JP6352045B2 JP2014098833A JP2014098833A JP6352045B2 JP 6352045 B2 JP6352045 B2 JP 6352045B2 JP 2014098833 A JP2014098833 A JP 2014098833A JP 2014098833 A JP2014098833 A JP 2014098833A JP 6352045 B2 JP6352045 B2 JP 6352045B2
Authority
JP
Japan
Prior art keywords
formwork
tunnel lining
mold body
mold
support member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014098833A
Other languages
Japanese (ja)
Other versions
JP2015214853A (en
Inventor
賢一 文村
賢一 文村
尚文 沢藤
尚文 沢藤
進 島屋
進 島屋
敦史 古田
敦史 古田
重周 岸
重周 岸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2014098833A priority Critical patent/JP6352045B2/en
Publication of JP2015214853A publication Critical patent/JP2015214853A/en
Application granted granted Critical
Publication of JP6352045B2 publication Critical patent/JP6352045B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、トンネルの覆工方法に関する。   The present invention relates to a tunnel lining method.

トンネル形成技術として、NATM(New Austrian Tunneling Method)工法や矢板工法があり、現在はNATM工法が採用されている。   As a tunnel forming technique, there are a NATM (New Austrian Tunneling Method) method and a sheet pile method, and the NATM method is currently employed.

例えば特許文献1には、NATM工法において、覆工体を構築するため、掘削孔の内部で縮径可能な複数のテレフォームを用いる構成が開示されている。テレフォームは、展開した状態でトンネルの内周面に沿い、型枠装置と掘削孔との隙間に覆工体を形成するコンクリートを打設するようになっている。テレフォームは、打設されたコンクリートについて所定の強度が発現するまで、コンクリートを支持する。そして、コンクリートについて所定の強度が発現した後は、テレフォームを縮径し、トンネル内で掘削方向前方に送る。前方に送ったテレフォームは、再び展開され、コンクリートを打設する間、コンクリートを支持する。このようなテレフォームをトンネル掘削方向に複数連結し、コンクリートの支持を終えたテレフォームを前方に順次送ることで、施工の迅速化を図っている。   For example, Patent Document 1 discloses a configuration using a plurality of teleforms that can be reduced in diameter in an excavation hole in order to construct a lining body in the NATM method. The teleform is placed along the inner peripheral surface of the tunnel in the unfolded state, and concrete forming a covering body is placed in the gap between the formwork device and the excavation hole. The teleform supports the concrete until a predetermined strength develops for the placed concrete. And after predetermined intensity | strength expresses about concrete, a teleform is diameter-reduced and it sends in the excavation direction front in a tunnel. The teleform sent forward is unfolded again and supports the concrete while it is being placed. A plurality of such teleforms are connected in the tunnel excavation direction, and the teleforms that have finished supporting concrete are sequentially sent forward to speed up the construction.

特許文献1に記載の構成では、テレフォームは、ガントリーにより、トンネル内で支持されている。そして、テレフォームを縮径し、前方に送るときにも、テレフォームをガントリーに載せて、テレフォームを移動させる。   In the configuration described in Patent Document 1, the teleform is supported in the tunnel by the gantry. When the teleform is reduced in diameter and sent forward, the teleform is placed on the gantry and moved.

従来のNATM工法においては、コンクリートが硬化して所定の強度が発現されないと、テレフォームからガントリーを外すことができなかった。つまり、コンクリートの所定の強度が発現するまではガントリーを転用して次の打設作業に移ることが困難であった。そのため、施工の迅速化には限界があった。一方、施工の迅速化のため、型枠の取り外しを早期に行うと、覆工体の品質低下に繋がるという問題があった。   In the conventional NATM construction method, the gantry cannot be removed from the teleform unless the concrete is hardened and a predetermined strength is exhibited. In other words, it has been difficult to divert the gantry and move on to the next placing operation until the predetermined strength of the concrete is developed. Therefore, there was a limit to speeding up the construction. On the other hand, if the formwork is removed at an early stage in order to speed up the construction, there is a problem that the quality of the lining body is lowered.

特開2008−308855号公報JP 2008-308855 A

本発明の目的は、覆工体の品質を確保しつつ、施工の迅速化を図ることのできるトンネルの覆工方法、トンネル覆工用型枠の支持方法又はトンネル覆工用型枠の支持構造を提供することである。   An object of the present invention is to provide a tunnel lining method, a tunnel lining form support method, or a tunnel lining form support structure capable of speeding up the construction while ensuring the quality of the lining body. Is to provide.

本発明は、上記課題を解決するため、以下の手段を採用する。
すなわち、本発明のトンネル覆工用型枠の支持方法は、地山に掘削された掘削孔の内部に配置され、前記掘削孔の内周面に対向した型枠面を有する型枠本体を、その一端が前記型枠本体に連結されるように配置され、他端が前記地山側に固定された、張力調整可能なテンションケーブルを含む支持部材で支持することを特徴とする。
The present invention employs the following means in order to solve the above problems.
That is, the method of supporting the tunnel lining formwork of the present invention includes a formwork body disposed inside the excavation hole excavated in a natural ground and having a formwork surface facing the inner peripheral surface of the excavation hole. One end thereof is disposed so as to be connected to the formwork body, and the other end is supported by a support member including a tension cable capable of adjusting tension, which is fixed to the natural ground side.

このような構成により、型枠本体は地山側に固定された支持部材によって支持される。これにより、型枠本体の型枠面と掘削孔との間に二次覆工コンクリートを打設した際に、二次覆工コンクリートの圧力や荷重を支えることができる。そして、二次覆工コンクリートを支えている型枠本体の下方を、縮径させた他の型枠本体を通過させて掘削方向の前方に送ることができる。   With such a configuration, the mold body is supported by a support member fixed to the natural ground side. Thereby, when the secondary lining concrete is placed between the mold surface of the mold body and the excavation hole, the pressure and load of the secondary lining concrete can be supported. Then, the lower part of the formwork body supporting the secondary lining concrete can be passed forward in the excavation direction through the other formwork body having a reduced diameter.

また、前記支持部材は、その一端が、前記掘削孔の周囲の前記地山に打ち込まれたロックボルト又はアンカー部材に連結され、他端が前記型枠本体に連結されるようにしてもよい。   In addition, one end of the support member may be connected to a lock bolt or an anchor member that is driven into the ground around the excavation hole, and the other end may be connected to the formwork body.

このように、ロックボルト又はアンカー部材に支持部材の一端を連結することで、支持部材により、型枠本体を強固に支持することができる。   Thus, by connecting one end of the support member to the lock bolt or the anchor member, the mold body can be firmly supported by the support member.

また、前記支持部材は、一端が前記掘削孔の内周面に設置された鋼製支保工に連結され、他端が前記型枠本体に連結されるようにしてもよい。   The support member may have one end connected to a steel support installed on the inner peripheral surface of the excavation hole and the other end connected to the mold body.

このような構成により、掘削孔の内周面に固定された鋼製支保工に支持部材の一端を連結することでも、支持部材により、型枠本体を強固に支持することができる。   With such a configuration, the mold body can be firmly supported by the support member by connecting one end of the support member to the steel support fixed to the inner peripheral surface of the excavation hole.

また、本発明のトンネル覆工用型枠の支持構造は、地山に掘削された掘削孔の内部に配置され、前記掘削孔の内周面に対向した型枠面を有する型枠本体と、該型枠本体を固定す
ために、その一端が前記型枠本体に連結されるように配置され、他端が前記地山側に固定された、張力調整可能なテンションケーブルを含む支持部材と、を備えていることを特徴とする。
Further, the tunnel lining formwork support structure of the present invention has a formwork body disposed inside an excavation hole excavated in a natural ground and having a formwork surface facing the inner peripheral surface of the excavation hole, In order to fix the formwork main body, a support member including a tension cable capable of adjusting tension, which is disposed so that one end thereof is connected to the formwork main body and the other end is fixed to the ground mountain side, It is characterized by having.

このような構成により、型枠本体は、二次覆工コンクリートの圧力や荷重を支えることができ、二次覆工コンクリートを支えている型枠本体の下方を、縮径させた他の型枠本体を通過させて前方に送ることができる。   With such a configuration, the formwork body can support the pressure and load of the secondary lining concrete, and other formwork in which the diameter of the lower part of the formwork body supporting the secondary lining concrete is reduced. It can be sent forward through the body.

また、本発明のトンネルの覆工方法は、上記のトンネル覆工用型枠の支持方法によって、前記型枠本体を前記支持部材で支持して設置する工程と、前記型枠本体と前記掘削孔との間にコンクリートを打設する工程と、前記支持部材の他端の前記型枠本体への連結を解除し、前記型枠本体を脱型する工程と、脱型させた前記型枠本体を前記掘削孔内で掘削方向前方に送る工程と、を備えることを特徴とする。
さらに、前記型枠本体は、前記掘削孔内に、前記掘削孔の掘削方向に沿って複数個を連設する。
Further, the tunnel lining method of the present invention includes a step of supporting and installing the mold body by the support member according to the method for supporting the tunnel lining mold, the mold body and the excavation hole. A step of placing concrete between the other end, a step of releasing the connection of the other end of the support member to the mold body, and demolding the mold body; and the mold body removed from the mold And a step of feeding forward in the excavation direction within the excavation hole.
Further, a plurality of the mold main bodies are continuously provided in the excavation hole along the excavation direction of the excavation hole.

このような構成により、型枠本体は、二次覆工コンクリートの圧力や荷重を支えることができる。そして、所定の強度に達した後に支持部材を取り外し、縮径させた他の型枠本体を、覆工コンクリートを支えている型枠本体の下方を通過させて前方に送ることができる。
これによって、複数の型枠本体を用いて、それぞれの型枠本体では二次覆工コンクリートの強度が発現するのに十分な期間を確保しつつ、トンネルの覆工を迅速に行うことができる。
With such a configuration, the mold body can support the pressure and load of the secondary lining concrete. Then, after reaching a predetermined strength, the support member is removed, and another mold body whose diameter has been reduced can be passed forward through the lower part of the mold body supporting the covering concrete.
As a result, a plurality of formwork bodies can be used, and tunnel lining can be quickly performed while securing a sufficient period of time for the strength of the secondary lining concrete to develop in each formwork body.

また、本発明のトンネルの覆工方法は、上記のトンネル覆工用型枠の支持方法及び前記型枠本体を支持するガントリーによって、前記型枠本体を支持する工程と、前記型枠本体と前記掘削孔との間にコンクリートを打設する工程と、前記ガントリーによる前記型枠本体の支持を解除して前記ガントリーを掘削方向前方に移動させる工程と、前記支持部材の他端の前記型枠本体への連結を解除し、前記型枠本体を脱型する工程と、脱型させた前記型枠本体を、掘削方向前方の前記地山と前記ガントリーとの間に送る工程と、を備えることを特徴とする。 Further, the tunnel lining method of the present invention includes the above-described method for supporting the tunnel lining form and the step of supporting the form body by the gantry for supporting the form body, the form body and the Placing concrete between the excavation holes, releasing the support of the mold body by the gantry and moving the gantry forward in the excavation direction, and the mold body at the other end of the support member Removing the connection to the mold body and demolding the mold body, and sending the demolded mold body between the ground and the gantry forward in the excavation direction. Features.

このような構成により、型枠本体は、二次覆工コンクリートの圧力や荷重をガントリーと併用して支えることができる。内部から支持するだけでは無く、ガントリーと併用使用をすれば、ガントリーを早期に撤去することができる。
そして、所定の強度に達した後に支持部材を取り外し、縮径させた他の型枠本体を、覆工コンクリートを支えている他の型枠本体の下方を通過させて前方に送ることができる。
With such a configuration, the mold body can support the pressure and load of the secondary lining concrete in combination with the gantry. In addition to supporting from the inside, if used together with the gantry, the gantry can be removed early.
Then, after the predetermined strength is reached, the support member is removed, and the other mold body whose diameter has been reduced can be passed forward under the other mold body supporting the covering concrete.

本発明によれば、型枠本体は、掘削孔内で二次覆工コンクリートを支えることができるので、二次覆工コンクリートを支えている型枠本体の下方を、他の型枠本体を通過させて前方に送ることができる。したがって、二次覆工コンクリートの強度が発現するのに十分な期間を確保して覆工体の品質を確保しつつ、トンネルの覆工を迅速に行うことができる。   According to the present invention, the mold body can support the secondary lining concrete in the excavation hole, so that the lower part of the mold body supporting the secondary lining concrete passes through the other mold body. Can be sent forward. Therefore, it is possible to quickly cover the tunnel while securing a sufficient period of time for the strength of the secondary lining concrete to be expressed to ensure the quality of the lining body.

本実施形態に係るトンネル覆工用型枠の支持方法、トンネル覆工用型枠の支持構造、トンネルの覆工方法で用いる型枠装置の概念的な構成を示す断面図である。It is sectional drawing which shows the conceptual structure of the formwork apparatus used with the support method of the tunnel lining form which concerns on this embodiment, the support structure of the tunnel lining form, and the tunnel lining method. 型枠装置を用いたトンネルの覆工方法を概念的に示す側断面図である。It is side sectional drawing which shows notionally the tunnel lining method using a formwork apparatus. 型枠本体を地山側で支持するための支持部材の概念的な構成を示す断面図である。It is sectional drawing which shows the conceptual structure of the supporting member for supporting a formwork main body on the natural ground side. 支持部材の変形例を概念的に示す断面図である。It is sectional drawing which shows notionally the modification of a supporting member. 支持部材の他の変形例を概念的に示す断面図である。It is sectional drawing which shows the other modified example of a support member notionally.

以下、添付図面を参照して、本発明によるトンネル覆工用型枠の支持方法、トンネル覆工用型枠の支持構造、トンネルの覆工方法を実施するための形態について、図面に基づいて説明する。   Hereinafter, with reference to the accompanying drawings, a method for carrying out a tunnel lining form support method, a tunnel lining form support structure, and a tunnel covering method according to the present invention will be described based on the drawings. To do.

図1は、本実施形態に係るトンネル覆工用型枠の支持方法、トンネル覆工用型枠の支持構造、トンネルの覆工方法で用いる型枠装置の構成を示す断面図である。図2は、型枠装置を用いたトンネルの覆工方法を示す側断面図である。
図1、図2に示すように、トンネルTは、NATM工法によって施工される。
すなわち、トンネルTを構築するには、まず、地山Gを削岩機や発破により掘削し、掘削孔Hを形成する。そして、掘削孔Hの内周面にコンクリートを吹き付け、このコンクリートを硬化させることで、一次覆工コンクリート11を形成する。
FIG. 1 is a cross-sectional view illustrating a configuration of a formwork apparatus used in a tunnel lining form support method, a tunnel lining form support structure, and a tunnel cover form method according to the present embodiment. FIG. 2 is a sectional side view showing a tunnel lining method using a formwork apparatus.
As shown in FIGS. 1 and 2, the tunnel T is constructed by the NATM construction method.
That is, in order to construct the tunnel T, first, the natural ground G is excavated by a rock drill or blasting to form the excavation hole H. And concrete is sprayed on the internal peripheral surface of the excavation hole H, and the primary lining concrete 11 is formed by hardening this concrete.

また、一次覆工コンクリート11を通して、掘削孔Hから周囲の地山Gに、複数本のロックボルト12を放射状に打ち込む。この場合、掘削孔Hの内周面には、トンネルTの軸線方向に間隔をあけて、図示しない鋼製支保工を設置してもよい。   Further, a plurality of rock bolts 12 are driven radially from the excavation hole H into the surrounding natural ground G through the primary lining concrete 11. In this case, a steel support (not shown) may be installed on the inner peripheral surface of the excavation hole H with an interval in the axial direction of the tunnel T.

その後、掘削孔Hの内周面を覆う一次覆工コンクリート11の内周側に、後述する型枠装置トンネル覆工用型枠10を設置する。次いで、型枠装置10と一次覆工コンクリート11との間に、コンクリートを打設充填し、このコンクリートを硬化させることで二次覆工コンクリート13を形成する。二次覆工コンクリート13が所定の強度が発現した後、型枠装置10を撤去することで、トンネルTの覆工体15が構築される。   Thereafter, a formwork device tunnel lining form 10 to be described later is installed on the inner circumference side of the primary lining concrete 11 covering the inner circumference surface of the excavation hole H. Next, concrete is cast and filled between the formwork device 10 and the primary lining concrete 11, and the secondary lining concrete 13 is formed by curing the concrete. After the secondary lining concrete 13 develops a predetermined strength, the lining body 15 of the tunnel T is constructed by removing the formwork device 10.

このようにして構築された覆工体15は、一次覆工コンクリート11,ロックボルト12,二次覆工コンクリート13からなり、一次覆工コンクリート11および二次覆工コンクリート13が、地山Gに打ち込まれた複数本のロックボルト12により、地山Gと一体化している。   The lining body 15 constructed in this manner is composed of a primary lining concrete 11, a rock bolt 12, and a secondary lining concrete 13, and the primary lining concrete 11 and the secondary lining concrete 13 are formed on the ground mountain G. It is integrated with the natural ground G by a plurality of driven lock bolts 12.

型枠本体20を含む型枠装置10は、掘削孔H内に設置される。型枠本体20は、掘削孔Hが連続する方向に沿って、所定長を有している。この型枠本体20は、掘削孔Hの内周面の一次覆工コンクリート11に対し、掘削孔Hの径方向に間隔を空けて対向した型枠面20fを有している。   The formwork apparatus 10 including the formwork body 20 is installed in the excavation hole H. The mold body 20 has a predetermined length along the direction in which the excavation holes H are continuous. The mold body 20 has a mold surface 20f opposed to the primary lining concrete 11 on the inner peripheral surface of the excavation hole H with an interval in the radial direction of the excavation hole H.

この型枠本体20は、掘削孔Hの周方向に沿って複数連結された型枠部材21を備えている。各型枠部材21は、断面円弧状をなしている。これらの型枠部材21は、掘削孔Hの周方向で隣接する他の型枠部材21と、ヒンジ22を介して回動自在に連結されている。これにより、型枠本体20は、型枠部材21同士を連結部分のヒンジ22で回動させることで、型枠本体20を展開して拡径させたり、型枠本体20を折り畳んで縮径させたりすることができる。   The formwork body 20 includes a formwork member 21 connected in a plurality along the circumferential direction of the excavation hole H. Each mold member 21 has a circular arc shape in cross section. These formwork members 21 are rotatably connected to other formwork members 21 adjacent in the circumferential direction of the excavation hole H via hinges 22. Accordingly, the mold body 20 rotates the mold members 21 with the hinges 22 of the connecting portions, thereby expanding the diameter of the mold body 20 or expanding the diameter of the mold body 20 to reduce the diameter. Can be.

各型枠部材21は、掘削孔Hの周方向で隣接する他の型枠部材21との連結部分に、ヒンジ22に対して内周側に、ジャッキ受圧部23が形成されている。周方向で隣接する型枠部材21,21のジャッキ受圧部23,23間には、ジャッキ24を着脱自在に介在させることができるようになっている。ジャッキ24によりジャッキ受圧部23,23どうしが互いに離間する方向の押圧力を付与することで、型枠本体20は展開して拡径した状態で維持される。   Each mold member 21 is formed with a jack pressure receiving portion 23 on the inner peripheral side with respect to the hinge 22 at a connection portion with another mold member 21 adjacent in the circumferential direction of the excavation hole H. A jack 24 can be detachably interposed between the jack pressure receiving portions 23 and 23 of the mold members 21 and 21 adjacent in the circumferential direction. By applying a pressing force in a direction in which the jack pressure receiving portions 23, 23 are separated from each other by the jack 24, the mold body 20 is maintained in a state where it is expanded and expanded in diameter.

なお、型枠本体20の両端部に位置する型枠部材21Dは、その一端側のみが型枠部材21に連結され、他端側には、掘削孔Hの底面14に設置する接地面21fを有している。   In addition, as for the mold member 21D located in the both ends of the mold main body 20, only the one end side is connected with the mold member 21, and the other end side is provided with the grounding surface 21f installed on the bottom surface 14 of the excavation hole H. Have.

図3は、型枠本体を地山側で支持するための支持部材の構成を示す断面図である。
図3に示すように、支持部材40は、型枠本体20の外周側に配置され、型枠本体20を、掘削孔Hの周囲の地山G側から支持する。
支持部材40は、地山Gに打ち込まれ、一次覆工コンクリート11の内周側に突出したロックボルト12の先端部に連結されるナット部材41と、型枠本体20に連結される固定具42と、ナット部材41と固定具42との間に設けられたテンションケーブル43と、を備えている。
FIG. 3 is a cross-sectional view showing a configuration of a support member for supporting the formwork body on the natural ground side.
As shown in FIG. 3, the support member 40 is disposed on the outer peripheral side of the mold body 20 and supports the mold body 20 from the natural ground G side around the excavation hole H.
The support member 40 is driven into the natural ground G, and a nut member 41 connected to the tip of the lock bolt 12 protruding to the inner peripheral side of the primary lining concrete 11, and a fixture 42 connected to the mold body 20. And a tension cable 43 provided between the nut member 41 and the fixture 42.

ナット部材41は、ネジ穴41hを有しており、ネジ穴41hをロックボルト12の外周面に形成されたネジ溝12mに螺着させる。   The nut member 41 has a screw hole 41 h, and the screw hole 41 h is screwed into a screw groove 12 m formed on the outer peripheral surface of the lock bolt 12.

固定具42は、型枠本体20に形成された貫通孔25に装着されている。固定具42は、型枠本体20の内周面に沿うベース部材44と、テンション調整部材45と、を備える。ベース部材44は、テンション調整部材45が貫通するネジ孔(図示無し)を有している。テンション調整部材45は、ベース部材44のネジ孔にねじ込まれる雄ネジ部(図示無し)を有している。このようなテンション調整部材45は、ベース部材44のネジ孔内で回転させることにより、ベース部材44からの突出寸法が変化する。   The fixture 42 is attached to the through hole 25 formed in the mold body 20. The fixture 42 includes a base member 44 along the inner peripheral surface of the mold body 20 and a tension adjusting member 45. The base member 44 has a screw hole (not shown) through which the tension adjusting member 45 passes. The tension adjustment member 45 has a male screw portion (not shown) that is screwed into the screw hole of the base member 44. By rotating the tension adjusting member 45 in the screw hole of the base member 44, the protruding dimension from the base member 44 changes.

テンションケーブル43は、一端がナット部材41に連結され、他端が固定具42のテンション調整部材45に連結されている。   The tension cable 43 has one end connected to the nut member 41 and the other end connected to the tension adjustment member 45 of the fixture 42.

このような支持部材40は、固定具42のテンション調整部材45をベース部材44のネジ孔(図示無し)に対して回転させることで、テンションケーブル43の張力を調整できるようになっている。   Such a support member 40 can adjust the tension of the tension cable 43 by rotating the tension adjusting member 45 of the fixture 42 with respect to the screw hole (not shown) of the base member 44.

このようなテンション調整機構により、型枠本体の型枠面と掘削孔との間に二次覆工コンクリートを打設した後に、テンション調整部材45によって各支持部材40が支持する型枠本体20にかかる圧力や荷重を部分的に調整することができる。   By such a tension adjustment mechanism, after placing secondary lining concrete between the mold surface of the mold body and the excavation hole, the tension adjustment member 45 supports the mold body 20 supported by each support member 40. Such pressure and load can be partially adjusted.

図1の例では、支持部材40は型枠本体20の両端の近傍に配置されている。支持部材40は、型枠本体20に対し、掘削孔Hが連続する方向に間隔を空けて複数箇所に設けられている。
支持部材40は、これ以外にも、型枠本体20の周方向に間隔を空けて複数箇所に設置しても良い。
In the example of FIG. 1, the support member 40 is disposed in the vicinity of both ends of the mold body 20. The support members 40 are provided at a plurality of positions with a space in the direction in which the excavation holes H are continuous with respect to the mold body 20.
In addition to this, the support member 40 may be installed at a plurality of locations at intervals in the circumferential direction of the mold body 20.

型枠本体20は、支持部材40を介してロックボルト12に連結されるので、型枠本体20を強固に支持することができる。
次に、上記のような型枠装置10を用いたトンネルTの覆工方法について説明する。
Since the mold body 20 is connected to the lock bolt 12 via the support member 40, the mold body 20 can be firmly supported.
Next, a tunnel T lining method using the above-described formwork apparatus 10 will be described.

(型枠装置設置工程)
トンネルTを覆工するには、地山Gに掘削した掘削孔H内に型枠装置10を設置する。このとき、型枠本体20を支持部材40で支持して設置する。
(Formwork device installation process)
In order to cover the tunnel T, the formwork apparatus 10 is installed in the excavation hole H excavated in the natural ground G. At this time, the mold body 20 is supported and installed by the support member 40.

(二次覆工コンクリート打設工程)
次いで、型枠本体20と掘削孔Hとの間に二次覆工コンクリート13を打設する。
(Secondary lining concrete placing process)
Next, the secondary lining concrete 13 is placed between the mold body 20 and the excavation hole H.

(型枠装置の縮径、前方への送り工程)
二次覆工コンクリート13について、所定の強度が発現した後、固定具42を取り外し、支持部材40の他端における型枠本体20への連結を解除する。そして、型枠本体20を構成する複数の型枠部材21を、連結部のヒンジ22で折畳み、型枠本体20を縮径させ、打設されたコンクリートから脱型させる。
(Reducing diameter of formwork device, forward feeding process)
After the secondary lining concrete 13 exhibits a predetermined strength, the fixture 42 is removed, and the connection to the mold body 20 at the other end of the support member 40 is released. Then, the plurality of mold members 21 constituting the mold body 20 are folded at the hinges 22 of the connecting portions, the diameter of the mold body 20 is reduced, and the mold is removed from the placed concrete.

縮径させた型枠本体20は、不図示の移動台車や、型枠本体20に備えた走行車輪によって、掘削孔H内に敷設されたレールに沿って移動させ、掘削孔H内で掘削方向前方に送る。
この後は、掘削方向前方の所定位置で、再び、型枠装置10を設置し、上記一連の工程を順次繰り返す。
The mold body 20 having a reduced diameter is moved along a rail laid in the excavation hole H by a moving carriage (not shown) or a traveling wheel provided in the mold main body 20, and the excavation direction in the excavation hole H. Send forward.
Thereafter, the formwork apparatus 10 is installed again at a predetermined position in front of the excavation direction, and the above series of steps is sequentially repeated.

ここで、図2に示すように、上記型枠装置10は、複数組を用いることができる。複数の型枠装置10を用いた場合、たとえば次の工程を経る。すなわち、所定の位置に設置した第一の型枠装置10Aで二次覆工コンクリート13の打設を行っている間に、掘削方向前方に第二の型枠装置10Bを設置する。そして、第一の型枠装置10Aの位置で打設した二次覆工コンクリート13について所定の強度が発現した後、第一の型枠装置10Aを縮径する。縮径させた第一の型枠装置10Aは、第二の型枠装置10Bの位置で二次覆工コンクリート13の打設を行っていても、あるいは第二の型枠装置10Bの位置に打設された二次覆工コンクリート13について所定の強度が発現される前であっても、掘削方向前方へ移動させることができる。
このようにして、互いに前後する複数の型枠装置10間で、実施する工程を順次ずらして施工を行うことができる。なお、三組以上の型枠装置10を用いても良い。
Here, as shown in FIG. 2, the said formwork apparatus 10 can use multiple sets. When a plurality of formwork apparatuses 10 are used, for example, the following steps are performed. That is, the second formwork apparatus 10B is installed forward in the excavation direction while the secondary lining concrete 13 is being placed by the first formwork apparatus 10A installed at a predetermined position. And after predetermined intensity | strength is expressed about the secondary lining concrete 13 cast | placed in the position of 10 A of 1st mold apparatuses, 10 A of 1st mold apparatuses are diameter-reduced. The first formwork apparatus 10A having a reduced diameter is placed at the position of the second formwork apparatus 10B, even if the secondary lining concrete 13 is placed at the position of the second formwork apparatus 10B. Even before the predetermined strength is developed for the secondary lining concrete 13 provided, it can be moved forward in the excavation direction.
In this way, it is possible to perform the construction by sequentially shifting the steps to be performed between the plurality of formwork apparatuses 10 that are located one after the other. Three or more sets of formwork devices 10 may be used.

上記のようにして施工を行う際、各型枠装置10は、支持部材40により型枠本体20を支持することによって、型枠本体20は二次覆工コンクリート13による荷重や圧力を支持することができる。したがって、支持部材40を取り外し、縮径させた型枠本体20は、その掘削方向前方で二次覆工コンクリート13を支えている他の型枠本体20の下方を通過させて前方に送ることができる。   When performing construction as described above, each formwork device 10 supports the formwork body 20 by the support member 40, so that the formwork body 20 supports the load and pressure of the secondary lining concrete 13. Can do. Therefore, the formwork body 20 with the support member 40 removed and reduced in diameter can be passed forward under the other formwork body 20 supporting the secondary lining concrete 13 in front of the excavation direction. it can.

上述したように、型枠本体20は、型枠本体20の外周側で地山G側に固定された支持部材40によって支持される。
支持部材40は、一端がロックボルト12に連結され、他端が型枠本体20に連結されているので、型枠本体20は、支持部材40およびロックボルト12を介して、地山Gに強固に支持される。
As described above, the mold body 20 is supported by the support member 40 fixed to the natural ground G side on the outer periphery side of the mold body 20.
Since the support member 40 has one end connected to the lock bolt 12 and the other end connected to the mold body 20, the mold body 20 is firmly attached to the natural ground G via the support member 40 and the lock bolt 12. Supported by

これにより、型枠装置10は、ガントリー等での支持を要せずとも、二次覆工コンクリート13の荷重や圧力を支持することができる。したがって、二次覆工コンクリート13を支えている型枠本体20の下方を、縮径させた他の型枠本体20を通過させて前方に送ることができる。   Thereby, the formwork apparatus 10 can support the load and pressure of the secondary lining concrete 13 without requiring support by a gantry or the like. Therefore, the lower part of the mold body 20 supporting the secondary lining concrete 13 can be passed forward through the other mold body 20 having a reduced diameter.

そして、複数の型枠本体20を連接して用い、それぞれの型枠本体20を、二次覆工コンクリート13の打設後、順次前方に送るようにした。
これにより、それぞれの型枠本体20では二次覆工コンクリート13の強度が発現するのに十分な期間を確保しつつ、トンネルTの覆工を迅速に行うことが可能となる。
Then, a plurality of formwork main bodies 20 are connected and used, and each formwork main body 20 is sequentially fed forward after the placement of the secondary lining concrete 13.
Thereby, it is possible to quickly cover the tunnel T while securing a sufficient period for the strength of the secondary lining concrete 13 to develop in each mold body 20.

したがって、上記実施形態に係る方法によれば、覆工体15の品質を確保しつつ、施工の迅速化を図ることが可能となる。   Therefore, according to the method according to the embodiment, it is possible to speed up the construction while ensuring the quality of the covering body 15.

次に、本発明の他の実施形態を説明する。本実施形態では、先述の実施形態にガントリーを組み合わせる。すなわち、上記実施形態に係るトンネル覆工用型枠の支持方法、トンネル覆工用型枠の支持構造又はトンネルの覆工方法において、ガントリーによって型枠装置10を支持する。   Next, another embodiment of the present invention will be described. In this embodiment, a gantry is combined with the previous embodiment. That is, the formwork apparatus 10 is supported by the gantry in the method for supporting a tunnel lining form, the structure for supporting a tunnel lining form, or the method for covering a tunnel according to the above embodiment.

本実施形態は、基本的には先述の実施形態と同様であるが、支持部材40とガントリーとの併用により型枠装置10を支持する。よって、二次覆工コンクリートの打設時には、これら双方の構成により、より確実に型枠装置10を支持することができる。また、ガントリーは作業足場としても利用することができる。   This embodiment is basically the same as the above-described embodiment, but supports the formwork apparatus 10 by using the support member 40 and the gantry together. Therefore, at the time of placing the secondary lining concrete, the formwork apparatus 10 can be more reliably supported by both of these configurations. The gantry can also be used as a working scaffold.

型枠装置10は支持部材40によって支持されているため、二次覆工コンクリート13の所定の強度が発現する前、すなわち二次覆工コンクリート13が若材齢であっても、ガントリーによる型枠装置10の支持を解除してガントリーを移動させる事ができる。   Since the formwork apparatus 10 is supported by the support member 40, the formwork by the gantry is used even before the predetermined strength of the secondary lining concrete 13 is developed, that is, even when the secondary lining concrete 13 is young. The gantry can be moved by releasing the support of the device 10.

そして、二次覆工コンクリート13について所定の強度が発現した後、支持部材40の他端の型枠本体20への連結を解除し、型枠装置10を脱型する。脱型させた型枠装置10は縮径されて、掘削方向前方の他の型枠装置10内を通過させて移動させる事ができる。
このときガントリーは、新たに二次覆工コンクリート13を打設する予定の位置に設置されている。移動させた型枠装置10は縮径されているため、地山Gとガントリーとの間へ移動させて展開することができる。
And after predetermined intensity | strength expresses about the secondary lining concrete 13, the connection to the mold body 20 of the other end of the support member 40 is cancelled | released, and the mold apparatus 10 is demolded. The demolded formwork apparatus 10 is reduced in diameter, and can be moved through the other formwork apparatus 10 in front of the excavation direction.
At this time, the gantry is newly installed at the position where the secondary lining concrete 13 is to be placed. Since the moved formwork apparatus 10 is reduced in diameter, it can be moved between the natural ground G and the gantry and deployed.

ガントリーは、例えば、門型のガントリーなどが用いられるが、型枠装置を支持することができ、かつ型枠装置の移動を妨げないものであれば、種々の形状のものを採用することができる。   As the gantry, for example, a portal gantry is used, but various shapes can be adopted as long as they can support the formwork apparatus and do not hinder the movement of the formwork apparatus. .

なお、本発明のトンネル覆工用型枠の支持方法、トンネル覆工用型枠の支持構造、トンネルの覆工方法は、図面を参照して説明した上述の実施形態に限定されるものではなく、その技術的範囲において様々な変形例が考えられる。   The tunnel lining form support method, tunnel lining form support structure, and tunnel covering method of the present invention are not limited to the above-described embodiment described with reference to the drawings. Various modifications can be considered in the technical scope.

例えば、支持部材40において、テンションケーブル43を用いた場合、ロックボルト12の打設位置と型枠本体20に設けられた貫通孔25の位置との誤差吸収がしやすいという利点がある。例えば、支持部材40において、テンションケーブル43を用いたが、これに代えて、鋼棒や鋼製の棒ネジを用いてもよい。   For example, when the tension cable 43 is used in the support member 40, there is an advantage that it is easy to absorb an error between the placement position of the lock bolt 12 and the position of the through hole 25 provided in the mold body 20. For example, although the tension cable 43 is used in the support member 40, a steel bar or a steel bar screw may be used instead.

また、支持部材40を設ける数や位置は特に限定されない。打設するコンクリートの特性、地山の状態、採用する型枠の形状などによって、支持部材40の設置数、あるいは設置位置を変更することができる。   Further, the number and position of the support members 40 are not particularly limited. Depending on the properties of the concrete to be placed, the state of the natural ground, the shape of the formwork to be adopted, etc., the number of installed support members 40 or the installation position can be changed.

また、図4に示すように、支持部材40は、その一端が吹付けコンクリート(一時覆工コンクリート)側に打ち込まれたアンカー部材50に連結され、他端が型枠本体20に連結されているようにしてもよい。
図4の例では、アンカー部材50は地山Gまで到達していない例を示しているが、アンカー部材50は地山Gまで打ち込まれてもよい。
このように、ロックボルト12とは別に独立して一次覆工コンクリート11または地山Gに打ち込まれたアンカー部材50に支持部材40の一端を連結することでも、支持部材40により、型枠本体20を強固に支持することができる。
As shown in FIG. 4, one end of the support member 40 is connected to an anchor member 50 driven into the shotcrete (temporary lining concrete) side, and the other end is connected to the mold body 20. You may do it.
In the example of FIG. 4, the anchor member 50 does not reach the natural ground G, but the anchor member 50 may be driven up to the natural ground G.
In this way, by connecting the one end of the support member 40 to the anchor member 50 that is driven into the primary lining concrete 11 or the natural ground G independently of the lock bolt 12, the mold body 20 can be connected by the support member 40. Can be firmly supported.

図5は、一次覆工時に設けた鋼製支保工を利用して、型枠本体を支持する例である。
図5に示すように、支持部材40は、一端が型枠本体20の外周側で地山G側に固定された鋼製支保工60に連結され、他端が型枠本体20に連結された連結部材70を備えるようにしてもよい。
FIG. 5 is an example of supporting the formwork body using a steel support provided at the time of primary lining.
As shown in FIG. 5, the support member 40 has one end connected to a steel support 60 fixed to the ground pile G side on the outer peripheral side of the mold body 20, and the other end connected to the mold body 20. A connecting member 70 may be provided.

鋼製支保工60は、例えば断面H型の鋼材である。鋼製支保工60は、掘削孔Hの内周面に沿って配置されている。鋼製支保工60は、一次覆工コンクリート11中に埋設され、一方のフランジ部60fが一次覆工コンクリート11から掘削孔Hの内方に露出している。これにより、鋼製支保工60は、地山G側に固定されている。このような鋼製支保工60は、掘削孔Hが連続する方向に間隔を空けて複数箇所に設けられている。   The steel support 60 is, for example, a steel material having an H-shaped cross section. The steel support 60 is disposed along the inner peripheral surface of the excavation hole H. The steel support 60 is embedded in the primary lining concrete 11, and one flange portion 60 f is exposed from the primary lining concrete 11 to the inside of the excavation hole H. Thereby, the steel support 60 is fixed to the natural ground G side. Such steel supports 60 are provided at a plurality of locations at intervals in the direction in which the excavation holes H are continuous.

連結部材70は、その一端を鋼製支保工60のフランジ部60fに溶接したナット部材61にねじ込んで連結する。連結部材70の他端は、型枠本体20の貫通孔25に貫通させ、ナット部材62をねじこむことで型枠本体20に連結できる。   One end of the connecting member 70 is screwed and connected to a nut member 61 welded to the flange portion 60f of the steel support 60. The other end of the connecting member 70 is passed through the through hole 25 of the mold body 20 and can be connected to the mold body 20 by screwing the nut member 62.

このような構成により、型枠本体20の外周側の地山G側に固定された鋼製支保工60に支持部材40の一端を連結することでも、支持部材40により、型枠本体20を強固に支持することができる。   With such a configuration, even if one end of the support member 40 is connected to the steel support 60 fixed to the ground pile G side on the outer peripheral side of the mold body 20, the mold body 20 is strengthened by the support member 40. Can be supported.

これ以外にも、本発明の主旨を逸脱しない限り、上記実施の形態で挙げた構成を取捨選択したり、他の構成に適宜変更したりすることが可能である。   In addition to this, the configuration described in the above embodiment can be selected or changed to another configuration as appropriate without departing from the gist of the present invention.

10 型枠装置(トンネル覆工用型枠)
11 一次覆工コンクリート
12 ロックボルト
13 二次覆工コンクリート
14 底面
15 覆工体
20 型枠本体
20f 型枠面
21 型枠部材
40 支持部材
41 ナット部材
42 固定具
43 テンションケーブル
50 アンカー部材
60 鋼製支保工
G 地山
H 掘削孔
T トンネル
10 Formwork equipment (formwork for tunnel lining)
11 Primary lining concrete 12 Rock bolt 13 Secondary lining concrete 14 Bottom surface 15 Covering body 20 Formwork body 20f Formwork surface 21 Formwork member 40 Support member 41 Nut member 42 Fixing tool 43 Tension cable 50 Anchor member 60 Made of steel Support construction G Ground mountain H Drilling hole T Tunnel

Claims (7)

トンネル覆工用型枠の支持方法であって、
地山に掘削された掘削孔の内部に配置され、前記掘削孔の内周面に対向した型枠面を有する型枠本体を、
その一端が前記型枠本体に連結されるように配置され、他端が前記地山側に固定された、張力調整可能なテンションケーブルを含む支持部材で支持することを特徴とするトンネル覆工用型枠の支持方法。
A method for supporting a tunnel lining formwork,
A mold body having a mold surface disposed inside a drill hole drilled in a natural ground and facing the inner peripheral surface of the drill hole,
A tunnel lining mold characterized in that one end thereof is arranged so as to be connected to the formwork body and the other end is fixed to the natural ground side and is supported by a support member including a tension cable capable of adjusting tension. How to support the frame.
前記支持部材の他端が、前記掘削孔の周囲の前記地山に打ち込まれたロックボルト又はアンカー部材に連結されていることを特徴とする請求項1に記載のトンネル覆工用型枠の支持方法。   2. The tunnel lining formwork support according to claim 1, wherein the other end of the support member is connected to a lock bolt or an anchor member driven into the ground around the excavation hole. Method. 前記支持部材の他端が、前記掘削孔の内周面に設置された鋼製支保工に連結されていることを特徴とする請求項1または2に記載のトンネル覆工用型枠の支持方法。   The method for supporting a tunnel lining form according to claim 1 or 2, wherein the other end of the support member is connected to a steel support installed on the inner peripheral surface of the excavation hole. . トンネル覆工用型枠の支持構造であって、
地山に掘削された掘削孔の内部に配置され、前記掘削孔の内周面に対向した型枠面を有する型枠本体と、
該型枠本体を固定するために、その一端が前記型枠本体に連結されるように配置され、他端が前記地山側に固定された、張力調整可能なテンションケーブルを含む支持部材と、を備えていることを特徴とするトンネル覆工用型枠の支持構造。
A tunnel lining formwork support structure,
A mold body having a mold surface disposed inside the excavation hole excavated in the natural ground and facing the inner peripheral surface of the excavation hole;
In order to fix the formwork main body, a support member including a tension cable capable of adjusting tension, which is disposed so that one end thereof is connected to the formwork main body and the other end is fixed to the ground mountain side, A support structure for a tunnel lining formwork, comprising:
請求項1〜3のいずれか一項に記載のトンネル覆工用型枠の支持方法によって、前記型枠本体を前記支持部材で支持して設置する工程と、
前記型枠本体と前記掘削孔との間にコンクリートを打設する工程と、
前記支持部材の他端の前記型枠本体への連結を解除し、前記型枠本体を脱型する工程と、
脱型させた前記型枠本体を前記掘削孔内で掘削方向前方に送る工程と、
を備えることを特徴とするトンネルの覆工方法。
By the method for supporting a tunnel lining formwork according to any one of claims 1 to 3, the process of installing the formwork body supported by the support member;
Placing concrete between the mold body and the excavation hole;
Releasing the connection of the other end of the support member to the mold body, and demolding the mold body;
Sending the demolded mold body forward in the excavation direction in the excavation hole;
A tunnel lining method characterized by comprising:
請求項1〜3のいずれか一項に記載のトンネル覆工用型枠の支持方法及び前記型枠本体を支持するガントリーによって、前記型枠本体を支持する工程と、
前記型枠本体と前記掘削孔との間にコンクリートを打設する工程と、
前記ガントリーによる前記型枠本体の支持を解除して前記ガントリーを掘削方向前方に移動させる工程と、
前記支持部材の他端の前記型枠本体への連結を解除し、前記型枠本体を脱型する工程と、
脱型させた前記型枠本体を、掘削方向前方の前記地山と前記ガントリーとの間に送る工程と、
を備えることを特徴とするトンネルの覆工方法。
The step of supporting the formwork body by the method for supporting the formwork for tunnel lining according to any one of claims 1 to 3 and the gantry for supporting the formwork body,
Placing concrete between the mold body and the excavation hole;
Releasing the support of the mold body by the gantry and moving the gantry forward in the excavation direction;
Releasing the connection of the other end of the support member to the mold body, and demolding the mold body;
The mold body is removed from the mold, a step of sending between the natural ground and the gantry drilling forward,
A tunnel lining method characterized by comprising:
前記型枠本体は、前記掘削孔内に、前記掘削孔の掘削方向に沿って複数個を連設することを特徴とする請求項5又は6に記載のトンネルの覆工方法。   The tunnel lining method according to claim 5 or 6, wherein a plurality of said formwork main bodies are continuously provided in said excavation hole along the excavation direction of said excavation hole.
JP2014098833A 2014-05-12 2014-05-12 Method for supporting tunnel lining formwork, structure for supporting tunnel lining formwork, and tunnel lining method Active JP6352045B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014098833A JP6352045B2 (en) 2014-05-12 2014-05-12 Method for supporting tunnel lining formwork, structure for supporting tunnel lining formwork, and tunnel lining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014098833A JP6352045B2 (en) 2014-05-12 2014-05-12 Method for supporting tunnel lining formwork, structure for supporting tunnel lining formwork, and tunnel lining method

Publications (2)

Publication Number Publication Date
JP2015214853A JP2015214853A (en) 2015-12-03
JP6352045B2 true JP6352045B2 (en) 2018-07-04

Family

ID=54751978

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014098833A Active JP6352045B2 (en) 2014-05-12 2014-05-12 Method for supporting tunnel lining formwork, structure for supporting tunnel lining formwork, and tunnel lining method

Country Status (1)

Country Link
JP (1) JP6352045B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401609A (en) * 2016-11-10 2017-02-15 河南理工大学 Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure
CN108005680A (en) * 2017-12-08 2018-05-08 中铁二院工程集团有限责任公司 A kind of inverted arch support component suitable for shield formula TBM tunnels prefabricated pipe section liner structure
JP7050602B2 (en) * 2018-07-11 2022-04-08 積水化学工業株式会社 Tunnel rehabilitation method, rehabilitation tunnel structure and coupling device
CN112196581B (en) * 2020-10-15 2022-10-28 中铁二局第二工程有限公司 Soft rock tunnel construction supporting time determination method
JP7444763B2 (en) 2020-12-01 2024-03-06 大成建設株式会社 Tunnel lining structure and tunnel construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58124000A (en) * 1982-01-20 1983-07-23 岡部株式会社 Method of executing tunnel secondary covering work concrete
JP2520179Y2 (en) * 1990-11-07 1996-12-11 佐賀工業株式会社 Support leg attachment / detachment structure for secondary lining formwork
US5284404A (en) * 1992-03-31 1994-02-08 Hu Ming C Moving steel form system
JP3188342B2 (en) * 1993-03-18 2001-07-16 株式会社鴻池組 Tunnel construction method
JPH09209696A (en) * 1996-02-02 1997-08-12 Shimizu Corp Tunnel lining movable form device
JP3029022B2 (en) * 1997-07-03 2000-04-04 西松建設株式会社 Formwork apparatus for tunnel lining and lining method using the same
JP4810959B2 (en) * 2005-10-12 2011-11-09 株式会社大林組 Buried formwork mounting structure, mounting method, concrete structure reinforcing method, and concrete structure
JP4964475B2 (en) * 2006-02-16 2012-06-27 鹿島建設株式会社 Construction method of concrete for tunnel lining

Also Published As

Publication number Publication date
JP2015214853A (en) 2015-12-03

Similar Documents

Publication Publication Date Title
JP6352045B2 (en) Method for supporting tunnel lining formwork, structure for supporting tunnel lining formwork, and tunnel lining method
JP5767558B2 (en) Mobile formwork apparatus and lining concrete construction method
JP6146895B2 (en) Forming device for tunnel lining
JP2011052536A5 (en)
JP6000889B2 (en) Mobile formwork apparatus and lining concrete construction method
WO2015179883A2 (en) Support arrangement
JP6452474B2 (en) Support structure of tunnel lining concrete formwork
JP4634363B2 (en) Multiple arc tunnel construction method
JP6232743B2 (en) Tunnel construction method and tunnel
JP2007530825A (en) Method and apparatus for making pretensioned anchors
JP6322490B2 (en) Pile head treatment method for severing material and site-built pile
KR101066641B1 (en) Pre-stressing tunneling method using presupport concept and thereof apparatus
KR101293237B1 (en) Apparatus of fixing cover for ground anchor
JP2017125334A (en) Lining assembling apparatus
JPH0560037B2 (en)
JP5508314B2 (en) Tunnel lining forming method
JP2016017393A (en) Construction method for tunnel having large cross-section
JP2004044364A (en) Continuous construction method for tunnel block
JP6422052B2 (en) Covering concrete construction method and centr for lining
JP4230938B2 (en) Support structure of tunnel lining material
JP6355475B2 (en) Support structure for fixture and tunnel lining formwork
JP7442387B2 (en) How to install rock bolts in tunnel construction
JP7401391B2 (en) How to install rock bolts in tunnel construction
KR20070026953A (en) Prestressing lock bolt apparatus
JP7364226B2 (en) Flexible segment for shield construction method and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170331

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180126

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180206

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180326

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180529

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180606

R150 Certificate of patent or registration of utility model

Ref document number: 6352045

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250