JP5025807B1 - 予備力計算装置およびその方法、コンピュータプログラム - Google Patents
予備力計算装置およびその方法、コンピュータプログラム Download PDFInfo
- Publication number
- JP5025807B1 JP5025807B1 JP2011067346A JP2011067346A JP5025807B1 JP 5025807 B1 JP5025807 B1 JP 5025807B1 JP 2011067346 A JP2011067346 A JP 2011067346A JP 2011067346 A JP2011067346 A JP 2011067346A JP 5025807 B1 JP5025807 B1 JP 5025807B1
- Authority
- JP
- Japan
- Prior art keywords
- power consumption
- time
- sequence
- period
- date
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004364 calculation method Methods 0.000 title claims abstract description 114
- 238000004590 computer program Methods 0.000 title claims description 3
- 238000000034 method Methods 0.000 title description 32
- 230000001629 suppression Effects 0.000 claims description 47
- 230000008569 process Effects 0.000 description 19
- 230000008859 change Effects 0.000 description 5
- 238000007726 management method Methods 0.000 description 4
- 230000004044 response Effects 0.000 description 4
- 230000007704 transition Effects 0.000 description 4
- 239000000470 constituent Substances 0.000 description 2
- 239000013598 vector Substances 0.000 description 2
- 230000006399 behavior Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000011946 reduction process Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】消費電力分布計算部は、第1日付において、第1時刻から予測期間長後の第2時刻までの予測期間における需要家宅の予測外気温系列を用い、予測外気温系列と類似するデータをもつ日付を気温履歴データベースに基づき特定し、特定した日付に対応する消費電力系列を電力履歴データベースから特定し、第1時刻に対し過去履歴使用時間長前の第3時刻から、第2時刻までの期間において、特定した消費電力系列間で、統計分布または代表値を計算する。消費電力予測部は、計算した統計分布または代表値に基づき、予測期間における予測消費電力系列を計算する。予備力計算部は、予測消費電力系列と、基準消費電力系列のうち予測期間における系列部分との差分である予備力を計算する。
【選択図】図1
Description
n’=(Σ(yt-μt)/σt)/S ・・・式1
により計算される。ytは時刻tにおける消費電力を示す。μt、σtは、時刻tにおける平均値と標準偏差を示す。Sは過去履歴使用時間長を示す。
zt=μt+n’σt ・・・式2
Claims (10)
- 需要家に対して計画された第1日付の消費電力の系列である基準消費電力系列を需要抑制計算装置から受信する基準消費電力受信部と、
電力計測器により計測される需要家による消費電力系列を日付及び需要抑制強度と関連づけて内部に記録する電力履歴データベースと、
温度センサにより計測される需要家宅の外気温系列を日付ごとに内部に記録する気温履歴データベースと、
前記第1日付において、第1時刻から、予測時間長後の第2時刻までの予測期間における需要家宅の予測外気温系列を用い、前記予測期間において前記予測外気温系列と類似する系列部分をもつ日付を前記気温履歴データベースにおいて特定し、特定した日付のうち前記需要抑制強度が前記第1日付と一致する消費電力系列を前記電力履歴データベースから特定し、前記第1時刻に対し過去履歴使用時間長前の第3時刻から前記第2時刻までの全体期間において、前記特定した消費電力系列群の各時刻の統計分布あるいは代表値を計算する消費電力分布計算部と、
前記第1日付における前記第3時刻から前記第1時刻までの履歴使用期間における前記消費電力系列と、前記全体期間における前記各時刻の統計分布あるいは代表値から、前記予測期間における予測消費電力系列を計算する消費電力予測部と、
前記予測消費電力系列と、前記基準消費電力系列のうち前記予測期間における系列部分との差分である予備力を計算し、前記予備力を前記需要抑制計算装置に送信する予備力計算部と、
を備えた予備力計算装置。 - 前記消費電力分布計算部は、前記全体期間における前記各時刻の統計分布あるいは代表値として、前記全体期間における前記各時刻の平均値と標準偏差を計算し、
前記消費電力予測部は、前記第1日付の前記履歴使用期間における前記消費電力系列の、前記履歴使用期間の前記各時刻の前記平均値に対する乖離率を計算し、前記乖離率と、前記予測期間の前記各時刻の前記平均値と前記標準偏差とから、前記予測期間における前記予測消費電力系列を計算する
ことを特徴とする請求項1に記載の予備力計算装置。 - 前記消費電力分布計算部は、前記特定した消費電力系列のうち、前記履歴使用期間において前記第1日付における消費電力系列と類似する系列を用いて、前記平均値と前記標準偏差を計算する
ことを特徴とする請求項2に記載の予備力計算装置。 - 前記消費電力予測部は、前記第1日付の前記履歴使用期間における前記消費電力系列について前記時刻毎の消費電力から、前記履歴使用期間における前記時刻毎の前記平均値を減算した値を、前記履歴使用期間における前記時刻毎の前記標準偏差で除算して前記時刻間で総計した値を前記過去履歴使用時間長で除算することにより、前記乖離率を得る
