JP5647626B2 - Plant state monitoring device and plant state monitoring method - Google Patents

Plant state monitoring device and plant state monitoring method Download PDF

Info

Publication number
JP5647626B2
JP5647626B2 JP2012000350A JP2012000350A JP5647626B2 JP 5647626 B2 JP5647626 B2 JP 5647626B2 JP 2012000350 A JP2012000350 A JP 2012000350A JP 2012000350 A JP2012000350 A JP 2012000350A JP 5647626 B2 JP5647626 B2 JP 5647626B2
Authority
JP
Japan
Prior art keywords
data
monitoring
plant
model
measurement signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012000350A
Other languages
Japanese (ja)
Other versions
JP2013140495A (en
Inventor
孝朗 関合
孝朗 関合
徹 江口
徹 江口
尚弘 楠見
尚弘 楠見
深井 雅之
雅之 深井
清水 悟
悟 清水
正博 村上
正博 村上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2012000350A priority Critical patent/JP5647626B2/en
Publication of JP2013140495A publication Critical patent/JP2013140495A/en
Application granted granted Critical
Publication of JP5647626B2 publication Critical patent/JP5647626B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Description

本発明は、プラントの監視結果を表示するプラント状態監視装置に関する。   The present invention relates to a plant state monitoring apparatus that displays a monitoring result of a plant.

ガスタービンプラント、ボイラプラント等のプラントを対象とした制御の分野では、制御性能に対する要求に加え、プラント効率の向上による燃料消費量の削減や、環境負荷物質の低減による排出ガスの処理コストの低減など、運転コストの低減に対するニーズがある。   In the field of control for plants such as gas turbine plants and boiler plants, in addition to demands for control performance, fuel consumption is reduced by improving plant efficiency, and exhaust gas processing costs are reduced by reducing environmentally hazardous substances. There is a need to reduce operating costs.

これらのニーズに対応するため、特許文献1には、プラントワイド最適プロセス制御装置において、運転コストや複数の制御性能を評価できる評価関数の値を、プロセス最適化部で最適にする制御技術が公開されている。このプロセス最適化部は、代数方程式や微分方程式を用いて表されるプロセスシミュレーション部と、最適化計算を行う最適演算部を有する。   In order to meet these needs, Patent Document 1 discloses a control technique for optimizing the value of an evaluation function that can evaluate an operating cost and a plurality of control performances in a plant-wide optimum process control apparatus by a process optimization unit. Has been. The process optimization unit includes a process simulation unit represented by using an algebraic equation and a differential equation, and an optimal calculation unit that performs optimization calculation.

特開2005−316738号公報Japanese Patent Laying-Open No. 2005-316738

特許文献1に記載されたプラントワイド最適プロセス制御装置を実装するには、対象となるプロセスをモデル化し、代数方程式や微分方程式で定式化する必要がある。しかし、プロセスのモデル化には、適用対象のプラントに対する事前知識が必要である。オペレータにも、適用対象のプラントに対する事前知識が、ある程度は必要となる。   In order to implement the plant-wide optimum process control apparatus described in Patent Document 1, it is necessary to model a target process and formulate it with an algebraic equation or a differential equation. However, prior modeling of the target plant is required for process modeling. Operators also need some prior knowledge of the plant to be applied.

また、プラントの計測信号を分析して運転コストの低減方法を検討すると、オペレータは長期間にわたる計測信号を処理する必要があるので、煩雑なデータ処理を伴う多くの工数が必要となる。   Moreover, when analyzing the measurement signal of the plant and examining the method for reducing the operation cost, the operator needs to process the measurement signal over a long period of time, and thus a lot of man-hours involving complicated data processing are required.

本発明の目的は、適用対象のプラントに対する事前知識が不要で、運転コストの低減に寄与する情報を自動的に取得できるプラント状態監視装置を提供することにある。   An object of the present invention is to provide a plant state monitoring device that does not require prior knowledge of a plant to be applied and can automatically acquire information that contributes to a reduction in operating cost.

上記の課題を解決するため、本発明によるプラント状態監視装置は、以下の構成を備える。   In order to solve the above problems, a plant state monitoring apparatus according to the present invention has the following configuration.

プラントの状態量を計測した計測信号を用いて、予め設定した監視項目について前記プラントの運転状態を監視し、監視結果を画像表示装置に表示するプラント状態監視装置において、前記計測信号を基にして計算した時系列データと前記計測信号の時系列データとのうち少なくとも1つの時系列データから、前記プラントを監視する際に参照するモデルデータを選定するモデルデータ選定手段と、前記モデルデータを複数のカテゴリーに分類することによって監視モデルを構築する状態監視手段を備える。   In the plant state monitoring device that monitors the operation state of the plant with respect to preset monitoring items using the measurement signal obtained by measuring the state quantity of the plant, and displays the monitoring result on the image display device, based on the measurement signal Model data selection means for selecting model data to be referred to when monitoring the plant from at least one time series data of the calculated time series data and the time series data of the measurement signal, and a plurality of the model data State monitoring means for constructing a monitoring model by classifying into categories is provided.

前記モデルデータ選定手段は、前記計測信号を基にして計算した前記プラントの効率の時系列データと、環境負荷物質についての前記計測信号の時系列データとのうち、少なくとも1つの時系列データについて、最大値をとる時刻の前後の予め定めた一定期間または最小値をとる時刻の前後の予め定めた一定期間をモデルデータの期間として決定し、このモデルデータの期間における前記少なくとも1つの時系列データを前記モデルデータとして選定する。   The model data selection means, for at least one time series data among the time series data of the efficiency of the plant calculated based on the measurement signal, and the time series data of the measurement signal for environmental load substances, A predetermined fixed period before and after the time at which the maximum value is taken or a predetermined fixed period before and after the time at which the minimum value is taken is determined as the period of the model data, and the at least one time series data in the period of the model data is Select as the model data.

前記状態監視手段は、現在の前記計測信号が前記監視モデルの前記カテゴリーのいずれかに属するか否かを判定し、判定結果を監視結果として前記画像表示装置に出力する。   The state monitoring unit determines whether the current measurement signal belongs to any one of the categories of the monitoring model, and outputs the determination result to the image display device as a monitoring result.

本発明によるプラント状態監視装置では、適用対象のプラントに対する事前知識が不要であり、運転コストの低減に寄与する情報を自動的に取得できる。このため、オペレータは、長期間にわたる計測信号の処理などの煩雑なデータ処理をすることなく、運転コストの低減に有用な情報を得ることができ、運転コストを削減できる。   The plant state monitoring apparatus according to the present invention does not require prior knowledge about the plant to be applied, and can automatically acquire information that contributes to a reduction in operating costs. For this reason, the operator can obtain information useful for reducing the operating cost without performing complicated data processing such as processing of measurement signals over a long period of time, and the operating cost can be reduced.

本発明の第1の実施例によるプラント状態監視装置を説明するブロック図である。It is a block diagram explaining the plant state monitoring apparatus by the 1st example of the present invention. プラント状態監視装置の動作フローチャートである。It is an operation | movement flowchart of a plant state monitoring apparatus. データ分類機能の構成を示す模式図である。It is a schematic diagram which shows the structure of a data classification function. F0レイヤーの構成を示すブロック図である。It is a block diagram which shows the structure of F0 layer. F1レイヤーの構成を示すブロック図である。It is a block diagram which shows the structure of F1 layer. 火力発電プラントを示すブロック図である。It is a block diagram which shows a thermal power plant. プラントの計測信号を、カテゴリーに分類した結果を説明する図である。It is a figure explaining the result of having classified the measurement signal of the plant into the category. プラントの計測信号を、カテゴリーに分類した結果の一例を示す図である。It is a figure which shows an example of the result of having classified the measurement signal of the plant into the category. 計測信号データベースに保存されているデータを示す図である。It is a figure which shows the data preserve | saved at the measurement signal database. 設計情報データベースに保存されているデータを示す図である。It is a figure which shows the data preserve | saved in the design information database. モデル情報データベースに保存されているデータを示す図である。It is a figure which shows the data preserve | saved at the model information database. 計測信号の時系列データとプラント効率の時系列データを示す図である。It is a figure which shows the time series data of a measurement signal, and the time series data of plant efficiency. 過去の時系列データを所定の期間に分割し、その期間毎にモデルデータを選定する方法を説明する図である。It is a figure explaining the method of dividing the past time series data into a predetermined period and selecting model data for every period. 本発明の第2の実施例によるプラント状態監視装置を説明するブロック図である。It is a block diagram explaining the plant state monitoring apparatus by 2nd Example of this invention. 改善情報決定手段700の動作を説明するフローチャートである。5 is a flowchart for explaining the operation of improvement information determination means 700. 図8Aのステップ1100の動作を説明する図である。It is a figure explaining operation | movement of step 1100 of FIG. 8A. 図8Aのステップ1110の動作による抽出結果を説明する図である。It is a figure explaining the extraction result by operation | movement of step 1110 of FIG. 8A. 図8Aのステップ1120の動作を説明する図であるIt is a figure explaining operation | movement of step 1120 of FIG. 8A. 本発明の第3の実施例によるプラント状態監視装置を説明するブロック図である。It is a block diagram explaining the plant condition monitoring apparatus by the 3rd example of the present invention. 本発明の第4の実施例によるプラント状態監視装置を説明するブロック図である。It is a block diagram explaining the plant condition monitoring apparatus by the 4th example of the present invention. モデルデータの期間を表示した画像表示装置の画面の例を示す図である。It is a figure which shows the example of the screen of the image display apparatus which displayed the period of model data. 監視結果を表示した画像表示装置の画面の例を示す図である。It is a figure which shows the example of the screen of the image display apparatus which displayed the monitoring result. 第2、第4の実施例のプラント状態監視装置の画像表示装置が表示する画面の例を示す図である。It is a figure which shows the example of the screen which the image display apparatus of the plant condition monitoring apparatus of a 2nd, 4th Example displays.

本発明の実施例によるプラント状態監視装置について、図面を参照して説明する。本実施例によるプラント状態監視装置は、以下に説明するように、計測信号から計算した時系列データや計測信号の時系列データからモデルデータを選定し、モデルデータを複数のカテゴリーに分類して監視モデルを構築する。モデルデータと監視モデルを用いることにより、オペレータは、適用対象のプラントに対する事前知識が不要で、運転コストの低減に寄与する情報を自動的に取得することができる。   A plant state monitoring apparatus according to an embodiment of the present invention will be described with reference to the drawings. As described below, the plant state monitoring apparatus according to the present embodiment selects model data from time series data calculated from measurement signals and time series data of measurement signals, and classifies model data into a plurality of categories for monitoring. Build a model. By using the model data and the monitoring model, the operator does not need prior knowledge about the plant to be applied, and can automatically acquire information that contributes to a reduction in operating costs.

図1は、本発明の第1の実施例によるプラント状態監視装置200を説明するブロック図である。図1に示したように、プラント状態監視装置200は、運転管理室900と接続され、プラント100の状態を監視する。   FIG. 1 is a block diagram illustrating a plant state monitoring apparatus 200 according to the first embodiment of the present invention. As shown in FIG. 1, the plant state monitoring apparatus 200 is connected to the operation management room 900 and monitors the state of the plant 100.

プラント状態監視装置200は、演算装置として、モデルデータ選定手段400及び状態監視手段500を備え、データベースとして、計測信号データベース310、設計情報データベース320、及びモデル情報データベース330を備える。尚、図1では、データベースを「DB」と略記している。計測信号データベース310、設計情報データベース320、及びモデル情報データベース330には、電子化された情報が記録されており、通常、電子ファイル(電子データ)と呼ばれる形態で情報が記録される。   The plant state monitoring apparatus 200 includes a model data selection unit 400 and a state monitoring unit 500 as arithmetic units, and includes a measurement signal database 310, a design information database 320, and a model information database 330 as databases. In FIG. 1, the database is abbreviated as “DB”. In the measurement signal database 310, the design information database 320, and the model information database 330, computerized information is recorded, and information is usually recorded in a form called an electronic file (electronic data).

さらに、プラント状態監視装置200は、外部とのインターフェイスとして、外部入力インターフェイス210及び外部出力インターフェイス220を備える。そして、外部入力インターフェイス210を介して、プラント100の運転状態である各種の状態量を計測した計測信号1と、運転管理室900で作成された外部入力信号2とが、プラント状態監視装置200に取り込まれる。また、外部出力インターフェイス220を介して、画像表示情報12を運転管理室900に出力する。   Furthermore, the plant state monitoring apparatus 200 includes an external input interface 210 and an external output interface 220 as interfaces with the outside. And the measurement signal 1 which measured various state quantities which are the operation states of the plant 100 via the external input interface 210, and the external input signal 2 created in the operation management room 900 are sent to the plant state monitoring apparatus 200. It is captured. In addition, the image display information 12 is output to the operation management room 900 via the external output interface 220.

