JP5667911B2 - Material information management system - Google Patents

Material information management system Download PDF

Info

Publication number
JP5667911B2
JP5667911B2 JP2011052019A JP2011052019A JP5667911B2 JP 5667911 B2 JP5667911 B2 JP 5667911B2 JP 2011052019 A JP2011052019 A JP 2011052019A JP 2011052019 A JP2011052019 A JP 2011052019A JP 5667911 B2 JP5667911 B2 JP 5667911B2
Authority
JP
Japan
Prior art keywords
information
arrangement
building
code
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011052019A
Other languages
Japanese (ja)
Other versions
JP2012190177A (en
Inventor
優 高瀬
優 高瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2011052019A priority Critical patent/JP5667911B2/en
Publication of JP2012190177A publication Critical patent/JP2012190177A/en
Application granted granted Critical
Publication of JP5667911B2 publication Critical patent/JP5667911B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、部材情報管理システムに関する。   The present invention relates to a member information management system.

建設工事や土木工事では、設計図面通りに施工されていることを記録するため、工事現場において完成前の建物の各部位を検査する作業が実施されている。例えば、鉄筋コンクリート造や鉄骨鉄筋コンクリート造の建物の躯体工事においては、鉄筋の配置、鋼種、間隔、定着状態、継手等が設計通りとなっているか否かを確認する配筋検査が行われる。   In construction work and civil engineering work, work to inspect each part of the building before completion is carried out at the construction site in order to record that construction is performed according to the design drawing. For example, in the frame construction of a reinforced concrete structure or a steel reinforced concrete structure, a bar arrangement inspection is performed to check whether the arrangement of the reinforcing bars, the steel type, the interval, the fixed state, the joints, and the like are as designed.

この配筋検査では、作業現場における検査対象部位の位置を特定するための平面図(伏図)、各検査対象部位の配筋図、及び各検査対象部位に対応したチェックリスト等が記載された検査野帳を用いて、検査者が検査対象(例えば梁、スラブ、柱等)を特定し、当該検査対象の検査結果を記録している。このような検査に用いられる検査野帳は、例えば作成者が手作業で配筋図から検査対象部位に対応する箇所を切り出し、平面図における当該検査対象部位に対応する位置に貼り付けることで作成される。さらに、切り出すべき配筋図の選択ミスや選択漏れ、あるいは平面図における各配筋図の貼り付け位置の間違い等を防止し、検査野帳の作成負荷を低減するために、建築部材に関する部材情報を部材図面から当該建築部材毎に自動的に抽出し、建築部材を一意に識別する識別情報に対応する部材情報を、当該識別情報に対応する建築部材に関連付けて建築図面中に配置し、当該部材情報が配置された建築図面を出力する、部材情報管理システムが提案されている(例えば特許文献1参照)。   In this bar arrangement inspection, a plan view (plan view) for specifying the position of the inspection target part at the work site, a bar arrangement diagram of each inspection target part, a check list corresponding to each inspection target part, and the like were described. Using an inspection field book, an inspector specifies an inspection object (for example, a beam, a slab, a column, etc.), and records the inspection result of the inspection object. The examination field book used for such examination is created, for example, by the operator manually cutting out a part corresponding to the examination target part from the bar arrangement diagram and pasting it at a position corresponding to the examination target part in the plan view Is done. Furthermore, in order to prevent misselection or omission of the arrangement chart to be cut out, or incorrect placement position of each arrangement chart in the plan view, etc., and to reduce the load of creating the inspection field book, member information on building members Is automatically extracted from the member drawing for each building member, and the member information corresponding to the identification information for uniquely identifying the building member is arranged in the building drawing in association with the building member corresponding to the identification information, and There has been proposed a member information management system that outputs an architectural drawing in which member information is arranged (see, for example, Patent Document 1).

また、上述のような検査に伴って、検査対象の各部位の名称や撮影日等の各種の情報を書き込んだ黒板や、各部位の設計図面を、各部位と共に撮影することが行われている。あるいは、すべての情報を各部位と共に撮影するのではなく、工事事務所等に設置されたパソコンに各種の情報を入力し、この情報と、工事現場で撮影されパソコンに取り込まれた画像とを、このパソコンを用いて、所定のソフトで合成することも行われている。   Further, along with the inspection as described above, a blackboard on which various kinds of information such as the name of each part to be inspected and an imaging date are written and a design drawing of each part are photographed together with each part. . Or, instead of photographing all the information together with each part, various information is input to a personal computer installed at a construction office, etc., and this information and an image captured at the construction site and captured on the personal computer Using this personal computer, composition is also performed with predetermined software.

さらに、被写体の図面を格納する図面テーブルと、図面テーブルに格納された図面を選択する選択部と、選択部によって選択された図面を表示する表示部とを備えることで、被写体を撮影する前に、表示部によって表示された図面を工事現場等において参照できるようにすると共に、被写体を撮影すると同時に、撮影した画像と表示部によって表示された図面とを相互に関連付ける関連付け部を備えた、撮影記録システムも提案されている(例えば特許文献2参照)。   In addition, the apparatus includes a drawing table that stores a drawing of the subject, a selection unit that selects a drawing stored in the drawing table, and a display unit that displays the drawing selected by the selection unit, before photographing the subject. In addition, it is possible to refer to the drawing displayed by the display unit at a construction site or the like, and at the same time, shoot and record the subject, and at the same time, include an association unit that associates the captured image with the drawing displayed by the display unit. A system has also been proposed (see, for example, Patent Document 2).

特開2010−282270号公報JP 2010-282270 A 特開2010−101158号公報JP 2010-101158 A

ところで、上述の如き従来の撮影記録システムでは、図面テーブルに格納されている図面を簡易な選択操作で選択可能とするために、例えば図面を被写体情報に基づく複数のグループに分類して格納していた。この場合、図面テーブルを格納する記憶媒体のファイルシステム等に起因して、設定可能なグループ数に制限が生じたり、必要な図面の格納漏れが生じる可能性があった。また、図面を複数のグループに分類して図面テーブルに格納するための作業負荷が大きなものとなる可能性があった。さらに、グループの分類が多岐にわたる場合、所望の図面を表示部によって表示させるためには、グループの分類に応じて選択部を複数回操作しなければならず、煩雑な操作が必要となる可能性があった。   By the way, in the conventional photographing and recording system as described above, for example, the drawings are classified into a plurality of groups based on subject information and stored so that the drawings stored in the drawing table can be selected by a simple selection operation. It was. In this case, due to the file system of the storage medium for storing the drawing table, there is a possibility that the number of groups that can be set is limited or a necessary omission of storing drawings occurs. In addition, there is a possibility that the workload for classifying the drawings into a plurality of groups and storing them in the drawing table becomes large. Furthermore, when the group classification is diverse, in order to display a desired drawing on the display unit, the selection unit must be operated a plurality of times according to the group classification, which may require a complicated operation. was there.

また、撮影した画像を整理する際に、各画像の被写体の配置情報(例えば、被写体が設けられている工区、通り芯、部材における位置(端部/中央、頭部/脚部等)等を特定する情報)を画像に関連付ける必要がある。しかし、上述の如き従来の撮影記録システムでは、撮影された画像と図面テーブルに格納された図面とを関連付けることはできるものの、被写体の配置情報を画像に関連付けることはできなかったため、作業者が事後的に配置情報を画像に関連付ける作業が必要となっていた。   Also, when organizing the captured images, the subject arrangement information (eg, the work area where the subject is provided, the core, the position in the member (end / center, head / leg, etc.), etc.) (Identified information) needs to be associated with the image. However, in the conventional photographing and recording system as described above, although the photographed image and the drawing stored in the drawing table can be associated with each other, the arrangement information of the subject cannot be associated with the image. In other words, it is necessary to associate the placement information with the image.

ここで、上述の如き従来の部材情報管理システムを用いて、各建築部材に関連付けて部材情報が配置された建築図面を出力することで、検査時において、作業者は撮影対象の部材の配置情報を建築図面から読み取ることができる。しかしながら、建築図面から読み取れる配置情報を画像に関連付けるためには、その配置情報を作業者が手作業で端末装置等に入力しなければならず、作業負荷の低減には寄与していなかった。このように、従来の部材情報管理システムと撮影記録システムとの連携には向上の余地があった。   Here, by using the conventional member information management system as described above, by outputting a building drawing in which member information is arranged in association with each building member, at the time of inspection, the operator can arrange the arrangement information of the member to be photographed. Can be read from architectural drawings. However, in order to associate the arrangement information that can be read from the architectural drawing with the image, the operator has to manually input the arrangement information to the terminal device or the like, which has not contributed to the reduction of the work load. As described above, there is room for improvement in the cooperation between the conventional member information management system and the photographing recording system.

本発明は、上記に鑑みてなされたものであって、必要な図面を容易且つ確実に記録手段に記録させることができ、記録手段に記録されている所望の図面を容易に表示させることができ、被写体を撮影した画像と当該被写体の配置情報とを容易に関連付けることができる、部材情報管理システムを提供することを目的とする。   The present invention has been made in view of the above, and can easily and surely record a necessary drawing on a recording unit, and can easily display a desired drawing recorded on the recording unit. An object of the present invention is to provide a member information management system capable of easily associating an image obtained by photographing a subject and arrangement information of the subject.

上述した課題を解決し、目的を達成するために、請求項1に記載の部材情報管理システムは、建築部材に関する部材図面と、前記建築部材を用いた建築物に関する建築図面とを格納する図面格納手段と、前記建築部材に関する部材情報と、当該建築部材を一意に識別する識別情報とを、前記部材図面から当該建築部材毎に抽出する部材情報抽出手段と、前記識別情報と、前記建築部材の配置に関する配置情報とを、前記建築図面から当該建築部材毎に抽出する配置情報抽出手段と、前記識別情報、前記部材情報抽出手段によって抽出された前記部材情報、及び、前記配置情報抽出手段によって抽出された前記配置情報を、相互に関連付けて格納する部材情報格納手段と、前記建築図面に含まれている前記建築部材に対応する識別情報を当該建築図面から取得し、当該取得した識別情報に対応する前記配置情報を前記部材情報格納手段から取得し、当該取得した識別情報と配置情報とを含む読取情報を、当該識別情報に対応する建築部材に関連付けて、当該建築図面中に配置する読取情報配置手段と、前記読取情報配置手段によって前記読取情報が配置された建築図面の少なくとも一部を出力する出力手段と、被写体を撮影する撮影手段と、前記撮影手段によって撮影された画像を格納する画像格納手段と、前記読取情報を読み取る読取手段と、前記読取手段によって読み取られた読取情報に含まれる前記配置情報を表示し、当該読取情報に含まれる前記識別情報に関連付けて前記部材情報格納手段に格納されている前記部材情報を表示する、表示手段と、前記画像格納手段に格納された前記画像と、前記表示手段によって表示された前記配置情報及び前記識別情報とを、相互に関連付ける関連付け手段と、を備える。   In order to solve the above-described problems and achieve the object, the member information management system according to claim 1 stores a member drawing relating to a building member and a building drawing relating to a building using the building member. Means, member information on the building member, identification information for uniquely identifying the building member, member information extracting means for extracting the building member for each building member from the member drawing, the identification information, and the building member Placement information relating to the placement is extracted by the placement information extracting means for extracting the building information for each building member, the identification information, the member information extracted by the member information extracting means, and the placement information extracting means. Member information storage means for storing the arranged arrangement information in association with each other, and identification information corresponding to the building member included in the building drawing. Acquired from the drawing, the arrangement information corresponding to the acquired identification information is acquired from the member information storage means, and read information including the acquired identification information and arrangement information is applied to the building member corresponding to the identification information. In association therewith, reading information arranging means arranged in the architectural drawing, output means for outputting at least a part of the architectural drawing in which the reading information is arranged by the reading information arranging means, photographing means for photographing the subject, An image storage means for storing an image photographed by the photographing means, a reading means for reading the read information, and the arrangement information included in the read information read by the reading means are displayed and included in the read information. Displaying the member information stored in the member information storage unit in association with the identification information, and a display unit and stored in the image storage unit Comprising the said image, and said arrangement information and said identification information displayed by said display means, and associating means for associating with each other, the.

また、請求項2に記載の部材情報管理システムは、請求項1に記載の部材情報管理システムにおいて、前記建築図面は、当該建築図面に含まれている前記建築部材を一意に識別する識別情報である符号を有し、前記読取情報配置手段は、前記建築図面から前記符号を抽出し、当該抽出した符号に対応する前記配置情報を前記部材情報格納手段から取得し、当該取得した配置情報を含む前記読取情報を、当該建築図面中の当該符号の位置に対応付けて配置する。 The member information management system according to claim 2 is the member information management system according to claim 1, wherein the architectural drawing is identification information for uniquely identifying the building member included in the architectural drawing. The reading information arrangement unit has a certain code, extracts the code from the architectural drawing, acquires the arrangement information corresponding to the extracted code from the member information storage unit, and includes the acquired arrangement information The read information is arranged in association with the position of the code in the architectural drawing.

また、請求項3に記載の部材情報管理システムは、請求項2に記載の部材情報管理システムにおいて、前記読取情報配置手段は、前記建築図面における通り芯の配置を基準として当該建築図面における前記符号の位置を特定し、当該特定した符号の位置に対応付けて前記読取情報を配置する。   Further, the member information management system according to claim 3 is the member information management system according to claim 2, wherein the reading information arrangement means uses the code in the architectural drawing based on the arrangement of the cores in the architectural drawing. The reading information is arranged in association with the position of the specified code.

また、請求項4に記載の部材情報管理システムは、請求項1から3のいずれか一項に記載の部材情報管理システムにおいて、前記読取情報配置手段は、前記読取情報を、光学的に読み取り可能な情報コードとして前記建築図面中に配置する。   Further, the member information management system according to claim 4 is the member information management system according to any one of claims 1 to 3, wherein the read information arrangement unit can optically read the read information. As a simple information code in the architectural drawing.

請求項1に記載の部材情報管理システムによれば、読取情報配置手段は、建築図面に含まれている各建築部材の識別情報を当該建築図面から取得し、当該取得した識別情報に対応する配置情報を部材情報格納手段から取得し、当該取得した識別情報と配置情報とを含む読取情報を、識別情報に対応する建築部材に関連付けて、建築図面中に配置する。これにより、建築図面中に配置された読取情報を読取手段に読み取らせるという極めて簡易な操作のみで、読取情報に含まれる配置情報や、当該読取情報に含まれる建築部材の識別情報に関連付けて部材情報格納手段に格納されている部材情報を表示手段に表示させることができ、検査対象の建築部材の配置情報や部材情報を利用者に容易に確認させることができる。また、建築部材に関する部材情報と、当該建築部材の識別情報とが、部材情報抽出手段によって部材図面から建築部材毎に抽出され、当該抽出された部材情報と識別情報とが相互に関連付けられて部材情報格納手段に格納されるので、利用者が自ら部材情報を複数のグループに分類する必要がなく、容易且つ確実に必要な部材情報を部材情報格納手段に格納することができる。   According to the member information management system according to claim 1, the read information arrangement unit acquires the identification information of each building member included in the architectural drawing from the architectural drawing, and the arrangement corresponding to the acquired identification information. Information is acquired from the member information storage means, and read information including the acquired identification information and arrangement information is associated with the building member corresponding to the identification information and arranged in the architectural drawing. Accordingly, the member is associated with the arrangement information included in the read information and the identification information of the building member included in the read information only by an extremely simple operation of causing the reading unit to read the read information arranged in the architectural drawing. The member information stored in the information storage means can be displayed on the display means, and the user can easily confirm the arrangement information and member information of the building member to be inspected. Further, the member information related to the building member and the identification information of the building member are extracted for each building member from the member drawing by the member information extracting unit, and the extracted member information and the identification information are associated with each other. Since it is stored in the information storage means, it is not necessary for the user to classify the member information into a plurality of groups, and the necessary member information can be easily and reliably stored in the member information storage means.

また、請求項2に記載の部材情報管理システムによれば、読取情報配置手段は、建築図面から建築部材を一意に識別する識別情報である符号を抽出し、当該抽出した符号に対応する配置情報を含む読取情報を、建築図面中の符号の位置に対応付けて配置するので、建築図面中の各建築部材の位置に対応して容易に読取情報を配置することができる。 Further, according to the member information management system according to claim 2, the reading information arrangement unit extracts a code which is identification information for uniquely identifying the building member from the architectural drawing, and the arrangement information corresponding to the extracted code. Is placed in association with the position of the code in the architectural drawing, the reading information can be easily arranged in correspondence with the position of each building member in the architectural drawing.

また、請求項3に記載の部材情報管理システムによれば、読取情報配置手段は、建築図面における通り芯の配置を基準として当該建築図面における符号の位置を特定し、当該特定した符号の位置に対応付けて読取情報を配置するので、建築図面における各建築部材の位置を容易且つ確実に特定し、当該特定した各建築部材の位置に対応して容易に読取情報を配置することができる。   Further, according to the member information management system according to claim 3, the reading information arrangement means specifies the position of the code in the architectural drawing with reference to the arrangement of the cores in the architectural drawing, and sets the position of the specified code. Since the read information is arranged in association with each other, the position of each building member in the architectural drawing can be easily and reliably specified, and the read information can be easily arranged corresponding to the position of each specified building member.

また、請求項4に記載の部材情報管理システムによれば、読取情報配置手段は、識別情報と配置情報とを含む読取情報を、光学的に読み取り可能な情報コードとして建築図面中に配置するので、撮影装置を用いて容易に読取情報を読み取らせることができる。   According to the member information management system of the fourth aspect, the read information arrangement means arranges the read information including the identification information and the arrangement information in the architectural drawing as an optically readable information code. The read information can be easily read using the photographing apparatus.

