JP5656041B2 - Construction drawing system - Google Patents

Construction drawing system Download PDF

Info

Publication number
JP5656041B2
JP5656041B2 JP2007197476A JP2007197476A JP5656041B2 JP 5656041 B2 JP5656041 B2 JP 5656041B2 JP 2007197476 A JP2007197476 A JP 2007197476A JP 2007197476 A JP2007197476 A JP 2007197476A JP 5656041 B2 JP5656041 B2 JP 5656041B2
Authority
JP
Japan
Prior art keywords
interference
reinforcing bars
avoidance
information
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007197476A
Other languages
Japanese (ja)
Other versions
JP2009030403A (en
Inventor
利晃 名取
利晃 名取
登貴弥 上中
登貴弥 上中
大橋 秀樹
秀樹 大橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2007197476A priority Critical patent/JP5656041B2/en
Publication of JP2009030403A publication Critical patent/JP2009030403A/en
Application granted granted Critical
Publication of JP5656041B2 publication Critical patent/JP5656041B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、鉄筋が干渉しないように配置し、施工図を作図する施工図作図システムに関する。   The present invention relates to a construction drawing drawing system for arranging construction drawings so that reinforcing bars do not interfere with each other.

従来から構造部材と設備部材との部材干渉を照合しやすい状態に表示できるようにするために、同一施工個所を対象とした構造図面データAと設備図面データBとを同一座標系に互いに重ね合わせて表示し、構造図面データAに示された構造部材と、設備図面データBに示された設備部材との相互干渉を照合する場合に、設備部材と構造部材との図面データの中から、表示する表示部材と表示しない非表示部材とをそれぞれ選別し、選別した表示部材を三次元表示して、構造部材と設備部材との干渉を照合する部材干渉照合システムが知られている(例えば、特許文献1参照)。
特開2003−256481号公報
Conventionally, the structural drawing data A and the equipment drawing data B for the same construction site are superimposed on each other in the same coordinate system so that the member interference between the structural member and the equipment member can be displayed in an easy-to-match state. When the mutual interference between the structural member shown in the structural drawing data A and the equipment member shown in the equipment drawing data B is collated, it is displayed from the drawing data of the equipment member and the structural member. There is known a member interference matching system that sorts display members to be displayed and non-display members not to be displayed, three-dimensionally displays the sorted display members, and checks interference between the structural member and the equipment member (for example, a patent) Reference 1).
Japanese Patent Laid-Open No. 2003-256482

ところで、建造物の基礎部分のコンクリート内には、ベースプレートや所定量の鉄筋が用いられるが、建造物の設計時においては、鉄筋同士の干渉や鉄筋とベースプレートの干渉が発生しないように鉄筋の配置位置まで検討されることは少なく、使用する鉄筋の径や数量のみが規定されるのが一般的である。したがって、施工図面の作成時において、鉄筋同士の干渉や鉄筋とベースプレートの干渉が発生しないように鉄筋の配置位置を検討し、施工図を作図している。しかしながら、基礎のベースプレート廻りの施工図やベースプレートの無い柱・梁内の鉄筋の施工図の作図には、高度な知識を必要とするとともに、配置を検討する時間、図面作成・修正の手間がかかり、また、平面や断面図との図面の整合性を取る手間がかかるため、多大な時間を要するという問題がある。   By the way, the base plate and a certain amount of reinforcing bars are used in the concrete of the foundation of the building. However, when designing the building, the reinforcing bars should be arranged so that there is no interference between the reinforcing bars and between the reinforcing bar and the base plate. The position is rarely considered, and only the diameter and quantity of reinforcing bars to be used are generally specified. Therefore, at the time of creating the construction drawing, the arrangement position of the reinforcing bars is examined and the construction drawing is drawn so that the interference between the reinforcing bars and the interference between the reinforcing bars and the base plate does not occur. However, drawing construction drawings around the base plate of the foundation and reinforcing bars in columns and beams without a base plate requires advanced knowledge, and it takes time to review the arrangement and troublesome drawing creation and correction. Moreover, since it takes time and effort to take the consistency of the drawing with the plan view and the cross-sectional view, there is a problem that it takes a lot of time.

本発明は、このような事情に鑑みてなされたもので、鉄筋が干渉しないように自動的に鉄筋の再配置を行い、再配置した結果に基づく施工図を容易に作図することができる施工図作図システムを提供することを目的とする。   The present invention has been made in view of such circumstances, and the relocation of the reinforcing bars is automatically performed so that the rebars do not interfere, and the construction drawing based on the result of the relocation can be easily drawn. An object is to provide a drawing system.

本発明は、施工条件と配置位置移動条件の情報が記憶された条件データ記憶手段と、使用する鉄筋の情報を入力する鉄筋情報入力手段と、前記鉄筋情報入力手段によって入力された鉄筋情報に基づいて、前記条件データ記憶手段に記憶されている施工条件を満たすように、前記使用する鉄筋の初期配置を決定する初期配置処理手段と、前記初期配置処理手段によって配置された鉄筋の干渉を検出し、前記条件データ記憶手段に記憶されている配置位置移動条件を満たし、かつ干渉している鉄筋が干渉しないように前記鉄筋の配置位置を移動する干渉検出・回避処理手段と、前記干渉検出・回避処理手段によって配置位置を移動した鉄筋を含む最終配置位置情報を表示する表示手段とを備え、前記配置位置移動条件は、鉄筋の干渉が発生した場合に、現時点の位置を優先して移動しないことを意味する干渉回避の優先順位を含み、前記干渉検出・回避処理手段は、前記干渉回避の優先順位に従って、優先順位の低い鉄筋から順に配置位置を移動させることを特徴とする。
本発明は、前記干渉検出・回避処理手段は、まず高さ方向の鉄筋の干渉の検出及び配置位置の移動を行い、その後に平面の鉄筋の干渉の検出及び配置位置の移動を行う、ことを特徴とする。
The present invention is based on condition data storage means in which information on construction conditions and arrangement position movement conditions is stored, reinforcing bar information input means for inputting information on reinforcing bars to be used, and reinforcing bar information input by the reinforcing bar information input means. The initial arrangement processing means for determining the initial arrangement of the reinforcing bars to be used and the interference of the reinforcing bars arranged by the initial arrangement processing means are detected so as to satisfy the construction conditions stored in the condition data storage means. An interference detection / avoidance processing means for moving the arrangement position of the reinforcing bar so as to satisfy the arrangement position movement condition stored in the condition data storage means and preventing the interfering reinforcing bar from interfering, and the interference detection / avoidance and display means for displaying the final position information including the reinforcing bars to move the position by the processing means, said position moving conditions, field interference rebar occurs To include interference avoidance priority, which means that no moving in favor of the position of current, the interference detection and avoidance processing means, according to the priority of the interference avoidance, the arrangement position in order from the lowest priority rebar It is made to move.
In the present invention, the interference detection / avoidance processing means first detects the interference of the reinforcing bars in the height direction and moves the arrangement position, and then detects the interference of the reinforcing bars in the plane and moves the arrangement position. Features.