運転管理室900は、外部入力装置910と画像表示装置940とを備える。外部入力装置910は、例えばキーボード920及びマウス930のような入力装置から構成される。外部入力信号2は、外部入力装置910の操作により作成される。プラント状態監視装置200が出力した画像表示情報12は、画像表示装置940が受け取る。   The operation management room 900 includes an external input device 910 and an image display device 940. The external input device 910 includes input devices such as a keyboard 920 and a mouse 930, for example. The external input signal 2 is created by operating the external input device 910. The image display information 940 output from the plant state monitoring apparatus 200 is received by the image display apparatus 940.

図1に示した本実施例のプラント状態監視装置200において、プラント100の各種状態量を計測した計測信号1は、外部入力インターフェイス210を介して取り込まれ、計測信号3として、計測信号データベース310に保存される。   In the plant state monitoring apparatus 200 of the present embodiment shown in FIG. 1, the measurement signal 1 obtained by measuring various state quantities of the plant 100 is taken in via the external input interface 210 and is stored in the measurement signal database 310 as the measurement signal 3. Saved.

モデルデータ選定手段400は、計測信号データベース310に保存されている計測信号4、及び設計情報データベース320に保存されているプラント100の設計情報7を基にして時系列データを計算し、この時系列データのうち、ある一定期間のデータをモデルデータとして選定する。モデルデータは、詳細は後述するが、プラント100の運転状態を監視する際に比較対象として参照するデータである。   The model data selection means 400 calculates time series data based on the measurement signal 4 stored in the measurement signal database 310 and the design information 7 of the plant 100 stored in the design information database 320. Among the data, data for a certain period is selected as model data. Although details will be described later, the model data is data that is referred to as a comparison target when the operation state of the plant 100 is monitored.

設計情報データベース320には、プラント状態監視装置200が行う計算に必要な設計情報が保存されている。モデルデータ選定手段400は、設計リクエスト信号8を設計情報データベース320に送信して、計算に必要な設計情報7を取得する。   The design information database 320 stores design information necessary for calculations performed by the plant state monitoring apparatus 200. The model data selection means 400 transmits the design request signal 8 to the design information database 320 and acquires the design information 7 necessary for the calculation.

モデルデータ選定手段400は、計測信号データベース310に保存された過去の計測信号を基にして計算したプラント効率の時系列データと、計測信号データベース310に保存された過去の計測信号に含まれる環境負荷物質の計測信号の時系列データとのうち、少なくとも1つの時系列データを用いて、この時系列データの最大値または最小値をとる時刻の前後の一定期間をモデルデータの期間として決定する。そして、モデルデータの期間におけるこの時系列データをモデルデータとして選定する。   The model data selection means 400 includes plant efficiency time-series data calculated based on past measurement signals stored in the measurement signal database 310 and environmental loads included in past measurement signals stored in the measurement signal database 310. Of the time series data of the measurement signal of the substance, at least one time series data is used, and a certain period before and after the time when the maximum value or the minimum value of the time series data is obtained is determined as the period of the model data. Then, the time series data in the model data period is selected as model data.

また、モデルデータ選定手段400は、過去のデータをある時刻から所定の期間毎に分割し、その期間毎に、計測信号を基にして計算したプラント効率の時系列データと、環境負荷物質の計測信号の時系列データとのうち、少なくとも1つの時系列データを用いて、この時系列データの最大値または最小値をとる時刻の前後の一定期間をモデルデータの期間として決定し、この期間における時系列データをモデルデータとして選定するようにしてもよい。   In addition, the model data selection unit 400 divides past data into a predetermined period from a certain time, and calculates the plant efficiency time-series data calculated based on the measurement signal and the measurement of environmental load substances for each period. Using at least one time-series data of the signal time-series data, a fixed period before and after the time at which the maximum or minimum value of the time-series data is taken is determined as the model data period, and the time in this period is determined. The series data may be selected as model data.

尚、モデルデータとして選定する計測信号のデータ項目(計測信号の種類)は、任意に設定できる。   Note that the data item (measurement signal type) of the measurement signal selected as model data can be arbitrarily set.

モデルデータ選定手段400が選定したモデルデータ5は、状態監視手段500に送信される。   The model data 5 selected by the model data selection unit 400 is transmitted to the state monitoring unit 500.

モデルデータ選定手段400の詳細な動作については、図6を用いて後述する。   The detailed operation of the model data selection unit 400 will be described later with reference to FIG.

状態監視手段500は、モデルデータ選定手段400で選定したモデルデータ5を用いて、プラント100の監視に用いる監視モデル600を構築し、保存する。監視モデル600は、モデルデータ5(計測信号)を、互いの類似性に応じて複数のカテゴリーに分類することによって構築したモデルであり、監視している計測信号が過去の計測信号のどの状態に近いかを求めるためのモデルである。モデルデータ5の類似性は、予め定めたパラメータ(後述するパラメータρ)で規定することができる。図1では、監視モデル600A〜600Cの3種類を監視モデル600として図示しているが、状態監視手段500は、任意の数の監視モデル600を備えることができる。尚、以下の説明では、監視モデル600A〜600Cを監視モデル600と総称する。   The state monitoring unit 500 uses the model data 5 selected by the model data selection unit 400 to construct and store a monitoring model 600 used for monitoring the plant 100. The monitoring model 600 is a model constructed by classifying the model data 5 (measurement signal) into a plurality of categories according to the similarity between each other, and in which state of the past measurement signal the monitored measurement signal is This is a model for finding closeness. The similarity of the model data 5 can be defined by a predetermined parameter (a parameter ρ described later). Although three types of monitoring models 600 </ b> A to 600 </ b> C are illustrated as the monitoring model 600 in FIG. 1, the state monitoring unit 500 can include an arbitrary number of monitoring models 600. In the following description, the monitoring models 600A to 600C are collectively referred to as the monitoring model 600.

監視モデル600についての情報であるモデル情報10は、モデル情報データベース330に保存される。また、モデル情報データベース330に保存されているモデル情報9は、状態監視手段500に送信され、必要に応じて監視モデル600にて使用される。   Model information 10 that is information about the monitoring model 600 is stored in the model information database 330. The model information 9 stored in the model information database 330 is transmitted to the state monitoring unit 500 and used in the monitoring model 600 as necessary.

状態監視手段500は、監視モデル600と、計測信号データベース310に保存されている計測信号6とを比較する。計測信号6が、監視モデル600のいずれのカテゴリーにも属しない場合、プラント100の状態が変化したと判定する。この場合、状態監視手段500は、監視モデル600として監視している項目と、プラント100のこの項目についての現在の状態がモデルデータと異なることとを監視結果11として出力する。すなわち、状態監視手段500は、監視している項目のデータが過去のデータ(モデルデータ)と異なる傾向を示していることを、監視結果11として出力する。   The state monitoring unit 500 compares the monitoring model 600 with the measurement signal 6 stored in the measurement signal database 310. When the measurement signal 6 does not belong to any category of the monitoring model 600, it is determined that the state of the plant 100 has changed. In this case, the state monitoring unit 500 outputs the item monitored as the monitoring model 600 and the monitoring result 11 that the current state of this item of the plant 100 is different from the model data. That is, the state monitoring unit 500 outputs, as the monitoring result 11, that the data of the item being monitored shows a tendency different from the past data (model data).

監視結果11は、外部出力インターフェイス220にて画像表示情報12に変換され、運転管理室900の画像表示装置940に送信される。   The monitoring result 11 is converted into the image display information 12 by the external output interface 220 and transmitted to the image display device 940 in the operation management room 900.

このようにして、本実施例のプラント状態監視装置200では、計測信号6が監視モデル600の構築に用いたモデルデータ5と異なる傾向を示した場合(すなわち、計測信号6が、監視モデル600のいずれのカテゴリーにも属しない場合)、画像表示装置940を介してオペレータにこのことを通知する。   Thus, in the plant state monitoring apparatus 200 of the present embodiment, when the measurement signal 6 shows a tendency different from the model data 5 used for the construction of the monitoring model 600 (that is, the measurement signal 6 is If it does not belong to any category), this is notified to the operator via the image display device 940.

尚、本実施例では、モデルデータ選定手段400、状態監視手段500、計測信号データベース310、設計情報データベース320、及びモデル情報データベース330がプラント状態監視装置200の内部に備えられているが、これらの一部をプラント状態監視装置200の外部に配置し、これらの装置間でデータを通信するようにしてもよい。   In this embodiment, the model data selection unit 400, the state monitoring unit 500, the measurement signal database 310, the design information database 320, and the model information database 330 are provided in the plant state monitoring apparatus 200. A part may be arranged outside the plant state monitoring apparatus 200, and data may be communicated between these apparatuses.

また、本実施例のプラント状態監視装置200では、監視対象とするプラント100が1基である場合を示しているが、1台のプラント状態監視装置200で複数基のプラント100を監視することも可能である。   Moreover, in the plant state monitoring apparatus 200 of the present embodiment, the case where there is one plant 100 to be monitored is shown, but it is also possible to monitor a plurality of plants 100 with one plant state monitoring apparatus 200. Is possible.

また、計測信号データベース310、設計情報データベース320、及びモデル情報データベース330に保存されている情報(プラント状態監視装置情報50)は、任意に運転管理室900の画像表示装置940に表示できるようになっている。また、プラント状態監視装置情報50は、運転管理室900の外部入力装置910を操作して生成する外部入力信号2で修正することができる。   Further, information (plant state monitoring device information 50) stored in the measurement signal database 310, the design information database 320, and the model information database 330 can be arbitrarily displayed on the image display device 940 of the operation management room 900. ing. Further, the plant state monitoring device information 50 can be corrected by the external input signal 2 generated by operating the external input device 910 of the operation management room 900.

次に、図2を用いて、本実施例のプラント状態監視装置の動作について説明する。図2は、プラント状態監視装置200の動作フローチャートである。図2のフローチャートに示すように、プラント状態監視装置200の基本動作は、ステップ1000〜ステップ1050を組み合わせて実行される。   Next, operation | movement of the plant state monitoring apparatus of a present Example is demonstrated using FIG. FIG. 2 is an operation flowchart of the plant state monitoring apparatus 200. As shown in the flowchart of FIG. 2, the basic operation of the plant state monitoring apparatus 200 is executed by combining Step 1000 to Step 1050.

まず、ステップ1000では、監視モデルを新規に作成する指示がオペレータからあるか否かを判定し、監視モデルを新規に作成する場合はステップ1010へ、監視モデルを新規に作成しない場合はステップ1030に進む。   First, in step 1000, it is determined whether or not there is an instruction from the operator to create a new monitoring model. If a new monitoring model is created, go to step 1010. If not, go to step 1030. move on.

ステップ1010では、モデルデータ選定手段400を動作させ、モデルデータを選定する。   In step 1010, the model data selection means 400 is operated to select model data.

ステップ1020では、状態監視手段500を動作させ、ステップ1010で選定したモデルデータ5を用いて監視モデル600を構築する。   In step 1020, the state monitoring unit 500 is operated, and the monitoring model 600 is constructed using the model data 5 selected in step 1010.

ステップ1030では、状態監視手段500を動作させ、監視モデル600と、計測信号データベース310に保存されている計測信号6を比較する。計測信号6が監視モデル600の構築に用いたモデルデータ5と異なる傾向を示した場合は(すなわち、計測信号6が、監視モデル600のいずれのカテゴリーにも属しない場合は)、状態が変化したと判定する。この場合、状態監視手段500は、監視モデル600として監視している項目と、プラント100のこの項目についての現在の状態が監視モデルの範囲を逸脱していること(すなわち、現在の状態がモデルデータと異なること)とを監視結果11として出力する。   In step 1030, the state monitoring unit 500 is operated to compare the monitoring model 600 with the measurement signal 6 stored in the measurement signal database 310. When the measurement signal 6 shows a tendency different from the model data 5 used to construct the monitoring model 600 (that is, when the measurement signal 6 does not belong to any category of the monitoring model 600), the state has changed. Is determined. In this case, the state monitoring means 500 indicates that the item being monitored as the monitoring model 600 and that the current state of this item of the plant 100 is out of the range of the monitoring model (that is, the current state is model data). Is output as the monitoring result 11.

ステップ1040では、監視結果11を外部出力インターフェイス220にて画像表示情報12に変換し、画像表示装置940に監視結果を表示する。   In step 1040, the monitoring result 11 is converted into the image display information 12 by the external output interface 220, and the monitoring result is displayed on the image display device 940.

ステップ1050では終了判定を実施する。終了すると判定した場合は、プラント状態監視装置200は動作を終了する。終了しないと判定した場合は、ステップ1030に戻る。ステップ1050における終了判定の方法には、ステップ1030〜1050の繰り返し回数が予め設定した回数を超えた場合に終了する、または外部入力装置910を用いてオペレータから動作停止の指示が入力された場合に終了するなど、様々な判断基準がある。   In step 1050, end determination is performed. When it determines with complete | finishing, the plant state monitoring apparatus 200 complete | finishes operation | movement. If it is determined not to end, the process returns to step 1030. The end determination method in step 1050 ends when the number of repetitions of steps 1030 to 1050 exceeds a preset number, or when an operation stop instruction is input from the operator using the external input device 910. There are various criteria such as termination.

次に、図3A〜図3Cと図4A〜図4Cを用いて、本実施例のプラント状態監視装置200が備える状態監視手段500において、モデルデータ5または計測信号6を分類する機能を説明する。   Next, a function of classifying the model data 5 or the measurement signal 6 in the state monitoring unit 500 included in the plant state monitoring apparatus 200 of the present embodiment will be described with reference to FIGS. 3A to 3C and FIGS. 4A to 4C.

以下の説明では、プラント状態監視装置200が有するデータ分類機能に、適応共鳴理論(Adaptive Resonance Theory:ART)を適用した場合について述べる。尚、データ分類機能として、ベクトル量子化等、他のクラスタリング手法を用いることもできる。ARTを始めとするデータ分類機能を利用することで、オペレータは、適用対象のプラントに対する事前知識を持たなくても、運転コストの低減に寄与する情報を取得することができ、オペレータの負担を軽減することができる。   In the following description, a case where an adaptive resonance theory (ART) is applied to the data classification function of the plant state monitoring apparatus 200 will be described. Note that other clustering methods such as vector quantization can be used as the data classification function. By using the data classification function such as ART, the operator can acquire information that contributes to the reduction of operating costs without having prior knowledge of the plant to which it is applied, thus reducing the burden on the operator. can do.

図3Aは、データ分類機能の構成を示す模式図である。図3Aに示すように、データ分類機能は、データ前処理装置610とARTモジュール620を備える。データ前処理装置610は、プラントの運転データをARTモジュール620の入力データに変換する。   FIG. 3A is a schematic diagram illustrating a configuration of a data classification function. As shown in FIG. 3A, the data classification function includes a data preprocessing device 610 and an ART module 620. The data preprocessing device 610 converts plant operation data into input data of the ART module 620.

以下に、データ前処理装置610及びARTモジュール620が行う処理の手順について説明する。   Hereinafter, a procedure of processing performed by the data preprocessing device 610 and the ART module 620 will be described.

まず、データ前処理装置610において、モデル情報データベース330に保存されている正規化条件の情報を用いて、計測項目毎にデータを正規化する。計測信号を正規化したデータNxi(n)及び正規化したデータの補数CNxi(n)(=1−Nxi(n))を含むデータを、入力データIi(n)とする。ここで、iはデータ項目を識別するための符号であり、nは時系列データの時刻を定義するためのサンプル番号である。この入力データIi(n)が、ARTモジュール620に入力される。   First, the data pre-processing device 610 normalizes data for each measurement item using information on normalization conditions stored in the model information database 330. Data including normalized data Nxi (n) and normalized data complement CNxi (n) (= 1−Nxi (n)) is defined as input data Ii (n). Here, i is a code for identifying the data item, and n is a sample number for defining the time of the time series data. This input data Ii (n) is input to the ART module 620.

ARTモジュール620は、入力データであるモデルデータ5または計測信号6を複数のカテゴリーに分類する。   The ART module 620 classifies the model data 5 or the measurement signal 6 as input data into a plurality of categories.

ARTモジュール620は、F0レイヤー621、F1レイヤー622、F2レイヤー623、メモリ624、及び選択サブシステム625を備え、これらは相互に結合している。F1レイヤー622及びF2レイヤー623は、重み係数を介して結合している。重み係数は、入力データが分類されるカテゴリーのプロトタイプ(原型)を表している。ここで、プロトタイプとは、カテゴリーの代表値を表すものである。   The ART module 620 includes an F0 layer 621, an F1 layer 622, an F2 layer 623, a memory 624, and a selection subsystem 625, which are coupled to each other. The F1 layer 622 and the F2 layer 623 are connected via a weighting factor. The weighting factor represents the prototype (prototype) of the category into which the input data is classified. Here, the prototype represents a representative value of the category.

次に、ARTモジュール620のアルゴリズムについて説明する。ARTモジュール620に入力データが入力された場合のアルゴリズムの概要は、下記の処理1〜処理5のようになる。   Next, the algorithm of the ART module 620 will be described. The outline of the algorithm when input data is input to the ART module 620 is as shown in the following processing 1 to processing 5.

処理1:F0レイヤー621により入力ベクトルを正規化し、ノイズを除去する。   Process 1: The input vector is normalized by the F0 layer 621, and noise is removed.

処理2:F1レイヤー622に入力された入力データと重み係数との比較により、ふさわしいカテゴリーの候補を選択する。   Process 2: A suitable category candidate is selected by comparing the input data input to the F1 layer 622 with a weighting factor.

処理3:選択サブシステム625で選択したカテゴリーの妥当性がパラメータρとの比により評価される。妥当と判断されれば、入力データはそのカテゴリーに分類され、処理4に進む。一方、妥当と判断されなければ、そのカテゴリーはリセットされ、他のカテゴリーからふさわしいカテゴリーの候補を選択する(処理2を繰り返す)。パラメータρの値を大きくするとカテゴリーの分類が細かくなり、ρの値を小さくすると分類が粗くなる。このパラメータρをビジランス(vigilance)パラメータと呼ぶ。パラメータρは、入力データの類似性を規定するパラメータである。パラメータρの値は、予め設定しておく。   Process 3: The validity of the category selected by the selection subsystem 625 is evaluated by the ratio with the parameter ρ. If it is determined to be valid, the input data is classified into the category, and the process proceeds to process 4. On the other hand, if it is not judged to be valid, the category is reset, and an appropriate category candidate is selected from the other categories (repeat processing 2). Increasing the value of parameter ρ makes the category classification finer, and decreasing the value of ρ makes the classification coarse. This parameter ρ is referred to as a vigilance parameter. The parameter ρ is a parameter that defines the similarity of input data. The value of parameter ρ is set in advance.

処理4:処理2において全ての既存のカテゴリーがリセットされると、入力データが新規カテゴリーに属すると判断され、新規カテゴリーのプロトタイプを表す新しい重み係数を生成する。   Process 4: When all the existing categories are reset in Process 2, it is determined that the input data belongs to the new category, and a new weighting factor representing the prototype of the new category is generated.

処理5:入力データがカテゴリーJに分類されると、カテゴリーJに対応する重み係数WJ(new)は、過去の重み係数WJ(old)及び入力データp(または入力データから派生したデータ)を用いて、下記の式(1)により更新される。
WJ(new)=Kw・p+(1−Kw)・WJ(old) ・・・(1)
ここで、Kwは、学習率パラメータ(0<Kw<1)であり、入力データpを新しい重み係数WJ(new)に反映させる度合いを決定する値である。
Process 5: When input data is classified into category J, weighting factor WJ (new) corresponding to category J uses past weighting factor WJ (old) and input data p (or data derived from input data). And updated by the following equation (1).
WJ (new) = Kw.p + (1-Kw) .WJ (old) (1)
Here, Kw is a learning rate parameter (0 <Kw <1), and is a value that determines the degree to which the input data p is reflected in the new weighting factor WJ (new).

尚、式(1)及び後述する式(2)〜式(12)を演算する機能は、ARTモジュール620に組み込まれている。また、演算に必要なパラメータも、ARTモジュール620に保存されている。   In addition, the function which calculates Formula (1) and Formula (2)-Formula (12) mentioned later is incorporated in the ART module 620. In addition, parameters necessary for the calculation are also stored in the ART module 620.

ARTモジュール620のデータ分類アルゴリズムの特徴は、上記の処理4にある。処理4では、学習した時のパターンと異なる入力データが入力された場合、記録されているパターンを変更せずに新しいパターンを記録することができる。このため、過去に学習したパターンを記録しながら、新たなパターンを記録することが可能となる。   The feature of the data classification algorithm of the ART module 620 is the processing 4 described above. In the process 4, when input data different from the learned pattern is input, a new pattern can be recorded without changing the recorded pattern. Therefore, it is possible to record a new pattern while recording a pattern learned in the past.

このように、ARTモジュール620は、入力データが与えられるとパターンを学習する。従って、学習済みのARTモジュール620に新たな入力データが入力されると、上記アルゴリズムにより、過去に学習したどのパターンに近いかを判定することができる。また、過去に経験したことのないパターンであれば、新規カテゴリーに分類する。   Thus, the ART module 620 learns a pattern when input data is given. Therefore, when new input data is input to the learned ART module 620, it is possible to determine which pattern has been learned in the past by the above algorithm. If the pattern has never been experienced before, it is classified into a new category.

図3Bは、F0レイヤー621の構成を示すブロック図である。F0レイヤー621では、入力データIを各時刻で再度正規化し、F1レイヤー622及び選択サブシステム625に入力する正規化入力ベクトルu を作成する。尚、図3Bでは、添え字iを省略している。 FIG. 3B is a block diagram showing a configuration of the F0 layer 621. In the F0 layer 621, the input data I i is normalized again at each time, and a normalized input vector u 0 i to be input to the F1 layer 622 and the selection subsystem 625 is created. In FIG. 3B, the suffix i is omitted.

始めに、入力データIから、式(2)に従ってw を計算する。ここで、aは定数である。 First, w 0 i is calculated from input data I i according to equation (2). Here, a is a constant.

Figure 0005647626
Figure 0005647626

次に、w を正規化したx を、式(3)を用いて計算する。ここで、「|| ||」はノルムを表す記号である。 Next, x 0 i obtained by normalizing w 0 i is calculated using Equation (3). Here, “||||” is a symbol representing a norm.

Figure 0005647626
Figure 0005647626

そして、式(4)を用いて、x からノイズを除去したv を計算する。ただし、θは、ノイズを除去するための定数である。式(4)の計算により、微小な値は0となるため、入力データのノイズが除去される。 Then, using equation (4), calculates the v 0 i free of noise from x 0 i. However, θ is a constant for removing noise. Since the minute value becomes 0 by the calculation of Expression (4), noise of the input data is removed.

Figure 0005647626
Figure 0005647626

最後に、式(5)を用いて正規化入力ベクトルu を求める。u はF1レイヤー622の入力となる。 Finally, a normalized input vector u 0 i is obtained using Equation (5). u 0 i is input to the F1 layer 622.

Figure 0005647626
Figure 0005647626

図3Cは、F1レイヤー622の構成を示すブロック図である。F1レイヤー622では、式(5)で求めたu を短期記憶として保持し、F2レイヤー623に入力するpを計算する。F2レイヤーの計算式をまとめて式(6)〜式(12)に示す。ただし、a、b、及びdは予め定めた定数、f()は式(4)で示した関数、TはF2レイヤー623で計算する適合度、Zjiは重み係数、Mはデータ項目の数、iはデータ項目を識別するための符号(1≦i≦M)である。 FIG. 3C is a block diagram showing the configuration of the F1 layer 622. As shown in FIG. In the F1 layer 622, u 0 i obtained by Expression (5) is held as a short-term memory, and p i input to the F2 layer 623 is calculated. Formulas for the F2 layer are collectively shown in Formulas (6) to (12). Where a, b, and d are predetermined constants, f () is the function shown in Equation (4), T j is the fitness calculated in the F2 layer 623, Z ji is a weighting factor, and M is a data item. The number i is a code (1 ≦ i ≦ M) for identifying the data item.

Figure 0005647626
Figure 0005647626

Figure 0005647626
Figure 0005647626

Figure 0005647626
Figure 0005647626

Figure 0005647626
Figure 0005647626

Figure 0005647626
Figure 0005647626

Figure 0005647626
Figure 0005647626

ただし、   However,

Figure 0005647626
Figure 0005647626

次に、図4A〜図4Cを用いて、本実施例のプラント状態監視装置200が備える状態監視手段500が有する、モデルデータ5または計測信号6を分類する機能を説明する。まず、図4Aを用いて、プラント100の実施例を説明する。次に、図4B及び図4Cを用いて、モデルデータ5または計測信号6をカテゴリーに分類する様子を述べる。   Next, the function which classify | categorizes the model data 5 or the measurement signal 6 which the state monitoring means 500 with which the plant state monitoring apparatus 200 of a present Example is provided is demonstrated using FIG. 4A-FIG. 4C. First, the Example of the plant 100 is described using FIG. 4A. Next, how the model data 5 or the measurement signal 6 is classified into categories will be described with reference to FIGS. 4B and 4C.

図4Aは、プラント100の実施例である火力発電プラントを示すブロック図である。図4Aにおいて、火力発電プラント100は、ガスタービン発電機110、制御装置120、及びデータ送信装置130を備える。ガスタービン発電機110は、発電機111、圧縮機112、燃焼器113、及びタービン114を備える。   FIG. 4A is a block diagram illustrating a thermal power plant that is an example of the plant 100. 4A, the thermal power plant 100 includes a gas turbine generator 110, a control device 120, and a data transmission device 130. The gas turbine generator 110 includes a generator 111, a compressor 112, a combustor 113, and a turbine 114.

発電に際しては、圧縮機112にて吸い込んだ空気を圧縮して圧縮空気とし、この圧縮空気を燃焼器113に送り、燃料と混合して燃焼する。燃焼により発生した高圧ガスを用いてタービン114を回転させ、発電機111により発電を行う。   At the time of power generation, the air sucked by the compressor 112 is compressed into compressed air, and this compressed air is sent to the combustor 113 and mixed with fuel and burned. The turbine 114 is rotated using the high-pressure gas generated by the combustion, and the generator 111 generates power.

制御装置120においては、電力需要に応じてガスタービン発電機110の出力を制御する。また、制御装置120は、ガスタービン発電機110に設置されたセンサ(図示せず)で計測した運転データ102を入力データとしている。運転データ102は、吸気温度、燃料投入量、タービン排ガス温度、タービン回転数、発電機発電量、及びタービン軸振動などの状態量であり、サンプリング周期毎に計測している。また、大気温度などの気象情報も計測している。これらの運転データ102の計測信号103は、データ送信装置130に送信される。   In the control device 120, the output of the gas turbine generator 110 is controlled according to the power demand. The control device 120 uses the operation data 102 measured by a sensor (not shown) installed in the gas turbine generator 110 as input data. The operation data 102 is state quantities such as intake air temperature, fuel input amount, turbine exhaust gas temperature, turbine rotation speed, generator power generation amount, turbine shaft vibration, and the like, and is measured at each sampling period. It also measures weather information such as atmospheric temperature. The measurement signal 103 of these operation data 102 is transmitted to the data transmission device 130.

制御装置120においては、これらの運転データ102を用いて、ガスタービン発電機110を制御するための制御信号101を算出する。また、制御装置120では、運転データ102の値が予め設定した範囲を逸脱した時に警報を発生させる処理を実施している。警報信号は、運転データ102の値が予め設定した範囲を逸脱した時に「1」、範囲内の時は「0」のデジタル信号として処理する。警報信号が「1」の時は、音や画面表示などで、警報の内容をオペレータに通知する。   In the control device 120, the control signal 101 for controlling the gas turbine generator 110 is calculated using these operation data 102. In addition, the control device 120 performs processing for generating an alarm when the value of the operation data 102 deviates from a preset range. The alarm signal is processed as a digital signal of “1” when the value of the operation data 102 deviates from a preset range, and “0” when within the range. When the alarm signal is “1”, the operator is notified of the content of the alarm by sound or screen display.

データ送信装置130は、計測信号1をプラント状態監視装置200に送信する。計測信号1には、制御装置120で計測した運転データ102、制御装置120で算出した制御信号101、計測信号103、及び警報信号を含む。   The data transmission device 130 transmits the measurement signal 1 to the plant state monitoring device 200. The measurement signal 1 includes operation data 102 measured by the control device 120, a control signal 101 calculated by the control device 120, a measurement signal 103, and an alarm signal.

図4Bは、プラント100から取得した計測信号1を、カテゴリーに分類した結果を説明する図である。図4Bの上図は計測信号1を示し、下図は計測信号1を分類したカテゴリーを示し、上図と下図の横軸は時間、上図の縦軸は計測信号、下図の縦軸はカテゴリー番号である。図4Bにおいて、監視開始前の期間は、モデルデータを選定するための期間(モデルデータの期間)であり、モデルデータとなる計測信号と、この計測信号を分類したカテゴリーが表されている。監視開始後の期間には、監視データである計測信号とそのカテゴリーが表されている。尚、図4Bでは、一例として、計測信号のうちの2項目(項目Aと項目B)を表示している。   FIG. 4B is a diagram for explaining a result of classifying the measurement signal 1 acquired from the plant 100 into categories. The upper figure of FIG. 4B shows the measurement signal 1, the lower figure shows the category into which the measurement signal 1 is classified, the horizontal axis of the upper and lower figures is time, the vertical axis of the upper figure is the measurement signal, and the vertical axis of the lower figure is the category number. It is. In FIG. 4B, a period before the start of monitoring is a period for selecting model data (a period of model data), and represents a measurement signal to be model data and a category in which the measurement signal is classified. In the period after the start of monitoring, measurement signals that are monitoring data and their categories are shown. In FIG. 4B, as an example, two items (item A and item B) of the measurement signal are displayed.

モデルデータの期間において、計測信号(すなわちモデルデータ)は、カテゴリー1〜3という3つのカテゴリーに分類されている。このようにモデルデータを複数のカテゴリーに分類したものが、監視モデル600である。   In the model data period, the measurement signals (that is, model data) are classified into three categories, categories 1 to 3. A monitoring model 600 is obtained by classifying model data into a plurality of categories.

図4Cは、プラント100の計測信号1を、カテゴリーに分類した分類結果の一例を示す図である。図4Cは、図4Bと同様に一例として、計測信号のうちの2項目(項目Aと項目B)を表示しており、2次元のグラフで表記した。また、縦軸及び横軸は、それぞれの項目の計測信号を規格化して示した。監視モデルは、モデルデータを複数のカテゴリーに分類することによって構築したモデルであり、図4Cによっても表すことができる。   FIG. 4C is a diagram illustrating an example of a classification result obtained by classifying the measurement signal 1 of the plant 100 into a category. FIG. 4C shows two items (item A and item B) of the measurement signal as an example, as in FIG. 4B, and is represented by a two-dimensional graph. In addition, the vertical axis and the horizontal axis indicate the measurement signals of the respective items normalized. The monitoring model is a model constructed by classifying model data into a plurality of categories, and can also be represented by FIG. 4C.

計測信号は、図3AのARTモジュール620によって複数のカテゴリー630に分割される。カテゴリー630は、図4Cでは、カテゴリー1〜4とそれぞれ記された4つの円で表され、1つの円が1つのカテゴリーに相当する。   The measurement signal is divided into a plurality of categories 630 by the ART module 620 of FIG. 3A. The category 630 is represented by four circles labeled as categories 1 to 4 in FIG. 4C, and one circle corresponds to one category.

本実施例では、計測信号は4つのカテゴリーに分類されている。カテゴリー1は、項目Aの値が大きく、項目Bの値が小さいグループであり、カテゴリー2は、項目Aと項目Bの値が共に小さいグループであり、カテゴリー3は項目Aの値が小さく、項目Bの値が大きいグループであり、カテゴリー4は項目Aと項目Bの値が共に大きいグループである。   In this embodiment, measurement signals are classified into four categories. Category 1 is a group with a large value for item A and a small value for item B, Category 2 is a group with a small value for both item A and item B, and category 3 has a small value for item A. B is a group having a large value, and category 4 is a group having both items A and B having large values.

図4Bに示すように、監視開始前の期間のデータ(モデルデータ)は、カテゴリー1〜3に分類された。すなわち、監視モデル600は、カテゴリー1〜3を有する。   As shown in FIG. 4B, the data (model data) for the period before the start of monitoring was classified into categories 1 to 3. That is, the monitoring model 600 has categories 1 to 3.

監視開始後の計測信号のうち、前半のデータはカテゴリー2に分類されており、モデルデータと同じカテゴリーである。すなわち、監視開始後の計測信号の前半のデータは、監視モデル600のカテゴリー2に属している。この場合、計測信号がカテゴリー2に属している(監視データの傾向がモデルデータと同じである)ことから、プラントの状態は変化していないと判断する。   Of the measurement signals after the start of monitoring, the first half of the data is classified into category 2, which is the same category as the model data. That is, the first half of the measurement signal after the start of monitoring belongs to category 2 of the monitoring model 600. In this case, since the measurement signal belongs to category 2 (the trend of monitoring data is the same as that of model data), it is determined that the state of the plant has not changed.

一方、監視開始後の計測信号のうち、後半のデータはカテゴリー4に分類されており、モデルデータと異なるカテゴリーに分類されている。すなわち、監視開始後の計測信号の後半のデータは、監視モデル600のいずれのカテゴリー(カテゴリー1〜3)にも属していない。この場合、計測信号がモデルデータのいずれのカテゴリーにも属していない(監視データの傾向がモデルデータと異なる)ことから、プラントの状態が変化したと判断する。そして、プラント状態監視装置200は、プラントのオペレータにプラントの状態が変化したことを画像表示装置940に表示し、オペレータに通知する。   On the other hand, the second half of the measurement signal after the start of monitoring is classified into category 4, and is classified into a category different from the model data. That is, the second half of the measurement signal after the start of monitoring does not belong to any category (category 1 to 3) of the monitoring model 600. In this case, since the measurement signal does not belong to any category of model data (the trend of monitoring data is different from that of model data), it is determined that the state of the plant has changed. Then, the plant state monitoring device 200 displays on the image display device 940 that the state of the plant has changed, and notifies the operator of the plant.

尚、本実施例では2項目の計測信号をカテゴリーに分類する例を述べたが、3項目以上の計測信号について、多次元の座標を用いてカテゴリーに分類することもできる。   In the present embodiment, an example in which two measurement signals are classified into categories has been described. However, three or more measurement signals can be classified into categories using multidimensional coordinates.

図5A〜図5Cは、プラント状態監視装置200のデータベースに保存されているデータの態様を説明する図である。   FIG. 5A to FIG. 5C are diagrams for explaining modes of data stored in the database of the plant state monitoring apparatus 200.

図5Aは、計測信号データベース310に保存されているデータを示す図である。計測信号データベース310には、プラント100に対して計測した運転データである計測信号1(図5Aでは、データ項目A、B、Cを記載)の値が、サンプリング周期(縦軸の時刻)毎に保存される。データの表示画面311において、縦横に移動可能なスクロールボックス312及び313を用いることにより、広範囲のデータをスクロールして表示することができる。   FIG. 5A is a diagram showing data stored in the measurement signal database 310. In the measurement signal database 310, the value of the measurement signal 1 (data items A, B, and C are described in FIG. 5A), which is operation data measured for the plant 100, is obtained at each sampling period (time on the vertical axis). Saved. By using scroll boxes 312 and 313 that can move vertically and horizontally on the data display screen 311, a wide range of data can be scrolled and displayed.

図5Bは、設計情報データベース320に保存されているデータを示す図である。設計情報データベース320には、プラント100の制御ロジック図やヒートバランス情報が保存される。尚、図5Bには図示していないが、プラント100を構成する機器(ガスタービン、発電機、及び圧縮機など)の設計図、設計値、及びプラント100を構成する機器の効率を計算するための式など、プラント100の性能を評価する指針となる計算式も設計情報データベース320に保存されている。制御ロジック図やヒートバランス情報など、設計情報データベース320に保存されているデータは、表示画面321に表示することができる。   FIG. 5B is a diagram showing data stored in the design information database 320. The design information database 320 stores a control logic diagram and heat balance information of the plant 100. Although not shown in FIG. 5B, in order to calculate the design drawing, design value, and efficiency of the equipment constituting the plant 100, the equipment (gas turbine, generator, compressor, etc.) constituting the plant 100. Formulas that serve as guidelines for evaluating the performance of the plant 100, such as the above formula, are also stored in the design information database 320. Data stored in the design information database 320 such as a control logic diagram and heat balance information can be displayed on the display screen 321.

図5Cは、モデル情報データベース330に保存されているデータを示す図である。モデル情報データベース330には、監視モデル毎に、カテゴリー番号と重み係数の関係が保存されている。ここで、重み係数とは、カテゴリーの中心座標(図4Cに示した円の中心座標)のことである。表示画面331には、一例として監視モデルAのデータ332aが表示されているが、表示を切り替えることにより、監視モデルBのデータ332bなど、他の監視モデルのデータを表示することもできる。   FIG. 5C is a diagram showing data stored in the model information database 330. The model information database 330 stores the relationship between the category number and the weighting factor for each monitoring model. Here, the weight coefficient is the center coordinate of the category (the center coordinate of the circle shown in FIG. 4C). The display screen 331 displays the monitoring model A data 332a as an example. However, by switching the display, other monitoring model data such as the monitoring model B data 332b can also be displayed.

図6Aと図6Bは、モデルデータ選定手段400の実施例を説明する図である。   6A and 6B are diagrams for explaining an embodiment of the model data selection means 400. FIG.

モデルデータ選定手段400では、計測信号データベース310に保存されている計測信号と、設計情報データベース320に保存されている式(13)を用いて、ガスタービンの効率ηを計算する。ここで、MWは発電出力(MWh)、Fは燃料流量(m/h)、Kは燃料比重(kg/m)、LHVは燃料発熱量(kJ/kg)である。
η=(MW×3600)/(F×K×LHV) ・・・(13)
図6Aは、計測信号の時系列データとプラント効率の時系列データを示す図である。上図には、計測信号の時系列データとして、発電出力MWと燃料流量Fの時系列データが表されており、下図には、プラント効率の時系列データとして、ガスタービンの効率ηの時系列データが表されている。
The model data selection unit 400 calculates the efficiency η of the gas turbine using the measurement signal stored in the measurement signal database 310 and the equation (13) stored in the design information database 320. Here, MW is a power generation output (MWh), F is a fuel flow rate (m 3 / h), K is a fuel specific gravity (kg / m 3 ), and LHV is a fuel heating value (kJ / kg).
η = (MW × 3600) / (F × K × LHV) (13)
FIG. 6A is a diagram illustrating time-series data of measurement signals and time-series data of plant efficiency. The upper figure shows the time series data of the power generation output MW and the fuel flow rate F as the time series data of the measurement signal, and the lower figure shows the time series of the gas turbine efficiency η as the time series data of the plant efficiency. Data is represented.