ことを特徴とする請求項2または3に記載の予備力計算装置。 - 前記消費電力予測部は、前記予測期間における前記時刻毎の前記標準偏差を前記乖離率に乗算し、前記予測期間における前記時刻毎の前記平均値をさらに加算することにより、前記予測消費電力系列を得る
ことを特徴とする請求項4に記載の予備力計算装置。 - 時刻と予測時間長と過去履歴使用時間長との対応を保持した予測パラメータデータベースをさらに備え、
前記消費電力分布計算部は、前記予測時間長の値を前記需要抑制計算装置から受信し、前記第1時刻と前記受信した予測時間長とに対応する過去履歴使用時間長を、前記予測パラメータデータベースから取得し、取得した過去履歴使用時間長を、前記過去履歴使用時間長として用いる
ことを特徴とする請求項1ないし5のいずれか一項に記載の予備力計算装置。 - 前記電力履歴データベースに記録された過去の日の消費電力系列と、前記消費電力分布計算部および前記消費電力予測部とを用いて、時刻毎に、複数の予測時間長のそれぞれに対する過去履歴使用時間長を決定する予測パラメータ学習部をさらに備え、
前記予測パラメータ学習部は、前記時刻毎に、前記複数の予測時間長のそれぞれについて、前記時刻から前記予測時間長の期間における前記消費電力系列を予測し、前記期間において、前記予測した消費電力系列と、前記電力履歴データベースに記録された消費電力系列との差が閾値以下になるように、前記過去履歴使用時間長を決定する
ことを特徴とする請求項6に記載の予備力計算装置。 - 需要家宅の予測外気温系列を外部の気温予測装置から受信する手段
をさらに備えたことを特徴とする請求項1ないし7のいずれか一項に記載の予備力計算装置。 - 需要家に対して計画された第1日付の消費電力の系列である基準消費電力系列を需要抑制計算装置から受信する基準消費電力受信ステップと、
電力計測器により計測される需要家による消費電力系列を日付及び需要抑制強度と関連づけて電力履歴データベースに記録する記録ステップと、
温度センサにより計測される需要家宅の外気温系列を日付ごとに気温履歴データベースに記録する記録ステップと、
前記第1日付において、第1時刻から、予測時間長後の第2時刻までの予測期間における需要家宅の予測外気温系列を用い、前記予測期間において前記予測外気温系列と類似する系列部分をもつ日付を前記気温履歴データベースにおいて特定し、特定した日付に対応する消費電力系列を前記電力履歴データベースから特定し、特定した日付のうち前記需要抑制強度が前記第1日付と一致する消費電力系列を前記電力履歴データベースから特定し、前記第1時刻から過去履歴使用時間長前の第3時刻から前記第2時刻までの全体期間において、特定した消費電力系列群の各時刻の統計分布あるいは代表値を計算する消費電力分布計算ステップと、
前記第1日付において前記第3時刻から前記第1時刻までの履歴使用期間における前記消費電力系列と、前記全体期間における前記各時刻の統計分布あるいは代表値から、前記予測期間における予測消費電力系列を計算する消費電力予測ステップと、
前記予測消費電力系列と、前記基準消費電力系列のうち前記予測期間における系列部分との差分である予備力を計算し、前記予備力を前記需要抑制計算装置に送信する予備力計算ステップと、
をコンピュータが実行する予備力計算方法。 - 需要家に対して計画された第1日付の消費電力の系列である基準消費電力系列を需要抑制計算装置から受信する基準消費電力受信ステップと、
電力計測器により計測される需要家による消費電力系列を日付及び需要抑制強度と関連づけて電力履歴データベースに記録する記録ステップと、
温度センサにより計測される需要家宅の外気温系列を日付ごとに気温履歴データベースに記録する記録ステップと、
前記第1日付において、第1時刻から、予測時間長後の第2時刻までの予測期間における需要家宅の予測外気温系列を、気温予測装置から受信し、前記予測期間において前記予測外気温系列と類似する系列部分をもつ日付を前記気温履歴データベースにおいて特定し、特定した日付に対応する消費電力系列を前記電力履歴データベースから特定し、特定した日付のうち前記需要抑制強度が前記第1日付と一致する消費電力系列を前記電力履歴データベースから特定し、前記第1時刻から過去履歴使用時間長前の第3時刻から第2時刻までの全体期間において、前記特定した消費電力系列群の各時刻の統計分布あるいは代表値を計算する消費電力分布計算ステップと、
前記第1日付において前記第3時刻から前記第1時刻までの履歴使用期間における前記消費電力系列と、前記各時刻の統計分布あるいは代表値から、前記予測期間における予測消費電力系列を計算する消費電力予測ステップと、
前記予測消費電力系列と、前記基準消費電力系列のうち前記予測期間における系列部分との差分である予備力を計算し、前記予備力を前記需要抑制計算装置に送信する予備力計算ステップと、
をコンピュータに実行させるためのコンピュータプログラムを記録した記録媒体。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011067346A JP5025807B1 (ja) | 2011-03-25 | 2011-03-25 | 予備力計算装置およびその方法、コンピュータプログラム |
US13/234,528 US8886477B2 (en) | 2011-03-25 | 2011-09-16 | Reserve capacity calculating apparatus and method therefor, and computer readable medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011067346A JP5025807B1 (ja) | 2011-03-25 | 2011-03-25 | 予備力計算装置およびその方法、コンピュータプログラム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP5025807B1 true JP5025807B1 (ja) | 2012-09-12 |
JP2012205385A JP2012205385A (ja) | 2012-10-22 |
Family
ID=46878050
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2011067346A Active JP5025807B1 (ja) | 2011-03-25 | 2011-03-25 | 予備力計算装置およびその方法、コンピュータプログラム |
Country Status (2)
Country | Link |
---|---|
US (1) | US8886477B2 (ja) |
JP (1) | JP5025807B1 (ja) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014180187A (ja) * | 2013-03-15 | 2014-09-25 | Toshiba Corp | 電力需要予測装置、方法及びプログラム並びに需要抑制計画策定装置 |
JP2015011374A (ja) * | 2013-06-26 | 2015-01-19 | 京セラ株式会社 | 電力管理装置、電力管理方法、および電力管理プログラム |
US9280797B2 (en) * | 2013-09-19 | 2016-03-08 | General Electric Company | System and method to minimize grid spinning reserve losses by pre-emptively sequencing power generation equipment to offset solar generation capacity based on geospatial regional solar and cloud conditions |
US8963353B1 (en) * | 2013-09-19 | 2015-02-24 | General Electric Company | System and method to minimize grid spinning reserve losses by pre-emptively sequencing power generation equipment to offset wind generation capacity based on geospatial regional wind conditions |
JP6193400B2 (ja) * | 2013-11-20 | 2017-09-06 | 株式会社東芝 | 電力需要予測システム、電力需要予測方法、需要家プロファイリングシステム、及び需要家プロファイリング方法 |
US10353349B2 (en) * | 2015-05-04 | 2019-07-16 | Energate Inc. | Load control by adaptive duty cycling |
JP6004042B1 (ja) * | 2015-05-19 | 2016-10-05 | ダイキン工業株式会社 | 複数の空気調和装置の管理装置 |
US10355517B2 (en) | 2015-06-22 | 2019-07-16 | Mitsubishi Electric Corporation | Storage-battery control device, storage-battery charge/discharge system, photovoltaic power generation system, and storage-battery control method |
JP6631870B2 (ja) * | 2015-08-03 | 2020-01-15 | パナソニックIpマネジメント株式会社 | 電力管理システム、電力管理装置、電力管理方法、及び、プログラム |
JP6490234B2 (ja) * | 2015-11-27 | 2019-03-27 | 三菱電機株式会社 | 情報収集ユニット、情報処理方法およびプログラム |
US10941950B2 (en) * | 2016-03-03 | 2021-03-09 | Kabushiki Kaisha Toshiba | Air conditioning control device, air conditioning control method and non-transitory computer readable medium |
JP6759867B2 (ja) * | 2016-08-31 | 2020-09-23 | 富士通株式会社 | 需要家特定プログラム、抽出プログラム、需要家特定方法、及び需要家特定装置 |
US9645596B1 (en) * | 2016-11-23 | 2017-05-09 | Advanced Microgrid Solutions, Inc. | Method and apparatus for facilitating the operation of an on-site energy storage system to co-optimize battery dispatch |
EP3667853A4 (en) * | 2017-08-09 | 2021-01-20 | Sumitomo Electric Industries, Ltd. | PERFORMANCE MANAGEMENT DEVICE, PERFORMANCE MANAGEMENT SYSTEM, PERFORMANCE MANAGEMENT PROCEDURE AND CONTROL PROGRAM |
US11397020B2 (en) * | 2019-07-05 | 2022-07-26 | Lg Electronics Inc. | Artificial intelligence based apparatus and method for forecasting energy usage |
CN114742263B (zh) * | 2022-03-02 | 2024-03-01 | 北京百度网讯科技有限公司 | 负荷预测方法、装置、电子设备及存储介质 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010166636A (ja) * | 2009-01-13 | 2010-07-29 | Hitachi Ltd | 電力需給運用管理サーバ、および電力需給運用管理システム |
JP2010183760A (ja) * | 2009-02-06 | 2010-08-19 | Toshiba Corp | 発電機の負荷配分装置及び方法 |
Family Cites Families (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5963457A (en) * | 1994-03-18 | 1999-10-05 | Hitachi, Ltd. | Electrical power distribution monitoring system and method |
JP3402953B2 (ja) * | 1996-09-13 | 2003-05-06 | 株式会社東芝 | 通信方法、通信システムおよび通信装置 |
US20040024483A1 (en) * | 1999-12-23 | 2004-02-05 | Holcombe Bradford L. | Controlling utility consumption |
JP3780838B2 (ja) * | 2000-09-26 | 2006-05-31 | 株式会社日立製作所 | グリーン電力供給システム及びグリーン電力供給方法 |
AU2002244045A1 (en) * | 2001-02-19 | 2002-09-04 | Rosemount Analytical Inc. | Improved generator monitoring, control and efficiency |
JP2003087969A (ja) * | 2001-09-17 | 2003-03-20 | Mitsubishi Electric Corp | 電力需要調整システム |
US6996728B2 (en) * | 2002-04-26 | 2006-02-07 | Hewlett-Packard Development Company, L.P. | Managing power consumption based on utilization statistics |
US6889173B2 (en) * | 2002-10-31 | 2005-05-03 | Emerson Retail Services Inc. | System for monitoring optimal equipment operating parameters |
US7321810B2 (en) * | 2003-05-13 | 2008-01-22 | Siemens Power Transmission & Distribution, Inc. | Method of dynamic economic dispatch |
US8450995B2 (en) * | 2007-06-01 | 2013-05-28 | Powerkuff, Llc | Method and apparatus for monitoring power consumption |
US7908117B2 (en) * | 2007-08-03 | 2011-03-15 | Ecofactor, Inc. | System and method for using a network of thermostats as tool to verify peak demand reduction |
US20090055030A1 (en) * | 2007-08-21 | 2009-02-26 | Ingeteam, S.A. | Control of active power reserve in a wind-farm |
DK2195724T3 (da) * | 2007-08-28 | 2020-01-20 | Commvault Systems Inc | Energistyring af databehandlingsressourcer, såsom adaptiv energistyring af datalagringsoperationer |
US8700187B2 (en) * | 2007-08-28 | 2014-04-15 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US7848900B2 (en) * | 2008-09-16 | 2010-12-07 | Ecofactor, Inc. | System and method for calculating the thermal mass of a building |
US8255090B2 (en) * | 2008-02-01 | 2012-08-28 | Energyhub | System and method for home energy monitor and control |
JP4703736B2 (ja) * | 2009-03-02 | 2011-06-15 | 株式会社東芝 | エネルギー管理システム及び方法 |
US8498753B2 (en) * | 2009-05-08 | 2013-07-30 | Ecofactor, Inc. | System, method and apparatus for just-in-time conditioning using a thermostat |
US8620634B2 (en) * | 2009-07-24 | 2013-12-31 | Honeywell International Inc. | Energy resource allocation including renewable energy sources |
AU2010303947B2 (en) * | 2009-10-09 | 2014-10-02 | Landis+Gyr Technology, Inc. | Apparatus and method for controlling communications to and from utility service points |
US8401709B2 (en) * | 2009-11-03 | 2013-03-19 | Spirae, Inc. | Dynamic distributed power grid control system |
US20110161250A1 (en) * | 2009-12-31 | 2011-06-30 | Koeppel Adam R | Distributed energy generator monitor and method of use |
US8706309B2 (en) * | 2010-04-10 | 2014-04-22 | Schweitzer Engineering Laboratories Inc | Systems and method for obtaining a load model and related parameters based on load dynamics |
EP2375527B1 (en) * | 2010-04-12 | 2018-09-19 | Samsung Electronics Co., Ltd. | Demand Response Method and Demand Response System |
WO2011154900A2 (en) * | 2010-06-10 | 2011-12-15 | Hach Company | Server monitoring of flow and sampling apparatus and/or logger |
US8532836B2 (en) * | 2010-11-08 | 2013-09-10 | General Electric Company | Demand response load reduction estimation |
US8515588B2 (en) * | 2011-03-09 | 2013-08-20 | General Electric Company | Generator reserve capacity control system and network |
-
2011
- 2011-03-25 JP JP2011067346A patent/JP5025807B1/ja active Active
- 2011-09-16 US US13/234,528 patent/US8886477B2/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010166636A (ja) * | 2009-01-13 | 2010-07-29 | Hitachi Ltd | 電力需給運用管理サーバ、および電力需給運用管理システム |
JP2010183760A (ja) * | 2009-02-06 | 2010-08-19 | Toshiba Corp | 発電機の負荷配分装置及び方法 |
Also Published As
Publication number | Publication date |
---|---|
JP2012205385A (ja) | 2012-10-22 |
US8886477B2 (en) | 2014-11-11 |
US20120245868A1 (en) | 2012-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5025807B1 (ja) | 予備力計算装置およびその方法、コンピュータプログラム | |
US10635055B2 (en) | Building control system with break even temperature uncertainty determination and performance analytics | |
JP4584056B2 (ja) | 電力需給予測・制御システム | |
WO2013099323A1 (ja) | 電力管理システム及び電力管理方法 | |
US9262718B2 (en) | Systems and methods to predict a reduction of energy consumption | |
US8880925B2 (en) | Techniques for utilizing energy usage information | |
US9127963B2 (en) | Selection of bellwether smart grid meters | |
US20140371933A1 (en) | Electric power consumption management system and method | |
JP2017034797A (ja) | ベースライン負荷推定装置及びベースライン負荷推定プログラム | |
JP6635895B2 (ja) | 電力需要制御システム、電力需要制御方法、アグリゲータシステム、需要家電力管理システム、及びプログラム | |
JP5360090B2 (ja) | 多店舗型施設の設備運用システムとその処理方法とプログラム | |
JP6437139B2 (ja) | 電力管理装置、サーバ、電力管理システム、電力管理方法、及び、プログラム | |
JP6841231B2 (ja) | 情報処理装置、その情報処理方法、およびプログラム | |
JP2014078228A (ja) | エンドユーザベースのバックアップ管理 | |
JP2017194863A (ja) | 需要予測装置 | |
JP2022189386A (ja) | 情報処理装置、情報処理方法及びプログラム | |
WO2016186069A1 (ja) | インセンティブ予測量提示装置 | |
JP6427049B2 (ja) | ピーク電力発現予測装置および予測方法 | |
JP2014149658A (ja) | ガス使用量の予測システムおよび予測方法 | |
JP6236110B2 (ja) | ガス使用量の予測システムおよび予測方法 | |
JP2020160932A (ja) | 電力予測方法及び電力予測システム | |
JP5914281B2 (ja) | 予測変数特定装置、方法、およびプログラム | |
JP2017195007A (ja) | 設備管理システム、設備管理装置及び設備管理方法 | |
EP4116895A1 (en) | State detection system | |
JP6196127B2 (ja) | 設備管理システム、設備管理装置及び設備管理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20120525 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20120619 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150629 Year of fee payment: 3 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 5025807 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |