JP5781574B2 - Starting reaction device for open shield machine - Google Patents

Starting reaction device for open shield machine Download PDF

Info

Publication number
JP5781574B2
JP5781574B2 JP2013181843A JP2013181843A JP5781574B2 JP 5781574 B2 JP5781574 B2 JP 5781574B2 JP 2013181843 A JP2013181843 A JP 2013181843A JP 2013181843 A JP2013181843 A JP 2013181843A JP 5781574 B2 JP5781574 B2 JP 5781574B2
Authority
JP
Japan
Prior art keywords
open shield
reaction force
shield machine
concrete
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013181843A
Other languages
Japanese (ja)
Other versions
JP2015048659A (en
Inventor
植村 誠
誠 植村
賢治郎 植村
賢治郎 植村
廣明 竹川
廣明 竹川
元晶 伊藤
元晶 伊藤
Original Assignee
植村 誠
誠 植村
賢治郎 植村
賢治郎 植村
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 植村 誠, 誠 植村, 賢治郎 植村, 賢治郎 植村 filed Critical 植村 誠
Priority to JP2013181843A priority Critical patent/JP5781574B2/en
Publication of JP2015048659A publication Critical patent/JP2015048659A/en
Application granted granted Critical
Publication of JP5781574B2 publication Critical patent/JP5781574B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、市街地に上下水道、地下道等の地下構造物を施工するオープンシールド工法に使用するオープンシールド機の発進反力装置に関するものである。   The present invention relates to a start reaction device for an open shield machine used in an open shield construction method for constructing underground structures such as water and sewage systems and underground passages in an urban area.

周知のごとくオープンシールド工法は、開削工法(オープン工法)とシールド工法の長所を生かした合理性に富む工法である。   As is well known, the open shield method is a rational method that takes advantage of the open cut method (open method) and the shield method.

このオープンシールド工法では、シールド機を前方の機体の後端に後方の機体の前端が嵌入して、相互の嵌合部で屈曲可能としてカーブ施工を可能としたり、方向修正を行えるようにしたものがある。   In this open shield method, the front end of the rear aircraft is inserted into the rear end of the front aircraft, and it is possible to bend at the mating part to enable curve construction and to correct the direction. There is.

その一例を下記特許文献について説明すると、オープンシールド機1は、図に示すように基本的には左右の側壁板1a,1bとこれら側壁板1a,1bと同程度の長さでその間を連結する底板1cとからなる前面、後面及び上面を開口したシールド機である。
特開平10−96234号公報
Consolidated To describe an example for the following Patent Document, open shield machine 1, side walls 1a of the left and right is basically as shown in FIG. 4, 1b and these side wall plates 1a, comparable to 1b therebetween in length It is a shield machine which opened the front surface, rear surface, and upper surface which consist of the bottom plate 1c which does.
JP-A-10-96234

該オープンシールド機1は図に示すように機体を前後方向で複数に分割し、フロント機2としての前方の機体の後端にテール機3としての後方の機体の前端が嵌入して、相互の嵌合部で屈曲可能とした。 As shown in FIG. 5 , the open shield machine 1 is divided into a plurality of bodies in the front-rear direction, and the front end of the rear body as the tail machine 3 is fitted into the rear end of the front body as the front machine 2 to The fitting part can be bent.

フロント機2は主として掘削を行うもので、前端と上面を開放面としてあり、機体内で後部に後方へ向けて中折ジャッキ4を左右によせて、また上下複数段に配設している。これに対してテール機3はコンクリート函体8の設置を行うもので、機体内で前部に後方へ向けてシールドジャッキ5を左右によせて、また上下複数段に配設している。図中6はフロント機2の前端に設けた刃口で、この例ではスライドジャッキ6aによる可動分割刃口としており、7はテール機3の後端に設けた土留板、9はストラット、10はプレスバー(押角)である。   The front machine 2 mainly performs excavation, and has a front end and an upper surface as open surfaces, and the middle jacks 4 are arranged in a plurality of stages in the upper and lower sides, with the folded jacks 4 facing rearward and rearward. On the other hand, the tail machine 3 is provided with a concrete box 8, and the shield jacks 5 are arranged on the left and right sides of the front and rear in the body and in a plurality of upper and lower stages. In the figure, 6 is a cutting edge provided at the front end of the front machine 2, and in this example, it is a movable divided cutting edge by a slide jack 6a, 7 is a retaining plate provided at the rear end of the tail machine 3, 9 is a strut, It is a press bar (push angle).

このようなオープンシールド機1を使用するオープンシールド工法は、図6〜図9に示すように、発進坑と到達坑との間で施工される。発進坑11内で前記オープンシールド機を組立て、発進坑11の前の地盤を地上に設置したシャベル系の掘削機12で掘削し、該オープンシールド機1のシールドジャッキ5を伸長して発進坑11内の反力壁に反力をとってオープンシールド機1を前進させ、地下構造物を形成する第1番目のコンクリート函体8を上方から吊り降し、オープンシールド機1のテール機3内で縮めたシールドジャッキ5の後方にストラット9およびプレスバー10とともにセットする。また、発進坑11はシートパイル等の土留鋼矢板で構成し、オープンシールド機1を発進させるにはこの土留壁を一部鏡切りするが、必要に応じて薬液注入等で発進坑11の前方部分に地盤改良を施しておくこともある。 As shown in FIGS. 6 to 9 , the open shield method using such an open shield machine 1 is constructed between the start pit and the arrival pit. The open shield machine is assembled in the start pit 11, the ground in front of the start pit 11 is excavated with a shovel excavator 12, and the shield jack 5 of the open shield machine 1 is extended to start the start pit 11 The open shield machine 1 is moved forward by taking the reaction force against the reaction wall inside, and the first concrete box 8 forming the underground structure is suspended from above, and within the tail machine 3 of the open shield machine 1 Set with the strut 9 and the press bar 10 behind the shrunk shield jack 5. The start pit 11 is made of earth retaining sheet piles such as a sheet pile, and in order to start the open shield machine 1, a part of the retaining wall is mirror-cut. The ground may be improved on the part.

次いで、同様に掘削機12でフロント機2の前面又は上面から土砂を掘削しかつ排土してオープンシールド機1を前進させ、前記第1番目のコンクリート函体8の前に第2番目のコンクリート函体8をテール機3内に吊り降す。以下、同様の掘進及びコンクリート函体8のセット工程を繰返して、順次コンクリート函体8を縦列に地中に埋設し、後方のコンクリート函体8上にダンプ14で埋戻しを施し、オープンシールド機1が到達坑13まで達したならばこれを分解・撤去して工事を完了する。   Next, similarly, the excavator 12 excavates the earth and sand from the front or upper surface of the front machine 2 and discharges it to advance the open shield machine 1, and the second concrete is placed in front of the first concrete box 8. The box 8 is suspended in the tail machine 3. Thereafter, the same excavation and setting process of the concrete box 8 are repeated, and the concrete boxes 8 are successively buried in the ground in columns, and back dumped by the dump 14 on the concrete box 8 at the rear, and an open shield machine When 1 reaches the reaching mine 13, it is disassembled and removed to complete the construction.

図中15は裏込注入材を注入するグラウト機で、1次グラウトはテール機3内に吊り降したコンクリート函体8の周囲に行い、2次グラウトはオープンシールド機1を推進させたあと、地中に残したコンクリート函体8の周囲に行う。   In the figure, 15 is a grouting machine for injecting the back-filling material, the primary grouting is performed around the concrete box 8 suspended in the tail machine 3, and the secondary grouting is propelled by the open shield machine 1, Perform around the concrete box 8 left in the ground.

ところで、オープンシールド機1の掘進はシールドジャッキ5を伸長だけでなく、このシールドジャッキ5を固定して中折ジャッキ4の伸長でテール機3に対してフロント機2を進めることでも行なわれ、シールドジャッキ5と中折ジャッキ4との2段階で押し進める。   By the way, the excavation of the open shield machine 1 is performed not only by extending the shield jack 5 but also by fixing the shield jack 5 and advancing the front machine 2 with respect to the tail machine 3 by extending the middle folding jack 4. Push in two stages, jack 5 and half-fold jack 4.

その際、中折ジャッキ4のうち、左右いずれかを多く伸長させればフロント機2はその反対側に向きを変え、その方向に曲がる。また、上下いずれかを多く伸長させればフロント機2はその反対側に向きを変え、上向きまたは下向きに曲がる。このようにしたカーブ施工または方向修正が可能である。   At that time, if the left or right of the half-folded jack 4 is extended a lot, the front machine 2 turns to the opposite side and bends in that direction. Further, if the upper or lower part is extended a lot, the front machine 2 changes its direction to the opposite side and bends upward or downward. Such curve construction or direction correction is possible.

前記プレスバー(押角)10はシールドジャッキ5の推進力を分散させ、コンクリート函体8に伝達させるためのもので、H形鋼などの鋼材が使用される。   The press bar (push angle) 10 is for dispersing the propulsive force of the shield jack 5 and transmitting it to the concrete box 8, and a steel material such as H-section steel is used.

前記従来技術では、発進坑からオープンシールド機1を前進させる発進反力は発進坑11内の反力壁から取ることになっているが、これは反力壁を支える地山が存在することが必要であり、支圧部に既設水路が存在する等の理由により、支圧背面の地山にシールド機掘進初期の推進反力を期待することができない場合があり、その場合は、オープンシールド工法による施工が不可能となるおそれがある。または、立坑位置を変更する等の不経済となる事象が発生してしまう。   In the prior art, the starting reaction force that advances the open shield machine 1 from the starting pit is to be taken from the reaction wall in the starting pit 11, but there is a natural ground that supports the reaction wall. In some cases, it may not be possible to expect the propulsion reaction force at the initial stage of the shield machine excavation on the ground behind the bearing due to the existence of existing water channels in the bearing section. There is a possibility that the construction by is impossible. Or the event which becomes uneconomical, such as changing a shaft position, will occur.

また、支圧背面が強固でない場合、オープンシールド機の推進による支圧鋼材の変位により、掘進初期敷設函体の施工精度が低下するという事象が起きる。   Moreover, when the bearing back surface is not strong, an event occurs in which the construction accuracy of the digging initial laying box decreases due to the displacement of the bearing steel material by the propulsion of the open shield machine.

本発明の目的は前記従来例の不都合を解消し、立坑背面に地山等の反力体がない箇所においても推進初期反力を確保でき、オープンシールド工法による施工が不可能となるおそれや立坑位置を変更する等の不経済となる事象が発生してしまうことがなく、経済的に施工が可能であり、地山の反力体と比較して推力による支圧部の変位が少ない為、掘進初期の敷設函体の施工精度が向上し、推進による支圧鋼材の変位を調整できるため、掘進初期の敷設函体の施工精度が向上するオープンシールド機の発進反力装置を提供することにある。   The object of the present invention is to eliminate the inconvenience of the conventional example, and to secure a propulsion initial reaction force even in a place where there is no reaction force body such as a natural ground on the back of the shaft, which may prevent construction by the open shield method. Economical construction is possible without causing uneconomical events such as changing the position, and because the displacement of the bearing section due to thrust is less than the reaction force of the natural ground, To improve the construction accuracy of the laying box at the beginning of excavation and to adjust the displacement of the bearing steel material by propulsion, and to provide a starting reaction force device for an open shield machine that improves the construction accuracy of the laying box at the beginning of excavation is there.

請求項1記載の本発明は前記目的を達成するため、側壁板にシールドジャッキを後方に向けて設けたオープンシールド機の前面又は上面から土砂を掘削しかつ排土して設置したコンクリート函体に反力を取ってシールドジャッキを伸長してオープンシールド機を掘進させ、前記コンクリート函体の前に次のコンクリート函体を吊り下し、同様の掘進及びコンクリート函体のセット工程を繰返して、順次コンクリート函体を縦列に地中に埋設するオープンシールド工法に使用するオープンシールド機の発進反力装置であり、コンクリート函体の反力受け装置として支圧鋼材を反力受けとし、受台コンクリート上に横向きに支圧架台鋼材を設置し、支圧架台鋼材と支圧鋼材の下部をヒンジ構造にて結合し、支圧鋼材の上部と支圧架台鋼材の後方に築造したジャッキ反力架台を油圧ジャッキを介し、ヒンジ構造にて結合したことを要旨とするものである。 In order to achieve the above object, the present invention as set forth in claim 1 is a concrete box installed by excavating and removing soil from the front or upper surface of an open shield machine having a shield jack on the side wall plate facing backward. Take the reaction force and extend the shield jack to advance the open shield machine, suspend the next concrete box in front of the concrete box, repeat the same excavation and concrete box setting process, and sequentially This is a starting reaction device for an open shield machine used in the open shield method in which concrete boxes are buried in the ground in a column. As a reaction force receiving device for a concrete box, a bearing steel is used as a reaction force receiver. The bearing frame steel is installed horizontally, and the lower part of the bearing frame steel and the lower part of the bearing steel are joined by a hinge structure, and the upper part of the bearing steel and the rear of the bearing frame steel are connected. Through the hydraulic jack the granulation was jack reaction force frame, in which the subject matter to be bound by a hinge structure.

請求項1記載の本発明によれば、支圧鋼材に作用する推進力は油圧ジャッキ、支圧架台鋼材を介し、受台コンクリートと底盤地山、発進坑を形成する土留鋼矢板と側部地山、底盤地山の反力に反力を期待することができ、推力による支圧部の変位を少ないものとすることができる。   According to the first aspect of the present invention, the propulsive force acting on the bearing steel is via the hydraulic jack, the bearing steel, and the earth retaining steel sheet pile and the side ground forming the pit concrete and the bottom ground. The reaction force can be expected from the reaction force of the mountain and the bottom ground, and the displacement of the bearing portion due to the thrust can be reduced.

また、シールド機の推進によって支圧鋼材に変位(傾き)が生じた場合には、支圧鋼材に固定した油圧ジャッキの伸縮により、支圧鋼材を正規の位置に動かして調整することができる。   Moreover, when displacement (inclination) arises in the bearing steel material by the propulsion of the shield machine, the bearing steel material can be adjusted by moving the bearing steel material to a normal position by expansion and contraction of the hydraulic jack fixed to the bearing steel material.

請求項2記載の本発明は、支圧架台鋼材は受台コンクリートに埋め込まれた受台鋼材溶接またはボルト止めすることを要旨とするものである。 According to a second aspect of the invention, Bearing mount steel is to the subject matter to be welded or bolted to cradle steel embedded in the pedestal concrete.

請求項2記載の本発明によれば、受台コンクリートに対する支圧架台鋼材の固定は、受台コンクリートに受台鋼材を埋め込み、この受台鋼材に溶接またはボルト止めすることで、強力な推力に耐えうる堅牢な固定ができる。   According to the second aspect of the present invention, the support base steel material is fixed to the cradle concrete by embedding the cradle steel material in the cradle concrete and welding or bolting to the cradle steel material. It can be fixed firmly.

以上述べたように本発明のオープンシールド機の発進反力装置は、立坑背面に地山等の反力体がない箇所においても推進初期反力を確保できるもので、地山等の反力体がないためオープンシールド工法による施工が不可能となるおそれや立坑位置を変更する等の不経済となる事象が発生してしまうことがなく、経済的な施工が可能であり、また、地山の反力体と比較して推力による支圧部の変位が少ない為、掘進初期の敷設函体の施工精度が向上し、推進による支圧鋼材の変位を調整できるため、掘進初期の敷設函体の施工精度が向上するものである。   As described above, the starting reaction force device of the open shield machine according to the present invention can secure a propulsion initial reaction force even in a place where there is no reaction force such as a ground on the back of the shaft, Therefore, there is no fear that construction using the open shield method will be impossible, or uneconomical events such as changing the shaft position will not occur, and economical construction is possible. Since the displacement of the bearing section due to thrust is less than that of the reaction force body, the construction accuracy of the laying box at the beginning of excavation is improved, and the displacement of the bearing steel material due to propulsion can be adjusted. Construction accuracy is improved.

以下、図面について本発明の実施の形態を詳細に説明する。図1は本発明のオープンシールド機の発進反力装置を使用したオープンシールド工法の概要を示す縦断側面図、図2は同上一部切欠いた平面図、図3は図2のC−C線矢視図で一部切欠いたもので、オープンシールド機全体としては前記従来例として説明したのと同様で、同一構成要素には同一参照符号を付してある。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a longitudinal side view showing an outline of an open shield construction method using a starting reaction force device for an open shield machine according to the present invention, FIG. 2 is a plan view in which the same is partially cut out, and FIG. The open shield machine as a whole is the same as that described as the conventional example, and the same reference numerals are assigned to the same components.

該オープンシールド機1は機体を、フロント機2としての前方の機体の後端にテール機3としての後方の機体の前端が嵌入して、機体を前後方向で複数に分割して相互の嵌合部で屈曲可能とした。   In the open shield machine 1, the front end of the rear body as the tail machine 3 is inserted into the rear end of the front body as the front machine 2, and the front body is divided into a plurality of parts in the front-rear direction to fit each other. It was possible to bend at the part.

フロント機2は主として掘削を行うもので、前端と上面を開放面としてあり、機体内で後部に後方へ向けて中折ジャッキ4を左右によせて、また上下複数段に配設している。図中6はフロント機2の前端に設けた刃口である。   The front machine 2 mainly performs excavation, and has a front end and an upper surface as open surfaces, and the middle jacks 4 are arranged in a plurality of stages in the upper and lower sides, with the folded jacks 4 facing rearward and rearward. In the figure, 6 is a blade edge provided at the front end of the front machine 2.

本実施形態ではこの中折ジャッキ4はフロント機2に固定され、そのロッド端はテール機3に軸着される。軸着構造は、該ロッド端を球体軸16とし、これをテール機3の球体軸受け17に嵌合させてなる。   In the present embodiment, the intermediate folding jack 4 is fixed to the front machine 2, and its rod end is pivotally attached to the tail machine 3. The shaft attachment structure is formed by fitting the rod end into the spherical shaft 16 and fitting it into the spherical bearing 17 of the tail machine 3.

また、テール機3の先端でフロント機2後端に入り込む部分の側方には、円弧状接合側壁面18を形成した。   In addition, an arc-shaped joint side wall surface 18 is formed on the side of the portion of the tail machine 3 that enters the rear end of the front machine 2.

テール機3はコンクリート函体8の設置を行うもので、機体内で前部に後方へ向けてシールドジャッキ5を左右によせて、また上下複数段に配設している。   The tail machine 3 is used to install a concrete box 8. The shield jacks 5 are arranged in a plurality of stages in the upper and lower sides with the shield jacks 5 facing forward and backward in the machine body.

シールドジャッキ5の後端に、H形鋼もしくはボックス形鋼による縦角材によるプレスバー10を上下のシールドジャッキ5に架け渡すように、各シールドジャッキ5とピン結合で取り付けた。このピン結合(軸着構造)も球体軸16と球体軸受け17との嵌合によるもので、シールドジャッキ5のロッド端を球体軸16とし、これをプレスバー10に設けた球体軸受け17に嵌合させてなる。   At the rear end of the shield jack 5, a press bar 10 made of a vertical square bar made of H-shaped steel or box-shaped steel was attached to each shield jack 5 by pin connection so as to be bridged over the upper and lower shield jacks 5. This pin connection (bearing structure) is also due to the fitting of the spherical shaft 16 and the spherical bearing 17, and the rod end of the shield jack 5 is used as the spherical shaft 16, which is fitted to the spherical bearing 17 provided on the press bar 10. Let me.

発進坑11はシートパイル等の土留鋼矢板19で構成され、その底盤を構成する受台コンクリート20にはH形鋼などの鋼材による受台鋼材21をそのフランジ面が露出するようにして長さ方向に向けて埋め込んだ。   The starting pit 11 is composed of a steel retaining sheet pile 19 such as a sheet pile, and the cradle concrete 20 constituting the bottom of the pit 11 has a length such that the flange surface of the cradle steel 21 made of steel such as H-shaped steel is exposed. Embedded in the direction.

この受台鋼材21に支圧架台鋼材22を溶接またはボルト止めして、支圧架台鋼材22を受台コンクリート20上に横向きに設置した。   The support base steel material 22 was welded or bolted to the base steel material 21, and the support base steel material 22 was installed sideways on the base concrete 20.

図中23は、オープンシールド機1に設置するコンクリート函体8の反力受け装置としての支圧鋼材であり、立設した状態で、前記支圧架台鋼材22とその下部をヒンジ構造24にて結合する。この支圧鋼材23はH形鋼などの鋼材であり、図示は省略するがコの字形に枠組んでもよい。   In the figure, reference numeral 23 denotes a bearing steel material as a reaction force receiving device for the concrete box 8 installed in the open shield machine 1. In the standing state, the bearing steel frame 22 and its lower part are connected by a hinge structure 24. Join. This bearing steel material 23 is a steel material such as H-shaped steel, and although not shown, it may be framed in a U-shape.

また、支圧架台鋼材22の後方に台形台状のジャッキ反力架台25を斜めに向けて築造し、前記支圧鋼材23の上部とジャッキ反力架台25とを油圧ジャッキ27を介し、ヒンジ構造24にて結合した。ジャッキ反力架台25はコンクリートまたは鋼材などによる。26は反力架台基礎コンクリートである。   In addition, a trapezoidal trapezoidal jack reaction force pedestal 25 is constructed obliquely behind the support column steel member 22, and the upper part of the support steel member 23 and the jack reaction force gantry 25 are hinged via a hydraulic jack 27. 24. The jack reaction force mount 25 is made of concrete or steel. 26 is the reaction force frame foundation concrete.

なお、図2、図3では省略したが、支圧架台鋼材22、ジャッキ反力架台25、油圧ジャッキ27は左右に並べて一対、2個を設けるものである。   Although omitted in FIGS. 2 and 3, the support-bearing base steel member 22, the jack reaction force base 25, and the hydraulic jack 27 are arranged in pairs on the left and right sides.

次に使用法を説明する。オープンシールド機1を使用するオープンシールド工法は、掘削機でフロント機2の前面又は上面から土砂を掘削しかつ排土してオープンシールド機1を前進させ、前記第1番目のコンクリート函体8の前に第2番目のコンクリート函体8をテール機3内に吊り降す。以下、同様の掘進及びコンクリート函体8のセット工程を繰返して、順次コンクリート函体8を縦列に地中に埋設し、後方のコンクリート函体8上に埋戻しを施し、オープンシールド機1が到達坑まで達したならばこれを分解・撤去して工事を完了する。   Next, the usage will be described. In the open shield method using the open shield machine 1, the excavator excavates and removes soil from the front or top surface of the front machine 2 to advance the open shield machine 1, and the first concrete box 8 Before, the second concrete box 8 is suspended in the tail machine 3. Thereafter, the same excavation and setting process of the concrete box 8 are repeated, and the concrete boxes 8 are successively buried in the column in the ground, backfilled on the concrete box 8 behind, and the open shield machine 1 arrives. When it reaches the mine, it is disassembled and removed to complete the construction.

この施工は発進坑と到達坑との間で施工され、発進坑11内で前記オープンシールド機を組立て、発進坑11の前の地盤を地上に設置したシャベル系の掘削機12で掘削し、該オープンシールド機1のシールドジャッキ5を伸長して本発明の発進坑11内の発進反力装置である支圧鋼材23に反力をとってオープンシールド機1を前進させる。   This construction is carried out between the start pit and the arrival pit, the open shield machine is assembled in the start pit 11, and the ground in front of the start pit 11 is excavated with a shovel excavator 12 installed on the ground. The shield jack 5 of the open shield machine 1 is extended, and the open shield machine 1 is moved forward by applying a reaction force to the bearing steel member 23 which is a starting reaction force device in the starting pit 11 of the present invention.

支圧鋼材23に作用する推進力は油圧ジャッキ27、支圧架台鋼材22を介し、受台コンクリート20と底盤地山、発進坑11を形成する土留鋼矢板19と側部地山、底盤地山の反力に反力を期待することができる。   The propulsive force acting on the supporting steel material 23 is via the hydraulic jack 27 and the supporting steel frame steel material 22, the receiving concrete 20 and the bottom ground ground, the earth retaining steel sheet pile 19 forming the start pit 11, the side ground ground, and the bottom ground ground. The reaction force can be expected from the reaction force.

また、オープンシールド機1の推進によって支圧鋼材23に変位(傾き)が生じた場合には、支圧鋼材23に固定した油圧ジャッキ27の伸縮により、支圧鋼材23を正規の位置に動かして調整することができる。   Further, when displacement (inclination) occurs in the bearing steel member 23 due to the propulsion of the open shield machine 1, the bearing steel member 23 is moved to a normal position by expansion and contraction of the hydraulic jack 27 fixed to the bearing steel member 23. Can be adjusted.

本発明のオープンシールド機の発進反力装置を使用したオープンシールド工法の概要を示す縦断側面図である。It is a vertical side view which shows the outline | summary of the open shield construction method using the starting reaction force apparatus of the open shield machine of this invention. 本発明のオープンシールド機の発進反力装置を使用したオープンシールド工法の概要を示す一部切欠いた平面図である。It is a partially cutaway plan view showing an outline of an open shield construction method using the starting reaction force device of the open shield machine of the present invention. 図2の一部切欠いたC−C線矢視図である。FIG. 3 is a partially cutaway CC line view of FIG. 2. オープンシールド機の概要を示す縦断正面図である。It is a vertical front view which shows the outline | summary of an open shield machine. オープンシールド機の概要を示す縦断側面図である。It is a vertical side view which shows the outline | summary of an open shield machine. オープンシールド工法の第1工程を示す側面図である。It is a side view which shows the 1st process of an open shield method. オープンシールド工法の第2工程を示す側面図である。It is a side view which shows the 2nd process of an open shield method. オープンシールド工法の第3工程を示す側面図である。It is a side view which shows the 3rd process of an open shield method. オープンシールド工法の第4工程を示す側面図である。It is a side view which shows the 4th process of an open shield method.

1…オープンシールド機
1a,1b…側壁板 1c…底板
2…フロント機 3…テール機
4…中折ジャッキ 5…シールドジャッキ
6…刃口 6a…スライドジャッキ
7…土留板
8…コンクリート函体 9…ストラット
10…プレスバー 11…発進坑
12…掘削機 13…到達坑
14…ダンプ 15…グラウト機
16…球体軸 17…球体軸受け
18…円弧状接合側壁面 19…土留鋼矢板
20…受台コンクリート
21…受台鋼材
22…支圧架台鋼材 23…支圧鋼材
24…ヒンジ構造 25…ジャッキ反力架台
26…反力架台基礎コンクリート
27…油圧ジャッキ
DESCRIPTION OF SYMBOLS 1 ... Open shield machine 1a, 1b ... Side wall plate 1c ... Bottom plate 2 ... Front machine 3 ... Tail machine 4 ... Middle folding jack 5 ... Shield jack 6 ... Blade 6a ... Slide jack 7 ... Earth retaining plate 8 ... Concrete box 9 ... Strut 10 ... Press bar 11 ... Starting pit 12 ... Excavator 13 ... Destination mine 14 ... Dump 15 ... Grout machine 16 ... Sphere shaft 17 ... Sphere bearing 18 ... Arc-shaped joint side wall surface 19 ... Retaining steel sheet pile 20 ... Concrete concrete
21 ... Steel steel
22 ... Supporting steel plate material 23 ... Supporting steel material 24 ... Hinge structure 25 ... Jack reaction force frame 26 ... Reaction force frame foundation concrete 27 ... Hydraulic jack

Claims (2)

側壁板にシールドジャッキを後方に向けて設けたオープンシールド機の前面又は上面から土砂を掘削しかつ排土して設置したコンクリート函体に反力を取ってシールドジャッキを伸長してオープンシールド機を掘進させ、
前記コンクリート函体の前に次のコンクリート函体を吊り下し、同様の掘進及びコンクリート函体のセット工程を繰返して、順次コンクリート函体を縦列に地中に埋設するオープンシールド工法に使用するオープンシールド機の発進反力装置であり、コンクリート函体の反力受け装置として支圧鋼材を反力受けとし、受台コンクリート上に横向きに支圧架台鋼材を設置し、支圧架台鋼材と支圧鋼材の下部をヒンジ構造にて結合し、支圧鋼材の上部と支圧架台鋼材の後方に築造したジャッキ反力架台を油圧ジャッキを介し、ヒンジ構造にて結合したことを特徴とするオープンシールド機の発進反力装置。
Open shield machine by extending reaction shield to the concrete box that was installed by excavating and removing soil from the front or top of the open shield machine with the shield jack facing backward on the side wall plate. Digging,
The next concrete box is suspended in front of the concrete box, and the same excavation and setting process of the concrete box are repeated, and then the open shield method is used for the open shield construction method in which the concrete boxes are sequentially buried in the ground. This is a starting reaction force device for a shield machine. As a reaction force receiving device for a concrete box, a bearing steel is used as a reaction force receiver, and the bearing steel is installed sideways on the cradle concrete. An open shield machine characterized in that the lower part of the steel material is connected with a hinge structure, and the upper part of the supporting steel material and the jack reaction force structure built behind the supporting steel material are connected with a hinge structure via a hydraulic jack. Starting reaction force device.
支圧架台鋼材は受台コンクリートに埋め込まれた受台鋼材溶接またはボルト止めする請求項1記載のオープンシールド機の発進反力装置。 Bearing mount steel starting reaction force device open shield machine according to claim 1, wherein the welding or bolted to cradle steel embedded in the pedestal concrete.
JP2013181843A 2013-09-03 2013-09-03 Starting reaction device for open shield machine Active JP5781574B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013181843A JP5781574B2 (en) 2013-09-03 2013-09-03 Starting reaction device for open shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013181843A JP5781574B2 (en) 2013-09-03 2013-09-03 Starting reaction device for open shield machine

Publications (2)

Publication Number Publication Date
JP2015048659A JP2015048659A (en) 2015-03-16
JP5781574B2 true JP5781574B2 (en) 2015-09-24

Family

ID=52698897

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013181843A Active JP5781574B2 (en) 2013-09-03 2013-09-03 Starting reaction device for open shield machine

Country Status (1)

Country Link
JP (1) JP5781574B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6034447B1 (en) * 2015-05-21 2016-11-30 植村 誠 Open shield method
JP5989863B1 (en) * 2015-07-09 2016-09-07 植村 誠 Open shield machine
JP6510432B2 (en) * 2016-01-21 2019-05-08 植村 誠 Construction method of underground structure
CN112879020B (en) * 2021-02-24 2022-07-26 中建八局轨道交通建设有限公司 Shield tunneling machine counterforce system and construction method thereof
JP7384956B2 (en) 2022-04-21 2023-11-21 誠 植村 Open shield method and open shield machine
CN117145501B (en) * 2023-10-13 2024-04-30 中铁隧道集团一处有限公司 Method for shield translation and stepping under complex section condition

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2934909B2 (en) * 1990-07-18 1999-08-16 大成建設株式会社 Starting the shield machine
JP2002188392A (en) * 2000-12-18 2002-07-05 Makoto Uemura Method of starting open shield machine
JP2004176432A (en) * 2002-11-28 2004-06-24 Makoto Uemura Construction method for underground structure
JP4225295B2 (en) * 2005-06-16 2009-02-18 株式会社大林組 Starting method of shield machine for tunnel construction method

Also Published As

Publication number Publication date
JP2015048659A (en) 2015-03-16

Similar Documents

Publication Publication Date Title
JP5781574B2 (en) Starting reaction device for open shield machine
JP4317843B2 (en) Construction method for underground structures
JP6307146B1 (en) Open shield machine and box installation method using it
JP2010090608A (en) Method for constructing underground space and structure of the underground space
JP6355148B1 (en) Box culvert insertion aid
JP5351125B2 (en) Open shield machine start method of open shield method
JP5529087B2 (en) Press bar of open shield machine
KR101069702B1 (en) Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel
JP2022026691A (en) Press bar for open shield construction method
JP7177233B2 (en) Start Reaction Force Structure and Method for Concrete Box or Open Shield Machine
JP5231508B2 (en) Open shield machine
JP3887383B2 (en) Construction method for underground structures
JP6947477B2 (en) How to advance the open shield machine
JP6714060B2 (en) Construction method of underground structure
JP5491562B2 (en) Open shield construction method for sand ground
JP5491576B2 (en) Open shield machine
JP5960786B2 (en) Shield machine collection method in open shield method
CN110359916B (en) Construction method for underground structure
JP2005307544A (en) Laying method and removal method for covering plate for open shield method
JP6989483B2 (en) Open shield machine removal method
JP2006291649A (en) Construction method for underground structure
JP5394454B2 (en) Open shield method
KR102608601B1 (en) Sheet non excavation method for drilling a tunnel having a file reinforcing structure
JP5639213B2 (en) Open shield method
JP5081858B2 (en) Open shield machine

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150210

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150410

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150714

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150715

R150 Certificate of patent or registration of utility model

Ref document number: 5781574

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250