実施の形態に係る部材情報管理システムの電気的構成を機能概念的に示したブロック図である。It is the block diagram which showed functionally the electrical structure of the member information management system which concerns on embodiment. 梁についての部材図面を例示した図である。It is the figure which illustrated the member drawing about a beam. 伏図を概念的に例示した図である。It is the figure which illustrated the sketch figure conceptually. 部材情報DBに格納されている情報を例示した表である。It is the table | surface which illustrated the information stored in member information DB. 画像テーブルに格納されている情報を例示した表である。It is the table | surface which illustrated the information stored in the image table. 部材情報テーブルに格納されている情報を例示した表である。It is the table | surface which illustrated the information stored in the member information table. 部材情報管理処理のフローチャートである。It is a flowchart of a member information management process. 部材情報抽出処理のフローチャートである。It is a flowchart of member information extraction processing. 端末装置の表示部に表示された部材表及び区画線の選択指示を例示した図である。It is the figure which illustrated the selection instruction | indication of the member table | surface and division line displayed on the display part of the terminal device. 端末装置の表示部に表示された部材表及び区画線の選択指示を例示した図である。It is the figure which illustrated the selection instruction | indication of the member table | surface and division line displayed on the display part of the terminal device. 表示部に表示された部材表と区画線の要否及び各区画の呼称の入力指示とを例示した図である。It is the figure which illustrated the member table | surface displayed on the display part, the necessity of a division line, and the input instruction of the name of each division. 表示部に表示された部材表と区画線の要否及び各区画の呼称の入力指示とを例示した図である。It is the figure which illustrated the member table | surface displayed on the display part, the necessity of a division line, and the input instruction of the name of each division. 表示部に表示された部材表と同上部材・不要部材の設定指示とを例示した図である。It is the figure which illustrated the member table | surface displayed on the display part, and the setting instruction | indication of a member and an unnecessary member same as the above. 部材情報抽出部が抽出して表示部に表示させた識別情報及び部材情報を例示した図である。It is the figure which illustrated the identification information and member information which the member information extraction part extracted and displayed on the display part. 配置情報抽出処理のフローチャートである。It is a flowchart of arrangement information extraction processing. 端末装置の表示部に表示された通り芯の範囲の設定指示を例示した図である。It is the figure which illustrated the setting instruction | indication of the range of the street core displayed on the display part of the terminal device. 表示部に表示された通り芯の符号選択指示を例示した図である。It is the figure which illustrated the code | symbol selection instruction | indication of the through-core displayed on the display part. 表示部に表示された全建築部材の符号選択指示を例示した図である。It is the figure which illustrated the code selection directions of all the building members displayed on the display part. 読取情報配置処理のフローチャートである。It is a flowchart of reading information arrangement processing. 読取情報配置処理において表示部に表示される建築図面を例示した図である。It is the figure which illustrated the architectural drawing displayed on a display part in reading information arrangement processing. 読取情報配置処理において表示部に表示される建築図面を例示した図である。It is the figure which illustrated the architectural drawing displayed on a display part in reading information arrangement processing. 読取情報配置処理において表示部に表示される建築図面を例示した図である。It is the figure which illustrated the architectural drawing displayed on a display part in reading information arrangement processing. 読取情報配置処理において表示部に表示される建築図面を例示した図である。It is the figure which illustrated the architectural drawing displayed on a display part in reading information arrangement processing. 撮影処理のフローチャートである。It is a flowchart of an imaging process. 建築図面に配置された情報コードを撮影部により撮影する状況を例示した図である。It is the figure which illustrated the situation where the information code arranged on the architectural drawing is imaged by the imaging unit. 読取部によって読み取られた情報コードに含まれる各情報をディスプレイに表示した撮影装置を例示した図である。It is the figure which illustrated the imaging device which displayed each information included in the information code read by the reading part on the display. 読取部によって取得された部材情報をディスプレイに表示した撮影装置を例示した図である。It is the figure which illustrated the imaging device which displayed the member information acquired by the reading part on the display. 編集処理のフローチャートである。It is a flowchart of an edit process. 部材情報サーバの制御部によって生成されたアルバムの構成例を示す図である。It is a figure which shows the structural example of the album produced | generated by the control part of the member information server.

以下に添付図面を参照して、この発明に係る部材情報管理システムの実施の形態を詳細に説明する。まず、〔I〕実施の形態の基本的概念を説明した後、〔II〕実施の形態の具体的内容について説明し、〔III〕最後に、実施の形態に対する変形例について説明する。ただし、実施の形態によって本発明が限定されるものではない。   Embodiments of a member information management system according to the present invention will be described below in detail with reference to the accompanying drawings. [I] First, the basic concept of the embodiment will be described, then [II] the specific contents of the embodiment will be described, and [III] Finally, a modification to the embodiment will be described. However, the present invention is not limited to the embodiments.

〔I〕実施の形態の基本的概念
まず、実施の形態の基本的概念について説明する。実施の形態に係る部材情報管理システムの適用対象は任意であり、例えば建設中の建物についての検査野帳や、製造中の製品の検査用帳票を出力すると共に、当該建設中の建物や製造中の製品を被写体として撮影記録を行うために用いることができる。ここで「部材」とは、建築物、機械、輸送機器、電子機器等の製品を構成する各要素を示す概念であり、例えば建築部材、機械部品、電子部品等を含む。以下の実施の形態においては、配筋検査用に、建設中の建物の各部材(例えば梁、スラブ、柱等)の配筋検査野帳を作成すると共に、工事検査記録用に、各部材を被写体とする場合を例に挙げて説明する。
[I] Basic Concept of Embodiment First, the basic concept of the embodiment will be described. The application target of the member information management system according to the embodiment is arbitrary. For example, an inspection field book for a building under construction or an inspection form for a product under production is output, and the building under construction or under production This product can be used for shooting and recording with the product as a subject. Here, the “member” is a concept indicating each element constituting a product such as a building, a machine, a transportation device, and an electronic device, and includes, for example, a building member, a mechanical component, and an electronic component. In the following embodiments, a bar arrangement inspection book of each member (for example, a beam, a slab, a column, etc.) of a building under construction is created for the bar inspection, and each member is used for a construction inspection record. A case where a subject is used will be described as an example.

この部材情報管理システムの特徴の一つは、概略的に、建築部材に関する部材情報と、当該建築部材を一意に識別する識別情報とを、部材図面から建築部材毎に抽出すると共に、建築部材の配置に関する配置情報を建築図面から建築部材毎に抽出し、これらの識別情報、部材情報、及び配置情報を、相互に関連付けて部材情報格納手段に格納する点、各建築部材についての識別情報と配置情報とを含む読取情報を、各建築部材に関連付けて建築図面中に配置する点、建築図面中に配置された読取情報を読取手段により読み取らせ、当該読み取った読取情報に基づいて配置情報や部材情報を表示する点、当該表示した配置情報と撮影された画像と関連付ける点等にある。   One of the features of this member information management system is that, roughly, member information relating to a building member and identification information for uniquely identifying the building member are extracted from the member drawing for each building member. The arrangement information regarding the arrangement is extracted from the building drawing for each building member, and the identification information, the member information, and the arrangement information are stored in the member information storage means in association with each other, the identification information and the arrangement for each building member. The reading information including the information is arranged in the architectural drawing in association with each building member, the reading information arranged in the architectural drawing is read by the reading means, and the arrangement information and the member based on the read reading information There are a point of displaying information, a point of associating the displayed arrangement information with a photographed image, and the like.

このシステムによれば、各建築部材に関する部材情報を、煩雑な分類作業を行うことなく容易且つ確実に部材情報格納手段に格納することができる。また、建築部材に関連付けて建築図面中に配置された読取情報を読取手段により読み取らせることにより、部材情報格納手段に格納された当該建築部材に関連する部材情報や配置情報を容易に表示させることができる。さらに、被写体を撮影した画像と当該被写体の配置情報とを容易に関連付けることができ、画像整理のための作業負荷を大幅に低減することができる。   According to this system, the member information regarding each building member can be easily and reliably stored in the member information storage means without performing complicated classification work. In addition, the reading information arranged in the architectural drawing in association with the building member is read by the reading means, thereby easily displaying the member information and the arrangement information related to the building member stored in the member information storage means. Can do. Furthermore, the image obtained by photographing the subject can be easily associated with the arrangement information of the subject, and the workload for organizing the image can be greatly reduced.

〔II〕実施の形態の具体的内容
次に、実施の形態の具体的内容について説明する。
[II] Specific Contents of Embodiment Next, specific contents of the embodiment will be described.

(構成)
ます、本実施の形態に係る部材情報管理システムの構成について説明する。図1は、実施の形態に係る部材情報管理システムの電気的構成を機能概念的に示したブロック図である。図1に示すように、部材情報管理システム1は、インターネット、LAN(Local Area Network)、WAN(Wide Area Network)等のネットワーク2を介して、プリンタ3、端末装置4、部材情報サーバ10、及び撮影装置20が相互に通信可能に接続されて構成されている。
(Constitution)
First, the configuration of the member information management system according to the present embodiment will be described. FIG. 1 is a block diagram functionally conceptually showing the electrical configuration of the member information management system according to the embodiment. As shown in FIG. 1, the member information management system 1 includes a printer 3, a terminal device 4, a member information server 10, and a network 2 such as the Internet, a LAN (Local Area Network), and a WAN (Wide Area Network). The imaging device 20 is configured to be communicable with each other.

(構成−プリンタ、端末装置)
プリンタ3及び端末装置4は、ネットワーク2を介して部材情報サーバ10から入力された建築図面の少なくとも一部を出力する出力手段である。プリンタ3としては、公知のプリンタを用いることができる。また、端末装置4としては、例えば公知の携帯型情報端末やノートブック型PC等を用いることができる。この端末装置4は、部材情報サーバ10から入力された情報を表示する表示部41を備えている。表示部41としては、例えば液晶ディスプレイ等の公知の表示装置を用いることができる。
(Configuration-printer, terminal device)
The printer 3 and the terminal device 4 are output means for outputting at least a part of the architectural drawing input from the member information server 10 via the network 2. As the printer 3, a known printer can be used. As the terminal device 4, for example, a known portable information terminal, notebook type PC, or the like can be used. The terminal device 4 includes a display unit 41 that displays information input from the member information server 10. As the display unit 41, for example, a known display device such as a liquid crystal display can be used.

(構成−部材情報サーバ)
部材情報サーバ10は、ネットワークIF11、制御部12、及びデータ記録部13を備えている。
(Configuration-member information server)
The member information server 10 includes a network IF 11, a control unit 12, and a data recording unit 13.

(構成−部材情報サーバ−ネットワークIF)
ネットワークIF11は、部材情報サーバ10がネットワーク2を介した通信を行うための通信制御インターフェースである。このネットワークIF11は、例えばネットワークボードとして構成されている。
(Configuration-member information server-network IF)
The network IF 11 is a communication control interface for the member information server 10 to perform communication via the network 2. The network IF 11 is configured as a network board, for example.

(構成−部材情報サーバ−制御部)
制御部12は、部材情報サーバ10の各部を制御する制御手段であり、具体的には、CPU(Central Processing Unit)や、このCPU上で解釈実行される各種のプログラム(OSなどの制御プログラムや、各種の処理手順などを規定したプログラム)、及び所要プログラムや所要データを格納するための内部メモリを備えて構成されるコンピュータである(後述する撮影装置20の制御部についても同じ)。
(Configuration-member information server-control unit)
The control unit 12 is a control unit that controls each unit of the member information server 10. Specifically, the control unit 12 includes a CPU (Central Processing Unit) and various programs (control programs such as an OS, etc.) that are interpreted and executed on the CPU. And a program defining various processing procedures), and a computer including an internal memory for storing required programs and required data (the same applies to a control unit of the photographing apparatus 20 described later).

この制御部12は、機能概念的に、部材情報抽出部12a、配置情報抽出部12b、及び読取情報配置部12cを備えている。部材情報抽出部12aは、建築部材に関する部材情報と、当該建築部材を一意に識別する識別情報とを、部材図面から当該建築部材毎に抽出する部材情報抽出手段である。配置情報抽出部12bは、識別情報と、建築部材の配置に関する配置情報とを、建築図面から当該建築部材毎に抽出する配置情報抽出手段である。読取情報配置部12cは、識別情報と配置情報とを含む読取情報を、当該識別情報に対応する建築部材に関連付けて、建築図面中に配置する読取情報配置手段である。これらの制御部12の各構成要素によって実行される処理の詳細については後述する。   The control unit 12 includes a member information extraction unit 12a, an arrangement information extraction unit 12b, and a read information arrangement unit 12c in terms of functional concept. The member information extraction unit 12a is member information extraction means for extracting member information relating to a building member and identification information for uniquely identifying the building member from the member drawing for each building member. The arrangement information extraction unit 12b is arrangement information extraction means for extracting the identification information and the arrangement information related to the arrangement of the building members from the building drawing for each building member. The read information arrangement unit 12c is read information arrangement means for associating read information including identification information and arrangement information with a building member corresponding to the identification information and arranging it in the architectural drawing. Details of processing executed by each component of the control unit 12 will be described later.

(構成−部材情報サーバ−データ記録部)
データ記録部13は、制御部12が各種処理を実行する際に参照するテーブルやデータベース等を記憶するための記録手段であり、例えばハードディスクやその他の記録媒体によって構成されている(後述する撮影装置20のデータ記録部についても同じ)。このデータ記録部13は、図面データベース13a(以下、データベースを「DB」と称する)、及び部材情報DB13bを備えている。
(Configuration-member information server-data recording unit)
The data recording unit 13 is a recording unit for storing a table, a database, or the like that is referred to when the control unit 12 executes various processes, and is configured by, for example, a hard disk or other recording medium (an imaging device described later). The same applies to the 20 data recording units). The data recording unit 13 includes a drawing database 13a (hereinafter, the database is referred to as “DB”) and a member information DB 13b.

図面DB13aは、建築部材に関する部材図面と、建築部材を用いた建築物に関する建築図面とを格納する図面格納手段である。ここで、部材図面とは、例えば梁、スラブ、柱、あるいは壁等の建築部材に関する図面であり、部材情報を含んでいる。部材情報には、例えば、各建築部材に使用される鉄筋の配置、鋼種、間隔、定着状態、継手等を特定する配筋情報や、当該建築部材の形状、寸法等が含まれる。図2は、梁についての部材図面を例示した図である。図2に示したように、部材図面は部材表を有している。この部材表は、区画線で区画された領域であって、建築部材を一意に識別するための識別情報を含むタイトル領域と、部材情報を含む部材情報領域とを有している。図2の例では、タイトル領域(部材表における太線で囲まれた領域)には、各梁の名称(「G51」「G52」等)、各梁のスパン(「5,000」等)、各梁が配置されている階(「PH」「7」等)、及び梁の配筋情報や形状等の項目名(「巾×成」「配筋」等)が格納されている。これらの情報の内、例えば各梁の名称を建築部材の識別情報として用いることができる。また、部材情報領域(部材表におけるタイトル領域以外の領域)には、タイトル領域の各項目に関連付けて、梁の寸法(「500×1,800」等)、配筋図、主筋やあばら筋の規格や寸法等(「HD25」「LD13[2]@100」等)の情報が部材情報として格納されている。   The drawing DB 13a is a drawing storage unit that stores a member drawing relating to a building member and a building drawing relating to a building using the building member. Here, the member drawing is a drawing related to a building member such as a beam, a slab, a column, or a wall, and includes member information. The member information includes, for example, bar arrangement information for specifying the arrangement, steel type, interval, fixing state, joints, and the like of reinforcing bars used for each building member, and the shape and size of the building member. FIG. 2 is a diagram illustrating a member drawing of the beam. As shown in FIG. 2, the member drawing has a member table. This member table is an area partitioned by lane markings, and includes a title area including identification information for uniquely identifying a building member, and a member information area including member information. In the example of FIG. 2, the title area (area surrounded by a thick line in the bill of material) includes the name of each beam (such as “G51” and “G52”), the span of each beam (such as “5,000”), Stored are the floors where beams are arranged (“PH”, “7”, etc.) and item names (“width × combination”, “bar arrangement”, etc.) such as beam arrangement information and shape. Of these pieces of information, for example, the name of each beam can be used as building member identification information. In addition, in the member information area (area other than the title area in the BOM), the dimensions of the beam (“500 × 1,800”, etc.), the bar arrangement diagram, the main line, and the stirrup line are associated with each item in the title area. Information such as standards and dimensions (“HD25”, “LD13 [2] @ 100”, etc.) is stored as member information.

図1に戻り、建築図面には、建築物を構成する梁、スラブ、柱、壁等の各建築部材の構造的な骨組みを平面図で表した伏図や、平面図、立面図、断面図、配置図等が含まれる。図3は、伏図を概念的に例示した図である。図3に示したように、伏図には、柱や壁の中心線となる通り芯が縦横に引かれており、この通り芯を基準として梁や柱等の建築部材の配置が示されている。なお、図3においてX軸と直交する方向の通り芯を「X方向の通り芯」と呼び、Y軸と直交する方向の通り芯を「Y方向の通り芯」と呼ぶ。また、これらの各通り芯を一意に識別する符号((図3ではX方向の通り芯について「1」等、Y方向の通り芯について「A」等)が振られている。さらに、各建築部材の位置に対応して当該建築部材の名称を特定する符号(図3では「G1」等)が振られている。なお、図3では簡略化のため、梁に対応する符号のみを表記している。   Returning to FIG. 1, the architectural drawing includes a plan view, a plan view, an elevation view, and a cross section of the structural framework of each building member such as beams, slabs, columns, walls, etc. that constitute the building. Figures, layouts, etc. are included. FIG. 3 is a diagram conceptually illustrating a plan view. As shown in FIG. 3, in the plan, the street cores that are the center lines of the columns and walls are drawn vertically and horizontally, and the arrangement of building members such as beams and columns is shown based on the street cores. Yes. In FIG. 3, the core in the direction orthogonal to the X axis is referred to as “X core in the direction”, and the core in the direction orthogonal to the Y axis is referred to as the “Y core in the direction”. In addition, codes (for example, “1” for the core in the X direction and “A” for the core in the Y direction in FIG. 3) are assigned to uniquely identify the cores. A code (such as “G1” in FIG. 3) that identifies the name of the building member is assigned corresponding to the position of the member, and only the code corresponding to the beam is shown in FIG. ing.

図1に戻り、部材情報DB13bは、建築部材を一意に識別する識別情報、部材情報抽出部12aによって抽出された部材情報、及び、配置情報抽出部12bによって抽出された配置情報を、相互に関連付けて格納する部材情報格納手段である。図4は、部材情報DB13bに格納されている情報を例示した表である。この図4に示すように、部材情報DB13bには、項目「ID」、「階」、「符号」、「X1」、「X2」、「Y1」、「Y2」、及び「リスト画像」に対応する情報が、相互に関連付けて格納されている。この内、項目「ID」に対応して格納される情報は、建築部材毎に個別に割り当てられたID番号である(図4では「3001」等)。項目「階」に対応して格納される情報は、建築物において各建築部材が配置される階を特定する情報である(図4では「2F」)。項目「符号」に対応して格納される情報は、建築部材を一意に識別する識別情報であり、例えば各建築部材の名称を特定する符号が格納される(図4では「G1」)。項目「X1」、「X2」、「Y1」、及び「Y2」に対応して格納される情報は、建築部材の配置に関する配置情報であり、例えば、建築図面における通り芯の配置を基準とした場合における各建築部材の配置を特定するための情報が格納される。図4の例では、項目「X1」及び「X2」に対応して、建築部材の配置位置に対応するX方向の通り芯の符号名が格納される(図4では「1」等)。例えば、建築部材がX方向の通り芯「1」の上に配置されている場合は、項目「X1」にのみ「1」が格納される。また、建築部材がX方向の通り芯「1」と「2」との間に配置されている場合は、項目「X1」に「1」が格納され、項目「X2」に「2」が格納される。同様に、項目「Y1」及び「Y2」に対応して、建築部材の配置位置に対応するY方向の通り芯の符号名が格納される(図4では「E」等)。例えば、建築部材がY方向の通り芯「E」の上に配置されている場合は、項目「Y1」にのみ「E」が格納される。また、建築部材がY方向の通り芯「E」と「F」との間に配置されている場合は、項目「Y1」に「E」が格納され、項目「Y2」に「F」が格納される。また、項目「リスト画像」に対応して格納される情報は、部材情報抽出部12aによって抽出された部材情報であり、例えば部材図面の一部を切り取った画像データが格納される。なお、図4では、部材情報自体に代えて、部材情報の所在を示す情報(図4では「¥2F¥G1.wmf」)が項目「リスト画像」に対応して格納されている場合を例示している。   Returning to FIG. 1, the member information DB 13b correlates the identification information for uniquely identifying the building member, the member information extracted by the member information extraction unit 12a, and the arrangement information extracted by the arrangement information extraction unit 12b. It is the member information storage means to store. FIG. 4 is a table illustrating information stored in the member information DB 13b. As shown in FIG. 4, the member information DB 13b corresponds to items “ID”, “floor”, “sign”, “X1”, “X2”, “Y1”, “Y2”, and “list image”. Are stored in association with each other. Among these, the information stored corresponding to the item “ID” is an ID number individually assigned to each building member (“3001” in FIG. 4). The information stored corresponding to the item “floor” is information for specifying the floor on which each building member is arranged in the building (“2F” in FIG. 4). The information stored corresponding to the item “code” is identification information for uniquely identifying a building member, and for example, a code for specifying the name of each building member is stored (“G1” in FIG. 4). The information stored corresponding to the items “X1”, “X2”, “Y1”, and “Y2” is the arrangement information regarding the arrangement of the building members, for example, based on the arrangement of the cores in the architectural drawing. Information for specifying the arrangement of each building member in the case is stored. In the example of FIG. 4, the code name of the core in the X direction corresponding to the arrangement position of the building member is stored corresponding to the items “X1” and “X2” (“1” in FIG. 4). For example, when the building member is arranged on the core “1” in the X direction, “1” is stored only in the item “X1”. Further, when the building member is arranged between the cores “1” and “2” in the X direction, “1” is stored in the item “X1” and “2” is stored in the item “X2”. Is done. Similarly, corresponding to the items “Y1” and “Y2”, the code name of the core in the Y direction corresponding to the arrangement position of the building member is stored (“E” in FIG. 4). For example, when the building member is arranged on the core “E” in the Y direction, “E” is stored only in the item “Y1”. When the building member is arranged between the cores “E” and “F” in the Y direction, “E” is stored in the item “Y1” and “F” is stored in the item “Y2”. Is done. The information stored corresponding to the item “list image” is member information extracted by the member information extraction unit 12a, and stores, for example, image data obtained by cutting a part of the member drawing. 4 exemplifies a case where information indicating the location of the member information (“¥ 2F ¥ G1.wmf” in FIG. 4) is stored corresponding to the item “list image” instead of the member information itself. doing.

(構成−撮影装置)
図1に戻り、撮影装置20は、撮影部21、ディスプレイ22、制御部23、及びデータ記録部24を備えている。
(Arrangement-photographing device)
Returning to FIG. 1, the photographing apparatus 20 includes a photographing unit 21, a display 22, a control unit 23, and a data recording unit 24.

(構成−撮影装置−撮影部)
撮影部21は、被写体を撮影する撮影手段である。この撮影部21は、例えばCCD(Charge Coupled Devices)素子等の公知の撮像素子を用いて構成されており、撮影した画像を制御部23に出力する。
(Structure-Imager-Imager)
The photographing unit 21 is photographing means for photographing a subject. The imaging unit 21 is configured using a known imaging element such as a CCD (Charge Coupled Devices) element, and outputs a captured image to the control unit 23.

(構成−撮影装置−ディスプレイ)
ディスプレイ22は、制御部23の制御に基づいて各種情報を表示する表示手段である。このディスプレイ22としては、例えば液晶ディスプレイ等の公知の表示手段を用いることができる。
(Arrangement-Imaging device-Display)
The display 22 is display means for displaying various information based on the control of the control unit 23. As the display 22, known display means such as a liquid crystal display can be used.

(構成−撮影装置−制御部)
制御部23は、撮影装置20の各部を制御する制御手段であり、機能概念的に、読取部23a、及び関連付け部23bを備えている。読取部23aは、撮影部21によって撮影された画像に基づき、読取情報を読み取る読取手段である。関連付け部23bは、後述する画像テーブル24aに格納された画像と、ディスプレイ22によって表示された配置情報及び識別情報とを、相互に関連付ける関連付け手段である。これらの制御部23の各構成要素によって実行される処理の詳細については後述する。
(Configuration-Image capture device-Control unit)
The control unit 23 is a control unit that controls each unit of the photographing apparatus 20, and includes a reading unit 23a and an association unit 23b in terms of functional concept. The reading unit 23 a is a reading unit that reads read information based on an image photographed by the photographing unit 21. The associating unit 23b is an associating unit that associates an image stored in an image table 24a, which will be described later, with arrangement information and identification information displayed on the display 22. Details of processing executed by each component of the control unit 23 will be described later.

(構成−撮影装置−データ記録部)
データ記録部24は、制御部23が各種処理を実行する際に参照するテーブルやデータベース等を記憶するための記録手段であり、画像テーブル24a、及び部材情報テーブル24bを備えている。
(Arrangement-Imaging device-Data recording unit)
The data recording unit 24 is a recording unit for storing a table, a database, or the like that is referred to when the control unit 23 executes various processes, and includes an image table 24a and a member information table 24b.

画像テーブル24aは、撮影部21によって撮影された画像を格納する画像格納手段である。図5は、画像テーブル24aに格納されている情報を例示した表である。この図5に示すように、画像テーブル24aには、項目「ID」、「階」、「符号」、「部位」、「位置」、及び「撮影画像」に対応する情報が相互に関連付けて格納されている。この内、項目「ID」に対応して格納される情報は、被写体を一意に識別するためのID番号である(図5では「3001」等)。項目「階」に対応して格納される情報は、建築物において各建築部材が配置される階を特定する情報である(図5では「2F」)。項目「符号」に対応して格納される情報は、建築部材を一意に識別する識別情報であり、例えば各建築部材の名称を特定する符号が格納される(図5では「G1」)。項目「部位」に対応して格納される情報は、建築部材の種別名を特定する情報である(図5では「大梁」)。項目「位置」に対応して格納される情報は、建築部材の配置に関する配置情報であり、例えば、建築図面における通り芯の配置を基準とした場合における各建築部材の配置を特定するための情報が格納される(図5では「1*E−F」等)。項目「撮影画像」に対応して格納される情報は、撮影部21よって撮影された画像データである(図5では「PICT30011.jpg」等)。なお、画像データのファイル形式は任意で、例えばビットマップ形式やJPEG形式等の各種のファイル形式を用いることができる。   The image table 24 a is an image storage unit that stores an image photographed by the photographing unit 21. FIG. 5 is a table illustrating information stored in the image table 24a. As shown in FIG. 5, information corresponding to items “ID”, “floor”, “sign”, “part”, “position”, and “captured image” is stored in association with each other in the image table 24a. Has been. Among these, the information stored corresponding to the item “ID” is an ID number for uniquely identifying the subject (“3001” in FIG. 5). The information stored corresponding to the item “floor” is information for specifying the floor on which each building member is arranged in the building (“2F” in FIG. 5). The information stored corresponding to the item “code” is identification information for uniquely identifying a building member, and for example, a code for specifying the name of each building member is stored (“G1” in FIG. 5). The information stored corresponding to the item “part” is information for identifying the type name of the building member (“large beam” in FIG. 5). The information stored corresponding to the item “position” is the arrangement information related to the arrangement of the building members. For example, the information for specifying the arrangement of each building member when the arrangement of the cores in the architectural drawing is used as a reference. Is stored (in FIG. 5, “1 * EF”, etc.). The information stored corresponding to the item “captured image” is image data captured by the imaging unit 21 (“PICT30011.jpg” in FIG. 5). The file format of the image data is arbitrary, and various file formats such as a bitmap format and a JPEG format can be used.

図1に戻り、部材情報テーブル24bは、部材情報を格納するための格納手段である。図6は、部材情報テーブル24bに格納されている情報を例示した表である。この図6に示すように、部材情報テーブル24bには、項目「ID」及び「リスト画像」に対応する情報が相互に関連付けて格納されている。この内、項目「ID」に対応して格納される情報は、建築部材毎に個別に割り当てられたID番号である(図6では「3001」等)。項目「リスト画像」に対応して格納される情報は、部材情報であり、例えば部材図面の一部を切り取った画像データが格納される。なお、図6では、部材情報自体に代えて、部材情報の所在を示す情報(図6では「¥2F¥G1.jpg」)が項目「リスト画像」に対応して格納されている場合を例示している。   Returning to FIG. 1, the member information table 24b is a storage means for storing member information. FIG. 6 is a table illustrating information stored in the member information table 24b. As shown in FIG. 6, information corresponding to the items “ID” and “list image” is stored in the member information table 24b in association with each other. Among these, the information stored corresponding to the item “ID” is an ID number assigned individually for each building member (“3001” in FIG. 6). The information stored corresponding to the item “list image” is member information, and stores, for example, image data obtained by cutting a part of the member drawing. FIG. 6 illustrates an example in which information indicating the location of the member information (“¥ 2F ¥ G1.jpg” in FIG. 6) is stored corresponding to the item “list image” instead of the member information itself. doing.

(処理−部材情報管理処理)
次に、このように構成される部材情報管理システム1によって実行される部材情報管理処理について説明する。図7は部材情報管理処理のフローチャートである(以下の各処理の説明ではステップを「S」と略記する)。この部材情報管理処理は、例えば端末装置4における公知の入力手段(図示省略)を介して部材情報管理処理の起動指示入力が行われた場合に起動される。
(Processing-member information management process)
Next, a member information management process executed by the member information management system 1 configured as described above will be described. FIG. 7 is a flowchart of the member information management process (in the following description of each process, step is abbreviated as “S”). This member information management process is activated when, for example, a member information management process activation instruction is input via a known input unit (not shown) in the terminal device 4.

図7に示すように、部材情報管理処理が起動されると、部材情報抽出部12aは、建築部材に関する部材情報と、当該建築部材を一意に識別する識別情報とを、部材図面から当該建築部材毎に抽出する部材情報抽出処理を実行する(SA1)。続いて、配置情報抽出部12bは、識別情報と、建築部材の配置に関する配置情報とを、建築図面から当該建築部材毎に抽出する配置情報抽出処理を実行する(SA2)。続いて、読取情報配置部12cは、識別情報と配置情報とを含む読取情報を、当該識別情報に対応する建築部材に関連付けて、当該建築図面中に配置する読取情報配置処理を実行する(SA3)。以下、これらの部材情報抽出処理、配置情報抽出処理、及び読取情報配置処理について、それぞれ説明する。   As shown in FIG. 7, when the member information management process is activated, the member information extraction unit 12a obtains the member information related to the building member and the identification information uniquely identifying the building member from the member drawing. The member information extraction process extracted every time is executed (SA1). Subsequently, the arrangement information extraction unit 12b executes an arrangement information extraction process for extracting the identification information and the arrangement information related to the arrangement of the building member from the building drawing for each building member (SA2). Subsequently, the read information arrangement unit 12c executes read information arrangement processing in which the read information including the identification information and the arrangement information is associated with the building member corresponding to the identification information and arranged in the architectural drawing (SA3). ). Hereinafter, each of the member information extraction process, the arrangement information extraction process, and the read information arrangement process will be described.

(処理−部材情報抽出処理)
図8は、部材情報抽出処理のフローチャートである。図8に示すように、部材情報抽出処理が起動されると、部材情報抽出部12aは、図面DB13aに格納されている部材図面から部材表を取得する(SB1)。この時、部材情報抽出部12aは部材表をベクターデータとして取得する。部材表の取得方法は任意で、例えば、端末装置4の表示部41に部材図面を表示させ、ユーザに部材図面における部材表の領域を公知の入力手段を介して選択させ、当該選択された領域に含まれる図形をベクターデータとして取得する。あるいは、ユーザにより予め部材図面からベクターデータとして切り出された部材表を図面DB13aに格納しておき、当該ベクターデータを図面DB13aから取得する。
(Processing-member information extraction process)
FIG. 8 is a flowchart of the member information extraction process. As shown in FIG. 8, when the member information extraction process is started, the member information extraction unit 12a acquires a member table from a member drawing stored in the drawing DB 13a (SB1). At this time, the member information extraction unit 12a acquires the member table as vector data. The member table acquisition method is arbitrary, for example, the member drawing is displayed on the display unit 41 of the terminal device 4, the user selects the member table region in the member drawing via a known input unit, and the selected region is displayed. The figure contained in is acquired as vector data. Alternatively, a member table previously cut out as vector data from the member drawing by the user is stored in the drawing DB 13a, and the vector data is acquired from the drawing DB 13a.

次に、部材情報抽出部12aは、SB1で取得した部材表を端末装置4の表示部41に表示させると共に、当該部材表における区画線の選択指示を表示させる(SB2)。図9及び図10は、端末装置4の表示部41に表示された部材表及び区画線の選択指示を例示した図である。図9及び図10に示すように、図2に例示した部材図面からベクターデータとして取得された部材表が表示部41に表示されると共に、当該部材表における区画線の選択を促す指示(図9及び図10では「区画線選択」ウィンドウ)が表示される。   Next, the member information extraction unit 12a displays the member table acquired in SB1 on the display unit 41 of the terminal device 4, and also displays an instruction for selecting a division line in the member table (SB2). FIG. 9 and FIG. 10 are diagrams exemplifying the instruction for selecting the member table and the division line displayed on the display unit 41 of the terminal device 4. As shown in FIGS. 9 and 10, the member table acquired as vector data from the member drawing illustrated in FIG. 2 is displayed on the display unit 41, and an instruction for prompting selection of a division line in the member table (FIG. 9). And in FIG. 10, a “partition line selection window” is displayed.

図8に戻り、部材情報抽出部12aは、表示部41に表示させた部材表のベクターデータに含まれる線が選択されたか否かを判定する(SB3)。その結果、線が選択されていない場合(SB3、No)、部材情報抽出部12aは線が選択されたか否かを再度判定する(SB3)。一方、線が選択された場合(SB3、Yes)、部材情報抽出部12aは、選択された線以上の長さの線を区画線として特定する(SB4)。例えば、図9に示した部材表を構成する線のうち、部材表の左端から右端に至る水平線の何れか一本が選択されると、当該選択された線の長さ以上の他の水平線を区画線として特定する(図9の部材表における水平方向の太線)。また、図10に示した部材表を構成する線のうち、部材表の中央近傍から下端に至る垂直線(図10中の「A」)が選択されると、当該選択された線の長さ以上の他の垂直線を区画線として特定する(図10の部材表における垂直方向の太線)。   Returning to FIG. 8, the member information extraction unit 12a determines whether or not a line included in the vector data of the member table displayed on the display unit 41 is selected (SB3). As a result, when a line is not selected (SB3, No), the member information extraction unit 12a determines again whether or not a line is selected (SB3). On the other hand, when a line is selected (SB3, Yes), the member information extraction unit 12a specifies a line having a length equal to or longer than the selected line as a partition line (SB4). For example, if any one of the horizontal lines from the left end to the right end of the member table is selected among the lines constituting the member table shown in FIG. 9, another horizontal line longer than the length of the selected line is selected. It is specified as a division line (horizontal thick line in the member table of FIG. 9). Moreover, when the vertical line ("A" in FIG. 10) from the vicinity of the center of the member table to the lower end is selected among the lines constituting the member table shown in FIG. 10, the length of the selected line is selected. The other vertical lines described above are specified as partition lines (the vertical thick lines in the member table of FIG. 10).

この時、部材情報抽出部12aは区画線として特定された各線の座標情報を取得し、当該取得した各区画線の座標情報を区画線テーブルとして表示部41に表示させる(図9及び図10では左上のテーブル)。この区画線テーブルには、テーブル項目「T」、「D」、「XS」、「YS」、「XE」、「YE」、及び「3pt」に対応する情報が相互に関連付けて格納されている。項目「T」に対応して格納される情報は、線の種別を特定する情報である(図9及び図10では区画線を意味する「L」等)。項目「D」に対応して格納される情報は、線の方向を特定する情報である(図9及び図10では水平方向について「0」、垂直方向について「1」)。項目「XS」に対応して格納される情報は、線の始点のX座標を特定する情報である(図9及び図10では「0」等)。項目「YS」に対応して格納される情報は、線の始点のY座標を特定する情報である(図9及び図10では「0」等)。項目「XE」に対応して格納される情報は、線の終点のX座標を特定する情報である(図9及び図10では「547」等)。項目「YE」に対応して格納される情報は、線の終点のY座標を特定する情報である(図9及び図10では「1」等)。項目「3pt」に対応して格納される情報は、線に対応する名称等を特定する情報である。   At this time, the member information extraction unit 12a acquires the coordinate information of each line specified as a lane marking, and causes the display unit 41 to display the acquired coordinate information of each lane marking as a lane marking table (in FIGS. 9 and 10). Table on the upper left). In this lane marking table, information corresponding to table items “T”, “D”, “XS”, “YS”, “XE”, “YE”, and “3pt” is stored in association with each other. . The information stored in correspondence with the item “T” is information for specifying the type of line (“L” or the like in FIG. 9 and FIG. 10 meaning a partition line). The information stored corresponding to the item “D” is information for specifying the line direction (“0” in the horizontal direction and “1” in the vertical direction in FIGS. 9 and 10). The information stored corresponding to the item “XS” is information for specifying the X coordinate of the starting point of the line (“0” in FIGS. 9 and 10). The information stored corresponding to the item “YS” is information for specifying the Y coordinate of the starting point of the line (“0” in FIGS. 9 and 10). The information stored corresponding to the item “XE” is information for specifying the X coordinate of the end point of the line (“547” in FIGS. 9 and 10). The information stored corresponding to the item “YE” is information for specifying the Y coordinate of the end point of the line (“1” in FIGS. 9 and 10). The information stored corresponding to the item “3pt” is information for specifying a name or the like corresponding to the line.

図8に戻り、部材情報抽出部12aは、区画線の選択が完了したか否かを判定する(SB5)。例えば、公知の入力手段を介して区画線の選択が完了した旨の入力がされた場合(図9及び図10では、「区画線選択」ウィンドウの「完了」ボタンが押された場合)、区画線の選択が完了したと判定する。   Returning to FIG. 8, the member information extraction unit 12a determines whether or not the selection of the lane marking has been completed (SB5). For example, when an input indicating that the selection of the lane marking has been completed is made via a known input means (in FIG. 9 and FIG. 10, when the “Finish” button in the “lane line selection” window is pressed) It is determined that the line selection is completed.

その結果、区画線の選択が完了していない場合(SB5、No)、部材情報抽出部12aはSB3に戻り、部材表のベクターデータに含まれる線が選択されたか否かを判定する(SB3)。その後、区画線の選択が完了する(SB5、Yes)まで、SB3からSB5の処理を繰り返す。   As a result, when the selection of the division line is not completed (SB5, No), the member information extraction unit 12a returns to SB3 and determines whether or not a line included in the vector data of the member table has been selected (SB3). . Thereafter, the processes from SB3 to SB5 are repeated until the selection of the lane marking is completed (SB5, Yes).

一方、区画線の選択が完了した場合(SB5、Yes)、部材情報抽出部12aは、特定された区画線の要否及び各区画の呼称の入力指示を表示させる(SB6)。   On the other hand, when selection of the lane marking is completed (SB5, Yes), the member information extraction unit 12a displays the necessity of the identified lane marking and an instruction to input the name of each zone (SB6).

図11及び図12は、表示部41に表示された部材表と区画線の要否及び各区画の呼称の入力指示とを例示した図である。図11及び図12に示すように、区画線の要否及び各区画の呼称を入力するための入力欄(図11及び図12では「区画の要否と呼称」ウィンドウ)が表示部41に表示される。なお、図11及び図12における網掛け領域は、入力手段を介して当該領域が選択されている状態を示している。   FIG. 11 and FIG. 12 are diagrams exemplifying the material table displayed on the display unit 41, necessity / unnecessity of lane markings, and instructions for inputting the names of the respective lanes. As shown in FIGS. 11 and 12, an input field (in FIG. 11 and FIG. 12, a “necessity and name of section” window) for inputting the necessity of the section line and the name of each section is displayed on the display unit 41. Is done. Note that the shaded area in FIGS. 11 and 12 indicates a state in which the area is selected via the input unit.

図8に戻り、部材情報抽出部12aは、区画線の要否及び各区画の呼称が入力されたか否かを判定する(SB7)。その結果、区画線の要否及び各区画の呼称が入力されていない場合(SB7、No)、部材情報抽出部12aは区画線の要否及び各区画の呼称が入力されたか否かを再度判定する(SB7)。一方、区画線の要否及び各区画の呼称が入力された場合(SB7、Yes)、部材情報抽出部12aは、入力された区画線の要否及び各区画の呼称を区画線テーブルに反映する(SB8)。   Returning to FIG. 8, the member information extraction unit 12a determines whether or not the lane lines are necessary and the names of the lanes are input (SB7). As a result, if the necessity of the lane line and the designation of each division are not input (SB7, No), the member information extraction unit 12a determines again whether the necessity of the lane line and the designation of each division have been input. (SB7). On the other hand, when the necessity of the lane line and the designation of each division are input (SB7, Yes), the member information extraction unit 12a reflects the necessity of the lane line and the designation of each division in the lane line table. (SB8).

例えば、図11において、部材表の最上段の行(項目「名称」に対応する行)の直下の行(項目「スパン」に対応する行)が選択され、当該行に対応する区画が不要であることを示す「/」が入力欄に入力された場合、部材情報抽出部12aは、部材表の最上段の行と、その直下の行とを区画する区画線が不要なものとし、これらの二つの行をまとめて一つの行として扱う。これに対応して、区画線テーブルの項目「3pt」において不要な区画線に対応する部分に「/」を格納するとともに、部材表における当該不要な区画線の表示を太い実線から点線に変更する。   For example, in FIG. 11, the row (row corresponding to the item “span”) immediately below the top row (row corresponding to the item “name”) of the BOM is selected, and the section corresponding to the row is not necessary. When “/” indicating that it is present is input to the input field, the member information extraction unit 12a does not need a partition line that divides the uppermost row of the member table and the row immediately below it. Treat two lines together as one line. Correspondingly, “/” is stored in a portion corresponding to an unnecessary lane line in the item “3pt” of the lane line table, and the display of the unnecessary lane line in the member table is changed from a thick solid line to a dotted line. .

また、図12において、部材表のうち「G51」に対応する列が選択され、当該列に対応する区画の名称として「G51」が入力欄に入力された場合、部材情報抽出部12aは、当該選択されている列の名称を「G51」と設定する。これに対応して、区画線テーブルの項目「3pt」において、選択された列に対応する区画線(垂直方向の区画線のうち、部材表の左端から3本目の区画線)に対応する部分に「G51」を格納する。   In FIG. 12, when a column corresponding to “G51” is selected in the member table, and “G51” is input to the input field as the name of the section corresponding to the column, the member information extraction unit 12a The name of the selected column is set as “G51”. Correspondingly, in the section line table item “3pt”, in the portion corresponding to the partition line corresponding to the selected column (the third partition line from the left end of the member table among the vertical partition lines). “G51” is stored.

また、図11及び12において、部材表の最上段の行(項目「名称」に対応する行)が選択され、当該行に対応する区画がタイトル領域であることを示す「*」が入力欄に入力された場合、部材情報抽出部12aは、部材表の最上段の行の上側の水平方向の区画線から次の水平方向の区画線(水平方向の区画線のうち、部材表の上端から2本目の区画線)までの領域をタイトル領域として扱う。これに対応して、区画線テーブルの項目「3pt」において、部材表の最上段の行の上側の水平方向の区画線に対応する部分に「*」を格納する。   11 and 12, the top row of the BOM (the row corresponding to the item “name”) is selected, and “*” indicating that the section corresponding to the row is the title area is displayed in the input field. When the member information is input, the member information extraction unit 12a starts from the horizontal partition line on the uppermost row of the member table to the next horizontal partition line (of the horizontal partition lines, the two from the upper end of the member table). The area up to the first partition line) is treated as the title area. Correspondingly, “*” is stored in the portion corresponding to the horizontal lane marking on the uppermost row of the member table in the lane marking table item “3pt”.

図8に戻り、部材情報抽出部12aは、区画線の要否及び各区画の呼称の入力が完了したか否かを判定する(SB9)。例えば、公知の入力手段を介して区画線の要否及び各区画の呼称の入力が完了した旨の入力がされた場合、区画線の要否及び各区画の呼称の入力が完了したと判定する。   Returning to FIG. 8, the member information extraction unit 12 a determines whether or not the lane lines are necessary and whether the names of the respective divisions have been input (SB9). For example, when the necessity input of the lane line and the input of the name of each division are input via a known input means, it is determined that the necessity of the lane line and the input of the name of each division are completed. .

その結果、区画線の要否及び各区画の呼称の入力が完了していない場合(SB9、No)、部材情報抽出部12aはSB7に戻り、区画線の要否及び各区画の呼称が入力されたか否かを判定する(SB7)。その後、区画線の要否及び各区画の呼称の入力が完了する(SB9、Yes)まで、SB7からSB9の処理を繰り返す。   As a result, when the input of the necessity of the lane line and the designation of each division is not completed (SB9, No), the member information extraction unit 12a returns to SB7, and the necessity of the lane line and the designation of each division are input. It is determined whether or not (SB7). Thereafter, the processes from SB7 to SB9 are repeated until the input of the necessity / unnecessity of the lane markings and the designation of the names of the respective sections is completed (SB9, Yes).

一方、区画線の要否及び各区画の呼称の入力が完了した場合(SB9、Yes)、部材情報抽出部12aは、同上部材・不要部材の設定指示を表示させる(SB10)。   On the other hand, when the input of the necessity / unnecessity of the lane markings and the designation of each zoning is completed (SB9, Yes), the member information extraction unit 12a displays the setting instruction for the same member / unnecessary member (SB10).

図13は、表示部41に表示された部材表と同上部材・不要部材の設定指示とを例示した図である。図13に示すように、同上部材・不要部材の設定が完了したか否かを確認するための画面(図13では「同上・不要部材の設定」ウィンドウ)が表示部41に表示される。この時、部材情報抽出部12aは、同上部材・不要部材の設定を行うための同上・不要部材設定テーブル(図13では「確認・設定画面」ウィンドウ内)を表示部41に表示させる。ここで「同上部材」とは、直上階の建築部材と配筋や寸法等が同じ建築部材を意味するものであり、部材表における同上部材に対応する部分には例えば「同上」と記載される。また、「不要部材」とは、直上階や直下階に建築部材が存在するために部材表においては区画が存在するものの、実際には当該区画に建築部材が存在しないことを意味するものであり、部材表における不要部材に対応する部分には例えば斜線が引かれる。   FIG. 13 is a diagram exemplifying a member table displayed on the display unit 41 and setting instructions for the same member / unnecessary member. As shown in FIG. 13, a screen for confirming whether or not the setting of the same member / unnecessary member has been completed (the “same as above / unnecessary member setting” window in FIG. 13) is displayed on the display unit 41. At this time, the member information extraction unit 12a causes the display unit 41 to display the same / unnecessary member setting table (in the “confirmation / setting screen” window in FIG. 13) for setting the same member / unnecessary member. Here, the “same member” means a building member having the same bar arrangement, dimensions, etc. as the building member on the directly upper floor, and the part corresponding to the same member in the member table is described as “same as above”, for example. . In addition, “unnecessary member” means that there is a building member on the upper floor or a lower floor, so that there are sections in the member table, but there is actually no building member in the section. For example, a portion corresponding to an unnecessary member in the member table is hatched.

同上・不要部材設定テーブルには、テーブル項目として各階の名称(図13では「PH」「7F」等)と区画の名称(図13では「G51」「G52」等)とが設けられており、これらの項目に対応して建築部材の上下階間での異同を特定するための記号(図13では「1」「2」等)が格納されている。例えば、名称「G51」において、階「PH」に記号「1」、階「7F」及び「6F」に記号「2」が格納されている場合、当該名称「G51」の階「PH」の建築部材と階「7F]の建築部材とは異なっているが、階「7F」の建築部材と階「6F」の建築部材とは同じであることを意味している。また、名称「G54」において、階「PH」に記号「1」、階「7F」に記号「0」、階「6F」に記号「3」が格納されている場合、当該名称「G54」の階「PH」の建築部材と階「6F]の建築部材とは異なっており、階「7F」には建築部材が存在しないことを意味している。   In the same / unnecessary member setting table, the names of each floor (“PH”, “7F”, etc. in FIG. 13) and division names (“G51”, “G52”, etc. in FIG. 13) are provided as table items. Corresponding to these items, symbols (“1”, “2”, etc. in FIG. 13) for specifying the difference between the upper and lower floors of the building member are stored. For example, in the name “G51”, when the symbol “1” is stored in the floor “PH” and the symbol “2” is stored in the floor “7F” and “6F”, the building of the floor “PH” of the name “G51” is stored. Although the member is different from the building member of the floor “7F”, it means that the building member of the floor “7F” and the building member of the floor “6F” are the same. In addition, in the name “G54”, when the symbol “1” is stored in the floor “PH”, the symbol “0” is stored in the floor “7F”, and the symbol “3” is stored in the floor “6F”, the name “G54” The building member on the floor “PH” is different from the building member on the floor “6F”, which means that there is no building member on the floor “7F”.

図8に戻り、部材情報抽出部12aは、同上部材・不要部材の設定がされたか否かを判定する(SB11)。その結果、同上部材・不要部材の設定がされていない場合(SB11、No)、部材情報抽出部12aは同上部材・不要部材の設定がされたか否かを再度判定する(SB11)。一方、同上部材・不要部材の設定がされた場合(SB11、Yes)、部材情報抽出部12aは、入力された同上部材・不要部材の設定指示を同上・不要部材設定テーブルに反映する(SB12)。   Returning to FIG. 8, the member information extraction unit 12a determines whether the same member / unnecessary member is set (SB11). As a result, when the same member / unnecessary member is not set (SB11, No), the member information extraction unit 12a determines again whether the same member / unnecessary member is set (SB11). On the other hand, when the same member / unnecessary member is set (SB11, Yes), the member information extraction unit 12a reflects the input same member / unnecessary member setting instruction in the same / unnecessary member setting table (SB12). .

例えば、図13に示した部材表においては、名称「G51」「G52」「G53」の階「6F」に対応する部分に「同上」と記載されていることから、当該部分に対応する建築部材は同上部材であることが分る。この場合、公知の入力手段を介して、同上・不要部材設定テーブルにおける名称「G51」「G52」「G53」の階「6F」に対応する各部分に、直上階である階「7F」に記載されている記号「2」が入力されると、部材情報抽出部12aは当該入力結果を同上・不要部材設定テーブルに反映して表示部41に表示させる。   For example, in the member table shown in FIG. 13, “same as above” is written in the portion corresponding to the floor “6F” of the names “G51”, “G52”, and “G53”. Is a member as above. In this case, each of the portions corresponding to the floors “6F” of the names “G51”, “G52”, and “G53” in the above-described unnecessary / unnecessary member setting table is described in the floor “7F”, which is directly above, via a known input unit. When the symbol “2” is input, the member information extraction unit 12a reflects the input result in the same / unnecessary member setting table and causes the display unit 41 to display the input result.

また、図13に示した部材表においては、名称「G54」の階「7F」に対応する部分に斜線が引かれていることから、当該部分に対応する建築部材は存在しないことが分る。この場合、公知の入力手段を介して、同上・不要部材設定テーブルにおける名称「G54」の階「6F」に対応する各部分に記号「0」が入力されると、部材情報抽出部12aは当該入力結果を同上・不要部材設定テーブルに反映して表示部41に表示させる。   Moreover, in the member table | surface shown in FIG. 13, since the diagonal line is drawn on the part corresponding to the floor "7F" of the name "G54", it turns out that the building member corresponding to the said part does not exist. In this case, when the symbol “0” is input to each part corresponding to the floor “6F” of the name “G54” in the same / unnecessary member setting table via the known input means, the member information extraction unit 12a The input result is reflected on the same / unnecessary member setting table and displayed on the display unit 41.

図8に戻り、部材情報抽出部12aは、同上部材・不要部材の設定が完了したか否かを判定する(SB13)。例えば、公知の入力手段を介して同上部材・不要部材の設定が完了した旨の入力がされた場合(図13では、「同上・不要部材の設定」ウィンドウの「OK」ボタンが押された場合)、同上部材・不要部材の設定が完了したと判定する。   Returning to FIG. 8, the member information extraction unit 12a determines whether the setting of the same member / unnecessary member is completed (SB13). For example, when the input indicating that the setting of the same member / unnecessary member is completed is made via a known input means (in FIG. 13, the “OK” button in the “Same as above / Unnecessary member setting” window is pressed) ), It is determined that the setting of the member / unnecessary member is completed.

その結果、同上部材・不要部材の設定が完了していない場合(SB13、No)、部材情報抽出部12aはSB11に戻り、同上部材・不要部材の設定がされたか否かを判定する(SB11)。その後、同上部材・不要部材の設定が完了する(SB13、Yes)まで、SB11からSB13の処理を繰り返す。   As a result, when the setting of the same member / unnecessary member is not completed (SB13, No), the member information extraction unit 12a returns to SB11 and determines whether the same member / unnecessary member is set (SB11). . Thereafter, the processing from SB11 to SB13 is repeated until the setting of the same member / unnecessary member is completed (SB13, Yes).

一方、同上部材・不要部材の設定が完了した場合(SB13、Yes)、部材情報抽出部12aは、区画線テーブルに基づき、部材表におけるタイトル領域及び部材情報領域を特定する(SB14)。例えば、部材情報抽出部12aは各区画線について区画線テーブルの項目「3pt」を参照し、「*」が格納されている区画線に対応する領域をタイトル領域として特定し、それ以外の領域を部材情報領域として特定する。   On the other hand, when the setting of the same member / unnecessary member is completed (SB13, Yes), the member information extraction unit 12a specifies the title area and the member information area in the member table based on the lane marking table (SB14). For example, the member information extraction unit 12a refers to the item “3pt” in the lane line table for each lane line, identifies an area corresponding to the lane line in which “*” is stored as the title area, and sets other areas as the area. It is specified as a member information area.

次に、部材情報抽出部12aは、区画線によって区画された部材表の各ベクターデータの内、タイトル領域に対応するベクターデータと部材情報領域に対応するベクターデータとを組み合わせたデータを部材情報及び識別情報として建築部材毎に抽出し、当該抽出したデータをデータ記録部13に記録する(SB15)。   Next, the member information extraction unit 12a uses, as member information and data obtained by combining vector data corresponding to the title region and vector data corresponding to the member information region, among the vector data of the member table partitioned by the partition line. The identification information is extracted for each building member, and the extracted data is recorded in the data recording unit 13 (SB15).

例えば、部材情報抽出部12aは、タイトル領域を区画する水平方向の区画線と垂直方向の区画線との双方に囲まれた領域(例えば部材表の左上端の領域、以下「タイトル区画」)に含まれるベクターデータと、タイトル領域において相互に隣接する水平方向及び垂直方向の区画線にて囲まれた各領域(以下、「識別区画」)に含まれるベクターデータと、これらの各識別区画と共通の区画線によって区画される部材情報領域中の領域(以下、「部材区画」)に含まれるベクターデータとを組合わせる。そして、組合わせたデータを、建築部材毎の識別情報及び部材情報として表示部41に表示させると共に、データ記録部13に記録する。   For example, the member information extraction unit 12a applies a region (for example, a region at the upper left end of the member table, hereinafter referred to as a “title partition”) surrounded by both a horizontal partition line and a vertical partition line that partition the title region. The vector data included, the vector data included in each area (hereinafter referred to as “identification section”) surrounded by horizontal and vertical partition lines adjacent to each other in the title area, and common to each of these identification sections Are combined with vector data contained in an area (hereinafter referred to as “member section”) in the member information area partitioned by the partition line. The combined data is displayed on the display unit 41 as identification information and member information for each building member, and recorded in the data recording unit 13.

図14は、部材情報抽出部12aが抽出して表示部41に表示させた識別情報及び部材情報を例示した図である。この図14では、タイトル区画に含まれるベクターデータと、階「PH」を含む識別区画及び名称「G51」を含む識別区画に含まれるベクターデータと、これらの識別区画と共通の区画線によって区画された部材区画に含まれる配筋情報等のベクターデータとが、相互に組み合わされて表示されている。さらに、図14の例では、名称「G51」に対応する列の両側に、元の部材表において当該列に隣接する所定幅の領域に含まれるベクターデータを組合わせている。これにより、建築部材の端部や隣接領域における配筋情報(定着状態や継手等)を、当該建築部材の部材情報に含めることができる。この図14の例では、部材情報抽出部12aは、識別区画を区画している水平方向の区画線の名称である「PH」と、識別区画を区画している垂直方向の区画線の名称である「G51」とを、識別情報として抽出し、これらの識別区画と共通の区画線によって区画された部材区画に含まれる配筋情報等のベクターデータを部材情報として抽出する。この場合、部材情報抽出部12aは、識別区画を区画している水平方向の区画線の名称(すなわち、階の名称)である「PH」をフォルダ名とするデータフォルダをデータ記録部13内に設ける。そして、上述のように部材表から抽出して組合わせたベクターデータに、識別区画を区画している垂直方向の区画線の名称(すなわち、建築部材の名称)である「G51」をファイル名として付して、データ記録部13の「PH」フォルダに格納する。なお、抽出した部材情報を部材情報DB13bに格納する際に、他のデータ形式(例えばJPEG形式)等に変換して格納してもよい。   FIG. 14 is a diagram illustrating the identification information and member information extracted by the member information extraction unit 12 a and displayed on the display unit 41. In FIG. 14, the vector data included in the title section, the vector data included in the identification section including the floor “PH” and the identification section including the name “G51”, and a partition line common to these identification sections are divided. Vector data such as bar arrangement information included in the member section is displayed in combination with each other. Further, in the example of FIG. 14, vector data included in a region having a predetermined width adjacent to the column in the original member table is combined on both sides of the column corresponding to the name “G51”. Thereby, bar arrangement information (an anchoring state, a joint, etc.) in the end of a building member or an adjacent region can be included in the member information of the building member. In the example of FIG. 14, the member information extraction unit 12 a uses “PH”, which is the name of the horizontal marking line that divides the identification section, and the name of the vertical marking line that divides the identification section. A certain “G51” is extracted as identification information, and vector data such as bar arrangement information included in a member section defined by a partition line common to these identification sections is extracted as member information. In this case, the member information extraction unit 12a provides a data folder in the data recording unit 13 with the folder name “PH”, which is the name of the partition line in the horizontal direction (that is, the name of the floor) that partitions the identification section. . Then, in the vector data extracted and combined from the member table as described above, “G51” which is the name of the vertical division line (that is, the name of the building member) dividing the identification division is used as the file name. At the same time, it is stored in the “PH” folder of the data recording unit 13. When the extracted member information is stored in the member information DB 13b, it may be converted into another data format (for example, JPEG format) and stored.

図8に戻り、SB15の処理の後、制御部12は部材情報抽出処理を終了してメインルーチンに戻る。   Returning to FIG. 8, after the process of SB15, the control unit 12 ends the member information extraction process and returns to the main routine.

(処理−配置情報抽出処理)
次に、配置情報抽出処理について説明する。図15は、配置情報抽出処理のフローチャートである。図15に示すように、配置情報抽出処理が起動されると、配置情報抽出部12bは、図面DB13aから建築図面を読み込む(SC1)。建築図面の読込方法は任意で、例えば端末装置4の表示部41に建築図面を表示させ、ユーザに建築図面における必要な領域を公知の入力手段を介して選択させ、当該選択された領域に含まれる図形をベクターデータとして取得する。あるいは、ユーザにより予め建築図面から必要な領域として切り出されたベクターデータを図面DB13aに格納しておき、当該ベクターデータを図面DB13aから取得する。
(Processing-Placement information extraction process)
Next, arrangement information extraction processing will be described. FIG. 15 is a flowchart of the arrangement information extraction process. As shown in FIG. 15, when the arrangement information extraction process is activated, the arrangement information extraction unit 12b reads an architectural drawing from the drawing DB 13a (SC1). The architectural drawing reading method is arbitrary. For example, the architectural drawing is displayed on the display unit 41 of the terminal device 4, and the user selects a necessary area in the architectural drawing via a known input means, and is included in the selected area. Acquired figure as vector data. Alternatively, vector data previously cut out as a necessary area from the architectural drawing by the user is stored in the drawing DB 13a, and the vector data is acquired from the drawing DB 13a.

続いて、配置情報抽出部12bは、SC1で取得した建築図面を端末装置4の表示部41に表示させると共に、当該建築図面における通り芯の範囲の設定指示を表示させる(SC2)。図16は、端末装置4の表示部41に表示された通り芯の範囲の設定指示を例示した図である。図16に示すように、図3に例示した建築図面から必要な領域として取得されたベクターデータが表示部41に表示されると共に、当該領域における通り芯の範囲の設定を促す指示(図16では「通り芯の始終点の設定」ウィンドウ)が表示される。図16におけるハッチング領域は、選択された通り芯の範囲を示す。   Subsequently, the arrangement information extraction unit 12b causes the architectural drawing acquired in SC1 to be displayed on the display unit 41 of the terminal device 4, and displays a setting instruction for the range of the core in the architectural drawing (SC2). FIG. 16 is a diagram exemplifying a setting instruction for setting the core range displayed on the display unit 41 of the terminal device 4. As shown in FIG. 16, the vector data acquired as a necessary area from the architectural drawing illustrated in FIG. 3 is displayed on the display unit 41, and an instruction for prompting the setting of the core range in the area (in FIG. 16, The “Set the start and end points of the core” window) is displayed. The hatched area in FIG. 16 shows the range of the selected core.

図15に戻り、配置情報抽出部12bは、表示部41に表示させた建築図面における通り芯の範囲が設定されたか否かを判定する(SC3)。その結果、通り芯の範囲が設定されていない場合(SC3、No)、配置情報抽出部12bは通り芯の範囲が設定されたか否かを再度判定する(SC3)。一方、通り芯の範囲が設定された場合(SC3、Yes)、配置情報抽出部12bは、設定された通り芯の範囲の表示画面における座標値を取得し、RAM(図示省略)に記憶させる(SC4)。   Returning to FIG. 15, the arrangement information extraction unit 12 b determines whether or not the core range in the architectural drawing displayed on the display unit 41 has been set (SC <b> 3). As a result, when the core range is not set (SC3, No), the arrangement information extraction unit 12b determines again whether the core range is set (SC3). On the other hand, when the core range is set (SC3, Yes), the arrangement information extraction unit 12b acquires the coordinate value on the display screen of the set core range and stores it in the RAM (not shown) ( SC4).

続いて、配置情報抽出部12bは、図面DB13aに格納されている元の建築図面における、通り芯の符号選択指示を表示部41に表示させる(SC5)。図17は、表示部41に表示された通り芯の符号選択指示を例示した図である。通り芯の符号の選択方法は任意で、例えば表示部41に図3に例示したような建築図面を表示させ、ユーザに建築図面における通り芯の符号を公知の入力手段を介して選択させる。   Subsequently, the arrangement information extraction unit 12b causes the display unit 41 to display a core code selection instruction in the original architectural drawing stored in the drawing DB 13a (SC5). FIG. 17 is a diagram illustrating an example of a core code selection instruction displayed on the display unit 41. The method for selecting the code of the core is arbitrary. For example, the architectural drawing as illustrated in FIG. 3 is displayed on the display unit 41, and the user is allowed to select the code of the core in the architectural drawing via known input means.

図15に戻り、配置情報抽出部12bは、建築図面における通り芯の符号の選択が完了したか否かを判定する(SC6)。例えば、公知の入力手段を介して通り芯の符号を選択した旨の入力がされた場合(図17では、「符号選択」ウィンドウの「OK」ボタンが押された場合)、通り芯の符号の選択が完了したと判定する。その結果、建築図面における通り芯の符号の選択が完了していない場合(SC6、No)、配置情報抽出部12bは通り芯の符号の選択が完了したか否かを再度判定する(SC6)。一方、通り芯の符号の選択が完了した場合(SC6、Yes)、配置情報抽出部12bは、選択された各通り芯の符号の座標値を取得する(SC7)。   Returning to FIG. 15, the arrangement information extraction unit 12b determines whether or not the selection of the core code in the architectural drawing is completed (SC6). For example, when an input indicating that the core code is selected via a known input means (in FIG. 17, the “OK” button in the “code selection” window is pressed), the code of the core is displayed. Determine that selection is complete. As a result, when the selection of the core code in the architectural drawing is not completed (No in SC6), the arrangement information extraction unit 12b determines again whether the selection of the core code is completed (SC6). On the other hand, when selection of the code of the core is completed (SC6, Yes), the arrangement information extraction unit 12b acquires the coordinate value of the code of each selected core (SC7).

この時、配置情報抽出部12bは、取得した各符号の座標情報を通り芯符号テーブルとして表示部41に表示させる(図17では左上のテーブル)。この通り芯符号テーブルには、項目「No.」「名」「XS」「YS」「高」「幅」「度」に対応する情報が相互に関連付けて格納される。項目「No.」に対応して格納される情報は、通り芯毎に個別に割り当てられるID番号(図17では「1001」等)である。項目「名」に対応して格納される情報は、各通り芯の符号を特定する情報(図17では「1」「A」等)である。項目「XS」に対応して格納される情報は、建築図面における通り芯の符号のX座標(図17では「582」等)である。特に、X方向の通り芯については、符号のX座標が当該通り芯のX座標と対応する。項目「YS」に対応して格納される情報は、建築図面における通り芯の符号のY座標(図17では「298」等)である。特に、Y方向の通り芯については、符号のY座標が当該通り芯のY座標と対応する。項目「高」に対応して格納される情報は、建築図面における通り芯の符号の文字高さ(図17では「6」等)である。項目「幅」に対応して格納される情報は、建築図面における通り芯の符号の文字幅(図17では「5」等)が格納される。項目「度」には建築図面における通り芯の符号の傾きが格納される。   At this time, the arrangement information extraction unit 12b causes the display unit 41 to display the acquired coordinate information of each code as a core code table (the upper left table in FIG. 17). In this street code table, information corresponding to the items “No.”, “Name”, “XS”, “YS”, “High”, “Width”, and “Degree” is stored in association with each other. The information stored corresponding to the item “No.” is an ID number (for example, “1001” in FIG. 17) individually assigned to each core. The information stored corresponding to the item “name” is information (“1”, “A”, etc. in FIG. 17) for identifying the code of each core. The information stored in correspondence with the item “XS” is the X coordinate (“582” in FIG. 17) of the core code in the architectural drawing. In particular, for the wick in the X direction, the X coordinate of the code corresponds to the X coordinate of the wick. The information stored corresponding to the item “YS” is the Y coordinate (“298” in FIG. 17) of the core code in the architectural drawing. In particular, with respect to the lead in the Y direction, the Y coordinate of the code corresponds to the Y coordinate of the lead. The information stored corresponding to the item “high” is the character height (“6” in FIG. 17) of the core code in the architectural drawing. The information stored corresponding to the item “width” stores the character width of the core code in the architectural drawing (such as “5” in FIG. 17). In the item “degree”, the inclination of the core code in the architectural drawing is stored.

図15に戻り、配置情報抽出部12bは、図面DB13aに格納されている元の建築図面における、全建築部材の符号選択指示を表示部41に表示させる(SC8)。図18は、表示部41に表示された全建築部材の符号選択指示を例示した図である。建築部材の符号の選択方法は任意で、例えば表示部41に図3に例示したような建築図面を表示させ、ユーザに建築図面における建築部材の符号を公知の入力手段を介して選択させる。   Returning to FIG. 15, the arrangement information extraction unit 12 b causes the display unit 41 to display code selection instructions for all building members in the original building drawing stored in the drawing DB 13 a (SC 8). FIG. 18 is a diagram illustrating a code selection instruction for all building members displayed on the display unit 41. The method of selecting the code of the building member is arbitrary, for example, the architectural drawing as illustrated in FIG. 3 is displayed on the display unit 41, and the user selects the code of the building member in the architectural drawing via a known input means.

図15に戻り、配置情報抽出部12bは、建築図面における全建築部材の符号の選択が完了したか否かを判定する(SC9)。例えば、公知の入力手段を介して全建築部材の符号を選択した旨の入力がされた場合(図18では、「符号選択」ウィンドウの「OK」ボタンが押された場合)、建築部材の符号の選択が完了したと判定する。その結果、建築図面における全建築部材の符号の選択が完了していない場合(SC9、No)、配置情報抽出部12bは全建築部材の符号の選択が完了したか否かを再度判定する(SC9)。   Returning to FIG. 15, the arrangement information extraction unit 12 b determines whether or not the selection of the codes of all building members in the architectural drawing has been completed (SC 9). For example, when an input indicating that the codes of all building members have been selected via a known input means (in FIG. 18, when the “OK” button in the “code selection” window is pressed), the codes of the building members are displayed. It is determined that the selection has been completed. As a result, when the selection of the codes of all the building members in the architectural drawing is not completed (No in SC9), the arrangement information extracting unit 12b determines again whether the selection of the codes of all the building members is completed (SC9). ).

一方、全建築部材の符号の選択が完了した場合(SC9、Yes)、配置情報抽出部12bは、選択された各建築部材の符号の座標値を取得する(SC10)。そして、SC7で取得した各通り芯の符号の座標値と、SC10で取得した各建築部材の符号の座標値とに基づき、建築図面における通り芯の配置を基準として建築部材の符号の位置を特定する(SC11)。例えば配置情報抽出部12bは、図17に例示した通り芯符号テーブルを参照し、SC10で取得した各建築部材の符号のX座標から所定範囲内に通り芯の符号のX座標が位置するX方向の通り芯、及び建築部材の符号のY座標から所定範囲内に通り芯の符号のY座標が位置するY方向の通り芯を特定する。これにより、配置情報抽出部12bは、建築図面において建築部材の符号が何れの通り芯の上、又は通り芯の間に位置しているかを特定する。図3に例示したように、建築図面においては各建築部材の位置に対応するように当該建築部材の名称を特定する符号が配置されていることから、建築図面における通り芯の配置を基準として特定した建築部材の符号の位置を、建築部材の配置に関する配置情報として抽出することができる。   On the other hand, when selection of the codes for all building members is completed (SC9, Yes), the arrangement information extraction unit 12b acquires the coordinate values of the codes of the selected building members (SC10). And based on the coordinate value of the code | symbol of each street core acquired by SC7, and the coordinate value of the code | symbol of each building member acquired by SC10, the position of the code | symbol of a building member is specified on the basis of arrangement | positioning of the core in a building drawing. (SC11). For example, the arrangement information extraction unit 12b refers to the core code table illustrated in FIG. 17, and the X direction of the core code is located within a predetermined range from the X coordinate of the code of each building member acquired in SC10. The Y core in the Y direction in which the Y coordinate of the core code is located within the predetermined range from the Y coordinate of the core of the building member and the building member is specified. Thereby, the arrangement | positioning information extraction part 12b specifies whether the code | symbol of a building member is located on or between the cores in a building drawing. As illustrated in FIG. 3, in the architectural drawing, since the code for identifying the name of the building member is arranged so as to correspond to the position of each building member, the arrangement of the core in the architectural drawing is specified as a reference. The position of the code | symbol of the constructed building member can be extracted as arrangement | positioning information regarding arrangement | positioning of a building member.

この時、配置情報抽出部12bは、抽出した各建築部材の識別情報及び配置情報を部材符号テーブルとして表示部41に表示させる(図18では左上のテーブル)。この部材符号テーブルには、項目「No.」「名」「X1」「X2」「Y1」「Y2」に対応する情報が相互に関連付けて格納される。項目「No.」に対応して格納される情報は、建築部材毎に個別に割り当てられるID番号(図18では「3001」等)である。項目「名」に対応して格納される情報は、建築部材を一意に識別する識別情報であり、各建築部材の名称を特定する符号(図18では「G1」等)が格納される。項目「X1」、「X2」、「Y1」、及び「Y2」に対応して格納される情報は、建築部材の配置に関する配置情報であり、建築図面における通り芯の配置を基準とした場合における各建築部材の符号の位置を特定する情報が格納される。図18の例では、項目「X1」及び「X2」に対応して、建築部材の符号の位置に対応するX方向の通り芯の符号名が格納される(図18では「1」等)。例えば、建築部材の符号がX方向の通り芯「1」の上に配置されている場合は、項目「X1」にのみ「1」が格納される。また、建築部材の符号がX方向の通り芯「1」と「2」との間に配置されている場合は、項目「X1」に「1」が格納され、項目「X2」に「2」が格納される。同様に、項目「Y1」及び「Y2」に対応して、建築部材の符号の位置に対応するY方向の通り芯の符号名が格納される(図18では「E」等)。例えば、建築部材の符号がY方向の通り芯「E」の上に配置されている場合は、項目「Y1」にのみ「E」が格納される。また、建築部材の符号がY方向の通り芯「E」と「F」との間に配置されている場合は、項目「Y1」に「E」が格納され、項目「Y2」に「F」が格納される。   At this time, the arrangement information extraction unit 12b displays the extracted identification information and arrangement information of each building member on the display unit 41 as a member code table (upper left table in FIG. 18). In this member code table, information corresponding to the items “No.”, “Name”, “X1”, “X2”, “Y1”, “Y2” is stored in association with each other. The information stored corresponding to the item “No.” is an ID number (“3001” in FIG. 18) assigned individually for each building member. The information stored corresponding to the item “name” is identification information for uniquely identifying a building member, and stores a code (“G1” in FIG. 18) for identifying the name of each building member. The information stored corresponding to the items “X1”, “X2”, “Y1”, and “Y2” is the arrangement information related to the arrangement of the building members, and is based on the arrangement of the cores in the architectural drawing as a reference. Information for specifying the position of the code of each building member is stored. In the example of FIG. 18, the code name of the core in the X direction corresponding to the position of the code of the building member is stored corresponding to the items “X1” and “X2” (“1” in FIG. 18). For example, when the sign of the building member is arranged on the core “1” in the X direction, “1” is stored only in the item “X1”. Further, when the sign of the building member is arranged between the cores “1” and “2” as in the X direction, “1” is stored in the item “X1” and “2” is stored in the item “X2”. Is stored. Similarly, corresponding to the items “Y1” and “Y2”, the code name of the core in the Y direction corresponding to the position of the code of the building member is stored (“E” and the like in FIG. 18). For example, when the sign of the building member is arranged on the core “E” in the Y direction, “E” is stored only in the item “Y1”. In addition, when the sign of the building member is arranged between the cores “E” and “F” in the Y direction, “E” is stored in the item “Y1” and “F” is stored in the item “Y2”. Is stored.

図15に戻り、配置情報抽出部12bは、SC11で特定した建築部材の符号の位置(すなわち各建築部材の配置情報)と、図8の部材情報抽出処理で部材情報抽出部12aが抽出した部材情報とを、SC11で位置を特定した建築部材の符号(すなわち建築部材の識別情報)毎に相互に関連付けて部材情報DB13bに格納する(SC12)。例えば配置情報抽出部12bは、図18に例示した部材符号テーブルの項目「No.」に対応して格納されているID番号を、図4に例示した部材情報DB13bの項目「ID」に対応付けて当該部材情報DB13bに格納する。また、配置情報抽出部12bは、図18に例示した部材符号テーブルの項目「名」に対応して格納されている符号を、図4に例示した部材情報DB13bの項目「符号」に対応付けて当該部材情報DB13bに格納する。また、配置情報抽出部12bは、図18に例示した部材符号テーブルの項目「X1」、「X2」、「Y1」、及び「Y2」に対応して格納されている各情報を、図4に例示した部材情報DB13bの項目「X1」、「X2」、「Y1」、及び「Y2」に対応付けて当該部材情報DB13bに格納する。また、配置情報抽出部12bは、SC1で読み込んだ建築図面に対応する階を当該建築図面のファイル名等に基づいて特定し、当該特定した階の名称を、部材情報DB13bの項目「階」に対応付けて当該部材情報DB13bに格納する。さらに配置情報抽出部12bは、データ記録部13において、特定した階の名称のフォルダを参照し、部材情報DB13bの項目「符号」に対応して格納した符号と同一名称のファイルを当該符号に対応する部材情報として特定し、当該ファイルの所在を示す情報を部材情報DB13bの項目「リスト画像」に対応付けて当該部材情報DB13bに格納する。   Returning to FIG. 15, the arrangement information extraction unit 12 b is a member extracted by the member information extraction unit 12 a by the position of the code of the building member specified in SC <b> 11 (that is, the arrangement information of each building member) and the member information extraction process of FIG. 8. The information is stored in the member information DB 13b in association with each other for each building member code (ie, building member identification information) whose position is specified in SC11 (SC12). For example, the arrangement information extraction unit 12b associates the ID number stored corresponding to the item “No.” in the member code table illustrated in FIG. 18 with the item “ID” in the member information DB 13b illustrated in FIG. And stored in the member information DB 13b. Further, the arrangement information extraction unit 12b associates the code stored in correspondence with the item “name” of the member code table illustrated in FIG. 18 with the item “code” of the member information DB 13b illustrated in FIG. It stores in the member information DB 13b. Further, the arrangement information extraction unit 12b stores each information stored corresponding to the items “X1”, “X2”, “Y1”, and “Y2” of the member code table illustrated in FIG. 18 in FIG. The information is stored in the member information DB 13b in association with the items “X1”, “X2”, “Y1”, and “Y2” of the exemplified member information DB 13b. In addition, the arrangement information extraction unit 12b specifies the floor corresponding to the architectural drawing read in SC1 based on the file name of the architectural drawing and the name of the specified floor is set in the item “floor” of the member information DB 13b. Correspondingly, it is stored in the member information DB 13b. Further, the arrangement information extraction unit 12b refers to the folder having the name of the identified floor in the data recording unit 13, and corresponds to the file having the same name as the code stored corresponding to the item “code” of the member information DB 13b. The information indicating the location of the file is stored in the member information DB 13b in association with the item “list image” of the member information DB 13b.

図15に戻り、SC12の処理の後、配置情報抽出部12bは、図17に例示した通り芯符号テーブル、SC10で取得した各建築部材の符号の座標値、及び、図18に例示した部材符号テーブルを、SC1で読み込んだ建築図面に対応付けて、図面DB13aに格納する(SC13)。その後、制御部12は配置情報抽出処理を終了してメインルーチンに戻る。   Returning to FIG. 15, after the process of SC12, the arrangement information extraction unit 12b performs the core code table illustrated in FIG. 17, the coordinate values of the codes of the building members acquired in SC10, and the member codes illustrated in FIG. The table is stored in the drawing DB 13a in association with the architectural drawing read in SC1 (SC13). Thereafter, the control unit 12 ends the arrangement information extraction process and returns to the main routine.

(処理−読取情報配置処理)
次に、読取情報配置処理について説明する。図19は、読取情報配置処理のフローチャートである。図19に示すように、読取情報配置処理が起動されると、読取情報配置部12cは、図15のSC13で図面DB13aに格納された建築図面と、当該建築図面に対応する通り芯符号テーブル、各建築部材の符号の座標値、及び、部材符号テーブルとを、当該図面DB13aから読み込む(SD1)。
(Processing-reading information arrangement processing)
Next, the reading information arrangement process will be described. FIG. 19 is a flowchart of the read information arrangement process. As shown in FIG. 19, when the read information arrangement process is started, the read information arrangement unit 12 c reads the architectural drawing stored in the drawing DB 13 a in SC 13 of FIG. 15, and the core code table corresponding to the architectural drawing, The coordinate value of each building member and the member code table are read from the drawing DB 13a (SD1).

続いて、読取情報配置部12cは、SD1で読み込んだ建築図面に含まれている各建築部材の符号(すなわち各建築部材の識別情報)を抽出し(SD2)、当該抽出した各建築部材の符号に対応する配置情報を、部材情報DB13bから取得する(SD3)。読取情報配置部12cは、例えば、SD1で建築図面と共に読み込んだ部材符号テーブルを参照することにより、建築図面に含まれている各建築部材の符号、及び当該符号に対応するID番号を抽出し、当該抽出したID番号に対応する配置情報を、部材情報DB13bから取得する。あるいは、各建築部材の符号に対応する配置情報を、部材符号テーブルから直接取得してもよい。   Subsequently, the read information arrangement unit 12c extracts the code of each building member (that is, identification information of each building member) included in the architectural drawing read in SD1 (SD2), and the code of each extracted building member Is obtained from the member information DB 13b (SD3). The reading information arrangement unit 12c extracts, for example, the code of each building member included in the building drawing and the ID number corresponding to the code by referring to the member code table read together with the building drawing in SD1. Arrangement information corresponding to the extracted ID number is acquired from the member information DB 13b. Alternatively, the arrangement information corresponding to the code of each building member may be obtained directly from the member code table.

続いて、読取情報配置部12cは、SD2で当該読取情報配置部12cが抽出した各建築部材の符号と、SD3で当該読取情報配置部12cが取得した配置情報とを含む読取情報を、光学的に読み取り可能な情報コードとして生成する(SD4)。なお、情報コードには、各建築部材の符号と配置情報との他、各種の情報を含めてもよい。以下では、建築部材のID番号、建築部材が配置される階、建築部材の種別名、建築部材の符号、及び、建築部材の配置情報を含む情報コードを読取情報配置部12cが生成する場合を例として説明する。例えば、読取情報配置部12cは部材情報DB13bを参照し、SD3で抽出した建築部材のID番号に基づいて、当該建築部材が配置される階を特定する。また、建築部材の符号と当該建築部材の種別名(例えば、大梁、小梁、基礎梁、スラブ、柱、壁等)とを対応付けたテーブルを予めデータ記録部13に記録させておき、当該テーブルを参照することで、読取情報配置部12cはSD2で当該読取情報配置部12cが抽出した建築部材の符号に対応する種別名を特定する。このようにして読取情報配置部12cが取得あるいは特定した建築部材のID番号が「3001」、当該建築部材が配置される階が「2F」、当該建築部材の種別名が「大梁G」、当該建築部材の符号が「G1」、当該建築部材の配置情報が部材情報DB13bの項目「X1」について「1」、「X2」について「−」、「Y1」について「E」、「Y2」について「F」である場合、読取情報配置部12cは、これらの各情報の相互間を区切り文字(例えばアンダーバー「_」等)で区切ったテキストデータ「3001_2F_大梁G_G1_1*E−F」に基づいて情報コードを生成する。また、情報コードとしては、例えばバーコードや2次元コード等の公知のコードを用いることができる。   Subsequently, the reading information arrangement unit 12c optically reads the reading information including the sign of each building member extracted by the reading information arrangement unit 12c in SD2 and the arrangement information acquired by the reading information arrangement unit 12c in SD3. Is generated as a readable information code (SD4). In addition, you may include various information in addition to the code | symbol and arrangement | positioning information of each building member in an information code. Below, the case where the reading information arrangement | positioning part 12c produces | generates the information code containing the ID number of a building member, the floor where a building member is arrange | positioned, the classification name of a building member, the code | symbol of a building member, and the arrangement information of a building member is produced | generated. This will be described as an example. For example, the reading information placement unit 12c refers to the member information DB 13b and identifies the floor on which the building member is placed based on the building member ID number extracted in SD3. In addition, a table in which a code of a building member and a type name of the building member (for example, a large beam, a small beam, a foundation beam, a slab, a column, a wall, etc.) are associated with each other is recorded in the data recording unit 13 in advance. By referring to the table, the reading information arrangement unit 12c specifies the type name corresponding to the sign of the building member extracted by the reading information arrangement unit 12c in SD2. In this way, the ID number of the building member acquired or specified by the read information placement unit 12c is “3001”, the floor on which the building member is placed is “2F”, the type name of the building member is “Oyori G”, The code of the building member is “G1”, the arrangement information of the building member is “1” for the item “X1” of the member information DB 13b, “−” for “X2”, “E” for “Y1”, “E2” for “Y2” In the case of “F”, the read information arrangement unit 12c uses the information code based on the text data “3001_2F_Ohiri G_G1_1 * EF” in which the pieces of information are separated by a delimiter (for example, an underscore “_”). Is generated. As the information code, for example, a known code such as a barcode or a two-dimensional code can be used.

次に読取情報配置部12cは、当該読取情報配置部12cが生成した情報コードを、建築図面中の建築部材の符号の位置に対応付けて配置する(SD5)。   Next, the read information arrangement unit 12c arranges the information code generated by the read information arrangement unit 12c in association with the position of the code of the building member in the architectural drawing (SD5).

図20から図23は、読取情報配置処理において表示部41に表示される建築図面を例示した図である。なお、情報コードを建築図面中に配置するのに先立って、図20に例示したように、読取情報配置部12cが情報コードのサイズの設定ウィンドウを表示部41に表示させ、情報コードのサイズの設定を受け付けるようにしてもよい。   20 to 23 are diagrams illustrating architectural drawings displayed on the display unit 41 in the read information arrangement process. Prior to placing the information code in the architectural drawing, as illustrated in FIG. 20, the read information placement unit 12 c causes the information code size setting window to be displayed on the display unit 41, and the information code size is set. You may make it accept a setting.

図19のSD5において、読取情報配置部12cは、例えば各情報コードに含まれるID番号に対応する建築部材の符号の位置を、SD1で建築図面と共に読み込んだ各建築部材の符号の座標値に基づき特定する。そして、図21に例示したように、当該特定した各建築部材の符号の位置から所定範囲内に、予め設定されているサイズあるいは図20に例示した設定ウィンドウで設定されたサイズの情報コードを配置すると共に、各情報コードから対応する建築部材の符号に至る矢印を表示させる。さらに、複数の情報コードが相互に重複表示されないようにするため、読取情報配置部12cは、例えば公知の描画ソフトにおける図形整列機能を用いて、図22に示すように各情報コードを等間隔に整列させる。また、入力手段(図示省略)を介して入力された操作に基づき、読取情報配置部12cが各情報コードの配置を変更(例えば、図22に例示した配置から図23に例示した配置に変更)するようにしてもよい。   In SD5 of FIG. 19, the read information arrangement unit 12c, for example, the position of the code of the building member corresponding to the ID number included in each information code based on the coordinate value of the code of each building member read together with the building drawing in SD1. Identify. Then, as illustrated in FIG. 21, the information code of the size set in advance or the size set in the setting window illustrated in FIG. 20 is arranged within a predetermined range from the position of the code of each identified building member. In addition, an arrow from each information code to the code of the corresponding building member is displayed. Further, in order to prevent a plurality of information codes from being displayed overlapping each other, the read information arrangement unit 12c uses, for example, a graphic alignment function in known drawing software to arrange each information code at regular intervals as shown in FIG. Align. Further, based on an operation input via an input unit (not shown), the read information arrangement unit 12c changes the arrangement of each information code (for example, from the arrangement illustrated in FIG. 22 to the arrangement illustrated in FIG. 23). You may make it do.

図19に戻り、読取情報配置部12cは、情報コードを配置した建築図面をプリンタ3から出力させる(SD6)。その後、制御部12は読取情報配置処理を終了し、メインルーチンに戻る。   Returning to FIG. 19, the read information arrangement unit 12c causes the printer 3 to output the architectural drawing in which the information code is arranged (SD6). Thereafter, the control unit 12 ends the read information arrangement process and returns to the main routine.

(処理−撮影処理)
次に、撮影装置20によって実行される撮影処理について説明する。図24は撮影処理のフローチャートである。この撮影処理に先立ち、撮影装置20の部材情報テーブル24bには、部材情報サーバ10の部材情報DB13bから取得された情報が格納されているものとする。例えば、撮影装置20の制御部23は、当該撮影装置20の入力手段(図示省略)を介して、部材情報テーブル24bに格納すべき情報の取得指示が行われた場合、部材情報DB13bの項目「ID」に対応して格納されている情報をネットワーク2を介して取得し、部材情報テーブル24bの項目「ID」に対応して格納する。また、撮影装置20の制御部23は、部材情報DB13bの項目「リスト画像」に対応して格納されている情報に基づき特定される格納場所から部材情報を取得し、部材情報テーブル24bの項目「リスト画像」に対応して格納する。なお、部材情報を取得する際に、当該部材情報のファイル形式の変換(例えばwmf等のベクター形式からJPEG等のラスター形式への変換等)を行ってから部材情報テーブル24bに格納するようにしてもよい。また、図6に例示したように、部材情報自体に代えて、データ記録部24における部材情報の所在を示す情報を項目「リスト画像」に対応して格納するようにしてもよい。
(Processing-Shooting process)
Next, a photographing process executed by the photographing apparatus 20 will be described. FIG. 24 is a flowchart of the photographing process. Prior to this photographing process, it is assumed that information acquired from the member information DB 13b of the member information server 10 is stored in the member information table 24b of the photographing apparatus 20. For example, when an instruction to obtain information to be stored in the member information table 24b is issued via the input unit (not shown) of the photographing apparatus 20, the control unit 23 of the photographing apparatus 20 performs an item “in the member information DB 13b. Information stored corresponding to “ID” is acquired via the network 2 and stored corresponding to the item “ID” of the member information table 24b. Further, the control unit 23 of the photographing apparatus 20 acquires member information from the storage location specified based on the information stored corresponding to the item “list image” of the member information DB 13b, and acquires the item “in the member information table 24b. Stored corresponding to “list image”. When acquiring member information, the file information is converted into a file format (for example, conversion from a vector format such as wmf to a raster format such as JPEG) and then stored in the member information table 24b. Also good. Further, as illustrated in FIG. 6, instead of the member information itself, information indicating the location of the member information in the data recording unit 24 may be stored corresponding to the item “list image”.

撮影処理は、例えば撮影装置20における公知の入力手段(図示省略)を介して撮影処理の起動指示入力が行われた場合に起動される。図24に示すように、撮影処理が起動されると、読取部23aは、入力手段(図示省略)を介して建築図面に配置された情報コードの読取指示が行われるまで待機する(SE1、No)。   The shooting process is started when, for example, a shooting process start instruction is input via a known input unit (not shown) in the shooting apparatus 20. As shown in FIG. 24, when the photographing process is started, the reading unit 23a stands by until an instruction to read the information code arranged in the architectural drawing is given via the input unit (not shown) (SE1, No). ).

入力手段(図示省略)を介して建築図面に配置された情報コードの読取指示が行われると(SE1、Yes)、読取部23aは撮影部21に情報コードの撮影を行わせ、当該撮影部21によって撮影された画像から情報コードを読み取る(SE2)。図25は、建築図面に配置された情報コードを撮影部21により撮影する状況を例示した図である。   When an instruction to read the information code arranged in the architectural drawing is given via the input means (not shown) (SE1, Yes), the reading unit 23a causes the photographing unit 21 to photograph the information code, and the photographing unit 21 The information code is read from the image photographed by (SE2). FIG. 25 is a diagram illustrating a situation in which the information code arranged in the architectural drawing is photographed by the photographing unit 21.

図24に戻り、SE2の処理の後、読取部23aは、当該読取部23aによって読み取られた情報コードに含まれる各情報をディスプレイ22に表示させる(SE3)。図26は、読取部23aによって読み取られた情報コードに含まれる各情報をディスプレイ22に表示した撮影装置20を例示した図である。例えば図26に示すように、テキストデータ「3051_2F_大梁G_G20_3*C」に基づいて生成された情報コードが読取部23aによって読み取られた場合、読取部23aは、区切り文字(この場合はアンダーバー「_」)で相互に区切られた各情報(例えば、建築部材のID番号、建築部材が設置されている階、建築部材の種別名、建築部材の符号、配置情報等)を当該情報コードから抽出し、各情報に対応する項目名(図26の例では「ID」、「階」、「部位」、「符号」、「位置」等)と関連付けてディスプレイ22にリスト表示させる。これにより、作業者が検査あるいは撮影を行おうとしている建築部材の名称や配置情報等を、検査や撮影を行う前に容易に確認することができる。   Returning to FIG. 24, after the processing of SE2, the reading unit 23a displays each information included in the information code read by the reading unit 23a on the display 22 (SE3). FIG. 26 is a diagram illustrating the photographing apparatus 20 that displays on the display 22 each piece of information included in the information code read by the reading unit 23a. For example, as illustrated in FIG. 26, when the information code generated based on the text data “3051_2F_Ohiri G_G20_3 * C” is read by the reading unit 23a, the reading unit 23a displays a delimiter (in this case, an underscore “_”). ) To each other (for example, the ID number of the building member, the floor where the building member is installed, the type name of the building member, the code of the building member, the arrangement information, etc.) are extracted from the information code, A list is displayed on the display 22 in association with item names corresponding to each information (in the example of FIG. 26, “ID”, “floor”, “part”, “code”, “position”, etc.). Thereby, the name, arrangement information, and the like of the building member that the operator is going to inspect or shoot can be easily confirmed before the inspection or shoot.

図24に戻り、SE3の処理の後、読取部23aは、部材情報をディスプレイ22に表示させる旨の指示入力が入力手段(図示省略)を介して行われたか否かを判定する(SE4)。   Returning to FIG. 24, after the processing of SE3, the reading unit 23a determines whether or not an instruction input for displaying the member information on the display 22 is made via an input unit (not shown) (SE4).

その結果、部材情報をディスプレイ22に表示させる旨の指示入力が入力手段(図示省略)を介して行われた場合(SE4、Yes)、読取部23aは、当該読取部23aによって読み取られた情報コードに含まれるID番号に対応する部材情報を部材情報テーブル24bから取得する(SE5)。例えば、図6の部材情報テーブル24bのように、部材情報の所在を示す情報が項目「リスト画像」に対応して格納されている場合には、読取部23aによって読み取られた情報コードに含まれるID番号に対応する部材情報の所在を示す情報を部材情報テーブル24bから取得し、当該情報に基づき特定される所在から部材情報を取得する。また、部材情報が、当該部材情報に対応する建築部材が配置される階の名称をフォルダ名とするデータフォルダに、当該建築部材の名称を用いたファイル名が付されて撮影装置20のデータ記録部24に格納されている場合には、読取部23aによって読み取られた情報コードに含まれる各情報の内、建築物において各建築部材が配置される階を特定する情報(例えば「2F」等)と、各建築部材の名称を特定する符号(例えば「G1」等)とに基づいて部材情報の所在(例えば「¥2F¥G1.jpg」等)を特定し、当該特定した所在から部材情報を取得するようにしてもよい。   As a result, when an instruction input for displaying the member information on the display 22 is made via input means (not shown) (Yes in SE4), the reading unit 23a reads the information code read by the reading unit 23a. The member information corresponding to the ID number included in is acquired from the member information table 24b (SE5). For example, when information indicating the location of the member information is stored corresponding to the item “list image” as in the member information table 24b of FIG. 6, it is included in the information code read by the reading unit 23a. Information indicating the location of the member information corresponding to the ID number is acquired from the member information table 24b, and the member information is acquired from the location specified based on the information. In addition, the data recording unit of the photographing apparatus 20 includes a file name using the name of the building member attached to a data folder having the name of the floor where the building member corresponding to the member information is arranged as the folder name. 24, the information (for example, “2F”, etc.) for identifying the floor on which each building member is arranged in the building among the information included in the information code read by the reading unit 23a. The location of member information (for example, “¥ 2F ¥ G1.jpg”, etc.) is specified based on a code (for example, “G1”, etc.) that specifies the name of each building member, and the member information is obtained from the specified location You may make it do.

図24に戻り、読取部23aは、当該読取部23aが取得した部材情報をディスプレイ22に表示させる(SE6)。図27は、読取部23aによって取得された部材情報をディスプレイ22に表示した撮影装置20を例示した図である。この図27では、階「2F」に配置されている建築部材「G20」の部材情報がディスプレイ22に表示された場合を例示している。   Returning to FIG. 24, the reading unit 23a displays the member information acquired by the reading unit 23a on the display 22 (SE6). FIG. 27 is a diagram illustrating the photographing apparatus 20 that displays the member information acquired by the reading unit 23 a on the display 22. In this FIG. 27, the case where the member information of the building member “G20” arranged on the floor “2F” is displayed on the display 22 is illustrated.

図24に戻り、SE4で部材情報をディスプレイ22に表示させる旨の指示入力が入力手段(図示省略)を介して行われない場合(SE4、No)、又はSE6の処理の後、撮影装置20の制御部23は、入力手段(図示省略)を介して被写体の撮影指示が行われるまで待機する(SE7、No)。   Referring back to FIG. 24, when the instruction input for displaying the member information on the display 22 is not performed through the input means (not shown) in SE4 (SE4, No), or after the processing of SE6, The control unit 23 waits until an instruction to shoot a subject is issued via an input unit (not shown) (No in SE7).

入力手段(図示省略)を介して被写体の撮影指示が行われると(SE7、Yes)、撮影装置20の制御部23は、撮影部21により被写体を撮影させ、当該撮影部21によって撮影された画像を画像テーブル24aに格納する(SE8)。撮影装置20の制御部23は、図5に例示したように、撮影部21によって撮影された画像に所定のファイル名(例えば、SE3でディスプレイ22によって表示された建築部材のID番号と、当該建築部材について画像が撮影された順序を示す数とを含むファイル名)を付して、画像テーブル24aの項目「撮影画像」に対応するように格納する。   When an instruction to shoot a subject is given via an input unit (not shown) (Yes in SE7), the control unit 23 of the photographing apparatus 20 causes the photographing unit 21 to photograph the subject, and an image photographed by the photographing unit 21 Are stored in the image table 24a (SE8). As illustrated in FIG. 5, the control unit 23 of the imaging device 20 has a predetermined file name (for example, an ID number of a building member displayed on the display 22 in SE3 and an image of the building that is captured by the imaging unit 21). The file name including the number indicating the order in which the images were taken for the member is attached and stored so as to correspond to the item “captured image” of the image table 24a.

図24に戻り、関連付け部23bは、SE8で画像テーブル24aに格納された画像と、SE3でディスプレイ22によって表示された情報とを、相互に関連付ける(SE9)。図5に示した画像テーブル24aの例では、関連付け部23bは、SE3でディスプレイ22によって表示された建築部材のID番号、建築部材が設置されている階、建築部材の種別名、建築部材の符号、及び配置情報を、SE8で項目「撮影画像」に対応して画像テーブル24aに格納された画像と相互に関連付けて、項目「ID」、「階」、「部位」、「符号」、及び「位置」にそれぞれ対応するように画像テーブル24aに格納する。   Returning to FIG. 24, the associating unit 23b associates the image stored in the image table 24a in SE8 with the information displayed on the display 22 in SE3 (SE9). In the example of the image table 24a illustrated in FIG. 5, the associating unit 23b includes the building member ID number displayed on the display 22 in SE3, the floor on which the building member is installed, the building member type name, and the building member code. , And the arrangement information are correlated with the image stored in the image table 24a corresponding to the item “captured image” in SE8, and the items “ID”, “floor”, “part”, “sign”, and “ It stores in the image table 24a so as to correspond to “position”.

図24に戻り、撮影装置20の制御部23は、SE3でディスプレイ22によって表示された情報に対応する建築部材についての撮影が完了したか否かを判定する(SE10)。例えば撮影装置20の制御部23は、SE3でディスプレイ22によって表示された情報に対応する建築部材についての撮影が完了した旨の入力が入力手段(図示省略)を介して行われた場合に、当該建築部材についての撮影が完了したと判定する。   Returning to FIG. 24, the control unit 23 of the photographing apparatus 20 determines whether or not photographing of the building member corresponding to the information displayed on the display 22 in SE3 is completed (SE10). For example, the control unit 23 of the image capturing device 20 receives the input indicating that the image capturing of the building member corresponding to the information displayed on the display 22 in SE3 is completed through the input unit (not illustrated). It is determined that the imaging of the building member has been completed.

その結果、SE3でディスプレイ22によって表示された情報に対応する建築部材についての撮影が完了していない場合(SE10、No)、制御部23はSE7に戻る。以降、SE3でディスプレイ22によって表示された情報に対応する建築部材についての撮影が完了する(SE10、Yes)まで、SE7からSE10の処理を繰り返す。   As a result, when the imaging of the building member corresponding to the information displayed on the display 22 in SE3 is not completed (SE10, No), the control unit 23 returns to SE7. Thereafter, the processing from SE7 to SE10 is repeated until the imaging of the building member corresponding to the information displayed on the display 22 in SE3 is completed (SE10, Yes).

一方、SE3でディスプレイ22によって表示された情報に対応する建築部材についての撮影が完了した場合(SE10、Yes)、撮影装置20の制御部23は、被写体とすべき全ての建築部材についての撮影が完了したか否かを判定する(SE11)。例えば撮影装置20の制御部23は、被写体とすべき全ての建築部材についての撮影が完了した旨の入力が入力手段(図示省略)を介して行われた場合に、全ての建築部材についての撮影が完了したと判定する。   On the other hand, when the imaging of the building member corresponding to the information displayed on the display 22 in SE3 is completed (SE10, Yes), the control unit 23 of the imaging device 20 performs the imaging of all the building members that should be the subject. It is determined whether or not it is completed (SE11). For example, the control unit 23 of the imaging device 20 captures images of all building members when input indicating that imaging of all building members that should be subjects has been completed is performed via input means (not shown). Is determined to be complete.

その結果、被写体とすべき全ての建築部材についての撮影が完了していない場合(SE11、No)、制御部23はSE1に戻る。以降、被写体とすべき全ての建築部材についての撮影が完了する(SE11、Yes)まで、SE1からSE11までの処理を繰り返す。   As a result, when photographing of all building members to be the subject has not been completed (SE11, No), the control unit 23 returns to SE1. Thereafter, the processing from SE1 to SE11 is repeated until photographing of all building members to be the subject is completed (SE11, Yes).

一方、被写体とすべき全ての建築部材についての撮影が完了した場合(SE11、Yes)、撮影装置20の制御部23は撮影処理を終了する。   On the other hand, when photographing of all building members that should be the subject is completed (SE11, Yes), the control unit 23 of the photographing device 20 ends the photographing process.

(処理−編集処理)
次に、部材情報サーバ10によって実行される編集処理について説明する。図28は編集処理のフローチャートである。この編集処理は、例えば端末装置4の入力手段(図示省略)を用いて、ネットワーク2を介して編集処理の起動指示入力が行われた場合に起動される。
(Processing-Editing processing)
Next, editing processing executed by the member information server 10 will be described. FIG. 28 is a flowchart of the editing process. This editing process is started when an instruction for starting the editing process is input via the network 2 using, for example, an input unit (not shown) of the terminal device 4.

図28に示すように、編集処理が起動されると、部材情報サーバ10の制御部12は、撮影装置20の画像テーブル24aに格納された情報をネットワーク2を介して取得する(SF1)。   As shown in FIG. 28, when the editing process is started, the control unit 12 of the member information server 10 acquires information stored in the image table 24a of the photographing apparatus 20 via the network 2 (SF1).

続いて部材情報サーバ10の制御部12は、SF1で取得した情報を用いて合成処理を行う(SF2)。具体的には、部材情報サーバ10の制御部12は、公知の画像処理技術を用いて、撮影装置20の画像テーブル24aの項目「撮影画像」に対応して格納されている画像毎に、当該画像テーブル24aの他の項目(例えば、項目「ID」、「階」、「部位」、「符号」、「位置」等)に対応して格納されている各情報を合成することで、所定の形式のアルバムを生成する。図29は、部材情報サーバ10の制御部12によって生成されたアルバムの構成例を示す図である。例えば図29に示すように、部材情報サーバ10の制御部12は、画像テーブル24aの項目「撮影画像」に対応して格納されている画像と、当該画像に関連付けて画像テーブル24aの項目「ID」、「階」、「部位」、「符号」、「位置」に格納されている各情報とを所定の形式で合成し、当該合成したデータを建築部材のID番号順に整列させる。なお、このアルバムは任意に編集できるものであり、例えば利用者が端末装置4の入力手段(図示省略)を介して新規データを追加したり、画像等の位置を自由に入れ替えたりすることができる。   Then, the control part 12 of the member information server 10 performs a synthetic | combination process using the information acquired by SF1 (SF2). Specifically, the control unit 12 of the member information server 10 uses, for each image stored corresponding to the item “captured image” of the image table 24a of the image capturing device 20 using a known image processing technique. By combining each piece of information stored corresponding to other items of the image table 24a (for example, items “ID”, “floor”, “part”, “sign”, “position”, etc.) Generate a formatted album. FIG. 29 is a diagram illustrating a configuration example of an album generated by the control unit 12 of the member information server 10. For example, as illustrated in FIG. 29, the control unit 12 of the member information server 10 stores an image stored in association with the item “captured image” in the image table 24a and the item “ID” in the image table 24a in association with the image. ”,“ Floor ”,“ part ”,“ code ”, and“ position ”are combined with each other in a predetermined format, and the combined data is arranged in the order of the ID numbers of the building members. Note that this album can be arbitrarily edited. For example, the user can add new data via the input means (not shown) of the terminal device 4 or can freely change the position of the image or the like. .

図28に戻り、SF2の処理の後、制御部12は編集処理を終了する。   Returning to FIG. 28, after the processing of SF2, the control unit 12 ends the editing processing.

(効果)
このように、本実施の形態によれば、読取情報配置部12cは、建築図面に含まれている各建築部材の符号を当該建築図面から取得し、当該取得した符号に対応する配置情報を部材情報DB13bから取得し、当該取得した符号と配置情報とを含む情報コードを、符号に対応する建築部材に関連付けて、建築図面中に配置する。これにより、建築図面中に配置された情報コードを撮影部21を介して読取部23aに読み取らせるという極めて簡易な操作のみで、情報コードに含まれる配置情報や、当該情報コードに含まれる建築部材の符号に関連付けて部材情報DB13bに格納されている部材情報を撮影装置20のディスプレイ22に表示させることができ、検査対象の建築部材の配置情報や部材情報を利用者に容易に確認させることができる。また、建築部材に関する部材情報と、当該建築部材の符号とが、部材情報抽出部12aによって部材図面から建築部材毎に抽出され、当該抽出された部材情報と符号とが相互に関連付けられて部材情報DB13bに格納されるので、利用者が自ら部材情報を複数のグループに分類する必要がなく、容易且つ確実に必要な部材情報を部材情報DB13bに格納することができる。
(effect)
Thus, according to this Embodiment, the reading information arrangement | positioning part 12c acquires the code | symbol of each building member contained in the building drawing from the said building drawing, and sets the arrangement | positioning information corresponding to the acquired code | symbol as a member. An information code acquired from the information DB 13b and including the acquired code and arrangement information is associated with the building member corresponding to the code and arranged in the architectural drawing. Thereby, the arrangement information included in the information code and the building member included in the information code can be obtained only by an extremely simple operation of causing the reading unit 23a to read the information code arranged in the architectural drawing via the photographing unit 21. The member information stored in the member information DB 13b in association with the reference numeral can be displayed on the display 22 of the photographing apparatus 20, and the user can easily confirm the arrangement information and member information of the building member to be inspected. it can. Moreover, the member information regarding a building member and the code | symbol of the said building member are extracted for every building member from the member drawing by the member information extraction part 12a, The said member information and code | symbol which were extracted are mutually linked | related, and member information Since it is stored in the DB 13b, it is not necessary for the user to classify the member information into a plurality of groups, and the necessary member information can be easily and reliably stored in the member information DB 13b.

また、読取情報配置部12cは、建築図面から建築部材に対応する符号を抽出し、当該抽出した符号に対応する配置情報を含む情報コードを、建築図面中の符号の位置に対応付けて配置するので、建築図面中の各建築部材の位置に対応して容易に情報コードを配置することができる。   Moreover, the reading information arrangement | positioning part 12c extracts the code | cord | chord corresponding to a building member from an architectural drawing, and arrange | positions the information code containing the arrangement | positioning information corresponding to the extracted code | symbol corresponding to the position of the code | symbol in an architectural drawing. Therefore, an information code can be easily arranged corresponding to the position of each building member in the building drawing.

また、読取情報配置部12cは、建築図面における通り芯の配置を基準として当該建築図面における符号の位置を特定し、当該特定した符号の位置に対応付けて情報コードを配置するので、建築図面における各建築部材の位置を容易且つ確実に特定し、当該特定した各建築部材の位置に対応して容易に情報コードを配置することができる。   Moreover, since the reading information arrangement | positioning part 12c specifies the position of the code | symbol in the said architectural drawing on the basis of arrangement | positioning of the core in an architectural drawing, and arrange | positions an information code in association with the position of the specified code | symbol, The position of each building member can be easily and reliably specified, and the information code can be easily arranged corresponding to the position of each specified building member.

また、読取情報配置部12cは、識別情報と配置情報とを含む読取情報を、光学的に読み取り可能な情報コードとして建築図面中に配置するので、撮影装置20の撮影部21を用いて容易に読取情報を読み取らせることができる。   Moreover, since the reading information arrangement | positioning part 12c arrange | positions the reading information containing identification information and arrangement | positioning information in an architectural drawing as an optically readable information code, it can be easily used using the imaging | photography part 21 of the imaging device 20. FIG. Reading information can be read.

〔III〕実施の形態に対する変形例
以上、実施の形態について説明したが、本発明の具体的な構成及び手段は、特許請求の範囲に記載した各発明の技術的思想の範囲内において、任意に改変及び改良することができる。以下、このような変形例について説明する。
[III] Modifications to Embodiments Although the embodiments have been described above, the specific configuration and means of the present invention are arbitrary within the scope of the technical idea of each invention described in the claims. Modifications and improvements can be made. Hereinafter, such a modification will be described.

(解決しようとする課題や発明の効果について)
まず、発明が解決しようとする課題や発明の効果は、前記した内容に限定されるものではなく、本発明によって、前記に記載されていない課題を解決したり、前記に記載されていない効果を奏することもでき、また、記載されている課題の一部のみを解決したり、記載されている効果の一部のみを奏することがある。
(About problems to be solved and effects of the invention)
First, the problems to be solved by the invention and the effects of the invention are not limited to the above-described contents, and the present invention solves the problems not described above or has the effects not described above. There are also cases where only some of the described problems are solved or only some of the described effects are achieved.

(構成及び制御について)
また、本実施の形態で自動的に行われるものとして説明した制御の全部または任意の一部を手動で行っても良く、逆に、手動で行われるものとして説明した制御の全部または任意の一部を公知技術または上述した思想に基づいて自動化しても良い。また、上述した各電気的構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。すなわち、各部の分散・統合の具体的形態は図示のものに限られず、その全部または一部を、各種の負荷や使用状況などに応じて、任意の単位で機能的または物理的に分散・統合して構成できる。例えば、撮影装置20におけるデータ記録部24を省略し、部材情報サーバ10におけるデータ記録部13を、当該部材情報サーバ10と撮影装置20とで共有するようにしてもよい。この場合、撮影処理において、撮影装置20の制御部23は、部材情報テーブル24bに代えて部材情報DB13bから部材情報等を含む必要な情報を取得する。また、プリンタ3や端末装置4の表示部41を部材情報サーバ10に備えてもよい。この他、前記文書中や図面中で示した処理手順、または、制御手順については、特記する場合を除いて任意に変更できる。
(About configuration and control)
Further, all or any part of the control described as being automatically performed in the present embodiment may be performed manually, and conversely, all or any of the control described as being performed manually is performed. The part may be automated based on a known technique or the above-described idea. Further, each of the electrical components described above is functionally conceptual and does not necessarily need to be physically configured as illustrated. In other words, the specific form of distribution / integration of each part is not limited to the one shown in the figure, and all or a part thereof may be functionally or physically distributed / integrated in arbitrary units according to various loads and usage conditions. Can be configured. For example, the data recording unit 24 in the photographing apparatus 20 may be omitted, and the data recording unit 13 in the member information server 10 may be shared between the member information server 10 and the photographing apparatus 20. In this case, in the photographing process, the control unit 23 of the photographing apparatus 20 acquires necessary information including member information from the member information DB 13b instead of the member information table 24b. Further, the member information server 10 may include the display unit 41 of the printer 3 or the terminal device 4. In addition, the processing procedure or the control procedure shown in the document or the drawing can be arbitrarily changed unless otherwise specified.

(部材情報管理処理について)
部材情報管理処理の各処理については、公知のCAD(Computer Aided Design)システム上で実行させてもよく、さらに公知の表計算ソフトやプレゼンテーションソフト等を組合わせて処理を実行させてもよい。
(About member information management processing)
Each process of the member information management process may be executed on a known CAD (Computer Aided Design) system, or may be executed by combining known spreadsheet software or presentation software.

(データの移動方法について)
上述の実施の形態では、部材情報サーバ10と撮影装置20との相互間において、ネットワーク2を介してデータの移動させる場合を例として説明したが、これとは異なる方法でデータを移動させるようにしてもよい。例えば、各種の記録媒体を介してデータを移動させたり、あるいは、部材情報サーバ10と撮影装置20との間を有線又は無線にて直接接続することで、データを移動させるようにしてもよい。
(About data movement method)
In the above-described embodiment, the case where data is moved between the member information server 10 and the imaging device 20 via the network 2 has been described as an example. However, the data is moved by a different method. May be. For example, the data may be moved by moving data via various recording media, or by directly connecting the member information server 10 and the imaging device 20 by wire or wirelessly.

この発明に係る部材情報管理システムは、必要な図面を容易且つ確実に記録手段に記録させることができ、記録手段に記録されている所望の図面を容易に表示させることができ、被写体を撮影した画像と当該被写体の配置情報とを容易に関連付けることができる、部材情報管理システムに有用である。   The member information management system according to the present invention can easily and surely record the necessary drawings on the recording means, can easily display the desired drawings recorded on the recording means, and has photographed the subject. This is useful for a member information management system that can easily associate an image with the arrangement information of the subject.

1 部材情報管理システム
2 ネットワーク
3 プリンタ
4 端末装置
10 部材情報サーバ
11 ネットワークIF
12、23 制御部
12a 部材情報抽出部
12b 配置情報抽出部
12c 読取情報配置部
13、24 データ記録部
13a 図面DB
13b 部材情報DB
20 撮影装置
21 撮影部
22 ディスプレイ
23a 読取部
23b 関連付け部
24a 画像テーブル
24b 部材情報テーブル
41 表示部
DESCRIPTION OF SYMBOLS 1 Member information management system 2 Network 3 Printer 4 Terminal device 10 Member information server 11 Network IF
12, 23 Control unit 12a Member information extraction unit 12b Arrangement information extraction unit 12c Reading information arrangement unit 13, 24 Data recording unit 13a Drawing DB
13b Member information DB
20 imaging device 21 imaging unit 22 display 23a reading unit 23b associating unit 24a image table 24b member information table 41 display unit

Claims (4)

建築部材に関する部材図面と、前記建築部材を用いた建築物に関する建築図面とを格納する図面格納手段と、
前記建築部材に関する部材情報と、当該建築部材を一意に識別する識別情報とを、前記部材図面から当該建築部材毎に抽出する部材情報抽出手段と、
前記識別情報と、前記建築部材の配置に関する配置情報とを、前記建築図面から当該建築部材毎に抽出する配置情報抽出手段と、
前記識別情報、前記部材情報抽出手段によって抽出された前記部材情報、及び、前記配置情報抽出手段によって抽出された前記配置情報を、相互に関連付けて格納する部材情報格納手段と、
前記建築図面に含まれている前記建築部材に対応する識別情報を当該建築図面から取得し、当該取得した識別情報に対応する前記配置情報を前記部材情報格納手段から取得し、当該取得した識別情報と配置情報とを含む読取情報を、当該識別情報に対応する建築部材に関連付けて、当該建築図面中に配置する読取情報配置手段と、
前記読取情報配置手段によって前記読取情報が配置された建築図面の少なくとも一部を出力する出力手段と、
被写体を撮影する撮影手段と、
前記撮影手段によって撮影された画像を格納する画像格納手段と、
前記読取情報を読み取る読取手段と、
前記読取手段によって読み取られた読取情報に含まれる前記配置情報を表示し、当該読取情報に含まれる前記識別情報に関連付けて前記部材情報格納手段に格納されている前記部材情報を表示する、表示手段と、
前記画像格納手段に格納された前記画像と、前記表示手段によって表示された前記配置情報及び前記識別情報とを、相互に関連付ける関連付け手段と、
を備える部材情報管理システム。
A drawing storage means for storing a member drawing relating to a building member and a building drawing relating to a building using the building member;
Member information extracting means for extracting member information relating to the building member and identification information for uniquely identifying the building member for each building member from the member drawing;
Arrangement information extraction means for extracting the identification information and the arrangement information relating to the arrangement of the building members for each building member from the building drawing;
Member information storage means for storing the identification information, the member information extracted by the member information extraction means, and the arrangement information extracted by the arrangement information extraction means;
The identification information corresponding to the building member included in the architectural drawing is acquired from the architectural drawing, the arrangement information corresponding to the acquired identification information is acquired from the member information storage means, and the acquired identification information is acquired. Reading information arrangement means for associating the reading information including the arrangement information with the building member corresponding to the identification information, and arranging the reading information in the architectural drawing;
Output means for outputting at least a part of the architectural drawing in which the read information is arranged by the read information arrangement means;
Photographing means for photographing the subject;
Image storage means for storing an image photographed by the photographing means;
Reading means for reading the read information;
Display means for displaying the arrangement information included in the read information read by the reading means, and displaying the member information stored in the member information storage means in association with the identification information included in the read information. When,
Association means for associating the image stored in the image storage means with the arrangement information and the identification information displayed by the display means;
A member information management system comprising:
前記建築図面は、当該建築図面に含まれている前記建築部材を一意に識別する識別情報である符号を有し、
前記読取情報配置手段は、前記建築図面から前記符号を抽出し、当該抽出した符号に対応する前記配置情報を前記部材情報格納手段から取得し、当該取得した配置情報を含む前記読取情報を、当該建築図面中の当該符号の位置に対応付けて配置する、
請求項1に記載の部材情報管理システム。
The architectural drawing has a code which is identification information for uniquely identifying the building member included in the architectural drawing,
The reading information arrangement unit extracts the code from the architectural drawing, acquires the arrangement information corresponding to the extracted code from the member information storage unit, and reads the reading information including the acquired arrangement information, Arranged in association with the position of the code in the architectural drawing,
The member information management system according to claim 1.
前記読取情報配置手段は、前記建築図面における通り芯の配置を基準として当該建築図面における前記符号の位置を特定し、当該特定した符号の位置に対応付けて前記読取情報を配置する、
請求項2に記載の部材情報管理システム。
The reading information arrangement means specifies the position of the code in the architectural drawing with reference to the arrangement of the cores in the architectural drawing, and arranges the reading information in association with the position of the specified code.
The member information management system according to claim 2.
前記読取情報配置手段は、前記読取情報を、光学的に読み取り可能な情報コードとして前記建築図面中に配置する、
請求項1から3のいずれか一項に記載の部材情報管理システム。
The read information arrangement means arranges the read information as an optically readable information code in the architectural drawing.
The member information management system according to any one of claims 1 to 3.
JP2011052019A 2011-03-09 2011-03-09 Material information management system Expired - Fee Related JP5667911B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011052019A JP5667911B2 (en) 2011-03-09 2011-03-09 Material information management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011052019A JP5667911B2 (en) 2011-03-09 2011-03-09 Material information management system

Publications (2)

Publication Number Publication Date
JP2012190177A JP2012190177A (en) 2012-10-04
JP5667911B2 true JP5667911B2 (en) 2015-02-12

Family

ID=47083279

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011052019A Expired - Fee Related JP5667911B2 (en) 2011-03-09 2011-03-09 Material information management system

Country Status (1)

Country Link
JP (1) JP5667911B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6955356B2 (en) * 2017-04-03 2021-10-27 株式会社ア−キテック Bar arrangement inspection support system and bar arrangement inspection support program
JP7018818B2 (en) * 2018-05-15 2022-02-14 株式会社ア-キテック Bar arrangement inspection support system and bar arrangement inspection support program
JP7421188B2 (en) * 2020-02-07 2024-01-24 国立研究開発法人理化学研究所 Programs, recording media, and systems
JP6989884B1 (en) 2021-07-30 2022-01-12 株式会社ルクレ Electronic small blackboard generator and electronic small blackboard generation method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11353317A (en) * 1998-06-04 1999-12-24 Toshiba Corp Drawing filing device, system therefor and its method and drawing identification code discriminating device and its method
US20060185275A1 (en) * 2005-02-07 2006-08-24 Yatt Barry D Method and system for building, designing with and managing elements of construction
JP2009230197A (en) * 2008-03-19 2009-10-08 Honda Motor Co Ltd Drawing information management system and drawing information management method
JP2010101158A (en) * 2008-09-26 2010-05-06 Takenaka Komuten Co Ltd Photographing and recording system
JP5386237B2 (en) * 2009-06-02 2014-01-15 株式会社竹中工務店 Material information management system

Also Published As

Publication number Publication date
JP2012190177A (en) 2012-10-04

Similar Documents

Publication Publication Date Title
JP5667911B2 (en) Material information management system
JP6920899B2 (en) Reinforcing bar management system
JP5612637B2 (en) Bar arrangement inspection support system and bar arrangement inspection support method
JP5386237B2 (en) Material information management system
JP2010101158A (en) Photographing and recording system
EP0822522B1 (en) Method and apparatus for defining surfaces of three-dimensional object from three-dimensional wire-frame model
US20230112828A1 (en) Inspection support device, inspection support method, and program
JP6235327B2 (en) Construction information management system and construction information management method
JP4809683B2 (en) Analysis model generation apparatus, analysis model generation method, and analysis model generation program
JP6955356B2 (en) Bar arrangement inspection support system and bar arrangement inspection support program
Meadati et al. Building information modeling implementation-current and desired status
JP5000630B2 (en) Construction management method
JP2022040999A (en) Information processing device, information processing system, information processing method and program
JP6846269B2 (en) Photo report creation program
JP6133763B2 (en) Production information management device, production information management method and program
JP7018818B2 (en) Bar arrangement inspection support system and bar arrangement inspection support program
JP2019174882A (en) Inspection image management system
JP4841864B2 (en) Work planning system, image display device, and program
JP7421917B2 (en) Process chart creation method, process chart creation support program, and process chart creation support device
JP4098491B2 (en) Design data creation system
JP6796828B2 (en) Construction quality inspection system and method
JP2017004156A (en) Central monitoring terminal, site operation terminal and plant monitoring control system
JP2001255926A (en) Product manufacture information generating device and program recoding medium
JP2011080216A (en) Bar arrangement inspection system
JP2024084993A (en) Estimation system and estimation program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20131220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140724

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140819

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140903

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141209

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141215

R150 Certificate of patent or registration of utility model

Ref document number: 5667911

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees