JP6174531B2 - Method for producing steel for evaluation - Google Patents

Method for producing steel for evaluation Download PDF

Info

Publication number
JP6174531B2
JP6174531B2 JP2014147396A JP2014147396A JP6174531B2 JP 6174531 B2 JP6174531 B2 JP 6174531B2 JP 2014147396 A JP2014147396 A JP 2014147396A JP 2014147396 A JP2014147396 A JP 2014147396A JP 6174531 B2 JP6174531 B2 JP 6174531B2
Authority
JP
Japan
Prior art keywords
steel material
evaluation
mold
steel
producing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014147396A
Other languages
Japanese (ja)
Other versions
JP2016024003A (en
Inventor
憲宏 藤本
憲宏 藤本
孝 澤田
孝 澤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Telegraph and Telephone Corp
Original Assignee
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp filed Critical Nippon Telegraph and Telephone Corp
Priority to JP2014147396A priority Critical patent/JP6174531B2/en
Publication of JP2016024003A publication Critical patent/JP2016024003A/en
Application granted granted Critical
Publication of JP6174531B2 publication Critical patent/JP6174531B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Description

本発明は、評価用鋼材の作製方法に関し、例えばクリープ現象による劣化を評価するための評価用鋼材の作製方法に関する。   The present invention relates to a method for producing an evaluation steel material, for example, a method for producing an evaluation steel material for evaluating deterioration due to a creep phenomenon.

鋼材等の金属材料は、高温下で力が加わり続けると、組織変化、炭化物の粗大化、および空孔や亀裂の発生等が生じ、徐々に塑性変形が進行することがある。この現象は、一般に、クリープ現象と呼ばれている。
クリープ現象による鋼材の耐久性を評価するための試験として、金属材料に定荷重試験機等によって引張力を加えて、ひずみや破断時間等の測定を行うクリープ試験やクリープ破断試験が知られている(非特許文献1参照)。
クリープ現象は常温条件下でも見られる現象であるが、上記クリープ試験等は、通常、高温条件下でクリープ現象による劣化を加速させることによって行われている。
When a force is continuously applied at a high temperature, a metal material such as a steel material may undergo a structural change, carbide coarsening, generation of pores or cracks, and the like, and plastic deformation may gradually progress. This phenomenon is generally called a creep phenomenon.
As tests for evaluating the durability of steel materials due to the creep phenomenon, creep tests and creep rupture tests are known in which tensile force is applied to a metal material with a constant load tester and the like to measure strain and rupture time. (Refer nonpatent literature 1).
The creep phenomenon is a phenomenon that can be seen under normal temperature conditions, but the creep test and the like are usually performed by accelerating deterioration due to the creep phenomenon under high temperature conditions.

ところで、金属材料における空孔の発生は、水素脆化の進行に関係することが知られており(非特許文献2参照)、クリープ現象によって発生する空孔も水素脆化に関与している可能性がある。一方、空孔は100〜200℃でアニールすることで消滅することが知られている。そのため、上記のように、高温条件下において鋼材のクリープ現象を加速させて試験を行うと、クリープ現象によって生じた空孔が消滅するため、クリープ現象による鋼材への影響や、クリープ現象により生じた空孔が及ぼす水素脆化に対する影響等を正確に知ることができない。
このような空孔の影響も含めたクリープ現象による鋼材の劣化を精度良く評価するためには、常温条件下において荷重を負荷した試験片(鋼材)を数年間安定な状態で保管することによって、クリープ現象によって経年劣化した鋼材を作製する必要があった。
By the way, it is known that the generation of vacancies in a metal material is related to the progress of hydrogen embrittlement (see Non-Patent Document 2), and vacancies generated by the creep phenomenon may also be involved in hydrogen embrittlement. There is sex. On the other hand, it is known that vacancies disappear by annealing at 100 to 200 ° C. Therefore, as described above, when the test was performed by accelerating the creep phenomenon of steel under high temperature conditions, the voids caused by the creep phenomenon disappeared, so the effect on the steel by the creep phenomenon and the creep phenomenon occurred. The effect of vacancies on hydrogen embrittlement cannot be known accurately.
In order to accurately evaluate the deterioration of steel materials due to the creep phenomenon including the effect of such voids, by storing test pieces (steel materials) loaded under normal temperature conditions in a stable state for several years, It was necessary to produce a steel material that deteriorated over time due to the creep phenomenon.

