JP5434728B2
JP5434728B2 JP2010066557A JP2010066557A JP5434728B2 JP 5434728 B2 JP5434728 B2 JP 5434728B2 JP 2010066557 A JP2010066557 A JP 2010066557A JP 2010066557 A JP2010066557 A JP 2010066557A JP 5434728 B2 JP5434728 B2 JP 5434728B2
Authority
JP
Japan
Prior art keywords
boiler
combustion
steaming
evaporation amount
operation target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010066557A
Other languages
Japanese (ja)
Other versions
JP2011196658A (en
Inventor
和也 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Miura Co Ltd
Original Assignee
Miura Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miura Co Ltd filed Critical Miura Co Ltd
Priority to JP2010066557A priority Critical patent/JP5434728B2/en
Publication of JP2011196658A publication Critical patent/JP2011196658A/en
Application granted granted Critical
Publication of JP5434728B2 publication Critical patent/JP5434728B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

この発明は、複数のボイラからなるボイラ群を制御するためのプログラム、制御器及びボイラシステムに関する。   The present invention relates to a program, a controller, and a boiler system for controlling a boiler group composed of a plurality of boilers.

従来、必要蒸発量に対して定格蒸発量が充分に大きなボイラ群を運転する際に燃焼効率を向上させる場合や、メンテナンスや故障等により使用できないボイラが存在する場合等、ボイラ群において一部のボイラを予備缶(運転対象外ボイラ)に設定して、ボイラ群を運転する場合がある。   Conventionally, when operating a group of boilers whose rated evaporation amount is sufficiently large compared to the required amount of evaporation, when improving combustion efficiency, or when there are boilers that cannot be used due to maintenance or failure, some boiler groups A boiler group may be operated by setting a boiler as a spare can (non-operational boiler).

一方、複数の段階的な燃焼位置を有するボイラを備えたボイラ群を制御する場合に、各ボイラに優先順位を設定し、要求負荷に変動が生じた場合に、各ボイラを、優先順位に従って制御する技術が開示されている(例えば、特許文献1参照。)。   On the other hand, when controlling a group of boilers that have boilers with multiple stages of combustion positions, priorities are set for each boiler, and each boiler is controlled according to the priorities when the required load fluctuates. (For example, refer to Patent Document 1).

また、ボイラ群において、燃焼停止位置にあるボイラを起動する場合に、この燃焼停止位置にあるボイラが給蒸するまでの間、既に給蒸しているボイラを一時的に上位の燃焼位置に移行してバックアップすることで、追従性を高める技術が開示されている(例えば、特許文献2参照。)。   In addition, when the boiler at the combustion stop position is started in the boiler group, the boiler that has already been steamed is temporarily shifted to a higher combustion position until the boiler at the combustion stop position is steamed. Thus, a technology for improving followability by backing up is disclosed (for example, see Patent Document 2).

特開2002−81604号公報JP 2002-81604 A 特開平1−256704号公報JP-A-1-256704

しかしながら、いずれかのボイラにおいて運転対象外ボイラと運転対象ボイラとの間での設定変更がされた場合に、運転対象ボイラについては上位の燃焼位置に移行し、運転対象外ボイラについては燃焼停止位置に移行することにより、設定変更されたボイラの燃焼状態をスムースに切り換える必要がある。   However, when a setting change is made between the non-operation boiler and the operation target boiler in any of the boilers, the operation target boiler moves to a higher combustion position, and the non-operation boiler has a combustion stop position. Therefore, it is necessary to smoothly switch the combustion state of the boiler whose settings have been changed.

また、好適には、設定変更されたボイラにおける上記燃焼状態の切換えをスムースに行なうことに加えて、運転対象外ボイラが上位の燃焼位置に移行するのを抑制しつつ、ボイラ群の応答性を効率的に確保したいという技術的要請がある。   Further, preferably, in addition to smoothly switching the combustion state in the boiler whose setting has been changed, the boiler group responsiveness is improved while suppressing the non-operating boiler from moving to a higher combustion position. There is a technical request to secure it efficiently.

本発明は、このような事情を考慮してなされたもので、複数のボイラからなるボイラ群において、運転対象外ボイラと運転対象ボイラの間で設定変更された場合に、設定変更されたボイラの燃焼状態をスムースに切り換えることが可能なプログラム、制御器及びボイラシステムを提供することを目的とする。   The present invention has been made in consideration of such circumstances, and in a group of boilers composed of a plurality of boilers, when the setting is changed between the non-operation-target boiler and the operation-target boiler, An object of the present invention is to provide a program, a controller, and a boiler system capable of smoothly switching the combustion state.

上記課題を解決するために、この発明は以下の手段を提案している。
請求項1に記載の発明は、複数の段階的な燃焼位置を有するボイラを備えたボイラ群を制御するためのプログラムであって、前記ボイラは、運転対象とされる運転対象ボイラと運転対象外とされる運転対象外ボイラのいずれかに設定されるとともに、前記運転対象ボイラと前記運転対象外ボイラの間で設定変更が可能とされ、前記運転対象ボイラと運転対象外ボイラの間での設定変更が実行された場合に、前記設定変更されたボイラを給蒸移行過程に移行するように構成されていることを特徴とする。
In order to solve the above problems, the present invention proposes the following means.
The invention according to claim 1 is a program for controlling a boiler group including boilers having a plurality of stepwise combustion positions, the boiler being an operation target boiler and an operation target non-operation target. Is set to one of the non-operating boilers, and the setting can be changed between the operating target boiler and the non-operating boiler, and the setting is performed between the operating target boiler and the non-operating boiler. When the change is executed, the boiler is changed so as to transfer to the steaming transfer process.

請求項9に記載の発明は、制御器であって、請求項1から請求項8のいずれか1項に記載のプログラムを備えることを特徴とする。   A ninth aspect of the present invention is a controller, comprising the program according to any one of the first to eighth aspects.

請求項10に記載の発明は、ボイラシステムであって、請求項9に記載の制御器を備えることを特徴とする。   A tenth aspect of the present invention is a boiler system including the controller according to the ninth aspect.

この発明に係るプログラム、制御器、ボイラシステムによれば、ボイラ群において、運転対象ボイラと運転対象外ボイラとの間で設定変更が実行された場合に、設定変更されたボイラを給蒸移行過程に移行するので、設定変更されたボイラの燃焼状態をスムースに切り換えることができる。   According to the program, the controller, and the boiler system according to the present invention, when a setting change is performed between the operation target boiler and the non-operation target boiler in the boiler group, the boiler whose setting has been changed is the steaming transition process. Therefore, the combustion state of the boiler whose settings have been changed can be switched smoothly.

この明細書において、給蒸移行過程とは、燃焼停止位置において、例えば、パージ(微風パージを含む)、パイロット燃焼(連続パイロット燃焼を含む)状態にあるボイラが燃焼開始してから第1燃焼位置において給蒸するまでの過程、低燃焼に対応するバーナが燃焼開始してから第1燃焼位置において給蒸するまでの過程を指しており、以下の第1状態から第4状態に分類され、第1状態から第4状態の順に短時間で給蒸可能とされている。
第1状態:低燃焼位置にあり、給蒸していないが圧力を保持している状態
第2状態:低燃焼を解除後、パージ又はパイロット燃焼状態となり、給蒸していないが圧力を保持している状態
第3状態:燃焼停止位置から低燃焼位置に移行して水を加熱しているが圧力を保持していない状態(無圧状態)
第4状態:パージ又はパイロット燃焼状態であるが圧力を保持していない状態(無圧状態)
なお、第4状態には、第2状態から圧力低下して無圧状態となった場合と、燃焼停止位置においてパージ又はパイロット燃焼状態となり、無圧状態である場合を含む。
給蒸移行過程のうち、圧力保持状態にある第1状態、第2状態から第1燃焼位置への移行は、移行時間を短くするうえで好適である。
なお、連続パイロット燃焼状態とは、ガス焚きボイラにおいて、燃焼信号が出力されるとすぐに着火することができるように、未燃ガスが缶内に滞留させないために行なうパイロットバーナの連続燃焼状態をいう。
なお、微風パージとは、油焚きボイラにおいて、燃焼信号が出力されるとすぐに着火することができるように、未燃ガスが缶内に滞留させないために送風機回転数を減少させて微風量で送風状態を維持することをいう。
また、移行時間とは、他の燃焼位置又は燃焼停止位置への移行を指示する信号が出力されてから、指示された他の燃焼位置又は燃焼停止位置に移行して所定の蒸発量となるまでの時間をいう。
In this specification, the steaming transition process is, for example, the first combustion position at the combustion stop position after the boiler in the purge (including light wind purge) and pilot combustion (including continuous pilot combustion) starts combustion. Refers to the process from the start of combustion of the burner corresponding to low combustion to the steam supply at the first combustion position, and is classified from the following first state to fourth state. Steaming is possible in a short time in the order from the first state to the fourth state.
First state: in low combustion position, not steaming but holding pressure Second state: after releasing low combustion, it becomes purge or pilot combustion state, not steaming but holding pressure State 3rd state: The state where the water is heated from the combustion stop position to the low combustion position but the pressure is not maintained (no pressure state)
Fourth state: Purge or pilot combustion state but no pressure is maintained (no pressure state)
The fourth state includes a case where the pressure is reduced from the second state to a no-pressure state, and a case where a purge or pilot combustion state is entered at the combustion stop position and a no-pressure state.
In the steaming transition process, the transition from the first state and the second state in the pressure maintaining state to the first combustion position is suitable for shortening the transition time.
The continuous pilot combustion state refers to the continuous combustion state of the pilot burner that is performed in order to prevent unburned gas from staying in the can so that it can be ignited as soon as a combustion signal is output in a gas-fired boiler. Say.
Note that the light air purge is a small air flow rate by reducing the blower rotation speed so that unburned gas does not stay in the can so that it can be ignited as soon as a combustion signal is output in an oil-fired boiler. This means maintaining the air blowing state.
In addition, the transition time is from when a signal instructing transition to another combustion position or combustion stop position is output until the transition to the other combustion position or combustion stop position instructed reaches a predetermined evaporation amount. Of time.

請求項2に記載の発明は、請求項1に記載のプログラムであって、前記ボイラ群は予め設定した優先順位に基づいて制御され、前記優先順位の変更にともなって前記設定変更を実行するように構成されていることを特徴とする。   Invention of Claim 2 is a program of Claim 1, Comprising: The said boiler group is controlled based on the preset priority, The said setting change is performed with the change of the said priority. It is comprised by these.

この発明に係るプログラムによれば、ボイラ群は、所定のタイミングで実施するローテーション、又は他の手段によって、各ボイラに設定された優先順位を変更することにより、運転対象ボイラと運転対象外ボイラの間での設定変更を、容易かつ効率的に行なうことができる。   According to the program according to the present invention, the boiler group can change the priority set for each boiler by rotation performed at a predetermined timing, or other means, so that the operation target boiler and the non-operation target boiler are changed. It is possible to easily and efficiently change settings between the two.

請求項3に記載の発明は、請求項1又は請求項2に記載のプログラムであって、前記設定変更されたボイラを給蒸移行過程に移行する場合に、前記ボイラ群における要求負荷と対応する蒸発量を確保するように、給蒸移行過程に移行するボイラを選択するように構成されていることを特徴とする。   Invention of Claim 3 is a program of Claim 1 or Claim 2, Comprising: When transferring the said setting changed boiler to a steaming transfer process, it respond | corresponds with the request | requirement load in the said boiler group. It is characterized by selecting the boiler which transfers to a steaming transfer process so that the evaporation amount may be ensured.

この発明に係るプログラムによれば、設定変更されたボイラを給蒸移行過程に移行する場合に、給蒸移行過程に移行するボイラを、要求負荷と対応する蒸発量を確保するように選択するので、ボイラ群の負荷追従性を効率的に向上することができる。   According to the program according to the present invention, when the boiler whose setting has been changed is shifted to the steaming transition process, the boiler that transitions to the steaming transition process is selected so as to ensure the evaporation amount corresponding to the required load. The load followability of the boiler group can be improved efficiently.

請求項4に記載の発明は、請求項1から請求項3のいずれか1項に記載のプログラムであって、運転対象から運転対象外に設定変更されたボイラを、給蒸移行過程に移行するように構成されていることを特徴とする。   The invention according to claim 4 is the program according to any one of claims 1 to 3, wherein the boiler whose setting is changed from the operation target to the non-operation target is transferred to the steaming transfer process. It is comprised as follows.

この発明に係るプログラムによれば、運転対象から運転対象外ボイラに設定変更されたボイラを給蒸移行過程に移行することにより、ボイラ群の負荷追従性を効率的に向上することができる。   According to the program according to the present invention, the load followability of the boiler group can be efficiently improved by shifting the boiler whose setting is changed from the operation target to the non-operation target boiler to the steaming transfer process.

請求項5に記載の発明は、請求項1から請求項3のいずれか1項に記載のプログラムであって、運転対象から運転対象外に設定変更されたボイラのうち燃焼しているボイラを、前記ボイラ群における要求負荷の減少にともなって給蒸移行過程に移行するように構成されていることを特徴とする。   Invention of Claim 5 is the program of any one of Claim 1 to Claim 3, Comprising: The boiler which is burning among the boilers which were set and changed from the operation object to the operation object, It is comprised so that it may transfer to the steaming transfer process with the reduction | decrease of the required load in the said boiler group.

この発明に係るプログラムによれば、運転対象から運転対象外に設定変更されたボイラを給蒸移行過程に移行するように構成されているので、要求負荷が減少する場合におけるボイラ群の負荷追従性を効率的に向上することができる。   According to the program according to the present invention, since the boiler whose setting is changed from the operation target to the non-operation target is transferred to the steaming transfer process, the load followability of the boiler group when the required load decreases. Can be improved efficiently.

請求項6に記載の発明は、請求項4又は請求項5に記載のプログラムであって、運転対象から運転対象外に設定変更された後、要求負荷の減少にともない給蒸移行過程に移行したボイラがある場合は、前記ボイラ群における要求負荷の増加にともなって蒸発量を増加する際に、前記給蒸移行過程にあるボイラを上位の燃焼位置に移行するように構成されていることを特徴とする。   Invention of Claim 6 is the program of Claim 4 or Claim 5, Comprising: After setting change from the operation object to the non-operation object, it shifted to the steaming transfer process with the reduction | decrease of required load When there is a boiler, when increasing the evaporation amount with an increase in the required load in the boiler group, the boiler in the steaming transition process is configured to shift to a higher combustion position. And

この発明に係るプログラムによれば、給蒸移行過程に移行した運転対象外ボイラを上位の燃焼位置に移行してバックアップすることにより、ボイラ群の負荷追従性を向上することができる。   According to the program according to the present invention, the load followability of the boiler group can be improved by transferring the non-operational boiler transferred to the steaming transfer process to the upper combustion position and backing up.

請求項7に記載の発明は、請求項1から請求項5のいずれか1項に記載のプログラムであって、運転対象外から運転対象に設定変更されたボイラを、給蒸移行過程に移行するように構成されていることを特徴とする。   The invention according to claim 7 is the program according to any one of claims 1 to 5, wherein the boiler whose setting has been changed from the non-operating object to the operating object is transferred to the steaming transfer process. It is comprised as follows.

この発明に係るプログラムによれば、運転対象外から運転対象に設定変更されたボイラを、給蒸移行過程に移行するので、ボイラ群の負荷追従性を向上することができる。   According to the program according to the present invention, the boiler whose setting has been changed from the non-operation target to the operation target is transferred to the steaming transfer process, so that the load followability of the boiler group can be improved.

請求項8に記載の発明は、請求項1から請求項3のいずれか1項に記載のプログラムであって、運転対象外から運転対象に設定変更されたボイラが給蒸移行過程に移行されるとともに運転対象から運転対象外に設定変更されたボイラが給蒸移行過程に移行されている場合において、前記運転対象外から運転対象に設定変更されたボイラが給蒸可能となった場合は、前記運転対象から運転対象外に設定変更されたボイラを燃焼停止位置に移行するように構成されていることを特徴とする。   The invention according to claim 8 is the program according to any one of claims 1 to 3, wherein the boiler whose setting has been changed from outside the operation target to the operation target is transferred to the steaming transfer process. When the boiler whose setting has been changed from the operation target to the operation target has been transferred to the steaming transition process, when the boiler whose setting has been changed from the operation target to the operation target becomes steamable, It is configured to shift the boiler whose setting is changed from the operation target to the non-operation target to the combustion stop position.

この発明に係るプログラムによれば、運転対象ボイラと運転対象外ボイラが、ともに給蒸移行過程にあり、運転対象ボイラが給蒸可能となった場合に、運転対象外ボイラを燃焼停止位置に移行するので、運転対象外ボイラと運転対象ボイラの間での切り換えをスムースに行なうことができる。   According to the program according to the present invention, when the operation target boiler and the non-operation target boiler are both in the steaming transition process, and the operation target boiler becomes capable of steaming, the non-operational boiler is transferred to the combustion stop position. Therefore, the switching between the non-operation target boiler and the operation target boiler can be performed smoothly.

この発明に係るプログラム、制御器、ボイラシステムによれば、複数のボイラからなるボイラ群において、運転対象外ボイラと運転対象ボイラの間で設定変更された場合に、設定変更されたボイラの燃焼状態をスムースに切り換えることができる。   According to the program, the controller, and the boiler system according to the present invention, when the setting is changed between the non-operational boiler and the operation target boiler in the boiler group including the plurality of boilers, the combustion state of the boiler whose setting is changed Can be switched smoothly.

本発明の一実施形態に係るボイラシステムの概略を示す図である。It is a figure showing the outline of the boiler system concerning one embodiment of the present invention. 一実施形態に係るボイラ群を構成するボイラの概略を説明する図である。It is a figure explaining the outline of the boiler which constitutes the boiler group concerning one embodiment. 一実施形態に係るプログラムの一例を説明するフロー図である。It is a flowchart explaining an example of the program which concerns on one Embodiment. 一実施形態に係るボイラシステムの動作の一例を説明する概略図である。It is the schematic explaining an example of operation | movement of the boiler system which concerns on one Embodiment.

以下、図1から図4を参照し、この発明の一実施形態について説明する。
図1は、本発明に係るボイラシステムの一実施形態を示す図であり、符号1はボイラシステムを示している。
Hereinafter, an embodiment of the present invention will be described with reference to FIGS.
FIG. 1 is a diagram showing an embodiment of a boiler system according to the present invention, and reference numeral 1 denotes a boiler system.

ボイラシステム1は、複数のボイラから構成されるボイラ群2と、制御部(制御器)4と、スチームヘッダ6と、スチームヘッダ6に設けられた圧力センサ7とを備え、ボイラ群2で発生させた蒸気を蒸気使用設備18に供給するようになっている。
この実施形態において、ボイラ群2は、例えば、第1ボイラ21、第2ボイラ22、第3ボイラ23、第4ボイラ24、第5ボイラ25を備え、5台の蒸気ボイラから構成されている。
The boiler system 1 includes a boiler group 2 composed of a plurality of boilers, a control unit (controller) 4, a steam header 6, and a pressure sensor 7 provided in the steam header 6, and is generated in the boiler group 2. The generated steam is supplied to the steam use facility 18.
In this embodiment, the boiler group 2 includes, for example, a first boiler 21, a second boiler 22, a third boiler 23, a fourth boiler 24, and a fifth boiler 25, and includes five steam boilers.

この実施形態における要求負荷は、圧力センサ7が検出するスチームヘッダ6内の蒸気の圧力(物理量)により代用されており、この圧力に基づいて蒸気使用設備18の消費蒸気量と対応する蒸発量を算出するようになっている。   The required load in this embodiment is substituted by the pressure (physical quantity) of the steam in the steam header 6 detected by the pressure sensor 7, and the amount of evaporation corresponding to the consumed steam quantity of the steam using equipment 18 is calculated based on this pressure. It comes to calculate.

スチームヘッダ6は、第1ボイラ21、・・・、第5ボイラ25と蒸気管11により接続されるとともに、蒸気使用設備18と蒸気管12により接続されており、ボイラ群2で発生させた蒸気を集合し、各ボイラ相互間の圧力差及び圧力変動を調整して蒸気使用設備18に蒸気を供給するようになっている。   The steam header 6 is connected to the first boiler 21,..., The fifth boiler 25 and the steam pipe 11, and is connected to the steam using facility 18 and the steam pipe 12, and steam generated in the boiler group 2. The steam is supplied to the steam using equipment 18 by adjusting the pressure difference and pressure fluctuation between the boilers.

ボイラ群2を構成している各ボイラ21、・・・、25は、図2に示すように、例えば、三位置制御ボイラとされ、それぞれ燃焼停止状態(燃焼停止位置に対応)、最下位燃焼位置である低燃焼状態(第1燃焼位置に対応)、高燃焼状態(第2燃焼位置に対応)での燃焼が制御可能とされている。   As shown in FIG. 2, each of the boilers 21,..., 25 constituting the boiler group 2 is, for example, a three-position control boiler, and is in a combustion stopped state (corresponding to a combustion stop position) and the lowest combustion. The combustion in the low combustion state (corresponding to the first combustion position) and the high combustion state (corresponding to the second combustion position), which are positions, can be controlled.

ボイラ21、22は、第1差分蒸発量が500(kg/h)、第2差分蒸発量が1000(kg/h)に設定され、第2燃焼位置で燃焼した場合の蒸発量、すなわち定格蒸発量は1500(kg/h)とされている。   In the boilers 21 and 22, the first differential evaporation amount is set to 500 (kg / h), the second differential evaporation amount is set to 1000 (kg / h), and the evaporation amount when burned at the second combustion position, that is, rated evaporation. The amount is set to 1500 (kg / h).

ボイラ23、24は、第1差分蒸発量が1000(kg/h)、第2差分蒸発量が2000(kg/h)に設定され、第2燃焼位置で燃焼した場合の蒸発量、すなわち定格蒸発量は3000(kg/h)とされている。   In the boilers 23 and 24, the first differential evaporation amount is set to 1000 (kg / h), the second differential evaporation amount is set to 2000 (kg / h), and the evaporation amount when burned at the second combustion position, that is, rated evaporation. The amount is set to 3000 (kg / h).

ボイラ25は、第1差分蒸発量が600(kg/h)、第2差分蒸発量が1000(kg/h)に設定され、第2燃焼位置で燃焼した場合の蒸発量、すなわち定格蒸発量は1600(kg/h)とされている。   In the boiler 25, the first differential evaporation amount is set to 600 (kg / h), the second differential evaporation amount is set to 1000 (kg / h), and the evaporation amount when burned at the second combustion position, that is, the rated evaporation amount is 1600 (kg / h).

ここで、差分蒸発量とは、ボイラを一段階上位の燃焼位置に移行した場合に増加する蒸発量、すなわち、移行した後の燃焼位置の蒸発量と移行前の燃焼停止位置(又は燃焼位置)の蒸発量との差をいい、一段階上位に移行して第N燃焼位置(Nは、1以上の整数)となることで増加する蒸発量を、「第N燃焼位置の差分蒸発量」、又は「第N差分蒸発量」といい、例えば、燃焼停止位置から第1燃焼位置に移行した場合に増加する蒸発量を「第1燃焼位置の差分蒸発量」、又は「第1差分蒸発量」と、第1燃焼位置から第2燃焼位置に移行した場合に増加する蒸発量を「第2燃焼位置の差分蒸発量」、又は「第2差分蒸発量」という。   Here, the difference evaporation amount is an evaporation amount that increases when the boiler is moved to the combustion position one level higher, that is, an evaporation amount at the combustion position after the transition and a combustion stop position (or combustion position) before the transition. The amount of evaporation that increases by shifting to a higher stage and becoming the Nth combustion position (N is an integer equal to or greater than 1) is expressed as “the difference evaporation amount at the Nth combustion position”, Or, it is referred to as “Nth differential evaporation amount”. For example, the evaporation amount that increases when the combustion shifts from the combustion stop position to the first combustion position is “differential evaporation amount at the first combustion position” or “first differential evaporation amount”. The amount of evaporation that increases when the first combustion position shifts to the second combustion position is referred to as “the difference evaporation amount at the second combustion position” or “the second difference evaporation amount”.

また、各ボイラ21、・・・、25における燃焼停止位置から最下位燃焼位置である第1燃焼位置に到達して給蒸されるまでの間を給蒸移行過程といい、給蒸移行過程は、以下の第1状態から第4状態(第1状態から第4状態の間はいずれかの状態に含むものとする)に分類することができる。
(1)第1状態:低燃焼位置にあり、給蒸していないが圧力を保持している状態
(2)第2状態:低燃焼を解除後、連続パイロット燃焼状態となり、給蒸していないが圧力を保持している状態
(3)第3状態:燃焼停止位置から低燃焼位置に移行して水を加熱しているが圧力は保持していない状態(無圧状態)
(4)第4状態:連続パイロット燃焼状態であるが圧力は保持していない状態(無圧状態)
The period from the combustion stop position in each of the boilers 21,..., 25 to the first combustion position that is the lowest combustion position and steaming is referred to as a steaming transition process. The first state can be classified into the fourth state (the state between the first state and the fourth state is included in any state).
(1) First state: in a low combustion position, not steamed but maintaining pressure (2) Second state: after releasing low combustion, it becomes a continuous pilot combustion state, not steamed but pressure (3) Third state: The state where the water is heated from the combustion stop position to the low combustion position but the pressure is not maintained (no pressure state)
(4) Fourth state: continuous pilot combustion state but no pressure (no pressure state)

この実施形態において、各ボイラ21、・・・、25は、燃焼停止位置、第1燃焼位置、給蒸移行過程の第1状態で維持されることが可能とされ、給蒸移行過程の第1状態から上位の燃焼位置(例えば、第1燃焼位置)に移行可能とされている。
また、各ボイラ21、・・・、25は、燃焼停止位置から給蒸移行過程(第1状態)への移行、又は上位の燃焼位置から給蒸移行過程(第1状態)への移行が可能とされている。
In this embodiment, each of the boilers 21,..., 25 can be maintained in the first state of the combustion stop position, the first combustion position, and the steaming transition process. It is possible to shift from the state to a higher combustion position (for example, the first combustion position).
Moreover, each boiler 21, ..., 25 can shift from the combustion stop position to the steaming transition process (first state), or transition from the upper combustion position to the steaming transition process (first state). It is said that.

また、各ボイラ21、・・・、25は、図示しない圧力センサによりボイラ内の圧力を出力するようになっており、制御部4は、給蒸移行過程にあるボイラが有圧(ボイラ内の圧力が所定の設定値以上)である場合に、各ボイラ21、・・・、25は、短時間での給蒸が可能な給蒸可能状態と判断するようになっている。   Moreover, each boiler 21, ..., 25 outputs the pressure in a boiler with the pressure sensor which is not shown in figure, and the control part 4 is that the boiler in a steaming transfer process has a pressure (inside a boiler). When the pressure is equal to or higher than a predetermined set value), each of the boilers 21,..., 25 is determined to be in a steamable state capable of steaming in a short time.

また、制御部4は、各ボイラ21、・・・、25が、第1燃焼位置から給蒸移行状態に移行(L→P)され有圧である場合の給蒸移行可能な蒸発量JK1、及び燃焼停止位置から給蒸移行状態に移行(S→P)され有圧である場合の給蒸移行可能な蒸発量JK2を算出するようになっており、かかる場合、給蒸可能な蒸発量は、第1差分蒸発量をカウントするようになっている。   Moreover, the control part 4 is the evaporation amount JK1 which can transfer to steam supply when each boiler 21, ..., 25 transfers to the steaming transfer state from a 1st combustion position (L-> P), and is a pressure. In addition, the evaporation amount JK2 that can be transferred to steaming is calculated from the combustion stop position to the steaming transition state (S → P) and under pressure. The first differential evaporation amount is counted.

なお、各ボイラ21、・・・、25を、給蒸移行過程に移行する場合、第1状態以外の各状態に移行、維持する構成としてもよく、この場合、第1燃焼位置への移行時間が短くなる点で、有圧の第1状態、第2状態が好適である。
また、上位の燃焼位置から給蒸移行過程に移行する場合、第1燃焼位置よりも上位の燃焼位置から給蒸移行過程に移行するように構成してもよい。
In addition, when transferring each boiler 21, ..., 25 to a steaming transfer process, it is good also as a structure which transfers and maintains each state other than a 1st state, In this case, the transition time to a 1st combustion position The first state and the second state of pressure are preferable in that
Moreover, when shifting from the upper combustion position to the steaming transition process, the transition may be made from the combustion position higher than the first combustion position to the steaming transition process.

また、要求負荷に応じて、各ボイラ21、・・・、25は、周知の燃焼位置制御技術により燃焼位置又は燃焼停止位置を制御可能とされており、例えば、スチームヘッダ6の圧力が高くなった場合には蒸発量を減少させ、圧力が低くなった場合には蒸発量を増加させるようになっている。   In addition, each boiler 21,..., 25 can control the combustion position or the combustion stop position by a known combustion position control technique according to the required load. For example, the pressure of the steam header 6 becomes high. If the pressure decreases, the evaporation amount is decreased. If the pressure decreases, the evaporation amount is increased.

制御部4は、入力部41と、メモリ42と、演算部43と、ハードディスク44と、出力部46と、通信線47とを備え、入力部41、メモリ42、演算部43、ハードディスク44、出力部46は通信線47により相互にデータ等を通信可能に接続され、ハードディスク44にはデータベース45が格納されている。   The control unit 4 includes an input unit 41, a memory 42, a calculation unit 43, a hard disk 44, an output unit 46, and a communication line 47, and includes an input unit 41, a memory 42, a calculation unit 43, a hard disk 44, and an output. The units 46 are connected to each other via a communication line 47 so that data and the like can be communicated with each other, and a database 45 is stored in the hard disk 44.

入力部41は、例えば、図示しないキーボード等のデータ入力機器を有していて設定等を演算部43に出力可能とされるとともに、圧力センサ7、各ボイラ21、・・・、25と信号線13、信号線16により接続され、圧力センサ7から入力された圧力信号及び各ボイラ21、・・・、25から入力された信号(例えば、燃焼位置等の情報)を演算部43に出力するようになっている。
出力部46は、各ボイラ21、・・・、25と信号線14により接続され、演算部43から出力された制御信号を各ボイラ21、・・・、25に出力するようになっている。
The input unit 41 includes, for example, a data input device such as a keyboard (not shown) and can output settings and the like to the calculation unit 43. The pressure sensor 7, the boilers 21,... 13. Connected by the signal line 16, and outputs the pressure signal input from the pressure sensor 7 and the signals input from the boilers 21,..., 25 (for example, information such as the combustion position) to the calculation unit 43. It has become.
The output unit 46 is connected to the boilers 21,..., 25 by the signal line 14, and outputs the control signal output from the calculation unit 43 to the boilers 21,.

演算部43は、メモリ42の記憶媒体(例えば、ROM)に格納されたプログラムを読み込んで実行し、例えば、要求負荷に対応する蒸発量の算出、入力部41から入力された各ボイラの運転状態に関する情報等に基づいて、各ボイラ21、・・・、25に関して、燃焼位置又は燃焼停止位置の移行の要否判断、燃焼位置又は燃焼停止位置の選択、給蒸移行過程への移行の要否判断、その結果に基づいて出力部46を介して各ボイラ21、・・・、25への信号を出力するようになっている。   The calculation unit 43 reads and executes a program stored in a storage medium (for example, ROM) of the memory 42, for example, calculates the evaporation amount corresponding to the required load, and the operating state of each boiler input from the input unit 41 On the basis of information related to the above, regarding the boilers 21,..., 25, determination of necessity of transition to the combustion position or combustion stop position, selection of the combustion position or combustion stop position, necessity of transition to the steaming transition process Based on the determination and the result, signals are output to the boilers 21,..., 25 via the output unit 46.

データベース45は、第1のデータベース45Aと、第2のデータベース45Bとを備えている。
第1のデータベース45Aは、圧力信号(mV)と圧力(Pa)との関係を示すデータテーブルが数値データとして格納されており、演算部43は、第1のデータベース45Aを参照して、圧力センサ7からの圧力信号(mV)に基づいてスチームヘッダ6内の圧力(Pa)を算出するようになっている。
The database 45 includes a first database 45A and a second database 45B.
In the first database 45A, a data table indicating the relationship between the pressure signal (mV) and the pressure (Pa) is stored as numerical data, and the calculation unit 43 refers to the first database 45A and refers to the pressure sensor. The pressure (Pa) in the steam header 6 is calculated based on the pressure signal (mV) from 7.

また、第2のデータベース45Bは、例えば、各ボイラ21、・・・、25の第1差分蒸発量、第2差分蒸発量、定格蒸発量がデータテーブルの形式で格納されており、演算部43が第2のデータベース45Bを参照することにより、各ボイラ21、・・・、25が、第1燃焼位置から給蒸移行状態に移行(L→P)され有圧である場合の給蒸移行可能な蒸発量JK1、燃焼停止位置から給蒸移行状態に移行(S→P)され有圧である場合の給蒸移行可能な蒸発量JK2、各ボイラ21、・・・、25の燃焼指示が出されている蒸発量を合計した総蒸発量JRを算出するようになっている。   The second database 45B stores, for example, the first differential evaporation amount, the second differential evaporation amount, and the rated evaporation amount of each boiler 21,..., 25 in the form of a data table. Refers to the second database 45B, so that each boiler 21,..., 25 shifts from the first combustion position to the steaming transition state (L → P) and is capable of steaming transition when pressure is maintained. Evaporation amount JK1, Evaporation amount JK2 that allows transition to steaming from the combustion stop position to the steaming transition state (S → P) and pressure, combustion instructions for each boiler 21,. The total evaporation amount JR is calculated by summing the evaporation amounts.

一実施形態に係るプログラムは、圧力センサ7が検出したスチームヘッダ6の圧力に基づいて、要求負荷に応じた必要蒸発量JNを算出し、ボイラ群2の総蒸発量JRが必要蒸発量JNを満足するように、予め設定された優先順位に従って、各ボイラ21、・・・、25が移行するべき燃焼位置、燃焼停止位置、又は給蒸移行過程に移行するボイラを選択するようになっている。   The program according to the embodiment calculates the required evaporation amount JN according to the required load based on the pressure of the steam header 6 detected by the pressure sensor 7, and the total evaporation amount JR of the boiler group 2 calculates the required evaporation amount JN. In order to satisfy, according to a preset priority order, each boiler 21, ..., 25 is designed to select a combustion position to which the boiler should shift, a combustion stop position, or a boiler that shifts to the steaming transition process. .

プログラムは、例えば、図3に示すフロー図のような概略構成とされている。
なお、プログラムにおける、圧力センサ7の圧力信号に基づく燃焼位置又は燃焼停止位置の移行については、上述のように周知の燃焼位置制御技術によるものとし、説明を省略する。
For example, the program has a schematic configuration as shown in the flowchart of FIG.
Note that the transition of the combustion position or the combustion stop position based on the pressure signal of the pressure sensor 7 in the program is based on the well-known combustion position control technique as described above, and the description thereof is omitted.

以下、図3を参照して、プログラムの一例に係るフロー図について説明する。
(1)まず、ボイラ群2の要求負荷と対応する必要蒸発量JN、ボイラ群2の各ボイラ21、・・・、25の燃焼指示が出されている蒸発量を合計した総蒸発量JR、第1燃焼位置から給蒸移行状態に移行(L→P)され有圧である場合の給蒸移行可能な蒸発量JK1、燃焼停止位置から給蒸移行状態に移行(S→P)され有圧である場合の給蒸移行可能な蒸発量JK2に、それぞれ初期値(=0)を設定する(S1)。
(2)ボイラ群2が運転中かどうかを判断する(S2)。
ボイラ群2が運転中の場合にはS3に移行し、運転が停止している場合にはプログラムを終了する。
(3)演算部43は、例えば、図示しないカウンタからの信号に基づいて、優先順位を変更するタイミングであるかどうかを判断する(S3)。
優先順位を変更するタイミングである場合にはS4に移行し、優先順位を変更するタイミングでない場合にはS6に移行する。
(4)演算部43は、予め設定された手順(例えば、ローテーション等)に基づき、優先順位を変更する(S4)。
(5)演算部43は、運転対象外から運転対象に設定変更されたボイラを、給蒸移行過程に移行する信号を出力し、S6に移行する(S5)。
(6)演算部43は、運転対象外から運転対象に設定変更された後に給蒸移行過程(S→P)とされたボイラの中に、新たに有圧となったボイラがあるかどうかを判断する(S6)。
新たに有圧となったボイラがある場合にはS7に移行し、新たに有圧となったボイラがない場合にはS9に移行する。
(7)演算部43は、入力部41を介して入力される各ボイラ21、・・・、25内の圧力に基づいて、燃焼停止位置から給蒸移行状態に移行(S→P)され有圧である場合の給蒸移行可能な蒸発量JK2を算出する(S7)。
(8)演算部43は、
第1燃焼位置から給蒸移行状態に移行(L→P)され有圧である場合の給蒸移行可能な蒸発量JK1 ≧ 燃焼停止位置から給蒸移行状態に移行(S→P)され有圧である場合の給蒸移行可能な蒸発量JK2
が、維持される範囲で、運転対象から運転対象外に設定変更された後、第1燃焼位置から給蒸移行過程に移行されたボイラを、燃焼停止位置に移行する信号を出力する(S8)。
(9)演算部43は、入力部41を介して取得した圧力センサ7の圧力信号に基づいて、必要蒸発量JNを算出する(S9)。
(10)演算部43は、S9において算出した必要蒸発量JNを、メモリ42に格納された必要蒸発量JNと比較して、必要蒸発量JNに所定値以上の変動があるかどうかを判断する(S10)。また、S9において算出した必要蒸発量JNをメモリ42に格納する。
必要蒸発量JNに所定以上の変動がある場合はS11に移行し、ない場合はS2に移行する。ここで、必要蒸発量JNに係る所定量は、任意に設定可能であり、例えば、100(kg/h)とされている。
(11)演算部43は、必要蒸発量JNの変動が、増加かどうかを判断する(S11)。
必要蒸発量JNの変動が、増加である場合はS12に移行し、増加ではなく減少である場合はS22に移行する。
(12)演算部43は、必要蒸発量JNとボイラ群2の総蒸発量JRとを比較する(S12)。
必要蒸発量JN>総蒸発量JRである場合はS13に移行し、必要蒸発量JN≦総蒸発量JRである場合はS2に移行する。
(13)演算部43は、演算部43は、運転対象外から運転対象に設定変更されたボイラの中に、給蒸可能(有圧)なボイラがあるかどうかを判断する(S13)。
給蒸可能なボイラがある場合にはS14に移行し、給蒸可能なボイラがない場合にはS18に移行する。
(14)演算部43は、各ボイラ21、・・・、25を上位の燃焼位置に移行した場合に、ボイラ群2が、必要蒸発量JN≦総蒸発量JRを満足するための最小限の給蒸可能な蒸発量を得るために必要なボイラを、優先順位に従ってリストアップする(S14)。
(15)S14においてリストアップしたボイラを給蒸(第1燃焼位置に移行)する信号を出力する(S15)。
(16)演算部43は、入力部41を介して取得した各ボイラ21、・・・、25の圧力からS15において第1燃焼位置に移行する信号を出力したボイラの給蒸可能な蒸発量を減算して、燃焼停止位置から給蒸移行状態に移行(S→P)され有圧である場合の給蒸移行可能な蒸発量JK2を新たに算出する(S16)。
(17)演算部43は、必要蒸発量JNと、S15において第1燃焼位置に移行する信号を出力したボイラの給蒸可能な蒸発量を加算して得たボイラ群2の給蒸後の総蒸発量JRとを比較する(S17)。
必要蒸発量JN≦総蒸発量JRである場合はS21に移行し、必要蒸発量JN>総蒸発量JRである場合はS18に移行する。
(18)演算部43は、上位に移行可能な燃焼位置の有無を判断する(S18)。
上位に移行可能な燃焼位置がある場合にはS19に移行し、上位に移行可能な燃焼位置がない場合にはS2に移行する。
(19)演算部43は、必要蒸発量JN≦総蒸発量JRを満足するための最小限の差分蒸発量を得るために必要な燃焼位置を、優先順位に従ってリストアップする(S19)。
(20)S19においてリストアップしたボイラを上位の燃焼位置に移行する信号を出力する(S20)。
(21)演算部43は、上位の燃焼位置に移行する信号を出力した後のボイラ群2の総蒸発量JRを算出する(S21)。
(22)演算部43は、必要蒸発量JN≦総蒸発量JRを満足しているかどうかを判断する(S22)。
必要蒸発量JN≦総蒸発量JRを満足していない場合にはS23に移行し、満足している場合はS2に移行する。
(23)演算部43は、必要蒸発量JN≦総蒸発量JRを満足し、燃焼を解除して下位に移行させることが可能な燃焼位置の有無を判断する(S23)。
燃焼を解除して下位に移行させることが可能な燃焼位置がある場合にはS24に移行し、存在しない場合はS2に移行する。
(24)演算部43は、燃焼解除可能とされ、優先順位が最下位の燃焼位置を、優先順位に従って選択する(S24)。
(25)演算部43は、S24において選択した燃焼位置が、運転対象から運転対象外に設定変更されたボイラに係るものであるかどうかを判断する(S25)。
運転対象から運転対象外に設定変更されたボイラに係るものでない場合にはS26に移行し、運転対象から運転対象外に設定変更されたボイラに係るものである場合にはS28に移行する。
(26)演算部43は、S24において選択した燃焼位置に燃焼を解除する信号を出力する(S26)。
(27)演算部43は、S26において燃焼解除した後、又はS28において給蒸移行過程に移行(L→P)する信号を出力した後のボイラ群2の総蒸発量JRを算出し、S22に移行する(S27)。
(28)演算部43は、S24において選択したボイラを給蒸移行過程の第1状態(L→P)に移行する信号を出力する(S28)。
(29)演算部43は、第1燃焼位置から給蒸移行状態に移行(L→P)され有圧である場合の給蒸移行可能な蒸発量JK1を算出して、S27に移行する(S29)。
上記(2)から(29)を繰り返して実行する。
Hereinafter, with reference to FIG. 3, a flowchart according to an example of the program will be described.
(1) First, the total evaporation amount JR, which is a sum of the required evaporation amount JN corresponding to the required load of the boiler group 2 and the evaporation amounts for which the combustion instructions of the boilers 21,. Evaporation amount JK1 capable of steaming transition from the first combustion position to the steaming transition state (L → P) and under pressure, transition from the combustion stop position to the steaming transition state (S → P) and pressure Is set to the initial value (= 0) for the evaporation amount JK2 that can be transferred to the steam supply (S1).
(2) It is determined whether the boiler group 2 is in operation (S2).
When the boiler group 2 is operating, the process proceeds to S3, and when the operation is stopped, the program is terminated.
(3) The computing unit 43 determines, for example, whether it is time to change the priority order based on a signal from a counter (not shown) (S3).
If it is time to change the priority, the process proceeds to S4. If it is not time to change the priority, the process proceeds to S6.
(4) The computing unit 43 changes the priority order based on a preset procedure (for example, rotation or the like) (S4).
(5) The calculating part 43 outputs the signal which transfers the boiler set to the driving | operation object from the driving | running | working object to a steaming transfer process, and transfers to S6 (S5).
(6) The calculation unit 43 determines whether or not there is a newly pressurized boiler in the steaming transition process (S → P) after the setting change from the non-operation target to the operation target. Judgment is made (S6).
If there is a newly pressurized boiler, the process proceeds to S7, and if there is no new pressurized boiler, the process proceeds to S9.
(7) Based on the pressure in each boiler 21,..., 25 input via the input unit 41, the calculation unit 43 shifts from the combustion stop position to the steaming transition state (S → P). The evaporation amount JK2 that can be transferred to the steam supply in the case of the pressure is calculated (S7).
(8) The calculation unit 43
Transition from the first combustion position to the steaming transition state (L → P), and the amount of vaporization JK1 in which steaming transition is possible when pressure is maintained JK1 ≧ Transition from the combustion stop position to the steaming transition state (S → P) and pressure Evaporation amount JK2 that can be transferred to steam supply
However, after the setting is changed from the operation target to the non-operation target within the range that is maintained, a signal that shifts the boiler that has been transferred from the first combustion position to the steaming transfer process to the combustion stop position is output (S8). .
(9) The calculation unit 43 calculates the required evaporation amount JN based on the pressure signal of the pressure sensor 7 acquired through the input unit 41 (S9).
(10) The computing unit 43 compares the required evaporation amount JN calculated in S9 with the required evaporation amount JN stored in the memory 42, and determines whether or not the required evaporation amount JN has a variation of a predetermined value or more. (S10). Further, the required evaporation amount JN calculated in S9 is stored in the memory 42.
If the required evaporation amount JN varies more than a predetermined amount, the process proceeds to S11, and if not, the process proceeds to S2. Here, the predetermined amount related to the required evaporation amount JN can be arbitrarily set, and is set to 100 (kg / h), for example.
(11) The computing unit 43 determines whether or not the change in the required evaporation amount JN is an increase (S11).
If the change in the required evaporation amount JN is an increase, the process proceeds to S12, and if it is not an increase but a decrease, the process proceeds to S22.
(12) The computing unit 43 compares the required evaporation amount JN with the total evaporation amount JR of the boiler group 2 (S12).
If the required evaporation amount JN> the total evaporation amount JR, the process proceeds to S13. If the required evaporation amount JN ≦ the total evaporation amount JR, the process proceeds to S2.
(13) The calculation unit 43 determines whether there is a steamable (pressured) boiler in the boiler whose setting is changed from the non-operation target to the operation target (S13).
If there is a steamable boiler, the process proceeds to S14, and if there is no steamable boiler, the process proceeds to S18.
(14) The arithmetic unit 43 is the minimum for the boiler group 2 to satisfy the required evaporation amount JN ≦ total evaporation amount JR when the boilers 21,. The boilers necessary for obtaining the amount of evaporation that can be steamed are listed according to the priority order (S14).
(15) A signal for steaming (moving to the first combustion position) the boiler listed in S14 is output (S15).
(16) The calculation unit 43 outputs the vaporizable evaporation amount of the boiler that has output a signal for shifting to the first combustion position in S15 from the pressures of the boilers 21,..., 25 acquired via the input unit 41. Subtraction is performed to newly calculate the evaporation amount JK2 that can be transferred to steaming when the combustion is stopped and the steaming transition state is reached (S → P) and the pressure is maintained (S16).
(17) The calculation unit 43 calculates the total amount after steaming of the boiler group 2 obtained by adding the required evaporation amount JN and the steaming amount that can be steamed by the boiler that has output the signal for shifting to the first combustion position in S15. The evaporation amount JR is compared (S17).
If the required evaporation amount JN ≦ total evaporation amount JR, the process proceeds to S21, and if the required evaporation amount JN> total evaporation amount JR, the process proceeds to S18.
(18) The computing unit 43 determines whether or not there is a combustion position that can be shifted to a higher position (S18).
If there is a combustion position that can be shifted to the upper level, the process proceeds to S19, and if there is no combustion position that can be shifted to the higher level, the process proceeds to S2.
(19) The calculation unit 43 lists the combustion positions necessary for obtaining the minimum difference evaporation amount for satisfying the required evaporation amount JN ≦ total evaporation amount JR according to the priority order (S19).
(20) A signal for shifting the boiler listed in S19 to a higher combustion position is output (S20).
(21) The computing unit 43 calculates the total evaporation amount JR of the boiler group 2 after outputting the signal for shifting to the upper combustion position (S21).
(22) The computing unit 43 determines whether or not the required evaporation amount JN ≦ total evaporation amount JR is satisfied (S22).
If the required evaporation amount JN ≦ total evaporation amount JR is not satisfied, the process proceeds to S23, and if satisfied, the process proceeds to S2.
(23) The computing unit 43 determines whether or not there is a combustion position that satisfies the necessary evaporation amount JN ≦ total evaporation amount JR and can cancel the combustion and shift to the lower position (S23).
If there is a combustion position at which combustion can be canceled and shifted to a lower position, the process proceeds to S24, and if there is no combustion position, the process proceeds to S2.
(24) The computing unit 43 selects the combustion position that can be released from combustion and has the lowest priority in accordance with the priority (S24).
(25) The computing unit 43 determines whether or not the combustion position selected in S24 relates to the boiler whose setting has been changed from the operation target to the non-operation target (S25).
If it is not related to a boiler whose setting has been changed from a driving target to a non-driving target, the process proceeds to S26, and if it is related to a boiler whose setting has been changed from a driving target to a non-driving target, the process proceeds to S28.
(26) The calculating part 43 outputs the signal which cancels combustion to the combustion position selected in S24 (S26).
(27) The calculation unit 43 calculates the total evaporation amount JR of the boiler group 2 after releasing the combustion in S26 or outputting the signal that shifts to the steaming transition process (L → P) in S28, and in S22 Transition (S27).
(28) The calculating part 43 outputs the signal which transfers the boiler selected in S24 to the 1st state (L-> P) of a steaming transfer process (S28).
(29) The computing unit 43 calculates the evaporation amount JK1 that can be transferred to the steam supply when the first combustion position shifts from the first combustion position to the steam supply transition state (L → P) and has a pressure, and the process proceeds to S27 (S29). ).
The above steps (2) to (29) are repeated.

次に、図4を参照して、ボイラシステム1の作用について説明する。
図4は、プログラムを用いてボイラ群2を制御する場合の各ボイラ21、・・・、25の状態を示す概略図であり、四角枠は各ボイラ21、・・・、25の第1燃焼位置、第2燃焼位置の燃焼状態を、各枠内に示した数値は、各燃焼位置における第1差分蒸発量及び第2差分蒸発量を示している。
Next, the operation of the boiler system 1 will be described with reference to FIG.
FIG. 4 is a schematic diagram showing the states of the boilers 21,..., 25 when the boiler group 2 is controlled using a program, and a square frame indicates the first combustion of the boilers 21,. The numerical values indicating the combustion state at the position and the second combustion position in each frame indicate the first differential evaporation amount and the second differential evaporation amount at each combustion position.

また、図4において、斜線で示した燃焼位置は給蒸中の燃焼位置を表し、網かけを施して「L→P」を記したボイラは第1燃焼位置から給蒸移行過程(第1状態)に移行する指示が出力され有圧のボイラを表し、網かけを施して「S→P」を記したボイラは燃焼停止位置から給蒸移行過程(第1状態)に移行する指示が出力されて有圧に到達したボイラを表し、網かけを施して「S→P」と「(設定圧力未満」を記した燃焼位置は燃焼停止位置から給蒸移行過程(第1状態)に移行する指示が出力された後、有圧に到達していないために給蒸可能ではないボイラを表している。また、「P→S」を記したボイラは給蒸移行過程から燃焼停止位置に移行する指示が出力されたボイラを表している。
また、「(予備缶)」と記載されたボイラは、運転対象外ボイラであることを表している。
また、各ボイラ21、・・・、25を表す枠の上側に記載した( )内の数字は、各ボイラ21、・・・、25の優先順位を示している。
In FIG. 4, the combustion position indicated by hatching represents the combustion position during steaming, and the boiler marked with “L → P” by shading is in the process of steaming transition from the first combustion position (first state). ) Is output and indicates a pressurized boiler, and the boiler that is shaded and marked “S → P” is output an instruction to shift from the combustion stop position to the steaming transition process (first state) Represents a boiler that has reached pressure, and is shaded to indicate that the combustion position marked “S → P” and “(less than the set pressure)” shifts from the combustion stop position to the steaming transition process (first state). Represents a boiler that is not steamable because it has not reached a pressure after it is output, and the boiler marked “P → S” is an instruction to shift from the steaming transition process to the combustion stop position. Represents an output boiler.
Moreover, the boiler described as "(preliminary can)" represents that it is a non-operational boiler.
Moreover, the number in () described above the frame showing each boiler 21, ..., 25 has shown the priority of each boiler 21, ..., 25.

また、便宜のため、図4(A)に示すように、第1ボイラ21、第2ボイラ22、第3ボイラ23が第1燃焼位置で給蒸し、第4ボイラ24、第5ボイラ25が燃焼停止位置にある場合を例に説明する。また、図4(A)における各ボイラ21、・・・、25の優先順位は、この順番に設定され、第1ボイラ21から第4ボイラ24が運転対象ボイラとされ、第5ボイラ25が運転対象外ボイラとされている。   For convenience, as shown in FIG. 4A, the first boiler 21, the second boiler 22, and the third boiler 23 are steamed at the first combustion position, and the fourth boiler 24 and the fifth boiler 25 are combusted. The case where it is at the stop position will be described as an example. Moreover, the priority order of each boiler 21, ..., 25 in FIG. 4 (A) is set in this order, the first boiler 21 to the fourth boiler 24 are set as operation target boilers, and the fifth boiler 25 is operated. It is considered as a non-target boiler.

(1)まず、図4(A)は、上述のように、第1ボイラ21、第2ボイラ22、第3ボイラ23が第1燃焼位置で給蒸し、第4ボイラ24、第5ボイラ25が燃焼停止位置にあることを示している。
ここで、便宜のため、必要蒸発量=JN2000(kg/h)、総蒸発量=JR2000(kg/h)とし、必要蒸発量JNと総蒸発量JRは等しいものとする。
(2)次に、ボイラ群2が運転中とされて、優先順位変更タイミングになったものとする。
演算部43は、ボイラ群2が運転中であることを判断(S2)してS3に移行し、S3を実行することにより優先順位変更タイミングであると判断し、S4に移行する。次に、優先順位を変更する信号を出力(S4)して、S5に移行する。
その結果、図4(B)に示すように、各ボイラ21、・・・、25の優先順位が、第5ボイラ25から第1ボイラ21の順番に入れ換わるとともに、第1ボイラ21が運転対象外ボイラ、第2ボイラ22から第5ボイラ25が運転対象ボイラとなる。
(3)演算部43は、運転対象外から運転対象に設定変更された第5ボイラ25を、給蒸移行過程(S→P)に移行する信号を出力し、S6に移行する(S5)。
その結果、図4(C)に示すように、各ボイラ25が燃焼開始し、燃焼停止位置から給蒸移行過程の第1状態に移行する。
(4)次に、演算部43は、各ボイラ21、・・・、25から入力部41を介して入力された信号に基づき、既に運転対象外から運転対象に設定変更された後に給蒸移行過程にあるボイラが存在する場合に、この給蒸移行過程にあるボイラのなかに、ボイラ内の圧力が設定圧力まで上昇して新たに給蒸可能となったボイラがあるかどうか判断する(S6)。
その結果、図4(C)に示すように、ボイラ群2に、運転対象外から運転対象に設定変更され、給蒸移行過程に移行(S→P)された後に有圧に到達したボイラは存在しないので、演算部43は、S9に移行する(S6)。
(5)演算部43は、S9において必要蒸発量JNを算出し、メモリ42に格納された必要蒸発量JN(=2000(kg/h))と比較して、必要蒸発量JNに所定値(例えば、例えば、100(kg/h))以上の変動があるかどうか判断する(S10)。
その結果、演算部43は、必要蒸発量JNに変動がないものと判断(S10)し、S2に移行する。
(6)次いで、演算部43は、S2、S3、S6を実行する。
このとき、ボイラ群2は、優先順位変更タイミングにはなく、給蒸移行過程にあるボイラは存在しないが、ボイラ群2における要求負荷が、例えば、1400(kg/h)に減少したものとする。その結果、演算部43は、S6を実行した後に、S9に移行する(S6)。
(7)演算部43は、S9において必要蒸発量JNを算出し、メモリ42に格納された必要蒸発量JN(=2000(kg/h))と比較して、必要蒸発量JNに所定値以上の変動があると判断(S10)し、S11に移行する。
(8)演算部43は、必要蒸発量JNの変動が、減少と判断(S11)してS22に移行する。
(9)演算部43は、S22、S23を実行して、必要蒸発量JN(=1400(kg/h)≦総蒸発量JR(=2000(kg/h)を満足しつつ、燃焼を解除して下位に移行させることが可能な燃焼位置の有無を判断する(S23)。
必要蒸発量JN≦総蒸発量JRを満足しつつ、燃焼を解除して下位に移行させることが可能な燃焼位置として第1ボイラ21の第1燃焼位置、第2ボイラ22の第1燃焼位置、第3ボイラ23の第1燃焼位置があると判断(S23)し、S24に移行する。
(10)演算部43は、燃焼解除可能とされ、優先順位が最下位の燃焼位置として、優先順位に従って、第1ボイラ21の第1燃焼位置(600(kg/h))を選択する(S24)。
(11)演算部43は、S23において選択した第1ボイラ21の第1燃焼位置が、運転対象から運転対象外に設定変更されたボイラに係るものであることを判断する(S25)し、S28に移行する。
(12)演算部43は、S24において選択した第1ボイラ21を給蒸移行過程の第1状態(L→P)に移行する信号を出力する(S28)。
(13)演算部43は、第1燃焼位置から給蒸移行過程に移行されて有圧である第1ボイラ21の給蒸可能な蒸発量JK1(=500(kg/h))を算出して、S27に移行する(S29)。
(14)演算部43は、燃焼解除した後、又は給蒸移行過程に移行(L→P)する信号を出力した後のボイラ群2の総蒸発量JRを算出し、S22に移行する(S27)。
ここで、ボイラ群2の総蒸発量JRは1400(kg/h)である。
(15)演算部43は、必要蒸発量JN(=1400(kg/h))≦総蒸発量JR(=1400(kg/h))を満足しているかどうかを判断する(S22)。
必要蒸発量JN≦総蒸発量JRを満足しているので、S2に移行する。
その結果、図4(D)に示すように、第1ボイラ21が第1燃焼位置から給蒸移行過程の第1状態に移行(L→P)する。
なお、図4(D)では、第5ボイラ25は有圧ではなく、設定圧未満であるものとする。
(16)次いで、演算部43は、S2、S3を実行する。
このとき、ボイラ群2は、優先順位変更タイミングにはなく、ボイラ群2における要求負荷は、1400(kg/h)に維持されたものとし、S3を実行した後にS6に移行する。
(17)ここで、給蒸移行過程にある第5ボイラ25の圧力が、給蒸移行過程における第1状態の設定圧力まで上昇して有圧になったものとする。
演算部43は、運転対象外から運転対象に設定変更された後に給蒸移行過程とされた第5ボイラ25が、新たに有圧となったと判断(S6)し、S7に移行する。
(18)演算部43は、入力部41を介して入力される各ボイラ21、・・・、25内の圧力に基づいて、燃焼停止位置から給蒸移行過程に移行された第5ボイラ25の給蒸可能な蒸発量JK2(=600(kg/h))を算出する(S7)。
(19)演算部43は、第1ボイラ21の給蒸移行可能な蒸発量JK1(=1000(kg/h)) ≧ 第5ボイラ25の給蒸移行可能な蒸発量JK2(=600(kg/h))が維持される範囲で、運転対象から運転対象外に設定変更された後、第1燃焼位置から給蒸移行過程に移行された第1ボイラ21に、燃焼停止位置に移行する信号(P→S)を出力する(S8)。
その結果、図4(E)に示すように、第1ボイラ21が給蒸移行過程の第1状態から燃焼停止位置に移行(P→S)する。
(1) First, in FIG. 4A, as described above, the first boiler 21, the second boiler 22, and the third boiler 23 are steamed at the first combustion position, and the fourth boiler 24 and the fifth boiler 25 are It shows that it is in the combustion stop position.
Here, for convenience, it is assumed that the required evaporation amount = JN2000 (kg / h) and the total evaporation amount = JR2000 (kg / h), and the required evaporation amount JN and the total evaporation amount JR are equal.
(2) Next, it is assumed that the boiler group 2 is in operation and the priority order is changed.
The calculation unit 43 determines that the boiler group 2 is in operation (S2), proceeds to S3, determines that it is the priority change timing by executing S3, and proceeds to S4. Next, a signal for changing the priority order is output (S4), and the process proceeds to S5.
As a result, as shown in FIG. 4B, the priority order of the boilers 21,..., 25 is switched from the fifth boiler 25 to the first boiler 21, and the first boiler 21 is operated. The outer boiler, the second boiler 22 to the fifth boiler 25 are the operation target boilers.
(3) The calculating part 43 outputs the signal which transfers the 5th boiler 25 by which setting change was carried out to the driving | running | working object from the driving | running | working object to a steaming transfer process (S-> P), and transfers to S6 (S5).
As a result, as shown in FIG. 4 (C), each boiler 25 starts to burn, and shifts from the combustion stop position to the first state of the steaming transition process.
(4) Next, based on the signal input from the boilers 21,... When there is a boiler that is in the process, it is determined whether or not there is a boiler that is capable of steaming as the pressure in the boiler rises to the set pressure among the boilers that are in the steaming transition process (S6). ).
As a result, as shown in FIG. 4 (C), the boiler group 2 has been changed from a non-operating object to an operating object, and after reaching the steaming transition process (S → P), Since it does not exist, the calculation unit 43 proceeds to S9 (S6).
(5) The calculation unit 43 calculates the required evaporation amount JN in S9, and compares it with the required evaporation amount JN (= 2000 (kg / h)) stored in the memory 42 to a predetermined value ( For example, it is determined whether there is a variation of, for example, 100 (kg / h) or more (S10).
As a result, the calculation unit 43 determines that there is no change in the required evaporation amount JN (S10), and proceeds to S2.
(6) Next, the calculation unit 43 executes S2, S3, and S6.
At this time, the boiler group 2 is not at the priority change timing, and there is no boiler in the steaming transition process, but the required load in the boiler group 2 is reduced to, for example, 1400 (kg / h). . As a result, the calculation unit 43 proceeds to S9 after executing S6 (S6).
(7) The calculation unit 43 calculates the required evaporation amount JN in S9, and compares it with the required evaporation amount JN (= 2000 (kg / h)) stored in the memory 42, so that the required evaporation amount JN is a predetermined value or more. Is determined (S10), and the process proceeds to S11.
(8) The computing unit 43 determines that the change in the required evaporation amount JN is a decrease (S11), and proceeds to S22.
(9) The calculation unit 43 executes S22 and S23 to cancel combustion while satisfying the required evaporation amount JN (= 1400 (kg / h) ≦ total evaporation amount JR (= 2000 (kg / h)). Then, it is determined whether there is a combustion position that can be shifted to a lower position (S23).
The first combustion position of the first boiler 21, the first combustion position of the second boiler 22 as combustion positions that can cancel the combustion and shift to the lower order while satisfying the required evaporation amount JN ≦ total evaporation amount JR, It is determined that there is a first combustion position of the third boiler 23 (S23), and the process proceeds to S24.
(10) The calculation unit 43 can cancel the combustion, and selects the first combustion position (600 (kg / h)) of the first boiler 21 according to the priority order as the combustion position with the lowest priority order (S24). ).
(11) The computing unit 43 determines that the first combustion position of the first boiler 21 selected in S23 relates to the boiler whose setting has been changed from the operation target to the non-operation target (S25), and S28 Migrate to
(12) The computing unit 43 outputs a signal for shifting the first boiler 21 selected in S24 to the first state (L → P) in the steaming transition process (S28).
(13) The calculation unit 43 calculates an evaporation amount JK1 (= 500 (kg / h)) that can be supplied to the steaming first boiler 21 that is transferred from the first combustion position to the steaming transition process. The process proceeds to S27 (S29).
(14) The calculation unit 43 calculates the total evaporation amount JR of the boiler group 2 after canceling the combustion or outputting a signal for shifting to the steaming transition process (L → P), and proceeds to S22 (S27). ).
Here, the total evaporation amount JR of the boiler group 2 is 1400 (kg / h).
(15) The computing unit 43 determines whether or not the required evaporation amount JN (= 1400 (kg / h)) ≦ total evaporation amount JR (= 1400 (kg / h)) is satisfied (S22).
Since the required evaporation amount JN ≦ total evaporation amount JR is satisfied, the process proceeds to S2.
As a result, as shown in FIG. 4D, the first boiler 21 shifts (L → P) from the first combustion position to the first state of the steam supply transition process.
In FIG. 4D, it is assumed that the fifth boiler 25 is not under pressure and is less than the set pressure.
(16) Next, the computing unit 43 executes S2 and S3.
At this time, the boiler group 2 is not at the priority change timing, and the required load in the boiler group 2 is maintained at 1400 (kg / h). After executing S3, the process proceeds to S6.
(17) Here, it is assumed that the pressure of the fifth boiler 25 in the steaming transition process is increased to the set pressure in the first state in the steaming transition process and becomes a pressure.
The calculating part 43 judges that the 5th boiler 25 made into the steaming transfer process after setting change from the operation object to the operation object became new pressure (S6), and transfers to S7.
(18) The calculation unit 43 is configured to control the fifth boiler 25 that has been transferred from the combustion stop position to the steaming transition process based on the pressure in each boiler 21,..., 25 input via the input unit 41. An evaporation amount JK2 (= 600 (kg / h)) that can be fed is calculated (S7).
(19) The calculation unit 43 calculates the evaporation amount JK1 (= 1000 (kg / h)) that can be transferred to the steam supply of the first boiler 21 ≧ the evaporation amount JK2 (= 600 (kg / h) that can be transferred to the steam supply of the fifth boiler 25. h)) is maintained within a range in which the operation target is changed from the operation target to the non-operation target, and then the first boiler 21 that has been transferred from the first combustion position to the steaming transfer process is transferred to the combustion stop position ( P → S) is output (S8).
As a result, as shown in FIG. 4E, the first boiler 21 shifts from the first state of the steaming transition process to the combustion stop position (P → S).

上記実施形態に係るボイラシステム1によれば、ボイラ群2において、設定変更されたボイラを給蒸移行過程に移行するので、設定変更されたボイラの燃焼状態をスムースに切り換えることができる。   According to the boiler system 1 according to the above-described embodiment, in the boiler group 2, since the boiler whose setting has been changed is transferred to the steaming transition process, the combustion state of the boiler whose setting has been changed can be switched smoothly.

また、ボイラ群2が、予め各ボイラ21、・・・、25に設定した優先順位を変更することにより、運転対象ボイラと運転対象外ボイラとの間での設定変更をするように構成されているので、設定変更を容易かつ効率的に行なうことができる。   Further, the boiler group 2 is configured to change the setting between the operation target boiler and the non-operation target boiler by changing the priority order set in advance in each of the boilers 21,..., 25. Therefore, the setting can be changed easily and efficiently.

また、要求負荷と対応する必要蒸発量JNを満足する総蒸発量JRを確保するように、設定変更されたボイラを給蒸移行過程に移行するので、ボイラ群2の負荷追従性を効率的に向上することができる。   In addition, since the boiler whose setting has been changed is transferred to the steaming transition process so as to ensure the total evaporation amount JR that satisfies the required evaporation amount JN corresponding to the required load, the load followability of the boiler group 2 is efficiently improved. Can be improved.

また、運転対象外ボイラを、要求負荷が減少する場合に、給蒸移行過程に移行するので、ボイラ群2の負荷追従性を効率的に向上することができる。
また、給蒸移行過程に移行された運転対象外ボイラを、運転対象ボイラが給蒸可能となった場合に燃焼停止位置に移行するので、運転対象外ボイラをスムースに燃焼停止位置に移行することができる。
その結果、運転対象外ボイラと運転対象ボイラの間での切り換えをスムースに行なうことができる。
In addition, since the non-operational boiler shifts to the steaming transition process when the required load decreases, the load followability of the boiler group 2 can be improved efficiently.
In addition, since the non-operational boiler that has been transferred to the steaming transition process is shifted to the combustion stop position when the operation target boiler is capable of steaming, the non-operational boiler must be smoothly transferred to the combustion stop position. Can do.
As a result, switching between the non-operating boiler and the operating boiler can be performed smoothly.

また、給蒸移行過程に移行され、給蒸状態に到達していない運転対象ボイラが存在する場合に、給蒸移行過程に移行した運転対象外ボイラを上位の燃焼位置に移行してバックアップすることにより、ボイラ群の負荷追従性を向上することができる。   In addition, when there is an operation target boiler that has been transferred to the steaming transition process and has not reached the steaming state, the non-operational boiler that has transitioned to the steaming transition process is transferred to a higher combustion position for backup. Thus, the load followability of the boiler group can be improved.

なお、本発明は、上記実施の形態に限定されるものではなく、発明の趣旨を逸脱しない範囲において、種々の変更をすることが可能である。
例えば、上記実施の形態においては、ボイラシステム1を構成するボイラ群2が、5台の三位置制御ボイラから構成される場合について説明したが、ボイラ群2を形成するボイラの構成、及びボイラの台数は任意に設定可能であり、例えば、四位置制御ボイラや、それ以上の燃焼位置を有するボイラを用いてもよいし、燃焼位置数や、蒸発量等の構成が異なるボイラを組み合わせてボイラ群を構成してもよいことはいうまでもない。
また、ボイラ群2を構成するボイラの一部が、故障、修理等により計画停止されている場合に稼動可能な一部のボイラを対象として燃焼制御してもよい。
Note that the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the invention.
For example, in the said embodiment, although the boiler group 2 which comprises the boiler system 1 demonstrated the case where it comprised from five three position control boilers, the structure of the boiler which forms the boiler group 2, and a boiler The number of units can be arbitrarily set. For example, a four-position control boiler or a boiler having a combustion position higher than that may be used, or a combination of boilers having different configurations such as the number of combustion positions and the amount of evaporation, etc. It goes without saying that may be configured.
Further, combustion control may be performed on a part of boilers that can be operated when a part of the boilers constituting the boiler group 2 is planned and stopped due to failure, repair, or the like.

また、上記実施の形態においては、第1燃焼位置にある運転対象外ボイラが、第1燃焼位置から給蒸移行過程に移行する場合について説明したが、例えば、第1燃焼位置よりも上位の燃焼位置にある運転対象外ボイラを給蒸移行過程に移行可能な構成としてもよい。   Moreover, in the said embodiment, although the case where the non-operational boiler in the 1st combustion position transfers to a steaming transfer process from the 1st combustion position was demonstrated, for example, combustion higher than the 1st combustion position It is good also as a structure which can transfer the non-operation target boiler in a position to the steaming transfer process.

また、上記実施の形態においては、設定変更されたボイラを給蒸移行過程の第1状態に移行する場合について説明したが、第1状態、第2状態、第3状態、第4状態のうち、任意の状態に設定してもよい。
また、運転対象外ボイラが給蒸移行過程に移行される移行後の状態と、運転対象ボイラが給蒸移行過程に移行される移行後の状態を、異なる状態に設定してもよい。
Moreover, in the said embodiment, although the case where the boiler changed setting was transferred to the 1st state of a steaming transfer process, among the 1st state, the 2nd state, the 3rd state, and the 4th state, An arbitrary state may be set.
Moreover, the state after the transition in which the non-operational boiler is transferred to the steaming transition process and the state after the transition in which the operation target boiler is transferred to the steaming transition process may be set to different states.

また、上記実施の形態においては、ボイラ群2の必要蒸発量JNを満足する総蒸発量JRを確保するように、給蒸移行過程に移行するボイラ、各ボイラ21、・・・、25の燃焼位置又は燃焼停止位置を選択する場合について説明したが、総蒸発量JRが必要蒸発量JNを下廻ってもよいし、必要蒸発量JNに対して所定範囲内となるように構成してもよい。   Moreover, in the said embodiment, the combustion which transfers to the steaming transfer process, each boiler 21, ..., 25 so that the total evaporation amount JR which satisfies the required evaporation amount JN of the boiler group 2 may be ensured. Although the case where the position or the combustion stop position is selected has been described, the total evaporation amount JR may be less than the required evaporation amount JN, or may be configured to be within a predetermined range with respect to the required evaporation amount JN.

また、総蒸発量JRを考慮することなく、給蒸移行過程に移行するボイラ、各ボイラ21、・・・、25の燃焼位置又は燃焼停止位置を選択してもよい。
すなわち、上記実施の形態においては、運転対象外から設定変更された運転対象ボイラが給蒸移行過程に移行後、必要蒸発量JNが減少した場合に、運転対象から設定変更された運転対象外ボイラが給蒸移行過程に移行する例について説明したが、運転対象から設定変更された運転対象外ボイラを、必要蒸発量JNが減少していない状況や、総蒸発量JRが必要蒸発量JNを下廻る状況で、給蒸移行過程に移行してもよい。
また、上記必要蒸発量JNが減少した場合に、運転対象から設定変更された運転対象外ボイラを燃焼停止位置に移行するように構成してもよい。
また、必要蒸発量JNと総蒸発量JRに代えて、例えば、圧力等、蒸発量に対応する他の物理量に基づいてボイラ群2を制御してもよい。
Moreover, you may select the combustion position or combustion stop position of the boiler which transfers to a steam supply transfer process, and each boiler 21, ..., 25, without considering total evaporation amount JR.
That is, in the above-described embodiment, when the required evaporation amount JN decreases after the operation target boiler whose setting has been changed from outside the operation target has shifted to the steaming transition process, the non-operation target boiler whose setting has been changed from the operation target. The example of the transition to the steaming transition process has been explained. However, in the case of a non-operational boiler whose setting has been changed from the operation target, the situation where the required evaporation amount JN has not decreased or the total evaporation amount JR has decreased below the required evaporation amount JN. In the circumstance, you may move to the steaming transition process.
Moreover, when the said required evaporation amount JN reduces, you may comprise so that the non-operation target boiler set-changed from the operation object may be transferred to a combustion stop position.
Further, instead of the required evaporation amount JN and the total evaporation amount JR, for example, the boiler group 2 may be controlled based on other physical quantities corresponding to the evaporation amount, such as pressure.

また、上記実施の形態においては、運転対象ボイラと運転対象外ボイラの間での設定変更を、例えば、所定のタイミングで、各ボイラ21、・・・、25をローテーションすることによる優先順位の変更により行なう場合について説明したが、所定タイミングにおけるローテーションに代えて、例えば、全ブローを実施したボイラの優先順位の変更や、ボイラ障害復旧時に伴う優先順位の変更を行なうことにより、運転対象ボイラと運転対象外ボイラの間での設定変更を実施してもよい。   Moreover, in the said embodiment, the setting change between an operation object boiler and a non-operation object boiler changes the priority by rotating each boiler 21, ..., 25 at a predetermined timing, for example. However, instead of rotating at a predetermined timing, for example, by changing the priority of the boiler that has performed all blows, or by changing the priority at the time of boiler failure recovery, the operation target boiler and the operation You may implement a setting change between non-target boilers.

また、上記実施の形態においては、運転対象ボイラと運転対象外ボイラの台数が一定である場合について説明したが、ボイラ群2における運転対象外ボイラの台数を変更可能な構成にしてもよい。   Moreover, in the said embodiment, although the case where the number of operation object boilers and the number of non-operation object boilers was constant was demonstrated, you may make it the structure which can change the number of non-operation object boilers in the boiler group 2.

また、上記実施の形態においては、運転対象から設定変更された運転対象外ボイラが、第1燃焼位置から給蒸移行過程に移行される場合について説明したが、例えば、給蒸のために燃焼していた運転対象ボイラや、給蒸移行過程(有圧)において燃焼していた運転対象ボイラが、燃焼解除されて燃焼停止位置に移行した直後に運転対象から設定変更された運転対象外ボイラが存在するような場合に、この運転対象から設定変更された運転対象外ボイラを給蒸移行過程に移行する構成としてもよい。
かかる構成により、運転対象から設定変更された運転対象外ボイラを短時間で給蒸移行過程(有圧)にして負荷追従性を向上することができる。
Moreover, in the said embodiment, although the case where the non-operation target boiler changed the setting from the operation target was transferred to the steaming transition process from the first combustion position, for example, it burns for steaming. There was a non-operational boiler whose setting was changed from the operation target immediately after the operation target boiler that had been burned and the operation target boiler that was burning in the steaming transition process (pressured) was released from combustion and moved to the combustion stop position In such a case, the non-operational boiler whose setting is changed from the operation target may be transferred to the steaming transfer process.
With such a configuration, it is possible to improve the load followability by making the non-operational boiler whose setting is changed from the operation target into the steaming transition process (with pressure) in a short time.

また、この発明に係るプログラムの概略構成の一例を、図3にフロー図として示したが、上記フロー図以外の方法(アルゴリズム)を用いてプログラムを構成してもよいことはいうまでもない。   An example of the schematic configuration of the program according to the present invention is shown as a flowchart in FIG. 3, but it goes without saying that the program may be configured using a method (algorithm) other than the above flowchart.

また、上記実施の形態においては、プログラムを格納するための記憶媒体がROMである場合について説明したが、ROM以外にも、例えば、EP−ROM、 ハードディスク、フレキシブルディスク、光ディスク、光磁気ディスク、CD−ROM、CD−R、磁気テープ、不揮発性のメモリカードなどを用いてもよい。また、演算部が読出したプログラムを実行することにより上記実施形態の作用が実現されるだけでなく、そのプログラムの指示に基づき、演算部で稼働しているOS(オペレーティングシステム)などが実際の処理の一部または全部を行い、その処理によって上記実施形態の作用が実現される場合も含まれる。さらに、記憶媒体から読出されたプログラムが、演算部に挿入された機能拡張ボードや演算部に接続された機能拡張ユニットに備わるメモリに書込まれた後、そのプログラムの指示に基づき、その機能拡張ボードや機能拡張ユニットに備わるCPUなどが実際の処理の一部または全部を行い、その処理によって前述した実施形態の作用が実現される場合も含まれることはいうまでもない。   In the above embodiment, the case where the storage medium for storing the program is the ROM has been described. However, in addition to the ROM, for example, EP-ROM, hard disk, flexible disk, optical disk, magneto-optical disk, CD A ROM, CD-R, magnetic tape, nonvolatile memory card, or the like may be used. Further, not only the operation of the above-described embodiment is realized by executing the program read out by the arithmetic unit, but an OS (operating system) operating in the arithmetic unit based on an instruction of the program performs actual processing. This includes a case where the operation of the above embodiment is realized by performing part or all of the above. Furthermore, after the program read from the storage medium is written to the memory provided in the function expansion board inserted in the operation unit or the function expansion unit connected to the operation unit, the function expansion is performed based on the instructions of the program. It goes without saying that the case where the CPU or the like provided in the board or the function expansion unit performs part or all of the actual processing and the operation of the above-described embodiment is realized by the processing.

運転対象外に設定されたボイラと運転対象に設定されたボイラとの間で設定変更可能とされたボイラ群において、応答性を確保しつつスムースに運転することが可能であるので、産業上利用可能である。   Since it is possible to operate smoothly while ensuring responsiveness in a group of boilers whose settings can be changed between a boiler set as an operation target and a boiler set as an operation target, industrial use Is possible.

1 ボイラシステム
2 ボイラ群
4 制御部(制御器)
21、22、23、24、25 ボイラ
1 Boiler system 2 Boiler group 4 Controller (controller)
21, 22, 23, 24, 25 Boiler

Claims (10)

複数の段階的な燃焼位置を有するボイラを備えたボイラ群を制御するプログラムであって、
前記ボイラは、
運転対象とされる運転対象ボイラと運転対象外とされる運転対象外ボイラのいずれかに設定されるとともに、前記運転対象ボイラと前記運転対象外ボイラの間で設定変更が可能とされ、
前記運転対象ボイラと運転対象外ボイラの間での設定変更が実行された場合に、
前記設定変更されたボイラを給蒸移行過程に移行するように構成されていることを特徴とするプログラム。
A program for controlling a boiler group including a boiler having a plurality of stepwise combustion positions,
The boiler is
It is set to either a driving target boiler that is a driving target and a non-driving target boiler that is not a driving target, and a setting change is possible between the driving target boiler and the non-driving target boiler,
When a setting change is performed between the operation target boiler and the non-operation target boiler,
A program configured to transfer the boiler whose setting has been changed to a steaming transfer process.
請求項1に記載のプログラムであって、
前記ボイラ群は予め設定した優先順位に基づいて制御され、前記優先順位の変更にともなって前記設定変更を実行するように構成されていることを特徴とするプログラム。
The program according to claim 1,
The said boiler group is controlled based on the priority set beforehand, The program changed so that the said setting change may be performed according to the change of the said priority.
請求項1又は請求項2に記載のプログラムであって、
前記設定変更されたボイラを給蒸移行過程に移行する場合に、前記ボイラ群における要求負荷と対応する蒸発量を確保するように、給蒸移行過程に移行するボイラを選択するように構成されていることを特徴とするプログラム。
The program according to claim 1 or 2,
When the boiler whose setting has been changed is transferred to the steaming transition process, the boiler to be transitioned to the steaming transition process is selected so as to ensure the amount of evaporation corresponding to the required load in the boiler group. A program characterized by being.
請求項1から請求項3のいずれか1項に記載のプログラムであって、
運転対象から運転対象外に設定変更されたボイラを、給蒸移行過程に移行するように構成されていることを特徴とするプログラム。
A program according to any one of claims 1 to 3, wherein
A program configured to transfer a boiler whose setting has been changed from an operation target to a non-operation target to a steaming transfer process.
請求項1から請求項3のいずれか1項に記載のプログラムであって、
運転対象から運転対象外に設定変更されたボイラのうち燃焼しているボイラを、前記ボイラ群における要求負荷の減少にともなって給蒸移行過程に移行するように構成されていることを特徴とするプログラム。
A program according to any one of claims 1 to 3, wherein
Of the boilers whose setting has been changed from the operation target to the operation target, the combustion boiler is configured to shift to the steaming transition process as the required load in the boiler group decreases. program.
請求項4又は請求項5に記載のプログラムであって、
運転対象から運転対象外に設定変更された後、要求負荷の減少にともない給蒸移行過程に移行したボイラがある場合は、
前記ボイラ群における要求負荷の増加にともなって蒸発量を増加する際に、
前記給蒸移行過程にあるボイラを上位の燃焼位置に移行するように構成されていることを特徴とするプログラム。
A program according to claim 4 or claim 5, wherein
If there is a boiler that has moved from the operation target to the non-operation target and then moved to the steaming transition process as the required load decreases,
When increasing the evaporation amount with the increase in the required load in the boiler group,
A program configured to shift a boiler in the steaming transition process to a higher combustion position.
請求項1から請求項5のいずれか1項に記載のプログラムであって、
運転対象外から運転対象に設定変更されたボイラを、給蒸移行過程に移行するように構成されていることを特徴とするプログラム。
A program according to any one of claims 1 to 5,
A program configured to transfer a boiler whose setting has been changed from a non-operating target to a driving target to a steaming transition process.
請求項1から請求項3のいずれか1項に記載のプログラムであって、
運転対象外から運転対象に設定変更されたボイラが給蒸移行過程に移行されるとともに運転対象から運転対象外に設定変更されたボイラが給蒸移行過程に移行されている場合において、前記運転対象外から運転対象に設定変更されたボイラが給蒸可能となった場合は、前記運転対象から運転対象外に設定変更されたボイラを燃焼停止位置に移行するように構成されていることを特徴とするプログラム。
A program according to any one of claims 1 to 3, wherein
When the boiler whose setting has been changed from the non-operating target to the operating target is transferred to the steaming transition process and the boiler whose setting has been changed from the operating target to the non-operating target is transferred to the steaming transition process, When the boiler whose setting has been changed from the outside to the operation target becomes steamable, the boiler whose setting has been changed from the operation target to the operation target is shifted to the combustion stop position. Program to do.
請求項1から請求項8のいずれか1項に記載のプログラムを備えることを特徴とする制御器。   A controller comprising the program according to any one of claims 1 to 8. 請求項9に記載の制御器を備えることを特徴とするボイラシステム。   A boiler system comprising the controller according to claim 9.
JP2010066557A 2010-03-23 2010-03-23 Program, controller and boiler system Expired - Fee Related JP5434728B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010066557A JP5434728B2 (en) 2010-03-23 2010-03-23 Program, controller and boiler system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010066557A JP5434728B2 (en) 2010-03-23 2010-03-23 Program, controller and boiler system

Publications (2)

Publication Number Publication Date
JP2011196658A JP2011196658A (en) 2011-10-06
JP5434728B2 true JP5434728B2 (en) 2014-03-05

Family

ID=44875111

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010066557A Expired - Fee Related JP5434728B2 (en) 2010-03-23 2010-03-23 Program, controller and boiler system

Country Status (1)

Country Link
JP (1) JP5434728B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5938970B2 (en) * 2012-03-21 2016-06-22 三浦工業株式会社 Boiler system
JP5672276B2 (en) * 2012-08-29 2015-02-18 三浦工業株式会社 Boiler system
CN102840571B (en) * 2012-09-20 2015-08-12 贵州电力试验研究院 Firepower power station boiler based on Subspace Identification exports the forecasting procedure of superheated steam
JP6119274B2 (en) * 2013-01-31 2017-04-26 三浦工業株式会社 Boiler system
JP5534062B1 (en) * 2013-02-22 2014-06-25 三浦工業株式会社 Boiler system
JP6102357B2 (en) * 2013-03-07 2017-03-29 三浦工業株式会社 Boiler system
JP6102365B2 (en) * 2013-03-13 2017-03-29 三浦工業株式会社 Boiler system
JP6387703B2 (en) * 2014-06-26 2018-09-12 三浦工業株式会社 Boiler system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2622605B2 (en) * 1989-03-16 1997-06-18 株式会社荏原製作所 Boiler operation number control device
JPH09159103A (en) * 1995-12-06 1997-06-20 Kawaju Reinetsu Kogyo Kk Boiler control device
JP4985964B2 (en) * 2007-07-20 2012-07-25 三浦工業株式会社 Number control device and multi-can installation system

Also Published As

Publication number Publication date
JP2011196658A (en) 2011-10-06

Similar Documents

Publication Publication Date Title
JP5434728B2 (en) Program, controller and boiler system
JP5621365B2 (en) Program, controller and boiler system
JP5447083B2 (en) Program, controller and boiler system
JP5251356B2 (en) Control system, control system program, combustion control method, and boiler system
JP5277849B2 (en) Control program, control system, boiler system, and control method
JP5440069B2 (en) Boiler group control method, program, controller, and boiler system
JP5598139B2 (en) Program, controller and boiler system
JP5983413B2 (en) Boiler system
JP5593895B2 (en) Program, controller and boiler system
JP5678614B2 (en) Program, controller, boiler and boiler system
JP6550999B2 (en) Boiler system
JP2010223485A (en) Control program, control system and boiler system
JP5418109B2 (en) Boiler group control method, program, controller, and boiler system
JP2011069516A (en) Method for controlling boiler group, program, controller and boiler system
JP5045914B2 (en) Boiler unit controller
JP5440607B2 (en) Program, controller and boiler system
JP5991156B2 (en) Boiler system
JP2013002784A (en) Program, controller, and boiler system
JP5455165B2 (en) Program, controller and boiler system
JP5942531B2 (en) Boiler system
JP2011069517A (en) Method for controlling boiler group, program, controller and boiler system
JP6467904B2 (en) Boiler system
JP2018066486A (en) Boiler system
JP2014055750A (en) Boiler system

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110714

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121221

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131107

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131112

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131125

R150 Certificate of patent or registration of utility model

Ref document number: 5434728

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees