給された電力を、電力線D2を介して分電盤9に出力する。その際、PV−PCS11は、PVパネル10から供給された電力を、家屋H内で使用できるように、直流電力から交流電力に規定の変換効率で変換して出力する。 The PV-PCS 11 receives the power generated by the PV panel 10 and outputs the supplied power to the distribution board 9 via the power line D2. At that time, the PV-PCS 11 converts the electric power supplied from the PV panel 10 from DC power to AC power at a specified conversion efficiency so as to be used in the house H, and outputs the converted power.

PV−PCS11は、いずれも図示しないが、CPU(Central Processing Unit)、ROM(Read Only Memory)、RAM(Random Access Memory)、通信インタフェース及び読み書き可能な不揮発性の半導体メモリを備える。PV−PCS11は、家屋H内に構築された宅内ネットワークを介して、制御装置20と通信する。なお、PV−PCS11は、外付けの通信アダプタ(図示せず)を介して、宅内ネットワークに接続される仕様であってもよい。 Although not shown, the PV-PCS 11 includes a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), a communication interface, and a readable/writable nonvolatile semiconductor memory. The PV-PCS 11 communicates with the control device 20 via the home network built in the house H. The PV-PCS 11 may be connected to the home network via an external communication adapter (not shown).

<電力計測装置4>
電力計測装置4は、家屋Hに配設された電力線D1〜D3のそれぞれを送電される電力の値を計測する。電力線D1は、商用電力系統8と分電盤9との間に配設され、電力線D2は、発電設備3と分電盤9との間に配設され、電力線D3は、分電盤9と給湯機6との間に配設されている。電力計測装置4は、電力線D1〜D3にそれぞれ接続されたCT(Current Transformer)1〜CT3の各々と通信線を介して接続される。CT1〜CT3は、交流電流を計測するセンサである。
<Power measuring device 4>
The power measuring device 4 measures the value of the power transmitted through each of the power lines D1 to D3 arranged in the house H. The power line D1 is arranged between the commercial power system 8 and the distribution board 9, the power line D2 is arranged between the power generation facility 3 and the distribution board 9, and the power line D3 is arranged as the distribution board 9. It is arranged between the water heater 6. The power measuring device 4 is connected to each of CTs (Current Transformers) 1 to CT3 connected to the power lines D1 to D3, respectively, via communication lines. CT1 to CT3 are sensors that measure alternating current.

電力線D1に配設されたCT1は、商用電力系統8から家屋Hに供給される電力P1を計測する。電力P1は、家屋Hにおいて電力を需要する電力需要家が電気事業者から買った電力である買電電力に相当する。電力線D2に配設されたCT2は、発電設備3から分電盤9に出力される電力P2を計測する。電力P2は、発電設備3による発電電力であって、家屋H内に供給され、家屋H内で使用可能な電力に相当する。電力線D3に配設されたCT3は、分電盤9から給湯機6に供給される電力P3を計測する。電力P3は、給湯機6において消費される電力に相当する。 The CT1 arranged on the power line D1 measures the power P1 supplied from the commercial power system 8 to the house H. The electric power P1 corresponds to purchased electric power that is an electric power purchased from an electric utility by an electric power consumer who demands electric power in the house H. The CT2 arranged on the power line D2 measures the power P2 output from the power generation equipment 3 to the distribution board 9. The electric power P2 is the electric power generated by the power generation facility 3, is supplied to the house H, and corresponds to the electric power that can be used in the house H. The CT3 arranged on the power line D3 measures the electric power P3 supplied from the distribution board 9 to the water heater 6. Electric power P3 corresponds to the electric power consumed in water heater 6.

給湯機6及び複数の電気機器7を含む家屋H全体で消費される消費電力をPcと表すと、消費電力Pcは、CT1によって計測される買電電力P1と、CT2によって計測される発電電力P2と、の和に相当する。すなわち、Pc=P1+P2の関係式が成立する。 When the power consumption of the entire house H including the water heater 6 and the plurality of electric devices 7 is represented by Pc, the power consumption Pc is the purchased power P1 measured by CT1 and the generated power P2 measured by CT2. Is equivalent to the sum of and. That is, the relational expression Pc=P1+P2 holds.

図2に、発電電力P2及び消費電力Pcの推移の例を示す。図2中の実線は、発電設備3による発電電力P2の推移を表しており、日射量が多くなる正午をピークとして昼間に大きくなる。これに対して、図2中の破線は、家屋Hにおける消費電力Pcを表しており、一般的に家庭における消費電力量が多くなる午後から夕方にかけて大きくなる。 FIG. 2 shows an example of changes in the generated power P2 and the consumed power Pc. The solid line in FIG. 2 represents the transition of the electric power P2 generated by the power generation facility 3, which peaks at noon when the amount of solar radiation increases and increases during the daytime. On the other hand, the broken line in FIG. 2 represents the power consumption Pc in the house H, which generally increases from afternoon to evening when the amount of power consumption in the home increases.

図2における期間T1,T3のように、発電電力P2が消費電力Pcより小さい場合、発電電力P2だけでは家屋Hで必要な電力を供給できないため、商用電力系統8から買電する必要がある。そのため、買電電力P1は正の値になる。これに対して、図2における期間T2のように、発電電力P2が消費電力Pcより大きい場合、家屋Hでは余剰電力が生じる。 When the generated power P2 is smaller than the power consumption Pc as in the periods T1 and T3 in FIG. 2, the house H cannot supply the required power only by the generated power P2, and therefore it is necessary to purchase power from the commercial power grid 8. Therefore, the purchased power P1 has a positive value. On the other hand, when the generated power P2 is larger than the power consumption Pc as in the period T2 in FIG. 2, surplus power is generated in the house H.

余剰電力が生じると、家屋Hの電力需要家は、余剰電力を逆潮電力として商用電力系統8へ供給することで、電気事業者に売電することができる。このように、家屋Hから商用電力系統8へ電力が供給されることで電力が電力需要家側から電気事業者側へ戻ることを、「逆潮流」という。逆潮流が生じている間は、買電電力P1は負の値になり、逆潮電力(売電電力)は(−P1)として表される。 When the surplus power is generated, the power consumer of the house H can sell the power to the electric power company by supplying the surplus power to the commercial power grid 8 as reverse power. In this way, the fact that electric power is supplied from the house H to the commercial electric power system 8 to return the electric power from the electric power consumer side to the electric power supplier side is called “reverse power flow”. While the reverse power flow is occurring, the purchased power P1 has a negative value, and the reverse power (sold power) is represented as (-P1).

電力計測装置4は、いずれも図示しないが、CPU、ROM、RAM、通信インタフェース及び読み書き可能な不揮発性の半導体メモリを備える。また、電力計測装置4は、無線通信インタフェースを備え、宅内ネットワークを介して、制御装置20と通信する。なお、電力計測装置4は、外付けの通信アダプタ(図示せず)を介して、宅内ネットワークに接続される仕様であってもよい。 The power measuring device 4 includes a CPU, a ROM, a RAM, a communication interface, and a readable/writable nonvolatile semiconductor memory, which are not shown. Further, the power measuring device 4 includes a wireless communication interface and communicates with the control device 20 via the home network. The power measuring device 4 may be connected to the home network via an external communication adapter (not shown).

電力計測装置4は、制御装置20からの要求に応答して、CT1〜CT3の計測によって得られた発電電力P2及び消費電力Pcを含む電力の計測値を含む計測データを生成し、制御装置20に送信する。送信される計測データは、電力計測装置4の機器アドレス、電力線のID及び計測時刻を含む。なお、電力計測装置4によって制御装置20に送信される電力の計測値は、電力(ワット)の単位で表されるものであっても良いし、電力を規定時間に亘って積算した電力量の単位で表されるものであっても良い。 In response to a request from the control device 20, the power measurement device 4 generates measurement data including measurement values of power including generated power P2 and power consumption Pc obtained by measuring CT1 to CT3, and the control device 20 Send to. The transmitted measurement data includes the device address of the power measuring device 4, the power line ID, and the measurement time. The measured value of the electric power transmitted to the control device 20 by the electric power measuring device 4 may be expressed in the unit of electric power (watt), or the electric power amount of the electric power obtained by integrating the electric power over a specified time. It may be expressed in units.

<給湯機6>
給湯機6は、ヒートポンプユニット60とタンクユニット61とを備える貯湯式の給湯機である。ヒートポンプユニット60とタンクユニット61とは、湯水が流れる水配管62で接続されている。給湯機6は、分電盤9により分岐された電力線D3を介して、商用電力系統8及び発電設備3と電気的に接続されており、商用電力系統8又は発電設備3から電力を得て動作する。
<Water heater 6>
The water heater 6 is a hot water storage type water heater including a heat pump unit 60 and a tank unit 61. The heat pump unit 60 and the tank unit 61 are connected by a water pipe 62 through which hot water flows. The water heater 6 is electrically connected to the commercial power system 8 and the power generation facility 3 via the power line D3 branched by the distribution board 9, and operates by obtaining power from the commercial power system 8 or the power generation facility 3. To do.

ヒートポンプユニット60は、CO(二酸化炭素)又はHFC(ハイドロフルオロカーボン)を冷媒として用いたヒートポンプ式の熱源器である。ヒートポンプユニット60は、周辺の空気を熱源として、貯湯タンク63内の低温水を高温水に沸き上げる。図3に示すように、ヒートポンプユニット60は、圧縮機71と、第1の熱交換器72と、膨張弁73と、第2の熱交換器74と、送風機75と、水ポンプ76と、制御基板79と、を備える。The heat pump unit 60 is a heat pump type heat source device using CO 2 (carbon dioxide) or HFC (hydrofluorocarbon) as a refrigerant. The heat pump unit 60 uses the surrounding air as a heat source to boil the low temperature water in the hot water storage tank 63 into high temperature water. As shown in FIG. 3, the heat pump unit 60 includes a compressor 71, a first heat exchanger 72, an expansion valve 73, a second heat exchanger 74, a blower 75, a water pump 76, and a control unit. And a substrate 79.

冷媒配管70は、圧縮機71と、第1の熱交換器72と、膨張弁73と、第2の熱交換器74と、を環状に接続している。これにより、冷媒が循環する冷媒回路が形成されている。冷媒回路は、ヒートポンプ又は冷凍サイクルともいう。水配管62は、貯湯タンク63の下部を起点に、水ポンプ76及び第1の熱交換器72を経て貯湯タンク63の上部に戻る。これにより、湯水が循環する沸上げ回路が形成されている。 The refrigerant pipe 70 annularly connects the compressor 71, the first heat exchanger 72, the expansion valve 73, and the second heat exchanger 74. As a result, a refrigerant circuit in which the refrigerant circulates is formed. The refrigerant circuit is also called a heat pump or a refrigeration cycle. The water pipe 62 starts from the lower part of the hot water storage tank 63 and returns to the upper part of the hot water storage tank 63 via the water pump 76 and the first heat exchanger 72. As a result, a boiling circuit for circulating hot water is formed.

圧縮機71は、冷媒を圧縮して温度及び圧力を上昇させる。圧縮機71は、駆動周波数に応じて、単位当たりの送り出し量である容量を変化させることができるインバータ回路を備える。圧縮機71は、制御基板79からの指示に従って上記の容量を変更する。 The compressor 71 compresses the refrigerant to raise the temperature and pressure. The compressor 71 includes an inverter circuit that can change the capacity, which is the delivery amount per unit, according to the drive frequency. The compressor 71 changes the above capacity according to an instruction from the control board 79.

第1の熱交換器72は、市水を目標の沸上げ温度まで昇温加熱するための加熱源である。沸上げ温度は、貯湯温度ともいう。第1の熱交換器72は、プレート式、二重管式等の熱交換器であり、冷媒と水との間で熱交換を行う。第1の熱交換器72における熱交換により、冷媒は放熱して温度が下降し、水は吸熱して温度が上昇する。 The first heat exchanger 72 is a heating source for heating the city water to a target boiling temperature. The boiling temperature is also called the hot water storage temperature. The first heat exchanger 72 is a plate-type, double-tube type, or other heat exchanger, and performs heat exchange between the refrigerant and water. Due to the heat exchange in the first heat exchanger 72, the refrigerant radiates heat to lower the temperature and the water absorbs heat to raise the temperature.

膨張弁73は、冷媒を膨張させて温度及び圧力を下降させる。膨張弁73は、制御基板79からの指示に従って弁開度を変更する。 The expansion valve 73 expands the refrigerant to lower the temperature and pressure. The expansion valve 73 changes the valve opening degree according to an instruction from the control board 79.

第2の熱交換器74は、送風機75により送られてきた外気と冷媒との間で熱交換を行う。第2の熱交換器74における熱交換により冷媒は吸熱して温度が上昇し、外気は放熱して温度が下降する。 The second heat exchanger 74 exchanges heat between the outside air sent by the blower 75 and the refrigerant. Due to the heat exchange in the second heat exchanger 74, the refrigerant absorbs heat and the temperature rises, and the outside air radiates heat to lower the temperature.

水ポンプ76は、貯湯タンク63の下部からの低温水を第1の熱交換器72へ搬送する。水ポンプ76は、インバータ回路を備え、制御基板79から指示される制御値に従って駆動回転数を変更することにより、搬送する際の水流量を変化させる。 The water pump 76 conveys the low temperature water from the lower part of the hot water storage tank 63 to the first heat exchanger 72. The water pump 76 includes an inverter circuit, and changes the drive rotation speed in accordance with a control value instructed by the control board 79, thereby changing the water flow rate during transportation.

制御基板79は、CPU、ROM、RAM、通信インタフェース及び読み書き可能な不揮発性の半導体メモリを備える。制御基板79は、圧縮機71、膨張弁73及び送風機75のそれぞれと通信線を介して通信可能に接続され、これらの動作を制御する。また、制御基板79は、図示しない通信線を介してタンクユニット61の給湯コントローラ64と通信可能に接続されている。 The control board 79 includes a CPU, a ROM, a RAM, a communication interface, and a readable/writable nonvolatile semiconductor memory. The control board 79 is communicably connected to each of the compressor 71, the expansion valve 73, and the blower 75 via a communication line, and controls these operations. The control board 79 is communicatively connected to the hot water supply controller 64 of the tank unit 61 via a communication line (not shown).

図1に戻って、タンクユニット61は、貯湯タンク63、給湯コントローラ64及び混合弁66等を備える。これらの構成部品は、金属製の外装ケース内に収められている。 Returning to FIG. 1, the tank unit 61 includes a hot water storage tank 63, a hot water supply controller 64, a mixing valve 66, and the like. These components are housed in a metal outer case.

貯湯タンク63は、ステンレス等の金属、樹脂等で形成されている。貯湯タンク63の外側には断熱材が配置されている。これにより、貯湯タンク63内で、高温の湯を長時間に亘って保温することができる。 The hot water storage tank 63 is made of metal such as stainless steel, resin, or the like. A heat insulating material is arranged outside the hot water storage tank 63. As a result, the hot water can be kept warm in the hot water storage tank 63 for a long time.

給湯コントローラ64は、いずれも図示しないが、CPU、ROM、RAM、通信インタフェース及び読み書き可能な不揮発性の半導体メモリを備え、給湯機6を統括的に制御する。給湯コントローラ64は、ヒートポンプユニット60の制御基板と図示しない通信線を介して通信可能に接続する。また、給湯コントローラ64は、通信線69を介してリモコン65と通信可能に接続する。さらに、給湯コントローラ64は、宅内ネットワークを介して、制御装置20と通信可能に接続する。 Although not shown, the hot water supply controller 64 includes a CPU, a ROM, a RAM, a communication interface, and a readable/writable non-volatile semiconductor memory, and controls the hot water supply device 6 as a whole. The hot water supply controller 64 is communicably connected to the control board of the heat pump unit 60 via a communication line (not shown). Further, the hot water supply controller 64 is communicatively connected to the remote controller 65 via a communication line 69. Further, hot water supply controller 64 is communicably connected to control device 20 via the home network.

リモコン65は、給湯機6の運転状態及び貯湯状態等を表示してユーザに提示するための端末装置である。リモコン65は、家屋Hにおける浴室に設置され、ユーザから沸上げ又は給湯等に関する操作入力を受け付ける。 The remote controller 65 is a terminal device for displaying the operating state and hot water storage state of the water heater 6 and presenting them to the user. The remote controller 65 is installed in the bathroom of the house H and receives an operation input regarding boiling or hot water supply from the user.

リモコン65は、いずれも図示しないが、CPU、ROM、RAM、読み書き可能な不揮発性の半導体メモリ、押しボタン、タッチパネル又はタッチパッド等の入力デバイス、有機ELディスプレイ又は液晶ディスプレイ等の表示デバイス、及び、通信インタフェース等を備える。 Although not shown, the remote controller 65 includes a CPU, a ROM, a RAM, a readable and writable nonvolatile semiconductor memory, an input device such as a push button, a touch panel or a touch pad, a display device such as an organic EL display or a liquid crystal display, and the like. It has a communication interface.

沸上げ動作の開始時には、貯湯タンク63内の高温水は消費されており、貯湯タンク63の下部には市水の温度に近い低温水が貯留している。図示しないポンプを作動させることで、この低温水がヒートポンプユニット60の第1の熱交換器72に入水され、冷媒との熱交換により昇温し、高温水となる。この高温水は貯湯タンク63の上部に戻され、貯湯タンク63内では、上部に高温水、下部に低温水が滞留して温度成層が形成され、高温水と低温水との間には温度境界層が生成される。 At the start of the boiling operation, the high temperature water in the hot water storage tank 63 is consumed, and low temperature water near the temperature of city water is stored in the lower portion of the hot water storage tank 63. By operating a pump (not shown), this low-temperature water enters the first heat exchanger 72 of the heat pump unit 60 and is heated by heat exchange with the refrigerant to become high-temperature water. This high-temperature water is returned to the upper part of the hot water storage tank 63, and in the hot water storage tank 63, high temperature water is accumulated in the upper part and low temperature water is accumulated in the lower part to form temperature stratification, and a temperature boundary is formed between the high temperature water and the low temperature water. A layer is created.

沸上げ量が増えて、高温水の領域が大きくなると貯湯タンク63の下部に温度境界層が近づき、第1の熱交換器72に入水する水の温度である入水温度が次第に上昇する。 When the amount of boiling increases and the area of high-temperature water increases, the temperature boundary layer approaches the lower part of the hot water storage tank 63, and the temperature of water entering the first heat exchanger 72 gradually rises.

貯湯タンク63の上部には出湯管が接続されており、貯湯タンク63からこの出湯管を介して出湯した高温水が、混合弁66にて市水と混合される。これにより、ユーザが所望する温度(例えば40℃)の湯水となって、例えば浴室に配設されたシャワー67又は蛇口68等の給湯端末に供給される。このとき、貯湯タンク63では、上部から流出した高温水の体積分、水道圧により、下部に接続された給水管(図示せず)から市水が供給される。これにより、貯湯タンク63内では温度境界層が上方へ移動する。高温水が少なくなると、給湯機6は、追加沸上げを行う。 A hot water outlet pipe is connected to an upper portion of the hot water storage tank 63, and high temperature water discharged from the hot water storage tank 63 via the hot water outlet pipe is mixed with city water by a mixing valve 66. Thereby, hot water having a temperature desired by the user (for example, 40° C.) is supplied to the hot water supply terminal such as the shower 67 or the faucet 68 provided in the bathroom. At this time, in the hot water storage tank 63, city water is supplied from a water supply pipe (not shown) connected to the lower portion of the hot water storage tank 63 due to the volume of the high temperature water flowing from the upper portion and the water pressure. As a result, the temperature boundary layer moves upward in the hot water storage tank 63. When the high-temperature water becomes low, the water heater 6 performs additional boiling.

<電気機器7a、7b、…>
電気機器7(電気機器7a,7b,…)は、例えば、エアコン、照明器、床暖房システム、冷蔵庫、IH(Induction Heating)調理器、テレビ等の電気機器である。電気機器7a,7b,…は、家屋H又はその敷地内に設置され、分電盤9により分岐された電力線D4,D5,…を介して、商用電力系統8及び発電設備3と電気的に接続されている。
<Electrical equipment 7a, 7b,...>
The electric devices 7 (electric devices 7a, 7b,...) Are electric devices such as an air conditioner, an illuminator, a floor heating system, a refrigerator, an IH (Induction Heating) cooker, and a television. The electric devices 7a, 7b,... Are installed in the house H or the site thereof, and are electrically connected to the commercial power system 8 and the power generation facility 3 via the power lines D4, D5,. Has been done.

