JP6143667B2 - Prediction system, monitoring system, operation support system, gas turbine equipment, and prediction method - Google Patents

Prediction system, monitoring system, operation support system, gas turbine equipment, and prediction method Download PDF

Info

Publication number
JP6143667B2
JP6143667B2 JP2013273461A JP2013273461A JP6143667B2 JP 6143667 B2 JP6143667 B2 JP 6143667B2 JP 2013273461 A JP2013273461 A JP 2013273461A JP 2013273461 A JP2013273461 A JP 2013273461A JP 6143667 B2 JP6143667 B2 JP 6143667B2
Authority
JP
Japan
Prior art keywords
prediction
calculated
process data
value
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2013273461A
Other languages
Japanese (ja)
Other versions
JP2015127914A (en
Inventor
野村 真澄
真澄 野村
佐川 功
功 佐川
康文 藤井
康文 藤井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2013273461A priority Critical patent/JP6143667B2/en
Publication of JP2015127914A publication Critical patent/JP2015127914A/en
Application granted granted Critical
Publication of JP6143667B2 publication Critical patent/JP6143667B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Description

本発明は、設備に関する所定の物理量を予測する予測システム、監視システム、運転支援システム、ガスタービン設備及び予測方法に関するものである。   The present invention relates to a prediction system, a monitoring system, an operation support system, a gas turbine facility, and a prediction method for predicting a predetermined physical quantity related to equipment.

従来、観測データ、学習データを用いて、異常を検知する異常検知システムが知られている(例えば、特許文献1参照)。この異常検知システムは、観測データと学習データとのかい離度に基づいて、観測データの異常を検知している。   Conventionally, an anomaly detection system that detects an anomaly using observation data and learning data is known (see, for example, Patent Document 1). This abnormality detection system detects an abnormality in observation data based on the degree of separation between the observation data and the learning data.

国際公開第2010/095314号International Publication No. 2010/095314

しかしながら、特許文献1に記載の異常検知システムは、観測センサデータから、複数の識別器を用いて、異常の有無を2値化して検知することから、定量的な検知を行うことができない。   However, the abnormality detection system described in Patent Document 1 cannot detect quantitatively because the presence or absence of abnormality is binarized and detected from observation sensor data using a plurality of discriminators.

そこで、本発明は、設備に関する所定の物理量を定量的にかつ安定的に予測することができる予測システム、監視システム、運転支援システム、ガスタービン設備及び予測方法を提供することを課題とする。   Accordingly, an object of the present invention is to provide a prediction system, a monitoring system, an operation support system, a gas turbine facility, and a prediction method capable of quantitatively and stably predicting a predetermined physical quantity related to the facility.

本発明の予測システムは、設備において取得可能な種々のプロセスデータを格納する記憶部と、前記記憶部に格納された前記プロセスデータに基づいて、前記設備に関する予測される所定の物理量を予測値として算出する演算部と、を備え、前記演算部は、前記記憶部に格納された種々の前記プロセスデータのうち、複数の前記プロセスデータを1組のデータセットとして、複数組分だけ取得し、取得した各組の前記データセットに基づいて、前記予測値を算出するための予測モデルをそれぞれ構築し、構築した複数の前記予測モデルから前記予測値をそれぞれ算出し、算出した複数の前記予測値を統合して、統合された前記予測値を算出することを特徴とする。   The prediction system of the present invention uses a storage unit that stores various process data that can be acquired in a facility, and a predetermined physical quantity that is predicted for the facility based on the process data stored in the storage unit as a predicted value. A calculation unit that calculates, and the calculation unit acquires a plurality of the process data as a set of data among the various process data stored in the storage unit, and acquires Based on the data set of each set, a prediction model for calculating the prediction value is constructed, respectively, the prediction value is calculated from the plurality of constructed prediction models, and the calculated plurality of prediction values Integration is performed, and the integrated prediction value is calculated.

また、本発明の予測方法は、設備において取得可能な種々のプロセスデータに基づいて、前記設備に関する所定の物理量を予測する予測方法であって、種々の前記プロセスデータのうち、複数の前記プロセスデータを1組のデータセットとして、複数組分だけ取得するデータセット取得工程と、取得した各組の前記データセットに基づいて、予測値を算出するための予測モデルをそれぞれ構築する予測モデル構築工程と、構築した複数の前記予測モデルから前記予測値をそれぞれ算出する予測値算出工程と、算出した複数の前記予測値を統合して、統合された前記予測値を算出する予測値統合工程と、を備えることを特徴とする。   The prediction method of the present invention is a prediction method for predicting a predetermined physical quantity related to the equipment based on various process data that can be acquired in the equipment, and a plurality of the process data among the various process data. A data set acquisition step for acquiring a plurality of sets as a set of data sets, and a prediction model construction step for building a prediction model for calculating a prediction value based on the acquired data sets of each set, A predicted value calculation step for calculating each of the predicted values from the plurality of constructed prediction models, and a predicted value integration step for calculating the integrated predicted values by integrating the calculated plurality of predicted values. It is characterized by providing.

この構成によれば、複数組のデータセットを用いて、複数の予測モデルを構築することができる。そして、複数の予測モデルから複数の予測値を算出し、算出した複数の予測値を統合することができる。このため、複数の予測モデルを用いることで、単一の予測モデルを用いる場合に比べて、予測値を安定的に算出することができる。このとき、予測モデルは、定量的な値として予測値を導出することができる。このため、プロセスデータに基づいて、設備に関する所定の物理量を、定量的な予測値として算出することができる。なお、設備に関する所定の物理量としては、例えば、設備の所定の部位(ガスタービン設備であれば圧縮器、燃焼器、タービンやその内部流体等)における温度、圧力、流量、振動等であり、特に限定されない。   According to this configuration, a plurality of prediction models can be constructed using a plurality of data sets. Then, a plurality of prediction values can be calculated from a plurality of prediction models, and the calculated plurality of prediction values can be integrated. For this reason, by using a plurality of prediction models, it is possible to stably calculate the prediction value as compared to the case of using a single prediction model. At this time, the prediction model can derive the prediction value as a quantitative value. For this reason, based on process data, the predetermined physical quantity regarding equipment can be calculated as a quantitative prediction value. The predetermined physical quantity related to the equipment is, for example, the temperature, pressure, flow rate, vibration, etc. in a predetermined part of the equipment (compressor, combustor, turbine, internal fluid, etc. in the case of gas turbine equipment) It is not limited.

この場合、前記演算部は、構築した複数の前記予測モデルのモデル特性に応じて、算出された複数の前記予測値を補正して統合し、統合された前記予測値を算出することが好ましい。   In this case, it is preferable that the arithmetic unit corrects and integrates the plurality of calculated prediction values according to model characteristics of the plurality of constructed prediction models, and calculates the integrated prediction values.

この構成によれば、予測モデルのモデル特性に応じて、予測値を補正することができるため、統合して算出された予測値の予測精度を向上させることができる。   According to this configuration, the prediction value can be corrected according to the model characteristics of the prediction model, so that the prediction accuracy of the prediction value calculated by integration can be improved.

この場合、前記予測モデルの前記モデル特性は、例えば、前記予測モデルの予測精度の誤差であり、前記演算部は、構築した複数の前記予測モデルの前記予測精度の前記誤差に応じて、算出された複数の前記予測値を加重平均することで補正を行っており、前記誤差が大きい前記予測モデルから算出された前記予測値に対しては、重み付けを小さくし、前記誤差が小さい前記予測モデルから算出された前記予測値に対しては、重み付けを大きくすることが好ましい。   In this case, the model characteristic of the prediction model is, for example, an error in prediction accuracy of the prediction model, and the calculation unit is calculated according to the error in the prediction accuracy of the plurality of prediction models constructed. Correction is performed by weighted averaging the plurality of prediction values, and the prediction value calculated from the prediction model having a large error is reduced in weight, and the prediction model having a small error is reduced from the prediction model. It is preferable to increase the weighting for the calculated predicted value.

この構成によれば、演算部は、誤差が大きい予測モデルから算出された予測値に対して、重み付けを小さくすることができるため、統合された予測値に対する誤差の影響を小さくすることができる。また、演算部は、誤差が小さい予測モデルから算出された予測値に対して、重み付けを大きくすることができるため、統合された予測値に対する誤差の影響を小さくすることができる。これにより、演算部は、統合された予測値の予測精度を向上させることができる。   According to this configuration, the calculation unit can reduce the weighting of the prediction value calculated from the prediction model having a large error, and thus can reduce the influence of the error on the integrated prediction value. In addition, since the calculation unit can increase the weighting for the prediction value calculated from the prediction model with a small error, the influence of the error on the integrated prediction value can be reduced. Thereby, the calculating part can improve the prediction precision of the integrated prediction value.

この場合、前記演算部は、前記誤差が、予め設定された限界誤差よりも大きい場合、前記限界誤差よりも前記誤差が大きい前記予測モデルから算出された前記予測値の統合を不実行とすることが好ましい。   In this case, when the error is larger than a preset limit error, the calculation unit does not execute the integration of the prediction values calculated from the prediction model in which the error is larger than the limit error. Is preferred.

この構成によれば、演算部は、誤差が大きい予測モデルにより算出される予測値を、他の予測値と統合しないため、統合された予測値に対して、誤差の影響を与えることがない。なお、誤差が大きい予測モデルにより算出される予測値は、例えば、重み付けをゼロとすることで、他の予測値との統合を不実行とすることができる。   According to this configuration, since the calculation unit does not integrate the prediction value calculated by the prediction model having a large error with other prediction values, the integrated prediction value is not affected by the error. In addition, the prediction value calculated by the prediction model with a large error can be made non-executable with other prediction values by setting the weighting to zero, for example.

この場合、前記演算部は、前記データセットに含まれる前記プロセスデータを選定することが好ましい。   In this case, it is preferable that the calculation unit selects the process data included in the data set.

この構成によれば、演算部は、データセットに含まれるプロセスデータを選定することができるため、データセットに含まれる全てのプロセスデータを用いずに、データセットに含まれる一部のプロセスデータを用いることが可能となる。なお、プロセスデータの選定については、特に限定されず、任意の手法によって選定してもよい。例えば、算出する予測値の物理量に対して、相関係数の高いプロセスデータを選定してもよい。また、プロセスデータをランダムに選定してもよいし、予めオペレータにより選択されたプロセスデータを選定してもよい。さらに、変数減少法またはステップワイズ法等の統計的手法を用いて、プロセスデータを選定してもよいし、総当たりでプロセスデータを選定してもよい。   According to this configuration, since the calculation unit can select the process data included in the data set, a part of the process data included in the data set is not used without using all the process data included in the data set. It can be used. The selection of process data is not particularly limited, and may be selected by any method. For example, process data having a high correlation coefficient may be selected for the physical quantity of the predicted value to be calculated. Further, the process data may be selected at random, or the process data selected in advance by the operator may be selected. Furthermore, the process data may be selected using a statistical method such as a variable reduction method or a stepwise method, or the process data may be selected as a brute force.

この場合、前記記憶部には、所定のサンプリング周期で前記プロセスデータが格納され、前記演算部は、前記データセットを取得する場合、前記サンプリング周期を異ならせた前記データセットを複数組分だけ取得し、前記サンプリング周期が異なる複数組の前記データセットに基づいて、前記予測モデルをそれぞれ構築することが好ましい。   In this case, the process data is stored in the storage unit at a predetermined sampling cycle, and the calculation unit acquires a plurality of sets of the data sets with different sampling cycles when acquiring the data set. And it is preferable to construct | assemble each said prediction model based on the said several data sets from which the said sampling period differs.

この構成によれば、サンプリング周期を異ならせたデータセットに基づいて、複数の予測モデルを構築することができる。このため、設備に関する所定の物理量の応答性を考慮した予測モデルを構築することができる。具体的に、設備に設けられる配管の所定の部位において流通する流体の流量は、所定の部位の上流側における流体の圧力の変化によって変化する場合がある。この場合、流体の圧力の変化が、下流側の流体の流量の変化として現れるには、所定の応答時間がかかる。このため、サンプリング周期を異ならせることで、応答時間を考慮した予測モデルを構築することができ、これにより、予測モデルの予測精度を向上させることができる。   According to this configuration, a plurality of prediction models can be constructed based on data sets with different sampling periods. For this reason, it is possible to construct a prediction model that takes into account the responsiveness of a predetermined physical quantity related to equipment. Specifically, the flow rate of the fluid flowing in a predetermined part of the pipe provided in the facility may change due to a change in the pressure of the fluid upstream of the predetermined part. In this case, it takes a predetermined response time for the change in the fluid pressure to appear as a change in the flow rate of the downstream fluid. For this reason, the prediction model which considered response time can be constructed | assembled by varying a sampling period, and, thereby, the prediction accuracy of a prediction model can be improved.

本発明の監視システムは、上記の予測システムと、前記予測システムによって算出される前記予測値を用いて、前記設備を監視する監視装置と、を備えることを特徴とする。   A monitoring system according to the present invention includes the above prediction system and a monitoring device that monitors the facility using the prediction value calculated by the prediction system.

この構成によれば、監視装置は、予測システムによって算出される定量的な予測値を用いて、設備を監視することができる。このため、監視装置は、予測値が異常値となる場合、実測値が異常値になる前に、オペレータに対して警告等を発することができる。このため、監視装置は、設備の挙動を予測しながら監視することができる。   According to this configuration, the monitoring apparatus can monitor the facility using the quantitative prediction value calculated by the prediction system. For this reason, when the predicted value becomes an abnormal value, the monitoring device can issue a warning or the like to the operator before the actually measured value becomes an abnormal value. For this reason, the monitoring device can perform monitoring while predicting the behavior of the facility.

本発明の運転支援システムは、上記の予測システムと、前記予測システムによって算出される前記予測値を用いて、前記設備の運転を支援する運転支援装置と、を備えることを特徴とする。   The driving support system of the present invention includes the above-described prediction system and a driving support device that supports driving of the facility using the predicted value calculated by the prediction system.

この構成によれば、運転支援装置は、予測システムによって算出される定量的な予測値を用いて、設備の運転を支援することができる。このため、運転支援装置は、予測値に基づいて、設備が効率の良い運転となるように支援することができる。   According to this configuration, the driving support device can support the operation of the facility using the quantitative prediction value calculated by the prediction system. For this reason, the driving assistance device can assist the facility to operate efficiently based on the predicted value.

本発明のガスタービン設備は、上記の予測システム、上記の監視システム及び上記の運転支援システムの少なくとも1つのシステムと、前記設備としてのガスタービンと、を備えることを特徴とする。   A gas turbine facility according to the present invention includes at least one of the prediction system, the monitoring system, and the operation support system, and a gas turbine as the facility.

この構成によれば、ガスタービンに関する所定の物理量を予測したり、ガスタービンの挙動を予測しながら監視したり、ガスタービンが効率の良い運転となるように支援したりすることができる。   According to this configuration, it is possible to predict a predetermined physical quantity related to the gas turbine, to monitor while predicting the behavior of the gas turbine, or to assist the gas turbine in an efficient operation.

図1は、実施例1に係るガスタービン設備の概略構成図である。FIG. 1 is a schematic configuration diagram of a gas turbine facility according to a first embodiment. 図2は、予測モデルの構築に関するフローチャートである。FIG. 2 is a flowchart regarding the construction of the prediction model. 図3は、統合された予測値の算出に関するフローチャートである。FIG. 3 is a flowchart relating to calculation of an integrated prediction value. 図4は、データセットの取得に関するフローチャートである。FIG. 4 is a flowchart regarding acquisition of a data set. 図5は、実施例2におけるデータセットの取得に関するフローチャートである。FIG. 5 is a flowchart regarding acquisition of a data set according to the second embodiment.

以下に、本発明に係る実施例を図面に基づいて詳細に説明する。なお、この実施例によりこの発明が限定されるものではない。また、下記実施例における構成要素には、当業者が置換可能かつ容易なもの、あるいは実質的に同一のものが含まれる。   Embodiments according to the present invention will be described below in detail with reference to the drawings. Note that the present invention is not limited to the embodiments. In addition, constituent elements in the following embodiments include those that can be easily replaced by those skilled in the art or those that are substantially the same.

図1は、実施例1に係るガスタービン設備の概略構成図である。図2は、予測モデルの構築に関するフローチャートである。図3は、統合された予測値の算出に関するフローチャートである。図4は、データセットの取得に関するフローチャートである。   FIG. 1 is a schematic configuration diagram of a gas turbine facility according to a first embodiment. FIG. 2 is a flowchart regarding the construction of the prediction model. FIG. 3 is a flowchart relating to calculation of an integrated prediction value. FIG. 4 is a flowchart regarding acquisition of a data set.

図1に示すように、実施例1に係る予測システム20は、例えば、ガスタービン発電プラント等のガスタービン設備1に組み込まれており、ガスタービン設備1に関する所定の物理量を予測するシステムとなっている。先ず、予測システム20の説明に先立ち、ガスタービン設備1について説明する。   As illustrated in FIG. 1, the prediction system 20 according to the first embodiment is incorporated in a gas turbine facility 1 such as a gas turbine power plant, for example, and is a system that predicts a predetermined physical quantity related to the gas turbine facility 1. Yes. First, the gas turbine facility 1 will be described prior to the description of the prediction system 20.

ガスタービン設備1は、ガスタービン(設備)10と、予測システム20と、監視システム30と、運転支援システム40とを備える。このとき、監視システム30は、上記の予測システム20と、監視装置31とを含んで構成され、また、運転支援システム40は、上記の予測システム20と、運転支援装置41とを含んで構成されている。   The gas turbine equipment 1 includes a gas turbine (equipment) 10, a prediction system 20, a monitoring system 30, and an operation support system 40. At this time, the monitoring system 30 is configured to include the prediction system 20 and the monitoring device 31, and the driving support system 40 is configured to include the prediction system 20 and the driving support device 41. ing.

ガスタービン10は、図示しない圧縮機、燃焼器及びタービンを有しており、圧縮機とタービンは、回転軸により一体回転可能に連結されている。圧縮機は、取り込んだ空気を圧縮し、圧縮した圧縮空気を燃焼器へ向けて供給する。燃焼器は、圧縮機から供給された圧縮空気と、燃料とを混合して燃焼する。タービンは、燃焼器から供給された燃焼ガスにより回転する。   The gas turbine 10 includes a compressor, a combustor, and a turbine (not shown), and the compressor and the turbine are coupled to each other by a rotating shaft so as to be integrally rotatable. A compressor compresses the taken-in air and supplies the compressed air compressed toward the combustor. The combustor mixes and burns the compressed air supplied from the compressor and fuel. The turbine is rotated by the combustion gas supplied from the combustor.

このガスタービン10には、ガスタービン10の運転状況を検知するための各種センサが設けられている。各種センサとしては、例えば、ガスタービン10を構成する圧縮機、燃焼器、タービン内の圧力を検出する圧力センサ11、同温度を検出する温度センサ12等がある。これら各種センサによって検出されたデータは、プロセスデータD1として、データベース22に入力される。また、ガスタービン10には、燃料流量を調整する弁13、圧縮器に取り込む空気を調整する案内翼14等が設けられている。弁13の開度、案内翼14の角度等に関するデータは、プロセスデータD1として、データベース22に入力される。ここで、データベース22には、各種センサ11,12によって取得したデータ、及び弁13、案内翼14に関するデータの他、ガスタービン10を運転するにあたってオペレータにより入力されたデータが、プロセスデータD1として入力される。つまり、データベース22に入力されるプロセスデータD1は、ガスタービン10に関するデータであれば、特に限定されない。   The gas turbine 10 is provided with various sensors for detecting the operation status of the gas turbine 10. Examples of the various sensors include a compressor, a combustor, a pressure sensor 11 that detects a pressure in the turbine, and a temperature sensor 12 that detects the temperature. Data detected by these various sensors is input to the database 22 as process data D1. Further, the gas turbine 10 is provided with a valve 13 for adjusting the fuel flow rate, a guide vane 14 for adjusting air taken into the compressor, and the like. Data relating to the opening degree of the valve 13 and the angle of the guide vanes 14 are input to the database 22 as process data D1. Here, in addition to the data acquired by the various sensors 11 and 12 and the data related to the valves 13 and the guide vanes 14, the data input by the operator when operating the gas turbine 10 is input to the database 22 as process data D1. Is done. That is, the process data D1 input to the database 22 is not particularly limited as long as it is data related to the gas turbine 10.

次に、予測システム20について説明する。予測システム20は、予測装置21と、プロセスデータD1を格納する上記のデータベース(記憶部)22とを含んで構成されている。予測装置21は、データベース22に格納されたプロセスデータD1に基づいて、ガスタービン10に関する所定の物理量を予測している。所定の物理量としては、例えば、ガスタービン10を構成する圧縮器、燃焼器、タービンやその内部流体等における温度、圧力、流量、振動等である。なお、所定の物理量は、ガスタービン10に関する物理量であれば、特に限定されない。   Next, the prediction system 20 will be described. The prediction system 20 includes a prediction device 21 and the database (storage unit) 22 that stores the process data D1. The prediction device 21 predicts a predetermined physical quantity related to the gas turbine 10 based on the process data D1 stored in the database 22. Examples of the predetermined physical quantity include temperature, pressure, flow rate, vibration, and the like in a compressor, a combustor, a turbine, and an internal fluid of the gas turbine 10. The predetermined physical quantity is not particularly limited as long as it is a physical quantity related to the gas turbine 10.

