JP6463942B2 - Slit formwork - Google Patents

Slit formwork Download PDF

Info

Publication number
JP6463942B2
JP6463942B2 JP2014213810A JP2014213810A JP6463942B2 JP 6463942 B2 JP6463942 B2 JP 6463942B2 JP 2014213810 A JP2014213810 A JP 2014213810A JP 2014213810 A JP2014213810 A JP 2014213810A JP 6463942 B2 JP6463942 B2 JP 6463942B2
Authority
JP
Japan
Prior art keywords
plate
intermediate member
slit
plates
divided
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014213810A
Other languages
Japanese (ja)
Other versions
JP2016079731A (en
Inventor
知英 渡邊
知英 渡邊
恵津子 町田
恵津子 町田
寛明 猪野
寛明 猪野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2014213810A priority Critical patent/JP6463942B2/en
Publication of JP2016079731A publication Critical patent/JP2016079731A/en
Application granted granted Critical
Publication of JP6463942B2 publication Critical patent/JP6463942B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

本発明は、コンクリート構造物にスリットを形成するためのスリット用型枠に関する。 The present invention relates to a slit for formwork for forming a slit in the concrete structure.

コンクリート構造物には、コンクリートの膨張や収縮にともなうひび割れや、地震時に応力が集中することによる破損等を防止するために、所定の位置にスリットや目地を設ける場合がある。   A concrete structure may be provided with slits and joints at predetermined positions in order to prevent cracks caused by expansion and contraction of concrete, damage due to stress concentration during an earthquake, and the like.

スリットは、発泡ポリスチレン等からなるスリット用型枠を設けておき、型枠の脱型時にこのスリット用型枠を撤去することにより形成するのが一般的である。
また、特許文献1には、スリット材本体を前後から支持する支持部材と、スリット材本体の前後に配設された目地棒と、スリット材本体の両側面に配設された溝型鋼と、スリット材本体の側方に間隔をあけて配設されたセパレータとを備えるスリット構造が開示されている。このスリット構造では、溝型鋼を貫通する連結ボルトを介して、セパレータによりスリット材本体を支持している。
The slit is generally formed by providing a slit mold made of expanded polystyrene or the like and removing the slit mold when removing the mold.
Patent Document 1 discloses a support member that supports the slit material body from the front and the back, joint rods disposed on the front and back of the slit material body, channel steel disposed on both side surfaces of the slit material body, and slits. There is disclosed a slit structure including a separator disposed at a side of a material body with a gap therebetween. In this slit structure, the slit material body is supported by the separator via a connecting bolt that penetrates the channel steel.

特開平11−044197号公報JP 11-044197 A

前記従来のスリット用型枠は、硬化したコンクリートに付着したり、コンクリート打設時の圧力により変形するおそれがある。このようなケースでは、スリット用型枠の撤去作業に手間がかかる。
また、特許文献1のスリット構造は、構造が煩雑で、特殊な金具を使用するため、施工に手間がかかるとともに、費用が高くなる。
The conventional slit form may adhere to the hardened concrete or be deformed by the pressure when placing the concrete. In such a case, it takes time to remove the slit mold.
In addition, the slit structure of Patent Document 1 is complicated in structure and uses special metal fittings, so that it takes time and cost for construction.

このような観点から、本発明は、簡易にコンクリート構造物にスリットを形成することを可能としたスリット用型枠を提案することを課題とする。 From such a viewpoint, an object of the present invention is to propose a slit form that enables a slit to be easily formed in a concrete structure.

前記課題を解決するために、本発明のスリット用型枠は、二枚のせき板と、前記二枚のせき板の間に介設された中間部材とが重ね合わされてなり、前記二枚のせき板がそれぞれ分割可能であり、一方の前記せき板の分割箇所と他方の前記せき板の分割箇所とが、当該二枚のせき板を重ねた状態で一致しないように構成されている。
前記中間部材は、板材であってもよいし、丸鋼等の棒材であってもよい。
また、前記二枚のせき板は、材料調達の容易さ、撤去時の容易さや、転用性等を考慮すると、鋼板であることが望ましい。
In order to solve the above problems, a slit for formwork of the present invention, two of the weir plate, Ri the name two intermediate member interposed weir plates are superimposed of said two sheets of cough Each of the plates can be divided, and the divided portion of one of the dividing plates and the divided portion of the other dividing plate are configured not to coincide with each other in a state where the two divided plates are overlapped.
The intermediate member may be a plate material or a bar material such as round steel.
The two dams are preferably steel plates in consideration of the ease of material procurement, ease of removal, diversion, and the like.

かかるスリット用型枠によれば、コンクリートによる押圧力が作用している場合であっても、中間部材を取り外すことで簡易に撤去することができる。中間部材は、2枚のせき板の間に介設されているため、コンクリートに付着していない。したがって、中間部材を比較的簡易に抜き出すことができる。   According to such a slit mold, even if a pressing force is applied by concrete, it can be easily removed by removing the intermediate member. Since the intermediate member is interposed between the two plates, it does not adhere to the concrete. Therefore, the intermediate member can be extracted relatively easily.