各電気機器7は、無線通信インタフェースを備え、宅内ネットワークを介して、制御装置20と通信する。なお、各電気機器7は、外付けの通信アダプタ(図示せず)を介して、宅内ネットワークに接続される仕様であってもよい。各電気機器7は、制御装置20からの要求に応答して、機器ID(Identification)と現在時刻と現在の運転状態を示す情報とを格納した運転状態データを、宅内ネットワークを介して制御装置20に送信する。 Each electric device 7 has a wireless communication interface, and communicates with the control device 20 via the home network. Note that each electric device 7 may have a specification of being connected to the home network via an external communication adapter (not shown). In response to the request from the control device 20, each electric device 7 stores the operating state data in which the device ID (Identification), the current time, and the information indicating the current operating state are stored via the home network. Send to.

<制御装置20>
制御装置20は、家屋H内の適切な場所に設置され、家屋H内に設置された各機器から宅内ネットワークを介して送信される情報を収集する情報収集ユニットである。制御装置20は、一例として、家屋H内に設置された各機器を統合的に制御することが可能なHEMSコントローラである。図4に示すように、制御装置20は、制御部21と、記憶部22と、計時部23と、宅内通信部24と、宅外通信部25と、を備える。これら各部はバス29を介して接続されている。
<Control device 20>
The control device 20 is an information collecting unit that is installed in an appropriate place in the house H and collects information transmitted from each device installed in the house H via the home network. The control device 20 is, for example, a HEMS controller capable of integrally controlling each device installed in the house H. As shown in FIG. 4, the control device 20 includes a control unit 21, a storage unit 22, a clock unit 23, an in-home communication unit 24, and an out-of-home communication unit 25. These units are connected via a bus 29.

制御部21は、いずれも図示しないが、CPU、ROM及びRAMを備える。CPUは、様々な処理及び演算を実行する処理部であって、中央処理装置、中央演算装置、プロセッサ、マイクロプロセッサ、マイクロコンピュータ、DSP(Digital Signal Processor)等とも呼ばれる。制御部21において、CPUは、ROMに格納されたプログラム及びデータを読み出し、RAMをワークエリアとして用いて、制御装置20を統括制御する。 Although not shown, the control unit 21 includes a CPU, a ROM, and a RAM. The CPU is a processing unit that executes various processes and calculations, and is also called a central processing unit, a central processing unit, a processor, a microprocessor, a microcomputer, a DSP (Digital Signal Processor), or the like. In the control unit 21, the CPU reads out the programs and data stored in the ROM, and uses the RAM as a work area to integrally control the control device 20.

記憶部22は、例えば、フラッシュメモリ、EPROM(Erasable Programmable ROM)又はEEPROM(Electrically Erasable Programmable ROM)等の不揮発性の半導体メモリであって、いわゆる二次記憶装置(補助記憶装置)としての役割を担う。記憶部22は、制御部21が各種処理を行うために使用する各種プログラム及びデータ、並びに、制御部21が各種処理を行うことにより生成又は取得する各種データを記憶する。 The storage unit 22 is a nonvolatile semiconductor memory such as a flash memory, an EPROM (Erasable Programmable ROM) or an EEPROM (Electrically Erasable Programmable ROM), and plays a role as a so-called secondary storage device (auxiliary storage device). .. The storage unit 22 stores various programs and data used by the control unit 21 to perform various processes, and various data generated or acquired by the control unit 21 performing various processes.

計時部23は、RTC(Real Time Clock)を備えており、制御装置20の電源がオフの間も計時を継続する計時デバイスである。 The clock unit 23 is a clock device that includes an RTC (Real Time Clock) and continues clocking while the power of the control device 20 is off.

宅内通信部24は、家屋H内に構築された宅内ネットワークを介して通信するためのNIC(Network Interface Card controller)を備える。宅内通信部24は、制御部21の制御のもと、発電設備3、電力計測装置4、給湯機6及び電気機器7のそれぞれと宅内ネットワークを介して通信する。宅内通信部24は、通信手段として機能する。 The home communication unit 24 includes a NIC (Network Interface Card controller) for communicating via the home network built in the house H. Under the control of the control unit 21, the in-home communication unit 24 communicates with each of the power generation equipment 3, the power measuring device 4, the water heater 6 and the electric device 7 via the in-home network. The home communication unit 24 functions as a communication means.

宅内ネットワークは、具体的には、エコーネットライト(ECHONET Lite)に準じた無線ネットワークである。エコーネットライトは、家電機器及び設備機器を制御するための通信プロトコルであって、HEMSの標準プロトコルとして普及している。エコーネットライトでは、規定電文と任意電文という2種類の形式の電文が送受信される。規定電文は、コンソーシアムによって規定された形式の電文である。任意電文は、フォーマットを自由に定義可能な電文である。任意電文は、第1の電文の一例であり、規定電文は、第2の電文の一例である。 The home network is specifically a wireless network conforming to ECHONET Lite. Echonet Light is a communication protocol for controlling home appliances and equipment, and is widely used as a standard protocol of HEMS. In the Echonet Lite, two types of electronic messages, a standard electronic message and an optional electronic message, are transmitted and received. The prescribed telegram is a telegram in the format prescribed by the consortium. The arbitrary message is a message whose format can be freely defined. The arbitrary message is an example of the first message, and the prescribed message is an example of the second message.

図5に、エコーネットライトにおける電文の構成を示す。規定電文と任意電文は、どちらもヘッダ(EHD1及びEHD2)と、トランザクションID(TID)と、送信内容のデータ(EDATA)と、を含む。規定電文のEDATAは、送信先のID(SEOJ及びDEOJ)、情報取得コマンド(ESV)、機器の制御内容(EPC)等、予め内容が規定されたデータである。例えば、機器のオン/オフの切り換え、空調機の温度及び風量の設定のように、簡単で使用頻度が高い制御は、規定電文のEDATAに規定されており、規定電文で実行することができる。エコーネットライトによって通信する全ての機器は、規定電文で通信する限り、互いに通信することができる。 FIG. 5 shows the structure of a telegram in Echonet Lite. Both the standard message and the optional message include a header (EHD1 and EHD2), a transaction ID (TID), and data (EDATA) of the transmission content. The specified message EDATA is data whose contents are specified in advance, such as the ID (SEOJ and DEOJ) of the transmission destination, the information acquisition command (ESV), and the control contents (EPC) of the device. For example, simple and frequently used control such as switching on/off of the device and setting the temperature and the air volume of the air conditioner are specified in the specified message EDATA and can be executed by the specified message. All devices that communicate with Echonet Lite can communicate with each other as long as they communicate with the prescribed telegram.

これに対して、任意電文のEDATAは、自由に定義することができるため、規定電文で規定されていない制御を実行することができる。例えば、空調機に付属する赤外線カメラの画像の取得、給湯機6が夜中にわき上げる湯量の設定等は、任意電文で実行される。また、規定電文で実行可能な制御でも、任意電文で実行しても良い。例えば、規定電文では1℃単位で設定される空調機の設定温度を、任意電文を用いることによって0.5℃単位で設定することができる。このように、任意電文は、機器を提供するベンダーによって様々に設計される。各ベンダーが使用する任意電文は一般的には公開されないため、異なるベンダーの機器間における通信は、ベンダー間でアライアンスを締結して情報を開示しない限り、任意電文では行えず、規定電文での通信に限定される。 On the other hand, since EDATA of an arbitrary message can be freely defined, it is possible to execute control that is not specified by the specified message. For example, the acquisition of an image of an infrared camera attached to the air conditioner, the setting of the amount of hot water that the water heater 6 raises in the middle of the night, and the like are executed by arbitrary telegrams. Further, the control that can be executed by the prescribed message or the arbitrary message may be executed. For example, the set temperature of the air conditioner which is set in the unit of 1° C. in the specified telegram can be set in the unit of 0.5° C. by using the arbitrary telegram. As described above, the arbitrary message is designed variously by the vendor that provides the device. Since arbitrary messages used by each vendor are not disclosed to the public, communication between devices of different vendors cannot be done by voluntary messages unless the information is signed by forming an alliance between the vendors, and communication by standard messages is required. Limited to

図4に戻って、宅内通信部24は、制御部21の制御のもと、操作端末30と、Wi−Fi(登録商標)、Wi−SUN(登録商標)、有線LAN(Local Area Network)等を介して通信する。 Returning to FIG. 4, the home communication unit 24, under the control of the control unit 21, the operation terminal 30, Wi-Fi (registered trademark), Wi-SUN (registered trademark), wired LAN (Local Area Network), and the like. To communicate through.

操作端末30は、スマートフォン、タブレット端末、リモコン、携帯電話、ノート型パソコン等の携帯機器であって、ユーザインタフェースとして機能する。操作端末30は、押しボタン、タッチパネル又はタッチパッド等の入力デバイスと、有機EL(Electro-Luminescence)ディスプレイ又は液晶ディスプレイ等の表示デバイスと、通信インタフェースとを備える。操作端末30は、ユーザからの操作を受け付け、受け付けた操作内容を示す情報を制御装置20に送信する。また、操作端末30は、制御装置20から送信された、ユーザに提示するための情報を受信し、受信した情報を表示する。 The operation terminal 30 is a mobile device such as a smartphone, a tablet terminal, a remote controller, a mobile phone, or a laptop computer, and functions as a user interface. The operation terminal 30 includes an input device such as a push button, a touch panel, or a touch pad, a display device such as an organic EL (Electro-Luminescence) display or a liquid crystal display, and a communication interface. The operation terminal 30 receives an operation from the user and transmits information indicating the received operation content to the control device 20. Further, the operation terminal 30 receives the information to be presented to the user, which is transmitted from the control device 20, and displays the received information.

宅外通信部25は、ルータ31を介して広域ネットワークNに接続するための通信インタフェースを備え、制御部21の制御のもと、広域ネットワークNを介して管理サーバ40を含む外部の機器と通信する。ルータ31は、広域ネットワークNを介して外部の機器と通信することができる装置であって、例えばブロードバンドルータである。広域ネットワークNは、例えばインターネットである。 The out-of-home communication unit 25 includes a communication interface for connecting to the wide area network N via the router 31, and communicates with an external device including the management server 40 via the wide area network N under the control of the control unit 21. To do. The router 31 is a device capable of communicating with an external device via the wide area network N, and is, for example, a broadband router. The wide area network N is, for example, the Internet.

<管理サーバ40>
管理サーバ40は、制御装置20と連携して電力管理システム1を機能させるためのサーバであって、例えばクラウドコンピューティングにおけるリソースを提供するサーバである。管理サーバ40は、家屋Hを含む複数の電力消費地に設置された制御装置を、広域ネットワークNを介して遠隔から管理する。図6に示すように、管理サーバ40は、制御部41と、記憶部42と、通信部43と、を備える。これら各部はバス49を介して接続されている。
<Management server 40>
The management server 40 is a server that causes the power management system 1 to function in cooperation with the control device 20, and is a server that provides resources in cloud computing, for example. The management server 40 remotely manages the control devices installed in a plurality of power consumption areas including the house H via the wide area network N. As shown in FIG. 6, the management server 40 includes a control unit 41, a storage unit 42, and a communication unit 43. These respective units are connected via a bus 49.

制御部41は、CPU、ROM及びRAMを備える。CPUは、様々な処理及び演算を実行する処理部であって、中央処理装置、中央演算装置、プロセッサ、マイクロプロセッサ、マイクロコンピュータ、DSP等とも呼ぶ。制御部41において、CPUは、ROMに格納されたプログラム及びデータを読み出し、RAMをワークエリアとして用いて、管理サーバ40を統括制御する。 The control unit 41 includes a CPU, ROM and RAM. The CPU is a processing unit that executes various processes and calculations, and is also called a central processing unit, a central processing unit, a processor, a microprocessor, a microcomputer, a DSP, or the like. In the control unit 41, the CPU reads out the programs and data stored in the ROM, and uses the RAM as a work area to centrally control the management server 40.

記憶部42は、フラッシュメモリ、EPROM、EEPROM等の不揮発性の半導体メモリであって、いわゆる二次記憶装置又は補助記憶装置としての役割を担う。記憶部42は、制御部41が各種処理を行うために使用するプログラム及びデータ、並びに、制御部41が各種処理を行うことにより生成又は取得するデータを記憶する。 The storage unit 42 is a non-volatile semiconductor memory such as a flash memory, an EPROM, or an EEPROM, and plays a role as a so-called secondary storage device or an auxiliary storage device. The storage unit 42 stores programs and data used by the control unit 41 to perform various processes, and data generated or acquired by the control unit 41 performing various processes.

通信部43は、広域ネットワークNに接続するための通信インタフェースを備え、制御部41の制御のもと、広域ネットワークNを介して制御装置20及び気象サーバ50と通信する。具体的に説明すると、通信部43は、気象サーバ50から気象情報を取得する。また、通信部43は、制御装置20から、発電設備3による発電電力P2の計測値、及び家屋Hにおける消費電力Pcの計測値を取得し、家屋Hにおける余剰電力の予測情報を制御装置20に送信する。 The communication unit 43 includes a communication interface for connecting to the wide area network N, and communicates with the control device 20 and the weather server 50 via the wide area network N under the control of the control unit 41. Specifically, the communication unit 43 acquires weather information from the weather server 50. In addition, the communication unit 43 acquires the measured value of the generated power P2 by the power generation facility 3 and the measured value of the power consumption Pc of the house H from the control device 20, and predicts the surplus power of the house H in the control device 20. Send.

<気象サーバ50>
気象サーバ50は、気象庁、気象事業者等によって運営されるデータサーバであって、気象情報を一般に利用可能に提供する。気象情報とは、天気、気温、日射量、日照時間、風向き等のような、気象の予報及び実績に関する情報である。気象サーバ50は、各電力需要家の電力消費地に設置された制御装置20と広域ネットワークNを介して通信可能に接続されており、広域ネットワークNを介して気象情報を配信する。
<Weather server 50>
The meteorological server 50 is a data server operated by the Meteorological Agency, a meteorological operator, and the like, and provides meteorological information to the general public. The weather information is information on weather forecasts and results such as weather, temperature, solar radiation amount, sunshine duration, wind direction, and the like. The weather server 50 is communicably connected to the control device 20 installed in the power consumption area of each power consumer via the wide area network N, and distributes the weather information via the wide area network N.

次に、図7を参照して、電力管理システム1の機能的な構成について説明する。図7に示すように、制御装置20は、機能的に、計測値取得部210と、計測値送信部220と、予測情報受信部230と、動作設定部240と、判定部250と、動作制御部260と、を備える。また、管理サーバ40は、機能的に、気象情報取得部410と、計測値取得部420と、予測部430と、予測情報送信部440と、を備える。 Next, with reference to FIG. 7, a functional configuration of the power management system 1 will be described. As illustrated in FIG. 7, the control device 20 functionally includes a measurement value acquisition unit 210, a measurement value transmission unit 220, a prediction information reception unit 230, an operation setting unit 240, a determination unit 250, and an operation control. And a section 260. Further, the management server 40 functionally includes a weather information acquisition unit 410, a measurement value acquisition unit 420, a prediction unit 430, and a prediction information transmission unit 440.

これらの各機能は、ソフトウェア、ファームウェア、又は、ソフトウェアとファームウェアとの組み合わせによって実現される。ソフトウェア及びファームウェアは、プログラムとして記述され、各機器におけるROM又は記憶部22,42に格納される。そして、制御部21,41において、CPUが、ROM又は記憶部22,42に記憶されたプログラムを実行することによって、各部の機能を実現する。また、管理サーバ40は、データベース490を備える。データベース490は、記憶部42内の記憶領域に構築される。 Each of these functions is realized by software, firmware, or a combination of software and firmware. The software and the firmware are described as programs and stored in the ROM or the storage units 22 and 42 of each device. Then, in the control units 21 and 41, the CPU realizes the functions of the respective units by executing the programs stored in the ROM or the storage units 22 and 42. The management server 40 also includes a database 490. The database 490 is constructed in the storage area in the storage unit 42.

制御装置20において、計測値取得部210は、発電電力P2及び消費電力Pcを含む、電力計測装置4によって得られた電力の計測値を、宅内ネットワークを介して電力計測装置4から取得する。電力計測装置4は、CT1〜CT3によって得られた電力の計測値を、例えば定期的に制御装置20に送信する。或いは、計測値取得部210が、必要に応じて電力計測装置4に電力の計測値の要求を送信し、電力計測装置4がこの要求に応答する方式で電力の計測値を制御装置20に送信してもよい。 In the control device 20, the measurement value acquisition unit 210 acquires, from the power measurement device 4 via the home network, measurement values of the power obtained by the power measurement device 4 including the generated power P2 and the power consumption Pc. The power measuring device 4 transmits the measured values of power obtained by CT1 to CT3 to the control device 20 periodically, for example. Alternatively, the measurement value acquisition unit 210 transmits a request for a power measurement value to the power measurement device 4 as necessary, and the power measurement device 4 transmits the power measurement value to the control device 20 in a system that responds to the request. You may.

計測値取得部210は、電力計測装置4から電力の計測値を取得すると、取得した計測値を記憶部22に格納する。計測値取得部210は、制御部21が宅内通信部24及び記憶部22と協働することによって実現される。計測値取得部210は、計測値取得手段として機能する。 When the measurement value acquisition unit 210 acquires the measurement value of power from the power measurement device 4, the measurement value acquisition unit 210 stores the acquired measurement value in the storage unit 22. The measurement value acquisition unit 210 is realized by the control unit 21 cooperating with the in-home communication unit 24 and the storage unit 22. The measurement value acquisition unit 210 functions as a measurement value acquisition unit.

計測値送信部220は、計測値取得部210によって取得された発電電力P2の計測値と消費電力Pcの計測値とを、広域ネットワークNを介して管理サーバ40に送信する。計測値送信部220は、規定のタイミングで、又は管理サーバ40からの要求に応じて、記憶部22に記憶された発電電力P2及び消費電力Pcの計測値を管理サーバ40に送信する。なお、計測値送信部220は、発電電力P2の計測値と消費電力Pcの計測値とを一括して送信しても良いし、別々に送信しても良い。計測値送信部220は、制御部21が宅外通信部25と協働することによって実現される。計測値送信部220は、計測値送信手段として機能する。 The measurement value transmission unit 220 transmits the measurement value of the generated power P2 and the measurement value of the power consumption Pc acquired by the measurement value acquisition unit 210 to the management server 40 via the wide area network N. The measured value transmission unit 220 transmits the measured values of the generated power P2 and the consumed power Pc stored in the storage unit 22 to the management server 40 at a specified timing or in response to a request from the management server 40. Note that the measurement value transmission unit 220 may transmit the measurement value of the generated power P2 and the measurement value of the power consumption Pc collectively or separately. The measurement value transmission unit 220 is realized by the control unit 21 cooperating with the outside communication unit 25. The measurement value transmitting unit 220 functions as a measurement value transmitting unit.

管理サーバ40において、気象情報取得部410は、気象サーバ50から気象情報を取得する。気象情報は、家屋Hを含む地域における天気、日射量、日照時間等の予報である気象予報と、これらの過去の実績である気象実績と、を含んでおり、発電設備3による発電電力P2を予測するための指標として用いられる。 In the management server 40, the weather information acquisition unit 410 acquires weather information from the weather server 50. The weather information includes a weather forecast that is a forecast of weather, an amount of solar radiation, a sunshine duration, and the like in an area including the house H, and a past weather record of these, and generates power P2 generated by the power generation facility 3. It is used as an index for prediction.

気象情報取得部410は、広域ネットワークNを介して気象サーバ50に要求を送信し、要求に対する応答として気象サーバ50から気象情報を取得する。気象情報取得部410は、気象サーバ50において気象情報が更新される毎に気象サーバ50から気象情報を取得し、取得した気象情報をデータベース490に格納する。気象情報取得部410は、制御部41が通信部43と協働することによって実現される。気象情報取得部410は、気象情報取得手段として機能する。 The weather information acquisition unit 410 transmits a request to the weather server 50 via the wide area network N, and acquires weather information from the weather server 50 as a response to the request. The weather information acquisition unit 410 acquires weather information from the weather server 50 each time the weather information is updated in the weather server 50, and stores the acquired weather information in the database 490. The weather information acquisition unit 410 is realized by the control unit 41 cooperating with the communication unit 43. The weather information acquisition unit 410 functions as a weather information acquisition unit.

計測値取得部420は、発電設備3による発電電力P2の計測値と、家屋Hにおける消費電力Pcの計測値と、を取得する。具体的に説明すると、計測値取得部420は、制御装置20の計測値送信部220によって、発電電力P2及び消費電力Pcの計測値が広域ネットワークNを介して送信されると、送信された計測値を取得する。 The measurement value acquisition unit 420 acquires the measurement value of the power P2 generated by the power generation facility 3 and the measurement value of the power consumption Pc of the house H. Specifically, the measurement value acquisition unit 420 transmits the measurement values when the measurement value transmission unit 220 of the control device 20 transmits the measurement values of the generated power P2 and the power consumption Pc via the wide area network N. Get the value.

計測値取得部420によって取得される発電電力P2及び消費電力Pcの計測値は、電力(ワット)の単位で表されるものであっても良いし、電力を規定時間に亘って積算した電力量の単位で表されるものであっても良い。計測値取得部420は、制御部41が通信部43と協働することによって実現される。計測値取得部420は、計測値取得手段として機能する。 The measured values of the generated power P2 and the consumed power Pc acquired by the measured value acquisition unit 420 may be expressed in units of electric power (watt), or the electric energy obtained by integrating the electric power over a specified time. It may be expressed in units of. The measurement value acquisition unit 420 is realized by the control unit 41 cooperating with the communication unit 43. The measurement value acquisition unit 420 functions as a measurement value acquisition unit.

データベース490は、気象情報取得部410によって取得された気象情報と、計測値取得部420によって取得された発電電力P2及び消費電力Pcの計測値と、を記憶する。具体的に説明すると、データベース490は、図8に示すように、気象予報情報491と、気象実績情報492と、発電電力情報493と、消費電力情報494と、を記憶する。 The database 490 stores the meteorological information acquired by the meteorological information acquisition unit 410 and the measured values of the generated power P2 and the power consumption Pc acquired by the measured value acquisition unit 420. Specifically, the database 490 stores weather forecast information 491, meteorological record information 492, generated power information 493, and power consumption information 494, as shown in FIG. 8.

気象予報情報491は、家屋Hを含む地域における翌日の気象予報を示す情報である。気象実績情報492は、家屋Hを含む地域における過去の気象実績を示す情報である。発電電力情報493は、家屋Hにおける発電電力P2の計測値を示す情報である。消費電力情報494は、家屋Hにおける消費電力Pcの計測値を示す情報である。気象実績情報492、発電電力情報493及び消費電力情報494は、それぞれ過去の規定期間における気象実績、発電電力P2の計測値及び消費電力Pcの計測値を、時系列順に格納している。データベース490に記憶されているこれらの情報は、気象情報取得部410又は計測値取得部420によって取得される毎に更新される。 The weather forecast information 491 is information indicating the weather forecast of the next day in the area including the house H. The meteorological record information 492 is information indicating past meteorological records in the area including the house H. The generated power information 493 is information indicating the measured value of the generated power P2 in the house H. The power consumption information 494 is information indicating the measured value of the power consumption Pc in the house H. The meteorological record information 492, the generated power information 493, and the consumed power information 494 store the meteorological record, the measured value of the generated power P2, and the measured value of the consumed power Pc in the past prescribed period, respectively, in chronological order. These pieces of information stored in the database 490 are updated every time they are acquired by the weather information acquisition unit 410 or the measurement value acquisition unit 420.

図7に戻って、予測部430は、気象情報取得部410によって取得された気象情報と、計測値取得部420によって取得された発電電力P2及び消費電力Pcの計測値と、に基づいて、家屋Hにおける余剰電力を予測する。余剰電力は、例えば図2に示した期間T2において、発電電力P2が消費電力Pcを上回った場合に生じる。予測部430は、データベース490に記憶された情報に基づいて、家屋Hにおける翌日の余剰電力を予測する。予測部430は、制御部41が記憶部42と協働することによって実現される。予測部430は、予測手段として機能する。 Returning to FIG. 7, the prediction unit 430, based on the meteorological information acquired by the meteorological information acquisition unit 410 and the measured values of the generated power P2 and the consumed power Pc acquired by the measured value acquisition unit 420, the house Predict surplus power at H. The surplus power is generated, for example, when the generated power P2 exceeds the power consumption Pc in the period T2 shown in FIG. The prediction unit 430 predicts the surplus power of the house H on the next day based on the information stored in the database 490. The prediction unit 430 is realized by the control unit 41 cooperating with the storage unit 42. The prediction unit 430 functions as a prediction unit.

第1に、予測部430は、家屋Hにおける翌日の発電量を予測する。そのために、予測部430は、データベース490に記憶された気象実績情報492と発電電力情報493とに基づいて、発電予測モデルを作成する。発電予測モデルは、発電電力P2を予測するためのモデルであって、過去の規定期間における発電量を、天気及び時間帯毎に分類したモデルである。規定期間は、2週間、1ヶ月等である。 First, the prediction unit 430 predicts the power generation amount of the house H on the next day. Therefore, the prediction unit 430 creates a power generation prediction model based on the weather record information 492 and the generated power information 493 stored in the database 490. The power generation prediction model is a model for predicting the generated power P2, and is a model in which the power generation amount in the past prescribed period is classified by weather and time zone. The prescribed period is 2 weeks, 1 month, etc.

予測部430は、過去の規定期間における気象実績を参照して、その規定期間における発電量を、晴れ、曇り、雨等のような天気別に分類し、分類した発電量を規定の時間帯毎に平均した平均値を算出する。そして、予測部430は、算出した発電量の平均値を、天気及び時間帯に対応付けることによって、発電予測モデルを作成する。規定の時間帯は、30分、1時間等の長さで区切られた時間帯である。 The predicting unit 430 refers to the meteorological record in the past specified period, classifies the power generation amount in the specified period according to the weather such as sunny, cloudy, and rain, and the classified power generation amount for each specified time zone. Calculate the averaged average value. Then, the prediction unit 430 creates a power generation prediction model by associating the calculated average value of the power generation amount with the weather and the time zone. The prescribed time zone is a time zone divided by a length of 30 minutes, 1 hour, or the like.

予測部430は、データベース490に記憶された気象予報情報491を参照して、家屋Hを含む地域における翌日の天気情報を取得する。そして、予測部430は、発電予測モデルを参照して、翌日の天気に対応する各時間帯の発電量を、翌日の発電量として予測する。 The prediction unit 430 refers to the weather forecast information 491 stored in the database 490 and acquires the weather information of the next day in the area including the house H. Then, the prediction unit 430 refers to the power generation prediction model and predicts the power generation amount of each time zone corresponding to the weather of the next day as the power generation amount of the next day.

第2に、予測部430は、家屋Hにおける翌日の消費電力量を予測する。そのために、予測部430は、データベース490に記憶された消費電力情報494に基づいて、消費予測モデルを作成する。消費予測モデルは、消費電力Pcを予測するためのモデルであって、過去の規定期間における消費電力量を、曜日及び時間帯毎に分類したモデルである。 Secondly, the prediction unit 430 predicts the power consumption of the house H on the next day. Therefore, the prediction unit 430 creates a consumption prediction model based on the power consumption information 494 stored in the database 490. The power consumption prediction model is a model for predicting the power consumption Pc, and is a model in which the power consumption amount in the past prescribed period is classified by day of the week and time zone.

予測部430は、過去の規定期間における消費電力量を曜日別に分類し、分類した消費電力量を規定の時間帯毎に平均した平均値を算出する。そして、予測部430は、算出した消費電力量の平均値を、曜日及び時間帯に対応付けることによって、消費予測モデルを作成する。なお、規定の期間及び規定の時間帯は、発電予測モデルと同様である。予測部430は、消費予測モデルを参照して、翌日の曜日に対応する各時間帯の消費電力量を、翌日の消費電力量として予測する。 The prediction unit 430 classifies the power consumption amounts in the past specified period by day of the week, and calculates an average value of the classified power consumption amounts for each specified time period. Then, the prediction unit 430 creates a consumption prediction model by associating the calculated average value of the power consumption with the day of the week and the time of day. The specified period and specified time zone are the same as those in the power generation prediction model. The prediction unit 430 refers to the consumption prediction model and predicts the power consumption in each time zone corresponding to the day of the next day as the power consumption of the next day.

このようにして翌日の発電量と消費電力量とを予測すると、予測部430は、発電量が消費電力量を超える期間を、余剰電力が生じる期間として予測する。余剰電力が生じる期間は、具体的には図2に示した昼間の期間T2に相当する。更に、予測部430は、余剰電力が生じる期間において、発電量から消費電力量を減じた量を、余剰電力量として予測する。予測部430は、余剰電力が生じる期間において、規定の時間帯毎に発電量から消費電力量を減じた量を算出する。これにより、予測部430は、図9に示すように、余剰電力が生じる期間に含まれる各時間帯における余剰電力量を予測する。 When the power generation amount and the power consumption amount of the next day are predicted in this way, the prediction unit 430 predicts a period in which the power generation amount exceeds the power consumption amount as a period in which surplus power is generated. The period during which the surplus power is generated specifically corresponds to the daytime period T2 shown in FIG. Furthermore, the prediction unit 430 predicts, as the surplus power amount, an amount obtained by subtracting the power consumption amount from the power generation amount during the period in which the surplus power is generated. The prediction unit 430 calculates an amount obtained by subtracting the power consumption amount from the power generation amount for each prescribed time period in the period in which the surplus power is generated. As a result, the prediction unit 430 predicts the amount of surplus power in each time period included in the period in which surplus power is generated, as illustrated in FIG. 9.

予測情報送信部440は、予測部430によって予測された余剰電力を示す予測情報を制御装置20に送信する。具体的に説明すると、予測情報送信部440は、余剰電力が生じる期間と、図9に示した各時間帯における余剰電力量と、を示す予測情報を、広域ネットワークNを介して制御装置20に送信する。予測情報送信部440は、規定のタイミングが到来すると、又は制御装置20からの要求に応答して、予測情報を制御装置20に送信する。予測情報送信部440は、制御部41が通信部43と協働することによって実現される。予測情報送信部440は、予測情報送信手段として機能する。 The prediction information transmission unit 440 transmits, to the control device 20, prediction information indicating the surplus power predicted by the prediction unit 430. More specifically, the prediction information transmission unit 440 transmits prediction information indicating a period in which surplus power is generated and the surplus power amount in each time zone illustrated in FIG. 9 to the control device 20 via the wide area network N. Send. The prediction information transmission unit 440 transmits the prediction information to the control device 20 when the specified timing arrives or in response to the request from the control device 20. The prediction information transmission unit 440 is realized by the control unit 41 cooperating with the communication unit 43. The prediction information transmission unit 440 functions as a prediction information transmission unit.

制御装置20において、予測情報受信部230は、広域ネットワークNを介して管理サーバ40と通信し、管理サーバ40から送信された予測情報を受信する。予測情報受信部230は、制御部21が宅外通信部25と協働することによって実現される。予測情報受信部230は、予測情報受信手段として機能する。 In the control device 20, the prediction information receiving unit 230 communicates with the management server 40 via the wide area network N and receives the prediction information transmitted from the management server 40. The prediction information receiving unit 230 is realized by the control unit 21 cooperating with the outside communication unit 25. The prediction information receiving unit 230 functions as a prediction information receiving unit.

動作設定部240は、予測情報受信部230によって受信された予測情報に基づいて、余剰電力で給湯機6を動作させる期間である第1の期間を設定する。余剰電力で給湯機6を動作させる期間とは、発電設備3によって余剰電力が生じている昼間に、余剰電力を利用して給湯機6に湯をわき上げさせる期間である。 The operation setting unit 240 sets the first period, which is a period in which the water heater 6 is operated with the surplus power, based on the prediction information received by the prediction information receiving unit 230. The period in which the hot water supply device 6 is operated with the surplus power is a period during which the hot water supply device 6 uses the surplus power to raise the hot water during the daytime when the power generation facility 3 generates the surplus power.

図10に、給湯機6が昼間に湯をわき上げる場合と昼間に湯をわき上げない場合とのそれぞれにおける貯湯タンク63内の貯湯量の推移を示す。図10において、実線L1は、昼間に湯をわき上げない場合の貯湯量を表しており、破線L2は、昼間に湯をわき上げる場合の貯湯量を表している。 FIG. 10 shows changes in the amount of hot water stored in the hot water storage tank 63 when the water heater 6 raises the hot water during the daytime and when it does not raise the hot water during the daytime. In FIG. 10, a solid line L1 represents the amount of hot water stored when the hot water is not pumped up during the daytime, and a broken line L2 represents the amount of hot water stored when the hot water is heated up during the daytime.

例えば雨又は曇りの日のように、余剰電力が少ない又は生じない場合には、給湯機6は、昼間に湯をわき上げない。この場合、実線L1に示すように、給湯機6は、電力料金が安い夜間に目標貯湯量の湯をわき上げる。これに対して、晴れの日のように多くの余剰電力が生じる場合には、給湯機6は、破線L2に示すように、目標貯湯量のうちのV1の量の湯を、余剰電力を利用して昼間にわき上げる。この場合、夜間にわき上げる湯量はV1だけ減少する。余剰電力が生じている昼間に給湯機6が湯をわき上げる期間を第1の期間と呼び、第1の期間より前の期間であって、余剰電力が生じていない夜間に給湯機6が湯をわき上げる期間を第2の期間と呼ぶ。 If the surplus power is low or absent, such as on a rainy or cloudy day, the water heater 6 does not boil hot water during the day. In this case, as shown by the solid line L1, the water heater 6 raises the target amount of hot water at night when the electricity charge is low. On the other hand, when a large amount of surplus power is generated, such as on a sunny day, the water heater 6 uses the surplus power of V1 of the target hot water storage amount, as indicated by a broken line L2. And raise it up in the daytime. In this case, the amount of hot water pumped up at night is reduced by V1. A period during which the water heater 6 raises hot water during the day when excess power is generated is called a first period, and the water heater 6 is heated at night before the first period and when no excess power is generated. The period of raising the arm is called the second period.

動作設定部240は、管理サーバ40による余剰電力の予測結果に基づいて、給湯機6に昼間に湯をわき上げさせるか否かを決定し、給湯機6に昼間に湯をわき上げさせる場合に、その期間とわき上げる湯量を設定する。具体的に説明すると、動作設定部240は、余剰電力が給湯機6の消費電力よりも大きい期間を、第1の期間、すなわち昼間わき上げ期間として設定する。動作設定部240は、管理サーバ40から受信した予測情報を参照して、余剰電力が生じる期間に含まれる各時間帯における余剰電力の大きさと給湯機6の消費電力の大きさとを比較する。そして、動作設定部240は、余剰電力が給湯機6の消費電力を超える期間を、昼間わき上げ期間として設定する。 The operation setting unit 240 determines whether or not to cause the water heater 6 to raise the hot water in the daytime based on the estimation result of the surplus power by the management server 40, and when making the water heater 6 raise the hot water in the daytime. , Set the period and amount of hot water to boil. Specifically, the operation setting unit 240 sets a period in which the surplus power is larger than the power consumption of the water heater 6 as the first period, that is, the daytime raising period. The operation setting unit 240 refers to the prediction information received from the management server 40 and compares the size of the surplus power in each time period included in the period in which the surplus power is generated with the power consumption of the water heater 6. Then, operation setting unit 240 sets a period during which the surplus power exceeds the power consumption of water heater 6 as the daytime raising period.

動作設定部240は、余剰電力が給湯機6の消費電力を超える期間が複数ある場合には、この複数の期間のうちの最長の期間を、昼間わき上げ期間として設定する。このように、なるべく長い時間を昼間わき上げ期間として設定することによって、給湯機6の発停回数を少なくできるため、給湯機6を効率的に動作させることができる。 When there are a plurality of periods when the surplus power exceeds the power consumption of water heater 6, operation setting unit 240 sets the longest period of the plurality of periods as the daytime raising period. In this way, by setting the longest possible time as the daytime raising period, the number of times of starting and stopping the water heater 6 can be reduced, so that the water heater 6 can be operated efficiently.

なお、給湯機6の消費電力は、給湯機6がわき上げ運転を実行している最中に給湯機6において消費される電力である。動作設定部240は、給湯機6の消費電力の情報を、宅内通信部24を介して給湯機6と通信することによって給湯機6から取得する。或いは、動作設定部240は、給湯機6の消費電力として、CT3によって計測された電力P3の計測値を電力計測装置4から取得しても良いし、ユーザによって入力された又は初期値として設定された固定値を用いても良い。 Note that the power consumption of the water heater 6 is the power consumed by the water heater 6 while the water heater 6 is performing the raising operation. The operation setting unit 240 acquires information on the power consumption of the water heater 6 from the water heater 6 by communicating with the water heater 6 via the in-home communication unit 24. Alternatively, the operation setting unit 240 may acquire, as the power consumption of the water heater 6, the measurement value of the power P3 measured by CT3 from the power measurement device 4, or may be input by the user or set as an initial value. Alternatively, a fixed value may be used.

更に、動作設定部240は、設定した昼間わき上げ期間において給湯機6がわき上げる第1の湯量である昼間わき上げ量を設定する。具体的に説明すると、動作設定部240は、設定した昼間わき上げ期間の長さに給湯機6のわき上げ能力を乗じた値を、給湯機6が昼間にわき上げるべき第1の湯量として設定する。 Further, the operation setting unit 240 sets the daytime amount of boiling, which is the first amount of hot water heated by the water heater 6 in the set daytime raising period. Specifically, the operation setting unit 240 sets a value obtained by multiplying the set length of the daytime raising period by the raising ability of the water heater 6 as the first amount of hot water that the water heater 6 should raise in the daytime. To do.

給湯機6のわき上げ能力は、給湯機6がいかに高速に湯を沸き上げることができるかを示す指標であって、給湯機6が規定時間当たりにわき上げ可能な湯量によって表される。動作設定部240は、給湯機6のわき上げ能力の情報を、宅内通信部24を介して給湯機6と通信することによって給湯機6から取得する。或いは、動作設定部240は、給湯機6のわき上げ能力として、ユーザによって入力された又は初期値として設定された固定値を用いても良い。 The boiling capacity of the water heater 6 is an index showing how fast the water heater 6 can boil hot water, and is represented by the amount of water that the water heater 6 can boil per specified time. The operation setting unit 240 obtains the information on the raising capacity of the water heater 6 from the water heater 6 by communicating with the water heater 6 via the in-home communication unit 24. Alternatively, the operation setting unit 240 may use a fixed value input by the user or set as an initial value as the arm raising capability of the water heater 6.

動作設定部240は、設定した昼間わき上げ期間の長さに給湯機6のわき上げ能力を乗じた乗算値が上限値より小さい場合、この乗算値を昼間わき上げ量として設定する。上限値は、給湯機6がわき上げ可能な湯量の最大値である。上限値は、具体的には、貯湯量の最大値から湯切れ防止量を減じた値として予め設定されている。湯切れ防止量は、例えば100Lであって、固定値である。動作設定部240は、設定した昼間わき上げ期間の長さに給湯機6のわき上げ能力を乗じた値が上限値より大きい場合には、上限値を昼間わき上げ量として設定する。 When the multiplication value obtained by multiplying the set length of the daytime raising period by the raising ability of the water heater 6 is smaller than the upper limit value, the operation setting unit 240 sets this multiplication value as the daytime raising amount. The upper limit value is the maximum amount of hot water that the water heater 6 can raise. Specifically, the upper limit value is preset as a value obtained by subtracting the hot water outage prevention amount from the maximum value of the hot water storage amount. The hot water drainage prevention amount is, for example, 100 L, which is a fixed value. When the value obtained by multiplying the set length of the daytime raising period by the raising ability of water heater 6 is larger than the upper limit value, operation setting unit 240 sets the upper limit value as the daytime raising amount.

このように、動作設定部240は、管理サーバ40から取得した余剰電力の予測情報に基づいて、余剰電力によって給湯機6を動作させる期間である昼間わき上げ期間と、昼間わき上げ期間において給湯機6がわき上げる昼間わき上げ量と、を設定する。動作設定部240は、制御部21によって実現される。動作設定部240は、動作設定手段として機能する。 In this way, the operation setting unit 240, based on the surplus power prediction information acquired from the management server 40, the hot water heater in the daytime warm-up period and the daytime warm-up period in which the hot water heater 6 is operated by the surplus power. 6 Set the amount of daytime lift up. The operation setting unit 240 is realized by the control unit 21. The operation setting unit 240 functions as operation setting means.