予測装置21は、データベース22と接続されており、予測される所定の物理量を予測値として算出する演算部25を有している。演算部25は、集積回路を含んで構成され、所定のプログラムを実行することで、各種演算を実行する。具体的に、演算部25は、予測プログラムを実行することで、データベース22に格納されたプロセスデータD1に基づいて、ガスタービン10に関する予測される所定の物理量を予測値として算出する。なお、予測装置21による予測値の算出については後述する。   The prediction device 21 is connected to the database 22 and includes a calculation unit 25 that calculates a predetermined physical quantity to be predicted as a predicted value. The calculation unit 25 includes an integrated circuit, and executes various calculations by executing a predetermined program. Specifically, the arithmetic unit 25 calculates a predetermined physical quantity to be predicted for the gas turbine 10 as a predicted value based on the process data D1 stored in the database 22 by executing a prediction program. The calculation of the predicted value by the prediction device 21 will be described later.

データベース22は、ガスタービン10から入力される種々のプロセスデータD1を格納している。このデータベース22には、所定のサンプリング周期でプロセスデータD1が蓄積される。データベース22は、予測装置21と接続されており、予測装置21の要求に応じて、所定のプロセスデータD1を予測装置21へ向けて出力する。   The database 22 stores various process data D1 input from the gas turbine 10. In the database 22, process data D1 is accumulated at a predetermined sampling period. The database 22 is connected to the prediction device 21 and outputs predetermined process data D1 to the prediction device 21 in response to a request from the prediction device 21.

監視装置31は、予測システム20に接続されており、予測システム20で予測された予測値を用いて、ガスタービン10の運転状況を監視している。この監視装置31は、例えば、オペレータに対し所定の情報を報知する警報機、ランプ及び表示装置等の報知装置を有している。監視装置31は、予測システム20で予測された予測値が、予め設定された異常値を超えた場合、オペレータに対して報知装置による異常報知を実行する。このように、監視装置31は、実測値が異常値となる前に、ガスタービン10の異常を予見する。   The monitoring device 31 is connected to the prediction system 20 and monitors the operation status of the gas turbine 10 using the predicted value predicted by the prediction system 20. The monitoring device 31 includes a notification device such as an alarm device, a lamp, and a display device that notifies the operator of predetermined information. When the predicted value predicted by the prediction system 20 exceeds a preset abnormal value, the monitoring device 31 performs abnormality notification by the notification device to the operator. Thus, the monitoring device 31 predicts an abnormality of the gas turbine 10 before the actually measured value becomes an abnormal value.

運転支援装置41は、予測システム20に接続されており、予測システム20で予測された予測値を用いて、ガスタービン10の運転を支援している。この運転支援装置41は、例えば、予測システム20で予測された予測値が、ガスタービン10が効率の良い運転となる所定の物理量となるように、ガスタービン10の運転に関する支援をオペレータに対して行う。   The driving support device 41 is connected to the prediction system 20 and uses the predicted value predicted by the prediction system 20 to support the operation of the gas turbine 10. For example, the operation support device 41 provides support for the operation of the gas turbine 10 to the operator so that the predicted value predicted by the prediction system 20 becomes a predetermined physical quantity that allows the gas turbine 10 to operate efficiently. Do.

次に、予測装置21の演算部25による予測値の演算制御について説明する。予測装置21の演算部25は、予測値を算出するにあたって、データ抽出制御と、予測モデル構築制御と、予測値算出制御と、予測値統合制御とを実行している。   Next, prediction value calculation control by the calculation unit 25 of the prediction device 21 will be described. The calculation unit 25 of the prediction device 21 performs data extraction control, prediction model construction control, prediction value calculation control, and prediction value integration control when calculating a prediction value.

演算部25は、データ抽出制御を実行することで、データベース22に格納された種々のプロセスデータD1のうち、複数のプロセスデータD1を1組のデータセットとして、複数組分だけを抽出(取得)する。抽出される複数組のデータセットは、含まれるプロセスデータD1の数または種別等が異なるものとなっている。また、データセットは、予測する物理量に応じて適宜用意されている。なお、データセットに含まれるプロセスデータD1は、演算部25により自動で選定して取得してもよいし、予め決定されたものを取得してもよく、特に限定されない。ここで、演算部25は、データセットに含まれるプロセスデータD1を自動で選定する場合、例えば、予測値として算出する物理量に対して相関係数の高いプロセスデータD1を選定してもよいし、プロセスデータD1をランダムに選定してもよいし、予めオペレータにより選択されたプロセスデータD1を選定してもよい。また、変数減少法またはステップワイズ法等の統計的手法を用いて、プロセスデータD1を選定してもよいし、総当たりでプロセスデータD1を選定してもよい。   The calculation unit 25 executes data extraction control, and extracts (acquires) only a plurality of sets from the various process data D1 stored in the database 22 with the plurality of process data D1 as one set. To do. The plurality of extracted data sets have different numbers or types of process data D1 included. Further, the data set is appropriately prepared according to the predicted physical quantity. The process data D1 included in the data set may be automatically selected and acquired by the calculation unit 25, or may be acquired in advance, and is not particularly limited. Here, when the calculation unit 25 automatically selects the process data D1 included in the data set, for example, the calculation unit 25 may select the process data D1 having a high correlation coefficient with respect to the physical quantity calculated as the predicted value. The process data D1 may be selected at random, or the process data D1 previously selected by the operator may be selected. In addition, the process data D1 may be selected by using a statistical method such as a variable reduction method or a stepwise method, or the process data D1 may be selected in a round robin manner.

演算部25は、予測モデル構築制御を実行することで、抽出したデータセットに基づいて予測モデルを構築する。予測モデルとしては、例えば、プロセスデータD1を入力変数とする多変量解析モデルがあるが、これに限定されず、他の解析モデルや非線形のニューラルネットワークを適用してもよい。また、構築される予測モデルは、定量的な予測値を算出可能な予測モデルとなっている。予測モデル構築制御では、1つのデータセットに対して、1つの予測モデルが構築されることから、データ抽出制御において抽出された複数組のデータセットに対して、複数の予測モデルが構築される。   The computing unit 25 constructs a prediction model based on the extracted data set by executing prediction model construction control. As the prediction model, for example, there is a multivariate analysis model using the process data D1 as an input variable, but the present invention is not limited to this, and another analysis model or a non-linear neural network may be applied. Moreover, the constructed prediction model is a prediction model that can calculate a quantitative prediction value. In the prediction model construction control, since one prediction model is constructed for one data set, a plurality of prediction models are constructed for a plurality of data sets extracted in the data extraction control.

演算部25は、予測値算出制御を実行することで、構築された複数の予測モデルを用いて予測値をそれぞれ算出する。   The calculation unit 25 calculates predicted values using the plurality of constructed prediction models by executing predicted value calculation control.

演算部25は、予測値統合制御を実行することで、算出した複数の予測値を統合する。この予測値統合制御では、予測モデルのモデル特性に応じて、算出された複数の予測値を補正して統合し、統合された予測値を算出している。具体的に、予測モデルのモデル特性は、例えば、予測モデルの予測精度の誤差であり、予測値統合制御では、予測モデルの予測精度の誤差に応じて、算出された複数の予測値を加重平均している。つまり、予測値統合制御では、誤差が大きい予測モデルから算出された予測値に対しては、重み付けを小さくし、誤差が小さい予測モデルから算出された予測値に対しては、重み付けを大きくしている。このとき、予測値統合制御では、予測モデルの誤差が、予め設定された限界誤差よりも大きい場合、限界誤差よりも誤差が大きい予測モデルから算出された予測値に対しては、重み付けをゼロとすることで、予測値の統合を不実行としている。   The calculation unit 25 integrates the plurality of calculated prediction values by executing the prediction value integration control. In this prediction value integration control, a plurality of calculated prediction values are corrected and integrated according to the model characteristics of the prediction model, and an integrated prediction value is calculated. Specifically, the model characteristic of the prediction model is, for example, an error in the prediction accuracy of the prediction model. In the prediction value integrated control, a plurality of calculated prediction values are weighted average according to the prediction accuracy error of the prediction model. doing. That is, in the prediction value integrated control, the weighting is reduced for the prediction value calculated from the prediction model having a large error, and the weighting is increased for the prediction value calculated from the prediction model having the small error. Yes. At this time, in the prediction value integrated control, when the error of the prediction model is larger than the preset limit error, the weight is set to zero for the prediction value calculated from the prediction model having the error larger than the limit error. By doing so, the integration of predicted values is not performed.

次に、図2から図4を参照して、予測システム20によって、ガスタービン10に関する所定の物理量を予測する予測方法について説明する。先ず、図2を参照して、予測システム20において予測モデルを構築する制御動作について説明する。ガスタービン10において取得される種々のプロセスデータD1が、データベース22に入力される(ステップS11)と、入力されたプロセスデータD1は、データベース22に格納される(ステップS12)。予測装置21の演算部25は、予測モデルを構築する場合、先ず、データ抽出制御を実行することで、データベース22から複数組のデータセットを抽出する(ステップS13:データセット取得工程)。この後、演算部25は、予測モデル構築制御を実行することで、抽出した複数組のデータセットから、複数の予測モデルを構築(作成)する(ステップS14:予測モデル構築工程)。そして、演算部25は、予測モデルを構築する制御動作を終了する。   Next, a prediction method for predicting a predetermined physical quantity related to the gas turbine 10 by the prediction system 20 will be described with reference to FIGS. 2 to 4. First, with reference to FIG. 2, the control operation | movement which builds a prediction model in the prediction system 20 is demonstrated. When various process data D1 acquired in the gas turbine 10 is input to the database 22 (step S11), the input process data D1 is stored in the database 22 (step S12). When constructing a prediction model, the calculation unit 25 of the prediction device 21 first extracts data sets from the database 22 by executing data extraction control (step S13: data set acquisition step). Thereafter, the calculation unit 25 executes (predicts model construction) control to construct (create) a plurality of prediction models from the extracted plurality of data sets (step S14: prediction model construction step). And the calculating part 25 complete | finishes the control action which builds a prediction model.

次に、図3を参照して、予測装置21の演算部25によって統合された予測値を算出する制御動作について説明する。予測装置21の演算部25は、統合された予測値を算出する場合、予測値算出制御を実行することで、構築した複数の予測モデルから予測値をそれぞれ算出する(ステップS21:予測値算出工程)。この後、演算部25は、予測値統合制御を実行することで、算出した複数の予測値を加重平均して統合し、統合された予測値を算出する(ステップS22:予測値統合工程)。そして、演算部25は、予測値を算出する制御動作を終了する。   Next, with reference to FIG. 3, the control operation for calculating the prediction value integrated by the calculation unit 25 of the prediction device 21 will be described. When calculating the integrated prediction value, the calculation unit 25 of the prediction device 21 calculates the prediction value from each of the plurality of constructed prediction models by executing the prediction value calculation control (step S21: prediction value calculation step). ). Thereafter, the calculation unit 25 executes the predicted value integration control, and calculates and integrates the calculated plurality of predicted values by weighted averaging (step S22: predicted value integration step). And the calculating part 25 complete | finishes the control action which calculates a predicted value.

次に、図4を参照して、予測装置21の演算部25によってデータセットを抽出する制御動作について説明する。予測装置21の演算部25は、データ抽出制御を実行すると、先ず、データセットに含まれるプロセスデータD1のうち、抽出するプロセスデータD1の項目を複数選定(決定)する(ステップS31)。演算部25は、抽出するプロセスデータD1を選定すると、選定したプロセスデータD1をデータベース22から抽出する(ステップS32)。この後、演算部25は、複数組のデータセットの全てを抽出したか否かを判定する(ステップS33)。演算部25は、ステップS33において、全てのデータセットを抽出していないと判定すると(ステップS33:No)、ステップS31に再び進んで、他のデータセットを抽出する制御動作を実行する。一方で、演算部25は、ステップS33において、全てのデータセットを抽出したと判定すると(ステップS33:Yes)、データセットを抽出する制御動作を終了する。   Next, a control operation for extracting a data set by the calculation unit 25 of the prediction device 21 will be described with reference to FIG. When executing the data extraction control, the calculation unit 25 of the prediction device 21 first selects (determines) a plurality of items of the process data D1 to be extracted from the process data D1 included in the data set (step S31). When selecting the process data D1 to be extracted, the arithmetic unit 25 extracts the selected process data D1 from the database 22 (step S32). Thereafter, the calculation unit 25 determines whether or not all of the plurality of data sets have been extracted (step S33). If the calculation unit 25 determines in step S33 that all data sets have not been extracted (step S33: No), the calculation unit 25 proceeds to step S31 again and executes a control operation for extracting other data sets. On the other hand, when the arithmetic unit 25 determines in step S33 that all data sets have been extracted (step S33: Yes), the control operation for extracting the data sets ends.

以上のように、実施例1の構成によれば、複数組のデータセットを用いて、複数の予測モデルを構築することができる。そして、複数の予測モデルから複数の予測値を算出し、算出した複数の予測値を統合することができる。このため、複数の予測モデルを用いることで、単一の予測モデルを用いる場合に比べて、予測値を安定的に算出することができる。このとき、予測モデルは、定量的な値として予測値を導出することができる。このため、プロセスデータD1に基づいて、ガスタービン10に関する所定の物理量を、定量的な予測値として算出することができる。   As described above, according to the configuration of the first embodiment, a plurality of prediction models can be constructed using a plurality of data sets. Then, a plurality of prediction values can be calculated from a plurality of prediction models, and the calculated plurality of prediction values can be integrated. For this reason, by using a plurality of prediction models, it is possible to stably calculate the prediction value as compared to the case of using a single prediction model. At this time, the prediction model can derive the prediction value as a quantitative value. For this reason, based on the process data D1, the predetermined physical quantity regarding the gas turbine 10 can be calculated as a quantitative prediction value.

また、実施例1の構成によれば、予測モデルのモデル特性に応じて、予測値を補正することができるため、統合して算出された予測値の予測精度を向上させることができる。つまり、演算部25は、誤差が大きい予測モデルから算出された予測値に対して、重み付けを小さくすることができるため、統合された予測値に対する誤差の影響を小さくすることができる。また、演算部25は、誤差が小さい予測モデルから算出された予測値に対して、重み付けを大きくすることができるため、統合された予測値に対する誤差の影響を小さくすることができる。これにより、演算部25は、統合された予測値の予測精度を向上させることができる。   Moreover, according to the structure of Example 1, since a prediction value can be corrected according to the model characteristic of a prediction model, the prediction accuracy of the prediction value calculated by integration can be improved. In other words, since the calculation unit 25 can reduce the weighting for the prediction value calculated from the prediction model having a large error, the influence of the error on the integrated prediction value can be reduced. Moreover, since the calculating part 25 can enlarge weighting with respect to the predicted value calculated from the prediction model with a small error, it can reduce the influence of the error with respect to the integrated predicted value. Thereby, the calculating part 25 can improve the prediction precision of the integrated prediction value.

また、実施例1の構成によれば、演算部25は、誤差が大きい予測モデルにより算出される予測値を、他の予測値と統合しないため、統合された予測値に対して、誤差の影響を与えることがない。なお、実施例1では、誤差が限界誤差よりも大きい予測モデルによって算出される予測値は、重み付けがゼロとなることで、他の予測値に統合されなかったが、この構成に限定されない。例えば、予測値算出制御において、誤差が限界誤差よりも大きい予測モデルを用いた予測値の算出を行わないことで、他の予測値に統合せずともよい。   Further, according to the configuration of the first embodiment, the calculation unit 25 does not integrate the prediction value calculated by the prediction model having a large error with the other prediction values, and therefore the influence of the error on the integrated prediction value. Never give. In the first embodiment, the prediction value calculated by the prediction model having an error larger than the limit error is not integrated with other prediction values because the weight is zero, but the present invention is not limited to this configuration. For example, in the prediction value calculation control, the prediction value is not calculated using a prediction model in which the error is larger than the limit error, so that the prediction value calculation control may not be integrated with other prediction values.

また、実施例1の構成によれば、演算部25は、データセットに含まれるプロセスデータD1を選定することができるため、データセットに含まれる全てのプロセスデータD1を用いずに、データセットに含まれる一部のプロセスデータD1を用いることが可能となる。   In addition, according to the configuration of the first embodiment, the calculation unit 25 can select the process data D1 included in the data set, so that all the process data D1 included in the data set is not used. Part of the process data D1 included can be used.

また、実施例1の構成によれば、監視システム30において、監視装置31は、予測システム20によって算出される定量的な予測値を用いて、ガスタービン10を監視することができる。このため、監視装置31は、ガスタービン10の挙動を予測しながら監視することができる。   Further, according to the configuration of the first embodiment, in the monitoring system 30, the monitoring device 31 can monitor the gas turbine 10 using the quantitative prediction value calculated by the prediction system 20. For this reason, the monitoring device 31 can monitor the behavior of the gas turbine 10 while predicting it.

また、実施例1の構成によれば、運転支援システム40において、運転支援装置41は、予測システム20によって算出される定量的な予測値を用いて、ガスタービン10の運転を支援することができる。このため、運転支援装置41は、予測値に基づいて、ガスタービン10が効率の良い運転となるように支援することができる。   Further, according to the configuration of the first embodiment, in the driving support system 40, the driving support device 41 can support the operation of the gas turbine 10 using the quantitative predicted value calculated by the prediction system 20. . For this reason, the driving assistance device 41 can assist the gas turbine 10 to perform an efficient driving based on the predicted value.

なお、実施例1では、予測値統合制御において、算出された複数の予測値を加重平均して統合したが、この統合に限定されない。例えば、予測値統合制御において、算出された複数の予測値を単純平均してもよく、特に限定されない。   In the first embodiment, in the prediction value integration control, the plurality of calculated prediction values are integrated by weighted averaging, but the present invention is not limited to this integration. For example, in the predicted value integrated control, a plurality of calculated predicted values may be simply averaged, and is not particularly limited.

次に、図5を参照して、実施例2に係る予測システム20及び予測方法について説明する。図5は、実施例2におけるデータセットの取得に関するフローチャートである。なお、実施例2では、重複した記載を避けるべく、実施例1と異なる部分について説明し、実施例1と同様の構成である部分については、同じ符号を付す。実施例2に係る予測システム20は、データセットの取得に際し、サンプリング周期を異ならせている。以下、実施例2に係る予測システム20について説明する。   Next, the prediction system 20 and the prediction method according to the second embodiment will be described with reference to FIG. FIG. 5 is a flowchart regarding acquisition of a data set according to the second embodiment. In the second embodiment, parts that are different from the first embodiment will be described in order to avoid redundant descriptions, and the same reference numerals are given to the parts that have the same configuration as the first embodiment. The prediction system 20 according to the second embodiment uses different sampling periods when acquiring a data set. Hereinafter, the prediction system 20 according to the second embodiment will be described.

実施例2の予測システム20において、データベース22には、実施例1と同様に、プロセスデータD1が、所定のサンプリング周期で蓄積される。予測装置21の演算部25によってデータ抽出制御が実行されると、データ抽出制御では、1つのデータセットに対し、複数の異なるサンプリング周期で、データセットに含まれるプロセスデータD1を取得する。すなわち、演算部25は、所定のデータセットに含まれるプロセスデータD1を、サンプリング周期T1の間隔で抽出し、この後、所定のデータセットに含まれるプロセスデータD1を、サンプリング周期T2の間隔で抽出する。   In the prediction system 20 of the second embodiment, the process data D1 is accumulated in the database 22 at a predetermined sampling period, as in the first embodiment. When data extraction control is executed by the calculation unit 25 of the prediction device 21, in the data extraction control, process data D1 included in the data set is acquired at a plurality of different sampling periods for one data set. That is, the arithmetic unit 25 extracts the process data D1 included in the predetermined data set at the interval of the sampling period T1, and thereafter extracts the process data D1 included in the predetermined data set at the interval of the sampling period T2. To do.

そして、演算部25は、予測モデル構築制御において、サンプリング周期が異なる複数組のデータセットに基づいて、予測モデルをそれぞれ構築する。   Then, in the prediction model construction control, the arithmetic unit 25 constructs prediction models based on a plurality of data sets having different sampling periods.

次に、図5を参照して、予測装置21の演算部25によってデータセットを抽出する制御動作について説明する。予測装置21の演算部25は、データ抽出制御を実行すると、先ず、抽出するプロセスデータD1のサンプリング周期(例えば、サンプリング周期T1)を決定する(ステップS41)。続いて、演算部25は、データセットに含まれるプロセスデータD1のうち、抽出するプロセスデータD1の項目を複数選定(決定)する(ステップS42)。演算部25は、抽出するプロセスデータD1を選定すると、ステップS41で決定したサンプリング周期の間隔で、選定したプロセスデータD1をデータベース22から抽出する(ステップS43)。この後、演算部25は、複数組のデータセットの全てを抽出したか否かを判定する(ステップS44)。演算部25は、ステップS44において、全てのデータセットを抽出していないと判定すると(ステップS44:No)、ステップS42に再び進んで、他のデータセットを抽出する制御動作を実行する。一方で、演算部25は、ステップS44において、全てのデータセットを抽出したと判定すると(ステップS44:Yes)、複数のサンプリング周期の全てでデータセットを抽出したか否かを判定する(ステップS45)。演算部25は、ステップS45において、全てのサンプリング周期についてデータセットを抽出していないと判定すると(ステップS45:No)、ステップS41に再び進んで、他のサンプリング周期についてデータセットを抽出する制御動作を実行する。一方で、演算部25は、ステップS45において、全てのサンプリング周期についてデータセットを抽出したと判定すると(ステップS45:Yes)、データセットを抽出する制御動作を終了する。   Next, a control operation for extracting a data set by the calculation unit 25 of the prediction device 21 will be described with reference to FIG. When the data extraction control is executed, the calculation unit 25 of the prediction device 21 first determines a sampling period (for example, a sampling period T1) of the process data D1 to be extracted (step S41). Subsequently, the computing unit 25 selects (determines) a plurality of process data D1 items to be extracted from the process data D1 included in the data set (step S42). When selecting the process data D1 to be extracted, the computing unit 25 extracts the selected process data D1 from the database 22 at the sampling cycle interval determined in step S41 (step S43). Thereafter, the calculation unit 25 determines whether or not all of the plurality of data sets have been extracted (step S44). If the calculation unit 25 determines in step S44 that all data sets have not been extracted (step S44: No), the calculation unit 25 proceeds to step S42 again, and executes a control operation for extracting other data sets. On the other hand, when it is determined in step S44 that all data sets have been extracted (step S44: Yes), the calculation unit 25 determines whether or not the data sets have been extracted in all of the plurality of sampling periods (step S45). ). If the calculation unit 25 determines in step S45 that the data sets have not been extracted for all sampling periods (step S45: No), the control unit 25 proceeds again to step S41 and extracts the data sets for other sampling periods. Execute. On the other hand, if it determines with the calculation part 25 having extracted the data set about all the sampling periods in step S45 (step S45: Yes), the control operation which extracts a data set will be complete | finished.

以上のように、実施例2の構成によれば、サンプリング周期を異ならせたデータセットに基づいて、複数の予測モデルを構築することができる。このため、ガスタービン10に関する所定の物理量の応答性を考慮した予測モデルを構築することができる。つまり、ガスタービン10に設けられる配管の所定の部位において流通する流体の流量は、所定の部位の上流側における流体の圧力の変化によって変化する場合がある。この場合、流体の圧力の変化が、下流側の流体の流量の変化として現れるには、所定の応答時間がかかる。このため、サンプリング周期を異ならせることで、応答時間を考慮した予測モデルを構築することができ、これにより、予測モデルの予測精度を向上させることができる。   As described above, according to the configuration of the second embodiment, it is possible to construct a plurality of prediction models based on data sets with different sampling periods. For this reason, it is possible to construct a prediction model that takes into account the responsiveness of a predetermined physical quantity related to the gas turbine 10. That is, the flow rate of the fluid flowing in a predetermined part of the pipe provided in the gas turbine 10 may change due to a change in the pressure of the fluid upstream of the predetermined part. In this case, it takes a predetermined response time for the change in the fluid pressure to appear as a change in the flow rate of the downstream fluid. For this reason, the prediction model which considered response time can be constructed | assembled by varying a sampling period, and, thereby, the prediction accuracy of a prediction model can be improved.

なお、実施例1及び実施例2において、予測システム20は、ガスタービン10に関する所定の物理量を予測したが、ガスタービン10に限定されず、他の設備であってもよい。   In addition, in Example 1 and Example 2, although the prediction system 20 estimated the predetermined physical quantity regarding the gas turbine 10, it is not limited to the gas turbine 10, Other facilities may be sufficient.

1 ガスタービン設備
10 ガスタービン
20 予測システム
21 予測装置
22 データベース
25 演算部
30 監視システム
31 監視装置
40 運転支援システム
41 運転支援装置
D1 プロセスデータ
DESCRIPTION OF SYMBOLS 1 Gas turbine equipment 10 Gas turbine 20 Prediction system 21 Prediction device 22 Database 25 Operation part 30 Monitoring system 31 Monitoring device 40 Operation support system 41 Operation support device D1 Process data

Claims (10)

設備において取得可能な種々のプロセスデータを格納する記憶部と、
前記記憶部に格納された前記プロセスデータに基づいて、前記設備に関する予測される所定の物理量を予測値として算出する演算部と、を備え、
前記演算部は、
前記記憶部に格納された種々の前記プロセスデータのうち、複数の前記プロセスデータを1組のデータセットとして、複数組分だけ取得し、
取得した各組の前記データセットに基づいて、前記予測値を算出するための予測モデルをそれぞれ構築し、
構築した複数の前記予測モデルから前記予測値をそれぞれ算出し、
算出した複数の前記予測値を統合して、統合された前記予測値を算出することを特徴とする予測システム。
A storage unit for storing various process data that can be acquired in the facility;
A calculation unit that calculates, as a predicted value, a predetermined physical quantity predicted for the facility based on the process data stored in the storage unit, and
The computing unit is
Among a variety of the process data stored in the storage unit, a plurality of the process data is obtained as a set of data sets for a plurality of sets,
Based on the acquired data sets of each set, each constructed a prediction model for calculating the predicted value,
Each of the predicted values is calculated from a plurality of the predicted models constructed,
A prediction system characterized by integrating a plurality of calculated prediction values to calculate the integrated prediction value.
前記演算部は、
構築した複数の前記予測モデルのモデル特性に応じて、算出された複数の前記予測値を補正して統合し、統合された前記予測値を算出することを特徴とする請求項1に記載の予測システム。
The computing unit is
2. The prediction according to claim 1, wherein the plurality of calculated prediction values are corrected and integrated according to model characteristics of the plurality of prediction models constructed, and the integrated prediction value is calculated. system.
前記予測モデルの前記モデル特性は、前記予測モデルの予測精度の誤差であり、
前記演算部は、
構築した複数の前記予測モデルの前記予測精度の前記誤差に応じて、算出された複数の前記予測値を加重平均することで補正を行っており、
前記誤差が大きい前記予測モデルから算出された前記予測値に対しては、重み付けを小さくし、
前記誤差が小さい前記予測モデルから算出された前記予測値に対しては、重み付けを大きくすることを特徴とする請求項2に記載の予測システム。
The model characteristic of the prediction model is an error in prediction accuracy of the prediction model;
The computing unit is
According to the error of the prediction accuracy of the plurality of prediction models constructed, correction is performed by weighted average of the plurality of prediction values calculated,
For the prediction value calculated from the prediction model having a large error, the weight is reduced,
The prediction system according to claim 2, wherein weighting is increased for the prediction value calculated from the prediction model having a small error.
前記演算部は、
前記誤差が、予め設定された限界誤差よりも大きい場合、前記限界誤差よりも前記誤差が大きい前記予測モデルから算出された前記予測値の統合を不実行とすることを特徴とする請求項3に記載の予測システム。
The computing unit is
The integration of the predicted values calculated from the prediction model having the error larger than the limit error is not executed when the error is larger than a preset limit error. The prediction system described.
前記演算部は、
前記データセットに含まれる前記プロセスデータを選定することを特徴とする請求項1から4のいずれか1項に記載の予測システム。
The computing unit is
The prediction system according to any one of claims 1 to 4, wherein the process data included in the data set is selected.
前記記憶部には、所定のサンプリング周期で前記プロセスデータが格納され、
前記演算部は、
前記データセットを取得する場合、前記サンプリング周期を異ならせた前記データセットを複数組分だけ取得し、
前記サンプリング周期が異なる複数組の前記データセットに基づいて、前記予測モデルをそれぞれ構築することを特徴とする請求項1から5のいずれか1項に記載の予測システム。
The storage unit stores the process data at a predetermined sampling period,
The computing unit is
When obtaining the data set, obtain a plurality of sets of the data set with different sampling periods,
The prediction system according to any one of claims 1 to 5, wherein each of the prediction models is constructed based on a plurality of data sets having different sampling periods.
請求項1から6のいずれか1項に記載の予測システムと、
前記予測システムによって算出される前記予測値を用いて、前記設備を監視する監視装置と、を備えることを特徴とする監視システム。
The prediction system according to any one of claims 1 to 6,
A monitoring system comprising: a monitoring device that monitors the facility using the predicted value calculated by the prediction system.
請求項1から6のいずれか1項に記載の予測システムと、
前記予測システムによって算出される前記予測値を用いて、前記設備の運転を支援する運転支援装置と、を備えることを特徴とする運転支援システム。
The prediction system according to any one of claims 1 to 6,
A driving support system comprising: a driving support device that supports driving of the facility using the predicted value calculated by the prediction system.
請求項1から6のいずれか1項に記載の予測システム、請求項7に記載の監視システム及び請求項8に記載の運転支援システムの少なくとも1つのシステムと、
前記設備としてのガスタービンと、を備えることを特徴とするガスタービン設備。
At least one of the prediction system according to any one of claims 1 to 6, the monitoring system according to claim 7, and the driving support system according to claim 8,
A gas turbine facility comprising: a gas turbine as the facility.
設備において取得可能な種々のプロセスデータに基づいて、前記設備に関する所定の物理量を予測する予測方法であって、
種々の前記プロセスデータのうち、複数の前記プロセスデータを1組のデータセットとして、複数組分だけ取得するデータセット取得工程と、
取得した各組の前記データセットに基づいて、予測値を算出するための予測モデルをそれぞれ構築する予測モデル構築工程と、
構築した複数の前記予測モデルから前記予測値をそれぞれ算出する予測値算出工程と、
算出した複数の前記予測値を統合して、統合された前記予測値を算出する予測値統合工程と、を備えることを特徴とする予測方法。
A prediction method for predicting a predetermined physical quantity related to the equipment based on various process data obtainable in the equipment,
Among the various process data, a plurality of the process data as a set of data sets, a data set acquisition step of acquiring a plurality of sets, and
Based on the acquired data sets of each set, a prediction model construction step of constructing a prediction model for calculating a prediction value, respectively,
A predicted value calculation step of calculating the predicted value from the plurality of the predicted models constructed;
A prediction value integrating step of integrating the plurality of calculated prediction values and calculating the integrated prediction value.
JP2013273461A 2013-12-27 2013-12-27 Prediction system, monitoring system, operation support system, gas turbine equipment, and prediction method Expired - Fee Related JP6143667B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013273461A JP6143667B2 (en) 2013-12-27 2013-12-27 Prediction system, monitoring system, operation support system, gas turbine equipment, and prediction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013273461A JP6143667B2 (en) 2013-12-27 2013-12-27 Prediction system, monitoring system, operation support system, gas turbine equipment, and prediction method

Publications (2)

Publication Number Publication Date
JP2015127914A JP2015127914A (en) 2015-07-09
JP6143667B2 true JP6143667B2 (en) 2017-06-07

Family

ID=53837882

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013273461A Expired - Fee Related JP6143667B2 (en) 2013-12-27 2013-12-27 Prediction system, monitoring system, operation support system, gas turbine equipment, and prediction method

Country Status (1)

Country Link
JP (1) JP6143667B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7147131B2 (en) * 2016-02-24 2022-10-05 株式会社ジェイテクト Analysis system
KR101872342B1 (en) * 2016-10-07 2018-06-29 고려대학교 산학협력단 Method and device for intelligent fault diagnosis using improved rtc(real-time contrasts) method
KR102079359B1 (en) * 2017-07-13 2020-02-20 고려대학교 산학협력단 Process Monitoring Device and Method using RTC method with improved SAX method
JP7064085B2 (en) * 2017-11-10 2022-05-10 三菱重工業株式会社 Plant abnormality monitoring system and plant abnormality monitoring method
WO2019239542A1 (en) 2018-06-14 2019-12-19 三菱電機株式会社 Abnormality sensing apparatus, abnormality sensing method, and abnormality sensing program
JP7143148B2 (en) 2018-08-23 2022-09-28 三菱重工業株式会社 Prediction device, prediction method, and program
JP7263020B2 (en) * 2019-01-16 2023-04-24 株式会社東芝 Treated water quality estimation device, treated water quality estimation method and program
WO2021095822A1 (en) * 2019-11-12 2021-05-20 株式会社Ihi Plant operation prediction device
KR20220106999A (en) * 2019-11-29 2022-08-01 도쿄엘렉트론가부시키가이샤 Reasoning device, reasoning method and reasoning program

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4017272B2 (en) * 1998-12-16 2007-12-05 中国電力株式会社 Plant state estimation / prediction apparatus and method
JP2007003381A (en) * 2005-06-24 2007-01-11 Mitsubishi Heavy Ind Ltd Calibration support device for detector, technique thereof, and program
JP2009275691A (en) * 2008-04-16 2009-11-26 Mitsubishi Heavy Ind Ltd Combustion control method and control device for internal combustion engine

Also Published As

Publication number Publication date
JP2015127914A (en) 2015-07-09

Similar Documents

Publication Publication Date Title
JP6143667B2 (en) Prediction system, monitoring system, operation support system, gas turbine equipment, and prediction method
JP6511702B2 (en) Monitoring device, monitoring method of target device, and program
JP6050599B2 (en) Method and system for device operation monitoring
KR102025145B1 (en) Apparatus and Method for Predicting Plant Data
Simani et al. Dynamic system identification and model-based fault diagnosis of an industrial gas turbine prototype
EP2977616B1 (en) Method and systems for detection of compressor surge
WO2016133121A1 (en) Abnormality diagnosis method and abnormality diagnosis system
EP3401600B1 (en) Systems and methods related to detecting flame blowout occurrences in gas turbines
JP6432890B2 (en) Monitoring device, target device monitoring method, and program
EP3584656B1 (en) Risk assessment device, risk assessment method, and risk assessment program
WO2016039805A1 (en) Apparatus and method for ensembles of kernel regression models
US9852240B2 (en) Systems and methods for gas turbine operational impact modeling using statistical and physics-based methodologies
JP6111913B2 (en) Control parameter adjustment system
EP3584657A1 (en) Risk assessment device, risk assessment method, and risk assessment program
US20160365735A1 (en) Systems and Methods for Power Plant Data Reconciliation
JP6274932B2 (en) Prediction system, monitoring system, operation support system, gas turbine equipment, and prediction method
JP6952622B2 (en) Performance evaluation method, performance evaluation device, and performance evaluation system
US10392963B2 (en) Systems and methods related to transmitting and receiving sensor data
JP7397080B2 (en) Gas networks and methods for detecting faults in gas networks under pressure or vacuum
JP6347771B2 (en) Abnormality diagnosis apparatus, abnormality diagnosis method, and abnormality diagnosis program
JP6169284B2 (en) Method of analyzing measurement error of operation parameter of gas turbine and control device
JP7487412B2 (en) Plant monitoring method, plant monitoring device, and plant monitoring program
JP5022018B2 (en) Gas turbine monitoring device
JP7374192B2 (en) Gas networks and methods for detecting leaks in gas networks under pressure or vacuum
JP2016206089A (en) Gas meter evaluation system and gas meter used therefor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160425

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170309

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170411

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170509

R150 Certificate of patent or registration of utility model

Ref document number: 6143667

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees