JP5504622B2 - Lead-acid battery manufacturing method, and lead-acid battery electrode plate strap casting method and casting apparatus used in the manufacturing method - Google Patents

Lead-acid battery manufacturing method, and lead-acid battery electrode plate strap casting method and casting apparatus used in the manufacturing method Download PDF

Info

Publication number
JP5504622B2
JP5504622B2 JP2008315640A JP2008315640A JP5504622B2 JP 5504622 B2 JP5504622 B2 JP 5504622B2 JP 2008315640 A JP2008315640 A JP 2008315640A JP 2008315640 A JP2008315640 A JP 2008315640A JP 5504622 B2 JP5504622 B2 JP 5504622B2
Authority
JP
Japan
Prior art keywords
molten metal
level
metal level
gear pump
strap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008315640A
Other languages
Japanese (ja)
Other versions
JP2010140744A (en
Inventor
隆二 西村
裕貴 辻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Resonac Corp
Original Assignee
Shin Kobe Electric Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shin Kobe Electric Machinery Co Ltd filed Critical Shin Kobe Electric Machinery Co Ltd
Priority to JP2008315640A priority Critical patent/JP5504622B2/en
Publication of JP2010140744A publication Critical patent/JP2010140744A/en
Application granted granted Critical
Publication of JP5504622B2 publication Critical patent/JP5504622B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Secondary Cells (AREA)
  • Connection Of Batteries Or Terminals (AREA)

Description

本発明は、鉛蓄電池の製造方法並びにこの製造方法で用いる鉛蓄電池用極板ストラップ鋳造方法及び鋳造装置に関するものである。   The present invention relates to a method for producing a lead-acid battery, a method for casting an electrode plate strap for a lead-acid battery used in the production method, and a casting apparatus.

周知のように、鉛蓄電池は、正極板と負極板とをセパレータを介して積層して鉛蓄電池用の極板群を構成する極板群構成工程と、極板群の同極性の極板の耳部同士を接続するストラップを鋳造するストラップ鋳造工程と、ストラップが鋳造された極板群を電槽内に収容してセル間を接続し、該電槽内に電解液を注入する組立工程とを行うことにより製造される。   As is well known, the lead-acid battery is composed of a positive electrode plate and a negative electrode plate stacked via a separator to constitute a plate group for a lead-acid battery, and a plate plate of the same polarity as the electrode plate group. A strap casting process for casting a strap for connecting the ears; an assembly process for housing the electrode plate group in which the strap is cast in the battery case, connecting the cells, and injecting an electrolyte into the battery case; It is manufactured by performing.

ストラップ鋳造工程で用いるストラップ鋳造装置は、図13に示したように構成されている。図13において、1は鉛合金の溶湯Mを生成する鉛溶解槽である。鉛溶解槽1は、ヒータ2を備えていて、該ヒータにより鉛合金を加熱して溶融することにより鉛合金の溶湯Mを生成する。3は鋳型、4′は鉛溶解槽1内の溶湯Mを溶湯供給路5を通して鋳型3に供給するポンプ、6はポンプ4′を駆動する駆動源、7は鋳型3内の溶湯レベルを調整する溶湯レベル調整部である。   The strap casting apparatus used in the strap casting process is configured as shown in FIG. In FIG. 13, reference numeral 1 denotes a lead melting tank for producing a molten M of lead alloy. The lead melting tank 1 includes a heater 2, and a lead alloy melt M is generated by heating and melting the lead alloy with the heater. 3 is a mold, 4 ′ is a pump for supplying the molten metal M in the lead melting tank 1 to the mold 3 through the molten metal supply path 5, 6 is a driving source for driving the pump 4 ′, and 7 is a level of the molten metal in the mold 3. It is a molten metal level adjustment part.

図15及び図16に示されているように、鋳型3は、ストラップを鋳造するためのキャビティ301と、キャビティ301に隣接配置されてキャビティ301との間が堰302により仕切られた湯溜り溝303と、キャビティ301及び湯溜り溝303の上方に形成された余剰溶湯収容空間304とを有する型凹部305と、湯溜り溝303より下方に設けられて湯溜り溝303内に連通路306を通して接続された湯道307とを備えている。   As shown in FIGS. 15 and 16, the mold 3 includes a cavity 301 for casting a strap and a puddle groove 303 disposed adjacent to the cavity 301 and partitioned from the cavity 301 by a weir 302. And a mold recess 305 having an excess molten metal storage space 304 formed above the cavity 301 and the hot water storage groove 303, and provided below the hot water storage groove 303 and connected to the hot water storage groove 303 through the communication passage 306. And a hot water passage 307.

鋳型3は、堰302の厚み方向の中央部でキャビティ側ユニット3Aと、湯溜り側ユニット3Bとに分割されていて、これらのユニットが断熱層309を介して接合されることにより、鋳型3が組立てられている。キャビティ側ユニット3Aは図示しない冷却手段により冷却され、湯溜り側ユニット3Bは図示しない加熱手段により加熱される。   The mold 3 is divided into a cavity side unit 3A and a hot water pool side unit 3B at the central portion in the thickness direction of the weir 302, and these units are joined via a heat insulating layer 309. It is assembled. The cavity side unit 3A is cooled by a cooling means (not shown), and the hot water pool side unit 3B is heated by a heating means (not shown).

図示のポンプ4′は、遠心式の渦巻きポンプからなっていて、その吐出口は、溶湯供給路5を通して湯道307の軸線方向(長手方向)の一端に接続されている。湯道307の軸線方向の他端は閉鎖されていて、ポンプ4′から湯道307内に溶湯Mが送給されたときに該溶湯が連通路306を通して湯溜り溝303内に流入して、湯溜り溝303内の溶湯Mの液面Maのレベル(溶湯レベル)を上昇させる。ポンプ4′と鋳型の湯溜り溝303との間を接続する溶湯供給路5は、ポンプ4′と溶湯レベル調整部7との間を接続するパイプライン501と溶湯レベル調整部7との間を接続するパイプライン502とからなっている。   The illustrated pump 4 ′ is a centrifugal centrifugal pump, and its discharge port is connected to one end in the axial direction (longitudinal direction) of the runner 307 through the molten metal supply path 5. The other end of the runner 307 in the axial direction is closed, and when the molten metal M is fed into the runner 307 from the pump 4 ′, the melt flows into the hot pool groove 303 through the communication passage 306. The level (melt level) of the liquid surface Ma of the molten metal M in the hot water pool groove 303 is increased. The molten metal supply path 5 that connects between the pump 4 ′ and the mold hot water storage groove 303 is between the pipeline 501 that connects the pump 4 ′ and the molten metal level adjusting unit 7 and the molten metal level adjusting unit 7. It consists of a pipeline 502 to be connected.

溶湯レベル調整部7は、上端に開口部を有し下端が溶湯供給路5に接続された溶湯開放通路701と、溶湯開放通路701の開口部を開閉する弁棒702及び弁棒702を駆動するバルブ駆動機構704からなる溶湯レベル調整用バルブ703とを備えている。溶湯レベル調整部7は、溶湯開放通路701の上端開口部から流出した溶湯を鉛溶解槽1内にオーバフローさせる流出口を備えていて、該流出口のレベルを、鋳型内の湯溜り溝303内における溶湯の規定レベルL1に一致させた状態で配置されている。   The molten metal level adjusting unit 7 drives a molten metal release passage 701 having an opening at the upper end and a lower end connected to the molten metal supply passage 5, and a valve rod 702 and a valve rod 702 for opening and closing the opening of the molten metal release passage 701. And a molten metal level adjusting valve 703 including a valve driving mechanism 704. The molten metal level adjusting unit 7 includes an outlet for allowing the molten metal flowing out from the upper end opening of the molten metal release passage 701 to overflow into the lead melting tank 1, and the level of the outlet is set in the hot water pool groove 303 in the mold. Are arranged in a state of being matched with the specified level L1 of the molten metal.

溶湯レベル調整部7のバルブ703が開いている状態では、湯溜り溝303内の溶湯レベルが規定レベルL1を越えたときに溶湯開放通路701の上端から流出した溶湯が流出口から鉛溶解槽1内にオーバフローして湯溜り溝303内の溶湯レベルを規定レベルL1に保つ。また、バルブ703が閉じている状態では、溶湯のオーバフローが阻止されるため、湯溜り溝303内の溶湯レベルが規定レベルL1を越えて上昇するのが許容される。この種の鋳造装置は、例えば特許文献1に記載されている。   In a state in which the valve 703 of the molten metal level adjusting unit 7 is open, the molten metal that has flowed out from the upper end of the molten metal release passage 701 when the molten metal level in the molten metal groove 303 exceeds the specified level L1 passes through the outlet from the lead melting tank 1. And the molten metal level in the hot water storage groove 303 is kept at the specified level L1. Further, when the valve 703 is closed, the molten metal overflow is prevented, so that the molten metal level in the hot water accumulation groove 303 is allowed to rise beyond the specified level L1. This type of casting apparatus is described in Patent Document 1, for example.

上記の鋳造装置においては、溶湯レベル調整部7のバルブ703を開いた状態でポンプ4′を運転して、湯溜り溝303内の溶湯レベルを規定レベルL1に保持しておく。この過程を待機過程とする。極板群の同極性の耳部同士を接続するストラップを鋳造する際には、先ずバルブ703を一定時間の間閉じて湯溜り溝303内の溶湯レベルを上昇させることにより湯溜り溝303内の溶湯Mを堰302を越えてキャビティ301内に流入させ、キャビティ301内が溶湯で満たされる状態にする。このときキャビティ内が確実に溶湯で満たされるようにするため、溶湯レベルが最終的には堰302の上端のレベルを越えて型凹部305の上端開口部付近に設定された過剰レベルに達するように、バルブ703を閉じておく時間を設定する。   In the above casting apparatus, the pump 4 ′ is operated with the valve 703 of the molten metal level adjusting unit 7 opened, and the molten metal level in the molten metal groove 303 is maintained at the specified level L 1. This process is referred to as a standby process. When casting a strap for connecting the same polarity ears of the electrode plate group, first, the valve 703 is closed for a certain period of time to raise the molten metal level in the puddle groove 303 to thereby increase the level in the puddle groove 303. The molten metal M is allowed to flow through the weir 302 and into the cavity 301 so that the cavity 301 is filled with the molten metal. At this time, in order to ensure that the cavity is filled with the molten metal, the molten metal level eventually exceeds the level of the upper end of the weir 302 and reaches an excessive level set near the upper end opening of the mold recess 305. The time for which the valve 703 is closed is set.

上記のようにして型凹部内の溶湯レベルを過剰レベルまで上昇させた後、バルブ703を開いて溶湯レベルを規定レベルL1に向けて下降させていき、溶湯レベルが、溶湯中に極板群の耳部を挿入しても型凹部305から溶湯があふれ出ることがないレベル以下になるタイミングで、図15に示すように、極板群10の複数の同極性の極板の集電体に設けられた耳部11を、キャビティ301の上方から下降させて、キャビティ301内に挿入する。このとき型凹部305内の溶湯レベルは、型凹部305の上端開口部付近まで上昇する。この状態でキャビティ内の溶湯を凝固させるために必要な時間が経過するのを待つ。溶湯レベル調整部7からの溶湯のオーバフローを継続させ、キャビティ内の溶湯が凝固する前に湯溜り溝303内の溶湯レベルを規定レベルL1まで降下させて待機状態に移行する。極板群の耳部をキャビティ内に挿入した後、キャビティ内の溶湯を凝固させるために必要な時間が経過したときに図16に示すようにノックアウトピン308を押し上げてキャビティ内で成形されたストラップ12をキャビティから取り出す。   After the molten metal level in the mold recess is raised to an excessive level as described above, the valve 703 is opened and the molten metal level is lowered toward the specified level L1, and the molten metal level of the electrode group in the molten metal is reduced. As shown in FIG. 15, at the timing when the molten metal does not overflow from the mold recess 305 even when the ear portion is inserted, it is provided on a current collector of a plurality of electrode plates of the same polarity in the electrode plate group 10. The obtained ear portion 11 is lowered from above the cavity 301 and inserted into the cavity 301. At this time, the molten metal level in the mold recess 305 rises to the vicinity of the upper end opening of the mold recess 305. In this state, it waits for the time necessary for solidifying the molten metal in the cavity to elapse. The overflow of the molten metal from the molten metal level adjusting unit 7 is continued, and before the molten metal in the cavity is solidified, the molten metal level in the hot water accumulation groove 303 is lowered to the specified level L1 to shift to the standby state. A strap formed in the cavity by pushing up the knockout pin 308 as shown in FIG. 16 when a time necessary for solidifying the molten metal in the cavity has elapsed after inserting the ears of the electrode plate group into the cavity. 12 is removed from the cavity.

上記の鋳造装置では、ポンプ4′として渦巻き式の遠心ポンプが用いられているが、特許文献2に示されているように、ポンプ4′として往復動式のプランジャポンプを用いた鋳造装置も知られている。この鋳造装置では、プランジャポンプのピストンを前進させて型凹部内の溶湯レベルを堰の上端より高い過剰レベルまで上昇させた後、プランジャポンプのピストンを後退させて、型凹部内の溶湯レベルを強制的に堰の上端のレベルまで下降させるようにしている。
PCT国際公開WO91/05625号公報 特開平9−174226号公報
In the above casting apparatus, a centrifugal centrifugal pump is used as the pump 4 '. However, as disclosed in Patent Document 2, a casting apparatus using a reciprocating plunger pump as the pump 4' is also known. It has been. In this casting machine, the plunger pump piston is advanced to raise the molten metal level in the mold recess to an excessive level higher than the upper end of the weir, and then the plunger pump piston is moved backward to force the molten metal level in the mold recess. Therefore, it is lowered to the level of the upper end of the weir.
PCT International Publication No. WO91 / 05625 Japanese Patent Laid-Open No. 9-174226

渦巻き式の遠心ポンプは、図17に示すように、揚程hが大きくなるにつれて吐出量Vが低減していくという特性がある。そのため、図13ないし図16に示したように構成された鋳造装置のように、溶湯を鋳型に供給するポンプ4′として渦巻き式の遠心ポンプを用いた場合には、図13に示すように鉛溶解槽内の溶湯レベルが高く、ポンプの揚程hが低い場合と、図14に示すように鉛溶解槽内の溶湯レベルが低く、ポンプの揚程hが高い場合とでポンプの吐出量が異なり、鉛溶解槽内の溶湯レベルの変動により、鋳型内への溶湯の供給量に過不足が生じて、鋳造されるストラップの形状が不均一になったり、溶接不良が生じたりするという問題があった。   As shown in FIG. 17, the spiral centrifugal pump has a characteristic that the discharge amount V decreases as the lift h increases. Therefore, when a spiral centrifugal pump is used as the pump 4 'for supplying the molten metal to the mold as in the casting apparatus configured as shown in FIGS. 13 to 16, lead as shown in FIG. The discharge amount of the pump differs depending on whether the molten metal level in the melting tank is high and the pump head h is low, and the molten metal level in the lead melting tank is low and the pump head h is high as shown in FIG. Due to fluctuations in the molten metal level in the lead melting tank, there was an excess or deficiency in the amount of molten metal supplied into the mold, resulting in uneven casting shapes and poor welding. .

また従来の鋳造装置では、型凹部内の溶湯レベルを過剰レベルまで上昇させた後、バルブ702を開いて溶湯レベル調整部の流出口から溶湯をオーバフローさせることにより、溶湯レベルを低下させ、その過程で極板群の耳部をキャビティ内に挿入しているが、オーバフローによる溶湯レベルの低下は遅いため、ストラップが凝固するまでの間に溶湯レベルを堰302の上端よりも下方のレベルまで低下させることができないことがあり、ストラップの厚みが過剰になることがあった。このようにストラップの厚みが過剰になることがある場合には、ストラップと極板の集電体の外骨部との間に必要な距離d(図16参照)を確保するために、耳部の高さを高く設定しておく必要があるため、極板の高さが高くなって、電池の大型化を招くという問題が生じる。   Further, in the conventional casting apparatus, after the melt level in the mold recess is raised to an excessive level, the melt level is lowered by opening the valve 702 and overflowing the melt from the outlet of the melt level adjusting unit. However, since the drop of the molten metal due to overflow is slow, the molten metal level is lowered to a level below the upper end of the weir 302 until the strap solidifies. In some cases, the thickness of the strap becomes excessive. When the thickness of the strap may become excessive in this way, in order to secure the necessary distance d (see FIG. 16) between the strap and the outer bone of the current collector of the electrode plate, Since it is necessary to set the height high, there arises a problem that the height of the electrode plate increases and the size of the battery increases.

特許文献2に示されたように、鉛溶解槽から鋳型に溶湯を供給するポンプとしてプランジャポンプを用いて、プランジャポンプのピストンを前進させて型凹部内の溶湯レベルを堰の上端より高い過剰レベルまで上昇させた後、プランジャポンプのピストンを後退させて、型凹部内の溶湯レベルを強制的に堰の上端のレベルまで下降させるようにすれば、原理的には、渦巻き式の遠心ポンプを用いた場合に生じる上記の問題を解消することができる。   As shown in Patent Document 2, a plunger pump is used as a pump for supplying molten metal from a lead melting tank to a mold, and the piston of the plunger pump is advanced so that the molten metal level in the mold recess is higher than the upper end of the weir. After that, the piston of the plunger pump is retracted to forcibly lower the molten metal level in the mold recess to the level of the upper end of the weir. In principle, a spiral centrifugal pump is used. It is possible to eliminate the above-mentioned problems that occur when there is a problem.

しかしながら、プランジャポンプは、ピストンの単位変位量当たりの吐出量及び吸込み量が多いため、吐出量及び吸込み量の微妙なコントロールができないという問題を有している。また特許文献2にも示されているように、プランジャポンプはエアシリンダ等の往復駆動装置により駆動する必要があるが、往復駆動装置は、シリンダに作動流体を供給するタイミングのずれによりピストンの変位量に大きな誤差を生じるため、ポンプの吐出量及び吸込み量を微妙に制御することは困難である。   However, since the plunger pump has a large discharge amount and suction amount per unit displacement of the piston, it has a problem that the discharge amount and suction amount cannot be delicately controlled. Further, as shown in Patent Document 2, the plunger pump needs to be driven by a reciprocating drive device such as an air cylinder. However, the reciprocating drive device displaces the piston due to a deviation in timing of supplying the working fluid to the cylinder. Since a large error occurs in the amount, it is difficult to finely control the discharge amount and suction amount of the pump.

このように、プランジャポンプを用いた場合には、鋳型の型凹部内の溶湯レベルを過剰レベルから堰の上端レベルまで下降させる際に溶湯レベルを細かく制御することが困難であるため、溶湯レベルが堰のレベルよりも高いレベルまでしか低下しなかったり、湯溜り溝内の溶湯レベルが規定レベルよりも低いレベルまで低下してしまったりするという問題が生じる。溶湯レベルの低下量が不足すると、鋳造されるストラップの厚みが過剰になり、耳部の高さを高くすることが必要になって極板の大形化を招く。また溶湯レベルが規定レベルよりも低いレベルまで低下すると、次にプランジャポンプにより定量の溶湯を鋳型内に送り込んだ際に溶湯の量が不足し、ストラップの厚みが不足したり、溶接不良が生じたりするおそれがある。   Thus, when the plunger pump is used, it is difficult to finely control the molten metal level when lowering the molten metal level in the mold recess of the mold from the excessive level to the upper end level of the weir. There arises a problem that the level is lowered only to a level higher than the level of the weir, or the molten metal level in the hot water ditch is lowered to a level lower than the specified level. If the amount of decrease in the molten metal level is insufficient, the thickness of the strap to be cast becomes excessive, and it becomes necessary to increase the height of the ear portion, leading to an increase in the size of the electrode plate. If the molten metal level is lowered to a level lower than the specified level, the amount of molten metal is insufficient when the fixed amount of molten metal is fed into the mold by the plunger pump, resulting in insufficient thickness of the strap or poor welding. There is a risk.

またプランジャポンプを用いる場合には、待機過程において、鉛溶解槽−ポンプ−溶湯レベル調整部−鉛溶解槽の経路で常時溶湯の循環流を生じさせておくことができないため、待機過程において溶湯供給路5内及び鉛溶解槽1内で溶湯の流動を生じさせておくことができない。溶湯供給路5を構成するパイプラインの内、ポンプ4′と溶湯レベル調整部7との間を接続するパイプライン501は、鉛溶解槽1内の溶湯及び溶湯レベル調整部7からオーバフローする溶湯が触れる部分であるため、該パイプライン501にはヒータを巻き付けることができない。そのため、パイプライン501は、鉛溶解槽1内の溶湯と、溶湯レベル調整部7からオーバフローする溶湯とにより加熱されるだけであり、特にパイプライン501の鉛溶解槽内の溶湯から上部に露出している部分は、その加熱が不十分になりがちである。従って、溶湯供給路5内で溶湯の流動が停止すると、上記パイプライン501の内部で溶湯が凝固してストラップの鋳造を行うことができなくなり、鉛蓄電池の製造ラインが停止するおそれがある。   Also, when using a plunger pump, it is not possible to keep the molten metal circulating in the lead melting tank-pump-melt level adjusting unit-lead melting tank in the standby process. It is impossible to cause the molten metal to flow in the passage 5 and the lead melting tank 1. Among the pipelines constituting the molten metal supply path 5, the pipeline 501 connecting the pump 4 ′ and the molten metal level adjusting unit 7 has the molten metal in the lead melting tank 1 and the molten metal overflowing from the molten metal level adjusting unit 7. Since it is a part to be touched, a heater cannot be wound around the pipeline 501. Therefore, the pipeline 501 is only heated by the molten metal in the lead melting tank 1 and the molten metal overflowing from the molten metal level adjusting unit 7, and is particularly exposed to the upper part from the molten metal in the lead melting tank of the pipeline 501. The heated part tends to be insufficiently heated. Therefore, when the flow of the molten metal stops in the molten metal supply path 5, the molten metal solidifies in the pipeline 501 and the strap cannot be cast, and the lead storage battery manufacturing line may be stopped.

また待機過程において鉛溶解槽1内の溶湯の流動が停止すると、溶湯の表面が酸化するため、鉛合金の組成が変化し、鋳造されるストラップの品質を低下させる。ストラップを形成する鉛合金としては、通常鉛アンチモン鉛合金が用いられるが、溶湯の表面で鉛アンチモン合金が酸化するとその酸化物中に大量のアンチモンが取り込まれるため、鉛溶解槽内の溶湯の表面で酸化が進むと、溶湯の表面付近とその内部とで合金の組成が異なる状態が生じ、鋳造されるストラップの品質が悪くなる。   Further, when the flow of the molten metal in the lead melting tank 1 is stopped in the standby process, the surface of the molten metal is oxidized, so that the composition of the lead alloy changes and the quality of the strap to be cast is lowered. Lead antimony lead alloy is usually used as the lead alloy forming the strap, but when the lead antimony alloy is oxidized on the surface of the molten metal, a large amount of antimony is taken into the oxide, so the surface of the molten metal in the lead melting tank When the oxidation proceeds, the alloy composition is different between the vicinity of the molten metal surface and the inside thereof, and the quality of the cast strap deteriorates.

上記2つの理由から、特許文献2に示されたように、鉛溶解槽1から鋳型3に溶湯を供給するポンプとしてプランジャポンプを用いることは好ましくない。     For the above two reasons, as shown in Patent Document 2, it is not preferable to use a plunger pump as a pump for supplying molten metal from the lead melting tank 1 to the mold 3.

本発明の目的は、鋳型内での溶湯レベルの制御を正確に行って、鋳型内に供給される溶湯の量に過不足が生じるのを防ぎ、鋳造されるストラップの厚みが過剰になったり、不足したりするのを防いで、極板群の耳部同士の接続部の品質を向上させることができるようにした鉛蓄電池用極板ストラップ鋳造方法及びこの鋳造方法を実施するために用いる鋳造装置を提供することにある。   The purpose of the present invention is to accurately control the molten metal level in the mold to prevent the amount of molten metal supplied into the mold from becoming excessive and insufficient, and the thickness of the strap to be cast becomes excessive, A lead plate battery casting method for a lead-acid battery strap and a casting apparatus used for carrying out this casting method, which can prevent the shortage and improve the quality of the connection part between the ears of the electrode plate group. Is to provide.

本発明の他の目的は、鋳型内に供給される溶湯の量に過不足が生じるのを防いで鋳造されるストラップの厚みが過剰になったり、不足したりするのを防ぐだけでなく、待機過程においても鉛溶解槽内及び溶湯供給路内で常時溶湯の流動を生じさせて、鋳造工程を停止させることを余儀なくされたり、鋳造されるストラップの品質が低下したりするのを防ぐことができるようにした鉛蓄電池用極板ストラップ鋳造方法及びこの鋳造方法を実施するために用いる鋳造装置を提供することにある。   Another object of the present invention is not only to prevent an excess or deficiency in the amount of molten metal supplied into the mold, but also to prevent the cast strap from becoming excessive or insufficient in thickness, as well as waiting. Even in the process, it is possible to prevent the casting process from being forced to stop by constantly causing the molten metal to flow in the lead melting tank and the molten metal supply path, and to reduce the quality of the cast strap. An object of the present invention is to provide an electrode plate strap casting method for a lead storage battery and a casting apparatus used for carrying out this casting method.

本発明の更に他の目的は、極板群の同極性の耳部同士を接続するストラップを鋳造する際にストラップの厚みが過剰になったり、不足したりするおそれをなくすとともに、溶湯供給路内で鉛が凝固してストラップ鋳造工程を停止させることを余儀なくされたり、鉛溶解槽内で溶湯の組成が変化してストラップの品質が低下したりするおそれをなくして、極板群の耳部同士の接続部の品質が高く、信頼性が高い鉛蓄電池を能率よく製造することができるようにした鉛蓄電池の製造方法を提供することにある。   Still another object of the present invention is to eliminate the possibility that the thickness of the strap becomes excessive or insufficient when casting a strap that connects the same-polarity ears of the electrode plate group. In order to eliminate the risk of lead solidifying and the strap casting process being forced to stop, or the composition of the molten metal changing in the lead melting tank and lowering the quality of the strap, It is in providing the manufacturing method of the lead storage battery which enabled it to manufacture efficiently the lead storage battery with high quality of this connection part, and high reliability.

本発明においては、上記の目的を達成するため、鉛蓄電池の極板群の同極性の極板の耳部同士を接続するストラップを鋳造する鉛蓄電池用極板ストラップ鋳造装置に下記の要素を設ける。
(a)鉛合金の溶湯を生成する鉛溶解槽。
(b)ストラップを鋳造するためのキャビティと該キャビティに隣接配置されて該キャビティとの間が堰により仕切られた湯溜り溝と前記キャビティ及び湯溜り溝の上方に形成された余剰溶湯収容空間とを有する型凹部と、前記湯溜り溝より下方に設けられて前記湯溜り溝内に接続された湯道とを備えた鋳型。
(c)鉛溶解槽内に開口させられた第1のポートと鋳型の湯道に溶湯供給路を通して接続された第2のポートとを有して、正方向に回転したときに鉛溶解槽内の溶湯を第2のポートから溶湯供給路内に吐出させ、逆方向に回転したときに溶湯供給路内の溶湯を吸引して第1のポートから鉛溶解槽内に吐出させるギアポンプ。
(d)上端に開口部を有し下端が溶湯供給路に接続された溶湯開放通路と溶湯開放通路の上端の開口部を開閉するバルブと溶湯開放通路の開口部から流出した溶湯を鉛溶解槽内にオーバフローさせる溶湯流出口とを備えて、バルブが開いている状態では湯溜り溝内の溶湯レベルが規定レベルを越えたときに溶湯開放通路内の溶湯を溶湯流出口からオーバフローさせて湯溜り溝内の溶湯レベルを規定レベルに保ち、バルブが閉じているときには湯溜り溝内の溶湯レベルが規定レベルを越えて上昇するのを許容する溶湯レベル調整部。
In the present invention, in order to achieve the above-mentioned object, the following elements are provided in a lead-acid battery plate strap casting apparatus for casting a strap for connecting the ears of the same-polarity plate of the lead-acid battery group. .
(A) A lead melting tank for producing a molten lead alloy.
(B) a cavity for casting the strap, a hot water storage groove disposed adjacent to the cavity and partitioned by a weir, and an excess molten metal storage space formed above the cavity and the hot water storage groove A mold provided with a mold recess and a runner provided below the puddle groove and connected to the puddle groove.
(C) having a first port opened in the lead melting tank and a second port connected to the runner of the mold through the molten metal supply path, and in the lead melting tank when rotated in the forward direction A gear pump that discharges the molten metal from the second port into the molten metal supply path, and sucks the molten metal in the molten metal supply path and discharges it from the first port into the lead melting tank when rotated in the reverse direction.
(D) A molten metal release passage having an opening at the upper end and a lower end connected to the molten metal supply passage, a valve for opening and closing the opening at the upper end of the molten metal release passage, and the molten metal flowing out from the opening of the molten metal release passage When the valve is open, the molten metal in the molten metal release passage overflows from the molten metal outlet when the level of the molten metal in the molten metal groove exceeds the specified level. A molten metal level adjusting unit that maintains the molten metal level in the groove at a specified level and allows the molten metal level in the molten metal groove to rise beyond the specified level when the valve is closed.

ギアポンプは、正方向及び逆方向のいずれの方向にも回転させることができ、溶湯を吐出させることも吸い込むこともできる。更にギアポンプは、ギアの単位回転角度当たりの吐出量及び吸込み量が、プランジャポンプのピストンの単位変位量当たりの吐出量及び吸込み量に比べてはるかに小さく、またギアポンプは、駆動タイミングを正確に制御できる電動機により駆動できるため、ギアポンプを用いれば、溶湯の吐出量及び吸込み量の微妙なコントロールを容易に行うことができる。更に、ギアポンプの吐出量及び吸込み量は揚程の影響を受けないため、ギアポンプを用いると、鉛溶解槽内の溶湯レベルの変化により吐出量が変動して鋳型内への溶湯の供給量に過不足が生じるのを防ぐことができる。   The gear pump can be rotated in either the forward direction or the reverse direction, and can discharge or suck in the molten metal. Furthermore, the gear pump has a much smaller discharge amount and suction amount per unit rotation angle of the gear than the discharge amount and suction amount per unit displacement amount of the piston of the plunger pump, and the gear pump accurately controls the drive timing. Since it can be driven by an electric motor that can be used, if a gear pump is used, delicate control of the discharge amount and the suction amount of the molten metal can be easily performed. Furthermore, since the discharge amount and suction amount of the gear pump are not affected by the head, using the gear pump causes the discharge amount to fluctuate due to the change in the molten metal level in the lead melting tank, and the supply amount of molten metal into the mold is too short Can be prevented.

従って、上記のように鋳造装置を構成すると、鋳型の湯溜り溝内の溶湯レベルを上昇させて型凹部内の溶湯レベルを過剰レベルまで上昇させた後、該溶湯レベルを下降させる際に溶湯レベルの制御を精度よく行うことができ、鋳型のキャビティ内に極板群の耳部を挿入した後、溶湯レベルを堰の上端のレベル以下のレベルまで速やかに、かつ正確に下降させることができる。従って、鋳造されるストラップの厚みが過剰になるのを確実に防ぐことができ、キャビティの形状通りの形状を有するストラップを正確に鋳造することができる。   Therefore, when the casting apparatus is configured as described above, the molten metal level in the mold puddle groove is raised to raise the molten metal level in the mold recess to an excessive level, and then the molten metal level is lowered when the molten metal level is lowered. Can be accurately controlled, and the molten metal level can be quickly and accurately lowered to a level equal to or lower than the level of the upper end of the weir after the ear portion of the electrode plate group is inserted into the cavity of the mold. Therefore, it is possible to reliably prevent the thickness of the strap to be cast from becoming excessive, and it is possible to accurately cast the strap having the shape as the shape of the cavity.

また上記のように鋳造装置を構成すると、待機過程では、鉛溶解槽−ポンプ−溶湯レベル調整部−鉛溶解槽の経路で常時溶湯の循環流を生じさせておくことができるため、鉛溶解槽内で鉛合金の組成が不均一な部分が生じるのを防ぐことができ、鋳造されるストラップの品質が低下するのを防ぐことができる。   In addition, when the casting apparatus is configured as described above, in the standby process, a molten metal circulation flow can be always generated in the lead melting tank-pump-melt level adjusting unit-lead melting tank path. It is possible to prevent a portion having a non-uniform lead alloy composition from occurring, and to prevent deterioration of the quality of the cast strap.

上記の溶湯レベル調整部は、バルブが開いているときに湯溜り溝内の溶湯レベルを、溶湯流出口のレベルに等しくする作用をする。そのため、上記の溶湯レベル調整部は、溶湯流出口のレベル(高さ)を鋳型の湯溜り溝内における溶湯の規定レベルに一致させた状態で配置される。   The molten metal level adjusting unit functions to make the molten metal level in the hot water ditch groove equal to the level of the molten metal outlet when the valve is open. Therefore, the molten metal level adjusting unit is arranged in a state where the level (height) of the molten metal outlet matches the specified level of the molten metal in the molten metal groove of the mold.

上記溶湯レベル調整部においては、溶湯流出口の高さを調整し得るようにしておくのが好ましい。このように構成しておくと、湯溜り溝内の溶湯レベルを、ストラップの鋳造を適性に行うために適したレベルに容易に調整することができる。   In the molten metal level adjusting unit, it is preferable that the height of the molten metal outlet can be adjusted. If comprised in this way, the molten metal level in a hot water ditch | groove can be easily adjusted to the level suitable in order to perform casting of a strap appropriately.

本発明に係わる鉛蓄電池用極板ストラップ鋳造方法は、上記の鋳造装置を用いて、鉛蓄電池の極板群の同極性の極板の耳部同士を接続するストラップを鋳造する方法であって、本発明においては、バルブを開いた状態でギアポンプを正方向に連続回転させて湯溜り溝内の溶湯レベルを規定レベルに保つ待機過程と、バルブを閉じた状態でギアポンプを正方向に回転させることにより湯溜り溝内の溶湯レベルを上昇させて湯溜り溝内の溶湯を堰を越えてキャビティ内に流入させ、最終的には型凹部内の溶湯レベルを堰の上端のレベル以上のレベルまで上昇させる溶湯レベル上昇過程と、バルブを開き、湯溜り溝内の溶湯レベルが堰の上端レベル以下のレベルまで低下するまでの間ギアポンプを逆方向に回転させて溶湯レベル上昇過程で上昇した溶湯レベルを下降させる溶湯レベル下降過程とを行わせて、溶湯レベル下降過程で型凹部内の溶湯レベルが極板群の耳部を溶湯中に挿入しても型凹部から溶湯があふれることがないレベルまで低下したときに極板群の耳部をキャビティ内の溶湯中に挿入し、溶湯レベル下降過程で湯溜り溝内の溶湯レベルが規定レベルまたは設定レベルまで低下したときにギアポンプの回転方向を逆方向から正方向に反転させて待機過程に移行させる。そして、キャビティ内の溶湯を凝固させることによりストラップを鋳造する。   An electrode plate strap casting method for a lead storage battery according to the present invention is a method of casting a strap for connecting the ears of the same polarity electrode plates of the electrode plate group of the lead storage battery using the above casting apparatus, In the present invention, the gear pump is continuously rotated in the forward direction while the valve is open, and the gear pump is rotated in the forward direction while the valve is closed while the molten metal in the sump groove is kept at the specified level. To raise the level of molten metal in the puddle groove and flow the molten metal in the puddle groove over the weir into the cavity, and finally raise the molten metal level in the mold recess to a level higher than the level at the top of the weir. As the melt level rises, the valve is opened and the gear pump is rotated in the reverse direction until the melt level in the sump groove drops to a level below the upper end level of the weir. Even if the molten metal level in the mold depression is inserted into the molten metal in the molten metal level in the molten metal level lowering process, the molten metal does not overflow from the concave mold. Insert the ears of the electrode plate group into the molten metal in the cavity when the level drops to the level, and change the gear pump rotation direction when the molten metal level in the molten metal groove drops to the specified level or set level during the molten metal level lowering process. Invert from the reverse direction to the forward direction and shift to the standby process. Then, the strap is cast by solidifying the molten metal in the cavity.

上記の方法を自動的に実施するため、本発明に係わる鋳造装置には、バルブを開いた状態でギアポンプを正方向に連続回転させて湯溜り溝内の溶湯レベルを規定レベルに保つ待機過程と、バルブを閉じた状態でギアポンプを正方向に回転させることにより湯溜り溝内の溶湯レベルを上昇させて湯溜り溝内の溶湯を堰を越えてキャビティ内に流入させ、最終的には型凹部内の溶湯レベルを堰の上端のレベル以上の過剰レベルまで上昇させる溶湯レベル上昇過程と、バルブを開いた状態でギアポンプを逆方向に回転させて溶湯レベル上昇過程で上昇した溶湯レベルを低下させる溶湯レベル下降過程とを行わせ、溶湯レベル下降過程で前記湯溜り溝内の溶湯レベルが堰の上端レベル以下のレベルまで低下したときにギアポンプの回転方向を逆方向から正方向に反転させて待機過程に移行させるようにバルブ及びギアポンプを制御する制御部を設けておくのが好ましい。   In order to automatically carry out the above method, the casting apparatus according to the present invention includes a standby process in which the gear pump is continuously rotated in the forward direction with the valve opened to maintain the molten metal level in the puddle groove at a specified level. By rotating the gear pump in the forward direction with the valve closed, the level of the molten metal in the puddle groove is raised to flow the molten metal in the puddle groove over the weir into the cavity, and finally the mold recess The melt level rise process that raises the molten metal level to the excess level above the top level of the weir and the melt level that rises in the melt level rise process by rotating the gear pump in the reverse direction with the valve open When the molten metal level in the hot water ditch is lowered to a level below the upper end level of the weir during the molten metal level decreasing process, the rotation direction of the gear pump is reversed. The preferably provided a control unit for controlling the valves and gear pump as is reversed to shift to the standby process in the positive direction is preferred.

上記の各過程は、鋳型内の溶湯レベルを検出するレベルセンサを設けて、レベルセンサにより検出される溶湯レベルを規定レベルや設定レベルに一致させるようにギアポンプを制御することにより行わせることができる。レベルセンサとしては、超音波式や静電式等の非接触式のセンサを用いるのが好ましい。   Each of the above processes can be performed by providing a level sensor for detecting the melt level in the mold and controlling the gear pump so that the melt level detected by the level sensor matches the specified level or the set level. . As the level sensor, it is preferable to use a non-contact type sensor such as an ultrasonic type or an electrostatic type.

ギアポンプの吐出量及び吸い込み量は、揚程の影響を受けず、ギアポンプの回転速度とギアポンプの単位回転角度当たりの吐出量とから正確に計算することができ、鋳型内の溶湯レベルを所定のレベルにするために必要なギアポンプの駆動タイミング及び駆動時間は演算により正確に求めることができるため、上記の鋳造方法の各過程は、バルブ及びギアポンプを駆動するタイミングとギアポンプを駆動する時間とを管理することにより正確に行うことができる。このように、ギアポンプを駆動するタイミングと駆動する時間とを管理することにより各工程を行わせるようにすれば、溶湯レベルを検出するセンサを設けることなく、バルブ及びギアポンプを駆動するタイミングを所定のシーケンスで制御するだけで、各工程を行わせることができる。   The discharge amount and suction amount of the gear pump are not affected by the head, and can be accurately calculated from the rotation speed of the gear pump and the discharge amount per unit rotation angle of the gear pump, and the molten metal level in the mold is set to a predetermined level. Since the driving timing and driving time of the gear pump necessary for the above can be accurately calculated by calculation, each process of the casting method described above manages the timing for driving the valve and the gear pump and the time for driving the gear pump. Can be performed more accurately. Thus, if each process is performed by managing the timing for driving the gear pump and the driving time, the timing for driving the valve and the gear pump can be set to a predetermined level without providing a sensor for detecting the melt level. Each process can be performed only by controlling in sequence.

そのため、本発明に係わる鋳造方法の好ましい態様では、前記の構成を有する鉛蓄電池用極板ストラップ鋳造装置を用いて、バルブを開いた状態でギアポンプを正方向に連続回転させて湯溜り溝内の溶湯レベルを規定レベルに保つ待機過程と、型凹部内の溶湯レベルを前記堰の上端のレベル以上に設定された過剰レベルまで上昇させるために必要な時間の間バルブを閉じた状態でギアポンプを正方向に回転させて前記型凹部内の溶湯レベルを上昇させる溶湯レベル上昇過程と、溶湯レベル上昇過程が終了した後バルブを開いた状態で湯溜り溝内の溶湯レベルを堰の上端レベル以下のレベルまで低下させるために必要な時間の間ギアポンプを逆方向に回転させて型凹部内の溶湯レベルを下降させる溶湯レベル下降過程とを行わせて、溶湯レベル下降過程で型凹部内の溶湯レベルが極板群の耳部を溶湯中に挿入しても型凹部から溶湯があふれることがないレベルまで低下するタイミングで極板群の耳部をキャビティ内の溶湯中に挿入し、溶湯レベル下降過程が終了した後にギアポンプの回転方向を逆方向から正方向に反転させて待機過程に移行させる。キャビティ内の溶湯を硬化させることによりストラップを鋳造する。   Therefore, in a preferred embodiment of the casting method according to the present invention, using the electrode storage strap casting apparatus for a lead storage battery having the above-described configuration, the gear pump is continuously rotated in the forward direction with the valve opened, and the inside of the puddle groove is Waiting process to keep the molten metal level at the specified level, and the gear pump with the valve closed for the time required to raise the molten metal level in the mold recess to the excess level set above the top level of the weir. The molten metal level rising process in which the molten metal level in the mold recess is increased by rotating in the direction of the mold, and the molten metal level in the hot water ditching groove is lower than the upper end level of the weir with the valve opened after the molten metal level increasing process is completed. The melt level is lowered by rotating the gear pump in the opposite direction for the time required to lower the melt level to lower the melt level in the mold recess. During the descending process, the molten metal level in the mold recess is lowered to a level at which the molten metal does not overflow from the mold recess even if the molten metal is inserted into the molten metal. After the molten metal level lowering process is completed, the rotation direction of the gear pump is reversed from the reverse direction to the forward direction to shift to the standby process. The strap is cast by curing the molten metal in the cavity.

上記の鋳造方法を自動的に実施するため、本発明に係わる鋳造装置には、バルブを開いた状態でギアポンプを正方向に連続回転させて前記湯溜り溝内の溶湯レベルを規定レベルに保つ待機過程と、湯溜り溝内の溶湯レベルを堰を越えてキャビティ内に流入させてキャビティ内を溶湯で満たした状態にするために必要な時間の間バルブを閉じた状態でギアポンプを正方向に回転させて型凹部内の溶湯レベルを上昇させる溶湯レベル上昇過程と、溶湯レベル上昇過程が終了した後バルブを開いた状態で湯溜り溝内の溶湯レベルを堰の上端レベル以下のレベルまで低下させるために必要な時間の間ギアポンプを逆方向に回転させて型凹部内の溶湯レベルを下降させる溶湯レベル下降過程とを行わせ、溶湯レベル下降過程が終了した後にギアポンプの回転方向を逆方向から正方向に反転させて待機過程に移行させるようにバルブ及びギアポンプを制御する制御部を設けるのが好ましい。   In order to automatically carry out the above casting method, the casting apparatus according to the present invention has a standby state in which the gear pump is continuously rotated in the forward direction with the valve opened to maintain the molten metal level in the hot water ditch groove at a specified level. Rotate the gear pump in the forward direction with the valve closed for the time required for the process and the level of the melt in the puddle groove to flow into the cavity past the weir and fill the cavity with the melt. In order to lower the molten metal level in the hot water ditch groove to a level below the upper end level of the weir with the valve opened after the molten metal level increasing process to raise the molten metal level in the mold recess and the molten metal level rising process is completed The gear pump is rotated in the opposite direction for the time required for the melt to lower the melt level in the mold recess and the melt level lowering process is performed. Preferably, the rolling direction from the reverse direction is reversed in the forward direction is provided a control unit for controlling the valves and gear pump so as to shift to the standby process.