判定部250は、給湯機6が任意電文での通信に対応しているか否かを判定する。給湯機6が任意電文での通信に対応しているとは、給湯機6が制御装置20と任意電文で通信する機能を備えており、制御装置20と任意電文で通信可能であることを意味する。任意電文は、規定電文のように形式が規定されていないため、制御装置20と給湯機6との間でシステム構成が異なると、給湯機6と制御装置20との間で任意電文では通信できない可能性がある。特に、制御装置20と給湯機6との間でベンダー、バージョン等が異なると、システム構成も異なることが多い、そのため、判定部250は、給湯機6と任意電文で通信が可能であるか否かを確認する。 The determination unit 250 determines whether or not the water heater 6 is compatible with communication by an arbitrary electronic message. The fact that the water heater 6 supports communication by arbitrary message means that the water heater 6 has a function of communicating with the control device 20 by arbitrary message and can communicate with the control device 20 by arbitrary message. To do. Since the format of the arbitrary message is not defined like the standard message, if the system configuration differs between the control device 20 and the water heater 6, the arbitrary message cannot be communicated between the water heater 6 and the controller 20. there is a possibility. In particular, if the vendor, the version, etc. are different between the control device 20 and the water heater 6, the system configurations are often different. Therefore, the determination unit 250 determines whether or not it is possible to communicate with the water heater 6 by an arbitrary message. Check if

具体的に説明すると、判定部250は、任意電文での通信によって給湯機6から特定の情報の取得に成功した場合に、給湯機6が任意電文での通信に対応していると判定し、特定の情報の取得に失敗した場合に、給湯機6が任意電文での通信に対応していないと判定する。特定の情報は、エコーネットライトにおいて、任意電文では通信可能であるが、規定電文では通信可能で無い情報である。特定の情報は、具体的には、給湯機6の夜間わき上げ量である。 Specifically, the determination unit 250 determines that the water heater 6 is compatible with communication in an arbitrary message when the specific information is successfully obtained from the water heater 6 by communication in the arbitrary message. If the acquisition of the specific information fails, it is determined that the water heater 6 does not support communication by arbitrary message. The specific information is information that can be communicated by an arbitrary electronic message but cannot be communicated by a prescribed electronic message in Echonet Lite. The specific information is, specifically, the nighttime pull-up amount of the water heater 6.

夜間わき上げ量は、夜間に給湯機6がわき上げるべき湯量として給湯機6に設定された湯量である。夜間わき上げ量は、現在の貯湯量と翌日に必要な湯量とに基づいて設定される。判定部250は、給湯機6に任意電文で夜間わき上げ量の要求を送信し、要求に対する応答として夜間わき上げ量を給湯機6から受信した場合に、給湯機6が任意電文での通信に対応していると判定する。判定部250は、制御部21が宅内通信部24と協働することによって実現される。判定部250は、判定手段として機能する。 The nighttime heating amount is the amount of hot water set in the water heater 6 as the amount of hot water that the water heater 6 should raise at night. The night-time pumping amount is set based on the current hot water storage amount and the hot water amount required on the next day. When the determination unit 250 transmits a request for the nighttime heating amount to the water heater 6 by an arbitrary message and receives the nighttime heating amount from the water heater 6 as a response to the request, the water heater 6 performs communication by the arbitrary message. It is determined to be compatible. The determination unit 250 is realized by the control unit 21 cooperating with the in-home communication unit 24. The determination unit 250 functions as a determination unit.

動作制御部260は、給湯機6の動作を制御する。給湯機6の動作とは、余剰電力が生じている昼間、又は電気料金が安い夜間に、湯をわき上げる動作である。動作制御部260は、宅内通信部24に宅内ネットワークを介して給湯機6と通信させ、給湯機6に制御指令を送信することにより、給湯機6にわき上げ動作を実行させる。動作制御部260は、制御部21が宅内通信部24と協働することによって実現される。動作制御部260は、動作制御手段として機能する。 Operation control unit 260 controls the operation of water heater 6. The operation of the water heater 6 is an operation of boiling up the hot water during the daytime when surplus power is generated or at night when the electricity rate is low. The operation control unit 260 causes the in-home communication unit 24 to communicate with the water heater 6 via the in-home network, and sends a control command to the water heater 6 to cause the water heater 6 to perform the raising operation. The operation control unit 260 is realized by the control unit 21 cooperating with the in-home communication unit 24. The operation control unit 260 functions as operation control means.

動作制御部260は、判定部250による判定結果に応じて、宅内通信部24に任意電文又は規定電文で給湯機6と通信させることにより、余剰電力で給湯機6を動作させる。余剰電力で給湯機6を動作させるとは、家屋Hに発生した余剰電力を利用して給湯機6に湯をわき上げさせることを意味する。動作制御部260は、給湯機6に、動作設定部240によって設定された昼間わき上げ期間において、動作設定部240によって設定された昼間わき上げ量の湯をわき上げさせる。更に、動作制御部260は、夜間わき上げ期間において給湯機6がわき上げるべき第2の湯量を、昼間わき上げ量に基づいて設定し、給湯機6に、夜間わき上げ期間において第2の湯量の湯をわき上げさせる。 The operation control unit 260 causes the in-home communication unit 24 to communicate with the water heater 6 by an arbitrary message or a prescribed message according to the determination result of the determination unit 250, thereby operating the water heater 6 with surplus power. Operating the water heater 6 with surplus power means causing the water heater 6 to raise the hot water by using the surplus power generated in the house H. The operation control unit 260 causes the water heater 6 to raise the amount of hot water set in the daytime set by the operation setting unit 240 during the daytime set-up period set by the operation setting unit 240. Further, the operation control unit 260 sets the second amount of hot water that the water heater 6 should raise in the nighttime heating period based on the daytime heating amount, and the water heater 6 sets the second amount of hot water in the nighttime heating period. Bring up the hot water.

動作制御部260は、判定部250による判定の結果、給湯機6が任意電文での通信に対応している場合、宅内通信部24に任意電文で給湯機6と通信させることにより、余剰電力で給湯機6に湯をわき上げさせる。給湯機6が任意電文での通信に対応している場合、判定部250は、給湯機6から夜間わき上げ量の取得に成功している。この場合、動作制御部260は、任意電文での通信によって、夜間わき上げ量に基づく第1の指令を給湯機6に送信する。 As a result of the determination by the determination unit 250, the operation control unit 260 causes the in-home communication unit 24 to communicate with the hot water supply device 6 by an arbitrary message so that excess power is generated by the in-home communication unit 24. Let the water heater 6 raise the water. When the water heater 6 supports communication by an arbitrary electronic message, the determination unit 250 has succeeded in acquiring the nighttime lift amount from the water heater 6. In this case, operation control unit 260 transmits a first command based on the amount of nighttime lifting to water heater 6 by communication in an arbitrary telegram.

具体的に説明すると、動作制御部260は、判定部250によって取得された夜間わき上げ量から、動作設定部240によって設定された昼間わき上げ量を減じた量を、新たな夜間わき上げ量として設定する。新たな夜間わき上げ量は、夜間わき上げ期間において給湯機6がわき上げるべき第2の湯量である。そして、動作制御部260は、宅内通信部24による任意電文での通信によって、新たな夜間わき上げ量の湯を夜間にわき上げる指令を第1の指令として給湯機6に送信する。 To be more specific, the operation control unit 260 subtracts the daytime amount of pull-up set by the operation setting unit 240 from the amount of night-time pull-up obtained by the determination unit 250 as a new night-time pull-up amount. Set. The new nighttime heating amount is the second amount of hot water that the water heater 6 should raise during the nighttime heating period. Then, operation control unit 260 transmits a command to boil a new night boil amount of hot water at night as a first command to water heater 6 by communication by in-home communication unit 24 by an arbitrary message.

給湯機6は、制御装置20から新たな夜間わき上げ量を受信すると、受信した新たな夜間わき上げ量の湯を夜間にわき上げる。その後、給湯機6は、当初の夜間わき上げ量に対して不足している湯量を判定し、昼間わき上げ量を自身で決定する。そして、決定した昼間わき上げ量の湯を、余剰電力が生じている昼間わき上げ期間にわき上げる。 When the water heater 6 receives a new nighttime heating amount from the control device 20, the hot water heater 6 raises the received new nighttime heating amount at nighttime. After that, the water heater 6 determines the amount of hot water that is insufficient with respect to the initial nighttime heating amount, and determines the daytime heating amount by itself. Then, the determined daytime amount of hot water is heated to the side during the daytime heating period when the surplus power is generated.

このように、給湯機6は、制御装置20から新たな夜間わき上げ量を受信すると、昼間にわき上げが必要な湯量を自身で決定し、且つ、余剰電力が生じる昼間わき上げ期間を自身で判別して、余剰電力で湯をわき上げる。そのため、動作制御部260は、給湯機6が任意電文での通信に対応している場合、給湯機6から取得された夜間わき上げ量から昼間わき上げ量を減じた新たな夜間わき上げ量を給湯機6に送信する。そして、動作制御部260は、その後の昼間わき上げの実行を給湯機6に一任する。 In this way, when the hot water supply device 6 receives a new nighttime heating amount from the control device 20, it determines the amount of hot water that needs to be heated during the daytime, and the heating water heater 6 itself during the daytime heating period during which excess power is generated. Judgment is made, and hot water is raised by surplus power. Therefore, when the water heater 6 supports communication by arbitrary telegram, the operation control unit 260 sets a new nighttime heating amount obtained by subtracting the daytime heating amount from the nighttime heating amount acquired from the water heating device 6. It transmits to the water heater 6. Then, operation control unit 260 entrusts hot water supply device 6 with the execution of the following daytime raising.

これに対して、動作制御部260は、判定部250による判定の結果、給湯機6が任意電文での通信に対応していない場合、宅内通信部24に規定電文で給湯機6と通信させることにより、余剰電力で給湯機6に湯をわき上げさせる。動作制御部260は、任意電文で給湯機6と通信できない場合、規定電文での通信によって第2の指令を給湯機6に送信し、給湯機6に湯をわき上げさせる。第2の指令は、規定電文で送信可能な指令であるため、任意電文で送信された第1の指令とは異なる。 On the other hand, as a result of the determination by the determination unit 250, the operation control unit 260 causes the in-home communication unit 24 to communicate with the hot water supply device 6 by the specified electronic message when the hot water supply device 6 does not support communication by the arbitrary electronic message. Thus, the hot water heater 6 is caused to raise the hot water with the surplus power. When the operation control unit 260 cannot communicate with the water heater 6 by the arbitrary message, the operation controller 260 transmits the second command to the water heater 6 by the communication by the prescribed message, and causes the water heater 6 to raise the hot water. The second command is a command that can be transmitted as a specified message, and thus is different from the first command transmitted as an arbitrary message.

具体的に説明すると、給湯機6が任意電文での通信に対応していない場合、判定部250は、給湯機6から夜間わき上げ量の取得に失敗している。この場合、動作制御部260は、規定量から、動作設定部240によって設定された昼間わき上げ量を減じた量を、夜間わき上げ量として設定する。この夜間わき上げ量は、夜間わき上げ期間において給湯機6がわき上げるべき第2の湯量である。言い換えると、動作制御部260は、給湯機6において現在設定されている夜間わき上げ量の情報を取得できないため、諸情報から夜間わき上げ量を推定する。 Specifically, when the water heater 6 does not support communication by an arbitrary electronic message, the determination unit 250 has failed to acquire the nighttime heating amount from the water heater 6. In this case, the motion control unit 260 sets an amount obtained by subtracting the daytime armlift amount set by the motion setting unit 240 from the specified amount as the night arm lift amount. This nighttime heating amount is the second amount of hot water that the water heater 6 should raise during the nighttime heating period. In other words, the operation control unit 260 cannot acquire the information on the nighttime heating amount currently set in the water heater 6, and therefore estimates the nighttime heating amount from various information.

規定量は、具体的には、給湯機6の最大貯湯量である。動作制御部260は、給湯機6の最大貯湯量の情報を、宅内通信部24を介して給湯機6と通信することによって給湯機6から取得する。或いは、動作制御部260は、規定量として固定値を用いても良い。例えば、動作制御部260は、貯湯タンク63の容量から推定される量を規定量として用いても良いし、過去の規定期間における夜間わき上げ量の平均値を規定量として用いても良い。 The specified amount is specifically the maximum amount of hot water stored in the water heater 6. The operation control unit 260 acquires information on the maximum hot water storage amount of the water heater 6 from the water heater 6 by communicating with the water heater 6 via the in-home communication unit 24. Alternatively, the operation control unit 260 may use a fixed value as the specified amount. For example, operation control unit 260 may use the amount estimated from the capacity of hot water storage tank 63 as the prescribed amount, or may use the average value of the nighttime raising amount in the past prescribed period as the prescribed amount.

給湯機6は、深夜23時から翌朝7時までの間、自動的に夜間わき上げを実行する。この夜間わき上げ期間において、動作制御部260は、宅内通信部24に規定電文で給湯機6と通信させて、設定した夜間わき上げ量の湯を給湯機6にわき上げさせる。具体的に説明すると、夜間わき上げ期間において、動作制御部260は、規定電文での通信によって、規定の時間間隔で給湯機6から残湯量を取得することによって、給湯機6の残湯量を監視する。動作制御部260は、宅内通信部24によって、規定の時間間隔で給湯機6に残湯量の要求を送信し、要求に対する応答を給湯機6から受信する。残湯量の要求及びその応答は、規定電文で送信される。規定の時間間隔は、30秒間隔、1分間隔等である。 The water heater 6 automatically performs nighttime raising from 23:00 to 7:00 the next morning. During this nighttime heating period, the operation control unit 260 causes the in-home communication unit 24 to communicate with the water heater 6 by a prescribed telegram, and causes the water heater 6 to raise the set amount of nighttime hot water. More specifically, during the night-time raising period, the operation control unit 260 monitors the remaining hot water amount of the water heater 6 by acquiring the remaining hot water amount from the hot water heater 6 at a specified time interval through communication by a specified telegram. To do. The operation control unit 260 transmits a request for the amount of remaining hot water to the water heater 6 at a prescribed time interval by the in-home communication unit 24, and receives a response to the request from the water heater 6. The request for the amount of remaining hot water and its response are transmitted by a prescribed electronic message. The prescribed time interval is 30 seconds, 1 minute, or the like.

動作制御部260は、給湯機6の残湯量を監視した結果、夜間わき上げ期間の開始時における残湯量からの増分量が、設定した夜間わき上げ量に達すると、給湯機6にわき上げを停止させる。具体的に説明すると、動作制御部260は、設定した夜間わき上げ量の湯がわき上げられると、宅内通信部24によって、給湯機6にわき上げ停止の指令を送信する。わき上げ停止の指令は、規定電文で送信される。これにより、動作制御部260は、給湯機6に本来設定されていた夜間わき上げ量の湯がわき上げられる前に、夜間わき上げを強制的に終了させる。 As a result of monitoring the amount of remaining hot water of the water heater 6, the operation control unit 260 turns on the water heater 6 when the increment amount from the amount of remaining hot water at the start of the night heating period reaches the set night heating amount. Stop. More specifically, when the set night-time amount of hot water is pumped up, the operation control unit 260 causes the in-home communication unit 24 to send a command to the water heater 6 to stop pumping. The command to stop raising the arm is transmitted by a standard telegram. As a result, the operation control unit 260 forcibly ends the night-time heating before the night-time heating amount originally set for the water heater 6 is heated.

夜間わき上げの後、動作制御部260は、動作設定部240によって設定された昼間わき上げ期間が到来するまで待機する。そして、動作制御部260は、昼間わき上げ期間において、宅内通信部24に規定電文で給湯機6と通信させて、動作設定部240によって設定された昼間わき上げ量の湯を給湯機6にわき上げさせる。 After night-time raising, the operation control unit 260 waits until the daytime raising period set by the operation setting unit 240 comes. Then, the operation control unit 260 causes the in-home communication unit 24 to communicate with the water heater 6 by a specified message during the daytime heating period, and the hot water supply device 6 is supplied with the daytime amount of hot water set by the operation setting unit 240. To raise.

具体的に説明すると、動作制御部260は、昼間わき上げ期間が開始するタイミングが到来すると、宅内通信部24によって、給湯機6にわき上げ開始の指令を送信する。これにより、動作制御部260は、給湯機6に余剰電力で湯をわき上げさせる。その後、昼間わき上げ期間が終了するタイミングが到来すると、動作制御部260は、宅内通信部24によって、給湯機6にわき上げ停止の指令を送信する。これにより、給湯機6は、昼間わき上げを停止する。わき上げ開始及び停止の指令は、規定電文で送信される。 More specifically, the operation control unit 260 transmits a command to start heating to the water heater 6 by the in-home communication unit 24 when the timing when the daytime heating period starts. Thereby, operation control unit 260 causes water heater 6 to raise hot water with surplus power. After that, when the timing for ending the daytime pump-up period comes, the operation control unit 260 transmits a command to stop pumping to the water heater 6 by the in-home communication unit 24. As a result, the water heater 6 stops the raising of the water in the daytime. The commands for starting and stopping the raising of the arm are transmitted by a prescribed telegram.

図11に、操作端末30に表示される設定画面を示す。制御装置20の制御部21は、宅内通信部24を介して操作端末30と通信し、給湯機6の設定画面を操作端末30の表示デバイスに表示させる。電力需要家であるユーザは、図11に示す設定画面において、操作端末30の入力デバイスを介して、給湯機6の昼間わき上げを設定することができる。 FIG. 11 shows a setting screen displayed on the operation terminal 30. The control unit 21 of the control device 20 communicates with the operation terminal 30 via the in-home communication unit 24 to display the setting screen of the water heater 6 on the display device of the operation terminal 30. A user who is a power consumer can set the daytime pumping of the water heater 6 via the input device of the operation terminal 30 on the setting screen shown in FIG. 11.

具体的に説明すると、図11に示す設定画面において、「自動昼間わき上げ」の項目をONに設定すると、給湯機6の昼間わき上げ機能を有効にすることができる。また、「他社機器・旧機器での制御」の項目をONに設定すると、給湯機6が任意電文で通信不可能な他社の機器又は旧バージョンの機器であっても、規定電文での通信によって給湯機6に昼間わき上げを実行させることができる。制御部21は、このようにしてユーザから入力された設定を受け付ける設定受付手段として機能する。 More specifically, when the item of “automatic daytime raising” is set to ON on the setting screen shown in FIG. 11, the daytime raising function of the water heater 6 can be enabled. Also, if the item "Control with other company's device/old device" is set to ON, even if the water heater 6 is a device of another company or an old version device that cannot communicate with arbitrary messages, it will be It is possible to cause the water heater 6 to perform daytime raising. The control unit 21 functions as a setting receiving unit that receives the setting input by the user in this way.

図12に、昼間わき上げ機能が有効にされた場合における操作端末30の表示画面を示す。制御装置20の制御部21は、宅内通信部24を介して操作端末30と通信し、家屋Hにおける現在の電力状況を、操作端末30の表示デバイスに表示させる表示制御手段として機能する。 FIG. 12 shows a display screen of the operation terminal 30 when the daytime arm raising function is enabled. The control unit 21 of the control device 20 functions as a display control unit that communicates with the operation terminal 30 via the in-home communication unit 24 and causes the display device of the operation terminal 30 to display the current power status of the house H.

具体的に説明すると、図12に示す表示画面において、操作端末30は、昼間わき上げ制御中である旨を給湯機6の画像の近くに表示する。そして、操作端末30は、昼間わき上げ制御中であるため、夜間わき上げ量を減らしている旨を表示する。このような表示によって、ユーザは、昼間わき上げ制御中における様々な情報を確認することができる。 Specifically, on the display screen shown in FIG. 12, the operation terminal 30 displays that the daytime underarm control is in progress near the image of the water heater 6. Then, since the operating terminal 30 is in the daytime arm-raising control, it displays that the night arm-raising amount is being reduced. With such a display, the user can confirm various information during the daytime armlifting control.

以上のように構成された電力管理システム1において実行される処理の流れについて、図13から図16を参照して説明する。図13は、ある1日において、気象サーバ50、管理サーバ40、制御装置20及び給湯機6によって実行される処理の流れを示している。 A flow of processing executed in the power management system 1 configured as above will be described with reference to FIGS. 13 to 16. FIG. 13 shows a flow of processing executed by the weather server 50, the management server 40, the control device 20, and the water heater 6 in one day.

図13に示す処理が開始すると、管理サーバ40において、制御部41は、気象サーバ50から気象情報を取得する(ステップS1)。具体的に説明すると、制御部41は、朝、昼、夕方の1日3回、気象サーバ50において気象情報が更新されるタイミングで、広域ネットワークNを介して気象サーバ50にアクセスする。そして、制御部41は、気象サーバ50から、気象情報として、家屋Hを含む地域における天気、日射量及び日照時間の予測情報を取得する。制御部41は、気象情報を取得すると、取得した気象情報をデータベース490に格納する。ステップS1において、制御部41は、気象情報取得部410として機能する。 When the process shown in FIG. 13 starts, the control unit 41 in the management server 40 acquires the weather information from the weather server 50 (step S1). Specifically, the control unit 41 accesses the weather server 50 via the wide area network N at the timing when the weather information is updated in the weather server 50 three times a day in the morning, daytime, and evening. Then, the control unit 41 acquires, from the meteorological server 50, forecast information on the weather, the amount of solar radiation, and the sunshine duration in the area including the house H as the meteorological information. Upon acquiring the weather information, the control unit 41 stores the acquired weather information in the database 490. In step S1, the control unit 41 functions as the weather information acquisition unit 410.

気象情報を取得した後、制御部41は、夜の19時頃になると、制御装置20から、発電設備3による発電電力P2の計測値、及び家屋Hにおける消費電力Pcの計測値を取得する(ステップS2,S3)。制御装置20において、制御部21は、規定のタイミングで、又は管理サーバ40からの要求に応じて、電力計測装置4によって計測された発電電力P2及び消費電力Pcの計測値を、広域ネットワークNを介して管理サーバ40に送信する。制御部41は、このようにして制御装置20から送信された発電電力P2及び消費電力Pcの計測値を取得し、取得した計測値をデータベース490に格納する。ステップS2,S3において、制御部21は、計測値送信部220として機能し、制御部41は、計測値取得部420として機能する。 After obtaining the weather information, the control unit 41 obtains the measured value of the generated power P2 by the power generation facility 3 and the measured value of the power consumption Pc of the house H from the control device 20 at about 19:00 in the evening ( Steps S2 and S3). In the control device 20, the control unit 21 sets the measured values of the generated power P2 and the power consumption Pc measured by the power measurement device 4 to the wide area network N at a specified timing or in response to a request from the management server 40. Via the management server 40. The control unit 41 acquires the measured values of the generated power P2 and the consumed power Pc thus transmitted from the control device 20, and stores the acquired measured values in the database 490. In steps S2 and S3, the control unit 21 functions as the measurement value transmission unit 220, and the control unit 41 functions as the measurement value acquisition unit 420.

発電電力P2及び消費電力Pcの計測値を取得すると、制御部41は、家屋Hにおける余剰電力を予測する(ステップS4)。ステップS4において、制御部41は、予測部430として機能する。ステップS4における余剰電力予測処理の詳細については、図14に示すフローチャートを参照して説明する。 When the measured values of the generated power P2 and the consumed power Pc are acquired, the control unit 41 predicts the surplus power in the house H (step S4). In step S4, the control unit 41 functions as the prediction unit 430. Details of the surplus power prediction process in step S4 will be described with reference to the flowchart shown in FIG.

図14に示す余剰電力予測処理を開始すると、制御部41は、発電予測モデルを作成又は更新する(ステップS401)。具体的に説明すると、制御部41は、データベース490に記憶された気象実績と発電電力P2の計測値とを参照して、過去の規定期間における発電量を、天気及び時間帯毎に分類したモデルを作成する。或いは、発電予測モデルが既に作成されている場合には、制御部41は、データベース490に記憶された最新の情報に基づいて、発電予測モデルを更新する。 When the surplus power prediction process shown in FIG. 14 is started, the control unit 41 creates or updates the power generation prediction model (step S401). More specifically, the control unit 41 refers to the meteorological record and the measured value of the generated power P2 stored in the database 490, and models the power generation amount in the past prescribed period for each weather and time zone. To create. Alternatively, when the power generation prediction model has already been created, the control unit 41 updates the power generation prediction model based on the latest information stored in the database 490.

発電予測モデルを作成又は更新すると、制御部41は、消費予測モデルを作成又は更新する(ステップS402)。具体的に説明すると、制御部41は、データベース490に記憶された消費電力Pcの計測値を参照して、過去の規定期間における消費電力量を、曜日及び時間帯毎に分類したモデルを作成する。或いは、消費予測モデルが既に作成されている場合には、制御部41は、データベース490に記憶された最新の情報に基づいて、消費予測モデルを更新する。 When the power generation prediction model is created or updated, the control unit 41 creates or updates the consumption prediction model (step S402). More specifically, the control unit 41 refers to the measured value of the power consumption Pc stored in the database 490, and creates a model in which the power consumption amount in the past specified period is classified by day of the week and time zone. .. Alternatively, if the consumption prediction model has already been created, the control unit 41 updates the consumption prediction model based on the latest information stored in the database 490.

消費予測モデルを作成又は更新すると、制御部41は、対象地域の翌日の天気予報を取得し(ステップS403)、発電予測モデルと天気予報とに基づいて、家屋Hにおける翌日の発電量を予測する(ステップS404)。具体的に説明すると、制御部41は、データベース490に記憶された気象情報に基づいて、家屋Hを含む地域における翌日の天気情報を取得する。そして、制御部41は、発電予測モデルに予測した天気を入力し、入力した天気に対応する各時間帯の発電量を、翌日の発電量として予測する。 When the consumption prediction model is created or updated, the control unit 41 acquires the weather forecast for the next day in the target area (step S403), and predicts the amount of power generation in the house H for the next day based on the power generation prediction model and the weather forecast. (Step S404). Specifically, the control unit 41 acquires the weather information of the next day in the area including the house H based on the weather information stored in the database 490. Then, the control unit 41 inputs the predicted weather into the power generation prediction model, and predicts the power generation amount of each time zone corresponding to the input weather as the power generation amount of the next day.

発電電力を予測すると、制御部41は、消費予測モデルに基づいて、家屋Hにおける翌日の消費電力量を予測する(ステップS405)。具体的に説明すると、制御部41は、消費量予測モデルに翌日の曜日を入力し、入力した曜日に対応する各時間帯の消費電力量を、翌日の消費電力量として予測する。 After predicting the generated power, the control unit 41 predicts the power consumption on the next day in the house H based on the consumption prediction model (step S405). More specifically, the control unit 41 inputs the next day of the week into the consumption prediction model, and predicts the power consumption of each time zone corresponding to the input day of the week as the power consumption of the next day.

消費電力を予測すると、制御部41は、予測した発電量と消費電力量とに基づいて、家屋Hにおける翌日の余剰電力を予測する(ステップS406)。具体的に説明すると、制御部41は、発電量が消費電力量を超える期間を、余剰電力が生じる期間として予測する。更に、制御部41は、余剰電力が生じる期間に含まれる各時間帯において、発電量から消費電力量を減じた量を、余剰電力量として予測する。以上によって、図14に示す余剰電力予測処理を終了する。 After predicting the power consumption, the control unit 41 predicts the surplus power of the next day in the house H based on the predicted power generation amount and the power consumption amount (step S406). Specifically, the control unit 41 predicts a period in which the power generation amount exceeds the power consumption amount as a period in which surplus power is generated. Further, the control unit 41 predicts, as the surplus power amount, an amount obtained by subtracting the power consumption amount from the power generation amount in each time period included in the period in which the surplus power is generated. With the above, the surplus power prediction process shown in FIG. 14 is completed.

図13に戻る。このようにして家屋Hにおける余剰電力を予測した後、夜の21頃になると、制御部41は、余剰電力の予測情報を、広域ネットワークNを介して制御装置20に送信する(ステップS5)。制御装置20において、制御部21は、管理サーバ40から送信された予測情報を受信する。ステップS5において、制御部41は、予測情報送信部440として機能し、制御部21は、予測情報受信部230として機能する。 Return to FIG. After predicting the surplus power in the house H in this way, at about 21 o'clock at night, the control unit 41 transmits the prediction information of the surplus power to the control device 20 via the wide area network N (step S5). In the control device 20, the control unit 21 receives the prediction information transmitted from the management server 40. In step S5, the control unit 41 functions as the prediction information transmission unit 440, and the control unit 21 functions as the prediction information reception unit 230.

予測情報を受信すると、制御部21は、受信した予測情報に基づいて、昼間わき上げを調整する(ステップS6)。ステップS6において、制御部21は、動作設定部240として機能する。ステップS6における昼間わき上げ調整処理の詳細については、図15に示すフローチャートを参照して説明する。 Upon receiving the prediction information, the control unit 21 adjusts the daytime armlifting based on the received prediction information (step S6). In step S6, the control unit 21 functions as the operation setting unit 240. Details of the daytime arm raising adjustment processing in step S6 will be described with reference to the flowchart shown in FIG.

図15に示す昼間わき上げ調整処理を開始すると、制御部21は、余剰電力が給湯機6の消費電力を超える期間を設定する(ステップS601)。そして、制御部21は、特定した期間のうちの最長の期間を、昼間わき上げ期間として決定する(ステップS602)。具体的に説明すると、制御部21は、管理サーバ40から受信した予測情報を参照して、余剰電力が生じる期間の各時間帯における余剰電力が給湯機6の消費電力より大きいことが予測される期間を特定する。そして、制御部21は、特定した期間のうちから、最も長く連続する期間を、昼間わき上げ期間として設定する。 When the daytime raising adjustment process shown in FIG. 15 is started, the control unit 21 sets a period in which the surplus power exceeds the power consumption of the water heater 6 (step S601). Then, the control unit 21 determines the longest period of the identified periods as the daytime raising period (step S602). Specifically, the control unit 21 refers to the prediction information received from the management server 40, and predicts that the surplus power in each time period of the period in which surplus power is generated is larger than the power consumption of the water heater 6. Identify the time period. Then, the control unit 21 sets the longest continuous period from the specified periods as the daytime raising period.

昼間わき上げ期間を設定すると、制御部21は、昼間わき上げ量を計算する(ステップS603)。具体的に説明すると、制御部21は、設定した昼間わき上げ期間の長さに給湯機6のわき上げ能力を乗じることによって、昼間わき上げ期間において給湯機6がわき上げ可能な量を計算する。 When the daytime raising period is set, the control unit 21 calculates the daytime raising amount (step S603). More specifically, the control unit 21 multiplies the length of the set daytime throw-up period by the throwing capacity of the water heater 6 to calculate the amount that the water heater 6 can raise during the daytime throw-up period. ..

昼間わき上げ量を計算すると、制御部21は、昼間わき上げ量が上限値より大きいか否かを判定する(ステップS604)。昼間わき上げ量が上限値より大きい場合(ステップS604;YES)、制御部21は、計算した昼間わき上げ量に代えて、上限値を昼間わき上げ量に設定する(ステップS605)。 After calculating the daytime lift amount, the control unit 21 determines whether the daytime lift amount is larger than the upper limit value (step S604). When the daytime armature is larger than the upper limit (step S604; YES), the control unit 21 sets the upper limit to the daytime armage instead of the calculated daytime armage (step S605).

これに対して、昼間わき上げ量が上限値以下である場合(ステップS604;NO)、制御部21は、ステップS605の処理をスキップする。言い換えると、制御部21は、ステップS603において計算した昼間わき上げ量を、最終的な昼間わき上げ量として設定する。以上によって、図15に示す昼間わき上げ調整処理を終了する。 On the other hand, when the daytime pull-up amount is equal to or less than the upper limit value (step S604; NO), the control unit 21 skips the process of step S605. In other words, the control unit 21 sets the daytime armlift amount calculated in step S603 as the final daytime arm lift amount. With the above, the daytime armrest adjustment processing shown in FIG. 15 is completed.

図13に戻って、昼間わき上げを調整すると、制御部21は、給湯機6と協働して、夜間及び翌日の昼間におけるわき上げを実行する(ステップS7)。ステップS7における夜間及び昼間わき上げ処理の詳細については、図16に示すフローチャートを参照して説明する。 Returning to FIG. 13, when the daytime armlifting is adjusted, the control unit 21 cooperates with the water heater 6 to perform armlifting at night and in the daytime of the next day (step S7). Details of the nighttime and daytime arm-raising processing in step S7 will be described with reference to the flowchart shown in FIG.

図16に示す処理を開始すると、制御部21は、給湯機6から夜間わき上げ量を取得できたか否かを判定する(ステップS701)。具体的に説明すると、制御部21は、給湯機6に任意電文で夜間わき上げ量の要求を送信し、要求に対する応答を給湯機6から受信したか否かを判定する。これにより、制御部21は、給湯機6が任意電文での通信に対応しているか否かを判定する。ステップS701において、制御部21は、判定部250として機能する。 When the process shown in FIG. 16 is started, the control unit 21 determines whether or not the nighttime heating amount has been acquired from the water heater 6 (step S701). More specifically, the control unit 21 transmits a request for the nighttime raising amount to the water heater 6 by an arbitrary message and determines whether or not a response to the request has been received from the water heater 6. As a result, the control unit 21 determines whether or not the hot water supply device 6 is compatible with communication in arbitrary messages. In step S701, the control unit 21 functions as the determination unit 250.

給湯機6から夜間わき上げ量を取得できた場合(ステップS701;YES)、制御部21は、取得した夜間わき上げ量から昼間わき上げ量を減じた量を、新たな夜間わき上げ量として給湯機6に送信する(ステップS702)。言い換えると、制御部21は、給湯機6が任意電文での通信に対応している場合、給湯機6において当初設定されていた夜間わき上げ量から、昼間にわき上げるべき湯量を減じた量を夜間にわき上げるよう、任意電文で給湯機6に指令を送信する。 When the nighttime heating amount can be acquired from the water heater 6 (step S701; YES), the control unit 21 supplies the hot water as a new nighttime heating amount by subtracting the daytime heating amount from the acquired nighttime heating amount. To the device 6 (step S702). In other words, when the water heater 6 supports communication by arbitrary telegram, the control unit 21 subtracts the amount of hot water to be raised in the daytime from the amount of nighttime heat initially set in the water heater 6. A command is sent to the water heater 6 by an arbitrary message so that it can be pulled up at night.

給湯機6の給湯コントローラ64は、制御装置20から新たな夜間わき上げ量の指令を受信すると、受信した新たな夜間わき上げ量の湯を夜間にわき上げる。その後、給湯コントローラ64は、1日に必要な湯量が不足しないように、当初の夜間わき上げ量から新たな夜間わき上げ量を減じた量の湯を、昼間わき上げ期間にわき上げる。 When the hot water supply controller 64 of the water heater 6 receives the command for the new nighttime heating amount from the control device 20, the hot water supply controller 64 raises the received new nighttime heating amount at night. After that, the hot water supply controller 64 raises the amount of hot water obtained by subtracting the new amount of nighttime heating from the initial amount of nighttime heating during the daytime heating period so that the amount of hot water required for one day is not insufficient.

これに対して、給湯機6から夜間わき上げ量を取得できなかった場合(ステップS701;NO)、制御部21は、規定量から昼間わき上げ量を減じた量を、夜間わき上げ量として設定する(ステップS703)。言い換えると、制御部21は、給湯機6が任意電文での通信に対応していない場合、給湯機6において現在設定されている夜間わき上げ量の情報を取得できないため、制御装置20側で予め規定されている量を用いて、夜間わき上げ量を設定する。 On the other hand, when the night-time heating amount cannot be obtained from the water heater 6 (step S701; NO), the control unit 21 sets the night-time heating amount to the amount obtained by subtracting the daytime heating amount from the specified amount. Yes (step S703). In other words, when the water heater 6 does not support communication by arbitrary telegram, the control unit 21 cannot acquire the information about the nighttime raising amount that is currently set in the water heater 6, and therefore the control device 20 side preliminarily. Set the night lift amount using the specified amount.

夜間わき上げ量を設定すると、制御部21は、23時頃から開始する夜間わき上げの最中において、給湯機6のわき上げ量が、設定した夜間わき上げ量に達したか否かを判定する(ステップS704)。具体的に説明すると、制御部21は、夜間わき上げ期間が開始すると、規定電文での通信によって、給湯機6の残湯量をモニタリングする。そして、制御部21は、夜間わき上げ期間において、ステップS703において設定した夜間わき上げ量の湯がわき上げられたか否かを判定する。 When the night-time heating amount is set, the control unit 21 determines whether or not the heating amount of the water heater 6 has reached the set night-time heating amount during the night-time heating starting from around 23:00. (Step S704). Specifically, the control unit 21 monitors the amount of remaining hot water of the water heater 6 by communication in a specified telegram when the nighttime bubbling period starts. Then, the control unit 21 determines whether or not the nighttime amount of hot water set in step S703 has been heated during the nighttime heating period.

わき上げ量が設定した夜間わき上げ量に達していない場合(ステップS704;NO)、制御部21は、わき上げ量が設定した夜間わき上げ量に達するまで、処理をステップS704に留める。 When the amount of armpits has not reached the set amount of night armpits (step S704; NO), the control unit 21 keeps the process in step S704 until the amount of armpits reaches the set amount of night armpits.

最終的に、わき上げ量が設定した夜間わき上げ量に達すると(ステップS704;YES)、制御部21は、給湯機6にわき上げ停止を指示する(ステップS705)。具体的に説明すると、制御部21は、規定電文での通信によって、給湯機6にわき上げ停止の指令を送信する。給湯機6は、わき上げ停止の指令を受信すると、夜間わき上げを停止する。 Finally, when the amount of armpits reaches the set amount of armpits at night (step S704; YES), the control unit 21 instructs the water heater 6 to stop the armpits (step S705). More specifically, the control unit 21 transmits a command to stop heating to the water heater 6 by communication in a specified telegram. When the water heater 6 receives the command to stop the armpit raising, it stops the armpit raising at night.

夜間わき上げの後、制御部21は、昼間わき上げの開始時刻が到来したか否かを判定する(ステップS706)。具体的に説明すると、制御部21は、ステップS602において設定した昼間わき上げ期間が到来したか否かを判定する。昼間わき上げの開始時刻が到来していない場合(ステップS706;NO)、制御部21は、開始時刻が到来するまで、処理をステップS706に留める。 After the nighttime raising, the control unit 21 determines whether or not the daytime raising start time has arrived (step S706). Specifically, the control unit 21 determines whether or not the daytime raising period set in step S602 has arrived. When the start time of the daytime arm raising has not arrived (step S706; NO), the control unit 21 keeps the process at step S706 until the start time arrives.

昼間わき上げの開始時刻が到来すると(ステップS706;YES)、制御部21は、給湯機6にわき上げ開始を指示する(ステップS707)。具体的に説明すると、制御部21は、規定電文での通信によって、給湯機6にわき上げ開始の指令を送信する。給湯機6は、わき上げ開始の指令を受信すると、昼間わき上げを開始する。 When the start time of the daytime armlifting arrives (step S706; YES), the control unit 21 instructs the water heater 6 to start arming (step S707). More specifically, the control unit 21 transmits a command to start heating to the water heater 6 by communication in a specified telegram. When the water heater 6 receives the command to start the arm warming, it starts the arm warming in the daytime.

昼間わき上げを開始すると、制御部21は、昼間わき上げの終了時刻が到来したか否かを判定する(ステップS708)。昼間わき上げの終了時刻が到来していない場合(ステップS708;NO)、制御部21は、終了時刻が到来するまで、処理をステップS708に留める。 When the daytime armlift is started, the control unit 21 determines whether or not the daytime armarm end time has come (step S708). When the end time of the daytime arm raising has not arrived (step S708; NO), the control unit 21 keeps the process at step S708 until the end time arrives.

昼間わき上げの終了時刻が到来すると(ステップS708;YES)、制御部21は、給湯機6にわき上げ停止を指示する(ステップS709)。具体的に説明すると、制御部21は、規定電文での通信によって、給湯機6にわき上げ停止の指令を送信する。給湯機6は、わき上げ停止の指令を受信すると、昼間わき上げを停止する。 When the end time of the daytime armlifting arrives (step S708; YES), the control unit 21 instructs the water heater 6 to stop armpiting (step S709). More specifically, the control unit 21 transmits a command to stop heating to the water heater 6 by communication in a specified telegram. When the water heater 6 receives the command to stop the arm raising, it stops the arm raising in the daytime.

以上によって、図16に示したわき上げ処理、及び図13に示した電力管理システム1において1日単位で実行される処理は終了する。ステップS702〜S709において、制御部21は、動作制御部260として機能する。 With the above, the arm raising process shown in FIG. 16 and the process executed on a daily basis in the power management system 1 shown in FIG. 13 are completed. In steps S702 to S709, the control unit 21 functions as the operation control unit 260.

以上説明したように、実施の形態1に係る電力管理システム1は、家屋Hにおける翌日の余剰電力を予測し、余剰電力が生じる昼間に給湯機6に湯をわき上げさせる。その際に、制御装置20は、給湯機6が任意電文での通信に対応している場合、任意電文での通信によって、給湯機6に昼間わき上げを実行させ、給湯機6が任意電文での通信に対応していない場合、規定電文での通信によって、給湯機6に昼間わき上げを実行させる。これにより、制御装置20と給湯機6との間で通信可能な電文が異なる場合であっても、給湯機6を的確に動作させることができる。その結果、たとえ給湯機6が他社製又は旧式のものである場合でも、給湯機6に昼間わき上げを実行させることができるため、余剰電力を有効に利用することができる。 As described above, the power management system 1 according to Embodiment 1 predicts the surplus power of the next day in the house H, and causes the water heater 6 to raise the hot water during the daytime when the surplus power is generated. At that time, when the hot water supply device 6 supports communication by an arbitrary electronic message, the control device 20 causes the hot water supply device 6 to perform daytime raising by the communication by the optional electronic message, and the hot water supply device 6 performs the optional electronic message. If the communication is not supported, the hot water supply device 6 is caused to perform the daytime raising by the communication by the specified telegram. Thereby, even if the communicable telegram between control device 20 and water heater 6 is different, water heater 6 can be operated properly. As a result, even if the water heater 6 is manufactured by another company or is an old model, the water heater 6 can be caused to perform daytime pumping, and thus surplus power can be effectively used.

(実施の形態2)
次に、本発明の実施の形態2について説明する。なお、実施の形態1と同様の特徴については説明を省略する。
(Embodiment 2)
Next, a second embodiment of the present invention will be described. The description of the same features as those of the first embodiment will be omitted.

図17に、実施の形態2に係る電力管理システム1aの機能的な構成を示す。図17に示すように、電力管理システム1aは、電力計測装置4と、給湯機6と、ルータ31と、管理サーバ40aと、気象サーバ50と、を備える。実施の形態1に係る電力管理システム1は、家屋Hに設置され、給湯機6を制御する制御装置20を備えていた。これに対して、実施の形態2に係る電力管理システム1aは、制御装置20を備えない。その代わりに、管理サーバ40aが、ルータ31を介して給湯機6を制御する制御装置として機能する。 FIG. 17 shows a functional configuration of the power management system 1a according to the second embodiment. As shown in FIG. 17, the power management system 1a includes a power measurement device 4, a water heater 6, a router 31, a management server 40a, and a weather server 50. The power management system 1 according to the first embodiment is installed in the house H and includes the control device 20 that controls the water heater 6. On the other hand, the power management system 1a according to the second embodiment does not include the control device 20. Instead, the management server 40a functions as a control device that controls the water heater 6 via the router 31.

図17に示すように、管理サーバ40aは、機能的に、気象情報取得部410と、計測値取得部420と、予測部430と、動作設定部240と、判定部250と、動作制御部260と、を備える。制御部41において、CPUが、ROM又は記憶部42に記憶されたプログラムを実行することによって、各部の機能を実現する。 As illustrated in FIG. 17, the management server 40a functionally includes a weather information acquisition unit 410, a measurement value acquisition unit 420, a prediction unit 430, an operation setting unit 240, a determination unit 250, and an operation control unit 260. And In the control unit 41, the CPU realizes the function of each unit by executing the program stored in the ROM or the storage unit 42.

管理サーバ40aに備えられた各機能は、実施の形態1で説明した機能と同様である。但し、計測値取得部420は、電力計測装置4からルータ31を介して発電電力P2及び消費電力Pcの計測値を取得する。言い換えると、計測値取得部420は、制御装置20を経由せずに、発電電力P2及び消費電力Pcの計測値を取得する。動作設定部240、判定部250及び動作制御部260は、実施の形態1では制御装置20に備えられていたが、実施の形態2では、管理サーバ40aに備えられている。また、管理サーバ40aは、データベース490を備える。データベース490は、実施の形態1で説明したものと同様である。 Each function provided in the management server 40a is the same as the function described in the first embodiment. However, the measured value acquisition unit 420 acquires the measured values of the generated power P2 and the consumed power Pc from the power measuring device 4 via the router 31. In other words, the measured value acquisition unit 420 acquires the measured values of the generated power P2 and the consumed power Pc without passing through the control device 20. The operation setting unit 240, the determination unit 250, and the operation control unit 260 are included in the control device 20 in the first embodiment, but are included in the management server 40a in the second embodiment. The management server 40a also includes a database 490. The database 490 is the same as that described in the first embodiment.

以上のように構成された電力管理システム1aにおいて実行される処理の流れについて、図18を参照して説明する。図18は、ある1日において、気象サーバ50、管理サーバ40a、電力計測装置4及び給湯機6によって実行される処理の流れを示している。 The flow of processing executed in the power management system 1a configured as above will be described with reference to FIG. FIG. 18 shows a flow of processing executed by the weather server 50, the management server 40a, the power measuring device 4, and the water heater 6 in one day.

図18に示す処理が開始すると、管理サーバ40aにおいて、制御部41は、気象サーバ50から気象情報を取得する(ステップS21)。ステップS21の処理は、実施の形態1におけるステップS1の処理と同様である。 When the process illustrated in FIG. 18 is started, the control unit 41 in the management server 40a acquires the weather information from the weather server 50 (step S21). The process of step S21 is the same as the process of step S1 in the first embodiment.

気象情報を取得した後、制御部41は、夜の19時頃になると、広域ネットワークNを介して電力計測装置4から、発電設備3による発電電力P2の計測値、及び家屋Hにおける消費電力Pcの計測値を取得する(ステップS22,S23)。電力計測装置4は、規定のタイミングで、又は管理サーバ40aからの要求に応じて、発電電力P2及び消費電力Pcの計測値を、広域ネットワークNを介して管理サーバ40aに送信する。制御部41は、このようにして電力計測装置4から送信された発電電力P2及び消費電力Pcの計測値を取得し、取得した計測値をデータベース490に格納する。 After acquiring the weather information, the control unit 41, at about 19:00 in the evening, measures the value of the generated power P2 by the power generation facility 3 and the power consumption Pc of the house H from the power measurement device 4 via the wide area network N. The measurement value of is acquired (steps S22 and S23). The power measuring device 4 transmits the measured values of the generated power P2 and the power consumption Pc to the management server 40a via the wide area network N at a specified timing or in response to a request from the management server 40a. The control unit 41 acquires the measured values of the generated power P2 and the consumed power Pc thus transmitted from the power measuring device 4, and stores the acquired measured values in the database 490.

発電電力P2及び消費電力Pcの計測値を取得すると、制御部41は、家屋Hにおける余剰電力を予測する(ステップS24)。その後、夜の21頃になると、制御部41は、昼間わき上げを調整する(ステップS26)。昼間わき上げを調整すると、制御部41は、広域ネットワークNを介して給湯機6を制御して、夜間及び翌日の昼間におけるわき上げを実行する(ステップS27)。ステップS24,S26,S27の処理は、それぞれ実施の形態1におけるステップS4,S6,S7の処理と同様である。 When the measured values of the generated power P2 and the consumed power Pc are acquired, the control unit 41 predicts the surplus power in the house H (step S24). After that, at around 21 o'clock at night, the control unit 41 adjusts the daytime arm raising (step S26). After adjusting the daytime raising, the control unit 41 controls the water heater 6 via the wide area network N to execute the nighttime and the next day's daytime raising (step S27). The processes of steps S24, S26 and S27 are the same as the processes of steps S4, S6 and S7 in the first embodiment, respectively.

以上説明したように、実施の形態2に係る電力管理システム1aでは、管理サーバ40aが、家屋Hにおける電力の計測値を取得し、家屋Hにおける翌日の余剰電力を予測して、給湯機6の昼間わき上げを調整する。そして、管理サーバ40aは、遠隔から給湯機6に昼間わき上げを実行させる。その結果、家屋Hに制御装置20が設置されていない場合でも、給湯機6に昼間わき上げを実行させることができるため、電力管理システム1aの構成を簡略化することができる。 As described above, in the power management system 1a according to the second embodiment, the management server 40a acquires the measured value of the power in the house H, predicts the surplus power in the house H on the next day, and calculates the power of the water heater 6. Adjust daytime arm lift. Then, the management server 40a causes the hot water supply device 6 to remotely raise the daytime. As a result, even when the control device 20 is not installed in the house H, the water heater 6 can be caused to carry out daytime raising, so that the configuration of the power management system 1a can be simplified.

(実施の形態3)
次に、本発明の実施の形態3について説明する。なお、実施の形態2,3と同様の特徴については説明を省略する。
(Embodiment 3)
Next, a third embodiment of the invention will be described. The description of the features similar to those of the second and third embodiments will be omitted.

図19に、実施の形態3に係る電力管理システム1bの機能的な構成を示す。図19に示すように、電力管理システム1bは、給湯機6と、ルータ31と、通信アダプタ80と、を備える。通信アダプタ80は、給湯機6に外付けされ、給湯機6に電気的に接続されており、給湯機6と外部との間での通信を中継する。実施の形態3では、通信アダプタ80が、給湯機6を制御する制御装置として機能する。 FIG. 19 shows a functional configuration of the power management system 1b according to the third embodiment. As shown in FIG. 19, the power management system 1b includes a water heater 6, a router 31, and a communication adapter 80. The communication adapter 80 is externally attached to the water heater 6 and electrically connected to the water heater 6, and relays communication between the water heater 6 and the outside. In the third embodiment, communication adapter 80 functions as a control device that controls water heater 6.

図19に示すように、通信アダプタ80は、機能的に、指示受信部270と、変換部280と、判定部250と、動作制御部260と、を備える。通信アダプタ80は、CPU、ROM、RAM、通信インタフェース及び読み書き可能な不揮発性の半導体メモリを備える。CPUが、ROMに記憶されたプログラムを実行することによって、上記の各部の機能を実現する。 As shown in FIG. 19, the communication adapter 80 functionally includes an instruction receiving unit 270, a conversion unit 280, a determination unit 250, and an operation control unit 260. The communication adapter 80 includes a CPU, a ROM, a RAM, a communication interface, and a readable/writable nonvolatile semiconductor memory. The CPU executes the programs stored in the ROM to realize the functions of the above-described units.

指示受信部270は、広域ネットワークN及びルータ31を介してアグリゲータ90と通信し、アグリゲータ90から給湯機6を動作させる指示を受信する。アグリゲータ90は、例えば電力会社又は電力の売買を仲介する電力事業者である。例えば、指示受信部270は、夜間わき上げ量の指示、昼間わき上げ時刻の指示等を、アグリゲータ90から受信する。指示受信部270は、指示受信手段として機能する。 The instruction receiving unit 270 communicates with the aggregator 90 via the wide area network N and the router 31, and receives an instruction to operate the water heater 6 from the aggregator 90. The aggregator 90 is, for example, an electric power company or an electric power company that mediates buying and selling of electric power. For example, the instruction receiving unit 270 receives, from the aggregator 90, an instruction on the amount of nighttime raising and an instruction on the daytime raising time. The instruction receiving unit 270 functions as an instruction receiving unit.

変換部280は、指示受信部270によって受信された指示を、対応する任意電文又は規定電文に変換する。具体的に説明すると、アグリゲータ90からは様々な形式及び内容の指示が送信されるため、そのままでは給湯機6に制御指令を送信できない場合がある。そのため、変換部280は、アグリゲータ90から送信された指示の内容を解釈する。そして、変換部280は、指示の内容に従って給湯機6を動作させるために、給湯機6と通信可能な形式の電文であって、指示の内容に対応する任意電文又は規定電文を選択する。変換部280は、変換手段として機能する。 The conversion unit 280 converts the instruction received by the instruction receiving unit 270 into a corresponding arbitrary electronic message or prescribed electronic message. More specifically, since the aggregator 90 transmits instructions of various formats and contents, it may not be possible to transmit the control instruction to the water heater 6 as it is. Therefore, the conversion unit 280 interprets the content of the instruction transmitted from the aggregator 90. Then, in order to operate water heater 6 in accordance with the content of the instruction, conversion unit 280 selects a telegram of a format that can communicate with water heater 6 and corresponds to the content of the instruction. The conversion unit 280 functions as a conversion unit.

判定部250は、給湯機6が任意電文での通信に対応しているか否かを判定する。判定部250の機能は、実施の形態1,2と同様である。 The determination unit 250 determines whether or not the water heater 6 is compatible with communication by an arbitrary electronic message. The function of the determination unit 250 is the same as in the first and second embodiments.

動作制御部260は、指示受信部270によって受信された指示に対応する任意電文又は規定電文で、宅内通信部24に給湯機6と通信させる。これにより、動作制御部260は、アグリゲータ90からの指示に従って、余剰電力で給湯機6を動作させる。具体的に説明すると、判定部250による判定の結果、給湯機6が任意電文での通信に対応している場合、任意電文での通信によって、給湯機6に制御指令を送信する。これに対して、給湯機6が任意電文での通信に対応していない場合、規定電文での通信によって、給湯機6に制御指令を送信する。 The operation control unit 260 causes the in-home communication unit 24 to communicate with the water heater 6 by an arbitrary electronic message or a prescribed electronic message corresponding to the instruction received by the instruction receiving unit 270. Thereby, operation control unit 260 operates water heater 6 with the surplus power according to the instruction from aggregator 90. More specifically, if the result of the determination by the determination unit 250 is that the hot water supply device 6 is compatible with the communication in the arbitrary message, the control command is transmitted to the water heater 6 by the communication in the optional message. On the other hand, when the water heater 6 does not support communication by the arbitrary message, the control command is transmitted to the water heater 6 by communication by the prescribed message.

例えば、指示受信部270がアグリゲータ90から夜間わき上げ量の指示を受信した場合、給湯機6が任意電文での通信に対応している場合、動作制御部260は、指示された夜間わき上げ量を、任意電文で給湯機6に送信する。これに対して、給湯機6が任意電文での通信に対応していない場合、動作制御部260は、規定電文で給湯機6にわき上げの開始及び停止の指令を送信する。これにより、動作制御部260は、給湯機6に昼間わき上げを実行させる。 For example, when the instruction receiving unit 270 receives an instruction for the nighttime raising amount from the aggregator 90, when the water heater 6 supports communication by an arbitrary electronic message, the operation control unit 260 determines that the nighttime raising amount is instructed. Is transmitted to the water heater 6 by an arbitrary message. On the other hand, when the water heater 6 does not support communication by an arbitrary telegram, the operation control unit 260 sends a command to start and stop the pumping to the water heater 6 by the prescribed telegram. As a result, the operation control unit 260 causes the hot water supply device 6 to perform daytime raising.

また、指示受信部270がアグリゲータ90から昼間わき上げ時刻の指示を受信した場合、動作制御部260は、規定電文で給湯機6にわき上げの開始及び停止の指令を送信する。具体的に説明すると、動作制御部260は、指示された昼間わき上げ時刻が到来すると、規定電文で給湯機6にわき上げの開始の指令を送信する。そして、動作制御部260は、わき上げ量が規定の湯量に達したら、規定電文で給湯機6にわき上げの停止の指令を送信する。 In addition, when the instruction receiving unit 270 receives the instruction for the daytime arm-raising time from the aggregator 90, the operation control unit 260 transmits a command for starting and stopping the arm-raising to the water heater 6 by a specified telegram. More specifically, when the instructed daytime arm-raising time arrives, operation control unit 260 transmits a command to start the arm-raising to water heater 6 by a prescribed telegram. Then, when the amount of heated water reaches the specified amount of hot water, the operation control unit 260 transmits a command to stop heating of the heated water to the water heater 6 by a specified message.

以上説明したように、実施の形態3に係る電力管理システム1bでは、通信アダプタ80が、アグリゲータ90から指示を受信し、受信した指示に従って給湯機6を動作させる。その際、通信アダプタ80は、アグリゲータ90から受信した指示を、給湯機6に送信可能な形式に変換して、給湯機6に制御指令を送信する。これにより、アグリゲータ90が給湯機6を直接制御する場合に、アグリゲータ90から様々な形式及び内容の指示が送信されても、柔軟に給湯機6を動作させることができる。その結果、余剰電力をより有効に利用することにつながる。 As described above, in power management system 1b according to the third embodiment, communication adapter 80 receives an instruction from aggregator 90 and operates water heater 6 according to the received instruction. At that time, the communication adapter 80 converts the instruction received from the aggregator 90 into a format that can be transmitted to the water heater 6, and transmits the control instruction to the water heater 6. Accordingly, when the aggregator 90 directly controls the water heater 6, the water heater 6 can be flexibly operated even if instructions of various formats and contents are transmitted from the aggregator 90. As a result, the surplus power is used more effectively.

(実施の形態4)
次に、本発明の実施の形態4について説明する。なお、実施の形態1〜3と同様の特徴については説明を省略する。
(Embodiment 4)
Next, a fourth embodiment of the invention will be described. The description of the same features as those of the first to third embodiments will be omitted.

実施の形態1〜3では、動作制御部260は、給湯機6が任意電文での通信に対応していない場合、規定電文での通信によって、給湯機6に昼間わき上げを実行させた。これに対して、実施の形態4では、判定部250は、給湯機6が任意電文での通信に対応していない場合、給湯機6が、任意電文とも規定電文とも異なる第3の電文での通信に対応しているか否かを判定する。判定部250による判定の結果、給湯機6が第3の電文での通信に対応していれば、動作制御部260は、第3の電文による通信によって給湯機6に昼間わき上げを実行させる。一方、給湯機6が第3の電文での通信に対応していなければ、動作制御部260は、規定電文による通信によって給湯機6に昼間わき上げを実行させる。 In the first to third embodiments, operation control unit 260 causes water heater 6 to carry out daytime pumping by the communication in the prescribed telegram when water heater 6 does not support the communication in the arbitrary telegram. On the other hand, in the fourth embodiment, when the water heater 6 does not support communication by the arbitrary message, the determination unit 250 determines that the water heater 6 is the third message different from the arbitrary message and the prescribed message. It is determined whether or not communication is supported. As a result of the determination by the determination unit 250, if the water heater 6 is compatible with the communication in the third telegram, the operation control unit 260 causes the water heater 6 to perform the daytime raising by the communication in the third telegram. On the other hand, if the water heater 6 does not support communication by the third telegram, the operation control unit 260 causes the water heater 6 to perform daytime raising by communication by the prescribed telegram.

第3の電文は、具体的には、エコーネットライトのRelease Iで通信可能な電文である。Release Iは、エコーネットライトのバージョンの1つである。第3の電文は、Release Iにおいて新たに追加された「昼間わき上げシフト時刻」、「昼間わき上げ予測電力量」、「時間当たり消費電力量」等の項目に対応している。Release Iに対応している機器は、第3の電文での通信によって、このような項目の情報を送信することができる。 Specifically, the third telegram is a telegram capable of communicating with Release I of Echonet Lite. Release I is one version of Echonet Lite. The third telegram corresponds to items such as "daytime armpit shift time", "daytime armpit predicted power amount", and "hourly power consumption amount" which are newly added in Release I. A device compatible with Release I can transmit information on such an item by communication in the third electronic message.

図20に、実施の形態4に係る制御装置20によって実行される夜間及び昼間わき上げ処理(ステップS7)の流れを示す。 FIG. 20 shows the flow of the nighttime and daytime arm-raising processing (step S7) executed by the control device 20 according to the fourth embodiment.

図20に示す処理を開始すると、制御部21は、給湯機6から夜間わき上げ量を取得できたか否かを判定する(ステップS701)。ステップS701の処理は、実施の形態1と同様である。制御部21は、給湯機6に任意電文で夜間わき上げ量の要求を送信し、要求に対する応答を給湯機6から受信したか否かを判定する。これにより、制御部21は、給湯機6が任意電文での通信に対応しているか否かを判定する。 When the process shown in FIG. 20 is started, the control unit 21 determines whether or not the nighttime raising amount has been acquired from the water heater 6 (step S701). The process of step S701 is the same as that of the first embodiment. The control unit 21 transmits a request for the nighttime raising amount to the water heater 6 by an arbitrary message and determines whether or not a response to the request has been received from the water heater 6. As a result, the control unit 21 determines whether or not the hot water supply device 6 is compatible with communication in arbitrary messages.

給湯機6から夜間わき上げ量を取得できた場合(ステップS701;YES)、制御部21は、取得した夜間わき上げ量から昼間わき上げ量を減じた量を、新たな夜間わき上げ量として給湯機6に送信する(ステップS702)。ステップS702の処理は、実施の形態1と同様である。制御部21は、給湯機6が任意電文での通信に対応している場合、給湯機6において当初設定されていた夜間わき上げ量から、昼間にわき上げるべき湯量を減じた量を夜間にわき上げるよう、任意電文で給湯機6に指令を送信する。 When the nighttime heating amount can be acquired from the water heater 6 (step S701; YES), the control unit 21 supplies the hot water as a new nighttime heating amount by subtracting the daytime heating amount from the acquired nighttime heating amount. To the device 6 (step S702). The process of step S702 is the same as that of the first embodiment. When the water heater 6 supports communication by an arbitrary electronic message, the control unit 21 pulls the amount of hot water to be pumped up in the daytime from the nighttime amount of heat initially set in the water heater 6 at night. A command is transmitted to the water heater 6 by an arbitrary electronic message so as to raise it.

これに対して、給湯機6から夜間わき上げ量を取得できなかった場合(ステップS701;NO)、制御部21は、給湯機6がRelease Iに対応しているか否かを判定する(ステップS710)。具体的に説明すると、制御部21は、Release Iで新たに追加された「昼間わき上げシフト時刻」、「昼間わき上げ予測電力量」、「時間当たりの消費電力量」等の情報を、給湯機6から取得できるか否かを判定する。例えば、制御部21は、給湯機6に第3の電文でこれらの情報の要求を送信し、要求に対する応答を給湯機6から受信した場合に、給湯機6がRelease I及び第3の電文での通信に対応していると判定する。ステップS710において、制御部21は、判定部250として機能する。 On the other hand, when the nighttime heating amount cannot be acquired from the water heater 6 (step S701; NO), the control unit 21 determines whether or not the water heater 6 supports Release I (step S710). ). More specifically, the control unit 21 supplies information such as “daytime armpit shift time”, “daytime armpit predicted power amount”, and “hourly power consumption amount” newly added in Release I to hot water supply. It is determined whether it can be acquired from the machine 6. For example, when the control unit 21 transmits a request for these pieces of information to the water heater 6 in the third message and receives a response to the request from the water heater 6, the water heater 6 uses Release I and the third message. It is determined that the communication is supported. In step S710, the control unit 21 functions as the determination unit 250.

給湯機6がRelease Iに対応している場合(ステップS710;YES)、制御部21は、Release Iで給湯機6を制御する(ステップS711)。言い換えると、制御部21は、第3の電文での通信によって、給湯機6に夜間及び昼間わき上げを実行させる。ステップS711において、制御部21は、動作制御部260として機能する。 When the water heater 6 is compatible with Release I (step S710; YES), the control unit 21 controls the water heater 6 with Release I (step S711). In other words, the control unit 21 causes the water heater 6 to perform nighttime and daytime armlifting by communication using the third electronic message. In step S711, the control unit 21 functions as the operation control unit 260.

具体的に説明すると、制御部21は、第3の電文での通信によって、昼間わき上げシフト時刻を給湯機6に送信する。給湯機6は、夜間わき上げ期間において、自動的に夜間わき上げを開始する。制御部21は、夜間わき上げ期間において、給湯機6のわき上げ量を監視し、給湯機6のわき上げ量が夜間わき上げ量に達したタイミングで、給湯機6にわき上げ停止の指令を送信して夜間わき上げを停止させる。そして、制御部21は、給湯機6が昼間わき上げを自動的に開始できるように、給湯機6にわき上げの自動設定を送信する。その後、給湯機6は、制御装置20から送信された昼間わき上げシフト時刻が到来すると、自動的に昼間わき上げを開始する。制御部21は、昼間わき上げ期間が終了するタイミングで、給湯機6にわき上げ停止の指令を送信して夜間わき上げを停止させる。このようにして、制御部21は、給湯機6に夜間及び昼間わき上げを実行させる。昼間わき上げ期間、昼間わき上げ量及び夜間わき上げ量を設定する方法は、実施の形態1において給湯機6が任意電文に対応していない場合と同様である。 More specifically, the control unit 21 transmits the daytime arm-raising shift time to the water heater 6 by communication using the third electronic message. The water heater 6 automatically starts nighttime raising during the nighttime raising period. The control unit 21 monitors the amount of heating of the water heater 6 during the nighttime heating period, and at the timing when the amount of heating of the water heater 6 reaches the nighttime heating amount, issues a command to stop heating the water heater 6. Send to stop raising at night. Then, control unit 21 transmits the automatic setting of raising the arm to water heater 6 so that water heater 6 can automatically start the raising in the daytime. After that, when the daytime armpit shift time transmitted from the control device 20 arrives, the water heater 6 automatically starts daylight armature. At the timing when the daytime raising period ends, the control unit 21 transmits a command to stop heating to the water heater 6 to stop nighttime raising. In this way, the control unit 21 causes the water heater 6 to perform nighttime and daytime armlifting. The method of setting the daytime raising period, the daytime raising amount, and the nighttime raising amount is the same as in the first embodiment when the water heater 6 does not support arbitrary telegrams.

或いは、制御部21は、第3の電文での通信によって得られた情報に基づいて、規定電文での通信によって給湯機6を制御しても良い。例えば、第3の電文での通信によって、「昼間わき上げシフト時刻」が14時であり、「昼間わき上げ予測電力量」が2kWhであり、「時間当たりの消費電力量」が1kWhであることが通知された場合、制御部21は、昼間わき上げ期間を14時から16時の2時間と設定し、且つ、昼間わき上げ量を2時間でわき上げ可能な湯量と設定する。そして、制御部21は、実施の形態1と同様の規定電文での通信によって、給湯機6に夜間及び昼間わき上げを実行させる。 Alternatively, the control unit 21 may control the water heater 6 by the communication in the specified telegram, based on the information obtained by the communication in the third telegram. For example, by the communication in the third telegram, the "daytime armpit shift time" is 14:00, the "daytime armpit expected power amount" is 2 kWh, and the "hourly power consumption amount" is 1 kWh. Is notified, the control unit 21 sets the daytime raising period to 2 hours from 14:00 to 16:00, and sets the daytime raising amount to the amount of hot water that can be raised in 2 hours. Then, control unit 21 causes water heater 6 to perform nighttime and daytime armlifting by communication by the same telegram as in the first embodiment.

これに対して、給湯機6がRelease Iに対応していない場合(ステップS710;NO)、制御部21は、実施の形態1におけるステップS703〜S709と同様の処理を実行する。言い換えると、給湯機6が任意電文にもRelease Iにも対応していない場合、制御部21は、規定電文での通信によって、給湯機6に夜間及び昼間わき上げを実行させる。 On the other hand, when water heater 6 does not support Release I (step S710; NO), control unit 21 executes the same processing as steps S703 to S709 in the first embodiment. In other words, when the water heater 6 does not support arbitrary telegrams or Release I, the control unit 21 causes the water heater 6 to perform nighttime and daytime breeze by communication using the prescribed telegram.

以上説明したように、実施の形態4に係る制御装置20は、給湯機6が任意電文での通信に対応していない場合、給湯機6がRelease Iに対応しているか否かを判定する。そして、制御装置20は、給湯機6がRelease Iに対応している場合に、Release Iによる通信電文での通信によって、給湯機6に昼間わき上げを実行させる。このように、給湯機6と通信可能な電文を2段階で判定することによって、制御装置20と給湯機6との間で通信可能な電文が異なる場合であっても、給湯機6をより的確に動作させることができる。その結果、余剰電力をより有効に利用することができる。 As described above, control device 20 according to the fourth embodiment determines whether water heater 6 supports Release I when water heater 6 does not support communication by arbitrary message. Then, when water heater 6 is compatible with Release I, control device 20 causes water heater 6 to perform daytime pumping up by communication by a communication message by Release I. In this way, by determining the telegram that can communicate with the water heater 6 in two steps, even if the telegram that can communicate with the control device 20 and the water heater 6 are different, the water heater 6 can be more accurately determined. Can be operated. As a result, the surplus power can be used more effectively.

(変形例)
以上、本発明の実施の形態を説明したが、本発明を実施するにあたっては、種々の形態による変形及び応用が可能である。
(Modification)
Although the embodiments of the present invention have been described above, various modifications and applications are possible in carrying out the present invention.

例えば、上記実施の形態では、任意電文が第1の電文であり、規定電文が第2の電文であるとして説明した。しかしながら、本発明において、第1の電文と第2の電文とは、形式が異なっており、設備機器に送信可能な指令内容が異なるものであれば、他の形式の電文であっても良い。また、上記実施の形態4において、第3の電文は、Release Iで通信可能な電文に限らず、他の形式の電文であっても良い。また、制御装置20が設備機器と通信するためのネットワークは、エコーネットライトに限らない。 For example, in the above embodiment, the arbitrary message is the first message, and the specified message is the second message. However, in the present invention, the first message and the second message are different in format, and may be messages in other formats as long as the command contents that can be transmitted to the equipment are different. Further, in the above-described Embodiment 4, the third telegram is not limited to a telegram capable of communicating with Release I, and may be a telegram of another format. The network for the control device 20 to communicate with the equipment is not limited to Echonet Lite.

上記実施の形態では、予測部430は、過去の規定期間における消費電力Pcの計測値に基づいて消費予測モデルを作成した。しかしながら、本発明において、予測部430は、モデルの精度を高めるために、ユーザのスケジュール、気象情報等にも基づいて消費予測モデルを作成しても良い。また、予測部430は、発電予測モデル及び消費予測モデルを作成する際に、発電量及び消費電力量の平均値を算出することに限らず、統計分析、機械学習等の手法を用いて発電量及び消費電力量を予測しても良い。なお、消費電力Pcは、家屋H全体で消費される消費電力(P1+P2)に限らず、家屋H全体で消費される消費電力から給湯機6の消費電力P3を除いた電力(P1+P2−P3)として定めても良い。この場合、余剰電力は、発電電力P2が、家屋H全体で消費される消費電力から給湯機6の消費電力P3を除いた消費電力Pcより大きい場合に生じる。CT1〜CT3によって計測された電力P1,P2,P3から消費電力Pcを算出する処理は、電力計測装置4が実行しても良いし、制御装置20が実行しても良いし、管理サーバ40が実行しても良い。 In the above-described embodiment, the prediction unit 430 creates the consumption prediction model based on the measured value of the power consumption Pc in the past specified period. However, in the present invention, the prediction unit 430 may create the consumption prediction model based on the user's schedule, weather information, etc. in order to improve the accuracy of the model. In addition, the prediction unit 430 is not limited to calculating the average value of the power generation amount and the power consumption amount when creating the power generation prediction model and the consumption prediction model, and the power generation amount is calculated using a method such as statistical analysis or machine learning. Also, the power consumption may be predicted. The power consumption Pc is not limited to the power consumption (P1+P2) consumed by the entire house H, but is the power (P1+P2-P3) obtained by removing the power consumption P3 of the water heater 6 from the power consumed by the entire house H. You may decide. In this case, the surplus power is generated when the generated power P2 is larger than the power consumption Pc obtained by removing the power consumption P3 of the water heater 6 from the power consumption of the entire house H. The process of calculating the power consumption Pc from the powers P1, P2, P3 measured by CT1 to CT3 may be executed by the power measuring device 4, the control device 20, or the management server 40. You can run it.

上記実施の形態では、判定部250は、給湯機6から任意電文での通信によって特定の情報を取得できた場合に、給湯機6が任意電文での通信に対応していると判定した。しかしながら、本発明において、判定部250は、給湯機6の機種コード、機種番号等を確認することによって、給湯機6が第1の電文での通信に対応しているか否かを判定しても良い。上記実施の形態4において、給湯機6が第3の電文での通信に対応しているか否かを判定する処理についても同様である。 In the above-described embodiment, determination unit 250 determines that hot water supply device 6 is compatible with communication in arbitrary messages when specific information can be acquired from hot water supply device 6 by communication in arbitrary messages. However, in the present invention, the determination unit 250 may determine whether the water heater 6 is compatible with the communication in the first electronic message by checking the model code, model number, etc. of the water heater 6. good. The same applies to the process of determining whether or not the water heater 6 is compatible with the communication in the third telegram in the fourth embodiment.

上記実施の形態では、給湯機6が任意電文での通信に対応していない場合の夜間わき上げ期間において、給湯機6は自動的に夜間わき上げを開始し、動作制御部260は、わき上げ量が設定量に達したタイミングで給湯機6にわき上げを停止させた。しかしながら、本発明において、給湯機6が自動的に夜間わき上げを実行する機能を停止しても良い。この場合、給湯機6は自動的に夜間わき上げを開始しないため、動作制御部260は、夜間わき上げを開始するタイミングで、宅内通信部24によって、規定電文で給湯機6にわき上げ開始の指令を送信する。 In the above-described embodiment, the water heater 6 automatically starts nighttime raising during the nighttime raising period when the water heater 6 does not support communication by arbitrary telegram, and the operation control unit 260 causes the raising of the armature. When the amount reached the set amount, the water heater 6 was stopped. However, in the present invention, the function of the water heater 6 to automatically perform nighttime raising may be stopped. In this case, since the water heater 6 does not automatically start nighttime heating, the operation control unit 260 causes the in-home communication unit 24 to start heating the water heater 6 at a specified message at the timing of starting nighttime heating. Send a command.

上記実施の形態では、給湯機6が任意電文での通信に対応していない場合の昼間わき上げ期間において、動作制御部260は、昼間わき上げ期間の終了時刻が到来すると、給湯機6にわき上げを停止させた。しかしながら、本発明において、動作制御部260は、給湯機6の残湯量を監視し、わき上げ量が、動作設定部240によって設定された昼間沸き上げ量に達したタイミングで、給湯機6にわき上げを停止させても良い。 In the above-described embodiment, the operation control unit 260 moves to the water heater 6 when the end time of the daytime heating period arrives in the daytime heating period when the water heater 6 does not support communication by arbitrary message. Stopped raising. However, in the present invention, the operation control unit 260 monitors the remaining hot water amount of the water heater 6, and when the boiling amount reaches the daytime boiling amount set by the operation setting unit 240, the water heater 6 is blown. You may stop raising.

また、動作制御部260は、給湯機6が任意電文での通信に対応していない場合の夜間わき上げ期間において、給湯機6に夜間わき上げを停止させた後、宅内通信部24によって、給湯機6に自動わき上げの指令を送信しても良い。同様に、動作制御部260は、給湯機6が任意電文での通信に対応していない場合の昼間わき上げ期間において、給湯機6に昼間わき上げを停止させた後、宅内通信部24によって、給湯機6に自動わき上げの指令を送信しても良い。自動わき上げの指令は、湯切れを防止するためわき上げを給湯機6に許可するための指令であって、規定電文で送信される。 Further, the operation control unit 260 causes the in-home communication unit 24 to supply hot water to the hot water supply device 6 after stopping the night water heating in the night time heating period when the hot water supply device 6 does not support communication by arbitrary telegram. A command for automatic raising may be transmitted to the machine 6. Similarly, the operation control unit 260 causes the in-home communication unit 24 to stop the hot water supply device 6 during the daytime when the hot water supply device 6 does not support communication by an arbitrary telegram and then stops the daytime operation. A command for automatic raising may be transmitted to the water heater 6. The automatic raising command is a command for permitting the water heater 6 to prevent the hot water from running out, and is transmitted as a specified telegram.

上記実施の形態では、電力管理システム1,1a、1bにおける制御対象の機器は給湯機6であった。しかしながら、本発明において、制御対象の機器は、蓄電設備、空調機等であっても良い。蓄電設備は、定置型の蓄電池、電気自動車等である。空調機は、ルームエアコン、氷蓄熱機器、温水を利用した床暖房システム等である。 In the above-described embodiment, the device to be controlled in the power management systems 1, 1a, 1b is the water heater 6. However, in the present invention, the device to be controlled may be a power storage facility, an air conditioner, or the like. The power storage facility is a stationary storage battery, an electric vehicle, or the like. The air conditioner is a room air conditioner, an ice heat storage device, a floor heating system using hot water, or the like.

例えば、制御対象の機器が蓄電設備である場合、動作制御部260は、余剰電力を蓄電設備に充電させることによって、蓄電設備を動作させる。この場合、上記実施の形態におけるわき上げ量及び残湯量は、それぞれ充電量及び残電池量と置き換えることにより、上記実施の形態と同様に説明可能である。給湯機6に湯をわき上げさせる場合と同様、余剰電力を蓄電設備に充電させることによって、余剰電力を有効に利用することができる。 For example, when the device to be controlled is power storage equipment, the operation control unit 260 operates the power storage equipment by charging the power storage equipment with surplus power. In this case, the amount of pumping up and the amount of remaining hot water in the above embodiment can be explained in the same manner as in the above embodiment by replacing the amount of charge and the amount of remaining battery, respectively. Similar to the case where the water heater 6 raises the hot water, the surplus power can be effectively used by charging the power storage facility with the surplus power.

また、制御対象の機器が空調機である場合、動作制御部260は、余剰電力で空調機に空調させることによって、空調機を動作させる。余剰電力で空調機に空調させることによって、部屋、躯体等に蓄熱されるため、余剰電力を熱に変換して利用することができる。そのため、給湯機6及び蓄電設備の場合と同様に説明可能である。 When the device to be controlled is an air conditioner, the operation control unit 260 operates the air conditioner by causing the air conditioner to air-condition with surplus power. When the air conditioner is air-conditioned with the surplus power, heat is stored in the room, the skeleton, etc. Therefore, the surplus power can be converted into heat for use. Therefore, the description can be made similarly to the case of the water heater 6 and the power storage equipment.

上記実施の形態では、電力管理システム1が適用される対象として、家屋Hを例に挙げて説明した。しかしながら、本発明において、電力管理システム1が適用される対象は、家屋Hのような一般住宅であることに限らず、集合住宅、施設、ビル、工場等であっても良い。 In the above embodiment, the house H has been described as an example of the target to which the power management system 1 is applied. However, in the present invention, the target to which the power management system 1 is applied is not limited to a general house such as the house H, but may be an apartment house, a facility, a building, a factory, or the like.

上記実施の形態では、制御装置20の制御部21及び管理サーバ40,40aの制御部41において、CPUがROM又は記憶部22に記憶されたプログラムを実行することによって、図7、図17及び図19に示した各部として機能した。しかしながら、本発明において、制御部21,41は、専用のハードウェアであってもよい。専用のハードウェアとは、例えば単一回路、複合回路、プログラム化されたプロセッサ、ASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)、又は、これらの組み合わせである。制御部21,41が専用のハードウェアである場合、各部の機能それぞれを個別のハードウェアで実現してもよいし、各部の機能をまとめて単一のハードウェアで実現してもよい。 In the above-described embodiment, in the control unit 21 of the control device 20 and the control unit 41 of the management servers 40 and 40a, the CPU executes the programs stored in the ROM or the storage unit 22, thereby making FIG. It functions as each part shown in 19. However, in the present invention, the control units 21 and 41 may be dedicated hardware. The dedicated hardware is, for example, a single circuit, a composite circuit, a programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a combination thereof. When the control units 21 and 41 are dedicated hardware, the functions of the respective units may be realized by individual hardware, or the functions of the respective units may be collectively realized by a single hardware.

また、各部の機能のうち、一部を専用のハードウェアによって実現し、他の一部をソフトウェア又はファームウェアによって実現してもよい。このように、制御部21,41は、ハードウェア、ソフトウェア、ファームウェア、又は、これらの組み合わせによって、上述の各機能を実現することができる。 In addition, a part of the functions of each unit may be realized by dedicated hardware and the other part may be realized by software or firmware. As described above, the control units 21 and 41 can realize the above-described functions by hardware, software, firmware, or a combination thereof.

本発明に係る制御装置20及び管理サーバ40の動作を規定する動作プログラムを既存のパーソナルコンピュータ又は情報端末装置等のコンピュータに適用することで、当該コンピュータを、本発明に係る制御装置20及び管理サーバ40として機能させることも可能である。 By applying an operation program that defines the operations of the control device 20 and the management server 40 according to the present invention to a computer such as an existing personal computer or an information terminal device, the computer is used as the control device 20 and the management server according to the present invention. It is also possible to function as 40.

また、このようなプログラムの配布方法は任意であり、例えば、CD−ROM(Compact Disk ROM)、DVD(Digital Versatile Disk)、MO(Magneto Optical Disk)、メモリカード等のコンピュータ読み取り可能な記録媒体に格納して配布してもよいし、インターネット等の通信ネットワークを介して配布してもよい。 In addition, a method of distributing such a program is arbitrary, and for example, a computer-readable recording medium such as a CD-ROM (Compact Disk ROM), a DVD (Digital Versatile Disk), an MO (Magneto Optical Disk), or a memory card is used. It may be stored and distributed, or may be distributed via a communication network such as the Internet.

本発明は、本発明の広義の精神と範囲を逸脱することなく、様々な実施の形態及び変形が可能とされるものである。また、上述した実施の形態は、この発明を説明するためのものであり、本発明の範囲を限定するものではない。すなわち、本発明の範囲は、実施の形態ではなく、請求の範囲によって示される。そして請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、この発明の範囲内とみなされる。 The present invention allows various embodiments and modifications without departing from the broad spirit and scope of the present invention. Further, the above-described embodiments are for explaining the present invention and do not limit the scope of the present invention. That is, the scope of the present invention is shown not by the embodiments but by the scope of the claims. Various modifications made within the scope of the claims and within the scope of the meaning of the invention equivalent thereto are considered within the scope of the present invention.

本発明は、電力の管理を行うシステム等に好適に採用され得る。 INDUSTRIAL APPLICABILITY The present invention can be suitably applied to a system that manages power.

1,1a,1b 電力管理システム、3 発電設備、4 電力計測装置、6 給湯機、7(7a,7b,…) 電気機器、8 商用電力系統、9 分電盤、10 PVパネル、11 PV−PCS、20 制御装置、21 制御部、22 記憶部、23 計時部、24 宅内通信部、25 宅外通信部、29 バス、30 操作端末、31 ルータ、40,40a 管理サーバ、41 制御部、42 記憶部、43 通信部、49 バス、50 気象サーバ、60 ヒートポンプユニット、61 タンクユニット、62 水配管、63 貯湯タンク、64 給湯コントローラ、65 リモコン、66 混合弁、67 シャワー、68 蛇口、69 通信線、70 冷媒配管、71 圧縮機、72 第1の熱交換器、73 膨張弁、74 第2の熱交換器、75 送風機、76 水ポンプ、79 制御基板、80 通信アダプタ、90 アグリゲータ、210 計測値取得部、220 計測値送信部、230 予測情報受信部、240 動作設定部、250 判定部、260 動作制御部、270 指示受信部、280 変換部、410 気象情報取得部、420 計測値取得部、430 予測部、440 予測情報送信部、490 データベース、491 気象予報情報、492 気象実績情報、493 発電電力情報、494 消費電力情報、D1〜D5 電力線、H 家屋、N 広域ネットワーク 1, 1a, 1b Power management system, 3 Power generation equipment, 4 Power measuring device, 6 Water heater, 7 (7a, 7b,...) Electric equipment, 8 Commercial power system, 9 distribution board, 10 PV panel, 11 PV- PCS, 20 control device, 21 control unit, 22 storage unit, 23 clock unit, 24 home communication unit, 25 outside communication unit, 29 bus, 30 operation terminal, 31 router, 40, 40a management server, 41 control unit, 42 Storage unit, 43 communication unit, 49 bus, 50 weather server, 60 heat pump unit, 61 tank unit, 62 water pipe, 63 hot water storage tank, 64 hot water controller, 65 remote controller, 66 mixing valve, 67 shower, 68 faucet, 69 communication line , 70 Refrigerant piping, 71 Compressor, 72 First heat exchanger, 73 Expansion valve, 74 Second heat exchanger, 75 Blower, 76 Water pump, 79 Control board, 80 Communication adapter, 90 Aggregator, 210 Measured value Acquisition unit, 220 measurement value transmission unit, 230 prediction information reception unit, 240 operation setting unit, 250 determination unit, 260 operation control unit, 270 instruction reception unit, 280 conversion unit, 410 weather information acquisition unit, 420 measurement value acquisition unit, 430 prediction unit, 440 prediction information transmission unit, 490 database, 491 weather forecast information, 492 weather record information, 493 power generation information, 494 power consumption information, D1 to D5 power lines, H houses, N wide area network

Claims (15)

電力需要家の発電設備によって生じた余剰電力で機器を動作させる制御装置であって、
前記機器と通信する通信手段と、
前記機器が第1の電文での通信に対応している場合、前記通信手段に前記第1の電文で前記機器と通信させることにより、第1の期間において前記余剰電力で前記機器に第1の量の動作させ、前記機器が前記第1の電文での通信に対応していない場合、前記通信手段に第2の電文で前記機器と通信させることにより、前記第1の期間において前記余剰電力で前記機器に前記第1の量の動作させる動作制御手段と、を備え
前記動作制御手段は、前記第1の期間より前の第2の期間において前記機器が動作する第2の量を、前記第1の量に基づいて設定し、前記通信手段に前記第1の電文又は前記第2の電文で前記機器と通信させることにより、前記機器に、前記第2の期間において前記第2の量の動作をさせ、
前記動作制御手段は、前記機器が前記第1の電文での通信に対応していない場合、規定量から前記第1の量を減じた量を、前記第2の量として設定する、
制御装置。
A control device for operating equipment with surplus power generated by a power generation facility of a power consumer,
Communication means for communicating with the device;
When the device is compatible with the communication in the first telegram, the communication means is caused to communicate with the device in the first telegram so that the surplus power is applied to the device in the first period in the first period. Amount of operation , and when the device does not support communication in the first telegram, by causing the communication means to communicate with the device in the second telegram, the surplus power is generated in the first period. in and an operation control means for the operation of the first amount to said equipment,
The operation control means sets a second amount by which the device operates in a second period before the first period based on the first amount, and causes the communication means to have the first electronic message. Alternatively, by causing the device to communicate with the device by the second telegram, the device is caused to perform the second amount of operation in the second period,
When the device does not support communication in the first electronic message, the operation control unit sets an amount obtained by subtracting the first amount from a specified amount as the second amount,
Control device.
前記機器から前記第1の電文で特定の情報の取得に成功した場合に、前記機器が前記第1の電文での通信に対応していると判定する判定手段、を更に備え、
前記動作制御手段は、前記判定手段による判定結果に応じて、前記通信手段に前記第1の電文又は前記第2の電文で前記機器と通信させることにより、前記余剰電力で前記機器を動作させる、
請求項1に記載の制御装置。
Further comprising a determination unit that determines that the device is compatible with the communication in the first message when the specific information is successfully obtained from the device in the first message.
The operation control unit causes the communication unit to operate with the surplus power by causing the communication unit to communicate with the device by the first message or the second message according to the determination result by the determination unit,
The control device according to claim 1.
前記動作制御手段は、前記機器から前記特定の情報の取得に成功した場合、前記第1の電文での通信によって、前記特定の情報に基づく第1の指令を前記機器に送信し、前記機器から前記特定の情報の取得に失敗した場合、前記第2の電文での通信によって、前記第1の指令とは異なる第2の指令を前記機器に送信する、
請求項2に記載の制御装置。
When the operation control unit succeeds in obtaining the specific information from the device, the operation control unit transmits a first command based on the specific information to the device by communication in the first electronic message, When the acquisition of the specific information has failed, a second command different from the first command is transmitted to the device by communication using the second electronic message.
The control device according to claim 2.
前記機器は、給湯機であり、
前記動作制御手段は、前記通信手段に前記第1の電文又は前記第2の電文で前記給湯機と通信させることにより、前記余剰電力で前記給湯機に湯をわき上げさせる、
請求項1から3のいずれか1項に記載の制御装置。
The device is a water heater,
The operation control unit causes the communication unit to communicate with the water heater by the first message or the second message, thereby causing the water heater to raise the hot water with the surplus power.
The control device according to any one of claims 1 to 3.
前記余剰電力で前記給湯機が湯をわき上げる前記第1の期間と、前記第1の期間において前記給湯機がわき上げる第1の湯量と、を設定する動作設定手段、を更に備え、
前記動作制御手段は、前記通信手段に前記第1の電文又は前記第2の電文で前記給湯機と通信させることにより、前記給湯機に、前記動作設定手段によって設定された前記第1の期間において前記動作設定手段によって設定された前記第1の湯量の湯をわき上げさせる、
請求項4に記載の制御装置。
Further comprising a first period in which the water heater in the excess power is raised aside hot water, the a first quantity of water to raise the water heater is aside in the first period, the operation setting means for setting, and
The operation control means causes the communication means to communicate with the water heater by the first electronic message or the second electronic message, thereby causing the water heater to operate in the first period set by the operation setting means. To raise the first amount of hot water set by the operation setting means,
The control device according to claim 4.
前記動作設定手段は、前記余剰電力が前記給湯機の消費電力を超える期間を前記第1の期間として設定し、前記第1の期間の長さに前記給湯機のわき上げ能力を乗じた値を前記第1の湯量として設定する、
請求項5に記載の制御装置。
The operation setting means sets a period in which the surplus power exceeds the power consumption of the water heater as the first period, and a value obtained by multiplying the length of the first period by the raising capacity of the water heater. Set as the first amount of hot water,
The control device according to claim 5.
前記動作制御手段は、前記第2の期間において前記給湯機がわき上げる第2の湯量を、前記第1の湯量に基づいて設定し、前記通信手段に前記第1の電文又は前記第2の電文で前記給湯機と通信させることにより、前記給湯機に、前記第2の期間において前記第2の湯量の湯をわき上げさせる、
請求項5又は6に記載の制御装置。
The operation control means, a pre-Symbol second hot water to raise the water heater side in the second period, and set based on the first quantity of water, the first message or the second said communication means Causing the hot water supply device to raise the second hot water amount in the second period by communicating with the hot water supply device by a telegram;
The control device according to claim 5 or 6.
前記動作制御手段は、前記給湯機が前記第1の電文での通信に対応している場合、前記第2の期間において前記給湯機がわき上げる湯量として前記給湯機に設定された湯量から前記第1の湯量を減じた量を、前記第2の湯量として設定する、
請求項7に記載の制御装置。
When the water heater corresponds to the communication in the first telegram, the operation control means selects the amount of hot water set in the water heater as the amount of hot water to be raised by the water heater in the second period. An amount obtained by subtracting the amount of hot water of 1 is set as the second amount of hot water,
The control device according to claim 7.
前記動作制御手段は、前記給湯機が前記第1の電文での通信に対応していない場合、規定量から前記第1の湯量を減じた量を、前記第2の湯量として設定する、
請求項7又は8に記載の制御装置。
When the water heater does not support communication by the first electronic message, the operation control means sets an amount obtained by subtracting the first amount of hot water from a prescribed amount as the second amount of hot water.
The control device according to claim 7.
前記機器を動作させる指示を受信する指示受信手段と、
前記動作制御手段は、前記指示受信手段によって受信された前記指示に対応する前記第1の電文又は前記第2の電文で、前記通信手段に前記機器と通信させることにより、前記余剰電力で前記機器を動作させる、
請求項1から9のいずれか1項に記載の制御装置。
Instruction receiving means for receiving an instruction to operate the device,
The operation control unit causes the communication unit to communicate with the device by the first electronic message or the second electronic message corresponding to the instruction received by the instruction receiving unit, and thereby the device with the surplus power. To work,
The control device according to any one of claims 1 to 9.
前記動作制御手段は、前記機器が前記第1の電文での通信に対応していない場合、前記機器が第3の電文での通信に対応していれば、前記通信手段に前記第3の電文で前記機器と通信させることにより、前記余剰電力で前記機器を動作させ、前記機器が前記第3の電文での通信に対応していなければ、前記通信手段に前記第2の電文で前記機器と通信させることにより、前記余剰電力で前記機器を動作させる、
請求項1から10のいずれか1項に記載の制御装置。
If the device does not support communication in the first message, and the device supports communication in the third message, the operation control unit notifies the communication unit of the third message. By operating the device with the surplus power by communicating with the device by the device, and if the device does not support communication in the third message, the communication means communicates with the device in the second message. By operating the device with the surplus power by communicating,
The control device according to any one of claims 1 to 10.
気象情報を取得する気象情報取得手段と、
前記発電設備の発電電力の計測値、及び、前記電力需要家の電力消費地における消費電力の計測値を取得する計測値取得手段と、
前記気象情報取得手段によって取得された前記気象情報と、前記計測値取得手段によって取得された前記発電電力の計測値及び前記消費電力の計測値と、に基づいて、前記余剰電力を予測する予測手段と、を更に備え、
前記動作制御手段は、前記通信手段に前記第1の電文又は前記第2の電文で前記機器と通信させることにより、前記予測手段によって予測された前記余剰電力が生じる期間に前記機器を動作させる、
請求項1から11のいずれか1項に記載の制御装置。
Weather information acquisition means for acquiring weather information,
A measured value of the generated power of the power generation facility, and a measured value acquisition means for acquiring a measured value of the power consumption in the power consumption area of the power consumer,
Prediction means for predicting the surplus power based on the weather information acquired by the weather information acquisition means, and the measured value of the generated power and the measured value of the power consumption acquired by the measured value acquisition means And,
The operation control unit causes the communication unit to communicate with the device by the first electronic message or the second electronic message to operate the device during a period in which the surplus power predicted by the prediction unit occurs.
The control device according to any one of claims 1 to 11.
請求項1から11のいずれか1項に記載の制御装置と、管理サーバと、を備える電力管理システムであって、
前記管理サーバは、
気象情報を取得する気象情報取得手段と、
前記発電設備の発電電力の計測値、及び、前記電力需要家の電力消費地における消費電力の計測値を取得する計測値取得手段と、
前記気象情報取得手段によって取得された前記気象情報と、前記計測値取得手段によって取得された前記発電電力の計測値及び前記消費電力の計測値と、に基づいて、前記余剰電力を予測する予測手段と、
前記予測手段によって予測された前記余剰電力を示す予測情報を、前記制御装置に送信する予測情報送信手段と、を備え、
前記制御装置は、
前記管理サーバから送信された前記予測情報を受信する予測情報受信手段、を更に備え、
前記動作制御手段は、前記通信手段に前記第1の電文又は前記第2の電文で前記機器と通信させることにより、前記予測情報受信手段によって受信された前記予測情報によって示される前記余剰電力が生じる期間に前記機器を動作させる、
電力管理システム。
A power management system comprising: the control device according to any one of claims 1 to 11; and a management server,
The management server is
Weather information acquisition means for acquiring weather information,
A measured value of the generated power of the power generation facility, and a measured value acquisition means for acquiring a measured value of the power consumption in the power consumption area of the power consumer,
Prediction means for predicting the surplus power based on the weather information acquired by the weather information acquisition means, and the measured value of the generated power and the measured value of the power consumption acquired by the measured value acquisition means When,
Prediction information indicating the surplus power predicted by the prediction means, prediction information transmission means for transmitting to the control device,
The control device is
Further comprising prediction information receiving means for receiving the prediction information transmitted from the management server,
The operation control unit causes the communication unit to communicate with the device by the first electronic message or the second electronic message, thereby generating the surplus power indicated by the prediction information received by the prediction information receiving unit. Operate the device during the period,
Power management system.
電力需要家の発電設備によって生じた余剰電力で機器を動作させる制御方法であって、
前記機器が第1の電文での通信に対応している場合、前記第1の電文で前記機器と通信することにより、第1の期間において前記余剰電力で前記機器に第1の量の動作させ、
前記機器が前記第1の電文での通信に対応してない場合、第2の電文で前記機器と通信することにより、前記第1の期間において前記余剰電力で前記機器に前記第1の量の動作させ
前記第1の期間より前の第2の期間において前記機器が動作する第2の量を、前記第1の量に基づいて設定し、前記第1の電文又は前記第2の電文で前記機器と通信することにより、前記機器に、前記第2の期間において前記第2の量の動作をさせ、
前記機器が前記第1の電文での通信に対応していない場合、規定量から前記第1の量を減じた量を、前記第2の量として設定する、
機器の制御方法。
A control method for operating a device with surplus power generated by a power generation facility of a power consumer,
If the device supports communication in the first message, by communicating with the device in the first message, the first amount of operation to the equipment by the excess power in the first period Let
When the device does not support communication in the first telegram, by communicating with the device in the second telegram, the surplus power is used to supply the first amount of the first amount to the device in the first period. to the operation,
A second amount by which the device operates in a second period prior to the first period is set based on the first amount, and the device is set in the first telegram or the second telegram. Communicating to cause the device to operate the second amount during the second period,
When the device does not support communication by the first electronic message, an amount obtained by subtracting the first amount from a specified amount is set as the second amount,
How to control equipment.
機器と通信する通信手段を備えるコンピュータを、
前記機器が第1の電文での通信に対応している場合、前記通信手段に前記第1の電文で前記機器と通信させることにより、第1の期間において電力需要家の発電設備によって生じた余剰電力で前記機器に第1の量の動作させ、前記機器が前記第1の電文での通信に対応していない場合、前記通信手段に第2の電文で前記機器と通信させることにより、前記第1の期間において前記余剰電力で前記機器に前記第1の量の動作させる動作制御手段、として機能させ
前記動作制御手段は、前記第1の期間より前の第2の期間において前記機器が動作する第2の量を、前記第1の量に基づいて設定し、前記通信手段に前記第1の電文又は前記第2の電文で前記機器と通信させることにより、前記機器に、前記第2の期間において前記第2の量の動作をさせ、
前記動作制御手段は、前記機器が前記第1の電文での通信に対応していない場合、規定量から前記第1の量を減じた量を、前記第2の量として設定する、
プログラム。
A computer having communication means for communicating with the device,
When the device supports communication in the first telegram, the communication means is caused to communicate with the device in the first telegram so that the surplus generated by the power generation facility of the power consumer in the first period. by a first amount of operation on the device at a power, if the component is not compatible with communication in the first message, by communicating with the device in a second message to said communication means, said Causing the device to perform the first amount of operation with the surplus power in a first period ,
The operation control means sets a second amount by which the device operates in a second period before the first period based on the first amount, and causes the communication means to have the first electronic message. Alternatively, by causing the device to communicate with the device by the second telegram, the device is caused to perform the second amount of operation in the second period,
When the device does not support communication in the first electronic message, the operation control unit sets an amount obtained by subtracting the first amount from a specified amount as the second amount,
program.
JP2019524591A 2017-06-13 2017-06-13 Control device, power management system, device control method and program Active JP6719669B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2017/021786 WO2018229861A1 (en) 2017-06-13 2017-06-13 Control device, power management system, control method for appliance, and program

Publications (2)

Publication Number Publication Date
JPWO2018229861A1 JPWO2018229861A1 (en) 2019-11-21
JP6719669B2 true JP6719669B2 (en) 2020-07-08

Family

ID=64659655

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019524591A Active JP6719669B2 (en) 2017-06-13 2017-06-13 Control device, power management system, device control method and program

Country Status (2)

Country Link
JP (1) JP6719669B2 (en)
WO (1) WO2018229861A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020202729A (en) * 2019-06-13 2020-12-17 河村電器産業株式会社 High-voltage power reception facility monitoring system
JP7267149B2 (en) * 2019-08-26 2023-05-01 三菱電機株式会社 Control device, hot water system, hot water heater control method and program

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06214914A (en) * 1993-01-20 1994-08-05 Pfu Ltd Method for processing cooperative job among plural systems
JP5838825B2 (en) * 2012-01-20 2016-01-06 三菱電機株式会社 Hot water storage hot water supply system
JP2013207705A (en) * 2012-03-29 2013-10-07 Mitsubishi Electric Corp Control device
JP5891944B2 (en) * 2012-05-23 2016-03-23 三菱電機株式会社 Electric water heater

Also Published As

Publication number Publication date
JPWO2018229861A1 (en) 2019-11-21
WO2018229861A1 (en) 2018-12-20

Similar Documents

Publication Publication Date Title
CN108292860B (en) Power control device, operation plan making method and recording medium
JP6641455B2 (en) Hot water supply system and water heater control method
JP5823085B1 (en) Water heater operation management device, water heater operation management system, and water heater operation management method
JP7146035B2 (en) Hot water supply system, boiling schedule creation device, boiling schedule creation method and program
JP6599558B2 (en) Hot water supply system, water heater, and control method of water heater
US11859833B2 (en) Control device, control method for water heater, and program
JP6719669B2 (en) Control device, power management system, device control method and program
JP6142057B2 (en) Power management system, control device and storage battery device
JP6644162B2 (en) Power management system, control device, and power management method
JP2019060595A (en) Controller, energy management system, water heater control method, and program
JP6719672B2 (en) Control device, power management system, information presentation method and program
JP7390811B2 (en) Hot water supply control device, cloud server, hot water system, hot water supply control method and program
JP2020190352A (en) Control device, control system, and water heater control method and program
JP6452855B2 (en) Control device, water heater control method and program
JP7267149B2 (en) Control device, hot water system, hot water heater control method and program
JP7378251B2 (en) Control device, energy management system, energy management method and program
JP6833001B2 (en) Hot water supply system, water heater and control method of water heater
JP6914446B2 (en) Control devices, control systems, control methods and programs

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190607

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190607

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200519

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200616

R150 Certificate of patent or registration of utility model

Ref document number: 6719669

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250