本発明は、前記干渉検出・回避処理手段によって再配置した鉄筋を修正するための配置位置情報を入力する配置位置修正手段をさらに備えたことを特徴とする。   The present invention is further characterized by further comprising an arrangement position correction means for inputting arrangement position information for correcting the reinforcing bars rearranged by the interference detection / avoidance processing means.

本発明によれば、鉄筋が干渉しないように自動的に鉄筋の再配置を行い、再配置した結果に基づく施工図を作図するようにしたため、鉄筋の配置位置を検討する時間、図面作成の時間、図面の整合性を取る時間を大幅に短縮することができるとともに、図面作成時の高度な知識がなくとも施工図の作図を行うことができるという効果が得られる。   According to the present invention, the reinforcing bars are automatically rearranged so that the reinforcing bars do not interfere, and the construction drawing based on the rearranged result is drawn. In addition, the time required for drawing consistency can be greatly shortened, and the construction drawing can be drawn without a high level of knowledge at the time of drawing creation.

以下、本発明の一実施形態による施工図作図システムを図面を参照して説明する。図1は同実施形態の構成を示すブロック図である。この図において、符号1は、ベースプレート廻りの鉄筋が互いに干渉しないように配置し、施工図の作図を行う施工図作図システムであり、パーソナルコンピュータ等で構成する。符号2は、キーボードやマウス等で構成する入力部である。符号3は、ディスプレイ装置から構成する表示部である。符号4は、鉄筋の干渉を回避する場合に適用する条件の情報が記憶される条件データ記憶部である。符号5は、施工図作図システム1が生成した施工図のデータを記憶する施工図データ記憶部である。符号6は、施工図作図システム1が生成した施工図データに基づいて、施工図の印刷を行うプリンタ等で構成する印刷部である。符号7は、建造物の設計を支援するCADシステム等で構成する設計システムである。符号8は、設計システム7で設計した建造物の躯体情報を記憶する躯体情報記憶部である。この設計データ記憶部8には、ベースプレート廻りの鉄筋に関する設計情報が含まれる。   Hereinafter, a construction drawing system according to an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram showing the configuration of the embodiment. In this figure, reference numeral 1 denotes a construction drawing drawing system which is arranged so that the reinforcing bars around the base plate do not interfere with each other and draws construction drawings, and is constituted by a personal computer or the like. Reference numeral 2 denotes an input unit composed of a keyboard, a mouse, and the like. Reference numeral 3 denotes a display unit composed of a display device. Reference numeral 4 denotes a condition data storage unit that stores information on conditions to be applied when rebar interference is avoided. Reference numeral 5 denotes a construction drawing data storage unit that stores construction drawing data generated by the construction drawing drawing system 1. Reference numeral 6 denotes a printing unit configured by a printer or the like that prints a construction drawing based on the construction drawing data generated by the construction drawing drawing system 1. Reference numeral 7 denotes a design system constituted by a CAD system or the like that supports the design of a building. Reference numeral 8 denotes a frame information storage unit that stores frame information of a building designed by the design system 7. The design data storage unit 8 includes design information related to reinforcing bars around the base plate.

符号11は、入力部2から入力されるデータ、設計データ記憶部8に記憶されている躯体情報を読み込み、内部に保持する情報入力部である。符号12は、入力部2から入力された躯体情報、または躯体情報記憶部8から読み込まれた躯体情報に基づいて、鉄筋の初期配置を行う初期配置処理部である。符号13は、初期配置処理部12が配置した鉄筋が互いに干渉していないか否かを検出し、検出した鉄筋の干渉を回避するために、条件データ記憶部4に記憶されている条件を満たすように干渉回避処理を実行し、鉄筋が互いに干渉しないように再配置を行う干渉検出・回避処理部である。符号14は、鉄筋が互いに干渉しないように再配置が行われた鉄筋の施工図の作図処理を行う作図処理部であり、作図結果を施工図データ記憶部5または印刷部6へ出力する。   Reference numeral 11 denotes an information input unit that reads the data input from the input unit 2 and the chassis information stored in the design data storage unit 8 and holds the information inside. Reference numeral 12 denotes an initial arrangement processing unit that performs initial arrangement of reinforcing bars based on the case information input from the input unit 2 or the case information read from the case information storage unit 8. Reference numeral 13 detects whether the reinforcing bars arranged by the initial placement processing unit 12 do not interfere with each other, and satisfies the conditions stored in the condition data storage unit 4 in order to avoid interference of the detected reinforcing bars. The interference detection / avoidance processing unit executes the interference avoidance processing as described above and performs rearrangement so that the reinforcing bars do not interfere with each other. Reference numeral 14 denotes a drawing processing unit that performs drawing processing of the construction drawing of the reinforcing bars that have been rearranged so that the reinforcing bars do not interfere with each other, and outputs the drawing result to the construction drawing data storage unit 5 or the printing unit 6.

ここで、図12を参照して、ベースプレート廻りに配置される鉄筋について説明する。図12は、ベースプレート21の廻りにZ軸方向(高さ方向)に延びる柱内の鉄筋26と、X軸方向に延びる梁の上筋22、下筋23と、Y軸方向に延びる梁の上筋24、下筋25とを配置した状態を示す斜視図である。設計段階においては、使用するベースプレート21の配置位置、柱の大きさ、2つの梁の大きさ及び柱と梁内に用いる鉄筋の数量等が規定されているのみである。このため、例えば、X軸の梁の上筋22とY軸の梁の上筋24は高さを変えて配置する必要がある。また、梁の上筋22と柱の鉄筋26が干渉しないように各鉄筋の配置位置を検討する必要がある。さらに、柱内に配置されるベースプレートのアンカーボルトと、梁の上筋22が干渉しないように上筋22の配置を検討する必要がある。以下の説明においては、ベースプレート21を用いた柱内の鉄筋の干渉を回避する例を説明するが、本発明による干渉回避処理は、ベースプレートの無い柱や梁内の鉄筋の干渉回避にも適用可能である。また、図12に示す例は、梁と柱が直角に接合される例を示しているが、本発明は、任意の角度の梁に対しても対応可能であり、その際鉄筋間隔を自動計算して間隔をとる機能を有している。   Here, the reinforcing bars arranged around the base plate will be described with reference to FIG. 12 shows a reinforcing bar 26 in a column extending in the Z-axis direction (height direction) around the base plate 21, an upper bar 22 and a lower bar 23 extending in the X-axis direction, and an upper beam extending in the Y-axis direction. It is a perspective view which shows the state which has arrange | positioned the line | wire 24 and the lower line | wire 25. FIG. In the design stage, only the arrangement position of the base plate 21 to be used, the size of the column, the size of the two beams, the number of reinforcing bars used in the column and the beam, and the like are only specified. For this reason, for example, the upper bar 22 of the X-axis beam and the upper bar 24 of the Y-axis beam need to be arranged with different heights. Further, it is necessary to consider the position of each reinforcing bar so that the upper bar 22 of the beam and the column reinforcing bar 26 do not interfere with each other. Furthermore, it is necessary to consider the arrangement of the upper bar 22 so that the anchor bolt of the base plate arranged in the column and the upper bar 22 of the beam do not interfere with each other. In the following description, an example of avoiding rebar interference in a column using the base plate 21 will be described. However, the interference avoidance processing according to the present invention can also be applied to avoid interference of a rebar in a column without a base plate or a beam. It is. The example shown in FIG. 12 shows an example in which the beam and the column are joined at a right angle. However, the present invention can be applied to a beam having an arbitrary angle, and the rebar interval is automatically calculated. And have a function of spacing.

次に、図2〜図4を参照して、図1に示す施工図作図システム1の動作を説明する。図2は、図1に示す施工図作図システム1の動作を示すフローチャートである。図3は、図1に示すステップS9(レベル干渉回避処理)の詳細な動作を示すフローチャートである。図4は、図1に示すステップS10(平面干渉回避処理)の詳細な動作を示すフローチャートである。   Next, the operation of the construction drawing system 1 shown in FIG. 1 will be described with reference to FIGS. FIG. 2 is a flowchart showing the operation of the construction drawing system 1 shown in FIG. FIG. 3 is a flowchart showing the detailed operation of step S9 (level interference avoidance processing) shown in FIG. FIG. 4 is a flowchart showing the detailed operation of step S10 (plane interference avoidance processing) shown in FIG.

まず作業者が、入力部2を操作して、施工図作図システム1を起動すると、情報入力部11は表示部3に機能選択メニュー画面を表示する。ここで、作業者は入力部2を操作して、「条件設定」、「ファイル読み込み」、「入力へ」のいずれかを選択する(ステップS1)。作業者が「条件設定」を選択すると、情報入力部11は、条件設定画面を表示部3に表示する。ここで作業者は、条件の設定を行う(ステップS2)。図5に条件設定画面の一例を示す。ここで設定するべき条件は、「干渉回避の優先順位」、「コンクリートの施工かぶり厚(最小かぶり厚+10mm)」及び「直交する鉄筋の最小あき寸法」である。干渉回避の優先順位とは、鉄筋の干渉が発生した場合に、現時点の位置を優先して移動しないことを意味する優先順位である。   First, when the operator operates the input unit 2 to start the construction drawing system 1, the information input unit 11 displays a function selection menu screen on the display unit 3. Here, the operator operates the input unit 2 to select any one of “condition setting”, “file read”, and “to input” (step S1). When the operator selects “condition setting”, the information input unit 11 displays a condition setting screen on the display unit 3. Here, the operator sets conditions (step S2). FIG. 5 shows an example of the condition setting screen. The conditions to be set here are “interference avoidance priority”, “concrete construction cover thickness (minimum cover thickness + 10 mm)”, and “minimum drilling dimension of orthogonal reinforcing bars”. The priority order for avoiding interference is a priority order that means that when a rebar interference occurs, the current position is not given priority for movement.

図5に示す例では、アンカーボルト、柱主筋の4隅、梁主筋の4隅、梁主筋の4隅以外、柱主筋の4隅以外の優先順位が設定されている状態を示している。したがって、干渉が発生した場合、アンカーボルトは移動させず、優先順位の低い柱主筋の4隅以外から移動させて再配置することを意味する。この優先順位を変更設定する場合は、「上へ」または「下へ」のボタンを操作して、優先順位を変更する。また、コンクリートの最小かぶり厚は、「柱」、「梁の上部」、「梁の側面」、「梁の下部」についてコンクリートのかぶり厚の値を入力設定する。また、直交する鉄筋の最小あき寸法についても値を入力する。これらの条件値は、図5に示すように既定値(デフォルト値)が予め設定されており、変更する場合のみに値入力を行えばよい。ここで入力設定された条件値は、条件データ記憶部4に記憶する。そして、作業者が、「OK」ボタンを押下すると、機能選択メニュー画面に戻る。   The example shown in FIG. 5 shows a state in which priorities other than the four corners of the column main bars other than the anchor bolts, the four corners of the column main bars, the four corners of the beam main bars, and the four corners of the beam main bars are set. Therefore, when interference occurs, it means that the anchor bolt is not moved, but is moved from other than the four corners of the column main bars having a low priority and rearranged. When this priority order is changed and set, the "up" or "down" button is operated to change the priority. For the minimum cover thickness of concrete, the value of the concrete cover thickness is input and set for “column”, “upper part of beam”, “side of beam”, and “lower part of beam”. Also, enter a value for the minimum perforated dimension of the reinforcing bars. As these condition values, default values (default values) are set in advance as shown in FIG. 5, and values need only be input when they are changed. The condition value input and set here is stored in the condition data storage unit 4. When the operator presses the “OK” button, the screen returns to the function selection menu screen.

機能選択メニュー画面において、作業者が「ファイル読み込み」を選択すると、情報入力部11は、表示部3にファイル選択画面を表示し、躯体情報が記憶されたファイルを指定する指示を出す。これに対して、作業者は、躯体情報が記憶されたファイルを指定する。そして、情報入力部11は、指定されたファイル(ここでは、躯体情報記憶部8)から躯体情報を読み込む(ステップS3)。躯体情報の読み込みが終了すると、ステップS4へ移行する。また、機能選択メニュー画面から「入力へ」を選択するとステップS4へ移行する。   When the operator selects “read file” on the function selection menu screen, the information input unit 11 displays a file selection screen on the display unit 3 and issues an instruction to specify a file in which the chassis information is stored. On the other hand, the worker designates a file in which the chassis information is stored. Then, the information input unit 11 reads the frame information from the designated file (here, the frame information storage unit 8) (step S3). When reading of the chassis information is completed, the process proceeds to step S4. Further, when “to input” is selected from the function selection menu screen, the process proceeds to step S4.

次に、情報入力部11は、通り芯・レベル情報入力画面を表示部3に表示する。ここで、作業者は、入力部2を操作して、X通りの通り芯番号、Y通りの通り芯番号、GL(地盤面高さ)からの1FLの高さ(1階床高さ)、GL(地盤面高さ)からのベースプレートの下端までの高さを入力する(ステップS4)。図6に通り芯・レベル情報入力画面の一例を示す。このとき、ここで入力するべき値が読み込まれた躯体情報内に含まれていた場合は、その値が初期値として入力済みの状態となる。情報入力部11は、ここで入力された各値を内部に保持する。そして、作業者が「次へ」ボタンを押下すると、次へ移行する。   Next, the information input unit 11 displays a core / level information input screen on the display unit 3. Here, the operator operates the input unit 2 to set the X core number, the Y core number, the 1FL height (ground floor height) from GL (ground surface height), The height from GL (ground surface height) to the lower end of the base plate is input (step S4). FIG. 6 shows an example of the core / level information input screen. At this time, if the value to be input here is included in the read chassis information, the value is already input as an initial value. The information input unit 11 holds each value input here. When the operator presses the “Next” button, the process proceeds to the next.

次に、情報入力部11は、基礎の情報入力画面を表示部3に表示する。ここで、作業者は、入力部2を操作して、基礎の大きさ、基礎の位置、使用する鉄筋と使用本数を入力する(ステップS5)。図7に基礎の情報入力画面の一例を示す。このとき、ここで入力するべき値が読み込まれた躯体情報内に含まれていた場合は、その値が初期値として入力済みの状態となる。情報入力部11は、ここで入力された各値を内部に保持する。そして、作業者が「次へ」ボタンを押下すると、次へ移行する。   Next, the information input unit 11 displays a basic information input screen on the display unit 3. Here, the operator operates the input unit 2 to input the size of the foundation, the position of the foundation, the reinforcing bars to be used, and the number of pieces to be used (step S5). FIG. 7 shows an example of a basic information input screen. At this time, if the value to be input here is included in the read chassis information, the value is already input as an initial value. The information input unit 11 holds each value input here. When the operator presses the “Next” button, the process proceeds to the next.

次に、情報入力部11は、柱の情報入力画面を表示部3に表示する。ここで、作業者は、入力部2を操作して、柱の大きさ、柱の位置、使用する鉄筋と使用本数、使用するベースプレートの型番を入力する(ステップS6)。図8に柱の情報入力画面の一例を示す。このとき、ここで入力するべき値が読み込まれた躯体情報内に含まれていた場合は、その値が初期値として入力済みの状態となる。情報入力部11は、ここで入力された各値を内部に保持する。そして、作業者が「次へ」ボタンを押下すると、次へ移行する。   Next, the information input unit 11 displays a column information input screen on the display unit 3. Here, the operator operates the input unit 2 to input the size of the column, the position of the column, the reinforcing bars used and the number used, and the model number of the base plate used (step S6). FIG. 8 shows an example of a column information input screen. At this time, if the value to be input here is included in the read chassis information, the value is already input as an initial value. The information input unit 11 holds each value input here. When the operator presses the “Next” button, the process proceeds to the next.

次に、情報入力部11は、梁の情報入力画面を表示部3に表示する。ここで、作業者は、入力部2を操作して、梁の大きさ、梁の位置、使用する鉄筋と使用本数を入力する(ステップS7)。図9に梁の情報入力画面の一例を示す。このとき、ここで入力するべき値が読み込まれた躯体情報内に含まれていた場合は、その値が初期値として入力済みの状態となる。情報入力部11は、ここで入力された各値を内部に保持する。そして、作業者が「次へ」ボタンを押下すると、次へ移行する。   Next, the information input unit 11 displays a beam information input screen on the display unit 3. Here, the operator operates the input unit 2 and inputs the size of the beam, the position of the beam, the reinforcing bars to be used, and the number of bars to be used (step S7). FIG. 9 shows an example of a beam information input screen. At this time, if the value to be input here is included in the read chassis information, the value is already input as an initial value. The information input unit 11 holds each value input here. When the operator presses the “Next” button, the process proceeds to the next.

次に、情報入力部11は、情報入力が終了すると、内部に保持している各値を初期配置処理部12へ受け渡す。これを受けて、初期配置処理部12は、受け渡された各値に基づいて鉄筋オブジェクトを作成し、この鉄筋オブジェクトを使用して、基礎内の鉄筋、柱内の鉄筋及びベースプレート、梁内の鉄筋の初期配置を行う(ステップS8)。鉄筋オブジェクトは、鉄筋の芯の座標値と鉄筋直径の情報で特定される図形情報のことである。この初期配置処理は、条件データ記憶部4に記憶されているコンクリートの最小かぶり厚の値を参照して、鉄筋の位置を決定する。このとき、初期配置処理部12は、最小かぶり厚を満たすように、指定された鉄筋が等間隔に配置されるように初期配置位置を決定する。初期配置位置の決定が終了すると、初期配置処理部12は、基礎内の鉄筋、柱内の鉄筋及びベースプレート、梁内の鉄筋の初期配置位置情報を干渉検出・回避処理部13へ受け渡す。   Next, when the information input is completed, the information input unit 11 delivers each value held therein to the initial arrangement processing unit 12. In response to this, the initial placement processing unit 12 creates a reinforcing bar object based on the passed values, and uses the reinforcing bar object to reinforce the reinforcing bar in the foundation, the reinforcing bar and base plate in the column, and the beam in the beam. The initial arrangement of the reinforcing bars is performed (step S8). The reinforcing bar object is graphic information specified by the coordinate value of the core of the reinforcing bar and the information on the diameter of the reinforcing bar. In this initial arrangement process, the position of the reinforcing bar is determined with reference to the value of the minimum cover thickness of the concrete stored in the condition data storage unit 4. At this time, the initial placement processing unit 12 determines the initial placement position so that the specified reinforcing bars are placed at equal intervals so as to satisfy the minimum cover thickness. When the determination of the initial placement position is completed, the initial placement processing unit 12 delivers the initial placement position information of the reinforcing bars in the foundation, the reinforcing bars and base plate in the column, and the reinforcing bars in the beam to the interference detection / avoidance processing unit 13.

次に、干渉検出・回避処理部13は、初期配置の状態において高さ(レベル)方向の鉄筋の干渉を検出し、鉄筋の干渉があれば回避処理を行う(ステップS9)。ここで、ステップS9の処理動作を、図3を参照して、説明する。まず、干渉検出・回避処理部13は、比較するべき2つの梁を特定し、これらの梁の情報を取得する(ステップS21)。そして、干渉検出・回避処理部13は、一方の梁の鉄筋の情報を取得する(ステップS22)とともに、他方の梁の鉄筋に情報を取得する(ステップS23)。   Next, the interference detection / avoidance processing unit 13 detects interference of reinforcing bars in the height (level) direction in the initial arrangement state, and performs avoidance processing if there is interference of reinforcing bars (step S9). Here, the processing operation of step S9 will be described with reference to FIG. First, the interference detection / avoidance processing unit 13 specifies two beams to be compared and acquires information on these beams (step S21). Then, the interference detection / avoidance processing unit 13 acquires information on the reinforcing bars of one beam (step S22) and acquires information on the reinforcing bars of the other beam (step S23).

次に、干渉検出・回避処理部13は、2つの鉄筋のZ差が許容値以上か否かを判定する(ステップS24)。ここでいうZ差とは、比較する2つの鉄筋の高さの差のことである。また、許容値とは、一方の鉄筋の直径と他方の鉄筋の直径を足して2で割った値である。   Next, the interference detection / avoidance processor 13 determines whether or not the Z difference between the two reinforcing bars is greater than or equal to an allowable value (step S24). The Z difference here is the difference in height between the two reinforcing bars to be compared. The allowable value is a value obtained by adding the diameter of one reinforcing bar and the diameter of the other reinforcing bar and dividing by two.

この判定の結果、Z差が許容値未満であれば、干渉検出・回避処理部13は、X方向とY方向のどちらの鉄筋を上側に配置するか否かを判定する(ステップS28)。この判定は、例えば、「X方向を上側に配置する」、「小梁の方向(例えばY方向)と同方向を上側に配置する」等のルール情報を条件データ記憶部4に予め記憶しておき、この情報を参照して判定する。この判定の結果、X方向を上側に配置するのであれば、対象の鉄筋は上筋か下筋かを判定する(ステップS29)。この判定の結果、上筋であれば、Y方向の梁の鉄筋を、(許容値−Z差)分下げるように再配置する(ステップS30)。一方、下筋であれば、X方向の梁の鉄筋を、(許容値−Z差)分上げるように再配置する(ステップS31)。   As a result of this determination, if the Z difference is less than the allowable value, the interference detection / avoidance processing unit 13 determines whether or not the reinforcing bar in the X direction or the Y direction is to be arranged on the upper side (step S28). In this determination, for example, rule information such as “place the X direction on the upper side” and “place the same direction as the direction of the beam (eg, the Y direction) on the upper side” is stored in the condition data storage unit 4 in advance. The determination is made with reference to this information. As a result of this determination, if the X direction is to be arranged on the upper side, it is determined whether the target reinforcing bar is the upper or lower reinforcing bar (step S29). As a result of this determination, if it is an upper bar, the rebar of the beam in the Y direction is rearranged so as to be lowered by (allowable value−Z difference) (step S30). On the other hand, if it is a lower bar, the rebar of the beam in the X direction is rearranged so as to increase by (allowable value−Z difference) (step S31).

次に、ステップS28における判定の結果、Y方向を上側に配置するのであれば、対象の鉄筋は上筋は下筋かを判定する(ステップS32)。この判定の結果、上筋であれば、X方向の梁の鉄筋を、(許容値−Z差)分下げるように再配置する(ステップS33)。一方、下筋であれば、Y方向の梁の鉄筋を、(許容値−Z差)分上げるように再配置する(ステップS34)。   Next, as a result of the determination in step S28, if the Y direction is arranged on the upper side, it is determined whether the target reinforcing bar is the upper reinforcing bar or the lower reinforcing bar (step S32). As a result of this determination, if it is an upper bar, the rebar of the beam in the X direction is rearranged so as to be lowered by (allowable value−Z difference) (step S33). On the other hand, if it is a lower bar, the rebar of the beam in the Y direction is rearranged so as to increase by (allowable value−Z difference) (step S34).

次に、干渉検出・回避処理部13は、他方の梁の全ての鉄筋を比較したか否かを判定し(ステップS25)、全ての鉄筋を比較していなければ、ステップS23に戻り、同様の処理を行い、他方の全ての鉄筋について比較が終わるまで処理を繰り返す。   Next, the interference detection / avoidance processor 13 determines whether or not all the reinforcing bars of the other beam have been compared (step S25). If not all the reinforcing bars have been compared, the process returns to step S23, and the same The process is performed, and the process is repeated until the comparison is completed for all the other reinforcing bars.

次に、干渉検出・回避処理部13は、一方の梁の全ての鉄筋を比較したか否かを判定し(ステップS26)、全ての鉄筋を比較していなければ、ステップS22に戻り、同様の処理を行い、一方の全ての鉄筋について比較が終わるまで処理を繰り返す。   Next, the interference detection / avoidance processing unit 13 determines whether or not all the reinforcing bars of one beam have been compared (step S26). If not all the reinforcing bars have been compared, the process returns to step S22, and the same The process is performed, and the process is repeated until the comparison is completed for all the reinforcing bars.

次に、干渉検出・回避処理部13は、全ての梁について比較したか否かを判定し(ステップS27)、全ての梁について比較していなければ、ステップS21に戻り、同様の処理を行い、全ての梁について比較が終わるまで処理を繰り返す。   Next, the interference detection / avoidance processing unit 13 determines whether or not all beams have been compared (step S27). If all beams have not been compared, the process returns to step S21 to perform the same processing. Repeat the process until all beams have been compared.

この処理によって、全ての梁の全ての鉄筋が互いに干渉しているか否かが判定されて、干渉していれば、干渉している鉄筋の一方が上側または下側に移動されて再配置されることになる。   By this process, it is determined whether or not all the reinforcing bars of all the beams are interfering with each other. If there is an interference, one of the interfering reinforcing bars is moved to the upper side or the lower side and rearranged. It will be.

図2に戻り、干渉検出・回避処理部13は、平面の干渉鉄筋の干渉を検出し、鉄筋の干渉があれば回避処理を行う(ステップS10)。ここで、ステップS10の処理動作を、図4を参照して説明する。まず、干渉検出・回避処理部13は、比較するべき梁を特定し、この梁の情報を取得する(ステップS41)。そして、干渉検出・回避処理部13は、梁の鉄筋の情報を取得する(ステップS42)とともに、柱の鉄筋の情報を取得する(ステップS43)。   Returning to FIG. 2, the interference detection / avoidance processor 13 detects the interference of the planar interference rebar, and performs the avoidance process if there is interference of the rebar (step S <b> 10). Here, the processing operation of step S10 will be described with reference to FIG. First, the interference detection / avoidance processing unit 13 specifies a beam to be compared and acquires information on the beam (step S41). Then, the interference detection / avoidance processing unit 13 acquires information about the reinforcing bars of the beam (step S42) and also acquires information about the reinforcing bars of the column (step S43).

次に、干渉検出・回避処理部13は、2つの鉄筋のX(Y)差が許容値以上か否かを判定する(ステップS44)。ここでいうX(Y)差とは、X軸方向梁の場合、梁の鉄筋と柱の鉄筋のX座標の差のことであり、Y軸方向梁の場合、梁の鉄筋と柱の鉄筋のY座標の差のことである。また、許容値とは、一方の鉄筋の直径と他方の鉄筋の直径を足して2で割った値である。   Next, the interference detection / avoidance processor 13 determines whether or not the X (Y) difference between the two reinforcing bars is greater than or equal to an allowable value (step S44). The X (Y) difference here is the difference between the X coordinates of the beam reinforcement and the column reinforcement in the case of the X-axis beam, and in the case of the Y-axis beam, the difference between the beam reinforcement and the column reinforcement. This is the difference in Y coordinates. The allowable value is a value obtained by adding the diameter of one reinforcing bar and the diameter of the other reinforcing bar and dividing by two.

この判定の結果、X(Y)差が許容値未満であれば、干渉検出・回避処理部13は、条件データ記憶部4に記憶されている優先度はどちらが高く設定されているか否かを判定する(ステップS49)。この判定の結果、梁の優先度が高ければ、柱の鉄筋を移動した時、離隔距離が規定値以上となるか否かを判定する(ステップS50)。この規定値は鉄筋の芯から芯までの距離が鉄筋径を2.5倍した値である。この判定の結果、離隔距離が規定値以上であれば、干渉検出・回避処理部13は、柱の鉄筋を(許容値−X(Y)差)分移動する(ステップS51)。一方、離隔距離が規定値以上でない場合、干渉検出・回避処理部13は、梁のの鉄筋を(許容値−X(Y)差)分移動する(ステップS53)。   As a result of this determination, if the X (Y) difference is less than the allowable value, the interference detection / avoidance processing unit 13 determines which of the priorities stored in the condition data storage unit 4 is set higher. (Step S49). If the beam priority is high as a result of the determination, it is determined whether or not the separation distance is equal to or greater than a specified value when the column reinforcing bar is moved (step S50). This specified value is a value in which the distance from the core of the reinforcing bar is 2.5 times the diameter of the reinforcing bar. As a result of this determination, if the separation distance is equal to or greater than the specified value, the interference detection / avoidance processing unit 13 moves the column reinforcement by (allowable value−X (Y) difference) (step S51). On the other hand, when the separation distance is not equal to or greater than the specified value, the interference detection / avoidance processing unit 13 moves the rebar of the beam by (allowable value−X (Y) difference) (step S53).

次に、ステップS49の判定の結果、柱の優先度が高ければ、梁の鉄筋を移動した時、離隔距離が規定値以上になるか否かを判定する(ステップS52)。この判定の結果、離隔距離が規定値以上であれば、干渉検出・回避処理部13は、梁の鉄筋を(許容値−X(Y)差)分移動し(ステップS53)、離隔距離が規定値以上でない場合、干渉検出・回避処理部13は、柱の鉄筋を(許容値−X(Y)差)分移動する(ステップS51)。   Next, as a result of the determination in step S49, if the priority of the column is high, it is determined whether or not the separation distance is equal to or greater than a specified value when the rebar of the beam is moved (step S52). As a result of this determination, if the separation distance is equal to or greater than the specified value, the interference detection / avoidance processing unit 13 moves the rebar of the beam by (allowable value−X (Y) difference) (step S53), and the separation distance is specified. If not, the interference detection / avoidance processor 13 moves the column reinforcement by (allowable value−X (Y) difference) (step S51).

次に、干渉検出・回避処理部13は、柱の全ての鉄筋を比較したか否かを判定し(ステップS45)、全ての鉄筋を比較していなければ、ステップS43に戻り、同様の処理を行い、柱の全ての鉄筋について比較が終わるまで処理を繰り返す。   Next, the interference detection / avoidance processing unit 13 determines whether or not all the reinforcing bars of the column have been compared (step S45). If not all the reinforcing bars have been compared, the process returns to step S43 and the same processing is performed. And repeat the process until all the reinforcing bars in the column have been compared.

次に、干渉検出・回避処理部13は、梁の鉄筋とアンカーボルトのX(Y)差は許容値以上であるか否かを判定する(ステップS46)。この判定の結果、許容値以上でなければ、干渉検出・回避処理部13は、梁の鉄筋を(許容値−X(Y)差)分移動する(ステップS54)。一方許容値以上であれば移動は行わない。   Next, the interference detection / avoidance processor 13 determines whether or not the X (Y) difference between the beam reinforcing bar and the anchor bolt is greater than or equal to an allowable value (step S46). If the result of this determination is that it is not greater than or equal to the allowable value, the interference detection / avoidance processor 13 moves the rebar of the beam by (allowable value−X (Y) difference) (step S54). On the other hand, if it exceeds the allowable value, the movement is not performed.

次に、干渉検出・回避処理部13は、梁の全ての鉄筋を比較したか否かを判定し(ステップS47)、全ての鉄筋を比較していなければ、ステップS42に戻り、同様の処理を行い、梁の全ての鉄筋について比較が終わるまで処理を繰り返す。   Next, the interference detection / avoidance processing unit 13 determines whether or not all the reinforcing bars of the beam have been compared (step S47). If all the reinforcing bars have not been compared, the process returns to step S42 and the same processing is performed. And repeat the process until all the reinforcing bars of the beam have been compared.

次に、干渉検出・回避処理部13は、全ての梁について比較したか否かを判定し(ステップS48)、全ての梁について比較していなければ、ステップS41に戻り、同様の処理を行い、全ての梁について比較が終わるまで処理を繰り返す。   Next, the interference detection / avoidance processing unit 13 determines whether or not all beams have been compared (step S48). If not all the beams have been compared, the process returns to step S41, and the same processing is performed. Repeat the process until all beams have been compared.

この処理によって、全ての梁の全ての鉄筋が柱の鉄筋に干渉しているか否かが判定されて、干渉していれば、干渉している鉄筋の一方が移動されて再配置されることになる。   By this process, it is determined whether or not all the reinforcing bars of all the beams are interfering with the reinforcing bars of the column. If there is an interference, one of the interfering reinforcing bars is moved and rearranged. Become.

図2に戻り、干渉検出・回避処理部13は、干渉回避処理の結果を表示部3に表示する。図10に、干渉回避処理を行った結果を確認する画面の一例を示す。この画面には、各梁内の鉄筋に配置状況を示す図と、各鉄筋の配置を手動で微調整等を行うために、位置情報を入力するフィールドが表示される。作業者がこの入力フィールドに値を直接入力することにより、再配置された鉄筋の微調整等の修正を行うことが可能である。そして、作業者が「次へ」ボタンを押下することにより、次へ進む。   Returning to FIG. 2, the interference detection / avoidance processing unit 13 displays the result of the interference avoidance processing on the display unit 3. FIG. 10 shows an example of a screen for confirming the result of the interference avoidance process. On this screen, a diagram showing the arrangement status of the reinforcing bars in each beam and a field for inputting positional information for manually fine-tuning the arrangement of the reinforcing bars are displayed. When the operator directly inputs a value in this input field, it is possible to make corrections such as fine adjustment of the relocated reinforcing bars. Then, the operator proceeds to the next step by pressing the “Next” button.

次に、干渉検出・回避処理部13は、再配置した鉄筋の情報を作図処理部14へ受け渡す。これを受けて作図処理部14は、再配置された鉄筋の位置情報に基づいて、施工図データを生成し、施工図データ記憶部5へ記憶する。また、作図処理部14は、生成した施工図データを印刷部6へ出力し、施工図の印刷を行う。図11に、作図処理部14によって出力される施工図の一例を示す。実際のベースプレート廻りの鉄筋の配置は、図12に示す図ようになるが、図11に示す例は、前述した処理の対象となる鉄筋のみを出力した例を示している。   Next, the interference detection / avoidance processing unit 13 passes the information on the repositioned reinforcing bars to the drawing processing unit 14. In response to this, the drawing processing unit 14 generates construction drawing data based on the position information of the relocated reinforcing bars, and stores it in the construction drawing data storage unit 5. In addition, the drawing processing unit 14 outputs the generated construction drawing data to the printing unit 6 and prints the construction drawing. In FIG. 11, an example of the construction drawing output by the drawing process part 14 is shown. The actual arrangement of reinforcing bars around the base plate is as shown in FIG. 12, but the example shown in FIG. 11 shows an example in which only the reinforcing bars to be processed are output.

なお、干渉検出・回避処理部13による鉄筋干渉回避処理の後において、再配置された鉄筋の断面係数を再計算し、構造計算上問題ないか否かを確認する処理を実行するようにしてもよい。   Note that, after the reinforcing bar interference avoiding process by the interference detection / avoidance processing unit 13, the section coefficient of the relocated reinforcing bars is recalculated, and a process of confirming whether there is a problem in the structural calculation is executed. Good.

また、前述した説明においては、1本ずつ比較して干渉があれば干渉が発生している鉄筋を1本ずつ移動する例を説明したが、鉄筋の列を代表する鉄筋のみについて干渉があるか否かを判定し、干渉があれば対象の鉄筋の列を構成する鉄筋全てを同時に移動させるようにして、処理を簡略化することにより高速化を図るようにしてもよい。   Further, in the above description, an example has been described in which, if there is interference by comparison one by one, the reinforcing bars in which the interference is generated are moved one by one, but is there interference only for the reinforcing bars that represent the row of reinforcing bars? It may be determined whether or not, and if there is interference, all the reinforcing bars constituting the target reinforcing bar row are moved simultaneously, and the processing may be simplified to increase the speed.

このように、鉄筋が干渉しないように自動的に鉄筋の再配置を行い、再配置した結果に基づく施工図を作図するようにしたため、鉄筋の配置位置を検討する時間、図面作成の時間、図面の整合性を取る時間を大幅に短縮することができるとともに、図面作成時の高度な知識がなくとも施工図の作図を行うことができる。   In this way, the rebars are automatically rearranged so that they do not interfere with each other, and construction drawings based on the result of the rearrangement are drawn. It is possible to drastically reduce the time required to achieve consistency, and it is possible to draw a construction drawing without a high level of knowledge at the time of drawing creation.

なお、図1における処理部の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより施工図作図処理を行ってもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムが送信された場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリ(RAM)のように、一定時間プログラムを保持しているものも含むものとする。   1 is recorded on a computer-readable recording medium, and the program recorded on the recording medium is read by a computer system and executed, thereby executing the construction drawing drawing process. May be performed. Here, the “computer system” includes an OS and hardware such as peripheral devices. The “computer-readable recording medium” refers to a storage device such as a flexible medium, a magneto-optical disk, a portable medium such as a ROM and a CD-ROM, and a hard disk incorporated in a computer system. Further, the “computer-readable recording medium” refers to a volatile memory (RAM) in a computer system that becomes a server or a client when a program is transmitted via a network such as the Internet or a communication line such as a telephone line. In addition, those holding programs for a certain period of time are also included.

また、上記プログラムは、このプログラムを記憶装置等に格納したコンピュータシステムから、伝送媒体を介して、あるいは、伝送媒体中の伝送波により他のコンピュータシステムに伝送されてもよい。ここで、プログラムを伝送する「伝送媒体」は、インターネット等のネットワーク(通信網)や電話回線等の通信回線(通信線)のように情報を伝送する機能を有する媒体のことをいう。また、上記プログラムは、前述した機能の一部を実現するためのものであってもよい。さらに、前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるもの、いわゆる差分ファイル(差分プログラム)であってもよい。   The program may be transmitted from a computer system storing the program in a storage device or the like to another computer system via a transmission medium or by a transmission wave in the transmission medium. Here, the “transmission medium” for transmitting the program refers to a medium having a function of transmitting information, such as a network (communication network) such as the Internet or a communication line (communication line) such as a telephone line. The program may be for realizing a part of the functions described above. Furthermore, what can implement | achieve the function mentioned above in combination with the program already recorded on the computer system, what is called a difference file (difference program) may be sufficient.

本発明の一実施形態の構成を示すブロック図である。It is a block diagram which shows the structure of one Embodiment of this invention. 図1に示す施工図作図システム1の動作を示すフローチャートである。It is a flowchart which shows operation | movement of the construction drawing system 1 shown in FIG. 図1に示す施工図作図システム1の動作を示すフローチャートである。It is a flowchart which shows operation | movement of the construction drawing system 1 shown in FIG. 図1に示す施工図作図システム1の動作を示すフローチャートである。It is a flowchart which shows operation | movement of the construction drawing system 1 shown in FIG. 図1に示す情報入力部11が表示部3に表示する情報入力画面の一例を示す説明図である。FIG. 3 is an explanatory diagram illustrating an example of an information input screen displayed on the display unit 3 by the information input unit 11 illustrated in FIG. 1. 図1に示す情報入力部11が表示部3に表示する情報入力画面の一例を示す説明図である。FIG. 3 is an explanatory diagram illustrating an example of an information input screen displayed on the display unit 3 by the information input unit 11 illustrated in FIG. 1. 図1に示す情報入力部11が表示部3に表示する情報入力画面の一例を示す説明図である。FIG. 3 is an explanatory diagram illustrating an example of an information input screen displayed on the display unit 3 by the information input unit 11 illustrated in FIG. 1. 図1に示す情報入力部11が表示部3に表示する情報入力画面の一例を示す説明図である。FIG. 3 is an explanatory diagram illustrating an example of an information input screen displayed on the display unit 3 by the information input unit 11 illustrated in FIG. 1. 図1に示す情報入力部11が表示部3に表示する情報入力画面の一例を示すAn example of the information input screen displayed on the display unit 3 by the information input unit 11 shown in FIG. 図1示す干渉検出部12が表示部3に表示する干渉検出結果画面の一例を示す説明図である。It is explanatory drawing which shows an example of the interference detection result screen which the interference detection part 12 shown in FIG. 1 displays on the display part 3. FIG. 図1に示す作図処理部14が出力する施工図の一例を示す説明図である。It is explanatory drawing which shows an example of the construction drawing which the drawing process part 14 shown in FIG. 1 outputs. ベースプレート廻りに配置される鉄筋の一例を示す斜視図である。It is a perspective view which shows an example of the reinforcing bar arrange | positioned around a baseplate.

符号の説明Explanation of symbols

1・・・施工図作図システム、11・・・情報入力部、12・・・初期配置処理部、13・・・干渉検出・回避処理部、14・・・作図処理部、2・・・入力部、3・・・表示部、4・・・条件データ記憶部、5・・・施工図データ記憶部、6・・・印刷部、7・・・設計システム、8・・・躯体情報記憶部   DESCRIPTION OF SYMBOLS 1 ... Construction drawing drawing system, 11 ... Information input part, 12 ... Initial arrangement processing part, 13 ... Interference detection / avoidance processing part, 14 ... Drawing processing part, 2 ... Input 3 ... Display unit 4 ... Condition data storage unit 5 ... Construction drawing data storage unit 6 ... Printing unit 7 ... Design system 8 ... Case information storage unit

Claims (3)

施工条件と配置位置移動条件の情報が記憶された条件データ記憶手段と、
使用する鉄筋の情報を入力する鉄筋情報入力手段と、
前記鉄筋情報入力手段によって入力された鉄筋情報に基づいて、前記条件データ記憶手段に記憶されている施工条件を満たすように、前記使用する鉄筋の初期配置を決定する初期配置処理手段と、
前記初期配置処理手段によって配置された鉄筋の干渉を検出し、前記条件データ記憶手段に記憶されている配置位置移動条件を満たし、かつ干渉している鉄筋が干渉しないように前記鉄筋の配置位置を移動する干渉検出・回避処理手段と、
前記干渉検出・回避処理手段によって配置位置を移動した鉄筋を含む最終配置位置情報を表示する表示手段と
を備え、
前記配置位置移動条件は、鉄筋の干渉が発生した場合に、現時点の位置を優先して移動しないことを意味する干渉回避の優先順位を含み、
前記干渉検出・回避処理手段は、前記干渉回避の優先順位に従って、優先順位の低い鉄筋から順に配置位置を移動させることを特徴とする施工図作図システム。
Condition data storage means storing information on construction conditions and arrangement position movement conditions;
Reinforcing bar information input means for inputting information of the reinforcing bar to be used,
Based on the reinforcing bar information input by the reinforcing bar information input means, initial arrangement processing means for determining the initial arrangement of the reinforcing bars to be used so as to satisfy the construction conditions stored in the condition data storage means,
Detecting the interference of reinforcing bars arranged by the initial arrangement processing means, satisfying the arrangement position movement condition stored in the condition data storage means, and setting the arrangement position of the reinforcing bars so that the interfering reinforcing bars do not interfere with each other. Moving interference detection / avoidance processing means;
Display means for displaying final placement position information including a reinforcing bar whose placement position has been moved by the interference detection / avoidance processing means, and
The arrangement position movement condition includes a priority order of interference avoidance which means that the current position is not preferentially moved when rebar interference occurs ,
The construction detection drawing system, wherein the interference detection / avoidance processing means moves the arrangement position in order from a reinforcing bar having a low priority according to the priority of interference avoidance.
前記干渉検出・回避処理手段は、まず高さ方向の鉄筋の干渉の検出及び配置位置の移動を行い、その後に平面の鉄筋の干渉の検出及び配置位置の移動を行う、ことを特徴とする請求項1に記載の施工図作図システム。   The interference detection / avoidance processing means first detects the interference of the reinforcing bars in the height direction and moves the arrangement position, and then detects the interference of the flat reinforcing bars and moves the arrangement position. Item 1. The construction drawing system according to item 1. 前記干渉検出・回避処理手段によって再配置した鉄筋を修正するための配置位置情報を入力する配置位置修正手段をさらに備えたことを特徴とする請求項1又は2に記載の施工図作図システム。   The construction drawing drawing system according to claim 1, further comprising arrangement position correction means for inputting arrangement position information for correcting the reinforcing bars rearranged by the interference detection / avoidance processing means.
JP2007197476A 2007-07-30 2007-07-30 Construction drawing system Active JP5656041B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007197476A JP5656041B2 (en) 2007-07-30 2007-07-30 Construction drawing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007197476A JP5656041B2 (en) 2007-07-30 2007-07-30 Construction drawing system

Publications (2)

Publication Number Publication Date
JP2009030403A JP2009030403A (en) 2009-02-12
JP5656041B2 true JP5656041B2 (en) 2015-01-21

Family

ID=40401197

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007197476A Active JP5656041B2 (en) 2007-07-30 2007-07-30 Construction drawing system

Country Status (1)

Country Link
JP (1) JP5656041B2 (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5248550B2 (en) * 2010-06-04 2013-07-31 株式会社奥村組 On-site bar arrangement support method using 3D bar arrangement system
JP4727759B1 (en) * 2010-10-14 2011-07-20 透 丸山 Bar arrangement appropriateness judgment device
JP5426649B2 (en) * 2011-12-14 2014-02-26 システム明星株式会社 Reinforcement design support device, reinforcement design support method, and computer program
JP5612637B2 (en) * 2012-07-19 2014-10-22 システム明星株式会社 Bar arrangement inspection support system and bar arrangement inspection support method
JP5946398B2 (en) * 2012-12-03 2016-07-06 株式会社ア−キテック Arrangement correction processing device in 3D reinforcement simulation system
JP6074318B2 (en) * 2013-05-27 2017-02-01 株式会社ア−キテック CAD system
JP6260984B2 (en) * 2013-08-05 2018-01-17 SiftDDD株式会社 Reinforcement design support device, reinforcement design support method, and computer program
JP6260999B2 (en) * 2014-04-28 2018-01-17 SiftDDD株式会社 Reinforcement design support device, reinforcement design support method, and computer program
JP6742811B2 (en) * 2016-05-20 2020-08-19 株式会社ア−キテック Bar arrangement design support device and bar arrangement design support program
JP6286591B2 (en) * 2017-03-14 2018-02-28 株式会社ア−キテック Reinforcement verification support device and program thereof
JP7465159B2 (en) 2020-06-16 2024-04-10 株式会社日立プラントコンストラクション Scaffolding plan creation method and system
WO2023112088A1 (en) * 2021-12-13 2023-06-22 株式会社Arent Structure member design method and structure member design program
WO2024004085A1 (en) * 2022-06-29 2024-01-04 株式会社Arent Structural member design method and structural member design program
WO2024047686A1 (en) * 2022-08-29 2024-03-07 株式会社Arent Structural member design method and structural member design program
JP7246666B1 (en) * 2022-09-28 2023-03-28 株式会社Arent Structural Member Design Method, Structural Member Design Program
WO2024075174A1 (en) 2022-10-03 2024-04-11 東洋ライト工業株式会社 Rebar assembly device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0776975B2 (en) * 1991-08-30 1995-08-16 株式会社松下産業 Reinforcement design support method
JPH10320443A (en) * 1997-05-22 1998-12-04 Fujitsu Ltd Wiring pattern repair processor and storage medium stored with wiring pattern repair process program
JP3067099B2 (en) * 1997-09-05 2000-07-17 秀鋼技建株式会社 Bar arrangement design support apparatus and method
JP2007066284A (en) * 2005-09-01 2007-03-15 Kasaikan:Kk Method of creating piping drawing

Also Published As

Publication number Publication date
JP2009030403A (en) 2009-02-12

Similar Documents

Publication Publication Date Title
JP5656041B2 (en) Construction drawing system
JP5612637B2 (en) Bar arrangement inspection support system and bar arrangement inspection support method
EP1725959A1 (en) Method and system for scheduling reinforcing bars for use in reinforced products
JP4735002B2 (en) Rooftop thermal storage stand planning support program
JP5519575B2 (en) Plant construction process creation support system, plant construction process creation support method and program
JP3067099B2 (en) Bar arrangement design support apparatus and method
KR20190079684A (en) Supporting device, display system and drawing support method
JP4648547B2 (en) CAD system for unit building
JP7384339B1 (en) Allocation program and allocation system
JP3296802B2 (en) Automatic dimension entry mechanism in CAD system
JP2000172759A (en) Process control system
JP7149320B2 (en) Display method, display device and program
JP4073732B2 (en) Time chart creation device, time chart creation program and recording medium
JP6432957B1 (en) Information processing device that supports bar arrangement inspection by user interface for generating bar arrangement
JP3470974B2 (en) Figure creation method and apparatus
JP7013968B2 (en) Information processing equipment, process plan display method and process plan display program
JP5815068B2 (en) Plant construction process creation support system, plant construction process creation support method and program
JP2616328B2 (en) Graphic processing method and apparatus
JP2000170379A (en) Construction schedule control instrument and recording medium
JP2612732B2 (en) Schedule planning support method and device
JP3303402B2 (en) Graphic display device and graphic display method
JP6260999B2 (en) Reinforcement design support device, reinforcement design support method, and computer program
JPH09297780A (en) Structure analysis method for building
JP3375043B2 (en) Input display method of beam on computer screen
JP2007140736A (en) Estimation data preparation system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20091225

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110825

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110830

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111031

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120605

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20130409

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130627

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20130705

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20130802

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141112

R150 Certificate of patent or registration of utility model

Ref document number: 5656041

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150