モデルデータ選定手段400では、式(13)で計算したガスタービンの効率ηの時系列データが最大値となる時刻の前後の一定期間(図6Aの例では、時刻T1からT2までの期間)をモデルデータの期間として決定し、この期間における効率ηの時系列データをモデルデータ5として選定する。モデルデータの期間を決定するための一定期間は、予め定めておき、任意の長さの期間を設定することができる。図6Aでは、ガスタービンの効率ηの時系列データについてだけモデルデータの期間が設定されているが、計測信号(発電出力MWと燃料流量F)の時系列データについても、モデルデータの期間を設定することができる。   In the model data selection means 400, a fixed period (a period from time T1 to T2 in the example of FIG. 6A) before and after the time when the time series data of the efficiency η of the gas turbine calculated by the equation (13) becomes the maximum value. The period of the model data is determined, and the time series data of the efficiency η in this period is selected as the model data 5. The fixed period for determining the period of the model data is determined in advance, and a period of an arbitrary length can be set. In FIG. 6A, the model data period is set only for the time series data of the efficiency η of the gas turbine, but the model data period is also set for the time series data of the measurement signals (power generation output MW and fuel flow rate F). can do.

尚、モデルデータ5として選定する計測信号のデータ項目は、発電出力MWや燃料流量Fなど、プラントの効率を評価するのに有効なデータ項目である。選定するデータ項目の数は、1つでも複数でもよい。   The data items of the measurement signal selected as the model data 5 are effective data items for evaluating the efficiency of the plant, such as the power generation output MW and the fuel flow rate F. The number of data items to be selected may be one or more.

現在の計測信号6が、モデルデータ5を用いて構築した監視モデル600のカテゴリーに属すれば(すなわち、現在の計測信号6とモデルデータ5とが同じ傾向であれば)、高効率でプラント100を運転できていることを意味する。一方、現在の計測信号6が、監視モデル600のカテゴリーに属しておらず(すなわち、現在の計測信号6とモデルデータ5とが異なる傾向であり)、監視モデル600にて新規カテゴリーが発生すれば、プラント100の状態は、高効率で運転していた状態から変化したことを意味する。本実施例のプラント状態監視装置200を用いることで、プラント100の状態が高効率で運転していた状態から変化したことを、オペレータに通知できる。   If the current measurement signal 6 belongs to the category of the monitoring model 600 constructed using the model data 5 (that is, if the current measurement signal 6 and the model data 5 have the same tendency), the plant 100 is highly efficient. Means you can drive. On the other hand, if the current measurement signal 6 does not belong to the category of the monitoring model 600 (that is, the current measurement signal 6 and the model data 5 tend to be different) and a new category occurs in the monitoring model 600. This means that the state of the plant 100 has changed from the state of operation with high efficiency. By using the plant state monitoring apparatus 200 of the present embodiment, it is possible to notify the operator that the state of the plant 100 has changed from the state where it was operating with high efficiency.

また、モデルデータ選定手段400では、一酸化炭素や窒素酸化物などの環境負荷物質を計測したデータと、環境負荷物質の制御に関係する操作信号の時系列データとを抽出し、環境負荷物質の計測値が最小値となる時刻の前後の一定期間をモデルデータの期間として決定し、この期間における計測信号の時系列データをモデルデータ5として選定することもできる。この場合も、モデルデータの期間を決定するための一定期間は、予め定めておき、任意の長さの期間を設定することができる。   In addition, the model data selection unit 400 extracts data obtained by measuring environmentally hazardous substances such as carbon monoxide and nitrogen oxides, and time-series data of operation signals related to the control of the environmentally hazardous substances. A fixed period before and after the time when the measurement value becomes the minimum value is determined as the period of the model data, and the time series data of the measurement signal in this period can be selected as the model data 5. Also in this case, the fixed period for determining the period of the model data can be determined in advance, and a period of an arbitrary length can be set.

尚、モデルデータ5として選定する計測信号のデータ項目は、一酸化炭素濃度、窒素酸化物濃度、及び空気流量など、環境負荷物質を評価するのに有効なデータ項目である。選定するデータ項目の数は、1つでも複数でもよい。   The data items of the measurement signal selected as the model data 5 are effective data items for evaluating environmentally hazardous substances such as carbon monoxide concentration, nitrogen oxide concentration, and air flow rate. The number of data items to be selected may be one or more.

このモデルデータ5を用いて構築した監視モデル600を用いることで、環境負荷物質が最小となっている状態から計測信号のデータ傾向が変化した場合(すなわち、計測信号が、監視モデル600のいずれのカテゴリーにも属しない場合)、オペレータに通知できる。   By using the monitoring model 600 constructed using the model data 5, when the data trend of the measurement signal changes from the state where the environmental load substance is minimized (that is, the measurement signal is any of the monitoring models 600). If it does not belong to a category), the operator can be notified.

このように、モデルデータ選定手段400では、プラント効率の時系列データと、過去の計測信号に含まれる環境負荷物質の計測信号の時系列データとのうち、少なくとも1つの時系列データを用いて、この時系列データの最大値または最小値をとる時刻の前後の一定期間をモデルデータの期間として決定し、モデルデータの期間におけるこの時系列データをモデルデータ5として選定する。   As described above, the model data selection unit 400 uses at least one time-series data among the time-series data of the plant efficiency and the time-series data of the measurement signal of the environmental load substance included in the past measurement signal, A fixed period before and after the time at which the maximum value or minimum value of the time series data is taken is determined as the model data period, and this time series data in the model data period is selected as the model data 5.

また、モデルデータ選定手段400では、過去のデータを予め定めたある時刻から予め定めた所定の期間毎に分割し、その期間毎に、過去の計測信号を基にして計算したプラント効率の時系列データと、過去の計測信号に含まれる環境負荷物質の計測信号の時系列データとのうち、少なくとも1つの時系列データを用いて、この時系列データの最大値または最小値をとる時刻の前後の一定期間をモデルデータの期間として決定することもできる。そして、それぞれのモデルデータの期間において、この時系列データをモデルデータ5として選定することもできる。   Further, the model data selection unit 400 divides past data into predetermined time periods from a predetermined time, and calculates plant efficiency time series calculated based on past measurement signals for each period. Using at least one time-series data among the data and the time-series data of the environmental load substance measurement signal included in the past measurement signal, before and after the time when the maximum or minimum value of this time-series data is obtained. A certain period can be determined as the period of the model data. The time series data can be selected as the model data 5 in each model data period.

このように、予め定めた一定期間で区切ったモデルデータを用いて監視モデル600を構築することで、季節の変化に伴う大気温度変化や経年劣化によるプラント特性の変化を考慮できる。すなわち、大気の温度が高くなると、ガスタービンの効率が低下する。大気温度などの環境条件の変化に伴い、最適な操作条件や最大効率も変化する。季節毎に監視モデル600を切り替えて運用することで、大気温度の変化を考慮した監視が可能となる。   In this way, by constructing the monitoring model 600 using model data divided by a predetermined period, it is possible to take into account changes in the plant characteristics due to atmospheric temperature changes and aging due to seasonal changes. That is, as the temperature of the atmosphere increases, the efficiency of the gas turbine decreases. As environmental conditions such as atmospheric temperature change, the optimal operating conditions and maximum efficiency also change. By switching and operating the monitoring model 600 for each season, it is possible to perform monitoring in consideration of changes in the atmospheric temperature.

図6Bは、過去の時系列データを予め定めた所定の期間に分割し、その期間毎にモデルデータを選定する方法を説明する図である。図6Bに示すように、過去の時系列データのうち、プラント100の定期検査が終了した時刻t0からのデータを所定の期間に分割し、この期間毎にモデルデータを選定することもできる。図6Bの例では、期間aでは時刻t1〜t2、期間bでは時刻t4〜t5、期間cでは時刻t7〜t8のデータを、それぞれモデルデータとして選定している。定期検査後の経過時間に合わせて監視モデル600を切り替えることで、プラントの経年変化を考慮した監視が可能となる。   FIG. 6B is a diagram for explaining a method of dividing past time-series data into predetermined periods and selecting model data for each period. As shown in FIG. 6B, the data from time t0 when the periodic inspection of the plant 100 is completed among the past time-series data can be divided into predetermined periods, and model data can be selected for each period. In the example of FIG. 6B, the data at time t1 to t2 in period a, the time t4 to t5 in period b, and the time t7 to t8 in period c are selected as model data. By switching the monitoring model 600 in accordance with the elapsed time after the periodic inspection, it becomes possible to monitor the plant over time.

本実施例によれば、プラント効率の高いモデルデータと現時刻の計測信号との比較、及び環境負荷物質の低いモデルデータと現時刻の計測信号との比較のうち、少なくとも1つの比較により、現時刻の計測信号のデータ傾向がモデルデータと異なる場合に、オペレータにプラントの状態が変化したことを通知できる。この通知によりプラントの運用を改善する対策を実施することで、プラントの効率を向上して燃料消費量を削減したり、環境負荷物質を低減して排出ガスの処理コストを削減したりして、運転コストを削減できる。また、オペレータは、長期間の計測信号を処理することなく、運転コスト削減に有用な情報を得ることができる。   According to the present embodiment, at least one of the comparison between the model data with high plant efficiency and the measurement signal at the current time and the comparison between the model data with low environmental load substance and the measurement signal at the current time is performed. When the data trend of the time measurement signal is different from the model data, the operator can be notified that the state of the plant has changed. By implementing measures to improve the operation of the plant by this notification, the efficiency of the plant is improved and the fuel consumption is reduced, or the environmentally hazardous substance is reduced and the processing cost of the exhaust gas is reduced. Operating costs can be reduced. In addition, the operator can obtain information useful for reducing operating costs without processing long-term measurement signals.

以上に述べた実施例では、モデルデータ選定手段400にて、プラント効率が最大時または環境負荷物質が最小時の時刻からの期間をモデルデータの期間として選定した。プラント効率が最小時または環境負荷物質が最大時の時刻からの期間をモデルデータの期間として選定し、この期間で得られたモデルデータと現在の計測信号のデータ傾向が同じ場合に、プラントの運用状態が悪いことをオペレータに通知するような構成としてもよい。   In the embodiment described above, the model data selection means 400 selects the period from the time when the plant efficiency is maximum or the environmental load substance is minimum as the period of the model data. When the period from the time when the plant efficiency is the minimum or the environmental load substance is the maximum is selected as the model data period, and the model data obtained in this period and the data trend of the current measurement signal are the same, the plant operation It is good also as a structure which notifies an operator that a state is bad.

図7は、本発明の第2の実施例によるプラント状態監視装置200を説明するブロック図である。図7において、第1の実施例(図1)と同一の符号は、第1の実施例と同一または共通する要素を示す。本実施例のプラント状態監視装置200は、状態監視手段500に改善情報決定手段700が備えられている点が、第1の実施例のプラント状態監視装置200と異なる。改善情報決定手段700は、プラントの運転状態を改善する操作方法を決定して出力する。この操作方法は、画像表示装置940に表示される。   FIG. 7 is a block diagram illustrating a plant state monitoring apparatus 200 according to the second embodiment of the present invention. In FIG. 7, the same reference numerals as those in the first embodiment (FIG. 1) denote the same or common elements as those in the first embodiment. The plant state monitoring apparatus 200 according to the present embodiment is different from the plant state monitoring apparatus 200 according to the first embodiment in that the state monitoring unit 500 includes an improvement information determination unit 700. The improvement information determination means 700 determines and outputs an operation method for improving the operation state of the plant. This operation method is displayed on the image display device 940.

改善情報決定手段700は、監視モデル600A〜600Cから、それぞれ出力情報501A〜501Cを受信する。尚、以下の説明では、出力情報501A〜501Cを出力情報501と総称する。出力情報501は、監視モデル600のカテゴリー番号など、監視モデル600に関する情報である。   The improvement information determination unit 700 receives the output information 501A to 501C from the monitoring models 600A to 600C, respectively. In the following description, the output information 501A to 501C are collectively referred to as output information 501. The output information 501 is information regarding the monitoring model 600 such as the category number of the monitoring model 600.

以下、図8A〜図8Dを用いて、改善情報決定手段700の動作を説明する。   Hereinafter, the operation of the improvement information determination unit 700 will be described with reference to FIGS. 8A to 8D.

図8Aは、改善情報決定手段700の動作を説明するフローチャートである。尚、本フローチャートによる処理は、図2のステップ1030にて実施される。   FIG. 8A is a flowchart for explaining the operation of the improvement information determination unit 700. The process according to this flowchart is performed at step 1030 in FIG.

本フローチャートによる処理は、図8Aのステップ1100〜ステップ1120を組み合わせて実行される。ステップ1100では、監視モデル600からの出力情報501を用いて、計測信号のデータ傾向が変化した原因となったデータ項目(主要因データ項目)を求める。ステップ1110では、ステップ1100で抽出した主要因データ項目に関連する制御ロジック図を抽出する。ステップ1120では、求めたり抽出したりしたこれらの情報を用いて、プラント運用の改善案を出力する。   The processing according to this flowchart is executed by combining Steps 1100 to 1120 in FIG. 8A. In step 1100, using the output information 501 from the monitoring model 600, the data item (main factor data item) that causes the change in the data trend of the measurement signal is obtained. In step 1110, a control logic diagram related to the main factor data item extracted in step 1100 is extracted. In step 1120, a plan for improving the plant operation is output using the obtained and extracted information.

以下、図8B〜図8Dを用いて、各ステップの動作を述べる。   Hereinafter, the operation of each step will be described with reference to FIGS. 8B to 8D.

図8Bは、ステップ1100の動作を説明する図である。まず、新規カテゴリーに属するデータXに対して、最も近い既存のカテゴリー(正常カテゴリーN)を求める。次に、データXの値と正常カテゴリーNの中心との距離を求め、この距離に対する寄与度(この距離の射影)が最大であるデータ項目を、主要因データ項目として求める。図8Bの例では、データ項目Aが主要因データ項目として求められる。   FIG. 8B is a diagram for explaining the operation in step 1100. First, the nearest existing category (normal category N) is obtained for the data X belonging to the new category. Next, the distance between the value of the data X and the center of the normal category N is obtained, and the data item having the maximum contribution to this distance (projection of this distance) is obtained as the main factor data item. In the example of FIG. 8B, the data item A is obtained as the main factor data item.

図8Cは、ステップ1110の動作による抽出結果を説明する図である。ステップ1110では、ステップ1100で求めた主要因データ項目(項目A)が含まれる制御ロジック図を抽出する。制御ロジック図は、設計情報データベース320に保存されている。状態監視手段500は、設計情報リクエスト信号14を設計情報データベース320へ送信して、設計情報13(制御ロジック図)を取得する。   FIG. 8C is a diagram for explaining the extraction result by the operation of step 1110. In step 1110, a control logic diagram including the main factor data item (item A) obtained in step 1100 is extracted. The control logic diagram is stored in the design information database 320. The state monitoring unit 500 transmits the design information request signal 14 to the design information database 320 and acquires the design information 13 (control logic diagram).

図8Dは、ステップ1120の動作を説明する図である。ステップ1120では、ステップ1100で求めた主要因データ項目(項目A)について、監視モデル600を構築した時のデータ範囲と、項目Aのトレンドデータ(時系列データ)とを抽出して、データ傾向の変化を把握し、運用改善に寄与する操作方法を出力する。   FIG. 8D is a diagram for explaining the operation in step 1120. In step 1120, for the main factor data item (item A) obtained in step 1100, the data range when the monitoring model 600 is constructed and the trend data (time series data) of item A are extracted, and the data trend Grasp changes and output operation methods that contribute to operational improvements.

ステップ1120では、まず、モデルデータ5から項目Aの最大値及び最小値を抽出する。次に、抽出した最大値より大きいトレンドデータのサンプル点数と、抽出した最小値より小さいトレンドデータのサンプル点数とを比較する。最大値より大きいトレンドデータのサンプル点数が、最小値より小さいトレンドデータのサンプル点数よりも多い場合は、項目Aの値を下げる操作が運用改善に有用であると決定する。最小値より小さいトレンドデータのサンプル点数が、最大値より大きいトレンドデータのサンプル点数よりも多い場合は、項目Aの値を上げる操作が運用改善に有用であると決定する。決定した操作は、プラント運用の改善案として出力する。   In step 1120, first, the maximum value and minimum value of the item A are extracted from the model data 5. Next, the trend data sample points larger than the extracted maximum value are compared with the trend data sample points smaller than the extracted minimum value. If the number of sample points of trend data greater than the maximum value is greater than the number of sample points of trend data smaller than the minimum value, it is determined that the operation of reducing the value of item A is useful for operational improvement. When the number of sample points of trend data smaller than the minimum value is larger than the number of sample points of trend data larger than the maximum value, it is determined that the operation of increasing the value of item A is useful for operational improvement. The determined operation is output as a plan for improving the plant operation.

図8Dの例では、監視モデル構築時と比較してトレンドデータの値が大きくなって推移していることから、項目Aの値を下げる操作が運用改善に寄与すると決定する。   In the example of FIG. 8D, since the value of the trend data is larger than that at the time of construction of the monitoring model and changes, it is determined that the operation of lowering the value of item A contributes to operational improvement.

本実施例のプラント状態監視装置200を用いることで、オペレータは長期間の計測信号を処理することなく、自動的に運用改善の操作方法を得られる。   By using the plant state monitoring apparatus 200 of the present embodiment, the operator can automatically obtain an operation improvement method without processing long-term measurement signals.

図9は、本発明の第3の実施例によるプラント状態監視装置200を説明するブロック図である。図9において、第1の実施例(図1)と同一の符号は、第1の実施例と同一または共通する要素を示す。本実施例のプラント状態監視装置200は、状態監視手段500に総合監視手段800が備えられている点が、第1の実施例のプラント状態監視装置200と異なる。総合監視手段800は、画像表示装置940に表示する監視結果の優先順位を決定する。   FIG. 9 is a block diagram for explaining a plant state monitoring apparatus 200 according to the third embodiment of the present invention. In FIG. 9, the same reference numerals as those in the first embodiment (FIG. 1) denote the same or common elements as those in the first embodiment. The plant state monitoring apparatus 200 according to the present embodiment is different from the plant state monitoring apparatus 200 according to the first embodiment in that the state monitoring unit 500 includes a comprehensive monitoring unit 800. The comprehensive monitoring unit 800 determines the priority order of the monitoring results displayed on the image display device 940.

総合監視手段800は、監視モデル600A〜600Cから、それぞれ出力情報501A〜501Cを受信する。尚、以下の説明では、出力情報501A〜501Cを出力情報501と総称する。出力情報501は、監視モデル600のカテゴリー番号など、監視モデル600に関する情報である。   The comprehensive monitoring unit 800 receives output information 501A to 501C from the monitoring models 600A to 600C, respectively. In the following description, the output information 501A to 501C are collectively referred to as output information 501. The output information 501 is information regarding the monitoring model 600 such as the category number of the monitoring model 600.

総合監視手段800は、監視モデル600のそれぞれに対して、式(14)に従って評価値Eiを求める。ここで、iは監視モデル番号、Eiは監視モデルiの評価値、Wiは監視モデルiに対する重み係数、V1iはモデルデータ中の最良値(効率の最大値、または環境負荷物質の最小値)、及びV2iは現在の計測信号の値に基づいて求めた監視項目の値(効率、または環境負荷物質の計測値)である。尚、重み係数Wiは、予め設定する値である。重要な監視項目に対しては、監視モデル600の重み係数Wiの値を大きく設定する。
Ei=Wi×|V1i−V2i| ・・・(14)
評価値Eiは、重み係数Wiと、モデルデータの最良値V1iと現在の監視項目の値V2iの偏差の積とで計算される。重要な監視項目や偏差が大きい監視項目ほど、評価値Eiが大きくなる。従って、評価値Eiが大きいほど、対応の優先順位が高い。そこで、評価値Eiが大きい監視モデルほど表示の優先順位が高いとし、評価値Eiの大きい順番に監視結果を画像表示装置940に表示することで、対応の優先順位も併せてオペレータに通知する。
The comprehensive monitoring unit 800 calculates an evaluation value Ei for each of the monitoring models 600 according to the equation (14). Here, i is the monitoring model number, Ei is the evaluation value of the monitoring model i, Wi is a weighting factor for the monitoring model i, V1i is the best value in the model data (maximum value of efficiency or minimum value of environmentally hazardous substances), And V2i are monitoring item values (efficiency or measured values of environmentally hazardous substances) obtained based on the current measurement signal values. The weight coefficient Wi is a value set in advance. For important monitoring items, the value of the weighting factor Wi of the monitoring model 600 is set large.
Ei = Wi × | V1i−V2i | (14)
The evaluation value Ei is calculated by the weight coefficient Wi and the product of the deviation between the best value V1i of the model data and the value V2i of the current monitoring item. The evaluation value Ei increases as the monitoring item is more important or the monitoring item has a larger deviation. Therefore, the higher the evaluation value Ei, the higher the priority of correspondence. Therefore, the higher the evaluation value Ei is, the higher the display priority is, and the monitoring results are displayed on the image display device 940 in the order of the evaluation value Ei, thereby notifying the operator of the corresponding priority.

本実施例のプラント状態監視装置200を用いることで、状態が変化した監視項目について対応の優先順位をつけてオペレータに通知できる。   By using the plant state monitoring apparatus 200 according to the present embodiment, it is possible to give priority to the monitoring items whose state has changed and notify the operator of the priority.

図10は、本発明の第4の実施例によるプラント状態監視装置200を説明するブロック図である。図10において、第1の実施例(図1)と同一の符号は、第1の実施例と同一または共通する要素を示す。本実施例のプラント状態監視装置200は、状態監視手段500に改善情報決定手段700及び総合監視手段800が備えられている点が、第1の実施例のプラント状態監視装置200と異なる。   FIG. 10 is a block diagram illustrating a plant state monitoring apparatus 200 according to the fourth embodiment of the present invention. 10, the same reference numerals as those in the first embodiment (FIG. 1) denote the same or common elements as those in the first embodiment. The plant state monitoring apparatus 200 according to the present embodiment is different from the plant state monitoring apparatus 200 according to the first embodiment in that the state monitoring unit 500 includes an improvement information determination unit 700 and a comprehensive monitoring unit 800.

改善情報決定手段700及び総合監視手段800の動作は、それぞれ実施例2及び実施例3で説明した通りである。ただし、総合監視手段800は、対応を優先する項目についての出力情報502を改善情報決定手段700に出力する。画像表示装置940には、監視結果とプラントの運転状態を改善する操作方法が、優先順位に従って(すなわち、評価値Eiの大きい順番に)表示される。   The operations of the improvement information determination unit 700 and the comprehensive monitoring unit 800 are as described in the second embodiment and the third embodiment, respectively. However, the comprehensive monitoring unit 800 outputs the output information 502 about the item for which priority is given to the improvement information determining unit 700. On the image display device 940, the monitoring result and the operation method for improving the operation state of the plant are displayed according to the priority order (that is, in order of the evaluation value Ei).

本実施例のプラント状態監視装置200を用いることで、状態が変化した監視項目について対応の優先順位をつけてオペレータに通知でき、さらにオペレータは自動的に運用改善の操作方法を得られる。   By using the plant state monitoring apparatus 200 according to the present embodiment, it is possible to notify the operator by assigning priorities for the monitoring items whose state has changed, and the operator can automatically obtain an operation improvement operation method.

図11A、図11B、及び図12は、本実施例の画像表示装置940に表示される画面を説明する図である。図11A及び図11Bは第1〜第4の実施例のプラント状態監視装置200を、図12は第2、第4の実施例のプラント状態監視装置200を、それぞれ用いた時に表示される画面の例である。   FIG. 11A, FIG. 11B, and FIG. 12 are diagrams illustrating screens displayed on the image display device 940 of the present embodiment. 11A and 11B show screens displayed when the plant state monitoring apparatus 200 according to the first to fourth embodiments is used, and FIG. 12 shows screens displayed when the plant state monitoring apparatus 200 according to the second and fourth embodiments is used. It is an example.

図11Aは、モデルデータ選定手段400で選定したモデルデータ5の期間を表示した画像表示装置940の画面の例を示す図である。図11Aでは、モデルデータ5の期間として期間A〜期間Cが表示されている。オペレータは、画面からモデルデータ5の期間を確認できる。また、マウス930やキーボード920などの外部入力装置910を用いて各期間の開始時刻と終了時刻を変更することで、モデルデータ5の期間を変更することもできる。例えば、図11Aの例では、期間Aの開始時刻の入力欄960や終了時刻の入力欄961に時刻を入力し、実行ボタン962をクリックすることで、期間Aの開始時刻や終了時刻を変更できる。キャンセルボタン963をクリックすると、期間の変更処理をキャンセルできる。   FIG. 11A is a diagram illustrating an example of a screen of the image display device 940 that displays the period of the model data 5 selected by the model data selection unit 400. In FIG. 11A, period A to period C are displayed as the period of the model data 5. The operator can confirm the period of the model data 5 from the screen. In addition, the period of the model data 5 can be changed by changing the start time and end time of each period using an external input device 910 such as a mouse 930 or a keyboard 920. For example, in the example of FIG. 11A, the start time and end time of period A can be changed by inputting the time into the start time input field 960 and the end time input field 961 of period A and clicking the execution button 962. . When the cancel button 963 is clicked, the period changing process can be canceled.

図11Bは、監視結果11を表示した画像表示装置940の画面の例を示す図である。この画面には、監視項目毎に、監視項目のデータ傾向がモデルデータと一致しているか、または変化しているかという監視結果を表示する。オペレータは、この画面により、プラントの運転状態を一覧で確認できる。図11Bでは、監視項目として、ガスタービンの効率、一酸化炭素の濃度、及び窒素酸化物の濃度を例示しており、一酸化炭素の濃度のデータ傾向が、モデルデータから変化していることを示している。これにより、オペレータは、一酸化炭素の濃度が正常な状態から変化したことがわかる。   FIG. 11B is a diagram illustrating an example of a screen of the image display device 940 that displays the monitoring result 11. On this screen, for each monitoring item, a monitoring result indicating whether the data trend of the monitoring item matches or changes with the model data is displayed. The operator can confirm the operation state of the plant in a list on this screen. In FIG. 11B, gas turbine efficiency, carbon monoxide concentration, and nitrogen oxide concentration are illustrated as monitoring items, and the data trend of carbon monoxide concentration changes from the model data. Show. Thereby, the operator knows that the concentration of carbon monoxide has changed from the normal state.

図12は、第2、第4の実施例のプラント状態監視装置200を用いた時に、画像表示装置940が表示する画面の例を示す図である。この画面では、監視モデル毎に(図12では監視モデルA〜C)、改善情報決定手段700が抽出した制御ロジック図970と、運用改善に寄与する操作方法(推奨操作971)とを表示する。また、監視項目(図12では項目Aと項目B)のそれぞれについて、監視モデルを構築した時のデータ範囲とトレンドデータとをグラフに表示する。   FIG. 12 is a diagram illustrating an example of a screen displayed by the image display device 940 when the plant state monitoring device 200 of the second and fourth embodiments is used. In this screen, for each monitoring model (monitoring models A to C in FIG. 12), the control logic diagram 970 extracted by the improvement information determination unit 700 and the operation method (recommended operation 971) contributing to operation improvement are displayed. For each monitoring item (item A and item B in FIG. 12), the data range and trend data when the monitoring model is constructed are displayed in a graph.

以上に述べた実施例のプラント状態監視装置200では、推奨操作971を画面に表示するが、この推奨操作を直接プラント100の制御信号101に反映させて、推奨操作のようにプラント100を制御する構成としてもよい。   In the plant state monitoring apparatus 200 of the embodiment described above, the recommended operation 971 is displayed on the screen. This recommended operation is directly reflected in the control signal 101 of the plant 100 to control the plant 100 like the recommended operation. It is good also as a structure.

また、以上に述べた実施例では、モデルデータ選定手段400にて、プラント効率が最大時または環境負荷物質が最小時の時刻からの期間をモデルデータの期間として選定した。プラント効率が最小時または環境負荷物質が最大時の時刻からの期間をモデルデータの期間として選定し、この期間で得られたモデルデータと現在の計測信号のデータ傾向が同じ場合に、プラントの運用状態が悪いことをオペレータに通知するような構成としてもよい。   In the embodiment described above, the model data selection means 400 selects the period from the time when the plant efficiency is maximum or the environmental load substance is minimum as the period of the model data. When the period from the time when the plant efficiency is the minimum or the environmental load substance is the maximum is selected as the model data period, and the model data obtained in this period and the data trend of the current measurement signal are the same, the plant operation It is good also as a structure which notifies an operator that a state is bad.

尚、本発明は、上記した実施例に限定されるものではなく、様々な変形例を含む。上記した実施例は、本発明をわかりやすく説明するために詳細に記載したものであり、本発明は、必ずしも説明した全ての構成を備えるものに限定されるものではない。   In addition, this invention is not limited to an above-described Example, Various modifications are included. The above-described embodiments are described in detail for easy understanding of the present invention, and the present invention is not necessarily limited to those having all the configurations described.

また、上記の各構成、機能、処理部、及び処理手段等は、これらの一部または全部を集積回路で設計する等によりハードウェアで実現してもよい。また、上記の各構成や機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行するソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル、計測信号、及び算出情報等の情報は、メモリやハードディスク等の記憶装置、またはICカード、SDカード及びDVD等の記憶媒体に格納することができる。よって、各処理と各構成は、処理ユニットやプログラムモジュールとして実現可能である。   Further, each of the above-described configurations, functions, processing units, processing means, and the like may be realized by hardware by designing a part or all of them with an integrated circuit. Further, each of the above-described configurations, functions, and the like may be realized by software that interprets and executes a program that realizes each function by the processor. Information such as programs, tables, files, measurement signals, and calculation information for realizing each function can be stored in a storage device such as a memory or a hard disk, or a storage medium such as an IC card, an SD card, or a DVD. Therefore, each process and each configuration can be realized as a processing unit or a program module.

また、図面において、制御線や情報線は、説明上必要と考えられるものを示している。従って、必ずしも製品に必要な全ての制御線や情報線を示しているとは限らない。実際には、ほとんど全ての構成要素が相互に接続されていると考えてもよい。   In the drawings, control lines and information lines indicate what is considered necessary for explanation. Therefore, not all control lines and information lines necessary for a product are necessarily shown. In practice, it may be considered that almost all components are connected to each other.

本発明は、プラント状態監視装置及びプラント状態監視方法として、各種プラントに広く適用可能である。   The present invention is widely applicable to various plants as a plant state monitoring device and a plant state monitoring method.

1…計測信号、2…外部入力信号、3,4,6…計測信号、5…モデルデータ、7…設計情報、8…設計リクエスト信号、9,10…モデル情報、11…監視結果、12…画像表示情報、13…設計情報、14…設計情報リクエスト信号、50…プラント状態監視装置情報、100…プラント、200…プラント状態監視装置、210…外部入力インターフェイス、220…外部出力インターフェイス、310…計測信号データベース、320…設計情報データベース、330…モデル情報データベース、400…モデルデータ選定手段、500…状態監視手段、600,600A〜600C…監視モデル、630…カテゴリー、700…改善情報決定手段、800…総合監視手段、900…運転管理室、910…外部入力装置、920…キーボード、930…マウス、940…画像表示装置。   DESCRIPTION OF SYMBOLS 1 ... Measurement signal, 2 ... External input signal, 3, 4, 6 ... Measurement signal, 5 ... Model data, 7 ... Design information, 8 ... Design request signal, 9, 10 ... Model information, 11 ... Monitoring result, 12 ... Image display information, 13 ... Design information, 14 ... Design information request signal, 50 ... Plant state monitoring device information, 100 ... Plant, 200 ... Plant state monitoring device, 210 ... External input interface, 220 ... External output interface, 310 ... Measurement Signal database 320 ... Design information database 330 ... Model information database 400 ... Model data selection means 500 ... State monitoring means 600, 600A-600C ... Monitoring model, 630 ... Category, 700 ... Improvement information determination means, 800 ... Comprehensive monitoring means, 900 ... operation management room, 910 ... external input device, 920 ... key Board, 930 ... mouse, 940 ... image display device.

Claims (12)

プラントの状態量を計測した計測信号を用いて、予め設定した監視項目について前記プラントの運転状態を監視し、監視結果を画像表示装置に表示するプラント状態監視装置において、
前記計測信号を基にして計算した時系列データと前記計測信号の時系列データとのうち少なくとも1つの時系列データから、前記プラントを監視する際に参照するモデルデータを選定するモデルデータ選定手段と、
前記モデルデータを複数のカテゴリーに分類することによって監視モデルを構築する状態監視手段を備え、
前記モデルデータ選定手段は、前記計測信号を基にして計算した前記プラントの効率の時系列データと、環境負荷物質についての前記計測信号の時系列データとのうち、少なくとも1つの時系列データについて、最大値をとる時刻の前後の予め定めた一定期間または最小値をとる時刻の前後の予め定めた一定期間をモデルデータの期間として決定し、このモデルデータの期間における前記少なくとも1つの時系列データを前記モデルデータとして選定し、
前記状態監視手段は、現在の前記計測信号が前記監視モデルの前記カテゴリーのいずれかに属するか否かを判定し、判定結果を監視結果として前記画像表示装置に出力する、
ことを特徴とするプラント状態監視装置。
In the plant state monitoring device that uses the measurement signal that measures the state quantity of the plant, monitors the operation state of the plant for a preset monitoring item, and displays the monitoring result on the image display device,
Model data selecting means for selecting model data to be referred to when monitoring the plant from at least one time series data of the time series data calculated based on the measurement signal and the time series data of the measurement signal; ,
Comprising state monitoring means for constructing a monitoring model by classifying the model data into a plurality of categories;
The model data selection means, for at least one time series data among the time series data of the efficiency of the plant calculated based on the measurement signal, and the time series data of the measurement signal for environmental load substances, A predetermined fixed period before and after the time at which the maximum value is taken or a predetermined fixed period before and after the time at which the minimum value is taken is determined as the period of the model data, and the at least one time series data in the period of the model data is Select as the model data,
The state monitoring means determines whether the current measurement signal belongs to any of the categories of the monitoring model, and outputs a determination result to the image display device as a monitoring result.
A plant state monitoring device characterized by that.
請求項1に記載のプラント状態監視装置において、
前記状態監視手段は、
前記プラントの運転状態を改善する操作方法を、前記計測信号と前記監視モデルを構築した時に用いた前記モデルデータとから決定する改善情報決定手段をさらに備え、
前記判定結果と、前記改善情報決定手段が決定した前記操作方法とを、前記画像表示装置に出力するプラント状態監視装置。
In the plant condition monitoring device according to claim 1,
The state monitoring means includes
An operation method for improving the operating state of the plant further comprises improvement information determination means for determining from the measurement signal and the model data used when the monitoring model is constructed,
A plant state monitoring device that outputs the determination result and the operation method determined by the improvement information determination means to the image display device.
請求項1に記載のプラント状態監視装置において、
前記状態監視手段は、
前記監視項目毎に予め設定された重み係数に基づいて、前記画像表示装置に表示する監視結果の優先順位を決定する総合監視手段をさらに備え、
前記判定結果を、前記優先順位に従って前記画像表示装置に出力するプラント状態監視装置。
In the plant condition monitoring device according to claim 1,
The state monitoring means includes
Comprehensive monitoring means for determining the priority order of the monitoring results to be displayed on the image display device based on a weighting factor set in advance for each monitoring item,
A plant state monitoring device that outputs the determination result to the image display device according to the priority order.
請求項1に記載のプラント状態監視装置において、
前記状態監視手段は、
前記プラントの運転状態を改善する操作方法を、前記計測信号と前記監視モデルを構築した時に用いた前記モデルデータとから決定する改善情報決定手段と、
前記監視項目毎に予め設定された重み係数に基づいて、前記画像表示装置に表示する監視結果の優先順位を決定する総合監視手段を、さらに備え、
前記判定結果と、前記改善情報決定手段が決定した前記操作方法とを、前記優先順位に従って前記画像表示装置に出力するプラント状態監視装置。
In the plant condition monitoring device according to claim 1,
The state monitoring means includes
An improvement information determination means for determining an operation method for improving the operation state of the plant from the measurement signal and the model data used when the monitoring model is constructed,
Comprehensive monitoring means for determining a priority order of monitoring results to be displayed on the image display device based on a weighting factor set in advance for each monitoring item,
A plant state monitoring device that outputs the determination result and the operation method determined by the improvement information determination means to the image display device according to the priority order.
請求項1〜4のいずれか1項に記載のプラント状態監視装置において、
前記モデルデータ選定手段は、前記計測信号を基にして計算した前記プラントの効率の時系列データと、環境負荷物質についての前記計測信号の時系列データとのうち、少なくとも1つの時系列データを、予め定めた過去のある時刻から予め定めた所定の期間毎に分割し、分割された期間毎に前記モデルデータの期間を決定し、決定されたモデルデータの期間のそれぞれにおいて前記モデルデータを選定するプラント状態監視装置。
In the plant condition monitoring device according to any one of claims 1 to 4,
The model data selection means includes at least one time series data among the time series data of the efficiency of the plant calculated based on the measurement signal and the time series data of the measurement signal for environmental load substances, It divides every predetermined period from a predetermined past time, determines the model data period for each divided period, and selects the model data in each of the determined model data periods Plant condition monitoring device.
請求項2または4に記載のプラント状態監視装置において、
前記プラントの制御ロジック図を保存する設計情報データベースを備え、
前記改善情報決定手段は、前記状態監視手段が、現在の前記計測信号が前記監視モデルの前記カテゴリーのいずれにも属さないと判定した場合に、
属さない原因となった前記計測信号のデータ項目を求め、前記データ項目に関連する制御ロジック図を前記設計情報データベースから抽出し、
前記モデルデータの前記データ項目の最大値と、前記モデルデータの前記データ項目の最小値と、前記データ項目のトレンドデータとを比較し、
前記最大値より大きい前記トレンドデータのサンプル点数が、前記最小値より小さい前記トレンドデータのサンプル点数よりも多い場合は、前記データ項目の値を下げる操作が前記操作方法であると決定し、
前記最小値より小さい前記トレンドデータのサンプル点数が、前記最大値より大きい前記トレンドデータのサンプル点数よりも多い場合は、前記データ項目の値を上げる操作が前記操作方法であると決定し、
前記データ項目、前記制御ロジック図、及び前記操作方法をさらに前記画像表示装置に出力するプラント状態監視装置。
In the plant condition monitoring device according to claim 2 or 4,
A design information database for storing a control logic diagram of the plant;
The improvement information determination means, when the state monitoring means determines that the current measurement signal does not belong to any of the categories of the monitoring model,
Finding the data item of the measurement signal that caused the cause not to belong, extracting a control logic diagram related to the data item from the design information database,
Comparing the maximum value of the data item of the model data, the minimum value of the data item of the model data, and the trend data of the data item;
If the trend data sample points greater than the maximum value is greater than the trend data sample points less than the minimum value, it is determined that the operation to lower the value of the data item is the operation method,
When the number of sample points of the trend data smaller than the minimum value is larger than the number of sample points of the trend data larger than the maximum value, it is determined that the operation to increase the value of the data item is the operation method,
A plant state monitoring device that further outputs the data items, the control logic diagram, and the operation method to the image display device.
プラントの状態量を計測した計測信号を用いて、予め設定した監視項目について前記プラントの運転状態を監視する監視工程と、監視結果を画像表示装置に表示する表示工程とを有するプラント状態監視方法において、
前記監視工程は、
前記計測信号を基にして計算した時系列データと前記計測信号の時系列データとのうち少なくとも1つの時系列データから、前記プラントを監視する際に参照するモデルデータを選定するモデルデータ選定工程と、
前記モデルデータを複数のカテゴリーに分類することによって監視モデルを構築する状態監視工程を有し、
前記モデルデータ選定工程では、前記計測信号を基にして計算した前記プラントの効率の時系列データと、環境負荷物質についての前記計測信号の時系列データとのうち、少なくとも1つの時系列データについて、最大値をとる時刻の前後の予め定めた一定期間または最小値をとる時刻の前後の予め定めた一定期間をモデルデータの期間として決定し、このモデルデータの期間における前記少なくとも1つの時系列データを前記モデルデータとして選定し、
前記状態監視工程では、現在の前記計測信号が前記監視モデルの前記カテゴリーのいずれかに属するか否かを判定し、
前記表示工程では、前記状態監視工程での判定結果を、監視結果として前記画像表示装置に出力する、
ことを特徴とするプラント状態監視方法。
In a plant state monitoring method having a monitoring step of monitoring an operation state of the plant with respect to a preset monitoring item using a measurement signal obtained by measuring a state quantity of the plant, and a display step of displaying a monitoring result on an image display device ,
The monitoring step includes
A model data selection step of selecting model data to be referred to when monitoring the plant from at least one of the time series data calculated based on the measurement signal and the time series data of the measurement signal; ,
A state monitoring step of constructing a monitoring model by classifying the model data into a plurality of categories;
In the model data selection step, at least one time-series data among the time-series data of the plant efficiency calculated based on the measurement signal and the time-series data of the measurement signal for environmental load substances, A predetermined fixed period before and after the time at which the maximum value is taken or a predetermined fixed period before and after the time at which the minimum value is taken is determined as the period of the model data, and the at least one time series data in the period of the model data is Select as the model data,
In the state monitoring step, it is determined whether the current measurement signal belongs to one of the categories of the monitoring model,
In the display step, the determination result in the state monitoring step is output to the image display device as a monitoring result.
A plant state monitoring method characterized by the above.
請求項7に記載のプラント状態監視方法において、
前記状態監視工程は、前記プラントの運転状態を改善する操作方法を、前記計測信号と前記監視モデルを構築した時に用いた前記モデルデータとから決定する改善情報決定工程をさらに有し、
前記表示工程では、前記判定結果と、前記改善情報決定工程で決定した前記操作方法とを、前記画像表示装置に出力するプラント状態監視方法。
In the plant condition monitoring method according to claim 7,
The state monitoring step further includes an improvement information determination step for determining an operation method for improving the operation state of the plant from the measurement signal and the model data used when the monitoring model is constructed,
In the display step, a plant state monitoring method for outputting the determination result and the operation method determined in the improvement information determination step to the image display device.
請求項7に記載のプラント状態監視方法において、
前記状態監視工程は、前記監視項目毎に予め設定された重み係数に基づいて、前記画像表示装置に表示する監視結果の優先順位を決定する総合監視工程をさらに有し、
前記表示工程では、前記判定結果を、前記優先順位に従って前記画像表示装置に出力するプラント状態監視方法。
In the plant condition monitoring method according to claim 7,
The state monitoring step further includes a comprehensive monitoring step of determining a priority order of monitoring results to be displayed on the image display device based on a weighting factor set in advance for each monitoring item.
In the display step, a plant state monitoring method for outputting the determination result to the image display device according to the priority order.
請求項7に記載のプラント状態監視方法において、
前記状態監視工程は、
前記プラントの運転状態を改善する操作方法を、前記計測信号と前記監視モデルを構築した時に用いた前記モデルデータとから決定する改善情報決定工程と、
前記監視項目毎に予め設定された重み係数に基づいて、前記画像表示装置に表示する監視結果の優先順位を決定する総合監視工程を、さらに有し、
前記表示工程では、前記判定結果と、前記改善情報決定工程で決定した前記操作方法とを、前記優先順位に従って前記画像表示装置に出力するプラント状態監視方法。
In the plant condition monitoring method according to claim 7,
The state monitoring step includes
An improvement information determination step for determining an operation method for improving the operation state of the plant from the measurement data and the model data used when the monitoring model is constructed,
Based on a weighting factor set in advance for each monitoring item, further comprising a comprehensive monitoring step of determining a priority order of monitoring results to be displayed on the image display device;
In the display step, a plant state monitoring method for outputting the determination result and the operation method determined in the improvement information determination step to the image display device according to the priority order.
請求項7〜10のいずれか1項に記載のプラント状態監視方法において、
前記モデルデータ選定工程では、
前記計測信号を基にして計算した前記プラントの効率の時系列データと、環境負荷物質についての前記計測信号の時系列データとのうち、少なくとも1つの時系列データを、予め定めた過去のある時刻から予め定めた所定の期間毎に分割し、
分割された期間毎に前記モデルデータの期間を決定し、
決定されたモデルデータの期間のそれぞれにおいて前記モデルデータを選定するプラント状態監視方法。
In the plant state monitoring method according to any one of claims 7 to 10,
In the model data selection process,
A predetermined past time at least one time-series data among the time-series data of the plant efficiency calculated based on the measurement signal and the time-series data of the measurement signal for environmentally hazardous substances. Is divided every predetermined period from
Determine the period of the model data for each divided period,
A plant state monitoring method for selecting the model data in each determined period of model data.
請求項8または10に記載のプラント状態監視方法において、
前記改善情報決定工程では、前記状態監視工程で現在の前記計測信号が前記監視モデルの前記カテゴリーのいずれにも属さないと判定された場合に、
属さない原因となった前記計測信号のデータ項目を求め、前記プラントの制御ロジック図が保存されている設計情報データベースから、前記データ項目に関連する制御ロジック図を抽出し、
前記モデルデータの前記データ項目の最大値と、前記モデルデータの前記データ項目の最小値と、前記データ項目のトレンドデータとを比較し、
前記最大値より大きい前記トレンドデータのサンプル点数が、前記最小値より小さい前記トレンドデータのサンプル点数よりも多い場合は、前記データ項目の値を下げる操作が前記操作方法であると決定し、
前記最小値より小さい前記トレンドデータのサンプル点数が、前記最大値より大きい前記トレンドデータのサンプル点数よりも多い場合は、前記データ項目の値を上げる操作が前記操作方法であると決定し、
前記表示工程では、前記データ項目、前記制御ロジック図、及び前記操作方法をさらに前記画像表示装置に出力するプラント状態監視方法。
In the plant condition monitoring method according to claim 8 or 10,
In the improvement information determination step, when it is determined in the state monitoring step that the current measurement signal does not belong to any of the categories of the monitoring model,
Obtain the data item of the measurement signal that caused the cause not to belong, and extract the control logic diagram related to the data item from the design information database in which the control logic diagram of the plant is stored,
Comparing the maximum value of the data item of the model data, the minimum value of the data item of the model data, and the trend data of the data item;
If the trend data sample points greater than the maximum value is greater than the trend data sample points less than the minimum value, it is determined that the operation to lower the value of the data item is the operation method,
When the number of sample points of the trend data smaller than the minimum value is larger than the number of sample points of the trend data larger than the maximum value, it is determined that the operation to increase the value of the data item is the operation method,
In the display step, a plant state monitoring method for further outputting the data item, the control logic diagram, and the operation method to the image display device.
JP2012000350A 2012-01-05 2012-01-05 Plant state monitoring device and plant state monitoring method Active JP5647626B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012000350A JP5647626B2 (en) 2012-01-05 2012-01-05 Plant state monitoring device and plant state monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012000350A JP5647626B2 (en) 2012-01-05 2012-01-05 Plant state monitoring device and plant state monitoring method

Publications (2)

Publication Number Publication Date
JP2013140495A JP2013140495A (en) 2013-07-18
JP5647626B2 true JP5647626B2 (en) 2015-01-07

Family

ID=49037873

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012000350A Active JP5647626B2 (en) 2012-01-05 2012-01-05 Plant state monitoring device and plant state monitoring method

Country Status (1)

Country Link
JP (1) JP5647626B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6945297B2 (en) * 2016-12-05 2021-10-06 株式会社日立製作所 Device diagnostic device, device diagnostic system and device diagnostic method
JP7180985B2 (en) * 2018-03-01 2022-11-30 株式会社日立製作所 Diagnostic device and diagnostic method
JP7347953B2 (en) * 2019-04-08 2023-09-20 日立Geニュークリア・エナジー株式会社 Equipment early warning monitoring device and equipment early warning monitoring method
CN116500426B (en) * 2023-06-28 2023-09-05 东莞市兆恒机械有限公司 Method for calibrating high-temperature test of semiconductor detection equipment

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4327013B2 (en) * 2004-04-28 2009-09-09 株式会社東芝 Plant-wide optimum process controller
WO2011061793A1 (en) * 2009-11-18 2011-05-26 株式会社日立製作所 System and method for extracting process signals
WO2011148431A1 (en) * 2010-05-28 2011-12-01 株式会社日立製作所 Plant diagnostic device and diagnostic method using same

Also Published As

Publication number Publication date
JP2013140495A (en) 2013-07-18

Similar Documents

Publication Publication Date Title
JP5484591B2 (en) PLANT DIAGNOSIS DEVICE AND PLANT DIAGNOSIS METHOD
JP5292477B2 (en) Diagnostic device and diagnostic method
JP5337853B2 (en) Power plant diagnostic device and power plant diagnostic method
JP5260343B2 (en) Plant operating condition monitoring method
CN107408225B (en) Adaptive handling of operational data
JP5544418B2 (en) Plant diagnostic device, diagnostic method, and diagnostic program
CN102982488A (en) Automated system and method for implementing statistical comparison of power plant operations
CN107710089B (en) Plant equipment diagnosis device and plant equipment diagnosis method
JP2009243428A (en) Monitoring device, method and program of wind mill
JP5647626B2 (en) Plant state monitoring device and plant state monitoring method
JP5150590B2 (en) Abnormality diagnosis apparatus and abnormality diagnosis method
JP7180985B2 (en) Diagnostic device and diagnostic method
WO2022038804A1 (en) Diagnostic device and parameter adjustment method
JP4430384B2 (en) Equipment diagnostic apparatus and diagnostic method
JP5490277B2 (en) Plant operating condition monitoring method
JP6830414B2 (en) Diagnostic device and diagnostic method
KR102054500B1 (en) Method for providing design drawing
JP2018163645A (en) Fault diagnosis device, monitoring device, fault diagnosis method, and fault diagnosis program
JP2021174352A (en) Plant control support device, program and plant control support method
JP2017117034A (en) Diagnosis device and diagnostic method
JP6880864B2 (en) Energy management system and energy management method
CN115707913A (en) Abnormality detection system, abnormality detection method for abnormality detection system, and recording medium for abnormality detection system
US11886831B2 (en) Data sorting device and method, and monitoring and diagnosis device
JP2011138374A (en) Diagnostic device and diagnostic method
JP5490278B2 (en) Plant operating condition monitoring method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130823

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140527

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140528

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140724

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141021

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141107

R150 Certificate of patent or registration of utility model

Ref document number: 5647626

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150