また、前記二枚のせき板がそれぞれ分割可能に構成されているため、スリット用型枠の撤去作業を行いやすくなる。
また、一方の前記せき板の分割箇所と他方の前記せき板の分割箇所とが、当該二枚のせき板を重ねた状態で一致しないように構成されているため、分割箇所がコンクリート圧に対して弱点となることを防止することができる。
さらに、前記二枚のせき板および前記中間部材は、型枠の外側に突出するフランジ部において互いに固定されているのが望ましい。
Also, the two sheets of the sheathing board is because being dividable structure respectively, easily perform dismantling slit for formwork.
Also, split portions of one of said end plate and the other divided portion of the weir plate, because is configured not to coincide with a state of overlapping the two sheets of sheathing board, division point is to the concrete pressure Can be prevented.
Further, it is desirable that the two dam plates and the intermediate member are fixed to each other at a flange portion protruding to the outside of the mold.

本発明のスリット用型枠によれば、コンクリート構造物のスリットを簡易に形成することができる。 According to the slit for formwork of the present invention, it is possible to form a slit of a concrete structure easily.

本実施形態のスリット用型枠を示す斜視図である。It is a perspective view which shows the mold for slits of this embodiment. スリット用型枠の使用状況を示す図であって、(a)は型枠の平面図、(b)は(a)のA−A断面図である。It is a figure which shows the use condition of the mold for slits, Comprising: (a) is a top view of a mold, (b) is AA sectional drawing of (a). スリット用型枠の各部材を示す側面図であって、(a)は第二のせき板、(b)は第一のせき板、(c)は中間部材、(d)は固定板材である。It is a side view which shows each member of the mold for slits, (a) is a 2nd weir board, (b) is a 1st weir board, (c) is an intermediate member, (d) is a fixed board material. .

本実施形態では、空目地(スリット)を有するコンクリート構造物を形成する場合について説明する。
コンクリート構造物の空目地は、スリット用型枠1を利用して形成する。
This embodiment demonstrates the case where the concrete structure which has a void joint (slit) is formed.
The open joints of the concrete structure are formed using the slit mold 1.

スリット用型枠1は、図1に示すように、2枚のせき板2,3と、中間部材4とを重ね合わせることにより構成されている。なお、本明細書の説明において、上下前後左右は、図1に示す方向に統一する。   As shown in FIG. 1, the slit mold 1 is configured by superimposing two dam plates 2 and 3 and an intermediate member 4. In the description of this specification, the top, bottom, front, back, left, and right are unified in the direction shown in FIG.

スリット用型枠1は、図2の(a)に示すように、型枠5の一部を構成している。スリット用型枠1の前面側は、前せき板51,51により挟まれており、スリット用型枠1の後面側は、後せき板52,52により挟まれている。
すなわち、スリット用型枠1は、せき板51,52と交差するように配設されている。
As shown in FIG. 2A, the slit mold 1 constitutes a part of the mold 5. The front surface side of the slit mold 1 is sandwiched between the front slats 51, 51, and the rear surface side of the slit mold 1 is sandwiched between the rear slats 52, 52.
That is, the slit mold 1 is arranged so as to intersect with the dam plates 51 and 52.

スリット用型枠1のせき板2,3は、表面が平らな鋼板により構成されている。本実施形態では、中間部材の右側に配設される第一のせき板2と、中間部材の左側に配設される第二のせき板3とを有している。なお、せき板2,3を構成する板材は、例えば木製板材であってもよく、コンクリート打設時に圧力が作用した場合であっても変形しない強度を有していれば、必ずしも鋼板である必要はない。   The plates 2 and 3 of the slit mold 1 are made of a steel plate having a flat surface. In this embodiment, it has the 1st board 2 arrange | positioned on the right side of an intermediate member, and the 2nd board 3 arrange | positioned on the left side of an intermediate member. In addition, the board | plate material which comprises the dam boards 2 and 3 may be a wooden board | plate material, for example, and if it has the intensity | strength which does not deform | transform even when a pressure acts at the time of concrete placement, it is not necessarily required to be a steel plate. There is no.

せき板2,3は、コンクリート構造物の空目地を形成する箇所において、左右のコンクリートの端面に配設される板材であって、図2の(b)に示すように、コンクリート構造物の断面形状に応じて台形状に形成されている。なお、せき板2,3の形状は、コンクリート構造物の断面形状に応じて適宜形成すればよく、台形状に限定されない。   The slats 2 and 3 are plate members disposed on the end surfaces of the left and right concretes at the locations where the voids of the concrete structure are formed, and as shown in FIG. It is formed in a trapezoidal shape according to the shape. In addition, the shape of the dam plates 2 and 3 should just be formed suitably according to the cross-sectional shape of a concrete structure, and is not limited to trapezoid shape.

せき板2,3は、コンクリート構造物の断面形状よりも大きな高さを有している。せき板2,3の上端部21,31は、前せき板51および後せき板52と組み合せた状態で、コンクリート構造物の設計断面(前せき板51および後せき板52の上端)から上方に突出する。   The slats 2 and 3 have a height greater than the cross-sectional shape of the concrete structure. The upper end portions 21 and 31 of the slats 2 and 3 are upward from the design cross section of the concrete structure (upper ends of the front slat plate 51 and the rear slat plate 52) in a state where the top slat plate 51 and the rear slat plate 52 are combined. Protruding.

図3の(b)に示すように、第一のせき板2の上端部21は長方形状に形成されていて、前後の端部が一般部20の端面よりも左右に突出している。
同様に、図3の(a)に示すように、第二のせき板3の上端部31も長方形に形成されていて、前後の端部が一般部30の端面よりも左右に突出している。
As shown in FIG. 3B, the upper end portion 21 of the first dam plate 2 is formed in a rectangular shape, and the front and rear end portions protrude left and right from the end surface of the general portion 20.
Similarly, as shown in FIG. 3A, the upper end portion 31 of the second dam plate 3 is also formed in a rectangular shape, and the front and rear end portions protrude left and right from the end surface of the general portion 30.

図3の(a)および(b)に示すように、せき板2,3の上端部21,31には、貫通孔22,32が形成されている。
貫通孔22,32には、固定ボルトが挿通される。第一のせき板2、第二のせき板3および中間部材4は、貫通孔22および貫通孔32に挿通した固定ボルトを介して連結される。すなわち、せき板2,3の上端部21,31は、フランジ部を構成している。なお、本実施形態では、第一のせき板2の上端部21に4つの貫通孔22,22が上端縁と平行となるように形成されており、同様に第二のせき板3の上端部31に4つの貫通孔32,32が上端縁と平行となるように形成されているが、貫通孔22,32の数および配置は限定されない。
As shown to (a) and (b) of FIG. 3, the through-holes 22 and 32 are formed in the upper end parts 21 and 31 of the dam plates 2 and 3. As shown in FIG.
A fixing bolt is inserted into the through holes 22 and 32. The first dam plate 2, the second dam plate 3, and the intermediate member 4 are connected via a fixing bolt inserted through the through hole 22 and the through hole 32. That is, the upper end portions 21 and 31 of the weir plates 2 and 3 constitute a flange portion. In the present embodiment, four through holes 22 and 22 are formed in the upper end portion 21 of the first dam plate 2 so as to be parallel to the upper edge, and similarly, the upper end portion of the second dam plate 3. Although the four through holes 32 and 32 are formed in the 31 so that it may become parallel with an upper end edge, the number and arrangement | positioning of the through holes 22 and 32 are not limited.

せき板2,3の本体部20,30(上端部21,31以外の部分であって、コンクリートに接する部分)からは、前後に突出する下フランジ部23,33が形成されている。本実施形態では、本体部20,30の高さ方向中央部よりも下側に下フランジ部23,33が形成されているが、下フランジ部23,33の形成箇所(高さ位置)は限定されない。   Lower flange portions 23 and 33 projecting forward and backward are formed from the main body portions 20 and 30 (portions other than the upper end portions 21 and 31 and in contact with the concrete) of the weir plates 2 and 3. In the present embodiment, the lower flange portions 23 and 33 are formed below the central portion in the height direction of the main body portions 20 and 30, but the locations (height positions) of the lower flange portions 23 and 33 are limited. Not.

図2の(b)に示すように、せき板2(3)の前側に形成された下フランジ部23(33)は、前せき板51の外面(前面)よりも突出する形状を有している。また、せき板2(3)の後側に形成された下フランジ部23(33)は、後せき板52の外面(後面)よりも突出する形状を有している。   As shown in FIG. 2B, the lower flange portion 23 (33) formed on the front side of the bottom plate 2 (3) has a shape protruding from the outer surface (front surface) of the front plate 51. Yes. Further, the lower flange portion 23 (33) formed on the rear side of the bottom plate 2 (3) has a shape protruding from the outer surface (rear surface) of the rear plate 52.

下フランジ部23,33には、図3の(a)および(b)に示すように、固定ボルトを挿通するための貫通孔24,34が1個所ずつ形成されている。なお、下フランジ部23,33に形成される貫通孔24,34の数は限定されない。貫通孔24,34は、固定ボルトの挿通が可能に形成されており、第一のせき板2、第二のせき板3および中間部材4は、貫通孔24および貫通孔34を挿通した固定ボルトを介して固定される。   As shown in FIGS. 3A and 3B, the lower flange portions 23 and 33 are formed with through-holes 24 and 34 for inserting the fixing bolts one by one. In addition, the number of the through-holes 24 and 34 formed in the lower flange parts 23 and 33 is not limited. The through holes 24 and 34 are formed so that a fixing bolt can be inserted, and the first blocking plate 2, the second blocking plate 3, and the intermediate member 4 are fixed bolts inserted through the through hole 24 and the through hole 34. Fixed through.

第一のせき板2は、図3の(b)に示すように、前後の分割板材2a,2bを組み合わせることにより形成されている。すなわち、せき板2は、前後に分割可能である。
同様に、第二のせき板3は、図3の(a)に示すように、前後の分割板材3a,3bを組み合わせることにより、前後に分割可能に形成されている。
As shown in FIG. 3B, the first dam plate 2 is formed by combining front and rear divided plate members 2a and 2b. That is, the dam plate 2 can be divided into front and rear.
Similarly, as shown in FIG. 3A, the second dam plate 3 is formed so as to be divided forward and backward by combining the front and rear divided plate members 3a and 3b.

なお、第一のせき板2の分割板材2a,2bと、第二のせき板3の分割板材3a,3bは異なる形状に形成されている。すなわち、第一のせき板2の分割位置2c(分割板材2a,2bの突き合わせ面)と第二のせき板3の分割位置3c(分割板材3a,3bの突き合わせ面)は互いに異なっていて、両せき板2,3を重ねた状態で、分割位置が一致しないように構成されている(図2の(b)参照)。   The divided plate materials 2a and 2b of the first dam plate 2 and the divided plate materials 3a and 3b of the second dam plate 3 are formed in different shapes. That is, the dividing position 2c of the first dam plate 2 (abutting surfaces of the divided plate materials 2a and 2b) and the dividing position 3c of the second dam plate 3 (the abutting surfaces of the divided plate materials 3a and 3b) are different from each other. In the state where the weir plates 2 and 3 are overlapped, the division positions are configured not to coincide with each other (see FIG. 2B).

分割板材の他方の分割板材側端面には、半円状の凹部が形成されている。凹部は、分割板材同士を組み合わせることで、円形の貫通孔25,35を形成する。本実施形態では、せき板2に、上下2段の貫通孔25,35が形成されているが、貫通孔25,35の数は限定されない。
なお、貫通孔25,35は必要に応じて形成すればよく、省略してもよい。
A semicircular recess is formed on the other divided plate material side end surface of the divided plate material. The recesses form circular through holes 25 and 35 by combining the divided plate materials. In the present embodiment, the upper and lower two-stage through holes 25 and 35 are formed in the dam plate 2, but the number of the through holes 25 and 35 is not limited.
The through holes 25 and 35 may be formed as necessary and may be omitted.

中間部材4は、表面が平らな鋼板により構成されていて、2枚のせき板2,3の間に介設された状態で使用する。なお、中間部材4を構成する材料は、コンクリート打設時に作用する圧力に対して変形することがない強度を有していれば、鋼板以外の板材であってもよい。また、中間部材4は、鋼棒等の棒状部材であってもよい。   The intermediate member 4 is made of a steel plate having a flat surface, and is used in a state of being interposed between the two dam plates 2 and 3. In addition, the material which comprises the intermediate member 4 may be board | plate materials other than a steel plate, if it has the intensity | strength which does not deform | transform with respect to the pressure which acts at the time of concrete placement. Further, the intermediate member 4 may be a bar-shaped member such as a steel bar.

中間部材4は、せき板2,3よりも大きな幅寸法を有していて、図1に示すように、2枚のせき板2,3と重ねた状態で、前後の端部が突出する。すなわち、中間部材4の前後の端部は、図2に示すように、前せき板51の前面および後せき板52の後面から突出する。   The intermediate member 4 has a larger width dimension than the weir plates 2 and 3, and as shown in FIG. 1, the front and rear end portions protrude in a state where they are overlapped with the two weir plates 2 and 3. That is, the front and rear end portions of the intermediate member 4 protrude from the front surface of the front plate 51 and the rear surface of the back plate 52 as shown in FIG.

中間部材4は、コンクリート構造物の断面形状よりも大きな高さを有しており、図2の(b)に示すように、上端部41が前せき板51および後せき板52の上方に突出する形状を有している。   The intermediate member 4 has a height larger than the cross-sectional shape of the concrete structure, and the upper end portion 41 protrudes above the front slat plate 51 and the rear slat plate 52 as shown in FIG. It has a shape to

中間部材4の上端部41には、図3の(c)に示すように、固定ボルトを挿通するための貫通孔42,42が形成されている。中間部材4は、貫通孔42を挿通させた固定ボルトを介してせき板2,3に固定される。すなわち、上端部41は、フランジ部を構成している。
上端部41は、長方形状に形成されていて、前後の端部が一般部40の端面よりも左右に突出している。
As shown in FIG. 3C, through holes 42 and 42 for inserting fixing bolts are formed in the upper end portion 41 of the intermediate member 4. The intermediate member 4 is fixed to the dam plates 2 and 3 through fixing bolts through which the through holes 42 are inserted. That is, the upper end portion 41 constitutes a flange portion.
The upper end portion 41 is formed in a rectangular shape, and the front and rear end portions protrude left and right from the end surface of the general portion 40.

本実施形態では、せき板2,3の上端部21,31に形成された貫通孔22,32の位置に応じて上端部41に4つの貫通孔42が形成されている。なお、貫通孔42の数および配置は限定されない。   In the present embodiment, four through holes 42 are formed in the upper end portion 41 in accordance with the positions of the through holes 22 and 32 formed in the upper end portions 21 and 31 of the dam plates 2 and 3. The number and arrangement of the through holes 42 are not limited.

中間部材4の本体部40(上端部41以外の部分)には、前後に突出する下フランジ部43が形成されている。本実施形態では、本体部40の高さ方向中央部よりも下側に下フランジ部43が形成されているが、下フランジ部43の形成箇所は限定されない。   A lower flange portion 43 that protrudes forward and backward is formed in the main body portion 40 (a portion other than the upper end portion 41) of the intermediate member 4. In the present embodiment, the lower flange portion 43 is formed below the central portion in the height direction of the main body portion 40, but the formation location of the lower flange portion 43 is not limited.

図2の(b)に示すように、中間部材4の前側に形成された下フランジ部43は、前せき板51の外面(前面)よりも突出する形状を有している。また、中間部材4の後側に形成された下フランジ部43は、後せき板52の外面(後面)よりも突出する形状を有している。
下フランジ部43の先端は、せき板2,3と中間部材4とを重ね合わせた状態で、せき板2,3の下フランジ部23,33の先端と一致する。
As shown in FIG. 2B, the lower flange portion 43 formed on the front side of the intermediate member 4 has a shape protruding from the outer surface (front surface) of the front plate 51. Further, the lower flange portion 43 formed on the rear side of the intermediate member 4 has a shape that protrudes from the outer surface (rear surface) of the rear plate 52.
The front end of the lower flange portion 43 coincides with the front ends of the lower flange portions 23 and 33 of the bottom plates 2 and 3 in a state where the top plates 2 and 3 and the intermediate member 4 are overlapped.

下フランジ部43には、固定ボルトを挿通するための貫通孔44が1個所ずつ形成されている。なお、下フランジ部43に形成される貫通孔44の数は限定されない。中間部材4は、貫通孔44を挿通させた固定ボルトを介してせき板2,3に固定される。   The lower flange portion 43 is formed with one through hole 44 through which the fixing bolt is inserted. The number of through holes 44 formed in the lower flange portion 43 is not limited. The intermediate member 4 is fixed to the dams 2 and 3 through fixing bolts through which the through holes 44 are inserted.

中間部材4は、図3の(c)に示すように、前後の分割板材4a,4bを組み合わせることにより形成されている。すなわち、中間部材4は、前後に分割可能である。
なお、中間部材4の分割位置4c(分割板材4a,4bの突き合わせ個所)は、各せき板2,3の分割位置2c,3cと異なっている。すなわち、2枚のせき板2,3と中間部材4とを重ね合わせると、左右のせき板2,3および中間部材4に形成された3つの分割位置は、一致しないように構成されている(図2の(b)参照)。
As shown in FIG. 3C, the intermediate member 4 is formed by combining front and rear divided plate members 4a and 4b. That is, the intermediate member 4 can be divided into front and rear.
The division position 4c of the intermediate member 4 (the location where the divided plate members 4a and 4b are abutted) is different from the division positions 2c and 3c of the respective slats 2 and 3. That is, when the two slats 2 and 3 and the intermediate member 4 are overlapped, the three divided positions formed on the left and right slats 2 and 3 and the intermediate member 4 are configured not to match ( (See (b) of FIG. 2).

分割板材の他方の分割板材側の端面には、半円状の凹部が形成されている。凹部は、分割板材4a,4bを組み合わせることで、円形の貫通孔45を形成する。本実施形態の中間部材4には、上下2段の貫通孔45,45が形成されているが、貫通孔45の配置および数は、限定されるものではない。また、貫通孔45は必要に応じて形成すればよく、省略してもよい。   A semicircular recess is formed on an end surface of the other divided plate member on the other divided plate member side. The concave portion forms a circular through hole 45 by combining the divided plate members 4a and 4b. The intermediate member 4 of the present embodiment has upper and lower two-stage through holes 45, 45, but the arrangement and number of the through holes 45 are not limited. Further, the through hole 45 may be formed as necessary and may be omitted.

実施形態では、2枚のせき板2,3と中間部材4とを固定ボルトを介して固定する際に、上端部21,31,41に固定板材6を固定する。
固定板材6は、上端部21,31,41と同等の形状を有した長方形状の鋼板であって、上端部21,31,41に形成された貫通孔22,32,42の位置に応じて貫通孔61が形成されている。
In the embodiment, the fixing plate material 6 is fixed to the upper end portions 21, 31, 41 when the two dam plates 2, 3 and the intermediate member 4 are fixed via fixing bolts.
The fixed plate 6 is a rectangular steel plate having the same shape as the upper end portions 21, 31, 41, and depends on the positions of the through holes 22, 32, 42 formed in the upper end portions 21, 31, 41. A through hole 61 is formed.

スリット用型枠1は、各分割板材の上端部を固定板材6に固定することで、一体に固定されているとともに、上端部21,31,41の剛性が高められている。
なお、2枚のせき板2,3と中間部材4との当接面には、潤滑剤を塗布しておく。潤滑剤を構成する材料や、潤滑剤の設置方法は限定されない。
The slit mold 1 is fixed integrally by fixing the upper end portion of each divided plate member to the fixed plate member 6, and the rigidity of the upper end portions 21, 31, 41 is enhanced.
A lubricant is applied to the contact surface between the two dam plates 2 and 3 and the intermediate member 4. The material constituting the lubricant and the method for installing the lubricant are not limited.

次に、本実施形態のコンクリート構造物の施工方法について説明する。
コンクリート構造物の施工方法は、型枠組立工程と、打設工程と、脱型工程とを備えている。
Next, the construction method of the concrete structure of this embodiment is demonstrated.
The concrete structure construction method includes a formwork assembling process, a placing process, and a demolding process.

型枠組立工程は、スリット用型枠1が配設された型枠5を組み立てる工程である。
本実施形態では、型枠5を組み立てるとともに、鉄筋7の配筋と、配線用管8の配管を行う(図2の(a)参照)。
The mold assembly process is a process of assembling the mold 5 in which the slit mold 1 is disposed.
In the present embodiment, the mold 5 is assembled, and the reinforcing bars 7 are arranged and the wiring pipes 8 are piped (see FIG. 2A).

鉄筋7は、縦筋と横筋とを組み合わせることにより格子状に配筋されている。なお、鉄筋7として、鉄筋籠を配設してもよい。また、鉄筋7の配設ピッチや、鉄筋径等は限定されるものではない。   The reinforcing bars 7 are arranged in a lattice by combining vertical and horizontal bars. In addition, as the reinforcing bar 7, a reinforcing bar rod may be provided. Further, the arrangement pitch of the reinforcing bars 7, the diameter of the reinforcing bars, etc. are not limited.

配線用管8は、コンクリート構造物内を挿通する電線等を配線するための管材であって、せき板2,3および中間部材4に形成された貫通孔25,35,45を挿通している。なお、配線用管8は、必要に応じて配管すればよく、省略してもよい。   The wiring pipe 8 is a pipe material for wiring an electric wire or the like that is inserted through the concrete structure, and is inserted through the through holes 25, 35, 45 formed in the dam plates 2, 3 and the intermediate member 4. . The wiring pipe 8 may be piped as necessary and may be omitted.

スリット用型枠1は、せき板2,3、中間部材4および固定板材6を重ね合わせるとともに固定ボルトにより固定した状態で、前せき板51および後せき板52と組み合わせる。
せき板2,3と中間部材4との当接面には、潤滑剤を塗布する。また、せき板2,3のコンクリートとの接触面には剥離剤を塗布しておく。
The slit mold 1 is combined with the front plate 51 and the back plate 52 in a state where the plate plates 2 and 3, the intermediate member 4, and the fixed plate material 6 are overlapped and fixed with fixing bolts.
Lubricant is applied to the contact surface between the weir plates 2 and 3 and the intermediate member 4. Further, a release agent is applied to the contact surfaces of the dams 2 and 3 with the concrete.

本実施形態では、まず、せき板2,3の後側の分割板材2b,3bと中間部材4の後側の分割板材4bとを組み合わせた状態で、後せき板52に設置する。
次に、鉄筋6および配線用管材7を配設した後、せき板2,3の分割板材2a,3aと中間部材4の分割板材4aを取り付けるとともに、前せき板51を設置する。
なお、型枠5の組立順序は限定されない。
In the present embodiment, first, the rear divided plate members 2 b and 3 b and the rear divided plate member 4 b on the intermediate member 4 are combined with the rear divided plate members 2 and 3 and installed on the rear plate 52.
Next, after the reinforcing bars 6 and the wiring pipe material 7 are disposed, the divided plate members 2a and 3a of the dividing plates 2 and 3 and the divided plate member 4a of the intermediate member 4 are attached, and the front dividing plate 51 is installed.
In addition, the assembly order of the formwork 5 is not limited.

打設工程は、型枠5内にコンクリートを打設する工程である。
コンクリートを打設したら、所定の強度が発現するまで、コンクリートを養生する。
The placing process is a process for placing concrete in the mold 5.
After placing the concrete, the concrete is cured until a predetermined strength is developed.

脱型工程は、コンクリートの養生後、型枠5を撤去する工程である。
スリット用型枠1の撤去は、まず、中間部材4を撤去する。
中間部材4を撤去すると、第一のせき板2と第二のせき板3との間に隙間が形成されるため、両せき板2,3をコンクリート部材との当接面から撤去する際には、この隙間を利用して撤去する。
The demolding step is a step of removing the mold 5 after curing the concrete.
To remove the slit form 1, first, the intermediate member 4 is removed.
When the intermediate member 4 is removed, a gap is formed between the first slat plate 2 and the second slat plate 3. Therefore, when the both slat plates 2 and 3 are removed from the contact surface with the concrete member. Remove using this gap.

本実施形態のスリット用型枠1を利用すれば、コンクリートによる押圧力が作用している場合であっても、中間部材4を取り外すことで、スリット用型枠1を簡易に撤去することができる。中間部材4は、2枚のせき板2,3の間に介設されているため、コンクリートに付着していない。したがって、中間部材4を比較的簡易に抜き出すことができる。   If the slit form 1 of the present embodiment is used, the slit form 1 can be easily removed by removing the intermediate member 4 even when the pressing force by the concrete is acting. . Since the intermediate member 4 is interposed between the two plates 2 and 3, it does not adhere to the concrete. Therefore, the intermediate member 4 can be extracted relatively easily.

せき板2,3および中間部材4は、鋼板により形成されているため、コンクリート打設時の液圧により変形することがなく、高品質に施工を行うことが可能である。
また、中間部材4とせき板2,3との当接面には潤滑剤が塗布されているため、中間部材4の撤去が容易である。
Since the slats 2 and 3 and the intermediate member 4 are formed of steel plates, they can be constructed with high quality without being deformed by the hydraulic pressure at the time of placing concrete.
Further, since the lubricant is applied to the contact surface between the intermediate member 4 and the dam plates 2, 3, the intermediate member 4 can be easily removed.

中間部材4は、前後に分割可能なため、摩擦抵抗が少なく、簡易に撤去することができる。
さらに、中間部材4は、せき板2,3よりも大きな形状を有しているため、中間部材4を抜き出す際に突出部分を利用することで、作業性が向上する。
Since the intermediate member 4 can be divided into the front and the rear, the frictional resistance is small and the intermediate member 4 can be easily removed.
Furthermore, since the intermediate member 4 has a larger shape than the slats 2 and 3, the workability is improved by using the protruding portion when the intermediate member 4 is extracted.

せき板2,3の撤去は、中間部材4を撤去することにより他方のせき板3,2との間に隙間を有した状態で行うため、容易である。
また、せき板2,3は、前後に分割可能であるため、コンクリート面との付着面積が小さく、撤去しやすい。
The slats 2 and 3 can be easily removed because the intermediate member 4 is removed so that there is a gap between the slats 3 and 2.
Moreover, since the dams 2 and 3 can be divided | segmented into front and back, the adhesion area with a concrete surface is small, and it is easy to remove.

せき板2,3および中間部材4が、前後に分割可能であるため、配線用管材8の設置も容易である。
なお、せき板2,3および中間部材4の各分割個所は、異なる位置となるように設定されているため、分割箇所がコンクリートによる押圧力に対して弱点となることが防止されている。
Since the weir plates 2 and 3 and the intermediate member 4 can be divided into front and rear, the installation of the wiring tube 8 is easy.
In addition, since each division part of the weir plates 2 and 3 and the intermediate member 4 is set so that it may become a different position, it is prevented that a division part becomes a weak point with respect to the pressing force by concrete.

二枚のせき板2,3および中間部材4は、前せき板51および後せき板52の外側に突出するフランジ部において互いに固定されているため、コンクリート構造物にスリット用型枠1を構築するための箱抜き等を形成する必要がない。また、脱型時の作業性も向上する。   Since the two slats 2, 3 and the intermediate member 4 are fixed to each other at the flanges projecting outside the front slats 51 and the rear slats 52, the slit mold 1 is constructed in the concrete structure. There is no need to form a box or the like. In addition, workability at the time of demolding is improved.

本発明は、前述の実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。   The present invention is not limited to the above-described embodiment, and the above-described constituent elements can be appropriately changed without departing from the spirit of the present invention.

例えば、前記実施形態では、せき板および中間部材が、分割可能な場合について説明したが、せき板および中間部材は、1枚の板材により構成されていてもよい。また、せき板及び中間部材の分割数は限定されない。   For example, in the above-described embodiment, the case where the weir plate and the intermediate member can be divided has been described, but the weir plate and the intermediate member may be configured by a single plate material. Moreover, the division | segmentation number of a weir board and an intermediate member is not limited.

潤滑剤および剥離剤の塗布は、必要に応じて行えばよい。
中間部材は、必ずしもせき板よりも大きな形状を有している必要はない。
The application of the lubricant and the release agent may be performed as necessary.
The intermediate member does not necessarily have a shape larger than that of the dam plate.

前記実施形態では、中間部材として、1枚の板材を2枚のせき板の間に介設する場合について説明したが、スリット(空目地)の大きさに応じて、複数枚の板材を2枚のせき板の間に介設してもよい。   In the above-described embodiment, the case where a single plate member is interposed between two slats as an intermediate member has been described. However, a plurality of plate members can be divided into two pieces according to the size of the slit (open joint). It may be interposed between the plates.

前記実施形態では、せき板と中間部材とをボルト接合する場合について説明したが、せき板および中間部材の固定方法は限定されない。   Although the said embodiment demonstrated the case where a dam plate and an intermediate member were bolt-joined, the fixing method of a dam plate and an intermediate member is not limited.

1 スリット用型枠
2 第一のせき板
2a,2b 分割板材
20 本体部
21 上端部(フランジ部)
22 貫通孔
23 下フランジ部(フランジ部)
24 貫通孔
3 第二のせき板
3a,3b 分割板材
30 本体部
31 上端部(フランジ部)
32 貫通孔
33 下フランジ部(フランジ部)
34 貫通孔
4 中間部材
4a,4b 分割板材
41 上端部(フランジ部)
42 貫通孔
43 下フランジ部(フランジ部)
44 貫通孔
5 型枠
6 固定板材
DESCRIPTION OF SYMBOLS 1 Form for slit 2 1st baffle 2a, 2b Division board material 20 Main-body part 21 Upper end part (flange part)
22 Through hole 23 Lower flange (flange)
24 Through-hole 3 Second dam plate 3a, 3b Divided plate material 30 Body portion 31 Upper end portion (flange portion)
32 Through hole 33 Lower flange (flange)
34 Through-hole 4 Intermediate member 4a, 4b Divided plate material 41 Upper end (flange)
42 Through hole 43 Lower flange (flange)
44 Through-hole 5 Formwork 6 Fixed plate material

Claims (4)

二枚のせき板と、前記二枚のせき板の間に介設された中間部材と、が重ね合わされてなるスリット用型枠であって、
前記二枚のせき板がそれぞれ分割可能であり、
一方の前記せき板の分割箇所と他方の前記せき板の分割箇所とが、当該二枚のせき板を重ねた状態で一致しないように構成されていることを特徴とするスリット用型枠。
A slit mold formed by superimposing two slats and an intermediate member interposed between the two slats ,
Each of the two dams can be divided;
A slit mold, wherein a divided portion of one of the dam plates and a divided portion of the other dam plate are configured not to coincide with each other when the two dam plates are overlapped.
前記中間部材が板材であることを特徴とする、請求項1に記載のスリット用型枠。   The slit form according to claim 1, wherein the intermediate member is a plate material. 前記二枚のせき板が鋼板であることを特徴とする、請求項1または請求項2に記載のスリット用型枠。   The slit form according to claim 1 or 2, wherein the two dam plates are steel plates. 二枚のせき板と、前記二枚のせき板の間に介設された中間部材と、が重ね合わされてなるスリット用型枠であって、
前記二枚のせき板および前記中間部材が、型枠の外側に突出するフランジ部において固定されていることを特徴とするスリット用型枠。
A slit mold formed by superimposing two slats and an intermediate member interposed between the two slats ,
The slit mold, wherein the two dam plates and the intermediate member are fixed at a flange portion that protrudes to the outside of the mold.
JP2014213810A 2014-10-20 2014-10-20 Slit formwork Active JP6463942B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014213810A JP6463942B2 (en) 2014-10-20 2014-10-20 Slit formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014213810A JP6463942B2 (en) 2014-10-20 2014-10-20 Slit formwork

Publications (2)

Publication Number Publication Date
JP2016079731A JP2016079731A (en) 2016-05-16
JP6463942B2 true JP6463942B2 (en) 2019-02-06

Family

ID=55957912

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014213810A Active JP6463942B2 (en) 2014-10-20 2014-10-20 Slit formwork

Country Status (1)

Country Link
JP (1) JP6463942B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7045248B2 (en) * 2018-04-18 2022-03-31 株式会社竹中工務店 Formwork for forming slits and slit forming method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5149499B2 (en) * 1972-12-22 1976-12-27
US5190395A (en) * 1992-02-12 1993-03-02 Silicone Specialties, Inc. Expansion joint method and system
JP2000204534A (en) * 1999-01-14 2000-07-25 Hazama Gumi Ltd Form for preparing transverse joint of concrete dam and joint preparing method
JP3357854B2 (en) * 1999-02-01 2002-12-16 株式会社フォームジアリング Joint material for concrete structures
JP2008101366A (en) * 2006-10-18 2008-05-01 Hiroyasu Ooka Joint form and joint forming construction method
JP2013032673A (en) * 2011-08-01 2013-02-14 Yujiro Saito Form for dirt floor slit and construction method of dirt floor concrete

Also Published As

Publication number Publication date
JP2016079731A (en) 2016-05-16

Similar Documents

Publication Publication Date Title
KR101432260B1 (en) Steel-exposed type steel framed reinforced concrete pillar
KR101765107B1 (en) Building construction method using exposed concrete wall
JP2009174233A (en) Form device for rectangular column-shaped concrete structure, and construction method of rectangular-column-shaped concrete structure using it
KR101758493B1 (en) Precast permanent form and construction method for the same
KR101808909B1 (en) Method for constructing connection structure of steel beam
JP2014118723A (en) High-performance perforated steel plate dowel
JP6463942B2 (en) Slit formwork
KR101127362B1 (en) Composite structural member of corrugated steel web and concrete member
JP4750751B2 (en) Temporary formwork member, temporary formwork assembly using the same, and method for reconstructing sewerage facilities
KR101989224B1 (en) Structural Mold Manufacturing Method for Reinforced Concrete Column and Structural Mold Thereof
KR101428539B1 (en) Reformed concrete filled tube column structure
JP6535704B2 (en) Column-beam frame
JP5525472B2 (en) Column member manufacturing method and column member
JP6508866B2 (en) Column-beam frame
JP6009411B2 (en) Joint material construction method and joint material support structure
JP2017210774A (en) Wall body, construction method thereof, and concrete mold-cum-wall member
KR101624603B1 (en) Column with multi-hole steel plate and plate for mold and construction method thereof
JP6324105B2 (en) Concrete splicing method
JP6390360B2 (en) Structure and method for joining reinforced concrete beam and steel pipe column
JP6679261B2 (en) Reinforcement structure of steel beam support of slab
JP6124172B2 (en) Synthetic segment and manufacturing method thereof
JP6902747B2 (en) Reinforced concrete column-beam joint structure and its construction method
JP6886270B2 (en) Installation structure of seismic slit material and construction method of seismic slit material
JP5225955B2 (en) Boxing formwork and boxing hole construction method
KR20150018366A (en) Composite structure of concrete flange and web and method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170706

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180627

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180724

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180919

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181218

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190107

R150 Certificate of patent or registration of utility model

Ref document number: 6463942

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees