JP5502447B2 - Boom deflection suppressing device for a working machine with a boom - Google Patents

Boom deflection suppressing device for a working machine with a boom Download PDF

Info

Publication number
JP5502447B2
JP5502447B2 JP2009281786A JP2009281786A JP5502447B2 JP 5502447 B2 JP5502447 B2 JP 5502447B2 JP 2009281786 A JP2009281786 A JP 2009281786A JP 2009281786 A JP2009281786 A JP 2009281786A JP 5502447 B2 JP5502447 B2 JP 5502447B2
Authority
JP
Japan
Prior art keywords
tension
boom
rope
pretension
mast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009281786A
Other languages
Japanese (ja)
Other versions
JP2011121738A (en
Inventor
敬 小原
泰宏 前田
健郎 生山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tadano Ltd
Original Assignee
Tadano Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tadano Ltd filed Critical Tadano Ltd
Priority to JP2009281786A priority Critical patent/JP5502447B2/en
Publication of JP2011121738A publication Critical patent/JP2011121738A/en
Application granted granted Critical
Publication of JP5502447B2 publication Critical patent/JP5502447B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

本願発明は、伸縮ブームを備えたクレーン等のブーム付き作業機において、ブームの自重及び吊下荷重等による撓みを抑制するブームの撓み抑制装置に関するものである。   The present invention relates to a boom bending suppression device that suppresses bending due to its own weight, suspension load, or the like in a boom-equipped working machine such as a crane provided with a telescopic boom.

ブーム付の作業機の一例として、ブーム付きのクレーン(クレーン車)が知られている。このようなブーム付きクレーンは、ビル等の建造物を構築するに際して、必要な資材ユニットを吊り上げ、所要の作業場所に運搬するのに適している。このため、ビル建設等の用途に有効に利用されている。   As an example of a working machine with a boom, a crane with a boom (crane vehicle) is known. Such a crane with a boom is suitable for lifting a necessary material unit and transporting it to a required work place when a building such as a building is constructed. For this reason, it is used effectively for purposes such as building construction.

そして、上記ビル等の建造物は、近年益々高層化するとともに、使用される資材ユニットも、次第に大型化する傾向にある。   And the buildings such as the above-mentioned buildings are getting higher and higher in recent years, and the material units used tend to become larger gradually.

このため、クレーン自体も大型化し、ブームの伸縮段数を増加させて、高揚程での荷送り作業に適したものが提供されるようになっている。   For this reason, the crane itself is also increased in size, the number of boom expansion / contraction steps is increased, and a crane suitable for a high-lifting work is provided.

ところが、このようにブーム部分の長さが長くなり、吊荷の荷重も大きくなると、自重を含めてブームにかかる荷重も増大し、その撓み量も大きなものとなる。   However, when the length of the boom portion is increased and the load of the suspended load is increased as described above, the load applied to the boom including its own weight is increased, and the amount of bending is also increased.

このため、上記クレーンのようなブーム付作業機では、ブームの自重及び吊荷の荷重等による撓みを抑制するための撓み抑制装置が設けられている。   For this reason, in a working machine with a boom such as the above-described crane, a bending suppression device is provided for suppressing bending due to the weight of the boom, the load of a suspended load, or the like.

このブームの撓み抑制装置は、例えばマスト、テンションロープ、テンション部材、プリテンションシリンダ、テンションウインチ、マスト起伏シリンダ等を備え、伸縮ブームの基端ブームの先端部にマストを設け、該マストの先端部と上記基端ブームとの間にテンション部材を配置するとともに、上記マストの先端部と先端ブームの先端部との間にテンションロープを張設し、該張設されたテンションロープの張力を例えば上記マスト部分に配置したテンションウインチおよびプリテンションシリンダによって適切な張力を付与することによって、上記ブームの撓みを抑制するようにしている(例えば特許文献1を参照)。   This boom bending suppression device includes, for example, a mast, a tension rope, a tension member, a pretension cylinder, a tension winch, a mast hoisting cylinder, etc., and a mast is provided at the distal end of the base boom of the telescopic boom. And a proximal end boom, a tension member is disposed between the distal end portion of the mast and the distal end portion of the distal end boom. Appropriate tension is applied by a tension winch and a pretension cylinder arranged in the mast portion to suppress the bending of the boom (see, for example, Patent Document 1).

すなわち、このようなクレーン等のブーム付き作業機におけるブームの撓み抑制装置では、格納状態から、テンション部材の伸縮ブームの後端側への連結、マスト起伏シリンダの駆動によるマストの張出し、テンションウインチの駆動によるテンションロープの繰り出し、先端ブームの先端部へのテンションロープの接続、伸縮ブームの所定量の起伏および伸長、テンションウインチのロックを行った後、最終的なプリテンションセット(目標となる適切な規定値への張力セット)を行なって作業をする。   That is, in such a boom bending suppression device for a boom-equipped work machine such as a crane, the connection of the tension member to the rear end side of the telescopic boom from the retracted state, the extension of the mast by driving the mast hoisting cylinder, the tension winch After driving the tension rope, connecting the tension rope to the tip of the tip boom, lifting and extending the telescopic boom by a predetermined amount, locking the tension winch, the final pretension set (appropriate target Set the tension to the specified value).

このプリテンションセット作業は、上記テンションウインチによりテンションロープの張設を行った後に上記プリテンションシリンダを所定量縮め、上記テンションロープに所望の張力を掛けることにより行われる。   This pretension setting operation is performed by tensioning the tension rope with the tension winch and then shrinking the pretension cylinder by a predetermined amount and applying a desired tension to the tension rope.

そして、その上で必要な吊荷作業を行ない、同吊荷作業が終了すると、上記張力可変手段(張力調節)であるプリテンションシリンダを伸ばして、上記プリテンションセット前の張力までテンションロープを緩めるプリテンションリセット操作を行って、同装置を上述した元の格納状態に格納するようになっている。   Then, the necessary lifting work is performed, and when the lifting work is completed, the pretension cylinder as the tension changing means (tension adjustment) is extended and the tension rope is loosened to the tension before the pretension set. A pretension reset operation is performed to store the apparatus in the original storage state described above.

なお、上記プリテンションセット、リセット用のテンションロープの張力可変手段としては、上記プリテンションシリンダ以外に、例えばテンションウインチ自体を用いてプリテンションセット、リセットすることも可能である。   In addition to the pre-tension cylinder, for example, a tension winch itself can be used as the pre-tension set / reset tension rope tension changing means.

特開2008−120525号公報JP 2008-120525 A

ところが、このようなブーム撓み抑制装置において、ロープ張力可変手段であるプリテンションシリンダを伸ばしてテンションロープの張力を吊荷状態で緩める(プリテンションリセットする)と、ブームに負荷が掛かってしまい、ブームの撓みが増加して危険な状態(過負荷)になるという問題があった。   However, in such a boom deflection suppressing device, if the pretension cylinder, which is a rope tension variable means, is extended and the tension of the tension rope is loosened in a suspended state (pretension reset), a load is applied to the boom. There has been a problem that the bending of the material increases and becomes a dangerous state (overload).

他方、逆に吊荷状態でプリテンションセットすると、ブームが本来とは異なるプリテンション状態になってしまい(本来の性能を発揮できず)、危険である。   On the other hand, if the pretension is set in a suspended load state, the boom will be in a pretension state different from the original (cannot exhibit its original performance), which is dangerous.

本願発明は、このような問題を解決するためになされたもので、テンションロープの張力を緩める撓み抑制装置のプリテンションリセット作業時または上記テンションロープの張力を高めるプリテンションセット作業時において、テンションロープの張力又は実荷重を検出し、検出された張力又は実荷重が所定値以上である場合には、吊荷状態であると判断してプリテンションリセット動作またはプリテンションセット動作を規制することにより、吊荷状態又はブームの撓みによりテンションロープが緩まない状態において誤ってプリテンションリセット操作またはプリテンションセット操作がなされたような場合にも、自動的に同リセット動作またはセット操作が規制されるようにして、誤ったリセット動作またはセット操作を回避し得るようにしたブーム付き作業機におけるブーム撓み抑制装置を提供することを目的とするものである。   The present invention has been made to solve such a problem. In the pretension reset operation of the bending suppression device for loosening the tension of the tension rope, or in the pretension setting operation for increasing the tension of the tension rope, the tension rope When the detected tension or actual load is equal to or greater than a predetermined value, it is determined that the state is a suspended load, and the pretension reset operation or the pretension set operation is regulated. Even if the pretension reset operation or pretension set operation is mistakenly performed in the state where the tension rope does not loosen due to the suspended load or the bending of the boom, the reset operation or set operation is automatically regulated. Can avoid incorrect resetting or setting operations It is an object to provide a boom bending prevention device in Unishi was boom with the working machine.

本願各発明は、該目的を達成するために、それぞれ次のような課題解決手段を備えて構成されている。   In order to achieve the object, each invention of the present application includes the following problem solving means.

(1) 請求項1の発明の課題解決手段
本願請求項1の発明の課題解決手段は、マスト、テンションロープ、テンション部材、テンションロープの張力可変手段、テンションウインチ、マスト起伏手段を備え、伸縮ブームの基端ブームにマストを設け、該マストの先端部と基端ブームとの間にテンション部材を配置するとともに、上記マストの先端部と先端ブームの先端部または上記伸縮ブーム先端に固定されたジブ基台との間にテンションロープを張設し、該張設されたテンションロープの張力を上記張力可変手段により所定の目標値にプリテンションセットすることによって、上記伸縮ブームの撓みを抑制するようにしてなるブーム付作業機の撓み抑制装置であって、上記テンションロープにかかる張力を検出する張力検出手段と、上記テンションロープの張力を緩めるプリテンションリセット動作または上記テンションロープの張力を高めるプリテンションセット動作を規制する規制手段とを設け、上記張力可変手段を作動させて上記テンションロープの張力を緩めるプリテンションリセット作業時または上記テンションロープの張力を高めるプリテンションセット作業時、上記張力検出手段によって上記テンションロープにかかる張力を検出し、同検出された張力値が所定値以上である場合には吊荷状態であると判断して、上記プリテンションリセット動作または上記プリテンションセット動作を規制するようにしたことを特徴としている。
(1) The problem solving means of the invention of claim 1 The problem solving means of the invention of claim 1 comprises a mast, a tension rope, a tension member, a tension variable means for the tension rope, a tension winch, and a mast raising / lowering means. A mast is provided on the proximal boom of the mast, a tension member is disposed between the distal end of the mast and the proximal boom, and the jib fixed to the distal end of the mast and the distal end of the distal boom or the distal end of the telescopic boom. A tension rope is stretched between the base and the tension rope tension is pre-tensioned to a predetermined target value by the tension variable means to suppress the bending of the telescopic boom. A bending restraining device for the boom-equipped working machine, wherein the tension detecting means detects the tension applied to the tension rope; and Pre-tension reset operation for providing a pre-tension reset operation for relaxing the tension rope tension or a pre-tension setting operation for regulating the pre-tension setting operation for increasing the tension rope tension and actuating the tension variable means to loosen the tension rope tension At the time of pre-tension setting to increase the tension of the tension rope, the tension applied to the tension rope is detected by the tension detecting means, and when the detected tension value is equal to or greater than a predetermined value, it is in a suspended state. Therefore, the pretension reset operation or the pretension set operation is regulated.

このような構成によると、ブームの撓み抑制装置において、プリテンションシリンダ等のロープ張力可変手段を作動させて、作業開始前の張力までテンションロープの張力を緩めるプリテンションリセット作業時またはテンションロープの張力を高めるプリテンションセット作業時、張力検出手段によりテンションロープの張力を検出し、該検出された張力値が所定値以上である場合には、吊荷状態であると判断してプリテンションリセット動作またはプリテンションセット動作を規制するから、例えば吊荷状態で誤ってプリテンションリセット操作またはプリテンションセット操作がなされたような場合にも、自動的に同リセット動作またはセット操作が規制され、誤ったリセット動作またはセット操作が確実に回避される。   According to such a configuration, in the boom deflection control device, the rope tension variable means such as the pretension cylinder is operated to release the tension rope tension to the tension before starting the work, or the tension tension of the tension rope. When the pretension setting work is performed, the tension detecting means detects the tension of the tension rope, and when the detected tension value is equal to or greater than a predetermined value, it is determined that the state is a suspended load, or the pretension reset operation or Since the pre-tension set operation is restricted, for example, when the pre-tension reset operation or pre-tension set operation is mistakenly performed in a suspended load state, the same reset operation or set operation is automatically restricted, and an erroneous reset is performed. Operation or set operation is reliably avoided.

その結果、確実なプリテンションリセットまたはプリテンションセットが行われ、作業の安全性が確保される。   As a result, reliable pretension reset or pretension set is performed, and work safety is ensured.

(2) 請求項2の発明の課題解決手段
本願請求項2の発明の課題解決手段は、マスト、テンションロープ、テンション部材、テンションロープの張力可変手段、テンションウインチ、マスト起伏シリンダを備え、伸縮ブームの基端ブームにマストを設け、該マストの先端部と基端ブームとの間にテンション部材を配置するとともに、上記マストの先端部と先端ブームの先端部または上記伸縮ブーム先端に固定されたジブ基台との間にテンションロープを張設し、該張設されたテンションロープの張力を上記張力可変手段により所定の目標値にプリテンションセットすることによって、上記伸縮ブームの撓みを抑制するようにしてなるブーム付作業機の撓み抑制装置であって、実荷重値を演算する実荷重値演算手段と、上記テンションロープの張力を緩めるプリテンションリセット動作または上記テンションロープの張力を高めるプリテンションセット動作を規制する規制手段とを設け、上記張力可変手段を作動させて上記テンションロープの張力を緩めるプリテンションリセット作業時または上記テンションロープの張力を高めるプリテンションセット作業時、上記実荷重値演算手段によって実荷重値を演算し、同演算された実荷重値が所定値以上である場合には吊荷状態であると判断して、上記プリテンションリセット動作またはプリテンションセット動作を規制するようにしたことを特徴としている。
(2) The problem solving means of the invention of claim 2 The problem solving means of the invention of claim 2 comprises a mast, a tension rope, a tension member, tension tension variable means, a tension winch, and a mast hoisting cylinder, and a telescopic boom A mast is provided on the proximal boom of the mast, a tension member is disposed between the distal end of the mast and the proximal boom, and the jib fixed to the distal end of the mast and the distal end of the distal boom or the distal end of the telescopic boom. A tension rope is stretched between the base and the tension rope tension is pre-tensioned to a predetermined target value by the tension variable means to suppress the bending of the telescopic boom. a bending prevention device of a boom with a working machine comprising Te and the actual load value calculation means for calculating an actual load value, the tension ropes And regulating means for regulating the pulp retention resetting or pretension set operation to increase the tension of the tension ropes loosen the tension provided to actuate said tension varying means during pretensioning reset operations loosening the tension of the tension rope or At the time of pre-tension setting work for increasing the tension of the tension rope, the actual load value is calculated by the actual load value calculating means. If the calculated actual load value is equal to or greater than a predetermined value, it is determined that the load is suspended. Thus, the pretension reset operation or the pretension set operation is regulated.

このような構成によると、ブームの撓み抑制装置において、プリテンションシリンダ等のロープ張力可変手段を作動させて、作業開始前の張力までテンションロープの張力を緩めるプリテンションリセット作業時またはテンションロープの張力を高めるプリテンションセット作業時において、例えばブーム起伏反力又は/および吊荷張力などから実荷重値を演算し、該演算された実荷重値が所定値以上である場合には、吊荷状態であると判断してプリテンションリセット動作またはプリテンションセット動作を規制するから、例えば吊荷状態又はブームの撓みによりテンションロープが緩まない状態において誤ってプリテンションリセット操作またはプリテンションセット操作がなされたような場合にも、自動的に同リセット動作またはセット操作が規制され、誤ったリセット動作またはセット操作が確実に回避される。   According to such a configuration, in the boom deflection control device, the rope tension variable means such as the pretension cylinder is operated to release the tension rope tension to the tension before starting the work, or the tension tension of the tension rope. When the pretension setting work is performed, the actual load value is calculated from, for example, the boom undulation reaction force or / and the suspended load tension, and when the calculated actual load value is equal to or greater than the predetermined value, Pre-tension reset operation or pre-tension set operation is regulated by judging that there is, for example, pre-tension reset operation or pre-tension set operation seems to have been mistakenly performed in a state where the tension rope is not loosened due to hanging load or boom bending, for example. In this case, the same reset operation or set Operation is restricted, erroneous resetting or set operation is reliably avoided.

その結果、プリテンションリセット時またはプリテンションセット時の過負荷によるブームの撓みが防止され、作業の安全性が確保される。   As a result, bending of the boom due to overload at the time of pre-tension reset or pre-tension set is prevented, and work safety is ensured.

(3) 請求項3の発明の課題解決手段
本願請求項3の発明の課題解決手段は、上記請求項1又は2の発明の課題解決手段において、ブーム起伏角度の判定手段を設け、実際のブーム起伏角度が所定の範囲から外れている場合にも、プリテンションリセット動作またはプリテンションセット動作を規制するようにしたことを特徴としている。
(3) The problem solving means of the invention of claim 3 The problem solving means of the invention of claim 3 of the present invention is the problem solving means of the invention of claim 1 or 2, wherein a boom undulation angle determining means is provided, and an actual boom is provided. The pre-tension reset operation or the pre-tension set operation is restricted even when the undulation angle is out of a predetermined range.

実際の作業機のブーム起伏角が所定の設定範囲から外れている場合には、ブームの撓み量が増加し、プリテンションリセットまたはプリテンションセットが一律、かつ確実に行えない。   When the boom undulation angle of the actual working machine is out of the predetermined setting range, the amount of bending of the boom increases, and the pretension reset or pretension set cannot be performed uniformly and reliably.

そこで、さらにブーム起伏角度の判定手段を設け、実際のブーム起伏角度が所定の設定範囲から外れている場合にも、同様にプリテンションリセット動作またはセット動作を規制することにより、プリテンションリセットまたはプリテンションセットを一律、かつ確実に行えるようになる。   Therefore, a means for determining the boom hoisting angle is further provided, and even when the actual boom hoisting angle is out of the predetermined setting range, the pretension resetting operation or the setting operation is similarly regulated, thereby restricting the pretension resetting operation or the pretensioning operation. Tension setting can be performed uniformly and reliably.

(4) 請求項4の発明の課題解決手段
本願請求項4の発明の課題解決手段は、上記請求項1,2又は3の発明の課題解決手段において、ワーニングメッセージ出力手段を設け、プリテンションリセット動作またはプリテンションセット動作の規制時には、同プリテンションリセット動作またはプリテンションセット動作の規制に合わせてワーニングメッセージ出力手段により、プリテンションリセット動作またはプリテンションセット動作を規制する旨のワーニングメッセージを出力するようにしたことを特徴としている。
(4) The problem solving means of the invention of claim 4 The problem solving means of the invention of claim 4 of the present invention is the problem solving means of the invention of claim 1, 2, or 3, wherein a warning message output means is provided, and a pretension reset is provided. When the operation or pretension set operation is restricted, a warning message is output to the effect that the pretension reset operation or pretension set operation is restricted by the warning message output means in accordance with the restriction of the pretension reset operation or pretension set operation. It is characterized by doing so.

上記プリテンションリセット動作またはセット動作の規制は、自動的に掛けられるので、規制が掛けられたことをオペレータにも分るようにし、より安心して作業ができるようにする。   Since the restriction of the pretension reset operation or the set operation is automatically applied, the operator can know that the restriction has been applied so that the work can be performed with more peace of mind.

以上の結果、本願発明によると、クレーン等のブーム付き作業機におけるブーム撓み抑制装置のプリテンションリセット時またはプリテンションセット時の誤操作(誤制御)や不安が回避され、作業の安全性が図られる。   As a result of the above, according to the present invention, erroneous operation (erroneous control) and anxiety during pre-tension reset or pre-tension setting of the boom deflection control device in a boom-equipped work machine such as a crane are avoided, and work safety is achieved. .

本願発明の実施の形態1に係るブームの撓み抑制装置を備えたブーム付き作業機(クレーン車)の全体的な構成を示す側面図である。It is a side view which shows the whole structure of the working machine with a boom (crane car) provided with the bending suppression apparatus of the boom which concerns on Embodiment 1 of this invention. 図1中のX部の詳細な構成を示す斜視図である。It is a perspective view which shows the detailed structure of the X section in FIG. 図1に示したクレーン車におけるブーム撓み抑制装置の格納状態を示すクレーン車全体の側面図である。It is a side view of the whole crane vehicle which shows the retracted state of the boom bending suppression apparatus in the crane vehicle shown in FIG. 図1に示したクレーン車におけるブーム撓み抑制装置の張出状態を示すブーム撓み抑制装置部分の側面図である。It is a side view of the boom deflection suppression apparatus part which shows the overhanging state of the boom deflection suppression apparatus in the crane vehicle shown in FIG. 図1に示したクレーン車におけるブーム撓み抑制装置のテンションロープの掛け回し状態を示す全体的な側面図である。It is a whole side view which shows the state of the tension rope of the boom bending suppression apparatus in the crane vehicle shown in FIG. 本願発明の実施の形態1に係るブーム付き作業機のブーム撓み抑制装置の制御回路部分の構成を示すブロック図である。It is a block diagram which shows the structure of the control circuit part of the boom bending suppression apparatus of the working machine with a boom which concerns on Embodiment 1 of this invention. 同本願発明の実施の形態1に係るブーム付き作業機のブーム撓み抑制装置の図6の制御回路によるプリテンションリセット時の誤動作規制制御動作の内容を示すフローチャートである。It is a flowchart which shows the content of the malfunction control control operation at the time of the pretension reset by the control circuit of FIG. 6 of the boom bending suppression apparatus of the working machine with a boom which concerns on Embodiment 1 of this invention. 本願発明の実施の形態2に係るブーム付き作業機のブーム撓み抑制装置の制御回路部分の構成を示すブロック図である。It is a block diagram which shows the structure of the control circuit part of the boom bending suppression apparatus of the working machine with a boom which concerns on Embodiment 2 of this invention. 本願発明の実施の形態3に係るブーム付き作業機のブーム撓み抑制装置の制御回路の構成を示すブロック図である。It is a block diagram which shows the structure of the control circuit of the boom bending suppression apparatus of the working machine with a boom which concerns on Embodiment 3 of this invention. 本願発明の実施の形態4に係るブーム付き作業機のブーム撓み抑制装置のプリテンションセット時の誤動作規制制御動作の内容を示すフローチャートである。It is a flowchart which shows the content of the malfunction control control operation at the time of the pretension setting of the boom bending suppression apparatus of the working machine with a boom which concerns on Embodiment 4 of this invention.

<実施の形態1>
図1〜図7には、例えばクレーン車に適用した本願発明の実施の形態1に係るブーム撓み抑制装置を備えたブーム付き作業機およびブーム撓み抑制装置の構成が示されている。
<Embodiment 1>
FIGS. 1 to 7 show a configuration of a working machine with a boom and a boom deflection suppressing device including the boom deflection suppressing device according to the first embodiment of the present invention applied to, for example, a crane truck.

(クレーン車の全体的な構成)
先ず、図1〜図5を参照して、同実施の形態におけるブーム付作業機であるクレーン車Zの全体的な構成について概説する。
(Overall configuration of crane truck)
First, with reference to FIGS. 1-5, the general structure of the crane vehicle Z which is a working machine with a boom in the embodiment is outlined.

すなわち、このクレーン車Zは、車両1上に搭載された旋回台2に伸縮ブーム3の基端部を連結し、該伸縮ブーム3を上記旋回台2との間に配置したブーム起伏シリンダ6によって起伏動させるとともに、例えば上記伸縮ブーム3の基端ブーム3Aの先端部に張出・格納可能な状態に取付けられたマスト11を張出させて、その先端部と上記伸縮ブーム3の基端ブーム3Aの基端部とをテンションリンク、テンションロープその他のテンション部材13によって連結するとともに、上記マスト11の先端部と上記伸縮ブーム3の先端部、すなわち、先端ブーム3Bの先端部に設けられたブームヘッド3Cを後述の第1のテンションロープ14によって連結し、これらテンション部材13と第1のテンションロープ14の張力によって上記伸縮ブーム3の縦方向(起伏面に沿う方向)の撓み変形を抑制するようになっている。   That is, the crane vehicle Z is connected to the swivel base 2 mounted on the vehicle 1 by connecting the base end portion of the telescopic boom 3 and the boom hoisting cylinder 6 disposed between the telescopic boom 3 and the swivel base 2. For example, the mast 11 attached to the distal end portion of the base end boom 3A of the telescopic boom 3 so as to be extended and retracted is projected, and the distal end portion and the base end boom of the telescopic boom 3 are moved. The base end of 3A is connected by a tension link, tension rope or other tension member 13, and the tip of the mast 11 and the tip of the telescopic boom 3, that is, the boom provided at the tip of the tip boom 3B The head 3C is connected by a first tension rope 14 to be described later, and the expansion and contraction is performed by the tension of the tension member 13 and the first tension rope 14. It adapted to inhibit longitudinal (along the undulating surface) bending deformation of over beam 3.

なお、この実施形態では、上述のように、「マスト11を、上記伸縮ブーム3の基端ブーム3Aの先端部に張出・格納可能な状態に取付ける」としているが、この「基端ブーム3Aの先端部」とは、例えば図1に示すような上記基端ブーム3Aの先端及びその近傍の限られた部位に限定されるものではなく、当該基端ブーム3Aの先端寄りの広い範囲を意味しているものである。また、その他の構成として、例えば基端ブーム3Aの長手方向中間部位置を選んで取付けることも可能である。   In this embodiment, as described above, “the mast 11 is attached to the distal end portion of the base end boom 3A of the telescopic boom 3 in a state where it can be extended and retracted”. The “front end portion” is not limited to the front end of the base end boom 3A as shown in FIG. 1 and a limited portion near the base end boom 3A. It is what you are doing. Further, as another configuration, for example, it is possible to select and attach the middle position of the base end boom 3A in the longitudinal direction.

また、上記ブームヘッド3C側における上記第1のテンションロープ14の接続位置を上記ブームヘッド3Cの幅方向(伸縮ブーム3に起伏面に直交する方向)に適宜張り出させて設けることで、上記伸縮ブーム3の横方向(伸縮ブーム3に起伏面に直交する方向)の撓み変形を抑制することもできるものである(上掲の特許文献1の記載を参照)。   In addition, the extension position of the first tension rope 14 on the boom head 3C side is appropriately extended in the width direction of the boom head 3C (the direction perpendicular to the undulation surface of the extension boom 3). The bending deformation of the boom 3 in the lateral direction (the direction perpendicular to the undulating surface of the telescopic boom 3) can also be suppressed (see the description of the above-mentioned Patent Document 1).

なお、この実施の形態の場合、必ずしも上記伸縮ブーム3の先端側先端ブーム3Bの先端部にジブを設けることを要件とはしていないが、例えば図1中に仮想線で示すように、必要に応じて上記伸縮ブーム3の上記先端ブーム3Bのブームヘッド3Cの先端部にはジブ基台5を介してラチス構造のラフィングジブ4が連結される。その場合、図示のように、ラフィングジブ4は、ジブ基台5に対して前後方向に揺動可能に取付けられた前後一対のマスト41,42と、その途中を上記マスト41,42の上端に支持され、基端側を折り返しシーブ45を介して旋回台2上のバックテンションウィンチ47側から延設されたバックテンションロープ44の先端に、また先端側をラフィングジブ4の先端に各々接続されたバックテンションリンク43によって支持される。   In the case of this embodiment, it is not always necessary to provide a jib at the distal end of the distal boom boom 3B on the distal end side of the telescopic boom 3. However, as shown in phantom lines in FIG. Accordingly, a luffing jib 4 having a lattice structure is connected to the tip of the boom head 3C of the tip boom 3B of the telescopic boom 3 via a jib base 5. In that case, as shown in the figure, the luffing jib 4 is supported by a pair of front and rear masts 41 and 42 attached to the jib base 5 so as to be swingable in the front-rear direction, and the middle is supported by the upper ends of the mast 41 and 42 The back tension is connected to the tip of the back tension rope 44 extending from the back tension winch 47 side on the swivel base 2 through the folded sheave 45 and the tip side is connected to the tip of the luffing jib 4. Supported by a link 43.

そして、上記バックテンションロープ44を、上記旋回台2上のバックテンションウィンチ47によって巻込み・繰出しすることにより、上記バックテンションロープ44の上記折返しシーブ45と上記旋回台2側に設けた固定シーブ46との間のロープ長を増減させることによって上記ラフィングジブ4のチルト角を調整し得るようにする。   Then, the back tension rope 44 is wound and fed by a back tension winch 47 on the swivel base 2, whereby the folded sheave 45 of the back tension rope 44 and the fixed sheave 46 provided on the swivel base 2 side. The tilt angle of the luffing jib 4 can be adjusted by increasing or decreasing the rope length between the two.

なお、さらに他の実施形態として、上述のようなバックテンションロープ44によってチルト角を調整するラチス構造のラフィングジブ4に代えて、例えば伸縮式のボックス構造のもので、且つ伸縮ブーム3との間に配置したチルトシリンダによってチルト角を調整可能としたジブも装着することができる。   As still another embodiment, instead of the luffing jib 4 having a lattice structure that adjusts the tilt angle by the back tension rope 44 as described above, for example, a telescopic box structure and a telescopic boom 3 are provided. A jib whose tilt angle can be adjusted by the arranged tilt cylinder can also be mounted.

ところで、上記マスト11は、例えば図4に示すように、その基端部11aが上記伸縮ブーム3の基端ブーム3Aの先端部3Aaに対して、該伸縮ブーム3の起伏面に沿う方向に回動可能に枢支されていて、該マスト11と上記基端ブーム3Aとの間に配置したマスト起伏シリンダ12の伸縮によって、同図4中に実線で図示するように上記基端ブーム3Aに対して略直交するように立設される張出姿勢と、同図4中に鎖線で図示するように上記基端ブーム3Aに沿って上記基端ブーム3Aと平行に倒伏格納された格納姿勢との間で任意に姿勢が変更される。   By the way, as shown in FIG. 4, for example, the mast 11 has a base end portion 11 a that rotates in a direction along the undulation surface of the telescopic boom 3 with respect to the distal end portion 3 Aa of the base end boom 3 A of the telescopic boom 3. The mast hoisting cylinder 12 that is pivotally supported and disposed between the mast 11 and the base end boom 3A is expanded and contracted with respect to the base end boom 3A as shown by a solid line in FIG. And a retracted posture that is stored in a lying manner in parallel with the base end boom 3A along the base end boom 3A as shown by a chain line in FIG. The posture is arbitrarily changed between.

また、上記マスト11は、同一の構造をもつ左右一対のマスト体を所定の間隔をもって並置した状態に一体化されており、これら一対のマスト体を上記基端ブーム3Aの左右両側面の外側にそれぞれ位置させた状態で、上記基端ブーム3A側に格納して保持されるようになっている。   The mast 11 is integrated in a state where a pair of left and right mast bodies having the same structure are juxtaposed with each other at a predetermined interval, and these pair of mast bodies are arranged outside the left and right side surfaces of the base end boom 3A. In the state of being positioned respectively, the base boom 3A is stored and held.

なお、上記マスト11は、上記同一の構造をもつ左右一対のマスト体を所定の間隔をもって並置するものに変えて、例えば左右一対のマスト体を左右斜め側方に所定の角度開いた状態のもので構成することもできる。   In addition, the mast 11 is a state in which a pair of left and right mast bodies having the same structure are arranged in parallel with a predetermined interval, for example, a pair of left and right mast bodies opened at a predetermined angle to the left and right sides. Can also be configured.

そして、上記マスト11の先端部11bには、該マスト11の側面に直交する方向に延びる回転軸に支持された状態で、一対の固定シーブ(図2参照)18,18が取付けられている。そして、この一対の固定シーブ18,18には上記第1のテンションロープ14が巻き掛けられている。この第1のテンションロープ14の取り回しについては、後述する。   A pair of fixed sheaves (see FIG. 2) 18 and 18 are attached to the distal end portion 11b of the mast 11 while being supported by a rotating shaft extending in a direction orthogonal to the side surface of the mast 11. The first tension rope 14 is wound around the pair of fixed sheaves 18, 18. The handling of the first tension rope 14 will be described later.

さらに、上記マスト11の軸方向の中間部位には、次に述べるテンションウィンチ15と張力可変手段としてのプリテンションシリンダ(伸縮シリンダ)16が備えられている。   Further, a tension winch 15 described below and a pretension cylinder (expandable cylinder) 16 as tension changing means are provided at an intermediate portion in the axial direction of the mast 11.

なお、このプリテンションシリンダ16が、特許請求の範囲中の張力可変手段に相当する。   The pretension cylinder 16 corresponds to a tension varying means in the claims.

上記テンションウィンチ15は、図2にも示すように、例えば油圧モータ15bによって回転駆動されるウインチドラム15aを備えており、このウインチドラム15aには上記第1のテンションロープ14の一端が巻き掛けられている。このテンションウィンチ15は、巻込動及び繰出動を通常の作動形態とするものであるが、上記ブーム撓み抑制装置10の張出作業時には通常の作動形態とは異なった作動を行なうように構成されている。   As shown in FIG. 2, the tension winch 15 includes a winch drum 15a that is rotationally driven by, for example, a hydraulic motor 15b. One end of the first tension rope 14 is wound around the winch drum 15a. ing. The tension winch 15 has a normal operation mode for the winding operation and the feeding operation, but is configured to perform an operation different from the normal operation mode when the boom deflection suppressing device 10 is extended. ing.

すなわち、上記第1のテンションロープ14の先端側に設けられた折返しシーブ19を介して連結された第2のテンションロープ17の先端(図2参照)を上記伸縮ブーム3のブームヘッド3C側に連結した状態で、上記伸縮ブーム3を伸長作動させる場合には、通常の作動形態であれば上記テンションウィンチ15を繰出作動させるのであるが、これを、逆に巻込作動させるようになっている。   That is, the tip of the second tension rope 17 (see FIG. 2) connected via the folded sheave 19 provided on the tip side of the first tension rope 14 is connected to the boom head 3C side of the telescopic boom 3. In this state, when the telescopic boom 3 is operated to extend, the tension winch 15 is fed out in the normal operation mode, but this is reversely wound.

なお、以上の第1,第2のテンションロープ14,17が特許請求の範囲中のテンションロープに相当する。   The first and second tension ropes 14 and 17 correspond to the tension ropes in the claims.

このように巻込作動しているテンションウィンチ15から上記第1のテンションロープ14を上記伸縮ブーム3の伸長力によって逆に引き出すことで、上記テンションウィンチ15の油圧回路(図示省略)の油圧が上昇し、該油圧回路に設けたリリーフ弁が作動して、上記第1のテンションロープ14の引き出しが所定の抵抗をもった状態で行なわれる。その結果、上記第1のテンションロープ14は上記伸縮ブーム3の伸長に伴って所定のブレーキ力が付与された状態で引き出されることになる(すなわち、上記第1のテンションロープ14には所定のテンションが掛けられた状態となる)。   The hydraulic pressure of the hydraulic circuit (not shown) of the tension winch 15 is increased by pulling out the first tension rope 14 from the tension winch 15 that has been wound in this way by the extension force of the telescopic boom 3. Then, the relief valve provided in the hydraulic circuit is activated, and the first tension rope 14 is pulled out with a predetermined resistance. As a result, the first tension rope 14 is pulled out in a state where a predetermined braking force is applied as the telescopic boom 3 is extended (that is, the first tension rope 14 has a predetermined tension). ).

一方、上記テンションウィンチ15の一方のフランジ側には、上記ウインチドラム15aをロックするドラムロック機構20が備えられている。このドラムロック機構20は、掛止爪21aを備えた爪プレート21と該爪プレート21の掛止爪21aに選択的に掛止されるロック爪22を備え、該ロック爪22をロックシリンダ23によって、その支軸を中心として回動させることにより、その爪部を上記爪プレート21の掛止爪21aに対して選択的に掛止させることで上記ドラム15aの回転をロック・アンロックするようになっている。なお、このドラムロック機構20のロック・アンロック状態は、ロック・アンロック検出器24によって検出されるようになっている。   On the other hand, on one flange side of the tension winch 15, a drum lock mechanism 20 for locking the winch drum 15a is provided. The drum lock mechanism 20 includes a claw plate 21 having a latching claw 21 a and a lock claw 22 that is selectively latched by the latching claw 21 a of the claw plate 21. By rotating about the support shaft, the claw portion is selectively latched on the latch claw 21a of the claw plate 21, so that the rotation of the drum 15a is locked / unlocked. It has become. The lock / unlock state of the drum lock mechanism 20 is detected by a lock / unlock detector 24.

上記張力可変手段としてのプリテンションシリンダ16は、上記第1のテンションロープ14に所定のプリテンション(張力)を付与するものであって、その作動ロッド16a先端にはロードセル等の張力検出手段62を介して上記第1のテンションロープ14の他端が連結されている。このプリテンションシリンダ16には、油圧回路の圧力を検出する圧力センサPS1(なお、以下の説明では、図示しない他方側プリテンションシリンダ16の圧力センサをPS2とする)が付設されており、上記圧力センサPS1,PS2によって検出される上記左右プリテンションシリンダ16,16相互の油圧値によって、後述するプリテンションセット状態の完了状態が判定され、また上記張力検出手段62によってプリテンションセット後の上記第1,第2のテンションロープ14,17の張力および張力の変化が検出されるようになっている。   The pretension cylinder 16 serving as the tension variable means applies a predetermined pretension (tension) to the first tension rope 14, and a tension detecting means 62 such as a load cell is provided at the tip of the operating rod 16a. The other end of the first tension rope 14 is connected through the via. The pretension cylinder 16 is provided with a pressure sensor PS1 for detecting the pressure of the hydraulic circuit (in the following description, the pressure sensor of the other pretension cylinder 16 not shown is referred to as PS2). A completion state of a pre-tension set state, which will be described later, is determined based on the hydraulic value between the left and right pre-tension cylinders 16 and 16 detected by the sensors PS1 and PS2, and the tension detection means 62 performs the first after the pre-tension set. The tension of the second tension ropes 14 and 17 and the change in tension are detected.

なお、以上の構成のブーム撓み抑制装置10は、上記伸縮ブーム3の上部両側に一対のものが並設されている。   In addition, the boom bending suppression apparatus 10 having the above-described configuration is provided in parallel with a pair of upper and lower sides of the telescopic boom 3.

ここで、図1、図2及び図4を参照して、上記第1のテンションロープ14の取り回しについて説明する。   Here, the handling of the first tension rope 14 will be described with reference to FIGS. 1, 2, and 4.

上記伸縮ブーム3の先端の上記ブームヘッド3Cには、上記第2のテンションロープ17を介して折返しシーブ19が連結されている(図1参照)。また、上記折返しシーブ19には、図2に示すように、上記第1のテンションロープ14が巻き掛けられている。そして、この第1のテンションロープ14の一端側は、上記マスト11の先端部に設けられた一対の固定シーブ18のうちの一方側を経て上記テンションウィンチ15のウインチドラム15aに巻き付けられている。一方、上記第1のテンションロープ14の他端は、上記一対の固定シーブ18のうちの他方側を経て上記プリテンションシリンダ16の作動ロッド16a先端にロードセル等の張力検出手段62を介して連結されている。   A folded sheave 19 is connected to the boom head 3C at the tip of the telescopic boom 3 via the second tension rope 17 (see FIG. 1). Further, as shown in FIG. 2, the first tension rope 14 is wound around the folded sheave 19. One end side of the first tension rope 14 is wound around the winch drum 15 a of the tension winch 15 through one side of a pair of fixed sheaves 18 provided at the tip of the mast 11. On the other hand, the other end of the first tension rope 14 is connected to the tip of the operating rod 16a of the pretension cylinder 16 via a tension detecting means 62 such as a load cell via the other side of the pair of fixed sheaves 18. ing.

なお、この実施形態では、上記折返しシーブ19に巻き掛けられた上記第1のテンションロープ14を、該折返しシーブ19に連結された上記第2のテンションロープ17を介して上記伸縮ブーム3のブームヘッド3Cに接続するようにしているが、他の実施形態においては、上記第2のテンションロープ17の長さを短くしたり、場合によっては上記折返しシーブ19を直接上記ブームヘッド3Cに取付けるなど、種々の態様を採り得るものである。   In this embodiment, the first tension rope 14 wound around the folded sheave 19 is connected to the boom head of the telescopic boom 3 via the second tension rope 17 connected to the folded sheave 19. In other embodiments, the length of the second tension rope 17 is shortened, and in some cases, the folded sheave 19 is directly attached to the boom head 3C. The embodiment can be adopted.

したがって、上記テンションウィンチ15が巻込動あるいは繰出動を行なうことで、上記第1のテンションロープ14の上記マスト11と上記折返しシーブ19との間の長さが変化し、上記伸縮ブーム3の伸縮に対して上記第1のテンションロープ14の長さを追従させることができる。   Therefore, when the tension winch 15 performs the winding or feeding operation, the length between the mast 11 and the folded sheave 19 of the first tension rope 14 changes, and the telescopic boom 3 expands and contracts. The length of the first tension rope 14 can be made to follow.

そして、上記伸縮ブーム3を所要の長さに設定した時点で、上記ドラムロック機構20を作動させて上記テンションウィンチ15のウインチドラム15aをロックし、その時点における上記第1のテンションロープ14の長さを保持させる。このテンションウィンチ15のウインチドラム15aのロック時点で、一応上記第1のテンションロープ14には一定の大きさのプリテンションが付与されるが、上記ドラムロック機構20のウインチドラムロック位置(即ち、上記ロック爪22が選択的に掛止される上記爪プレート21における掛止爪21aの選択)のみによっては、精度良くプリテンションの調整を行なうことは困難である。   When the telescopic boom 3 is set to a required length, the drum lock mechanism 20 is operated to lock the winch drum 15a of the tension winch 15, and the length of the first tension rope 14 at that time. Keep it. When the winch drum 15a of the tension winch 15 is locked, a predetermined amount of pretension is applied to the first tension rope 14, but the winch drum lock position of the drum lock mechanism 20 (i.e. It is difficult to adjust the pretension with high accuracy only by selecting the latching claw 21a in the claw plate 21 on which the lock claw 22 is selectively latched.

このため、この実施の形態では、上記ドラムロック機構20を作動させて上記テンションウィンチ15のウインチドラム15aをロックした後、上記プリテンションシリンダ16を適宜伸縮させて(縮めて)上記第1のテンションロープ14のプリテンション(張力)を所定の目標値(規定値)に設定するようにしている(後述)。   For this reason, in this embodiment, after the drum lock mechanism 20 is operated to lock the winch drum 15a of the tension winch 15, the pretension cylinder 16 is appropriately expanded and contracted (shrinked). The pretension (tension) of the rope 14 is set to a predetermined target value (specified value) (described later).

このように、上記伸縮ブーム3を所要の長さに設定し、それに対応させて上記第1のテンションロープ14の長さを適切に調整設定することによって、上記プリテンションシリンダ16により上記第1のテンションロープ14に所定のプリテンションを付与することで、先ず上記伸縮ブーム3の自重による撓みの大きさが所定の範囲内に抑制される。   In this way, the telescopic boom 3 is set to a required length, and the length of the first tension rope 14 is appropriately adjusted and set accordingly, so that the pretension cylinder 16 allows the first tension rope 16 to be adjusted. By applying a predetermined pretension to the tension rope 14, first, the amount of bending due to the weight of the telescopic boom 3 is suppressed within a predetermined range.

そして、この状態で、上記伸縮ブーム3のブームヘッド3Cから吊下げられた吊荷フック7を用いて荷を吊り下げることでクレーン作業が行なわれるが、この場合、上記ブーム撓み抑制装置10によって上記伸縮ブーム3の自重による撓みが所定範囲内に抑えられているため、該伸縮ブーム3が過度に撓みを生じることなく、安全に高い揚程でのクレーン作業が実現される。   In this state, the crane work is performed by suspending the load using the suspended load hook 7 suspended from the boom head 3C of the telescopic boom 3. In this case, the boom bending suppression device 10 performs the above-described crane work. Since the bending of the telescopic boom 3 due to its own weight is suppressed within a predetermined range, the crane work at a high head can be realized safely without causing the telescopic boom 3 to bend excessively.

次に、図3及び図5には、上記ブーム撓み抑制装置10の張出し作業の状態を示している。   Next, FIG.3 and FIG.5 has shown the state of the overhang | projection operation | work of the said boom bending suppression apparatus 10. FIG.

図3は、上記クレーン車Zの走行時の姿勢であって、この状態では上記伸縮ブーム3は略水平な全倒伏状態で、かつ全縮状態とされている。また、上記ブーム撓み抑制装置10は、格納姿勢にあり、上記マスト11は上記マスト起伏シリンダ12が全縮することにより、上記伸縮ブーム3の側面に沿った略水平な姿勢に格納保持されている。なお、上記マスト11の格納姿勢での保持は、図示しない固定手段によって確保されていることはいうまでもない。   FIG. 3 shows the posture of the crane vehicle Z when traveling. In this state, the telescopic boom 3 is in a substantially horizontal all-overstrained state and in a fully contracted state. The boom deflection suppressing device 10 is in a retracted posture, and the mast 11 is stored and held in a substantially horizontal posture along the side surface of the telescopic boom 3 when the mast hoisting cylinder 12 is fully contracted. . Needless to say, the holding posture of the mast 11 is secured by a fixing means (not shown).

この図3に示す走行時の姿勢において、上記車両1に備えられている各アウトリガを張出して、上記クレーン車Zを浮上支持した状態(図5参照)において、上記ブーム撓み抑制装置10の張出し作業が開始される。   In the state shown in FIG. 3, the outriggers of the boom deflection suppressing device 10 are extended in a state where the outriggers provided in the vehicle 1 are extended to support the crane vehicle Z in a floating state (see FIG. 5). Is started.

すなわち、図5に示すように、先ず上記伸縮ブーム3を全倒伏、かつ全縮状態のまま、上記マスト起伏シリンダ12を伸長させて、上記マスト11を図3の略水平な格納位置から略鉛直な状態に立設する張出位置まで回動(起仰)させ、この張出位置で停止させる。次に伸縮ブーム3の基端ブーム3Aの後端側にテンション部材13を連結した後に、上記テンションウィンチ15を適宜巻込・繰出作動させながら、上記第1のテンションロープ14の先端側に上記折返しシーブ19を介して連結された上記第2のテンションロープ17の先端を上記伸縮ブーム3の上記ブームヘッド3C側に接続する(上記第1のテンションロープ14の上記伸縮ブーム3側への接続完了)。   That is, as shown in FIG. 5, first, the mast hoisting cylinder 12 is extended with the telescopic boom 3 fully lowered and fully retracted, and the mast 11 is moved from the substantially horizontal storage position of FIG. Rotate (elevate) to an overhanging position standing upright, and stop at this overhanging position. Next, after the tension member 13 is connected to the rear end side of the base end boom 3A of the telescopic boom 3, the folding winch 15 is appropriately wound and unwound, and then folded back to the front end side of the first tension rope 14. The tip end of the second tension rope 17 connected via the sheave 19 is connected to the boom head 3C side of the telescopic boom 3 (completion of connection of the first tension rope 14 to the telescopic boom 3 side). .

その後、例えば図5に矢印Aで示すように、上記伸縮ブーム3を伸長させながら、矢印Bで示すように上記伸縮ブーム3を起仰させ、最終的に図1に示すような作業姿勢とする。   Thereafter, as shown by an arrow A in FIG. 5, for example, the telescopic boom 3 is lifted as shown by an arrow B while the telescopic boom 3 is extended, and finally the working posture is as shown in FIG. .

この場合、上記伸縮ブーム3の伸長に伴って、上記テンションウィンチ15が巻込作動されることにより、上記第1のテンションロープ14は所定のテンションが付与された状態のまま上記テンションウィンチ15から引き出される。従って、上記マスト11の張出姿勢は、該マスト11を後方側から支持する上記テンション部材13のテンションと、前方から支持する上記第1のテンションロープ14のテンションとの釣り合いによって規制され、例え上記伸縮ブーム3の起伏角が大きくなって上記マスト11の自重による後方側へのモーメントが増大しても、上記マスト起伏シリンダ12には大きな荷重が掛かることはなく、該マスト起伏シリンダ12の信頼性が確保され、張出作業における安全性が確保される。   In this case, the tension winch 15 is rolled in as the telescopic boom 3 is extended, so that the first tension rope 14 is pulled out from the tension winch 15 with a predetermined tension applied. It is. Accordingly, the protruding posture of the mast 11 is regulated by the balance between the tension of the tension member 13 that supports the mast 11 from the rear side and the tension of the first tension rope 14 that supports the mast 11 from the front. Even if the hoisting angle of the telescopic boom 3 is increased and the moment to the rear side due to the weight of the mast 11 is increased, the mast hoisting cylinder 12 is not subjected to a large load, and the reliability of the mast hoisting cylinder 12 is improved. Is secured, and safety in overhanging work is secured.

ところで、以上のようなブーム撓み抑制装置10では、必要な吊荷作業を行ない、同吊荷作業がが終了すると、上記張力可変手段(張力調節手段)であるプリテンションシリンダ16を伸ばして、上記プリテンションセット前の張力まで第1のテンションロープ14を緩めるプリテンションリセット操作を行って、同装置10を上述した元の格納状態に格納するようになっている。   By the way, in the boom bending suppression apparatus 10 as described above, when the necessary hanging work is performed and the hanging work is finished, the pretension cylinder 16 which is the tension changing means (tension adjusting means) is extended, and A pretension reset operation is performed to loosen the first tension rope 14 up to the tension before the pretension setting, and the apparatus 10 is stored in the original storage state described above.

ところが、このようなプリテンションリセット作業時、例えば吊荷状態又はブームの撓みにより上記第1のテンションロープ14が緩まない状態において、プリテンションリセット操作がなされたような場合には、過負荷によりブームの撓みが大きくなる問題がある。   However, during such a pretension reset operation, for example, when the pretension reset operation is performed in a suspended load state or in a state where the first tension rope 14 is not loosened due to bending of the boom, the boom is caused by overload. There is a problem that the bending of the substrate becomes large.

そこで、この実施の形態では、上記第1のテンションロープ14に掛かる張力を検出し、同張力が所定値以上である場合には、吊荷状態等であると判断してプリテンションリセット動作を規制するようにしている。   Therefore, in this embodiment, the tension applied to the first tension rope 14 is detected, and when the tension is equal to or greater than a predetermined value, it is determined that the state is a suspended load or the like, and the pretension reset operation is restricted. Like to do.

(プリテンションリセット動作の規制制御)
次に図6のブロック図は、この実施の形態における同プリテンションリセット動作の規制制御を行う制御回路の構成を、また図7のフローチャートは同図6の制御回路によりなされるプリテンションリセット動作の規制制御動作を示している。
(Regulation control of pre-tension reset operation)
Next, the block diagram of FIG. 6 shows the configuration of the control circuit that controls the pretension reset operation in this embodiment, and the flowchart of FIG. 7 shows the pretension reset operation performed by the control circuit of FIG. The regulation control operation is shown.

図6中、符号50は、所定ビット数のマイクロコンピュータ(CPU)を中心とし、外部入力取込用のインターフェイス回路、同インターフェイス回路を介して入力されるアナログ信号をデジタル信号に変換するA/D変換器、外部のアクチュエータや画像ディスプレイ、音声回路等駆動用のドライバー回路等を備えて構成されているブーム撓み抑制コントローラ(ブーム撓み抑制制御用の電子制御ユニット:ECU)である。   In FIG. 6, reference numeral 50 is a microcomputer (CPU) having a predetermined number of bits, and an interface circuit for taking in external inputs, and an A / D for converting an analog signal input through the interface circuit into a digital signal. A boom deflection suppression controller (electronic control unit: ECU for boom deflection suppression control) configured to include a converter, an external actuator, an image display, a driver circuit for driving an audio circuit, and the like.

一方、符号60は、上記クレーン車Zのキャビン内に設けられていて、上述したブーム撓み抑制装置10の第1のテンションロープ14のプリテンション状態をセット操作するプリテンションセットスイッチ、符号61は、同じく上記クレーン車Zのキャビン内に設けられていて、上述したブーム撓み抑制装置10の第1のテンションロープ14のプリテンションセット状態をリセットするプリテンションリセットスイッチ、62は、上記第1のテンションロープ14の張力を検出する張力検出手段であり、それぞれそれらの出力信号は、上記インターフェイス回路を介して上記ブーム撓み抑制コントローラ50に入力され、上記A/D変換器を介してマイクロコンピュータ(CPU)内に取り込まれる。   On the other hand, a reference numeral 60 is provided in the cabin of the crane vehicle Z, and a pretension set switch for setting and operating the pretension state of the first tension rope 14 of the boom bending suppression device 10 described above. Similarly, a pre-tension reset switch provided in the cabin of the crane vehicle Z and resets the pre-tension set state of the first tension rope 14 of the boom deflection suppressing device 10 described above, 62 is the first tension rope 14 is a tension detection means for detecting the tension of each of them, and their output signals are input to the boom deflection suppression controller 50 via the interface circuit, and are sent to the microcomputer (CPU) via the A / D converter. Is taken in.

他方、符号71は、例えば上記プリテンションシリンダ16の伸縮作動用の油圧回路に供給する油圧の供給状態を制御する電磁制御弁よりなるプリテンションシリンダ駆動手段、72は、上記ブーム撓み抑制コントローラ50によりプリテンションシリンダ16のプリテンションリセット動作が規制される時に同時に駆動されてプリテンションリセット動作が規制されたことを示すワーニング情報を発生するワーニング情報発生手段である。   On the other hand, reference numeral 71 is a pretension cylinder driving means comprising an electromagnetic control valve for controlling the supply state of hydraulic pressure supplied to, for example, the hydraulic circuit for expansion and contraction operation of the pretension cylinder 16, and 72 is controlled by the boom deflection suppression controller 50. This is warning information generating means that is driven simultaneously when the pretension reset operation of the pretension cylinder 16 is restricted and generates warning information indicating that the pretension reset operation is restricted.

これらの各制御手段を用いたプリテンションリセット時の第1のテンションロープ14の張力値に対応した規制制御は、上記ブーム撓み抑制コントローラ50により、例えば図7のフローチャートに示すようにしてなされる。   The restriction control corresponding to the tension value of the first tension rope 14 at the time of pre-tension reset using these control means is performed by the boom deflection suppression controller 50 as shown in the flowchart of FIG.

すなわち、当該制御開始後、上記撓み抑制コントローラ50は、先ず上記プリテンションリセットスイッチ61のON又はOFF信号を入力する(ステップS1)。そして、そのON又はOFF状態を判定する(ステップS2)。その結果、プリテンションリセットスイッチ61がON操作されておらず、プリテンションリセット作業時でない(NO)の場合には、そのままステップS1にリターンする。   That is, after the start of the control, the deflection suppression controller 50 first inputs an ON or OFF signal of the pretension reset switch 61 (step S1). Then, the ON or OFF state is determined (step S2). As a result, if the pretension reset switch 61 is not turned on and is not during the pretension reset operation (NO), the process directly returns to step S1.

一方、同プリテンションリセットスイッチ61がON操作されており、プリテンションリセット作業時である(YES)と判定されると、続いて上記張力検出手段62からの第1のテンションロープ14の張力検出信号を入力し(ステップS3)、その時の第1のテンションロープ14の張力が吊荷状態であることを示す所定の張力値よりも小さい値であるか、または同吊荷状態であることを示す所定の張力値以上であるかを判定する(ステップS4)。   On the other hand, if the pretension reset switch 61 is turned on and it is determined that the pretension reset operation is being performed (YES), then the tension detection signal of the first tension rope 14 from the tension detecting means 62 is subsequently received. (Step S3), and the tension of the first tension rope 14 at that time is a value smaller than a predetermined tension value indicating that it is in a suspended state or a predetermined value indicating that it is in the suspended state. It is determined whether the tension value is equal to or greater than (step S4).

同判定の結果、前者の場合(NOの場合)には、そのままプリテンションシリンダ16を伸ばしてプリテンションリセット動作を継続させる(ステップS5)。   As a result of the determination, in the former case (NO), the pretension cylinder 16 is extended as it is and the pretension reset operation is continued (step S5).

他方、後者の場合(YESの時)には、上述したワーニング情報手段72を作動させて、吊荷状態であり、プリテンションリセットを行うと危険である旨をオペレータに報知する(ステップS6)とともに、同プリテンションシリンダ16の駆動を停止してプリテンションリセット動作を禁止する(ステップS7)。   On the other hand, in the latter case (in the case of YES), the warning information means 72 described above is operated to notify the operator that it is in a suspended state and dangerous if pretension reset is performed (step S6). Then, the drive of the pretension cylinder 16 is stopped and the pretension reset operation is prohibited (step S7).

このような構成によると、プリテンションシリンダ16等のロープ張力可変手段を作動させて、作業開始前の張力まで第1のテンションロープ14の張力を緩める撓み抑制装置10のプリテンションリセット作業時において、第1のテンションロープ14の張力を検出し、検出された張力が所定値以上である場合には、吊荷状態であると判断してプリテンションリセット動作を規制するから、例えば吊荷状態又はブームの撓みにより第1のテンションロープ14が緩まないような状態において誤ってプリテンションリセット操作がなされたような場合にも、自動的に同リセット動作が規制され、誤ったリセット動作が確実に回避される。   According to such a configuration, the rope tension variable means such as the pretension cylinder 16 is operated to relax the tension of the first tension rope 14 up to the tension before the work starts. When the tension of the first tension rope 14 is detected and the detected tension is equal to or greater than a predetermined value, the pretension reset operation is restricted by determining that the tension is in a suspended state. Even when the pretension reset operation is mistakenly performed in a state where the first tension rope 14 is not loosened due to the bending of the same, the reset operation is automatically restricted, and the erroneous reset operation is reliably avoided. The

その結果、プリテンションリセット時の過負荷による伸縮ブーム3の撓みが防止され、作業の安全性が確保される。   As a result, bending of the telescopic boom 3 due to overload at the time of pre-tension reset is prevented, and work safety is ensured.

なお、上述のワーニング情報手段72としては、例えば画面での映像又は文字表示、文字表示のあるランプの点滅表示、音声報知など各種の構成が考えられる。   As the warning information means 72 described above, for example, various configurations such as video or character display on a screen, blinking display of a lamp with character display, and voice notification can be considered.

また、上述のプリテンションリセット動作は、本来所定の作業姿勢の範囲(設定時の値)で行う。したがって、上述の構成の場合、上記プリテンションリセット動作を規制するか否かの張力の基準値は作業姿勢に拘わらず一定とした。   Further, the above-described pretension reset operation is originally performed within a predetermined working posture range (value at the time of setting). Therefore, in the case of the above-described configuration, the reference value of the tension whether or not to restrict the pretension reset operation is constant regardless of the work posture.

しかし、該基準値は、上述のように一定でなくクレーンの作業姿勢毎に設定、つまり同作業姿勢が低い時には低い時なりの、また高い時には高い時なりの作業姿勢に応じた最適な値を持たせて規制制御するようにしてもよい。   However, the reference value is not constant as described above and is set for each crane work posture, that is, an optimum value corresponding to the low work posture when the work posture is low and high when the work posture is high. You may make it carry out and carry out regulation control.

(実施の形態2)
次に図8は、本願発明の実施の形態2に係るブーム付き作業機のブーム撓み抑制装置におけるプリテンションリセット動作規制制御回路の構成を示すブロック図である。
(Embodiment 2)
Next, FIG. 8 is a block diagram showing a configuration of a pretension reset operation restriction control circuit in the boom deflection suppressing device for a boom-equipped working machine according to Embodiment 2 of the present invention.

この実施の形態では、プリテンションリセット動作規制制御用のパラメータとして、上記実施の形態1の構成における第1のテンションロープ14にかかる張力値に変えて、例えば図8に示すように、伸縮ブーム3の起伏反力を検出する起伏反力検出手段63又は/および吊荷張力を検出する吊荷張力検出手段64の検出値を基に、ブーム撓み抑制コントローラ50により実荷重値を演算し、同演算された実荷重値が吊荷状態であることを示す所定の値のよりも小さい場合には、そのままプリテンションシリンダ16を伸ばしてプリテンションリセット動作を継続させる。   In this embodiment, instead of the tension value applied to the first tension rope 14 in the configuration of the first embodiment as a parameter for pretension reset operation restriction control, for example, as shown in FIG. Based on the detection value of the undulation reaction force detection means 63 for detecting the undulation reaction force of the vehicle and / or the load tension detection means 64 for detecting the load tension, the boom deflection suppression controller 50 calculates the actual load value. If the actual load value is smaller than a predetermined value indicating that it is in the suspended load state, the pretension cylinder 16 is extended as it is and the pretension reset operation is continued.

なお、上記実荷重値を演算するパラメータとしては、上記のような起伏反力や吊荷張力の他にも、例えばバックテンションロープ44の張力その他各種の吊荷の実荷重値を示すパラメータが使用される。   As parameters for calculating the actual load value, in addition to the above-described undulation reaction force and suspended load tension, for example, the tension of the back tension rope 44 and other parameters indicating actual load values of various suspended loads are used. Is done.

他方、同実荷重値が吊荷状態であることを示す所定の値以上である場合には、上述したワーニング情報手段72を作動させて、吊荷状態であり、プリテンションリセットを行うと危険である旨をオペレータに報知するとともに、同プリテンションシリンダ16の駆動を停止してプリテンションリセット動作を禁止する。   On the other hand, if the actual load value is greater than or equal to a predetermined value indicating that it is in a suspended load state, it is dangerous to operate the warning information means 72 described above to be in a suspended load state and perform a pretension reset. The operator is notified of this fact, and the driving of the pretension cylinder 16 is stopped to prohibit the pretension reset operation.

このような構成によっても、プリテンションシリンダ16等のロープ張力可変手段を作動させて、作業開始前の張力値まで第1のテンションロープ14の張力を緩める撓み抑制装置10のプリテンションリセット作業時において、例えば吊荷状態又はブームの撓みにより第1のテンションロープ14が緩まないような状態において誤ってプリテンションリセット操作がなされたような場合にも、自動的に同リセット動作が規制されるので、やはり誤ったリセット動作が確実に回避される。   Even in such a configuration, the rope tension variable means such as the pretension cylinder 16 is operated to release the tension of the first tension rope 14 to the tension value before starting the work, during the pretension reset operation of the deflection suppressing device 10. For example, even if the pretension reset operation is mistakenly performed in a state where the first tension rope 14 is not loosened due to a suspended load state or a bending of the boom, the reset operation is automatically restricted. Again, an erroneous reset operation is reliably avoided.

その結果、プリテンションリセット時の過負荷による伸縮ブーム3の撓みが防止され、作業の安全性が確保される。   As a result, bending of the telescopic boom 3 due to overload at the time of pre-tension reset is prevented, and work safety is ensured.

(実施の形態3)
次に図9は、本願発明の実施の形態2に係るブーム付き作業機のブーム撓み抑制装置におけるプリテンションリセット動作規制制御回路の構成を示すブロック図である。
(Embodiment 3)
Next, FIG. 9 is a block diagram showing a configuration of a pretension reset operation restriction control circuit in the boom deflection suppressing device for a boom-equipped working machine according to Embodiment 2 of the present invention.

プリテンションリセット動作の規制制御は、上述のように吊荷状態における作業の安全性を向上させるためには、さらに伸縮ブーム3の長さやジブ4の長さ、ジブ4の角度等を検出し、それらが本来の設定値の範囲にあるか否かをブーム撓み抑制コントローラ50によって判定し、実際の伸縮ブーム3の長さやジブ4の長さ、角度が上記本来の設定値の範囲内にある場合には、そのままプリテンションシリンダ16を伸ばしてプリテンションリセット動作を継続させる。   The regulation control of the pretension reset operation detects the length of the telescopic boom 3, the length of the jib 4, the angle of the jib 4, etc. in order to improve the safety of work in the suspended load state as described above. When the boom deflection control controller 50 determines whether or not they are within the range of the original set values, and the actual length of the telescopic boom 3, the length of the jib 4, and the angle are within the range of the original set values In this case, the pretension cylinder 16 is extended as it is and the pretension reset operation is continued.

他方、実際の伸縮ブーム3の長さやジブ4の長さ、角度が上記本来の設定値の範囲内にない場合には、上述したワーニング情報手段72を作動させて、吊荷状態であり、プリテンションリセットを行うと危険である旨をオペレータに報知するとともに、同プリテンションシリンダ16の駆動を停止してプリテンションリセット動作を禁止する。   On the other hand, when the actual length of the telescopic boom 3, the length of the jib 4, and the angle are not within the range of the original set values, the warning information means 72 described above is operated, The operator is notified that it is dangerous to perform the tension reset, and the pretension cylinder 16 is stopped to prohibit the pretension reset operation.

このような構成によると、プリテンションシリンダ16等のロープ張力可変手段を作動させて、作業開始前の張力まで第1のテンションロープ14の張力を緩める撓み抑制装置10のプリテンションリセット作業時において、吊荷状態であるか否かのみでなく、伸縮ブーム3やジブ4の状態をも考慮した上で、自動的に同リセット動作が規制されるようになり、誤ったリセット動作が、より確実に回避される。   According to such a configuration, the rope tension variable means such as the pretension cylinder 16 is operated to relax the tension of the first tension rope 14 up to the tension before the work starts. The reset operation is automatically regulated in consideration of not only whether it is in the suspended load state but also the state of the telescopic boom 3 and the jib 4, so that an erroneous reset operation is more reliably performed. Avoided.

その結果、プリテンションリセット時の過負荷による伸縮ブーム3の撓みが確実に防止され、より有効に作業の安全性が確保される。   As a result, bending of the telescopic boom 3 due to overload at the time of pre-tension reset is reliably prevented, and work safety is more effectively ensured.

(実施の形態4)
次に図10のフローチャートは、本願発明の実施の形態4に係るブーム撓み抑制装置のプリテンションセット時の誤動作規制制御動作の内容を示している。
(Embodiment 4)
Next, the flowchart of FIG. 10 shows the contents of the malfunction restriction control operation at the time of pre-tension setting of the boom deflection suppressing apparatus according to the fourth embodiment of the present invention.

上記のようなブーム撓み抑制装置では、上記プリテンションリセット時だけではなく、逆に同じ吊荷状態でプリテンションセットすると、上記伸縮ブーム3が本来とは異なるプリテンション状態になってしまい(本来の性能を発揮できず)、危険である。   In the boom deflection suppressing device as described above, when the pretension setting is performed not only at the time of the pretension reset but also in the same suspended load state, the telescopic boom 3 enters a pretension state different from the original (original It is dangerous).

この実施の形態では、このような問題を解決するために構成されている。   This embodiment is configured to solve such a problem.

すなわち、この実施の形態におけるプリテンションセット時の第1のテンションロープ14の張力値に対応した規制制御は、上記実施の形態1の図6のものと同様のブーム撓み抑制コントローラ50により、例えば図10のフローチャートに示すようにしてなされる。   That is, the restriction control corresponding to the tension value of the first tension rope 14 at the time of pre-tension setting in this embodiment is performed by, for example, the figure shown in FIG. This is done as shown in the flowchart of FIG.

すなわち、当該制御開始後、上記撓み抑制コントローラ50は、先ず上記プリテンションセットスイッチ60のON又はOFF信号を入力する(ステップS1)。そして、そのON又はOFF状態を判定する(ステップS2)。その結果、プリテンションセットスイッチ60がON操作されておらず、プリテンションセット作業時でない(NO)の場合には、そのままステップS1にリターンする。   That is, after the start of the control, the deflection suppression controller 50 first inputs an ON or OFF signal of the pretension set switch 60 (step S1). Then, the ON or OFF state is determined (step S2). As a result, if the pretension set switch 60 has not been turned on and the pretension set operation is not being performed (NO), the process directly returns to step S1.

一方、同プリテンションセットスイッチ60がON操作されており、プリテンションセット作業時である(YES)と判定されると、続いて上記張力検出手段62からの第1のテンションロープ14の張力検出信号を入力し(ステップS3)、その時の第1のテンションロープ14の張力が吊荷状態であることを示す所定の張力値よりも小さい値であるか、または同吊荷状態であることを示す所定の張力値以上であるかを判定する(ステップS4)。   On the other hand, if the pretension set switch 60 is turned on and it is determined that the pretension set operation is being performed (YES), then the tension detection signal of the first tension rope 14 from the tension detecting means 62 is subsequently received. (Step S3), and the tension of the first tension rope 14 at that time is a value smaller than a predetermined tension value indicating that it is in a suspended state or a predetermined value indicating that it is in the suspended state. It is determined whether the tension value is equal to or greater than (step S4).

同判定の結果、前者の場合(NOの場合)には、そのままプリテンションシリンダ16を縮めてプリテンションセット動作を継続させる(ステップS5)。   As a result of the determination, in the former case (NO), the pretension cylinder 16 is contracted as it is, and the pretension setting operation is continued (step S5).

他方、後者の場合(YESの時)には、上述したワーニング情報発生手段72を作動させて、吊荷状態であり、プリテンションセットを行うと危険である旨をオペレータに報知する(ステップS6)とともに、同プリテンションシリンダ16の駆動を停止してプリテンションセット動作を禁止する(ステップS7)。   On the other hand, in the latter case (in the case of YES), the warning information generating means 72 described above is operated to notify the operator that the vehicle is in a suspended state and dangerous when pre-tensioning is performed (step S6). At the same time, the drive of the pretension cylinder 16 is stopped to prohibit the pretension setting operation (step S7).

このような構成によると、プリテンションシリンダ16等のロープ張力可変手段を作動させて、所定の目標張力(例えば1t)まで第1のテンションロープ14の張力を高める撓み抑制装置10のプリテンションリセット作業時において、第1のテンションロープ14の張力を検出し、検出された張力が所定値以上である場合には、吊荷状態であると判断してプリテンションセット動作を規制するから、例えば吊荷状態又はブームの撓みにより第1のテンションロープ14が緩まないような状態において誤ってプリテンションセット操作がなされたような場合にも、自動的に同セット動作が規制され、誤ったセット動作が確実に回避される。   According to such a configuration, the pretension reset operation of the bending suppression device 10 that operates the rope tension varying means such as the pretension cylinder 16 to increase the tension of the first tension rope 14 to a predetermined target tension (for example, 1 t). At this time, the tension of the first tension rope 14 is detected, and when the detected tension is equal to or greater than a predetermined value, it is determined that the suspension is in a suspended state and the pretension setting operation is restricted. Even if the pre-tension setting operation is mistakenly performed in a state where the first tension rope 14 is not loosened due to the state or bending of the boom, the same setting operation is automatically restricted, and the erroneous setting operation is ensured. To be avoided.

その結果、プリテンションセット時の過負荷による伸縮ブーム3の撓みが防止され、作業の安全性が確保される。   As a result, bending of the telescopic boom 3 due to overload during pre-tension setting is prevented, and work safety is ensured.

もちろん、この場合において、上記実施の形態2,3の技術的思想を組み合わせ、実荷重値をパラメータとして、同様の制御を行うことも可能である。   Of course, in this case, it is also possible to perform the same control by combining the technical ideas of the second and third embodiments and using the actual load value as a parameter.

1 ・・車両
2 ・・旋回台
3 ・・伸縮ブーム
4 ・・ラフィングジブ
5 ・・ジブ基台
6 ・・ブーム起伏シリンダ
7 ・・吊荷フック
10 ・・ブーム撓み抑制装置
11 ・・マスト
12 ・・マスト起伏シリンダ
13 ・・テンションリンク
14 ・・第1のテンションロープ
15 ・・テンションウィンチ
15a ・・ウインチドラム
15b ・・油圧モータ
16 ・・プリテンションシリンダ
17 ・・第2のテンションロープ
18 ・・固定シーブ
19 ・・折返しシーブ
20 ・・ドラムロック機構
21 ・・爪プレート
22 ・・ロック爪
23 ・・ロックシリンダ
24 ・・ロック・アンロック検出器
41 ・・マスト
42 ・・マスト
43 ・・バックテンションリンク
44 ・・バックテンションロープ
45 ・・折返しシーブ
46 ・・固定シーブ
47 ・・バックテンションウィンチ
60 ・・プリテンションセットスイッチ
61 ・・プリテンションリセットスイッチ
62 ・・張力検出手段
63 ・・起伏反力検出手段
64 ・・吊荷張力検出手段
Z ・・クレーン車
DESCRIPTION OF SYMBOLS 1 ・ ・ Vehicle 2 ・ ・ Swivel base 3 ・ ・ Expandable boom 4 ・ ・ Roughing jib 5 ・ ・ Jib base 6 ・ ・ Boom hoisting cylinder 7 ・ ・ Hanging load hook 10 ・ ・ Boom deflection suppressing device 11 ・ ・ Mast 12 Mast hoisting cylinder 13 ·· Tension link 14 ·· First tension rope 15 ·· Tension winch 15a ·· Winch drum 15b ·· Hydraulic motor 16 ·· Pretension cylinder 17 ·· Second tension rope 18 ·· Fixed sheave 19 ·· Folding sheave 20 ·· Drum lock mechanism 21 ·· Claw plate 22 ·· Lock claw 23 ·· Lock cylinder 24 ·· Lock / unlock detector 41 ·· Mast 42 ·· Mast 43 ·· Back tension link 44・ ・ Back tension rope 45 ・ ・ Folded sheave 46 ・Fixed sheave 47 ... back tension winch 60 .. pretension set switch 61 .. pretension reset switch 62 · tension detecting means 63 ... undulation reaction force detecting means 64 ... suspended load tension detecting means Z ... Crane

Claims (4)

マスト、テンションロープ、テンション部材、テンションロープの張力可変手段、テンションウインチ、マスト起伏手段を備え、伸縮ブームの基端ブームにマストを設け、該マストの先端部と基端ブームとの間にテンション部材を配置するとともに、上記マストの先端部と先端ブームの先端部または上記伸縮ブーム先端に固定されたジブ基台との間にテンションロープを張設し、該張設されたテンションロープの張力を上記張力可変手段により所定の目標値にプリテンションセットすることによって、上記伸縮ブームの撓みを抑制するようにしてなるブーム付作業機の撓み抑制装置であって、上記テンションロープにかかる張力を検出する張力検出手段と、上記テンションロープの張力を緩めるプリテンションリセット動作または上記テンションロープの張力を高めるプリテンションセット動作を規制する規制手段とを設け、上記張力可変手段を作動させて上記テンションロープの張力を緩めるプリテンションリセット作業時または上記テンションロープの張力を高めるプリテンションセット作業時、上記張力検出手段によって上記テンションロープにかかる張力を検出し、同検出された張力値が所定値以上である場合には吊荷状態であると判断して、上記プリテンションリセット動作または上記プリテンションセット動作を規制するようにしたことを特徴とするブーム付き作業機におけるブーム撓み抑制装置。   A mast, tension rope, tension member, tension rope tension varying means, tension winch, mast raising / lowering means, a mast is provided on the proximal boom of the telescopic boom, and a tension member between the distal end of the mast and the proximal boom A tension rope between the tip of the mast and the tip of the tip boom or the jib base fixed to the tip of the telescopic boom, and the tension of the tension rope A bending suppression device for a working machine with a boom configured to suppress bending of the telescopic boom by pre-tensioning the tension variable means to a predetermined target value, and detecting the tension applied to the tension rope Detection means and a pretension reset operation for releasing the tension of the tension rope or the tension. Pre-tension setting operation that increases the tension of the tension rope is provided during the pre-tension reset operation that operates the tension variable means to loosen the tension of the tension rope or increases the tension of the tension rope. When the tension detecting means detects the tension applied to the tension rope and the detected tension value is equal to or greater than a predetermined value, the tension is determined to be in the suspended state, and the pretension reset operation or the pretensioning operation is performed. A boom deflection suppressing device for a working machine with a boom, characterized by regulating a tension setting operation. マスト、テンションロープ、テンション部材、テンションロープの張力可変手段、テンションウインチ、マスト起伏シリンダを備え、伸縮ブームの基端ブームにマストを設け、該マストの先端部と基端ブームとの間にテンション部材を配置するとともに、上記マストの先端部と先端ブームの先端部または上記伸縮ブーム先端に固定されたジブ基台との間にテンションロープを張設し、該張設されたテンションロープの張力を上記張力可変手段により所定の目標値にプリテンションセットすることによって、上記伸縮ブームの撓みを抑制するようにしてなるブーム付作業機の撓み抑制装置であって、実荷重値を演算する実荷重値演算手段と、上記テンションロープの張力を緩めるプリテンションリセット動作または上記テンションロープの張力を高めるプリテンションセット動作を規制する規制手段とを設け、上記張力可変手段を作動させて上記テンションロープの張力を緩めるプリテンションリセット作業時または上記テンションロープの張力を高めるプリテンションセット作業時、上記実荷重値演算手段によって実荷重値を演算し、同演算された実荷重値が所定値以上である場合には吊荷状態であると判断して、上記プリテンションリセット動作またはプリテンションセット動作を規制するようにしたことを特徴とするブーム付き作業機におけるブーム撓み抑制装置。 A mast, tension rope, tension member, tension rope tension variable means, tension winch, mast hoisting cylinder are provided, a mast is provided on the proximal boom of the telescopic boom, and the tension member is between the distal end of the mast and the proximal boom A tension rope between the tip of the mast and the tip of the tip boom or the jib base fixed to the tip of the telescopic boom, and the tension of the tension rope A bending suppression device for a working machine with a boom configured to suppress bending of the telescopic boom by pre-tensioning to a predetermined target value by a tension variable means, and calculating an actual load value. It means and the tension of the pulp retention resetting or the tensioning rope loosen the tension of the tension ropes A regulating means for regulating the pre-tension setting operation to be increased, and the above-mentioned actual operation is performed at the time of pre-tension reset operation for operating the tension variable means to loosen the tension rope and / or pre-tension setting work for increasing the tension rope tension. The actual load value is calculated by the load value calculation means, and when the calculated actual load value is equal to or greater than the predetermined value, it is determined that the load is suspended, and the pretension reset operation or the pretension set operation is restricted. The boom bending suppression apparatus in the working machine with a boom characterized by the above-mentioned. ブーム起伏角度の判定手段を設け、実際のブーム起伏角度が所定の範囲から外れている場合にも、プリテンションリセット動作またはプリテンションセット動作を規制するようにしたことを特徴とする請求項1又は2記載のブーム付き作業機におけるブーム撓み抑制装置。   The boom undulation angle determining means is provided, and the pretension reset operation or the pretension set operation is regulated even when the actual boom undulation angle is out of a predetermined range. The boom bending suppression apparatus in the working machine with a boom of 2. ワーニングメッセージ出力手段を設け、プリテンションリセット動作またはプリテンションセット動作の規制時には、同プリテンションリセット動作またはプリテンションセット動作の規制に合わせてワーニングメッセージ出力手段により、プリテンションリセット動作またはプリテンションセット動作を規制する旨のワーニングメッセージを出力するようにしたことを特徴とする請求項1,2又は3記載のブーム付き作業機におけるブーム撓み抑制装置。   A warning message output means is provided, and when pre-tension reset operation or pre-tension set operation is restricted, pre-tension reset operation or pre-tension set operation is performed by the warning message output means according to the restriction of the pre-tension reset operation or pre-tension set operation. 4. The boom deflection suppressing device for a boom-equipped work machine according to claim 1, wherein a warning message is output to regulate the boom.
JP2009281786A 2009-12-11 2009-12-11 Boom deflection suppressing device for a working machine with a boom Active JP5502447B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009281786A JP5502447B2 (en) 2009-12-11 2009-12-11 Boom deflection suppressing device for a working machine with a boom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009281786A JP5502447B2 (en) 2009-12-11 2009-12-11 Boom deflection suppressing device for a working machine with a boom

Publications (2)

Publication Number Publication Date
JP2011121738A JP2011121738A (en) 2011-06-23
JP5502447B2 true JP5502447B2 (en) 2014-05-28

Family

ID=44286025

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009281786A Active JP5502447B2 (en) 2009-12-11 2009-12-11 Boom deflection suppressing device for a working machine with a boom

Country Status (1)

Country Link
JP (1) JP5502447B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104016233A (en) * 2014-06-25 2014-09-03 徐州重型机械有限公司 Cross-country tire crane and safety control device and method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102616661B (en) * 2012-04-18 2014-07-16 中联重科股份有限公司 Control method and system for forbidding on-load extension and retraction for crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104016233A (en) * 2014-06-25 2014-09-03 徐州重型机械有限公司 Cross-country tire crane and safety control device and method thereof

Also Published As

Publication number Publication date
JP2011121738A (en) 2011-06-23

Similar Documents

Publication Publication Date Title
JP5502446B2 (en) Boom working machine
US20120152878A1 (en) Crane
JP2010235249A (en) Control device of crane, and crane
JP5616658B2 (en) Boom working machine
JP5136633B2 (en) crane
JP4186822B2 (en) Mobile crane
JP5684993B2 (en) Crane safety device and crane
JP5502447B2 (en) Boom deflection suppressing device for a working machine with a boom
JP5570198B2 (en) Boom deflection suppressing device for a working machine with a boom
JP2008143627A (en) Safety device of crane
JP5187385B2 (en) Crane mast collapse prevention device
WO2005090225A1 (en) Load lift-off device for use in boom crane
JP4939701B2 (en) Luggage ground cutting method and apparatus using boom crane
JP5570197B2 (en) Boom deflection control device for a working machine with a boom
JP5576645B2 (en) Boom working machine
JP5522781B2 (en) Boom deflection control device for a working machine with a boom
JP5439151B2 (en) Boom deflection suppressing device for a working machine with a boom
JP5448769B2 (en) Boom deflection suppressing device for a working machine with a boom
JP7120906B2 (en) crane
JP5439150B2 (en) Boom deflection suppressing device for a working machine with a boom
WO2020050400A1 (en) Safety device for crane, crane, safety control method for crane, and safety control program for crane
JP5805805B2 (en) Operation method of boom deflection control device in working machine with boom
JPWO2019017409A1 (en) Crane car
WO2022107494A1 (en) Controller, boom device, and crane truck
JP6642203B2 (en) crane

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20111219

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121206

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131210

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131212

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140127

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140304

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140313

R150 Certificate of patent or registration of utility model

Ref document number: 5502447

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250