JP5395768B2 - Glue surface protection work that can secure the installation interval of the main reinforcing bars and cover of mortar and other hardened materials - Google Patents

Glue surface protection work that can secure the installation interval of the main reinforcing bars and cover of mortar and other hardened materials Download PDF

Info

Publication number
JP5395768B2
JP5395768B2 JP2010200940A JP2010200940A JP5395768B2 JP 5395768 B2 JP5395768 B2 JP 5395768B2 JP 2010200940 A JP2010200940 A JP 2010200940A JP 2010200940 A JP2010200940 A JP 2010200940A JP 5395768 B2 JP5395768 B2 JP 5395768B2
Authority
JP
Japan
Prior art keywords
stirrup
main reinforcing
cover
secure
glue frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010200940A
Other languages
Japanese (ja)
Other versions
JP2012057345A (en
Inventor
克行 柳内
博 阿部
英男 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Japan Conservation Engineers Co Ltd
Original Assignee
Japan Conservation Engineers Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Conservation Engineers Co Ltd filed Critical Japan Conservation Engineers Co Ltd
Priority to JP2010200940A priority Critical patent/JP5395768B2/en
Publication of JP2012057345A publication Critical patent/JP2012057345A/en
Application granted granted Critical
Publication of JP5395768B2 publication Critical patent/JP5395768B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

本発明は、斜面の崩壊防止等に利用するモルタル等硬化材吹き付けによるのり枠工において、鉄筋の設置位置を所定の間隔で確保し、スターラップと地面の間隔を適正に保持できるのり枠工法に関するものである。   The present invention relates to a glue frame construction method that can secure the installation positions of reinforcing bars at a predetermined interval and appropriately maintain the distance between the stirrup and the ground in the glue frame construction by spraying a hardener such as mortar used for preventing the collapse of slopes, etc. Is.

従来ののり枠工には、設置する主鉄筋が上面あるいは下面で4本以上になった場合、両端以外の主鉄筋の設置は、設置中に設置者が位置を測りながら設置する方法、または、経験による目測で設置する方法である(例えば、非特許文献1、2、3参照)。
また、のり枠工を地表面の不陸が大きい場所に設置する場合、アンカー材を地面に打ち込み、このアンカー材にのり枠工内のスターラップを取り付けることによりモルタル等硬化材のかぶりを確保しているものがある。(例えば、特許文献1参照)。
In the conventional glue frame construction, when the number of main reinforcing bars to be installed is 4 or more on the upper surface or the lower surface, the installation of main reinforcing bars other than both ends can be performed by the installer while measuring the position during installation, or It is a method of installing by eye measurement based on experience (for example, see Non-Patent Documents 1, 2, and 3).
In addition, when installing the glue frame work in a place where the ground surface is not flat, the anchor material is driven into the ground, and the stirrup in the glue frame work is attached to this anchor material to ensure the covering of the hardened material such as mortar. There is something that is. (For example, refer to Patent Document 1).

従来の施工方法でののり枠工の主鉄筋設置について図4で説明する(非特許文献2参照)。図4において、8はのり枠工の上部スターラップであり、これと対向側の下部スターラップ4で、現地作業により上部主鉄筋7と下部主鉄筋6を設置する。下部主鉄筋6の両端の下部主鉄筋6aは下部スターラップ4により施工位置が決まるが、両端以外の下部主鉄筋6bの施工位置は現地で計測、または、目測により決定し設置している。
また、上部主鉄筋7の両端の上部主鉄筋7aは上部スターラップ8により施工位置が決まるが、両端以外の上部主鉄筋7bの施工位置は現地で計測、または、目測により決定し設置している。
The main reinforcing bar installation of the girder work in the conventional construction method will be described with reference to FIG. 4 (see Non-Patent Document 2). In FIG. 4, 8 is the upper stirrup of the frame work, and this is the lower stirrup 4 on the opposite side, and the upper main reinforcing bar 7 and the lower main reinforcing bar 6 are installed by field work. The construction positions of the lower main reinforcing bars 6a at both ends of the lower main reinforcing bar 6 are determined by the lower stirrup 4, but the construction positions of the lower main reinforcing bars 6b other than the both ends are determined by measurement or installed on site.
Moreover, although the construction position of the upper main reinforcement 7a at both ends of the upper main reinforcement 7 is determined by the upper stirrup 8, the construction position of the upper main reinforcement 7b other than both ends is determined on site or determined by visual inspection. .

特許文献1の図1は、のり枠工の内の上部鉄筋4、下部鉄筋4′及びスターラップ5等から構成される鉄筋組立体6をアンカー材3に設置してかぶりを確保している。   In FIG. 1 of Patent Document 1, a rebar assembly 6 composed of an upper rebar 4, a lower rebar 4 ′, a stirrup 5, and the like in a glue frame is installed on the anchor material 3 to ensure the cover.

特開平10−37201号公報の発明(発明の名称:法枠形成用型枠及びのり枠施工方法)Invention of JP-A-10-37201 (Title of Invention: Form for Forming Leg Frame and Glue Frame Construction Method) のり枠工の設計・施工指針(改訂版) 平成18年11月 社団法人全国特定法面保護協会 P50〜51Guideline for construction and construction of glue frame work (revised version) November 2006 Nationwide Specific Slope Protection Association P50-51 新版 フリーフレーム工法 性能照査型による限界状態設計例 2008年4月 フリーフレーム協会 P12〜13New version Free frame construction method Limit state design example by performance check type April 2008 Free Frame Association P12-13 改訂版 フリーフレーム工法 設計・施工の手引き 2003年3月 フリーフレーム協会 P93(写真)Revised Free Frame Method Design and Construction Guide March 2003 Free Frame Association P93 (Photo)

従来の技術では、例えば図4(非特許文献2参照)において、のり枠工に上部主鉄筋7と下部主鉄筋6を設置しようとする場合、両端の上部主鉄筋7aと下部主鉄筋6aは、施工位置をスターラップ4、8によって特定できたが、中央の上部主鉄筋7b及び下部主鉄筋6bは、スターラップ4、8内での設置位置を特定できなかった。
さらに、上部主鉄筋7を上部スターラップ8に取り付ける場合は、上部スターラップ8を取り付ける前に一旦下部スターラップ4内に上部鉄筋7を置いた後、上部スターラップ8を設置し、その後、上部鉄筋7を持ち上げながら上部スターラップ8に結線していた。
また、のり枠工を設置する場合、下部スターラップ4から地面9までのモルタル等硬化材のかぶりを確保するためには、特許文献1の図1のアンカー材3を設置するなどの事前準備が必要であった。
In the prior art, for example, in FIG. 4 (see Non-Patent Document 2), when the upper main reinforcing bar 7 and the lower main reinforcing bar 6 are to be installed in the glue frame, the upper main reinforcing bar 7a and the lower main reinforcing bar 6a at both ends Although the construction position could be specified by the stirrups 4 and 8, the central upper main rebar 7b and the lower main rebar 6b could not specify the installation positions in the stirrups 4 and 8.
Furthermore, when attaching the upper main reinforcing bar 7 to the upper stirrup 8, before attaching the upper stirrup 8, first place the upper rebar 7 in the lower stirrup 4, and then install the upper stirrup 8. While lifting the rebar 7, it was connected to the upper stirrup 8.
Moreover, when installing a glue frame, in order to ensure the covering of hardened materials such as mortar from the lower stirrup 4 to the ground 9, advance preparations such as installing the anchor material 3 of FIG. It was necessary.

本発明は、従来の構造が有していた問題を解決しようとするものであり、のり枠工の内側に設置する上部主鉄筋と下部主鉄筋をそれぞれ所定の位置に設置するとともに、下部スターラップから地面までのモルタル等硬化材のかぶりを確保することを目的とするものである。   The present invention is intended to solve the problems of the conventional structure. The upper main reinforcing bar and the lower main reinforcing bar installed inside the glue frame work are respectively installed at predetermined positions, and the lower stirrup is provided. It is intended to ensure the covering of a hardening material such as mortar from the ground to the ground.

本発明は、上記従来の課題を解決するために提供するものであり、本発明の第1は、のり枠工の主鉄筋の設置間隔とモルタル等硬化材のかぶりを確保できるのり面保護工において、のり枠工に設置する下部主鉄筋を所定の間隔で設置するために、当該下部主鉄筋の設置位置に合わせて調整したカバースペーサーを下部スターラップに設置する主鉄筋径以上に延長することで下部主鉄筋を所定の位置で確保できるようにしたものである。   The present invention is provided in order to solve the above-described conventional problems. The first aspect of the present invention is a slope protection work that can secure the installation interval of the main reinforcing bars and the covering of the hardened material such as mortar. In order to install the lower main reinforcement to be installed in the glue frame work at a predetermined interval, the cover spacer adjusted according to the installation position of the lower main reinforcement is extended beyond the main reinforcement diameter installed in the lower stirrup The lower main reinforcing bar can be secured at a predetermined position.

本発明の第2は、のり枠工の主鉄筋の設置間隔とモルタル等硬化材のかぶりを確保できるのり面保護工において、のり枠工に設置する上部主鉄筋を所定の間隔で設置するために、主鉄筋の設置間隔に合わせて調整したL字型ネットコネクターを下部スターラップに所定位置の左右に取り付けることより上部主鉄筋を所定の位置に設置できるようにしたものである。   In the second aspect of the present invention, in order to install the upper main reinforcing bars to be installed in the glue frame work at predetermined intervals in the slope surface protection work that can secure the covering interval of the main reinforcing bars of the glue frame work and the covering of the hardening material such as mortar. The upper main reinforcing bar can be installed at a predetermined position by attaching L-shaped net connectors adjusted in accordance with the installation interval of the main reinforcing bar to the left and right of the predetermined position on the lower stirrup.

本発明の第3は、のり枠工の主鉄筋の設置間隔とモルタル等硬化材のかぶりを確保できるのり面保護工において、のり枠工の両側の金網状の型枠に所定の間隔で配置したU字形の上部スターラップとU字形の下部スターラップのうち、当該下部スターラップの下側にカバースペーサーを取り付けることにより、当該下部スターラップから地面までのモルタル等硬化材のかぶりを確保できるようにしたものである。   In the third aspect of the present invention, in the slope surface protection work that can secure the installation interval of the main reinforcing bars of the glue frame work and the covering of the hardening material such as mortar, they are arranged at predetermined intervals on the metal mesh-like molds on both sides of the glue work. By attaching a cover spacer to the lower side of the lower stirrup of the U-shaped upper stirrup and U-shaped lower stirrup, it is possible to secure the covering of the hardened material such as mortar from the lower stirrup to the ground. It is a thing.

本発明は上記の構造であるから、のり枠工内に設置する下部主鉄筋は下部スターラップにあらかじめ下部主鉄筋の所定の位置に加工したカバースペーサーを設置しておくことで、現地で下部主鉄筋を設置するときにカバースパーサーの上端部に合わせて設置することで所定の位置を確実に確保できる。   Since the present invention has the above-described structure, the lower main reinforcing bar to be installed in the girder frame is installed on the lower stirrup beforehand by installing a cover spacer that has been processed at a predetermined position of the lower main reinforcing bar in advance. A predetermined position can be reliably ensured by installing the reinforcing bars according to the upper end of the cover spars.

また、のり枠工に設置する上部主鉄筋はカバースペーサーを下部スターラップの上端部にあらかじめ所定の長さに加工したL字型ネットコネクターを設置しておくことで、現地で上部主鉄筋を設置する場合、L字型ネットコネクターに合わせて設置することで所定の位置が確実に確保できる。   In addition, the upper main reinforcing bar to be installed in the glue frame is installed on the site by installing an L-shaped net connector with a cover spacer processed in advance to the upper end of the lower stirrup. In this case, the predetermined position can be surely secured by installing according to the L-shaped net connector.

さらに、下部スターラップに取り付ける下部スターラップから地面までのモルタル等硬化材のかぶりを確保できるような形状に加工して取り付けることで、不陸のある施工箇所の地面でも、あるいは上部主鉄筋や下部主鉄筋を設置したため過重量でのり枠が変形した場合でも、カバースペーサーを設置しておくことでかぶりを確保することが可能となる。   Furthermore, by processing and mounting in a shape that can secure the covering of the hardened material such as mortar from the lower stirrup to the lower stirrup to the ground, even on the ground of the construction site where there is unevenness, or the upper main reinforcing bar and the lower Even when the glue frame is deformed due to excessive weight because the main rebar is installed, it is possible to secure the cover by installing the cover spacer.

本発明の実施例を図面に即して説明する。図1において、1はのり枠の金網状型枠、2はL字型ネットコネクター、3は下部ネットコネクターで下部スターラップを支えている5はカバースペーサーで下部スターラップ4に取り付けている。6(6a・6b)は下部主鉄筋であり、その両端の下部主鉄筋6aは下部スターラップ4の両端に取り付け、中央部の下部主鉄筋6bはカバースペーサー5の位置で取り付け、下部主鉄筋6を下部スターラップ4にそれぞれ結線する。次に、上部主鉄筋7をL字型ネットコネクター上に配置した後、上部スターラップ8を下部スターラップ4に沿って配置し、上部主鉄筋7(7a・7b)を上部スターラップ8にそれぞれ結線する。 Embodiments of the present invention will be described with reference to the drawings. In Figure 1, 1 is a wire mesh-like formwork glue frame, 2 L-shaped net connector, 3 bears the lower portion stirrup 4 in the lower net connector. A cover spacer 5 is attached to the lower stirrup 4. 6 (6a, 6b) are lower main reinforcing bars, the lower main reinforcing bars 6a at both ends thereof are attached to both ends of the lower stirrup 4, the lower main reinforcing bar 6b at the center is attached at the position of the cover spacer 5, and the lower main reinforcing bar 6 is attached. Are connected to the lower stirrup 4 respectively. Next, after the upper main reinforcing bar 7 is arranged on the L -shaped net connector 2 , the upper stirrup 8 is arranged along the lower stirrup 4, and the upper main reinforcing bar 7 (7 a, 7 b) is placed on the upper stirrup 8. Connect each one.

図2は、工場で加工されたのり枠工部材を現地に設置した状態のものである。すでに、のり枠工部材として金網状型枠1にL字型ネットコネクター2を介して下部スターラップ4が取り付けられ、下部スターラップ4にカバースペーサー5も取り付けられている。   FIG. 2 shows a state in which a glue frame member processed at a factory is installed on site. Already, the lower star wrap 4 is attached to the wire net form 1 as the glue frame work member via the L-shaped net connector 2, and the cover spacer 5 is also attached to the lower star wrap 4.

図1は、図2の工場加工したのり枠工部材に下部主鉄筋6と上部主鉄筋7を取り付け、さらに上部スターラップ8を設置したもので、のり枠工部材の設置完了図となる。この後、のり枠工部材内にモルタル等硬化材を吹き付けてのり枠工を斜面の保護工として完成させる。   FIG. 1 is a diagram of the installation completion of the glue frame member, in which the lower main reinforcing bar 6 and the upper main reinforcing bar 7 are attached to the factory-finished glue frame member of FIG. 2 and the upper stirrup 8 is further installed. Thereafter, a curing material such as mortar is sprayed into the glue frame member to complete the glue frame as a slope protection.

「発明に係る設置工程」
本発明に係るカバースペーサー5とL字型ネットコネクター2を用いたのり枠工部材の工場での組み立て工程は次のとおりである。
(1) のり枠工部材の組み立て工場にて、両端の金網状型枠1内にU字型の下部スターラップ4を金網状型枠1の所定位置に設置してあるL字型ネットコネクター2と下部ネットコネクター3に取り付ける。
(2) 取り付けられた下部スターラップ4に下部主鉄筋6bの設置位置が合うように加工したカバースぺーサー5を取り付ける。このとき、カバースペーサー5を下部主鉄筋径程度の長さを下部スターラップ5から突出させて取り付ける。
(3) 取り付けが完了したら、この状態で、のり枠部材の中央を畳むように、コンパクトにパッケージして現地に搬入する。
"Installation process according to the invention"
The assembly process in the factory of the glue frame construction member using the cover spacer 5 and the L-shaped net connector 2 according to the present invention is as follows.
(1) An L-shaped net connector 2 in which U-shaped lower stirrups 4 are installed at predetermined positions in the wire mesh formwork 1 in the wire mesh formwork 1 at both ends at an assembly factory for glue frame work members. And attach to the lower net connector 3.
(2) The cover spacer 5 processed so that the installation position of the lower main reinforcing bar 6b matches the attached lower stirrup 4 is attached. At this time, the cover spacer 5 is attached so as to protrude from the lower stirrup 5 by a length about the diameter of the lower main reinforcing bar.
(3) When the installation is complete, in this state, pack it in a compact manner so that the center of the glue frame member is folded, and carry it to the site.

現地でののり枠工部材の設置工程は次の通りである。
(1) 工場より受け入れたのり枠部材を現地で再度広げて地面に設置する。
(2) 下部主鉄筋6(6a・6b)を下部スターラップ4およびカバースペーサー5に合わせて位置を確保し、それぞれを結線する。
(3) 上部主鉄筋7(7a・7b)をL字型ネットコネクター2の上に載せ所定の位置を確保した上で上部スターラップ8を下部スターラップ4に沿って設置する。
(4) L字型ネットコネクター2に載っている上部主鉄筋7(7a・7b)を上部スターラップ8にそれぞれを結線する。
(5) このとき、カバースペーサー5により下部スターラップ4と設置地面の間隔は、所定のかぶりとなるカバースペーサー5の高さhで保持している。
The installation process of glue frame members at the site is as follows.
(1) Spread the glue frame member received from the factory on site and install it on the ground.
(2) Align the lower main reinforcing bars 6 (6a, 6b) with the lower stirrup 4 and the cover spacer 5 to secure the positions and connect them.
(3) The upper main wrap 7 (7a, 7b) is placed on the L-shaped net connector 2 and a predetermined position is secured, and then the upper stirrup 8 is installed along the lower stirrup 4.
(4) The upper main reinforcing bars 7 (7a, 7b) mounted on the L-shaped net connector 2 are connected to the upper stirrup 8 respectively.
(5) At this time, the space between the lower stirrup 4 and the installation ground is held by the cover spacer 5 at the height h of the cover spacer 5 that becomes a predetermined cover.

「本発明装置による作用」
本発明による具体的な作用は次のとおりである。
(1) 下部スターラップ4に取り付けているカバースペーサー5により下部主鉄筋6(6a・6b)の所定の位置を確保することが容易に可能となり、品質の向上と施工性の向上が達成できる。
(2) L字型ネットコネクター2により上部主鉄筋7(7a・7b)の所定の位置を確保することが容易に可能となり、また、上部スターラップ8に結線するときも上部主鉄筋7(7a・7b)を持ち上げることなく結線できるため、品質の向上と施工性の向上が達成できる。
(3) 工場加工であらかじめカバースペーサー5を取り付けていることにより下部スターラップ4と設置地面9の間隔となるかぶりをカバースペーサー5の高さhとして所定の間隔で確保することが容易に可能となり、品質の向上と施工性の向上が達成できる。
"Operation by the device of the present invention"
Specific actions according to the present invention are as follows.
(1) The cover spacer 5 attached to the lower stirrup 4 can easily secure a predetermined position of the lower main reinforcing bar 6 (6a, 6b), thereby improving quality and workability.
(2) The L-shaped net connector 2 makes it possible to easily secure a predetermined position of the upper main reinforcing bar 7 (7a, 7b), and when connecting to the upper stirrup 8, the upper main reinforcing bar 7 (7a・ Since it can be connected without lifting 7b), improvement in quality and improvement in workability can be achieved.
(3) By attaching the cover spacer 5 in advance at the factory, it becomes possible to easily secure the cover that becomes the distance between the lower stirrup 4 and the installation ground 9 as the height h of the cover spacer 5 at a predetermined interval. Improved quality and workability can be achieved.

本発明においてL字型ネットコネクターとカバースペーサーを用い主鉄筋とスターラップを取り付けたのり枠工の断面図である。It is sectional drawing of the glue frame construction which attached the main reinforcement and the stirrup using the L-shaped net connector and the cover spacer in this invention. 本発明において工場で加工したのり枠工部材を現地で広げ、設置した断面図である。It is sectional drawing which expanded and installed the glue frame member processed in the factory in this invention in the field. 図1の斜視図である。FIG. 2 is a perspective view of FIG. 1. 従来ののり枠工の断面図である。It is sectional drawing of the conventional glue frame construction. 特許文献1の図1でアンカー材を用いた従来ののり枠工の断面図である。It is sectional drawing of the conventional glue frame construction using the anchor material in FIG.

1……金網状型枠
2……L字型ネットコネクター
3……下部ネットコネクター
3′……上部ネットコネクター
4……下部スターラップ
5……カバースペーサー
6(6a・6b)……下部主鉄筋
7(7a・7b)……上部主鉄筋
8……上部スターラップ
9……地面
1 …… Wire mesh form 2 …… L-shaped net connector 3 …… Lower net connector 3 ′ …… Upper net connector 4 …… Lower stirrup 5 …… Cover spacer 6 (6a ・ 6b) …… Lower main rebar 7 (7a, 7b) …… Upper main reinforcement 8 …… Upper stirrup 9 …… The ground

Claims (1)

のり枠工の両側の金網状型枠(1)に所定の間隔で配置したU字形の上部スターラップ(8)と下部スターラップ(4)のうち、
当該下部スターラップ(4)の下側にカバースペーサー(5)を取付けると共に、下部スターラップ(4)に設置する主鉄筋の径以上に延長することで下部主鉄筋(6)を所定の位置で確保できるように構成し、
L字型ネットコネクター(2)と下部コネクター(3)で下部スターラップ5を型枠(1) に支持してのり枠工部材、これを工場で組み立て加工し、
当該のり枠工部材を現地の地面に設置して、下部主鉄筋(6)「(6a).(6b)」を下部スターラップ(4)及びカバースペーサー(5)に合わせて位置を確保してそれぞれ取り付け、
また、上部主鉄筋(7)「(7a).(7b)」をL字型ネットコネクター(2)の上に載せて所定の位置を確保し、
上部スターラップ(8)を当該上部主鉄筋(7)「(7a).(7b)」を被せるように下部スターラップ(4)に沿って設置するように構成した
ことを特徴とするのり枠工の主鉄筋の設置間隔とモルタル等硬化材のかぶりを確保できるのり面保護工。
Of the U-shaped upper stirrup (8) and lower stirrup (4) arranged at predetermined intervals on the wire mesh formwork (1) on both sides of the glue frame work,
Attach the cover spacer (5) to the lower side of the lower stirrup (4), and extend the lower main rebar (6) in place by extending it beyond the diameter of the main rebar installed on the lower stirrup (4). Configured to ensure,
The lower stirrup 5 is supported on the formwork (1) with the L-shaped net connector (2) and the lower connector (3).
Install the frame frame member on the ground, and position the lower main reinforcing bar (6) “(6a). (6b)” to the lower stirrup (4) and cover spacer (5). Each installed,
Also, place the upper main rebar (7) “(7a). (7b)” on the L-shaped net connector (2) to secure a predetermined position,
Glue frame construction characterized in that the upper stirrup (8) is installed along the lower stirrup (4) so as to cover the upper main reinforcement (7) "(7a). (7b)" This is a slope protection work that can secure the installation interval of the main reinforcing bars and the covering of hardened materials such as mortar.
JP2010200940A 2010-09-08 2010-09-08 Glue surface protection work that can secure the installation interval of the main reinforcing bars and cover of mortar and other hardened materials Active JP5395768B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010200940A JP5395768B2 (en) 2010-09-08 2010-09-08 Glue surface protection work that can secure the installation interval of the main reinforcing bars and cover of mortar and other hardened materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010200940A JP5395768B2 (en) 2010-09-08 2010-09-08 Glue surface protection work that can secure the installation interval of the main reinforcing bars and cover of mortar and other hardened materials

Publications (2)

Publication Number Publication Date
JP2012057345A JP2012057345A (en) 2012-03-22
JP5395768B2 true JP5395768B2 (en) 2014-01-22

Family

ID=46054773

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010200940A Active JP5395768B2 (en) 2010-09-08 2010-09-08 Glue surface protection work that can secure the installation interval of the main reinforcing bars and cover of mortar and other hardened materials

Country Status (1)

Country Link
JP (1) JP5395768B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0643236Y2 (en) * 1991-05-27 1994-11-09 健吾 木本 Formwork for slope protection construction
JP2000144755A (en) * 1998-09-04 2000-05-26 Okabe Co Ltd Grating crib work and formwork

Also Published As

Publication number Publication date
JP2012057345A (en) 2012-03-22

Similar Documents

Publication Publication Date Title
JP4858888B1 (en) On-site non-welded assembly method for reinforcing bar and its reinforcing frame with auxiliary bars.
US10017942B2 (en) Rebar wall set-up bar
JP6960082B2 (en) How to build a skeleton by spraying concrete
JP6796335B2 (en) Reinforcing support member for reinforcing bar cage, reinforcing bar cage using this, and structure of reinforcing bar cage
JP2012036584A (en) Arrangement method of reinforced concrete column
JP5395768B2 (en) Glue surface protection work that can secure the installation interval of the main reinforcing bars and cover of mortar and other hardened materials
KR102283531B1 (en) Concrete Block Assembly for Arch type Structure using Hinge Connector, Arch type Structure using such Assembly, and Constructing Method thereof
JP4449875B2 (en) Large-section tunnel structure and its construction method
KR101722084B1 (en) Process of Bar Assembly
JP4368327B2 (en) Housing, connecting structure of housing and method for arranging plate-like members
JP5693869B2 (en) Bridge girder construction method
JP2011246983A (en) Floor reinforcing bar arrangement method
KR200406190Y1 (en) Confining Structure of Steel Reinforcement with Wire
KR101938887B1 (en) Reinforcement structure of seismic detailing hoop with fixed device
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
JP2010013898A (en) Steel reinforced concrete column assembling method
JP7270213B2 (en) Arch rebar assembly method
JP3207708U (en) Building structure fixing device
JP5907443B1 (en) Construction method of unevenness adjustment frame for pressure plate construction and spray base for unevenness adjustment
KR102129947B1 (en) The three-dimensional wire mesh for concrete
JP6324105B2 (en) Concrete splicing method
KR101846245B1 (en) Helical lattice
JP2000273946A (en) Method for constructing reinforced concrete structure
JP5697942B2 (en) Reinforcing bar unit and foundation reinforcing bar unit and foundation reinforcing bar structure
JP4129225B2 (en) Construction method of protective embankment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120615

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130411

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130415

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130612

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131002

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131018

R150 Certificate of patent or registration of utility model

Ref document number: 5395768

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250