JP4716276B2 - Train control device - Google Patents

Train control device Download PDF

Info

Publication number
JP4716276B2
JP4716276B2 JP2004124072A JP2004124072A JP4716276B2 JP 4716276 B2 JP4716276 B2 JP 4716276B2 JP 2004124072 A JP2004124072 A JP 2004124072A JP 2004124072 A JP2004124072 A JP 2004124072A JP 4716276 B2 JP4716276 B2 JP 4716276B2
Authority
JP
Japan
Prior art keywords
speed
speed limit
train
check pattern
pattern
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2004124072A
Other languages
Japanese (ja)
Other versions
JP2005306145A (en
Inventor
晃揮 大和田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Signal Co Ltd
Original Assignee
Nippon Signal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Signal Co Ltd filed Critical Nippon Signal Co Ltd
Priority to JP2004124072A priority Critical patent/JP4716276B2/en
Publication of JP2005306145A publication Critical patent/JP2005306145A/en
Application granted granted Critical
Publication of JP4716276B2 publication Critical patent/JP4716276B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Description

本発明は、車上において速度照査パターンを作成し、その作成された速度照査パターンを用いて列車の速度制御を行う列車制御装置に係り、特に、目標停止位置までの間の速度制限区間を有する場合であってもソフトウェアの処理負荷を増加させないようにしたものに関する。   The present invention relates to a train control apparatus that creates a speed check pattern on a vehicle and controls the speed of the train using the created speed check pattern, and in particular, has a speed limit section to a target stop position. Even in such a case, the present invention relates to a software that does not increase the processing load of software.

近年、列車の運転間隔の縮小及び乗り心地改善のために、常時、地上から得られる所定のデジタル情報(ATC情報)に基づいて、車上(列車)において主体的に速度照査パターンを作成し、その作成した速度照査パターンを用いて列車の速度制御を行う、一段制御デジタルATC方式の列車制御装置が提案されている(非特許文献1参照。)。   In recent years, in order to reduce train operation intervals and improve ride comfort, always create a speed check pattern on the vehicle (train) based on predetermined digital information (ATC information) obtained from the ground, A one-stage control digital ATC system train control device that performs train speed control using the created speed check pattern has been proposed (see Non-Patent Document 1).

この一段制御デジタルATC方式に係る列車制御装置は、常時、地上側から速度照査パターンを作成するための所定の情報を得て、現在の列車位置から目標停止点までの1本の放物線状の速度照査パターンを作成することができるように構成されている。この一段制御デジタルATCは、より列車の運転間隔の縮小化を図ることができるとともに、乗り心地の改善を図ることができるという特長がある。
平成9年5月15日(社)日本鉄道技術協会発行「鉄道技術者のための電気概論,信号シリーズ,ATS・ATC」第4版,P.76〜155
The train control device according to the one-step control digital ATC system always obtains predetermined information for creating a speed check pattern from the ground side, and a single parabolic speed from the current train position to the target stop point. It is configured so that a check pattern can be created. This one-stage control digital ATC has features that it is possible to further reduce the train operation interval and to improve the ride comfort.
May 15, 1997, published by Japan Railway Technology Association, "Introduction to Electricity for Railway Engineers, Signal Series, ATS / ATC" 4th Edition, P.I. 76-155

しかしながら、上記提案に係る一段制御デジタルATC方式に係る列車制御装置においては、現在の列車位置から所定の目標停止位置までの間に地上設備上の要因や気象条件等の要因による速度制限区間が存在すると、速度照査パターンの作成の所定の演算処理の回数が増加し、つまり、その演算処理計算点数が増加し、車上装置のソフトウェアの処理負荷が増大するという問題点があった。   However, in the train control device according to the proposed one-step control digital ATC system, there is a speed limit section due to factors such as ground facilities and weather conditions between the current train position and a predetermined target stop position. Then, there has been a problem that the number of predetermined calculation processes for creating the speed check pattern increases, that is, the calculation processing calculation points increase, and the processing load of software on the on-board device increases.

図6(a),(b)の速度照査パターン図を用いてさらに説明すると、同図(a)のP0 は、列車イが所定の目標停止位置aまで所定の距離を有している場合に、その列車イの図示しない車上装置で作成された速度照査パターンを示している。この速度照査パターンP0 は、所定の目標停止位置aにおいて列車イの速度が0となる放物線状を呈している。そして、この速度照査パターンP0 上の黒丸印は、列車イが目標停止位置aまで走行する間にその列車イの車上装置において行われた速度照査パターンP0 を作成するための計算点、すなわち、その速度照査パターンP0 を作成するための所定の演算処理を行うための地点を示している。この計算(演算処理)は、一定時間(例えば数秒)間隔で行われる。したがって、この計算点は、図示されるように、列車速度の低下に伴い密に示される。 Further explanation will be made using the speed verification pattern diagrams of FIGS. 6A and 6B. P0 in FIG. 6A indicates that the train A has a predetermined distance to the predetermined target stop position a. The speed check pattern created by the on-board device (not shown) of the train A is shown. The speed check pattern P0 has a parabolic shape in which the speed of the train A is 0 at a predetermined target stop position a. The black circles on the speed check pattern P0 are calculation points for creating the speed check pattern P0 performed in the on-board device of the train A while the train A travels to the target stop position a, that is, A point for performing a predetermined calculation process for creating the speed check pattern P0 is shown. This calculation (arithmetic processing) is performed at regular time intervals (for example, several seconds). Therefore, this calculation point is shown densely as the train speed decreases, as shown.

上述の各計算点において作成された速度照査パターンが前回の計算点において作成された速度照査パターンP0 と異なるとき、例えば、目標停止位置aにおける図示しない信号機の現示アップが行われたようなときは、目標停止位置が現在よりもさらに遠方(図(a)においては、目標停止位置aよりも右側)となる新たな速度照査パターンが作成されるが、ここでは、説明を簡単にするために、目標停止位置aは、列車イがその目標停止位置aに停止するまで変化しないものとして説明する。 When the speed check pattern created at each of the above-mentioned calculation points is different from the speed check pattern P0 created at the previous calculation point, for example, when a display of a traffic signal (not shown) at the target stop position a is performed , the target stop position is further than the current distant (in FIG. 6 (a), the right side from the target stop position a) is the new rate Shosa pattern to be is created, here, for simplicity of explanation The target stop position a will be described as not changing until the train A stops at the target stop position a.

ところで、図(b)に示されるように、目標停止位置aまでの間に気象条件等による速度制限区間L1 〜L3 が存在すると、それら速度制限区間L1 〜L3 に対応した速度照査パターンP′が作成されるが、この場合、速度制限区間のないときよりも速度照査パターンを作成するための計算点が増加するという問題点が発生してしまう。すなわち、速度制限区間L1 〜L3 の存在しない速度照査パターンP0 上に表示される計算点の数よりも、速度制限区間L1 〜L3 が存在するときに作成される速度照査パターンP′上に表示される計算点の数が多くなり、車上装置のソフトウェアの処理負荷が増大してしまうという欠点がある。 Meanwhile, as shown in FIG. 6 (b), the speed limit interval L1 to L3 according to weather conditions, etc. until the target stop position a is present, the speed Shosa corresponding to their speed limit interval L1 to L3 pattern P ' However, in this case, there is a problem in that the number of calculation points for creating a speed check pattern increases compared to when there is no speed limit section. That is, the number of calculation points displayed on the speed check pattern P0 where the speed limit sections L1 to L3 do not exist is displayed on the speed check pattern P 'created when the speed limit sections L1 to L3 exist. There is a disadvantage that the number of calculation points increases and the processing load of software on the on-board device increases.

そこで、本発明は、上記欠点を解決するためになされたものであって、その目的は、目標停止位置までの間に速度制限区間が存在してもソフトウェアの処理負荷を増加させることがない列車制御装置を提供することにある。   Therefore, the present invention has been made to solve the above-described drawbacks, and the purpose thereof is a train that does not increase the software processing load even if a speed limit section exists before reaching the target stop position. It is to provide a control device.

本発明に係る列車制御装置は、上記目的を達成するために、請求項1に記載の発明は、地上側から常時入手する所定の情報に基づいて列車に搭載されている車上装置で所定の速度照査パターンを作成し、その作成された速度照査パターンを用いて列車制御を行う列車制御装置において、所定の目標停止位置を列車の停止位置とする第1の速度照査パターンを作成すると共に、前記所定の目標停止位置までの間に速度制限区間が存在するときに、その速度制限区間に対応した第2の速度照査パターンを作成する速度照査パターン作成部と、
前記速度制限区間を越えた地点から速度制限区間の制限速度に対応した前記第1の速度照査パターンの照査速度に達するまで速度照査パターンを作成するための演算処理を中止する演算部と、を有することを特徴としている。
本発明の請求項2に記載の列車制御装置は、所定の目標停止位置までの間に速度制限区間が複数存在するとき、それら複数の速度制限区間のうちの一つの速度制限区間に対応して作成される速度照査パターン内の他の速度制限区間に対応する速度が前記他の速度制限区間の制限速度よりも低いときは、前記他の速度制限区間に対応した速度照査パターンの作成を省略することを特徴としている。
In order to achieve the above object, the train control device according to the present invention is an onboard device mounted on a train based on predetermined information that is always obtained from the ground side. In the train control device that creates a speed check pattern and performs train control using the created speed check pattern, the first speed check pattern with a predetermined target stop position as a train stop position is created, and A speed check pattern creating unit that creates a second speed check pattern corresponding to the speed limit section when a speed limit section exists between the predetermined target stop position;
A calculation unit to stop processing for creating velocity Shosa pattern from a point beyond between the speed limit Zone to reach Shosa speed of the first speed Shosa pattern corresponding to the speed limit of the speed limit zone, It is characterized by having.
In the train control device according to claim 2 of the present invention, when there are a plurality of speed limit sections until a predetermined target stop position, the train control apparatus corresponds to one speed limit section among the plurality of speed limit sections. when the speed corresponding to another speed limit interval in speed Shosa pattern created is lower than the limit speed of the other speed limit section is omitted creation speed Shosa pattern corresponding to said another speed limit zone It is characterized by that.

本発明の請求項1に記載の列車制御装置は、所定の目標停止位置を列車の停止位置とする第1の速度照査パターンを作成すると共に、前記所定の目標停止位置までの間に速度制限区間が存在するときに、その速度制限区間に対応した第2の速度照査パターンを作成する速度照査パターン作成部と、前記速度制限区間を越えた地点から速度制限区間の制限速度に対応した前記第1の速度照査パターンの照査速度に達するまで速度照査パターンを作成するための演算処理を中止する演算部と、を有するので、車上装置のソフトウェアの処理負荷を軽減することができる。
本発明の請求項2に記載の列車制御装置は、所定の目標停止位置までの間に速度制限区間が複数存在するとき、それら複数の速度制限区間のうちの一つの速度制限区間に対応して作成される速度照査パターン内の他の速度制限区間に対応する速度が前記他の速度制限区間の制限速度よりも低いときは、前記他の速度制限区間に対応した速度照査パターンの作成を省略するので、効率よく速度照査パターンを作成することができる。
The train control device according to claim 1 of the present invention creates a first speed check pattern in which a predetermined target stop position is a train stop position, and a speed limit section until the predetermined target stop position. the but when present, corresponding with the speed Shosa pattern creation section that creates a second speed Shosa pattern corresponding to the speed limit zone, from the point beyond between the speed limit Ward speed limit of the speed limit zone Since it has a calculation part which stops the calculation process for creating a speed check pattern until it reaches the check speed of the 1st speed check pattern, the processing load of software of an on-board device can be reduced.
In the train control device according to claim 2 of the present invention, when there are a plurality of speed limit sections until a predetermined target stop position, the train control apparatus corresponds to one speed limit section among the plurality of speed limit sections. when the speed corresponding to another speed limit interval in speed Shosa pattern created is lower than the limit speed of the other speed limit section is omitted creation speed Shosa pattern corresponding to said another speed limit zone Therefore, a speed check pattern can be created efficiently.

以下、本発明を実施するための最良の形態を図面に基づいて説明する。図1は、本発明に係る列車制御装置の概略構成図であって、レールRを走行する列車イには、本発明の列車制御装置を実現するための車上装置ロが搭載されている。このレールRは、所定の長さに区分された軌道回路に形成されている。   Hereinafter, the best mode for carrying out the present invention will be described with reference to the drawings. FIG. 1 is a schematic configuration diagram of a train control apparatus according to the present invention, and an onboard apparatus B for realizing the train control apparatus of the present invention is mounted on a train A traveling on a rail R. The rail R is formed in a track circuit divided into a predetermined length.

図1中、1は、一つの軌道回路のレールRの一端側(始端側)にデジタル情報からなる制御信号(本発明の地上側から送出される所定の情報に相当する。)を供給する地上送信器である。すなわち、この地上送信器1は、周知のATCにおける地上装置と同様に構成されていて、軌道回路識別データ、経路コードデータ、速度制限データ、分岐データ、前方列車位置又は開通区間数データ等の所定のデータ群からなり、このデータ群からなる制御信号をレールRに供給することができるように構成されている。   In FIG. 1, reference numeral 1 denotes a ground for supplying a control signal composed of digital information (corresponding to predetermined information transmitted from the ground side of the present invention) to one end side (start end side) of the rail R of one track circuit. It is a transmitter. In other words, this ground transmitter 1 is configured in the same manner as a ground device in a well-known ATC, and has predetermined information such as track circuit identification data, route code data, speed limit data, branch data, forward train position or opening section number data. And a control signal consisting of this data group can be supplied to the rail R.

列車イに搭載されている車上装置ロは、列車イの先端下部に設けられた車上子(アンテナ)10を介して地上側からの情報、すなわち、レールRからの制御信号及び図示しない地上子からの位置信号を受信する受信部11を有している。なお、車上子10は、図1では図面を簡略化するために、レールRからの制御信号と地上子からの位置信号とを一つの上子で受信できるように示されているが、実際は別々に設けられている。なお、地上子は、列車イがその地上子を通過したときに、その地上子から得た位置信号により自列車(イ)の絶***置を検出することができるように構成されている。 The on-board device B mounted on the train A is provided with information from the ground side via the on-board element (antenna) 10 provided at the lower end of the train A, that is, the control signal from the rail R and the ground (not shown). It has the receiving part 11 which receives the position signal from a child. Incidentally, board coil 10, in order to simplify the drawing in FIG. 1, a position signal of the control signal and ground terminal or these from the rail R shown to be able to receive a single car upper child In fact, it is provided separately. The ground unit is configured such that when the train A passes through the ground unit, the absolute position of the own train (A) can be detected from the position signal obtained from the ground unit.

車上装置ロの演算部12は、CPUを中心に形成されていて車上装置ロを統括的に制御できるように構成されている。すなわち、この演算部(CPU)12は、メモリ13に格納されているシステムプログラムデータ及び車上データベースを用いて所定の演算処理ができるように構成されている。そして、この演算部12には、速度照査パターン作成部14が接続されていて、演算部12の制御の下に所定の速度照査パターンを作成できるように構成されている。 The computing unit 12 of the on-board device B is formed around the CPU, and is configured to control the on-board device B in an integrated manner. That is, the calculation unit (CPU) 12 is configured to perform a predetermined calculation process using the system program data and the on-board database stored in the memory 13. A speed check pattern creation unit 14 is connected to the calculation unit 12 so that a predetermined speed check pattern can be created under the control of the calculation unit 12.

演算部(CPU)12には、受信部11からの信号入力以外に列車イの車軸に設けられている速度発電機Gからの信号も入力できるように構成されている。そして、この演算部(CPU)12は、作成された速度照査パターン及び速度発電機Gから得られた自列車速度に基づいてブレーキ駆動信号等の所定の出力信号を出力部15を介して列車イに搭載された図示しない各種駆動機器類に出力できるように構成されている。 In addition to the signal input from the receiving unit 11, the calculation unit (CPU) 12 is configured to be able to input a signal from the speed generator G provided on the train axle. The calculation unit (CPU) 12 outputs a predetermined output signal such as a brake drive signal via the output unit 15 based on the created speed check pattern and the own train speed obtained from the speed generator G. It is comprised so that it can output to the various drive equipments which are mounted in the (not shown).

以下、図2の速度照査パターン及び図3のフローチャートを用いて制御動作について説明する。今、列車イは、図2に示されるように目標停止位置aから所定の距離離れた位置に位置しているものとする。そして、車上装置ロの速度照査パターン作成部14では、このときの自列車位置と目標停止位置aとに基づいて、上記図6(a)と同様の第1の速度照査パターンP1 が作成されてメモリ13に記憶される(ステップ100。以下、ステップを「S」とする。)。そして、この第1の速度照査パターンP1 の作成時において、地上側から所定の速度制限区間情報が車上(列車イ)に送信されていなければ(S102否定)、列車イは、その作成された速度照査パターンP1 を用いた列車制御が行われる(S103)。すなわち、列車イは、その作成された速度照査パターンP1 を越えない範囲で、かつ、その速度照査パターンP1 に沿うように運転される。また、列車速度が速度照査パターンP1 を越えたときは、出力部15からブレーキ駆動信号が出力されて列車速度が抑制される。   Hereinafter, the control operation will be described using the speed verification pattern of FIG. 2 and the flowchart of FIG. Now, it is assumed that the train A is located at a position away from the target stop position a by a predetermined distance as shown in FIG. Then, the speed check pattern creation unit 14 of the on-board device b creates a first speed check pattern P1 similar to that shown in FIG. 6A based on the current train position and the target stop position a. Is stored in the memory 13 (step 100. Hereinafter, the step is referred to as “S”). When the first speed check pattern P1 is created, if the predetermined speed limit section information is not transmitted from the ground side to the vehicle (Train A) (No in S102), the train A is created. Train control using the speed check pattern P1 is performed (S103). That is, the train A is operated within the range not exceeding the created speed check pattern P1 and along the speed check pattern P1. When the train speed exceeds the speed check pattern P1, a brake drive signal is output from the output unit 15 to suppress the train speed.

列車イが図2に示されるように目標停止位置aから所定距離離れた位置(後述するdの位置)に位置しているときに、地上側から所定の速度制限区間情報が送信されると、すなわち、地上送信器1からレールRに速度制限区間Lの位置及びその速度制限区間Lの制限速度Vr の速度制限情報が印加されると(S102肯定)、その情報は車上子10を介して車上装置ロに受信される。車上装置ロの速度照査パターン作成部14では、地上側から得られた速度制限情報に基づいて、速度制限区間L用の第2の速度照査パターンP2 が作成される。この第2の速度照査パターンP2 の作成は、先ず、速度照査パターンP1 を目標停止位置a(V=0)から速度が制限速度Vr になるbまで計算し、V=Vr においてbから速度制限区間Lの開始位置cまでをフラットに形成する。次に、cから現在位置dまでの速度照査パターンP2 が計算される。このような第2の速度照査パターンP2 が作成されると、列車イは、この作成された第2の速度照査パターンP2 を用いて列車の運転制御が行われる(S104)。 As shown in FIG. 2, when the predetermined speed limit section information is transmitted from the ground side when the train A is located at a position (a position d described later) that is a predetermined distance away from the target stop position a, That is, when the speed limit information of the speed limit section L and the speed limit Vr of the speed limit section L is applied from the ground transmitter 1 to the rail R (Yes in S102), the information is transmitted via the vehicle upper piece 10. It is received by the on-board device b. The speed check pattern creation unit 14 of the on-board device b creates the second speed check pattern P2 for the speed limit section L based on the speed limit information obtained from the ground side. To create the second speed check pattern P2, first, the speed check pattern P1 is calculated from the target stop position a (V = 0) to b at which the speed becomes the speed limit Vr. Up to the start position c of L is formed flat. Next, a speed check pattern P2 from c to the current position d is calculated. When such a second speed check pattern P2 is created, train a is controlled for train operation using the created second speed check pattern P2 (S104).

この第2の速度照査パターンP2 に沿った列車制御が行われる際においても、周知の速度照査パターンを用いた列車制御と同様に、図2の黒丸印に示されるように、車上装置ロでは、一定の時間間隔で地上側から得た情報を基に速度照査パターンを作成する所定の演算処理が行われ、前回の演算処理で得られた速度照査パターンの補正ないし修正が行われて、常時、作成された速度照査パターン(P2 )の正当性がチェックされる。 When train control is performed along the second speed check pattern P2, as shown by the black circles in FIG. 2, as in the train control using the known speed check pattern, A predetermined calculation process is performed to create a speed check pattern based on information obtained from the ground side at regular time intervals, and the speed check pattern obtained in the previous calculation process is corrected or corrected, and The validity of the created speed check pattern (P2) is checked.

上述の一定時間間隔で行われる演算処理は、図2に示されるように、所定の速度制限区間Lを越えた地点から該速度制限区間Lの制限速度Vr に対応する第1の速度照査パターンP1 に達する位置bまでの間、中止される(S106、S108)。この中止される区間の列車速度は、制限速度Vr に保たれ、しかも、この制限速度Vr は、第1の速度照査パターンP1 内であるので、上述の演算処理が中止されても列車イの安全は確保される。なお、図2中、白丸は、速度制限区間Lを越えているので、本来ならば上述の演算処理を行わなければならないタイミングを示しているが、ここでは、その演算処理が中止されていることを示している。このように、演算処理が中止されるので、車上装置ロの負荷、すなわち、演算部12のソフトウェアの処理負荷を軽減することが可能となる。 Arithmetic processing performed at regular time intervals described above, as shown in FIG. 2, the first speed Shosa patterns corresponding the point exceeds a predetermined speed limit zone L the limit speed Vr of the speed limit zone L P1 Until the position b reaching the position b is canceled (S106, S108). The train speed of the section to be canceled is maintained at the speed limit Vr, and the speed limit Vr is within the first speed check pattern P1, so that the safety of train a is safe even if the above calculation processing is stopped. Is secured. In FIG. 2, white circles indicate the timing at which the above-described calculation processing should be performed because the speed limit section L is exceeded, but here the calculation processing is stopped. Is shown. As described above, since the arithmetic processing is stopped, it is possible to reduce the load on the on-board device B, that is, the processing load on the software of the arithmetic unit 12.

図4は、目標停止位置aまでの間に複数(図示の例では3個)の速度制限区間L1 〜L3 が存在するときの第1の速度照査パターンP1 及び第2の速度照査パターンP2 が示されている。このように、複数個の速度制限区間L1 〜L3 を有する場合であっても、上記図2に示されるときと同様に、速度制限区間を越えた部分において、上述の所定の演算処理を行わないので、演算部12のソフトウェアの処理負荷を軽減することができる。 FIG. 4 shows the first speed check pattern P1 and the second speed check pattern P2 when there are a plurality (three in the illustrated example) of speed limit sections L1 to L3 before reaching the target stop position a. Has been. Thus, even when having a plurality of speed limit interval L1 to L3, similarly to the case shown in FIG. 2, in the portion exceeding between speed limit zone, perform predetermined arithmetic processing described above Therefore, the software processing load of the arithmetic unit 12 can be reduced.

図5は、上記図4と同様に、目標停止位置aまでの間に複数(図示の例では4個)の速度制限区間L1 〜L4 が存在するときの第1の速度照査パターンP1 及び第2の速度照査パターンP2 が示されている。この場合も上記図2及び図のときと同様に、演算部12のソフトウェアの処理負荷を軽減することができる。また、この図5は、複数の速度制限区間L1 〜L4 が存在する場合であっても、相前後する速度制限区間の条件によっては、第2の速度照査パターンP2 の作成時に考慮に入れなくともよい速度制限区間が発生する場合があることを示している。図5の速度制限区間L1 はその例である。 As in FIG. 4, FIG. 5 shows the first speed check pattern P1 and second speed when there are a plurality (four in the illustrated example) of speed limit sections L1 to L4 up to the target stop position a. The speed check pattern P2 is shown. In this case as well, as in the case of FIGS. 2 and 4 , the processing load on the software of the calculation unit 12 can be reduced. Further, FIG. 5 shows that even when there are a plurality of speed limit sections L1 to L4, depending on the conditions of the speed limit sections that follow each other, it may not be taken into account when creating the second speed check pattern P2. It shows that a good speed limit section may occur. The speed limit section L1 in FIG. 5 is an example.

すなわち、この図5における第2の速度照査パターンP2 は、所定の目標停止位置aまでの間に複数の速度制限区間L1 〜L4 が存在するとき、それら複数の速度制限区間L1 〜L4のうちの一つの速度制限区間(例えばL2)に対応して作成される速度照査パターン内の他の速度制限区間(例えばL1)に対応する速度が該他の速度制限区間L1の制限速度よりも低いときは、上記他の速度制限区間L1に対応した速度照査パターンの作成を省略して作成される。このように第2の速度照査パターンP2 が作成された場合、その第2の速度照査パターンP2 の速度は、速度制限区間L1 の制限速度よりも低いので、列車の安全が確保される。 In other words, the second speed check pattern P2 in FIG. 5 indicates that when there are a plurality of speed limit sections L1 to L4 up to a predetermined target stop position a, when the speed corresponding to one of the speed limit interval (e.g. L2) in addition to the speed limit interval in speed Shosa pattern created corresponding (eg L1) is lower than the limit speed of the other speed limit section L1 is , it is prepared by omitting the creation speed Shosa pattern corresponding to the other speed limit interval L1. When the second speed check pattern P2 is created in this manner, the speed of the second speed check pattern P2 is lower than the speed limit of the speed limit section L1, so that the safety of the train is ensured.

本発明の一実施の形態に係る列車制御装置の概略構成図である。It is a schematic structure figure of a train control device concerning one embodiment of the present invention. 速度照査パターンの一例である。It is an example of a speed check pattern. 制御動作を示すフローチャートである。It is a flowchart which shows control operation. 速度照査パターンの一例である。It is an example of a speed check pattern. 速度照査パターンの一例である。It is an example of a speed check pattern. 従来の速度照査パターンの一例である。It is an example of the conventional speed check pattern.

符号の説明Explanation of symbols

イ 列車
ロ 車上装置
R レール
1 地上送信器
12 演算部(CPU)
14 速度照査パターン作成部
P1 第1の速度照査パターン
P2 第2の速度照査パターン
B Train B On-board equipment R Rail 1 Ground transmitter
12 Calculation unit (CPU)
14 Speed check pattern creation part P1 1st speed check pattern P2 2nd speed check pattern

Claims (2)

地上側から常時入手する所定の情報に基づいて列車に搭載されている車上装置で所定の速度照査パターンを作成し、その作成された速度照査パターンを用いて列車制御を行う列車制御装置において、
所定の目標停止位置を列車の停止位置とする第1の速度照査パターンを作成すると共に、前記所定の目標停止位置までの間に速度制限区間が存在するときに、その速度制限区間に対応した第2の速度照査パターンを作成する速度照査パターン作成部と、
前記速度制限区間を越えた地点から速度制限区間の制限速度に対応した前記第1の速度照査パターンの照査速度に達するまで速度照査パターンを作成するための演算処理を中止する演算部と、
を有することを特徴とする列車制御装置。
In the train control device that creates a predetermined speed check pattern with the on-board device mounted on the train based on the predetermined information that is always obtained from the ground side, and performs the train control using the created speed check pattern,
A first speed check pattern with a predetermined target stop position as a train stop position is created, and when there is a speed limit section between the predetermined target stop position, the first speed check pattern corresponding to the speed limit section A speed check pattern creating unit for creating two speed check patterns;
A calculation unit to stop processing for creating velocity Shosa pattern from a point beyond between the speed limit Zone to reach Shosa speed of the first speed Shosa pattern corresponding to the speed limit of the speed limit zone,
A train control device comprising:
請求項1に記載の列車制御装置において、所定の目標停止位置までの間に速度制限区間が複数存在するとき、それら複数の速度制限区間のうちの一つの速度制限区間に対応して作成される速度照査パターン内の他の速度制限区間に対応する速度が前記他の速度制限区間の制限速度よりも低いときは、前記他の速度制限区間に対応した速度照査パターンの作成を省略することを特徴とする列車制御装置。 In the train control device according to claim 1, when a plurality of speed limit sections exist until a predetermined target stop position, the train control apparatus is created corresponding to one speed limit section among the plurality of speed limit sections. when the speed corresponding to another speed limit interval in speed Shosa pattern is lower than the limit speed of the other speed limit interval, characterized in that omit the creation speed Shosa pattern corresponding to said another speed limit zone Train control device.
JP2004124072A 2004-04-20 2004-04-20 Train control device Expired - Lifetime JP4716276B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004124072A JP4716276B2 (en) 2004-04-20 2004-04-20 Train control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004124072A JP4716276B2 (en) 2004-04-20 2004-04-20 Train control device

Publications (2)

Publication Number Publication Date
JP2005306145A JP2005306145A (en) 2005-11-04
JP4716276B2 true JP4716276B2 (en) 2011-07-06

Family

ID=35435397

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004124072A Expired - Lifetime JP4716276B2 (en) 2004-04-20 2004-04-20 Train control device

Country Status (1)

Country Link
JP (1) JP4716276B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6296954B2 (en) * 2014-10-01 2018-03-20 株式会社日立製作所 Remote maintenance device, train operation management system, and software repair method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04317853A (en) * 1991-04-17 1992-11-09 Mitsubishi Electric Corp Method of forming running curve
JPH05193502A (en) * 1991-10-25 1993-08-03 Toshiba Corp Optimum traveling pattern calculating device and system
JP2001292509A (en) * 2000-04-06 2001-10-19 East Japan Railway Co Apparatus for controlling train
JP2002087264A (en) * 2000-09-11 2002-03-27 Nippon Signal Co Ltd:The Train traveling control system
JP2002370645A (en) * 2001-06-15 2002-12-24 Mitsubishi Electric Corp Method of preparing train operation curve

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04317853A (en) * 1991-04-17 1992-11-09 Mitsubishi Electric Corp Method of forming running curve
JPH05193502A (en) * 1991-10-25 1993-08-03 Toshiba Corp Optimum traveling pattern calculating device and system
JP2001292509A (en) * 2000-04-06 2001-10-19 East Japan Railway Co Apparatus for controlling train
JP2002087264A (en) * 2000-09-11 2002-03-27 Nippon Signal Co Ltd:The Train traveling control system
JP2002370645A (en) * 2001-06-15 2002-12-24 Mitsubishi Electric Corp Method of preparing train operation curve

Also Published As

Publication number Publication date
JP2005306145A (en) 2005-11-04

Similar Documents

Publication Publication Date Title
ES2708208T3 (en) Procedure and disposition to monitor a section of track delimited by two units of sensor axis counter
JP4812821B2 (en) Train speed control device
US8428797B2 (en) Method and arrangement for the operation of a railroad line
JP2017112832A (en) Train control system
JP2017055518A (en) Train control system
JP7219047B2 (en) Automated train driving system
JP5732366B2 (en) Ground device, on-vehicle device, train control system, and control method
CN103282259B (en) For the device of European Train Control System 2 grades of ETCS L2 Train Control
JP6158103B2 (en) Train control system
JP4716276B2 (en) Train control device
JP5170994B2 (en) ATS equipment
JP4070125B2 (en) Vehicle control device
JP4221350B2 (en) Train control device
JP5600545B2 (en) Train control system and train control method
JP2005349945A (en) Train control device
CN109318945A (en) Train control method, apparatus and system
JP6105239B2 (en) ATS equipment
JP4757045B2 (en) Train control device
JP2010058675A (en) Fixed point stop control device
JP6844966B2 (en) Wireless train control system
JP7080577B2 (en) On-board system of trains
JP2005237073A (en) Train control device
JP2016137876A (en) Operation control system and operation control method
JPH106994A (en) Railroad crossing controller
JP2020023232A (en) Train control system using radio communication and on-board device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070327

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20080226

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20080421

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100323

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100521

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101102

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101220

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110322

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110322

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4716276

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140408

Year of fee payment: 3