神鋼溶接サービス株式会社、“(10)クリープ試験、クリープ破断試験”、[平成26年7月3日検索]、インターネット<URL: http://www.sws-shinko.co.jp/pdf/sws_pr_09.pdf>.Shinko Welding Service Co., Ltd., “(10) Creep test, creep rupture test”, [searched July 3, 2014], Internet <URL: http://www.sws-shinko.co.jp/pdf/sws_pr_09 .pdf>. K. Takai et al., ”Lattice defects dominating hydrogen-relatedfailure of metals” 2008, ScienceDirect, Acta MATERIALIA, 56(2008) 5158-5167.K. Takai et al., “Lattice defects dominating hydrogen-relatedfailure of metals” 2008, ScienceDirect, Acta MATERIALIA, 56 (2008) 5158-5167.

しかしながら、常温条件下において荷重を加えた状態の鋼材(試験片)を作製するためには、長期間、定荷重試験機などの大型の試験装置を占有しなければならないという問題がある。   However, in order to produce a steel material (test piece) in a state where a load is applied under normal temperature conditions, there is a problem that a large-scale test apparatus such as a constant load tester must be occupied for a long period of time.

そこで、本願発明者は、本願発明に先立って、大型の試験装置を長期間占有することなく、常温条件下において荷重を加えた状態で安定させた評価用鋼材を作製する方法として、プレストレストコンクリートの製造方法を用いることを検討した。しかしながら、プレストレストコンクリートの製造方法を用いた場合、以下に示すような問題があることが明らかとなった。   Therefore, prior to the present invention, the inventor of the present application, as a method of producing a steel material for evaluation that is stabilized in a state of applying a load under normal temperature conditions without occupying a large test apparatus for a long time, The use of manufacturing methods was studied. However, when the prestressed concrete manufacturing method was used, it became clear that there existed the following problems.

一般に、プレストレストコンクリートの製造方法として、コンクリートを打設する前に鋼線に張力を与えるプレテンション方式と、コンクリートを打設した後に鋼線に張力を与えるポストテンション方式の2つの方式が知られている。
プレテンション方式によって荷重を負荷した鋼材(試験片)を作製する場合、コンクリートと鋼材の付着力でプレストレスを保持するため、丸棒状の鋼材をそのまま用いることができず、鋼材の形状を異形にする(例えば鋼材に凹凸を設ける)必要がある。
In general, there are two known methods for producing prestressed concrete: a pre-tension method that applies tension to the steel wire before placing concrete and a post-tension method that applies tension to the steel wire after placing concrete. Yes.
When producing a steel material (test specimen) loaded with the pre-tension method, the prestress is maintained by the adhesion between concrete and steel material, so the round bar-shaped steel material cannot be used as it is, and the shape of the steel material is irregular. (For example, unevenness is provided in the steel material).

一方,ポストテンション方式によって荷重を加えた鋼材を作製する場合、プレテンション導入後にグラウトを導入する必要があり、通常のコンクリートの打設と比較して、コストが高く、また、高度な技術が必要となる。   On the other hand, when producing a steel material with a load applied by the post tension method, it is necessary to introduce grout after the pre-tension is introduced, which is more costly and requires advanced technology compared to ordinary concrete placement. It becomes.

本発明は、上記の問題に鑑みてなされたものであり、本発明の目的は、大型の試験装置を長期間占有することなく、荷重を加えた状態で安定させた鋼材を容易に作製できるようにすることにある。   The present invention has been made in view of the above-described problems, and an object of the present invention is to make it possible to easily produce a steel material stabilized in a loaded state without occupying a large test apparatus for a long period of time. Is to make it.

本発明に係る評価用鋼材の作製方法は、型枠を構成し、互いに対向する2つの壁部材(101A、101B)に夫々形成された貫通孔(1011、1012)に棒状の鋼材(10)を挿入する第1工程(S101)と、前記第1工程の後に、前記鋼材の軸方向に荷重(S)を加えた状態で固定部材(102)によって前記鋼材を前記型枠に固定する第2工程(S102)とを含むことを特徴とする。   In the method for producing a steel material for evaluation according to the present invention, a rod-shaped steel material (10) is formed in through holes (1011 and 1012) that are formed in two wall members (101A and 101B) that constitute a mold and are opposed to each other. A first step (S101) to be inserted and a second step of fixing the steel material to the formwork by a fixing member (102) in a state where a load (S) is applied in the axial direction of the steel material after the first step. (S102).

上記評価用鋼材の作製方法において、前記第2工程の後に、前記型枠内にコンクリート(103)を打設する第3工程(S103)を含んでもよい。   The method for producing a steel material for evaluation may include a third step (S103) of placing concrete (103) in the mold after the second step.

上記評価用鋼材の作製方法において、前記固定部材は、ナットであり、前記鋼材は、前記型枠から露出した部分の表面の一部にねじ山(10A)が形成され、前記第2工程は、前記ナットを前記鋼材のねじ山に締め付けることによって、前記鋼材を前記型枠に固定する工程を含んでもよい。   In the method for producing a steel material for evaluation, the fixing member is a nut, and the steel material has a thread (10A) formed on a part of a surface of a portion exposed from the mold, and the second step includes: You may include the process of fixing the steel material to the formwork by tightening the nut to the thread of the steel material.

上記評価用鋼材の作製方法において、前記鋼材の前記型枠から露出した部分を両側から引っ張ることにより前記鋼材の軸方向に荷重を加える工程を含んでもよい。   The method for producing the steel material for evaluation may include a step of applying a load in the axial direction of the steel material by pulling a portion of the steel material exposed from the mold from both sides.

なお、上記説明において括弧を付した参照符号は、図面において当該参照符号が付された構成要素の概念に含まれるものを例示するに過ぎない。   In the above description, the reference numerals with parentheses merely exemplify what are included in the concept of the constituent elements with the reference numerals in the drawings.

本発明によれば、大型の試験装置を長期間占有することなく、荷重を加えた状態で安定させた鋼材を容易に作製することが可能となる。   ADVANTAGE OF THE INVENTION According to this invention, it becomes possible to produce easily the steel material stabilized in the state which added the load, without occupying a large sized test apparatus for a long period of time.

図1は、本発明の一実施の形態に係る評価用鋼材の作製方法によって作製される試験片の材料となる鋼材の一例を示す図である。FIG. 1 is a diagram showing an example of a steel material that is a material of a test piece manufactured by a method for manufacturing an evaluation steel material according to an embodiment of the present invention. 図2は、本発明の一実施の形態に係る評価用鋼材の作製方法において用いる枠型の一例を示す図である。FIG. 2 is a diagram showing an example of a frame mold used in the method for producing an evaluation steel material according to an embodiment of the present invention. 図3は、本発明の一実施の形態に係る評価用鋼材の作製方法を説明するためのフローチャートである。FIG. 3 is a flowchart for explaining a method for producing an evaluation steel material according to an embodiment of the present invention. 図4Aは、本発明の一実施の形態に係る評価用鋼材の作製方法の各工程を説明するための図である。FIG. 4A is a diagram for explaining each step of a method for producing an evaluation steel material according to an embodiment of the present invention. 図4Bは、本発明の一実施の形態に係る評価用鋼材の作製方法の各工程を説明するための図である。Drawing 4B is a figure for explaining each process of a production method of the steel material for evaluation concerning one embodiment of the present invention. 図4Cは、本発明の一実施の形態に係る評価用鋼材の作製方法の各工程を説明するための図である。FIG. 4C is a diagram for explaining each step of the method for producing the evaluation steel material according to the embodiment of the present invention. 図4Dは、本発明の一実施の形態に係る評価用鋼材の作製方法の各工程を説明するための図である。FIG. 4D is a diagram for explaining each step of the method for producing the steel for evaluation according to the embodiment of the present invention. 図5は、本発明の一実施の形態に係る評価用鋼材の作製方法によって製造された試験片の一例を示す図である。FIG. 5 is a view showing an example of a test piece manufactured by a method for producing an evaluation steel material according to an embodiment of the present invention.

以下、本発明の実施の形態について図を参照して説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

先ず、本実施の形態に係る方法によって評価用鋼材を作製する準備段階として、予め、評価対象の試験片の材料となる鋼材10と型枠101を用意しておく。
図1は、本発明の一実施の形態に係る評価用鋼材の作製方法によって作製される試験片の材料となる鋼材の一例を示す図である。図2は、本発明の一実施の形態に係る評価用鋼材の作製方法において用いる枠型の一例を示す図である。
First, as a preparation stage for producing an evaluation steel material by the method according to the present embodiment, a steel material 10 and a mold 101 that are materials of a test piece to be evaluated are prepared in advance.
FIG. 1 is a diagram showing an example of a steel material that is a material of a test piece manufactured by a method for manufacturing an evaluation steel material according to an embodiment of the present invention. FIG. 2 is a diagram showing an example of a frame mold used in the method for producing an evaluation steel material according to an embodiment of the present invention.

図1に示される鋼材10は、評価対象の試験片の材料となる鋼を主成分とした合金であり、例えば丸棒状に形成されている。鋼材10としては、例えば、Fe−Si合金(Si:0.25%)から成り、引張強度が1450MPa、直径Φが9mmの高強度の鋼棒を用いることができる。   A steel material 10 shown in FIG. 1 is an alloy having steel as a main component as a material of a test piece to be evaluated, and is formed in a round bar shape, for example. As the steel material 10, for example, a high-strength steel rod made of an Fe—Si alloy (Si: 0.25%), having a tensile strength of 1450 MPa and a diameter Φ of 9 mm can be used.

図2に示される型枠101は、鋼材10を固定するためのものである。型枠101は、例えば、平面視矩形状で箱状の部材である。型枠101の側面を構成する壁部材10A、10Bは、例えば鋼を主成分とする金属材料から構成されており、後述するように鋼材10に引張力を加えた状態で固定しても、型枠101が変形しない程度の強度を有している。   A mold 101 shown in FIG. 2 is for fixing the steel material 10. The mold 101 is a box-like member having a rectangular shape in plan view, for example. The wall members 10A and 10B constituting the side surface of the mold 101 are made of, for example, a metal material whose main component is steel, and even if the steel member 10 is fixed in a state where a tensile force is applied as described later, The frame 101 has such a strength that it does not deform.

図2示されるように、型枠101の互いに対向する2つの壁部材101A、101Bには、貫通孔1011、1012が夫々形成されている。貫通孔1011、1012の形状は、鋼材10の軸線に直交する断面形状に合わせて形成されている。例えば、後述するように貫通孔1011,1012に鋼材10を挿入したときに、貫通孔1011,1012と鋼材10との間に隙間ができないように、貫通孔1011、1012の径が調整されている。   As shown in FIG. 2, through holes 1011 and 1012 are formed in two wall members 101 </ b> A and 101 </ b> B of the mold 101 facing each other. The shape of the through holes 1011 and 1012 is formed in accordance with the cross-sectional shape orthogonal to the axis of the steel material 10. For example, as described later, when the steel material 10 is inserted into the through holes 1011 and 1012, the diameters of the through holes 1011 and 1012 are adjusted so that there is no gap between the through holes 1011 and 1012 and the steel material 10. .

また、型枠101のサイズは、試験片としての鋼材の長さに応じて適宜決定することができる。例えば、鋼材の長さが40〜50cm程度の試験片を作製する場合には、型枠101の貫通孔1011,1012に鋼材10を挿入したときに、型枠101内の鋼材10の長さが40〜50cm程度になるように型枠101のサイズ(長さLと幅W)を決めれば良い。なお、型枠101の高さHは、例えば、後述するように型枠101内にコンクリートを打設したときに、型枠101内の鋼材10がコンクリートに十分に埋まるように決定すれば良い。   Moreover, the size of the mold 101 can be appropriately determined according to the length of the steel material as the test piece. For example, when producing a test piece having a length of about 40 to 50 cm, the length of the steel material 10 in the mold 101 when the steel material 10 is inserted into the through holes 1011 and 1012 of the mold 101. What is necessary is just to determine the size (length L and width W) of the formwork 101 so that it may become about 40-50 cm. The height H of the mold 101 may be determined so that the steel material 10 in the mold 101 is sufficiently embedded in the concrete when concrete is placed in the mold 101 as described later, for example.

図3は、本発明の一実施の形態に係る評価用鋼材の作製方法を説明するためのフローチャートである。図3には、例えば鉄筋コンクリート等に用いられる鋼材のクリープ現象による劣化を評価するために、その評価に用いる試験片としての評価用鋼材を作製する手順が示されている。   FIG. 3 is a flowchart for explaining a method for producing an evaluation steel material according to an embodiment of the present invention. FIG. 3 shows a procedure for producing an evaluation steel material as a test piece used for evaluation in order to evaluate deterioration due to a creep phenomenon of a steel material used for reinforced concrete, for example.

本発明の一実施の形態に係る評価用鋼材の作製方法では、先ず、図4Aに示されるように、型枠101の2つの貫通孔1011、1012に鋼材10を挿入する(S101)。   In the method for producing an evaluation steel material according to an embodiment of the present invention, first, as shown in FIG. 4A, the steel material 10 is inserted into the two through holes 1011 and 1012 of the mold 101 (S101).

次に、鋼材10の型枠101から露出した部分を両側から引っ張ることにより、鋼材10の軸方向に引張力を加えた状態で固定部材102によって鋼材10を型枠101に固定する(S102)。
具体的には、図4Bに示されるように、鋼材10の型枠101から露出した部分の両側を例えばジャッキ等によって一定の力Sで引っ張ることにより、鋼材10に荷重を加える。鋼材10に与える応力(引張力)の大きさは、試験内容に応じて適宜調整すればよい。例えば、JIS A 5364の試験を行う場合には、鋼材10の引張強度の0.7倍の応力を与えればよい。
Next, the steel material 10 is fixed to the mold frame 101 by the fixing member 102 in a state where a tensile force is applied in the axial direction of the steel material 10 by pulling a portion of the steel material 10 exposed from the both sides from both sides (S102).
Specifically, as shown in FIG. 4B, a load is applied to the steel material 10 by pulling both sides of a portion of the steel material 10 exposed from the mold 101 with a constant force S using, for example, a jack. What is necessary is just to adjust suitably the magnitude | size of the stress (tensile force) given to the steel material 10 according to the content of a test. For example, when the test of JIS A 5364 is performed, a stress that is 0.7 times the tensile strength of the steel material 10 may be applied.

固定部材102は、鋼材10に荷重を加えた状態で鋼材10を型枠101に固定するための部材であり、例えばナットを用いることができる。
固定部材102としてナットを用いる場合、図4Bに示すように鋼材10の型枠101から露出した部分の表面にねじ山10Aを形成しておき、図4Cに示すように、ジャッキ等によって一定の力Sで引っ張った状態において鋼材10の2つのねじ山10Aにナット102を夫々締め付けることによって、鋼材10を型枠101に固定する。鋼材10をナット102によって型枠101に固定したら、鋼材10をジャッキ等から取り外す。
The fixing member 102 is a member for fixing the steel material 10 to the mold 101 in a state where a load is applied to the steel material 10, and for example, a nut can be used.
When a nut is used as the fixing member 102, a thread 10A is formed on the surface of the portion exposed from the mold 101 of the steel material 10 as shown in FIG. 4B, and a constant force is applied by a jack or the like as shown in FIG. 4C. In the state pulled by S, the steel material 10 is fixed to the mold frame 101 by fastening the nuts 102 to the two screw threads 10A of the steel material 10 respectively. After the steel material 10 is fixed to the mold 101 with the nut 102, the steel material 10 is removed from the jack or the like.

なお、ねじ山10Aは、例えば、ステップS101で鋼材10を貫通孔1011、1012に挿入する前に形成しても良いし、鋼材10を貫通孔1011、1012に挿入した後に形成しても良く、ねじ山10Aを形成するタイミングに特に制限はない。   The screw thread 10A may be formed, for example, before the steel material 10 is inserted into the through holes 1011 and 1012 in step S101, or may be formed after the steel material 10 is inserted into the through holes 1011 and 1012. There is no restriction | limiting in particular in the timing which forms the screw thread 10A.

次に、型枠101にコンクリートを打設する(S103)。具体的には、図4Dに示されるように、セメント、砂、砂利、および水を予め決めた分量で配合したコンクリート103を型枠101内に流し込み、養生させる。その後、コンクリート103が固まったら、ナット102を残して鋼材10の両端部を切断する(S104)。これにより、図5に示されるような、引張力が加えられた試験片(評価用鋼材)1を作製することができる。   Next, concrete is placed on the mold 101 (S103). Specifically, as shown in FIG. 4D, concrete 103 in which cement, sand, gravel, and water are mixed in a predetermined amount is poured into the mold 101 and cured. After that, when the concrete 103 is hardened, both ends of the steel material 10 are cut leaving the nut 102 (S104). Thereby, the test piece (steel material for evaluation) 1 to which a tensile force is applied as shown in FIG. 5 can be produced.

以上、本実施の形態に係る評価用鋼材の作製方法によれば、定荷重試験機等の大型の試験装置を用いることなく、常温条件下において荷重を加えた状態の評価用鋼材を作製することが可能となる。これにより、例えば風雨にさらされない屋内等の予め決められた場所に作製した試験片1を設置して、予め決められた期間だけ保管し、試験片1を調べることにより、クリープ現象による鋼材の劣化を評価することが可能となる。   As described above, according to the method for producing an evaluation steel material according to the present embodiment, an evaluation steel material in a state where a load is applied under normal temperature conditions can be produced without using a large-sized test apparatus such as a constant load tester. Is possible. Accordingly, for example, by installing the test piece 1 prepared in a predetermined place such as indoors where it is not exposed to wind and rain, storing it for a predetermined period, and examining the test piece 1, thereby deteriorating the steel material due to the creep phenomenon. Can be evaluated.

また、本実施の形態に係る評価用鋼材の作製方法によれば、鋼材10を型枠101に固定した後に、枠型101内にコンクリートを打設するので、鋼材10の表面に形成された不働態膜とそれを覆うアルカリ性のコンクリートにより、荷重を加えた状態の鋼材101を非常に安定した状態で保管することが可能となる。   In addition, according to the method for producing an evaluation steel material according to the present embodiment, since the concrete is placed in the frame mold 101 after the steel material 10 is fixed to the mold frame 101, the irregularities formed on the surface of the steel material 10 are not affected. Due to the working film and the alkaline concrete covering the working film, the steel material 101 under a load can be stored in a very stable state.

また、本実施の形態に係る評価用鋼材の作製方法によれば、プレストレストコンクリートの製造方法をそのまま適用する場合に比べて、制約が少なく、容易に評価用鋼材を作製することが可能となる。例えば、本作製方法によれば、プレストレステンション方式のようにコンクリートと鋼材との付着力を利用してプレストレスを保持するのではなく、固定部材によって鋼材を型枠に固定することにより鋼材に加える荷重を一定にするので、例えば丸棒状の鋼材をそのまま用いることができ、鋼材の形状を異形にする等の制約が少ない。また、ポストテンション方式のようにグラウトを導入する必要がないので、高度な技術が不要となり、作製コストも抑えることができる。   In addition, according to the method for producing an evaluation steel material according to the present embodiment, the evaluation steel material can be easily produced with less restrictions compared to the case where the prestressed concrete production method is applied as it is. For example, according to this production method, the prestress is not retained using the adhesion force between concrete and steel as in the prestress tension method, but the steel is fixed to the formwork by fixing the steel to the formwork by a fixing member. Since the load to be applied is constant, for example, a round bar-shaped steel material can be used as it is, and there are few restrictions such as making the shape of the steel material irregular. Further, since it is not necessary to introduce grout as in the post-tension method, advanced technology is not required, and manufacturing costs can be reduced.

また、本実施の形態に係る評価用鋼材の作製方法によれば、固定部材としてナットを用いるので、容易に、鋼材を型枠に固定して荷重を加えることが可能となる。   Moreover, according to the method for producing an evaluation steel material according to the present embodiment, since a nut is used as a fixing member, it is possible to easily fix the steel material to the mold and apply a load.

以上、本発明者らによってなされた発明を実施の形態に基づいて具体的に説明したが、本発明はそれに限定されるものではなく、その要旨を逸脱しない範囲において種々変更可能であることは言うまでもない。   Although the invention made by the present inventors has been specifically described based on the embodiments, it is needless to say that the present invention is not limited thereto and can be variously modified without departing from the gist thereof. Yes.

例えば、上記実施の形態において、鋼材10を型枠101に固定した後に枠型101内にコンクリートを打設する場合を例示したが、例えば温度や湿度等が管理された場所に試験片1を長期間保管することができる場合には、枠型101内にコンクリートを打設しなくても良い。これによれば、作業工程を減らすことができるので、評価用鋼材の作製コストの更なる低減を図ることができる。   For example, in the above embodiment, a case where concrete is placed in the frame mold 101 after the steel material 10 is fixed to the mold frame 101 is illustrated. However, for example, the test piece 1 is extended to a place where temperature, humidity, and the like are controlled. When it can be stored for a period of time, it is not necessary to place concrete in the frame mold 101. According to this, since a work process can be reduced, the further reduction of the production cost of the steel material for evaluation can be aimed at.

また、上記実施の形態において、鋼材10に引張力を加えて型枠101に固定する場合を例示したが、例えば鋼材の圧縮試験用の試験片を作製する場合には、鋼材10を両端から圧縮させた状態で型枠101の内側からナット102で固定してもよい。   Moreover, in the said embodiment, although the case where the tensile force was applied to the steel material 10 and it fixed to the mold 101 was illustrated, when producing the test piece for the compression test of steel materials, for example, the steel material 10 is compressed from both ends. In this state, the nuts 102 may be fixed from the inside of the mold 101.

また、上記実施の形態において、鋼材10が丸棒形状である場合を例示したが、これに限られず、例えば鋼材10が角状であってもよい。   Moreover, in the said embodiment, although the case where the steel material 10 was a round bar shape was illustrated, it is not restricted to this, For example, the steel material 10 may be square shape.

また、上記実施の形態において、型枠101が平面視矩形状である場合を例示したが、対向する2つの壁部材に形成された貫通孔に挿入した鋼材に荷重を加えた状態で型枠に固定することができれば、型枠の形状に特に制限はない。   Moreover, in the said embodiment, although the case where the formwork 101 was a planar view rectangular shape was illustrated, in the state which applied the load to the steel materials inserted in the through-hole formed in the two opposing wall members, There is no particular limitation on the shape of the mold as long as it can be fixed.

1…試験片(評価用鋼材)、10…鋼材、10A…ねじ山、101…型枠、1011、1012…貫通孔、101A、101B…壁部材、102…固定部材(ナット)、103…コンクリート、引張力…S。   DESCRIPTION OF SYMBOLS 1 ... Test piece (steel material for evaluation), 10 ... Steel material, 10A ... Thread, 101 ... Formwork, 1011, 1012 ... Through-hole, 101A, 101B ... Wall member, 102 ... Fixing member (nut), 103 ... Concrete, Tensile force ... S.

Claims (4)

型枠を構成し、互いに対向する2つの壁部材に夫々形成された貫通孔に棒状の鋼材を挿入する第1工程と、
前記第1工程の後に、前記鋼材の軸方向に荷重を加えた状態で固定部材によって前記鋼材を前記型枠に固定する第2工程と、を含む
ことを特徴とする評価用鋼材の作製方法。
A first step of constituting a formwork and inserting a rod-shaped steel material into through-holes respectively formed in two wall members facing each other;
After the first step, a second step of fixing the steel material to the formwork by a fixing member in a state in which a load is applied in the axial direction of the steel material.
請求項1に記載の評価用鋼材の作製方法において、
前記第2工程の後に、前記型枠内にコンクリートを打設する第3工程を含む
ことを特徴とする評価用鋼材の作製方法。
In the manufacturing method of the steel materials for evaluation according to claim 1,
After the second step, the method includes a third step of placing concrete in the mold.
請求項1または2に記載の評価用鋼材の作製方法において、
前記固定部材は、ナットであり、
前記第1工程の前あるいは後に、前記鋼材は、前記型枠から露出する部分の表面の一部にねじ山形成
前記第2工程は、前記ナットを前記鋼材のねじ山に締め付けることによって、前記鋼材を前記型枠に固定する工程を含む
ことを特徴とする評価用鋼材の作製方法。
In the manufacturing method of the steel material for evaluation of Claim 1 or 2,
The fixing member is a nut;
Wherein before or after the first step, wherein the steel material, the thread is formed on part of the surface of the portion exposed from the mold,
Said 2nd process includes the process of fixing the said steel material to the said formwork by fastening the said nut to the thread of the said steel material. The manufacturing method of the steel material for evaluation characterized by the above-mentioned.
請求項1乃至3の何れか一項に記載の評価用鋼材の作製方法において、
前記第2工程は、前記鋼材の前記型枠から露出した部分を両側から引っ張ることにより前記鋼材の軸方向に荷重を加える工程を含む、
ことを特徴とする評価用鋼材の作製方法。
In the manufacturing method of the steel material for evaluation as described in any one of Claims 1 thru | or 3,
The second step includes a step of applying a load in the axial direction of the steel material by pulling a portion exposed from the mold of the steel material from both sides.
A method for producing a steel material for evaluation characterized by the above.
JP2014147396A 2014-07-18 2014-07-18 Method for producing steel for evaluation Active JP6174531B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014147396A JP6174531B2 (en) 2014-07-18 2014-07-18 Method for producing steel for evaluation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014147396A JP6174531B2 (en) 2014-07-18 2014-07-18 Method for producing steel for evaluation

Publications (2)

Publication Number Publication Date
JP2016024003A JP2016024003A (en) 2016-02-08
JP6174531B2 true JP6174531B2 (en) 2017-08-02

Family

ID=55270884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014147396A Active JP6174531B2 (en) 2014-07-18 2014-07-18 Method for producing steel for evaluation

Country Status (1)

Country Link
JP (1) JP6174531B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5510573A (en) * 1978-07-11 1980-01-25 Hitachi Metals Ltd Creep test method
JP2977713B2 (en) * 1994-02-22 1999-11-15 日野自動車工業株式会社 Bolt delayed fracture test equipment
JP3205291B2 (en) * 1997-11-19 2001-09-04 日本防蝕工業株式会社 Prediction method of corrosion state of steel in concrete
JP2007199024A (en) * 2006-01-30 2007-08-09 Toyota Motor Corp Method for delayed fracture test on ferrous material, method for delayed fracture of bolt and fixture for delayed fracture test
JP5467026B2 (en) * 2010-10-21 2014-04-09 新日鐵住金株式会社 Method for evaluating delayed fracture characteristics of PC steel

Also Published As

Publication number Publication date
JP2016024003A (en) 2016-02-08

Similar Documents

Publication Publication Date Title
Sonck et al. Lateral–torsional buckling resistance of cellular beams
Zhang et al. Fatigue behavior of corroded prestressed concrete beams
Alias et al. Structural performance of grouted sleeve connectors with and without transverse reinforcement for precast concrete structure
CN106872259B (en) Method for calculating maximum crack width of flexural member configured with high-strength steel bar and calculating method for determining sectional area of high-strength steel bar
KR102369006B1 (en) High elongation fibres
KR20120031942A (en) High elongation fibre with good anchorage
JP2016102323A (en) Design method of prestress concrete girder
Tavio et al. Tensile strength/yield strength (TS/YS) ratios of high-strength steel (HSS) reinforcing bars
JP2014092416A (en) Method of manufacturing reinforced concrete specimen
JP6174531B2 (en) Method for producing steel for evaluation
Shimizu et al. Experimental study on ultimate strength of concrete filled double tubular steel with shear connector
Seong1b et al. Tensile behavior of new 2,200 MPa and 2,400 MPa strands according to various types of mono anchorage
KR101802790B1 (en) Method of Manufacturing Preflex Girder
Turker et al. Pullout capacity development of cast in place anchors with embedded studs
JP6232300B2 (en) Re-fixing method for existing PC steel
Mohammed et al. Analytical Study on Effect of Bar size on Pull-out force for Reinforcing bar embedded in Concrete Blocks
JP5571613B2 (en) Method for reinforcing concrete members
US20170016231A1 (en) Compact anchor for post-tensioned concrete segment
Yim et al. Experimental study on the transfer length in pretensioned prestressed concrete beam using 2,400 MPa PS strand
JP2016130638A (en) Method for evaluating hydrogen embrittlement characteristics
JP2009168608A (en) Method of introducing crack into inner peripheral surface of piping
JP2015010978A (en) Method for preparing sample
JP2005171581A (en) Method of manufacturing prestressed concrete member
Witjaksana Additional steel fibers in concrete mixture: Studies of compressive and tensile strength of concrete
JP2009121089A (en) Beam made of precast prestressed reinforced concrete and manufacturing method of the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160909

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170414

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170425

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170609

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170704

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170706

R150 Certificate of patent or registration of utility model

Ref document number: 6174531

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150