鋳型内への溶湯の供給を迅速に行わせるため、上記制御部は、待機過程ではギアポンプを第1の回転速度で正方向に回転させ、溶湯レベル上昇過程ではギアポンプを第1の回転速度よりも高い第2の回転速度で正方向に回転させ、溶湯レベル下降過程ではギアポンプを逆方向に回転させるように構成するのが好ましい。   In order to promptly supply the molten metal into the mold, the control unit rotates the gear pump in the forward direction at the first rotational speed in the standby process, and the gear pump is operated at a speed higher than the first rotational speed in the molten metal level increasing process. It is preferable to rotate the gear pump in the forward direction at a high second rotation speed and to rotate the gear pump in the reverse direction in the process of lowering the melt level.

本発明に係わる鉛蓄電池の製造方法では、正極板と負極板とをセパレータを介して積層して鉛蓄電池用の極板群を構成する極板群構成工程と、上記のいずれかの鋳造方法により極板群の同極性の極板の耳部同士を接続するストラップを鋳造するストラップ鋳造工程と、ストラップが鋳造された極板群を電槽内に収容してセル間を接続し、該電槽内に電解液を注入する組立工程とを行って鉛蓄電池を製造する。   In the method for manufacturing a lead storage battery according to the present invention, the positive electrode plate and the negative electrode plate are laminated via a separator to form an electrode plate group for a lead storage battery, and any one of the above casting methods. A strap casting process for casting a strap for connecting the ears of the same polarity electrode plates of the electrode plate group, and the electrode plate group in which the strap is cast is accommodated in the battery case, and the cells are connected to each other. A lead storage battery is manufactured by performing an assembly process of injecting an electrolytic solution into the inside.

本発明では、溶湯を吐出させることも吸い込むこともでき、溶湯の吐出量及び吸込み量の微妙なコントロールを容易に行うことができる上に、吐出量及び吸込み量が揚程の変化の影響を受けないギアポンプを用いて溶湯を鋳型に供給するので、鋳型内に供給する溶湯に過不足が生じるのを防ぐことができる。   In the present invention, the molten metal can be discharged or sucked, and the delicate control of the molten metal discharge amount and the suction amount can be easily performed, and the discharge amount and the suction amount are not affected by the change in the head. Since the molten metal is supplied to the mold using the gear pump, it is possible to prevent the molten metal supplied into the mold from being excessive or insufficient.

また本発明においては、鋳型の湯溜り溝内の溶湯レベルを上昇させて型凹部内の溶湯レベルを過剰レベルまで上昇させた後、ギアポンプを逆方向に回転させることにより溶湯レベルを強制的に下降させるので、鋳型のキャビティ内に極板群の耳部を挿入した後、溶湯レベルを堰の上端レベル以下のレベルまで速やかに、かつ正確に下降させることができる。従って本発明によれば、鋳造されるストラップの厚みが過剰になるのを確実に防ぐことができ、キャビティの形状通りの形状を有するストラップを正確に鋳造することができる。   In the present invention, the molten metal level in the mold pool is raised to raise the molten metal level in the mold recess to an excessive level, and then the gear pump is rotated in the reverse direction to forcibly lower the molten metal level. Therefore, after inserting the ear | edge part of an electrode group in the cavity of a casting_mold | template, a molten metal level can be fall | descended rapidly and correctly to the level below the upper end level of a weir. Therefore, according to the present invention, it is possible to reliably prevent the thickness of the strap to be cast from becoming excessive, and it is possible to accurately cast the strap having the shape as the shape of the cavity.

また本発明によれば、待機過程では、鉛溶解槽−ポンプ−溶湯レベル調整部−鉛溶解槽の経路で常時溶湯の循環流を生じさせておくことができるため、溶湯供給路5内で溶湯が冷却されて凝固するおそれを無くすことができ、溶湯供給路内で溶湯が凝固することによりストラップの鋳造工程を停止せざるを得ない事態が生じるのを防ぐことができる。また鉛溶解槽内で常時溶湯の流動を生じさせておくことができるため、鉛溶解槽内で溶湯の表面の酸化が進んで鉛合金の組成が不均一な部分が生じるのを防ぐことができ、鉛合金の組成が不均一になることにより鋳造されるストラップの品質が低下するのを防ぐことができる。   Further, according to the present invention, in the standby process, a molten metal circulation flow can be constantly generated through the route of the lead melting tank-pump-melt level adjusting unit-lead melting tank. It is possible to eliminate the possibility that the strap is cooled and solidified, and the situation in which the casting process of the strap has to be stopped due to the solidification of the molten metal in the molten metal supply path can be prevented. Moreover, since the flow of the molten metal can be constantly generated in the lead melting tank, it is possible to prevent the surface of the molten metal from being oxidized in the lead melting tank and causing a portion where the composition of the lead alloy is not uniform. Further, it is possible to prevent the quality of the strap cast from being deteriorated due to the non-uniform composition of the lead alloy.

鉛蓄電池を製造する方法においては、正極板と負極板とをセパレータを介して積層して鉛蓄電池用の極板群を構成する極板群構成工程と、極板群の同極性の極板の耳部同士を接続するストラップを鋳造するストラップ鋳造工程と、ストラップが鋳造された極板群を電槽内に収容してセル間を接続し、該電槽内に電解液を注入する組立工程とを行う。本発明に係わるストラップ鋳造方法及び鋳造装置は、上記ストラップ鋳造工程でストラップを鋳造する際に用いる。   In the method of manufacturing a lead storage battery, a positive electrode plate and a negative electrode plate are laminated via a separator to form an electrode plate group forming step for forming a plate group for a lead storage battery; and A strap casting process for casting a strap for connecting the ears; an assembly process for housing the electrode plate group in which the strap is cast in the battery case, connecting the cells, and injecting an electrolyte into the battery case; I do. The strap casting method and casting apparatus according to the present invention are used when casting a strap in the strap casting step.

以下図面を参照して、本発明に係わるストラップ鋳造装置の好ましい実施形態を、同鋳造装置を用いて行うストラップ鋳造方法とともに詳細に説明する。
図1は、本発明に係わる鉛蓄電池用極板ストラップ鋳造装置の一実施形態の全体的な構成を示したものである。同図において、1はヒータ2により鉛合金を加熱して鉛合金の溶湯Mを生成する鉛溶解槽、3は鋳型、4は鉛溶解槽1内の溶湯Mを溶湯供給路5を通して鋳型3に供給するポンプ、6はポンプ4を駆動する駆動源、7はポンプ4と鋳型3との間を接続する溶湯供給路5の途中に設けられて鋳型3内の溶湯レベルを調整する溶湯レベル調整部である。
A preferred embodiment of a strap casting apparatus according to the present invention will be described below in detail with a strap casting method performed using the casting apparatus with reference to the drawings.
FIG. 1 shows the overall configuration of an embodiment of an electrode plate strap casting apparatus for a lead storage battery according to the present invention. In the figure, 1 is a lead melting tank in which a lead alloy is heated by a heater 2 to generate a molten M of lead alloy, 3 is a mold, 4 is a molten metal in the lead melting tank 1 and is fed into a mold 3 through a molten metal supply path 5. A pump to be supplied, 6 is a drive source for driving the pump 4, and 7 is a melt level adjusting unit that is provided in the middle of the melt supply path 5 that connects the pump 4 and the mold 3 to adjust the melt level in the mold 3. It is.

図2に示したように、鋳型3は、ストラップを鋳造するためのキャビティ301と、キャビティ301に隣接配置されてキャビティ301との間が堰302により仕切られた湯溜り溝303と、キャビティ301及び湯溜り溝303の上方に形成された余剰溶湯収容空間304とからなる型凹部305と、湯溜り溝303より下方に設けられて湯溜り溝303内に連通路306を通して接続された湯道307とを備えている。湯道307の一端は外部に開口していて、この湯道の一端の開口部に溶湯供給路5を構成するパイプラインが接続される。湯道307の他端は閉鎖されていて、溶湯供給路5から湯道307内に溶湯が供給された際に、湯道307内の溶湯が連通路306を通して押し上げられて湯溜り303内に流入するようになっている。   As shown in FIG. 2, the mold 3 includes a cavity 301 for casting a strap, a hot water storage groove 303 disposed adjacent to the cavity 301 and partitioned from the cavity 301 by a weir 302, A mold recess 305 formed of an excess molten metal storage space 304 formed above the hot water storage groove 303, and a runway 307 provided below the hot water storage groove 303 and connected to the hot water storage groove 303 through the communication passage 306. It has. One end of the runner 307 is open to the outside, and a pipeline constituting the molten metal supply path 5 is connected to an opening at one end of the runner. The other end of the runner 307 is closed, and when the melt is supplied from the melt supply passage 5 into the runner 307, the melt in the runner 307 is pushed up through the communication passage 306 and flows into the sump 303. It is supposed to be.

鋳型3は、堰302の厚み方向の中央部でキャビティ側ユニット3Aと、湯溜り側ユニット3Bとに分割されていて、これらのユニットが断熱層309を介して相互に接合されることにより鋳型3が組立てられている。キャビティ側ユニット3A内には冷却媒体を通す冷却媒体通路310が設けられ、この冷却媒体通路を通して流される冷却媒体により、キャビティ側ユニット3Aが冷却される。また湯溜り側ユニット3B内に設けられた穴にヒータ311が挿入され、該ヒータにより湯溜り側ユニットが溶湯を溶融状態に保つために必要な温度まで加熱される。キャビティ側ユニット3Aには、キャビティ301内で鋳造されたストラップを取り出す際に用いるノックアウトピン308が取り付けられている。   The mold 3 is divided into a cavity side unit 3A and a hot water pool side unit 3B at the central portion in the thickness direction of the weir 302, and these units are joined to each other via a heat insulating layer 309. Is assembled. A cooling medium passage 310 for passing a cooling medium is provided in the cavity side unit 3A, and the cavity side unit 3A is cooled by the cooling medium flowing through the cooling medium passage. Further, a heater 311 is inserted into a hole provided in the hot water pool side unit 3B, and the hot water pool side unit is heated to a temperature necessary for keeping the molten metal in a molten state by the heater. A knockout pin 308 used for taking out the strap cast in the cavity 301 is attached to the cavity side unit 3A.

なお図2には、キャビティ301及び湯溜り303が一組だけ示されているが、極板群には正極板と負極板とがあり、正極板の耳部同士を接続する正極ストラップと負極板の耳部同士を接続する負極ストラップとの双方を鋳造する必要があるため、実際には、正極ストラップ及び負極ストラップをそれぞれ鋳造するために、2組のキャビティ301及び湯溜り303が正負極板の耳部の位置に対応して配置される。図2は鋳型の半部(一方の極性のストラップを鋳造する部分)のみを示している。実際には、図示のキャビティ側ユニット3Aの左側に極板群の他方の極性のストラップを鋳造するための他のキャビティ側ユニットが配置され、該他のキャビティ側ユニットの左側に、他の湯溜り側ユニットが配置される。   FIG. 2 shows only one set of the cavity 301 and the sump 303, but the electrode plate group includes a positive electrode plate and a negative electrode plate, and the positive electrode strap and the negative electrode plate that connect the ears of the positive electrode plate to each other. In fact, in order to cast both the positive strap and the negative strap, the two cavities 301 and the sump 303 are formed of the positive and negative plates, respectively. It arrange | positions corresponding to the position of an ear | edge part. FIG. 2 shows only the half of the mold (the part where the strap of one polarity is cast). Actually, another cavity side unit for casting the strap of the other polarity of the electrode plate group is arranged on the left side of the cavity side unit 3A shown in the figure, and another hot water pool is placed on the left side of the other cavity side unit. A side unit is arranged.

本発明においては、ポンプ4がギアポンプからなっている。ギアポンプは、図3に示すように、第1のギア収容室401と第2のギア収容室402とを対称に有するほぼ繭形のポンプハウジング403を備えていて、第1のギア収容室401及び第2のギア収容室402内にそれぞれ駆動ギア405及び従動ギア406が収容されている。駆動ギア405及び従動ギア406はそれぞれポンプハウジング403の側板に回転自在に支持された回転軸407及び408に取り付けられていて、第1のギア収容室401と第2のギア収容室402とがオーバラップする部分で互いに噛み合わされている。ポンプハウジング403の第1のギア収容室401と第2のギア収容室402とをつなぐ部分から駆動ギア405及び従動ギア406が並ぶ方向に対して直角な方向に沿って、互いに反対方向に突出するように第1のポート409及び第2のポート410が設けられている。ギアポンプ4の第1のポート409は鉛溶解槽1内の溶湯M中に開口させられ、第2のポート410は溶湯供給路5の一部を構成するパイプライン501と、溶湯レベル調整部7と、溶湯供給路5の他の部分を構成するパイプライン502とを通して鋳型3の湯道307に接続されている。ギアポンプ4を駆動する駆動源6は電動機からなり、該電動機によりギアポンプ4の駆動ギア405が回転駆動される。   In the present invention, the pump 4 is a gear pump. As shown in FIG. 3, the gear pump includes a substantially bowl-shaped pump housing 403 that has a first gear housing chamber 401 and a second gear housing chamber 402 symmetrically. A drive gear 405 and a driven gear 406 are housed in the second gear housing chamber 402, respectively. The drive gear 405 and the driven gear 406 are respectively attached to rotary shafts 407 and 408 that are rotatably supported on the side plate of the pump housing 403, and the first gear housing chamber 401 and the second gear housing chamber 402 are over. It is meshed with each other at the wrapping part. Projecting in a direction opposite to each other along the direction perpendicular to the direction in which the drive gear 405 and the driven gear 406 are arranged from the portion connecting the first gear housing chamber 401 and the second gear housing chamber 402 of the pump housing 403. Thus, a first port 409 and a second port 410 are provided. The first port 409 of the gear pump 4 is opened in the molten metal M in the lead melting tank 1, and the second port 410 is a pipeline 501 constituting a part of the molten metal supply path 5, the molten metal level adjusting unit 7, The molten metal supply path 5 is connected to the runway 307 of the mold 3 through the pipeline 502 constituting the other part. The drive source 6 that drives the gear pump 4 is an electric motor, and the drive gear 405 of the gear pump 4 is rotationally driven by the electric motor.

図示のギアポンプは、駆動ギア405が図3において時計方向(この方向を正方向とする。)に回転したときに鉛溶解槽1内の溶湯Mを第1のポート409から吸い込んで第2のポート410から吐出させる。また駆動ギア405が図3において反時計方向(この方向を逆方向とする。)に回転したときに溶湯供給路5内の溶湯を吸い込んで鉛溶解槽1内に戻す。   The illustrated gear pump sucks the molten metal M in the lead melting tank 1 from the first port 409 when the drive gear 405 rotates clockwise in FIG. 3 (this direction is the positive direction). It is made to discharge from 410. Further, when the drive gear 405 rotates counterclockwise in FIG. 3 (this direction is the opposite direction), the molten metal in the molten metal supply path 5 is sucked back into the lead melting tank 1.

ギアポンプ4は、ギアの回転方向を切り換えることにより、吐出方向を自由に切り換えることができるという特徴を有し、また吐出量が揚程の影響を受けないという特徴を有する。ギアポンプの単位回転角度当たりの吐出量及び吸込み量は、プランジャポンプのピストンの単位変位量当たりの吐出量及び吸込み量に比べて少ないため、吐出量及び吸込み量の微妙なコントロールが可能である。   The gear pump 4 has a feature that the discharge direction can be freely switched by switching the rotation direction of the gear, and the discharge amount is not affected by the head. Since the discharge amount and the suction amount per unit rotation angle of the gear pump are smaller than the discharge amount and the suction amount per unit displacement amount of the piston of the plunger pump, the discharge amount and the suction amount can be delicately controlled.

溶湯レベル調整部7は、溶湯供給路5の途中に挿入されて、鋳型内の溶湯レベルを調整する働きをする。図4ないし図6に示したように、本実施形態で用いる溶湯レベル調整部7は、直方体状に形成された金属ブロック700を備え、金属ブロック700内に上下方向に伸びる溶湯開放通路701と、横方向に伸びる溶湯流路705とが直交した状態で設けられている。溶湯開放通路701の下端はパイプライン501を通してギアポンプ4の第2のポート410に接続されている。溶湯流路705の一端は金属ブロック700にねじ込まれたネジ706により閉鎖され、他端はパイプライン502を通して鋳型の湯道307に接続されている。   The melt level adjusting unit 7 is inserted in the middle of the melt supply path 5 and functions to adjust the melt level in the mold. As shown in FIGS. 4 to 6, the melt level adjusting unit 7 used in the present embodiment includes a metal block 700 formed in a rectangular parallelepiped shape, and a melt opening passage 701 extending in the vertical direction in the metal block 700, The molten metal flow path 705 extending in the lateral direction is provided in a state of being orthogonal. The lower end of the molten metal release passage 701 is connected to the second port 410 of the gear pump 4 through the pipeline 501. One end of the molten metal flow path 705 is closed by a screw 706 screwed into the metal block 700, and the other end is connected to the mold runway 307 through the pipeline 502.

溶湯開放通路701は上端に開口部701aを有している。溶湯開放通路701の上方には、溶湯開放通路701の上端の開口部の周縁部に当接して溶湯開放通路701の開口部701aを閉じた状態にする閉位置と、溶湯開放通路の開口部701aの周縁部から離れて該開口部を開いた状態にする開位置との間を上下に変位する弁棒702と、弁棒702を閉位置と開位置との間で変位させる弁棒駆動機構704(図1参照)とが設けられ、弁棒702と、弁棒駆動機構704とにより溶湯レベル調整バルブ703が構成されている。   The molten metal release passage 701 has an opening 701a at the upper end. Above the molten metal release passage 701, there is a closed position in which the opening 701a of the molten metal release passage 701 is closed by contacting the peripheral edge of the opening at the upper end of the molten metal release passage 701, and an opening 701a of the molten metal release passage 701a. A valve rod 702 that is displaced up and down between the open position where the opening is opened apart from the peripheral edge of the valve, and a valve rod drive mechanism 704 that displaces the valve rod 702 between the closed position and the open position. (Refer to FIG. 1), and a molten metal level adjusting valve 703 is configured by the valve rod 702 and the valve rod drive mechanism 704.

金属ブロック700の上端には、両端が水平方向に開口した溝707が設けられている。溝707の一端は、端板710により閉鎖されている。端板710は、溝707の両側にそれぞれ位置させて金属ブロック700に固定されたスタッド708,708とこれらのスタッドに螺合されたナット709,709とにより金属ブロック700に固定されている。   At the upper end of the metal block 700, a groove 707 having both ends opened in the horizontal direction is provided. One end of the groove 707 is closed by an end plate 710. The end plate 710 is fixed to the metal block 700 by studs 708 and 708 positioned on both sides of the groove 707 and fixed to the metal block 700 and nuts 709 and 709 screwed to these studs.

溝707の他端側には、溶湯流出口711を有するコの字形の流出口形成板712が、上下方向の位置を調整し得るようにして取り付けられている。流出口形成板712は、溝707の両側にそれぞれ位置させて金属ブロック700に固定されたスタッド713,713とこれらのスタッドに螺合されたナット714,714とにより金属ブロック700に取り付けられている。図4に示されているように、スタッド713,713を貫通させるために流出口形成板712に設けられた孔715は、上下方向に伸びる長孔となっている。従って、ナット714を緩めた状態で板712を上下に変位させることにより、溶湯流出口711のレベルを、長孔715の長さにより決まる一定の範囲内で調節することができる。   A U-shaped outlet forming plate 712 having a molten metal outlet 711 is attached to the other end of the groove 707 so that the position in the vertical direction can be adjusted. The outlet forming plate 712 is attached to the metal block 700 by studs 713 and 713 that are positioned on both sides of the groove 707 and fixed to the metal block 700 and nuts 714 and 714 that are screwed to these studs. . As shown in FIG. 4, the hole 715 provided in the outlet forming plate 712 to penetrate the studs 713 and 713 is a long hole extending in the vertical direction. Therefore, the level of the molten metal outlet 711 can be adjusted within a certain range determined by the length of the long hole 715 by moving the plate 712 up and down while the nut 714 is loosened.

図6に示したように、溶湯レベル調整部7は、溶湯流出口711のレベル(溶湯流出口の下端のレベル)が、鋳型3内の湯溜り溝303内に設定する溶湯の規定レベルL1に一致するように、その上下位置が調整された状態で配置される。   As shown in FIG. 6, the molten metal level adjusting unit 7 sets the level of the molten metal outlet 711 (the level at the lower end of the molten metal outlet) to the specified level L 1 of the molten metal set in the hot water pool groove 303 in the mold 3. It arrange | positions in the state which the up-and-down position was adjusted so that it might correspond.

湯溜り溝内の溶湯レベルを規定レベルL1に保つ際には、弁棒702を上昇させてバルブ703を開いておく。このとき溶湯レベル調整部7は、湯溜り溝303内の溶湯レベルが規定レベルL1を越えたときに溶湯開放通路701内の溶湯を溶湯流出口711から鉛溶解槽1内にオーバフローさせて湯溜り溝303内の溶湯レベルを規定レベルL1に保つ。また鋳型内の溶湯レベルを規定レベルを越えて上昇させる際には、バルブ703を閉じる。このとき溶湯のオーバフローが阻止されるため、溶湯レベル調整部7はギアポンプ4から湯道307への溶湯の供給に伴って湯溜り溝303内の溶湯レベルが規定レベルを越えて上昇するのを許容する。   When the molten metal level in the hot water storage groove is kept at the specified level L1, the valve rod 702 is raised and the valve 703 is opened. At this time, the molten metal level adjusting unit 7 causes the molten metal in the molten metal release passage 701 to overflow from the molten metal outlet 711 into the lead melting tank 1 when the molten metal level in the molten metal groove 303 exceeds the specified level L1. The molten metal level in the groove 303 is kept at the specified level L1. Further, when the molten metal level in the mold is raised beyond the specified level, the valve 703 is closed. At this time, since the overflow of the molten metal is prevented, the molten metal level adjusting unit 7 allows the molten metal level in the hot water accumulation groove 303 to rise beyond a specified level as the molten metal is supplied from the gear pump 4 to the molten metal 307. To do.

本発明に係わる鋳造方法では、待機過程と、溶湯レベル上昇過程と、溶湯レベル下降過程とを行い、溶湯レベル下降過程において、鋳型内の溶湯レベルが、極板群の耳部をキャビティ内に挿入しても溶湯が鋳型からあふれ出るおそれがないレベルまで低下したときに、キャビティ内に極板群の耳部を挿入してストラップの鋳造を行う。   In the casting method according to the present invention, a standby process, a molten metal level increasing process, and a molten metal level decreasing process are performed. In the molten metal level decreasing process, the molten metal level in the mold is inserted into the cavity of the electrode plate group. Even when the molten metal drops to a level where there is no risk of overflowing from the mold, the strap is cast by inserting the ear portion of the electrode plate group into the cavity.

待機過程では、溶湯レベル調整部7の弁棒702を上げてバルブ703を開いた状態でギアポンプ4を正方向に比較的低い第1の回転速度(例えば80rpm)で連続回転させることにより、図7に示すように、湯溜り溝303内の溶湯レベルを規定レベルL1に保ち、この状態で極板群10が搬送されてきてキャビティの上方に位置決めされるのを待つ。   In the standby process, the valve rod 702 of the molten metal level adjusting unit 7 is raised and the gear pump 4 is continuously rotated in the forward direction at a relatively low first rotational speed (for example, 80 rpm) while the valve 703 is opened. As shown in FIG. 4, the molten metal level in the hot water storage groove 303 is maintained at the specified level L1, and the electrode group 10 is conveyed in this state and waits for positioning above the cavity.

鋳型3の上方には、極板群構成工程で構成された極板群が、コンベアにより、その耳部を下方に向けた状態で搬送されてくる。鋳型3の上方に耳部11を下方に向けた極板群10が搬送されてきて、図7に示すように、キャビティ301の上方に対応する耳部11が位置決めされた状態になったときに、溶湯レベル上昇過程を開始させる。溶湯レベル上昇過程では、溶湯レベル調整部7の弁棒702を下げてバルブ703を閉じた状態にし、ギアポンプ4の回転速度を第1の回転速度よりも高い第2の回転速度(例えば160rpm)まで上昇させて、型凹部305内の溶湯レベルを堰302の上端のレベル以上に設定された過剰レベルまで上昇させるために必要な時間の間ギアポンプ4を正方向に回転させる。これにより、湯溜り溝303内の溶湯レベルを上昇させ、溶湯Mを堰302を越えてキャビティ301内に流入させる。溶湯がキャビティ301内を満たした後も溶湯レベルの上昇を継続させ、最終的に溶湯レベルを堰302の上端のレベル以上に設定された過剰レベルまで上昇させる。本実施形態では、型凹部305の上端の開口部のレベルを過剰レベルL2(図8参照)としている。図8に示した例では、型凹部内に過剰レベルL2まで供給された溶湯Mの表面が表面張力で盛り上がった状態にある。   Above the mold 3, the electrode plate group formed in the electrode plate group forming step is conveyed by a conveyor with its ears directed downward. When the electrode plate group 10 with the ears 11 facing downward is conveyed above the mold 3 and the corresponding ears 11 are positioned above the cavity 301 as shown in FIG. Start the process of increasing the melt level. In the molten metal level increasing process, the valve rod 702 of the molten metal level adjusting unit 7 is lowered to close the valve 703, and the rotational speed of the gear pump 4 is increased to a second rotational speed (for example, 160 rpm) higher than the first rotational speed. The gear pump 4 is rotated in the forward direction for a time required to raise the molten metal level in the mold recess 305 to an excessive level set to be equal to or higher than the upper end level of the weir 302. As a result, the level of the molten metal in the hot water accumulation groove 303 is raised, and the molten metal M flows into the cavity 301 beyond the weir 302. Even after the molten metal fills the cavity 301, the molten metal level continues to rise, and finally the molten metal level is raised to an excessive level set to be equal to or higher than the upper end level of the weir 302. In the present embodiment, the level of the opening at the upper end of the mold recess 305 is set to an excessive level L2 (see FIG. 8). In the example shown in FIG. 8, the surface of the molten metal M supplied to the excessive level L2 in the mold recess is in a state of rising due to surface tension.

溶湯レベル上昇過程で溶湯レベルを過剰レベルL2まで上昇させた後、溶湯レベル下降過程に移行する。溶湯レベル下降過程では、弁棒702を上げてバルブ703を開いた状態にすると同時に、ギアポンプ4の回転方向を反転させて、湯溜り溝303内の溶湯レベルを堰302の上端レベル以下のレベルまで低下させるために必要な時間の間ギアポンプ4を逆方向に回転させて、溶湯供給路5内の溶湯をポンプ4で吸い込むことにより、型凹部内の溶湯レベルを強制的に下降させる。   After the molten metal level is raised to the excess level L2 in the molten metal level increasing process, the process proceeds to the molten metal level decreasing process. In the molten metal level lowering process, the valve rod 702 is raised and the valve 703 is opened, and at the same time, the rotational direction of the gear pump 4 is reversed so that the molten metal level in the hot water accumulation groove 303 is lower than the upper end level of the weir 302. The gear pump 4 is rotated in the reverse direction for the time required for the reduction, and the molten metal in the molten metal supply passage 5 is sucked by the pump 4 to forcibly lower the molten metal level in the mold recess.

上記溶湯レベル下降過程において、型凹部内の溶湯レベルが極板群10の耳部11を溶湯中に挿入しても型凹部から溶湯があふれることがないレベルまで低下するタイミングで、極板群10を保持している治具に下降指令を与えて、極板群10の耳部11をキャビティ301内の溶湯中に挿入する。極板群10の耳部を溶湯中に挿入することにより型凹部内の溶湯レベルが再び上昇するが、ギアポンプ4が溶湯供給路5内の溶湯を吸い込むので、溶湯レベルは速やかに低下していく。図9に示すように、湯溜り溝303内の溶湯レベルが堰302の上端レベル以下のレベルまで低下したときに溶湯レベル下降過程を終了する。   In the molten metal level lowering process, at the timing when the molten metal level in the mold recess is lowered to such a level that the molten metal does not overflow from the mold recess even when the ear 11 of the electrode plate group 10 is inserted into the molten metal. A descent command is given to the jig holding the electrode 11 and the ear 11 of the electrode plate group 10 is inserted into the molten metal in the cavity 301. By inserting the ear portion of the electrode plate group 10 into the molten metal, the molten metal level in the mold recess rises again, but since the gear pump 4 sucks the molten metal in the molten metal supply passage 5, the molten metal level rapidly decreases. . As shown in FIG. 9, the molten metal level lowering process is terminated when the molten metal level in the hot water pool groove 303 is lowered to a level equal to or lower than the upper end level of the weir 302.

溶湯レベル下降過程を終了した後、ギアポンプ4の回転方向を逆方向から正方向に反転させて待機過程に移行させる。溶湯レベル下降過程においてギアポンプ4を逆方向に回転させる時間は、極板群の耳部11をキャビティ301内に挿入した際に生じる溶湯レベルの再上昇を考慮して設定しておく。   After the melt level lowering process is completed, the rotation direction of the gear pump 4 is reversed from the reverse direction to the forward direction to shift to the standby process. The time for rotating the gear pump 4 in the reverse direction in the process of lowering the melt level is set in consideration of the re-rise of the melt level that occurs when the ear portion 11 of the electrode plate group is inserted into the cavity 301.

溶湯レベル下降過程の終了時にギアポンプ4の回転方向を正方向に反転させる処理を行っても、ポンプは直ちには反転しないため、湯溜まり溝303内の溶湯レベルが規定レベルL1に達するまでギアポンプ4を逆方向に駆動してからその回転方向を反転させるようにすると、湯溜り溝内の溶湯レベルが規定レベルよりも低いレベルまで低下するおそれがある。湯溜り溝内の溶湯レベルが規定レベルよりも低いレベルまで低下するおそれを無くすためには、湯溜り溝303内の溶湯レベルが規定レベルL1よりも僅かに高く設定された設定レベルに達したときにギアポンプ4を反転させる処理を行うようにするのが好ましい。   Even if the process of reversing the rotational direction of the gear pump 4 to the positive direction at the end of the molten metal level lowering process is performed, the pump does not reverse immediately. Therefore, the gear pump 4 is kept until the molten metal level in the hot water pool groove 303 reaches the specified level L1. If the direction of rotation is reversed after driving in the reverse direction, the molten metal level in the hot water ditch groove may be lowered to a level lower than the specified level. In order to eliminate the possibility that the molten metal level in the puddle groove is lowered to a level lower than the specified level, the molten metal level in the puddle groove 303 reaches a set level set slightly higher than the specified level L1. It is preferable to perform a process of reversing the gear pump 4.

鋳造されるストラップの厚みが過剰になるのを防ぐためには、できるだけ速やかに湯溜り内の溶湯レベルを堰302の上端レベル以下のレベルまで下げる必要がある。従って上記設定レベルは堰302の上端レベルと規定レベルL1との間に設定するのが好ましい。   In order to prevent the thickness of the cast strap from becoming excessive, it is necessary to lower the molten metal level in the hot water pool to a level below the upper end level of the weir 302 as quickly as possible. Therefore, the set level is preferably set between the upper end level of the weir 302 and the specified level L1.

キャビティ301内の溶湯が凝固してストラップ12が鋳造された後に、図10に示すようにノックアウトピン308を上昇させて鋳造されたストラップ12を鋳型から外し、ストラップが鋳造された極板群10をコンベアにより次の工程(組立工程)に搬送する。   After the molten metal in the cavity 301 is solidified and the strap 12 is cast, the knockout pin 308 is raised as shown in FIG. 10 to remove the cast strap 12 from the mold, and the electrode plate group 10 on which the strap is cast is removed. It is conveyed to the next process (assembly process) by a conveyor.

上記のように、本実施形態では、溶湯を吐出させることも吸い込むこともでき、溶湯の吐出量及び吸込み量の微妙なコントロールを容易に行うことができる上に、吐出量及び吸込み量が揚程の変化の影響を受けないギアポンプ4を用いて鉛溶解槽1から鋳型3に溶湯を供給するため、鋳型内に供給する溶湯に過不足が生じるのを防ぐことができる。   As described above, in the present embodiment, the molten metal can be discharged or sucked, and the discharge amount and the suction amount of the molten metal can be easily controlled, and the discharge amount and the suction amount are high. Since the molten metal is supplied from the lead melting tank 1 to the mold 3 using the gear pump 4 that is not affected by the change, it is possible to prevent the molten metal supplied into the mold from being excessive or insufficient.

また本実施形態においては、鋳型3の湯溜り溝303内の溶湯レベルを上昇させて型凹部内の溶湯レベルを過剰レベルまで上昇させた後、ギアポンプ4を逆方向に回転させることにより溶湯レベルを強制的に下降させるので、鋳型のキャビティ301内に極板群の耳部11を挿入した後、溶湯レベルを堰302の上端レベル以下のレベルまで速やかに、かつ正確に下降させることができる。従って、鋳造されるストラップの厚みが過剰になるのを確実に防ぐことができ、キャビティの形状通りの形状を有するストラップを正確に鋳造することができる。   In the present embodiment, the melt level in the hot water pool groove 303 of the mold 3 is raised to raise the melt level in the mold recess to an excessive level, and then the gear pump 4 is rotated in the reverse direction to adjust the melt level. Since it is forcibly lowered, the molten metal level can be lowered quickly and accurately to a level below the upper end level of the weir 302 after inserting the ear portion 11 of the electrode plate group into the cavity 301 of the mold. Therefore, it is possible to reliably prevent the thickness of the strap to be cast from becoming excessive, and it is possible to accurately cast the strap having the shape as the shape of the cavity.

また本実施形態では、待機過程で、鉛溶解槽1−ポンプ4−溶湯レベル調整部7−鉛溶解槽1の経路で常時溶湯の循環流を生じさせておくことができるため、溶湯供給路5を構成するパイプラインの内、ポンプ4と溶湯レベル調整部7との間を接続するパイプライン501内で溶湯が冷却されて凝固するおそれを無くすことができ、溶湯供給路内で溶湯が凝固することによりストラップの鋳造工程を停止せざるを得ない事態が生じるのを防ぐことができる。また鉛溶解槽1内で常時溶湯の流動を生じさせておくことができるため、鉛溶解槽内で溶湯の表面の酸化が進んで鉛合金の組成が不均一な部分が生じるのを防ぐことができ、鉛合金の組成が不均一になることにより鋳造されるストラップの品質が低下するのを防ぐことができる。   Moreover, in this embodiment, since it is possible to always cause a circulating flow of the molten metal through the route of the lead melting tank 1 -pump 4 -melt level adjusting unit 7 -lead melting tank 1 in the standby process, the molten metal supply path 5 Among the pipelines constituting the pipe 4, the possibility that the molten metal is cooled and solidified in the pipeline 501 connecting the pump 4 and the molten metal level adjusting unit 7 can be eliminated, and the molten metal is solidified in the molten metal supply path. Thus, it is possible to prevent a situation in which the casting process of the strap has to be stopped. Moreover, since the flow of the molten metal can always be caused to occur in the lead melting tank 1, it is possible to prevent the surface of the molten metal from being oxidized in the lead melting tank and causing a portion where the composition of the lead alloy is not uniform. It is possible to prevent the quality of the cast strap from being deteriorated due to the non-uniform composition of the lead alloy.

上記の鋳造方法を自動的に実施するため、本発明に係わる鋳造装置には、図11に示すようにバルブ703を制御するバルブ制御部15と、ギアポンプ4を制御するポンプ制御部16とを備えた制御部17を設けておくのが好ましい。   In order to automatically perform the above casting method, the casting apparatus according to the present invention includes a valve control unit 15 for controlling the valve 703 and a pump control unit 16 for controlling the gear pump 4 as shown in FIG. It is preferable to provide a control unit 17.

この制御部17は、バルブ703を開いた状態でギアポンプ4を正方向に連続回転させて湯溜り溝303内の溶湯レベルを規定レベルに保つ待機過程と、バルブ703を閉じた状態でギアポンプ4を正方向に回転させることにより湯溜り溝内の溶湯レベルを上昇させて湯溜り溝内の溶湯を堰302を越えてキャビティ301内に流入させ、最終的には型凹部内の溶湯レベルを堰702の上端のレベル以上の過剰レベルまで上昇させる溶湯レベル上昇過程と、バルブ703を開いた状態でギアポンプ4を逆方向に回転させることにより溶湯レベル上昇過程で上昇した溶湯レベルを低下させて、湯溜り溝303内の溶湯レベルが堰302の上端レベル以下になったときにギアポンプの回転方向を逆方向から正方向に反転させる溶湯レベル下降過程とを行うようにバルブ703及びギアポンプ4を制御するとともに、溶湯レベル下降過程でキャビティ内に極板群の耳部を挿入しても型凹部から溶湯があふれ出るおそれがないレベルまで型凹部内の溶湯レベルが低下したときに極板群の耳部をキャビティ内に挿入することを指令する極板耳部降下指令を発生させるように構成される。   The control unit 17 continuously rotates the gear pump 4 in the forward direction with the valve 703 open to keep the melt level in the hot water storage groove 303 at a specified level, and the gear pump 4 with the valve 703 closed. By rotating in the forward direction, the level of the molten metal in the puddle groove is raised to cause the molten metal in the puddle groove to flow into the cavity 301 beyond the weir 302, and finally the molten metal level in the mold recess is reduced to the weir 702. The molten metal level rising process in which the molten metal level is raised to an excessive level equal to or higher than the upper end level of the steel plate and the molten metal level rising in the molten metal level rising process by rotating the gear pump 4 in the reverse direction while the valve 703 is opened are reduced. When the molten metal level in the groove 303 is equal to or lower than the upper end level of the weir 302, the molten metal level lowering process that reverses the rotation direction of the gear pump from the reverse direction to the normal direction. In addition, the valve 703 and the gear pump 4 are controlled so that the molten metal in the mold recesses is at a level where there is no risk of the molten metal overflowing from the mold recesses even when the ears of the electrode plate group are inserted into the cavity in the process of lowering the melt level. It is configured to generate an electrode plate ear drop command that commands insertion of an ear of the electrode plate group into the cavity when the level is lowered.

上記の各過程における溶湯レベルの制御は、鋳型内の溶湯レベルを検出するレベルセンサを設けて、レベルセンサにより検出される溶湯レベルを規定レベルや設定レベルに一致させるようにギアポンプを制御することにより行わせてもよく、上記の実施形態の説明で述べたように、バルブ703及びギアポンプ4を駆動するタイミングとギアポンプを駆動する時間とを管理することにより行ってもよい。   The control of the molten metal level in each of the above processes is performed by providing a level sensor for detecting the molten metal level in the mold and controlling the gear pump so that the molten metal level detected by the level sensor matches the specified level or the set level. Alternatively, as described in the above description of the embodiment, the timing for driving the valve 703 and the gear pump 4 and the time for driving the gear pump may be managed.

バルブ703及びギアポンプ4を駆動するタイミングとギアポンプを駆動する時間とを管理することにより各過程を行う場合には、上記制御部17が、バルブ703を開いた状態でギアポンプ4を正方向に連続回転させて湯溜り溝303内の溶湯レベルを規定レベルに保つ待機過程と、湯溜り溝303内の溶湯レベルを堰302を越えてキャビティ301内に流入させてキャビティ内を溶湯で満たした後溶湯レベルを堰の上端のレベルよりも高く設定された過剰レベルまで上昇させるために必要な時間の間バルブ703を閉じた状態でギアポンプ4を正方向に回転させて型凹部内の溶湯レベルを上昇させる溶湯レベル上昇過程と、溶湯レベル上昇過程が終了した後バルブを開いた状態で湯溜り溝内の溶湯レベルを堰の上端レベル以下のレベルまで低下させるために必要な時間の間ギアポンプを逆方向に回転させて型凹部内の溶湯レベルを下降させる溶湯レベル下降過程とを行わせて、溶湯レベル下降過程が終了した後にギアポンプの回転方向を逆方向から正方向に反転させて待機過程に移行させるようにバルブ703及びギアポンプ4を制御するとともに、溶湯レベル下降過程でキャビティ内に極板群の耳部を挿入しても型凹部から溶湯があふれ出るおそれがないレベルまで型凹部内の溶湯レベルが低下したときに極板群の耳部をキャビティ内に挿入することを指令する極板耳部降下指令を発生させるように構成される。   When performing each process by managing the timing for driving the valve 703 and the gear pump 4 and the time for driving the gear pump, the control unit 17 continuously rotates the gear pump 4 in the forward direction with the valve 703 opened. A waiting process for keeping the molten metal level in the hot water ditch groove 303 at a specified level, and the molten metal level in the hot water ditch groove 303 after passing the weir 302 into the cavity 301 to fill the cavity with the molten metal level. In which the gear pump 4 is rotated in the forward direction with the valve 703 closed for a time required to raise the level to an excessive level set higher than the level of the upper end of the weir. After the level rising process and the molten metal level rising process are finished, the molten metal level in the hot water pool groove is below the top level of the weir with the valve opened. Rotate the gear pump in the reverse direction for the time required to lower the melt level, and lower the melt level in the mold recess to lower the melt level. The valve 703 and the gear pump 4 are controlled so as to be reversed from the reverse direction to the forward direction and shifted to the standby process, and even if the ear portion of the electrode plate group is inserted into the cavity during the molten metal level lowering process, When the molten metal level in the mold recess is lowered to a level at which there is no risk of overflow, an electrode plate ear part lowering command is generated to command insertion of the ear part of the electrode plate group into the cavity.

上記制御部は、コンピュータに所定のプログラムを実行させることにより実現することができる。図12は、上記の制御部を構成するためにコンピュータに実行させるプログラムのアルゴリズムの一例を示したフローチャートである。このアルゴリズムに従う場合には、ステップS1でバルブ703を開き、ステップS2でギアポンプ4を第1の回転速度(低速度)で正方向に回転させて待機過程を行わせる。次いでステップS3で、現在のタイミングが溶湯レベルの上昇を開始するタイミング(レベル上昇開始タイミング)であるか否かを判定する。レベル上昇開始タイミングは、ストラップの鋳造に備えて極板群10の耳部11をキャビティ301の上方に位置決めする動作が完了したときのタイミング(例えば、極板群を搬送するコンベアが、極板群の位置決めを完了したことを示す位置決め完了信号を発生するタイミング)である。   The control unit can be realized by causing a computer to execute a predetermined program. FIG. 12 is a flowchart illustrating an example of an algorithm of a program that is executed by a computer to configure the control unit. When this algorithm is followed, the valve 703 is opened in step S1, and the gear pump 4 is rotated in the forward direction at the first rotational speed (low speed) in step S2 to perform a standby process. Next, in step S3, it is determined whether or not the current timing is a timing for starting the rise of the molten metal level (level rise start timing). The level rise start timing is the timing when the operation of positioning the ear portion 11 of the electrode plate group 10 above the cavity 301 is completed in preparation for casting of the strap (for example, the conveyor that conveys the electrode plate group is Is a timing for generating a positioning completion signal indicating completion of positioning.

ステップS3で現在のタイミングがレベル上昇開始タイミングではないと判定されたときには、レベル上昇開始タイミングが到来するのを待つ。ステップS3でレベル上昇開始タイミングであると判定されたときには、ステップS4に進んでバルブ703を閉じ、ステップS5でギアポンプ4の回転速度を第2の回転速度に上昇させて、ギアポンプを正方向に回転させる。これにより溶湯レベル上昇過程が開始される。   When it is determined in step S3 that the current timing is not the level rise start timing, the system waits for the level rise start timing to arrive. If it is determined in step S3 that the level increase start timing is reached, the process proceeds to step S4, the valve 703 is closed, the gear pump 4 is increased to the second rotation speed in step S5, and the gear pump is rotated in the forward direction. Let This starts the process of increasing the molten metal level.

次いでステップS6で現在のタイミングがレベル上昇終了タイミングであるか否かを判定する。レベル上昇終了タイミングは、ステップS4でバルブ703を閉じた後、湯溜り溝303内の溶湯レベルを堰302を越えてキャビティ301内に流入させてキャビティ内を溶湯で満たし、更に溶湯レベルを堰の上端のレベルよりも高く設定された過剰レベルまで上昇させるために必要な時間が経過したときのタイミングである。   Next, in step S6, it is determined whether or not the current timing is the level rise end timing. After the valve 703 is closed in step S4, the level rise end timing is such that the molten metal level in the hot water accumulation groove 303 flows over the weir 302 into the cavity 301 to fill the cavity with the molten metal, and the molten metal level is further reduced to the level of the weir. This is the timing when the time necessary for raising the level to the excessive level set higher than the upper end level has elapsed.

ステップS6で現在のタイミングがレベル上昇終了タイミングであると判定されたときには、ステップS7に進んでバルブ703を開き、ステップS8でギアポンプ4の回転方向を反転させて、ギアポンプ4を一定の回転速度で逆方向に回転させる。これにより溶湯レベル上昇過程を終了し、溶湯レベル下降過程を開始する。   When it is determined in step S6 that the current timing is the level increase end timing, the process proceeds to step S7, the valve 703 is opened, the rotation direction of the gear pump 4 is reversed in step S8, and the gear pump 4 is rotated at a constant rotation speed. Rotate in the opposite direction. Thereby, the molten metal level raising process is ended, and the molten metal level lowering process is started.

次いでステップS9で現在のタイミングが極板耳部挿入タイミングであるか否かを判定する。極板耳部挿入タイミングは、極板群の耳部をキャビティ内に挿入しても溶湯が型凹部からあふれるおそれがないレベルまで溶湯レベルが低下したときのタイミングである。ステップS9で現在のタイミングが極板耳部挿入タイミングであると判定されたときにステップS10に進んで極板耳部降下指令を発生し、極板群10を下降させて耳部11をキャビティ301内に挿入する。   Next, in step S9, it is determined whether or not the current timing is the electrode plate ear insertion timing. The electrode tab insertion timing is the timing when the molten metal level is lowered to a level at which the molten metal does not overflow from the mold recess even when the electrode tabs are inserted into the cavity. If it is determined in step S9 that the current timing is the electrode ear insertion timing, the process proceeds to step S10 to generate an electrode plate lowering command, and the electrode plate group 10 is lowered to move the ear 11 to the cavity 301. Insert inside.

次いでステップS11で現在のタイミングがレベル下降終了タイミングであるか否かを判定する。レベル下降終了タイミングは、ステップS8でギアポンプの逆方向への回転を開始した後、型凹部内の溶湯レベルを堰302の上端レベル以下のレベルまで低下させるために必要な時間が経過したときのタイミングである。   Next, in step S11, it is determined whether or not the current timing is the level lowering end timing. The level lowering end timing is the timing when the time necessary for lowering the molten metal level in the mold recess to a level lower than the upper end level of the weir 302 after starting the rotation of the gear pump in the reverse direction in step S8. It is.

ステップS11で現在のタイミングがレベル下降終了タイミングであると判定されたときに溶湯レベル下降過程を終了し、ステップS12に進んで鋳造工程の稼働を休止させることを指令する鋳造工程稼動休止指令が発生しているか否かを判定する。その結果鋳造工程稼働休止指令が発生していない場合には、ステップS2に戻って待機過程に移行する。ステップS12で鋳造工程稼働休止指令が発生していると判定されたときにはステップS13でポンプを停止させてこのプログラムを終了する。   When it is determined in step S11 that the current timing is the level lowering end timing, a molten metal level lowering process is ended, and a casting process operation stop command is issued to instruct to stop the operation of the casting process by proceeding to step S12. It is determined whether or not. As a result, if the casting process operation stop command has not been generated, the process returns to step S2 and shifts to a standby process. If it is determined in step S12 that a casting process operation stop command has been issued, the pump is stopped in step S13 and the program is terminated.

上記の実施形態では、溶湯上昇過程における溶湯レベルの上限である溶湯の過剰レベルを、型凹部305の上端開口部のレベルに設定しているが、本発明はこのように過剰レベルを設定する場合に限定されない。本発明で用いるギアポンプ4は、その吐出量が揚程の変化の影響を受けないため、溶湯レベル上昇過程で鋳型に供給する溶湯の量にそれほど余裕を持たせておく必要はない。そのため、過剰レベルL2は、型凹部305の上端開口部と堰302の上端との間に設定してもよい。   In the above embodiment, the excessive level of the molten metal, which is the upper limit of the molten metal level in the molten metal rising process, is set to the level of the upper end opening of the mold recess 305. However, in the present invention, the excessive level is set in this way. It is not limited to. In the gear pump 4 used in the present invention, the discharge amount is not affected by the change in the head, and therefore it is not necessary to allow a sufficient margin for the amount of the molten metal supplied to the mold in the process of increasing the molten metal level. Therefore, the excess level L2 may be set between the upper end opening of the mold recess 305 and the upper end of the weir 302.

本発明に係わる鋳造装置の一実施形態の全体的な構成を示す断面図である。It is sectional drawing which shows the whole structure of one Embodiment of the casting apparatus concerning this invention. 本実施形態で用いる鋳型の構成を示した断面図である。It is sectional drawing which showed the structure of the casting_mold | template used by this embodiment. 本実施形態で用いるギアポンプの構造例を示した断面図である。It is sectional drawing which showed the structural example of the gear pump used by this embodiment. 本実施形態で用いる溶湯レベル調整部の構成を示した正面図である。It is the front view which showed the structure of the molten metal level adjustment part used by this embodiment. 同溶湯レベル調整部の上面図である。It is a top view of the molten metal level adjustment part. 溶湯レベル調整部と鋳型との位置関係を説明するための断面図である。It is sectional drawing for demonstrating the positional relationship of a molten metal level adjustment part and a casting_mold | template. 本実施形態において、鋳型の湯溜り溝内に溶湯を規定レベルまで収容した状態を示した要部の断面図である。In this embodiment, it is sectional drawing of the principal part which showed the state which accommodated the molten metal to the regulation level in the hot water ditch | groove of the casting_mold | template. 本実施形態において鋳型の型凹部内の溶湯レベルを過剰レベルまで上昇させた状態を示した要部の断面図である。It is sectional drawing of the principal part which showed the state which raised the molten metal level in the type | mold recessed part of a casting_mold | template to an excessive level in this embodiment. 本実施形態において鋳型のキャビティ内に極板群の耳部を挿入し、湯溜り溝内の溶湯レベルを規定レベルまで低下させた状態を示した要部の断面図である。FIG. 5 is a cross-sectional view of the main part showing a state in which the ear portion of the electrode plate group is inserted into the mold cavity in the present embodiment and the molten metal level in the hot water ditch is lowered to a specified level. 本実施形態において、鋳造されたストラップを鋳型から取り外した状態を示した要部の断面図である。In this embodiment, it is sectional drawing of the principal part which showed the state which removed the cast strap from the casting_mold | template. 本実施形態で設ける制御部の構成を概略的に示したブロック図である。It is the block diagram which showed schematically the structure of the control part provided in this embodiment. 図11に示した制御部を構成するためにコンピュータに実行させるプログラムのアルゴリズムの一例を示したフローチャートである。It is the flowchart which showed an example of the algorithm of the program which makes a computer perform in order to comprise the control part shown in FIG. 従来の鉛蓄電池用極板ストラップ鋳造装置の構成を示した断面図である。It is sectional drawing which showed the structure of the conventional electrode plate strap casting apparatus for lead acid batteries. 従来の鉛蓄電池用極板ストラップ鋳造装置において、鉛溶解槽内の溶湯のレベルが図13に示した状態よりも低下した状態を示した断面図である。It is sectional drawing which showed the state which the level of the molten metal in a lead melting tank fell rather than the state shown in FIG. 13 in the conventional electrode plate strap casting apparatus for lead acid batteries. 従来の鋳造装置において溶湯で満たされたキャビティ内に極板群の耳部を挿入した状態を示した要部の断面図である。It is sectional drawing of the principal part which showed the state which inserted the ear | edge part of the electrode group in the cavity filled with the molten metal in the conventional casting apparatus. 従来の鋳造装置において、鋳造されたストラップを鋳型から取り外した状態を示した要部の断面図である。In the conventional casting apparatus, it is sectional drawing of the principal part which showed the state which removed the cast strap from the casting_mold | template. 遠心式渦巻きポンプの揚程を吐出量との間の関係を示したグラフである。It is the graph which showed the relationship between the head of a centrifugal vortex pump, and discharge amount.

符号の説明Explanation of symbols

1 鉛溶解槽
2 ヒータ
3 鋳型
301 キャビティ
302 堰
303 湯溜り溝
304 余剰溶湯収容空間
305 型凹部
306 連通路
307 湯道
308 ノックアウトピン
309 断熱層
310 冷却媒体通路
4 ギアポンプ
401 第1のギア収容室
402 第2のギア収容室
403 ポンプハウジング
405 駆動ギア
406 従動ギア
407 回転軸
408 回転軸
409 第1のポート
410 第2のポート
5 溶湯供給路
501 パイプライン
502 パイプライン
6 駆動源
7 溶湯レベル調整部
701 溶湯開放通路
701a 開口部
702 弁棒
703 バルブ
707 溝
710 端板
711 溶湯流出口
712 流出口形成板
715 長孔
DESCRIPTION OF SYMBOLS 1 Lead melting tank 2 Heater 3 Mold 301 Cavity 302 Weir 303 Hot water storage groove 304 Excess molten metal accommodation space 305 Mold recessed part 306 Communication path 307 Runway 308 Knockout pin 309 Heat insulation layer 310 Cooling medium path 4 Gear pump 401 First gear accommodation chamber 402 Second gear accommodating chamber 403 Pump housing 405 Drive gear 406 Driven gear 407 Rotating shaft 408 Rotating shaft 409 First port 410 Second port 5 Molten supply path 501 Pipeline 502 Pipeline 6 Driving source 7 Molten level adjusting unit 701 Melt opening passage 701a Opening 702 Valve rod 703 Valve 707 Groove 710 End plate 711 Molten outlet 712 Outlet forming plate 715 Long hole

Claims (9)

鉛蓄電池の極板群の同極性の極板の耳部同士を接続するストラップを鋳造する鉛蓄電池用極板ストラップ鋳造装置であって、
鉛合金の溶湯を生成する鉛溶解槽と、
前記ストラップを鋳造するためのキャビティと該キャビティに隣接配置されて該キャビティとの間が堰により仕切られた湯溜り溝と前記キャビティ及び湯溜り溝の上方に形成された余剰溶湯収容空間とを有する型凹部と、前記湯溜り溝より下方に設けられて前記湯溜り溝内に接続された湯道とを備えた鋳型と、
前記鉛溶解槽内に開口させられた第1のポートと前記鋳型の湯道に溶湯供給路を通して接続された第2のポートとを有して、正方向に回転したときに前記鉛溶解槽内の溶湯を前記第2のポートから前記溶湯供給路内に吐出させ、逆方向に回転したときに前記溶湯供給路内の溶湯を吸引して前記第1のポートから前記鉛溶解槽内に吐出させるギアポンプと、
上端に開口部を有し下端が前記溶湯供給路に接続された溶湯開放通路と前記溶湯開放通路の上端の開口部を開閉するバルブと前記溶湯開放通路の開口部から流出した溶湯を前記鉛溶解槽内にオーバフローさせる溶湯流出口とを備えて、前記バルブが開いている状態では前記湯溜り溝内の溶湯レベルが規定レベルを越えたときに前記溶湯開放通路内の溶湯を前記溶湯流出口からオーバフローさせて前記湯溜り溝内の溶湯レベルを規定レベルに保ち、前記バルブが閉じているときには前記湯溜り溝内の溶湯レベルが規定レベルを越えて上昇するのを許容する溶湯レベル調整部と、
を備えた鉛蓄電池用極板ストラップ鋳造装置。
An electrode plate strap casting device for a lead storage battery that casts a strap that connects the ears of the same polarity electrode plates of the electrode plate group of the lead storage battery,
A lead melting tank for producing molten lead alloy;
A cavity for casting the strap, a hot water storage groove disposed adjacent to the cavity and partitioned by a weir, and an excess molten metal storage space formed above the cavity and the hot water storage groove. A mold provided with a mold recess and a runner provided below the puddle groove and connected to the puddle groove;
The lead melting tank has a first port opened in the lead melting tank and a second port connected to the runner of the mold through a molten metal supply path, and rotates in the forward direction. The molten metal in the molten metal supply path is discharged from the second port into the molten metal supply path, and the molten metal in the molten metal supply path is sucked and discharged from the first port into the lead melting tank when rotated in the reverse direction. A gear pump,
A molten metal release passage having an opening at the upper end and a lower end connected to the molten metal supply passage, a valve for opening and closing the upper opening of the molten metal release passage, and the molten metal flowing out from the opening of the molten metal release passage are dissolved in the lead. A molten metal outlet for overflowing the tank, and when the valve is open, the molten metal in the molten metal release passage is removed from the molten metal outlet when the molten metal level in the molten metal groove exceeds a specified level. A molten metal level adjusting unit that overflows to maintain the molten metal level in the hot water ditch groove at a specified level, and that allows the molten metal level in the hot water ditch groove to rise above a specified level when the valve is closed;
Electrode plate strap casting device for lead storage batteries.
前記溶湯流出口は、その高さを調節し得るように設けられている請求項1に記載の鉛蓄電池用極板ストラップ鋳造装置。   The electrode plate strap casting apparatus for a lead storage battery according to claim 1, wherein the molten metal outlet is provided so that the height thereof can be adjusted. 前記バルブを開いた状態で前記ギアポンプを正方向に連続回転させて前記湯溜り溝内の溶湯レベルを前記規定レベルに保つ待機過程と、前記バルブを閉じた状態で前記ギアポンプを正方向に回転させることにより前記湯溜り溝内の溶湯レベルを上昇させて前記湯溜り溝内の溶湯を前記堰を越えて前記キャビティ内に流入させ、最終的には前記型凹部内の溶湯レベルを前記堰の上端のレベル以上の過剰レベルまで上昇させる溶湯レベル上昇過程と、前記バルブを開いた状態で前記ギアポンプを逆方向に回転させて前記溶湯レベル上昇過程で上昇した溶湯レベルを低下させる溶湯レベル下降過程とを行わせ、前記溶湯レベル下降過程で前記湯溜り溝内の溶湯レベルが前記堰の上端レベル以下のレベルまで低下したときに前記ギアポンプの回転方向を逆方向から正方向に反転させて前記待機過程に移行させるように前記バルブ及びギアポンプを制御する制御部が設けられている請求項1または2に記載の鉛蓄電池用極板ストラップ鋳造装置。   A standby process in which the gear pump is continuously rotated in the forward direction with the valve opened to maintain the molten metal level in the hot water ditch groove at the specified level, and the gear pump is rotated in the forward direction with the valve closed. As a result, the molten metal level in the puddle groove is raised so that the molten metal in the puddle groove flows over the weir and into the cavity, and finally the molten metal level in the mold recess is set to the upper end of the weir. A molten metal level increasing process for increasing the molten metal level to an excessive level equal to or higher than the above level, and a molten metal level decreasing process for decreasing the molten metal level increased in the molten metal level increasing process by rotating the gear pump in the reverse direction with the valve opened. The rotation direction of the gear pump when the molten metal level in the hot water ditch groove is lowered to a level lower than the upper end level of the weir in the molten metal level lowering process. It is reversed from the opposite direction to the positive direction plate strap casting apparatus for a lead acid battery according to the valve and claim control unit is provided for controlling the gear pump 1 or 2 so as to shift to the standby process. 前記バルブを開いた状態で前記ギアポンプを正方向に連続回転させて前記湯溜り溝内の溶湯レベルを前記規定レベルに保つ待機過程と、前記湯溜り溝内の溶湯レベルを前記堰を越えて前記キャビティ内に流入させて前記キャビティ内を溶湯で満たした状態にするために必要な時間の間前記バルブを閉じた状態で前記ギアポンプを正方向に回転させて前記型凹部内の溶湯レベルを上昇させる溶湯レベル上昇過程と、溶湯レベル上昇過程が終了した後前記バルブを開いた状態で前記湯溜り溝内の溶湯レベルを前記堰の上端レベル以下のレベルまで低下させるために必要な時間の間前記ギアポンプを逆方向に回転させて前記型凹部内の溶湯レベルを下降させる溶湯レベル下降過程とを行わせ、前記溶湯レベル下降過程が終了した後に前記ギアポンプの回転方向を逆方向から正方向に反転させて前記待機過程に移行させるように前記バルブ及びギアポンプを制御する制御部が設けられている請求項1または2に記載の鉛蓄電池用極板ストラップ鋳造装置。   With the valve open, the gear pump is continuously rotated in the forward direction to maintain the molten metal level in the hot water ditch groove at the specified level, and the molten metal level in the hot water ditch groove is passed over the weir. The gear pump is rotated in the forward direction with the valve closed for a time required to flow into the cavity to fill the cavity with the molten metal, thereby raising the molten metal level in the mold recess. The gear pump for a time required to lower the molten metal level in the molten metal groove to a level below the upper end level of the weir while the valve is opened after the molten metal level rising process is completed. And a melt level lowering process for lowering the melt level in the mold recess by rotating in the reverse direction, and after the melt level lowering process is completed, the gear pump The electrode plate strap casting apparatus for a lead storage battery according to claim 1 or 2, further comprising a control unit that controls the valve and the gear pump so as to reverse the rotation direction from the reverse direction to the forward direction and shift to the standby process. . 前記待機過程では前記ギアポンプを第1の回転速度で正方向に回転させ、前記溶湯レベル上昇過程では前記ギアポンプを前記第1の回転速度よりも高い第2の回転速度で正方向に回転させ、前記溶湯レベル下降過程では前記ギアポンプを逆方向に回転させるように前記制御部が構成されている請求項3または4に記載の鉛蓄電池用極板ストラップ鋳造装置。   In the standby process, the gear pump is rotated in the forward direction at a first rotational speed, and in the molten metal level increasing process, the gear pump is rotated in the forward direction at a second rotational speed higher than the first rotational speed, 5. The electrode strap casting apparatus for a lead storage battery according to claim 3, wherein the control unit is configured to rotate the gear pump in a reverse direction in a molten metal level lowering process. 鉛蓄電池の極板群の同極性の極板の耳部同士を接続するストラップを鋳造する方法であって、
請求項1に記載された鉛蓄電池用極板ストラップ鋳造装置を用い、
前記バルブを開いた状態で前記ギアポンプを正方向に連続回転させて前記湯溜り溝内の溶湯レベルを前記規定レベルに保つ待機過程と、前記バルブを閉じた状態で前記ギアポンプを正方向に回転させることにより前記湯溜り溝内の溶湯レベルを上昇させて前記湯溜り溝内の溶湯を前記堰を越えて前記キャビティ内に流入させ、最終的には前記型凹部内の溶湯レベルを前記堰の上端のレベル以上のレベルまで上昇させる溶湯レベル上昇過程と、前記バルブを開き、前記湯溜り溝内の溶湯レベルが前記堰の上端レベル以下のレベルまで低下するまでの間前記ギアポンプを逆方向に回転させて前記溶湯レベル上昇過程で上昇した溶湯レベルを下降させる溶湯レベル下降過程とを行わせ、
前記溶湯レベル下降過程で前記型凹部内の溶湯レベルが前記極板群の耳部を溶湯中に挿入しても前記型凹部から溶湯があふれることがないレベルまで低下したときに前記極板群の耳部を前記キャビティ内の溶湯中に挿入し、
前記溶湯レベル下降過程で前記湯溜り溝内の溶湯レベルが前記規定レベルまたは設定レベルまで低下したときに前記ギアポンプの回転方向を逆方向から正方向に反転させて前記待機過程に移行させ、
前記キャビティ内の溶湯を凝固させることにより前記ストラップを鋳造する鉛蓄電池用極板ストラップ鋳造方法。
A method of casting a strap for connecting the ears of electrode plates of the same polarity of the electrode plate group of a lead storage battery,
Using the electrode plate strap casting apparatus for a lead storage battery according to claim 1,
A standby process in which the gear pump is continuously rotated in the forward direction with the valve opened to maintain the molten metal level in the hot water ditch groove at the specified level, and the gear pump is rotated in the forward direction with the valve closed. As a result, the molten metal level in the puddle groove is raised so that the molten metal in the puddle groove flows over the weir and into the cavity, and finally the molten metal level in the mold recess is set to the upper end of the weir. The molten metal level is raised to a level equal to or higher than the level, and the valve is opened, and the gear pump is rotated in the reverse direction until the molten metal level in the hot water ditch is lowered to a level lower than the upper end level of the weir. And a molten metal level lowering process for lowering the molten metal level raised in the molten metal level rising process,
When the molten metal level in the mold recess is lowered to a level at which the molten metal does not overflow from the mold recess even when the ear portion of the electrode plate group is inserted into the molten metal in the molten metal level lowering process. Insert the ear into the molten metal in the cavity,
When the molten metal level in the molten metal groove is lowered to the specified level or set level in the molten metal level lowering process, the rotational direction of the gear pump is reversed from the reverse direction to the forward direction to shift to the standby process,
An electrode plate strap casting method for a lead storage battery, wherein the strap is cast by solidifying molten metal in the cavity.
鉛蓄電池の極板群の同極性の極板の耳部同士を接続するストラップを鋳造する方法であって、
請求項1に記載された鉛蓄電池用極板ストラップ鋳造装置を用い、
前記バルブを開いた状態で前記ギアポンプを正方向に連続回転させて前記湯溜り溝内の溶湯レベルを前記規定レベルに保つ待機過程と、前記型凹部内の溶湯レベルを前記堰の上端のレベル以上に設定された過剰レベルまで上昇させるために必要な時間の間バルブを閉じた状態でギアポンプを正方向に回転させて前記型凹部内の溶湯レベルを上昇させる溶湯レベル上昇過程と、溶湯レベル上昇過程が終了した後前記バルブを開いた状態で前記湯溜り溝内の溶湯レベルを前記堰の上端レベル以下のレベルまで低下させるために必要な時間の間前記ギアポンプを逆方向に回転させて前記型凹部内の溶湯レベルを下降させる溶湯レベル下降過程とを行わせ、
前記溶湯レベル下降過程で前記型凹部内の溶湯レベルが前記極板群の耳部を溶湯中に挿入しても前記型凹部から溶湯があふれることがないレベルまで低下するタイミングで前記極板群の耳部を前記キャビティ内の溶湯中に挿入し、
前記溶湯レベル下降過程が終了した後に前記ギアポンプの回転方向を逆方向から正方向に反転させて前記待機過程に移行させ、
前記キャビティ内の溶湯を凝固させることにより前記ストラップを鋳造する鉛蓄電池用極板ストラップ鋳造方法。
A method of casting a strap for connecting the ears of electrode plates of the same polarity of the electrode plate group of a lead storage battery,
Using the electrode plate strap casting apparatus for a lead storage battery according to claim 1,
A standby process in which the gear pump is continuously rotated in the forward direction with the valve opened to maintain the molten metal level in the hot water ditch groove at the specified level, and the molten metal level in the mold recess is equal to or higher than the upper end level of the weir. A melt level increasing process in which the gear pump is rotated in the forward direction while the valve is closed for the time necessary to increase to the excessive level set in the above, and the molten metal level in the mold recess is increased, and the molten metal level increasing process When the valve is opened, the gear recess is rotated in the reverse direction for a time required to lower the molten metal level in the hot water ditch to a level lower than the upper end level of the weir. A molten metal level lowering process for lowering the molten metal level inside,
In the process of lowering the molten metal level, the molten metal level in the mold recess decreases to a level at which the molten metal does not overflow from the mold recess even when the ear portion of the electrode plate group is inserted into the molten metal. Insert the ear into the molten metal in the cavity,
After the molten metal level lowering process is completed, the rotational direction of the gear pump is reversed from the reverse direction to the forward direction to shift to the standby process,
An electrode plate strap casting method for a lead storage battery, wherein the strap is cast by solidifying molten metal in the cavity.
前記待機過程では、前記ギアポンプを第1の回転速度で正方向に回転させ、前記溶湯レベル上昇過程では前記ギアポンプを前記第1の回転速度よりも高い第2の回転速度で正方向に回転させる請求項6または7に記載の鉛蓄電池用極板ストラップ鋳造方法。   The gear pump is rotated in the forward direction at a first rotational speed in the standby process, and the gear pump is rotated in the forward direction at a second rotational speed higher than the first rotational speed in the molten metal level increasing process. Item 8. The method for casting an electrode plate strap for a lead storage battery according to Item 6 or 7. 正極板と負極板とをセパレータを介して積層して鉛蓄電池用の極板群を構成する極板群構成工程と、前記極板群の同極性の極板の耳部同士を接続するストラップを鋳造するストラップ鋳造工程と、前記ストラップが鋳造された極板群を電槽内に収容してセル間を接続し、該電槽内に電解液を注入する組立工程とを行って鉛蓄電池を製造する鉛蓄電池の製造方法であって
前記ストラップ鋳造工程では、請求項6ないし8のいずれか1つに記載された鋳造方法により前記ストラップを鋳造する鉛蓄電池の製造方法。
A positive electrode plate and a negative electrode plate are laminated via a separator to form an electrode plate group forming step for a lead storage battery, and a strap for connecting the ears of the electrode plates of the same polarity of the electrode plate group. A lead-acid battery is manufactured by carrying out a casting process of casting a strap and an assembly process in which a group of electrode plates on which the strap is cast is accommodated in a battery case, and the cells are connected to each other, and an electrolytic solution is injected into the battery case. A method for manufacturing a lead storage battery, wherein, in the strap casting step, the strap is cast by the casting method according to any one of claims 6 to 8.
JP2008315640A 2008-12-11 2008-12-11 Lead-acid battery manufacturing method, and lead-acid battery electrode plate strap casting method and casting apparatus used in the manufacturing method Expired - Fee Related JP5504622B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008315640A JP5504622B2 (en) 2008-12-11 2008-12-11 Lead-acid battery manufacturing method, and lead-acid battery electrode plate strap casting method and casting apparatus used in the manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008315640A JP5504622B2 (en) 2008-12-11 2008-12-11 Lead-acid battery manufacturing method, and lead-acid battery electrode plate strap casting method and casting apparatus used in the manufacturing method

Publications (2)

Publication Number Publication Date
JP2010140744A JP2010140744A (en) 2010-06-24
JP5504622B2 true JP5504622B2 (en) 2014-05-28

Family

ID=42350698

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008315640A Expired - Fee Related JP5504622B2 (en) 2008-12-11 2008-12-11 Lead-acid battery manufacturing method, and lead-acid battery electrode plate strap casting method and casting apparatus used in the manufacturing method

Country Status (1)

Country Link
JP (1) JP5504622B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102335826B1 (en) * 2021-04-23 2021-12-06 (주)제이엔엘테크 Battery cell casting machine and casting method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101367565B1 (en) * 2012-01-19 2014-02-27 세방전지(주) Cast on strap mold
CN105364053B (en) * 2015-12-09 2017-11-17 浙江海悦自动化机械股份有限公司 A kind of producing device suitable for bus-bar
KR20180001274U (en) * 2016-10-26 2018-05-04 주식회사 아트라스비엑스 Strap Pump and Mold for cast
KR20180001275U (en) * 2016-10-26 2018-05-04 주식회사 아트라스비엑스 Strap cast mold
CN109860625B (en) * 2018-12-27 2024-03-29 安徽理士电源技术有限公司 Method and device for controlling cast-welding process of battery electrode group

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02152161A (en) * 1988-12-03 1990-06-12 Furukawa Battery Co Ltd:The Welding mold of plate lug group for lead-acid battery
GB8923690D0 (en) * 1989-10-20 1989-12-06 Drg Uk Ltd Casting apparatus
JPH09174226A (en) * 1995-12-22 1997-07-08 Furukawa Battery Co Ltd:The Method for casting strap for connecting ear group of electrode plate group for lead battery
GB0302268D0 (en) * 2003-01-31 2003-03-05 Tbs Eng Ltd Apparatus for connecting a battery plate to a metal strap or post

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102335826B1 (en) * 2021-04-23 2021-12-06 (주)제이엔엘테크 Battery cell casting machine and casting method

Also Published As

Publication number Publication date
JP2010140744A (en) 2010-06-24

Similar Documents

Publication Publication Date Title
JP5504622B2 (en) Lead-acid battery manufacturing method, and lead-acid battery electrode plate strap casting method and casting apparatus used in the manufacturing method
US8061404B2 (en) Mold for a battery cast on strap
RU2533964C2 (en) Continuous casting of lead alloy strip for higher-power storage battery electrodes
US10814384B2 (en) Apparatus for moulding battery components
JPH1186834A (en) Manufacture of plate group body for lead-acid battery and device thereof
CN105261725B (en) Polar plate of lead acid storage battery group cast welding device and method
CA1095982A (en) Method and apparatus for forming battery straps and intercell connections
KR100997365B1 (en) Submerged nozzle centering apparatus
CN107414059A (en) Lead accumulator cast welding machine cooling device
JP2000251921A (en) Battery jar forming device for lead-acid battery and battery jar forming method
US4341256A (en) Method and apparatus for forming battery straps and intercell connections
JP2011083778A (en) Three-dimensional shaping method and three-dimensional shaping device
JP2006024514A (en) Strap, die for casting, insert, casting apparatus, and casting method
CN202316971U (en) Automatic lead liquid injection mechanism
US4230241A (en) Ladle for delivering a plurality of aliquots of molten metal
US6216764B1 (en) Method and apparatus for making lead-acid batteries
JP2010212010A (en) Lead-acid battery and method of manufacturing the same
JP2001351599A (en) Device and method for manufacturing lead-acid battery
CN210730923U (en) Vertical downward drawing hot type continuous casting device
JPS6034225B2 (en) Welding device for battery electrode plate ears and cast straps
KR102157855B1 (en) Apparatus for manufactruing grid for battery
CN111906250B (en) Die and method for eliminating air holes in lead parts
JP2010277696A (en) Manufacturing method and manufacturing device of lead-acid battery
CN114005631A (en) Soft start mends integrated device
JP2002025534A (en) Forming method of strap of electrode plate group for lead-acid battery

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110926

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130520

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130611

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20130730

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140218

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140303

R150 Certificate of patent or registration of utility model

Ref document number: 5504622

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees