JP4570063B2 - Scaffold integrated moving formwork device - Google Patents

Scaffold integrated moving formwork device Download PDF

Info

Publication number
JP4570063B2
JP4570063B2 JP2001044556A JP2001044556A JP4570063B2 JP 4570063 B2 JP4570063 B2 JP 4570063B2 JP 2001044556 A JP2001044556 A JP 2001044556A JP 2001044556 A JP2001044556 A JP 2001044556A JP 4570063 B2 JP4570063 B2 JP 4570063B2
Authority
JP
Japan
Prior art keywords
bracket
frame body
formwork
wall
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001044556A
Other languages
Japanese (ja)
Other versions
JP2002242162A (en
Inventor
眞人 舘
公夫 谷田
徹 山崎
重尚 堀田
眞冶 片岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Sato Kogyo Co Ltd
Original Assignee
Maeda Corp
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp, Sato Kogyo Co Ltd filed Critical Maeda Corp
Priority to JP2001044556A priority Critical patent/JP4570063B2/en
Publication of JP2002242162A publication Critical patent/JP2002242162A/en
Application granted granted Critical
Publication of JP4570063B2 publication Critical patent/JP4570063B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、張出部を有する堤趾導流壁を、基盤面等から組み立てた足場支保工無しに施工可能とした足場一体型移動型枠装置に関する。
【0002】
【従来の技術】
例えば、図10に示されるように、ダムの左岸側および右岸側に施工される堤趾導流壁では、導流壁の頂部に内側に逆L字状に張り出した波返し部52が設けられる(図11(B)参照)。
【0003】
この波返し部52の施工は、図11に示されるように、既設コンクリート53の両側にそれぞれ基盤面から組立・設置された足場支保工54、55を利用してパイプ支保工56を組み、1回のコンクリート打設作業区間毎に、波返し部下面がわ型枠57を設けるとともに、側面型枠等の型枠58、59を設け、これら型枠57〜59内部にコンクリートを流し込み、その後コンクリートの硬化を待って脱型を行い前記型枠57〜59を横移動させる繰り返しによって施工を行っていた。
【0004】
【発明が解決しようとする課題】
しかしながら、上記従来方法(足場支保工)の場合には、足場支保工の容積が大きくなるとともに、設置期間も長期間となる。すなわち、図11に示されるように、波返し部52側では、非張出部側には1列の足場支保工で足りるのに対して、張出部側には複数列、図示例では3列の足場支保工が必要となる。
【0005】
また、型枠転用時の横移動が非常に煩雑である。さらには、型枠、足場および支保工の組立・解体作業が人力による高所作業となるため、多くの人手と作業日数を要し、また危険作業が多くなる、などの問題があった。
【0006】
そこで本発明の主たる課題は、既設コンクリートの上部に連続して、張出部を有する堤趾導流壁を施工するに当たり、足場工、型枠支保工、型枠工、鉄筋工およびコンクリート打設工などの一連の施工工程を、基盤面等から組み立てた足場支保工無しで施工できるようにした足場一体型移動型枠装置を提供することにある。
【0007】
【課題を解決するための手段】
前記課題を解決するための本第1発明は、打設済みコンクリート壁の上面に連続して、壁面の一方側に張出部を有する堤趾導流壁を順次移動しながら施工するための足場一体型移動型枠装置であって、
前記打設済みコンクリート壁の張出部がわ壁面に対して、前記移動方向に所定の間隔でかつ所定区間に亘って設置される複数のブラケットと、
これらブラケット群の内、所定数のブラケット群間に移動方向に沿って架け渡されるとともに、分割可能とされる走行レールと、
この走行レールに沿って走行自在とされる張出部移動支保設備と、
前記打設済みコンクリートの非張出部がわ壁面に対して、前記移動方向に沿って移動可能に支持されるとともに、打設済みコンクリート壁の張出部がわ壁面において前記張出部移動支保設備によって支持されるフレーム体と、
前記フレーム体に設備される側面型枠および張出部下面型枠と、
前記フレーム体および/またはブラケットに取り付けられる足場とからなり、
前記ブラケットは前記フレーム体内にほぼ収まる区間に亘って設けられ、前記走行レールは各ブラケット間毎に分割可能とされ、前記フレーム体内に、最後部のブラケットを最前部まで移送可能なように平面視でコ字状を成す移送レールと、この移送レールに沿って走行自在のフック付き走行体と、このフック付き走行体に吊持される揚重器具とからなり、移動型枠の移動に伴って最後部に位置するブラケット及び走行レール部分を移動方向前方側に盛替えする盛替え設備を備えたことを特徴とするものである。
【0008】
また、本第2発明は、打設済みコンクリート壁の上面に連続して、壁面の両側にそれぞれ張出部を有する堤趾導流壁を順次移動しながら施工するための足場一体型移動型枠装置であって、
前記打設済みコンクリート壁の両側にそれぞれ、前記移動方向に所定の間隔でかつ所定区間に亘って設置される複数のブラケットと、
これらブラケット群の内、所定数のブラケット群間に移動方向に沿って架け渡されるとともに、分割可能とされる走行レールと、
この走行レールに沿って走行自在とされる張出部移動支保設備と、
前記打設コンクリート壁の両側にそれぞれ配設された張出部移動支保設備によって支持されるフレーム体と、
このフレーム体に設備される側面型枠および張出部下面型枠と、
前記フレーム体および/またはブラケットに取り付けられる足場とからなり、
前記ブラケットは前記フレーム体内にほぼ収まる区間に亘って設けられ、前記走行レールは各ブラケット間毎に分割可能とされ、前記フレーム体内に、最後部のブラケットを最前部まで移送可能なように平面視でコ字状を成す移送レールと、この移送レールに沿って走行自在のフック付き走行体と、このフック付き走行体に吊持される揚重器具とからなり、移動型枠の移動に伴って最後部に位置するブラケット及び走行レール部分を移動方向前方側に盛替えする盛替え設備を備えたことを特徴とするものである。
【0009】
これら第1発明および第2発明において、既設コンクリート壁の天端が傾斜しているような場合には、前記フレーム体にコンクリート打設部分の上面を塞ぐ上型枠を設けることが望ましい。また、コンクリート硬化後の脱型を容易化するために、前記型枠の内、少なくとも一部の型枠には該型枠をコンクリート面から剥離させる脱型機構を備えていることが望ましい。
【0010】
本発明装置は、打設済みコンクリート壁の頂部に、側方に張り出した張出部を含む堤趾導流壁を効率的に施工可能とするために、施工に必要な型枠、足場等の設備を一体的に備えるフレーム体と共に、張出部下面がわ型枠を支持するための張出部移動支保設備を順次、ブラケットおよびブラケット間レール部分の盛替えと共に移動可能としたものであり、本装置によれば、足場工、型枠支保工、型枠工、鉄筋工およびコンクリート打設工などの一連の施工工程を基盤面等から組み立てた足場支保工無しで施工できるようになる。
【0011】
【発明の実施の形態】
以下、本発明の実施の形態について図面を参照しながら詳述する。
【0012】
〔第1形態例〕
図1は本発明に係る足場一体型移動型枠装置1の側面図、図2はその平面図、図3及び図4はその横断面図である。
【0013】
足場一体型移動型枠装置1は、図3に示されるように、打設済みコンクリート壁30の上面に連続して、逆L字状に側方に張り出した張出部31aを含むコンクリート頂壁部(堤趾導流壁)31を順次移動しながら施工するための装置であって、足場工、型枠支保工、型枠工、鉄筋工およびコンクリート打設工などの一連の施工工程を、基盤面等から組み立てた足場支保工無しで施工できるようにしたものである。
【0014】
以下、具体的に詳述すると、
前記足場一体型移動型枠装置1(以下、単に移動型枠という。)は、前記打設済みコンクリート壁30の張出部がわ壁面に対して、移動方向に所定の間隔でかつ所定区間に亘って設置される複数のブラケット群2〜2と、これらブラケット群2〜2間に移動方向に沿って架け渡されるとともに、各ブラケット間2、2n+1毎に分割可能とされる走行レール3A、3Bと、この走行レール3A、3Bに沿って走行自在とされる張出部移動支保設備4と、前記打設済みコンクリート30の非張出部がわ壁面に対して、前記移動方向に沿って移動可能に支持されるとともに、打設済みコンクリート壁30の張出部がわ壁面において前記張出部移動支保設備4によって支持される、型枠6A〜6E、足場7A〜7C、ブラケット2および走行レール3A、3Bの盛替え設備8などを備えるフレーム体5と、から主に構成される装置である。
【0015】
前記ブラケット2〜2は、図に示されるように、既設コンクリート壁30に対してアンカーなどの固定具によって支持された骨組構造のブラケットであり、移動方向、具体的には既設コンクリート壁30の天端に沿う方向に所定の間隔で、かつ前記フレーム体5内にほぼ収まる区間に亘って設けられている。このブラケット群2〜2の内、ブラケット2〜2間には、移動型枠装置1の移動方向に沿って2条の走行レール3A、3Bが架け渡されているとともに、足場7Aが架け渡されている。なお、前記走行レール3A、3Bは、各ブラケット間2、2n+1毎に分割可能となっている。なお、前記走行レール3A、3Bは各ブラケット支間毎ではなく、任意長さ毎に分割可能となっていてもよい。
【0016】
前記走行レール3A、3Bには、該走行レール3A、3Bに沿って走行自在とされる張出部移動支保設備4が設けられている。この張出部移動支保設備4は、2条のH桁16A、16Bからなる支持桁16の前部側位置および後部側位置にそれぞれ、下端にローラ10a(10b)を有するとともに、伸縮自在の走行脚10A、10Bを備える。また、これら走行脚10A、10Bの間に、複数の、図示例では3本の支持脚11、11…を備えている。これら各支持脚11、11…は、昇降操作ハンドル11aの回転操作により昇降自在とされる接地板12を備え、前記張出部移動支保設備4が移動する場合には、前記支持脚11、11…を走行レール3A、3Bから離間させ、前記張出部移動支保設備4が所定位置に定位する場合には、前記支持脚11、11…が下降操作され、前記接地板12が走行レール3A、3Bに接地して張出部下面がわ型枠6Cを支持するようになっている。なお、前記張出部移動支保設備4の移動操作は、前記走行脚10A、10B間に架け渡された側枠13、13側に一端が連結されるとともに、所定のブラケット2(同図ではブラケット2)に連結された推進ジャッキ14の伸縮操作により成される。また、前記支持桁16の上面はフレーム体5と連結されており、張出部移動支保設備4を移動させることにより、移動型枠1が移動可能となっている。
【0017】
前記フレーム体5は、前記打設済みコンクリート壁30の非張出部がわ壁面に移動方向に沿って設けられたスライドガイドレール17を支持部材として移動可能に支持されるとともに、打設済みコンクリート壁30の張出部がわ壁面において前記張出部移動支保設備4によって支持されている。このフレーム体5は、構築されるコンクリート頂壁部31の一方側側面から他方がわ側面に至る周囲をカバーする上部フレーム体5Aと、この上部フレーム体5Aに連続するとともに、コンクリート張出部31aの底面及びL字コーナー部をカバーする下部フレーム体5Bとからなるフレーム枠であり、前記非張出部がわ壁面に上下方向に3段からなる足場を有するステップ足場7Bが一体的に設けられているとともに、張出部がわ壁面にステップ足場7Cが一体的に設けられている。
【0018】
また、前記フレーム体5には、側面型枠6A、6B、張出部下面型枠6C、前記張出部下面型枠6Cから連続するL字コーナー部型枠6Dを備えるとともに、コンクリート打設部分の上面を塞ぐ上型枠6Eを備えている。これら各型枠6A〜6Eは、コンクリート硬化後にコンクリート面からの剥離が容易に行えるよう脱型機構を備えている。すなわち、前記側面型枠6Aは、取付けボルト18、18…の回転操作によってコンクリート面から剥離可能となっているとともに、上型枠6Eはフレーム体5側に一端が連結されるとともに、他端が上型枠6Eに連結された脱型用ジャッキ19によってコンクリート面から剥離可能とされ、前記L字コーナー部型枠6Dは前記張出部移動支保設備4に一端が連結された脱型用ジャッキ20によってコンクリート面から剥離可能となっている。なお、前記側面型枠6Bおよび前記張出部下面型枠6Cは張出部移動支保設備4の走行脚10A、10Bを収縮させ、フレーム体5全体を下降させることによって脱型が容易に行えるようになっている。この場合、フレーム体5のスライドガイドレール17側には、フレーム体5が上下移動できるように、縦フレームの途中に伸縮ジャッキ29を介在させている。
【0019】
なお、前記側面型枠6Bに横送り機構(図示せず)を付加し、前記側面型枠6Bをコンクリート面から離間方向に移動できるようにすれば、脱型が容易になるとともに、フレーム体5の移動が容易に行えるようになる。また曲線施工にも柔軟に対応できるようになる。前記上型枠6Eについては、張出部31aの上面がフラットな場合は省略可能である。
【0020】
また、前記下部フレーム体5Bには、移動方向後方側のブラケット2およびブラケット間走行レール3を移動方向前方側に盛替えするための盛替え設備8が設けられている。この盛替え設備8は、図2に示されるように、最後部のブラケット28を最前部まで移送可能なように平面視でコ字状を成す移送レール21と、この移送レール21に沿って走行自在のフック付き走行体22と、このフック付き走行体22に吊持されるチェーンブロック等の揚重器具(図示せず)と、からなる移送設備で、移動型枠1の移動に伴って最後部に位置するブラケット2が移動方向前方側に盛替えられるとともに、最後部に位置するブラケット間走行レール部分3が移動方向前方側に盛り替えられる。なお、フレーム体5には、前記各種油圧ジャッキ14、19、20を駆動するための油圧ポンプ駆動用発電装置24が搭載されている。
【0021】
次いで、前述した移動型枠1を用いてコンクリート頂壁部を施工する手順について図5のフロー図に基づいて詳述する。
【0022】
先ず、コンクリート頂壁部31へのコンクリート打設が完了し各型枠6A〜6Eの脱型を終えたならば、移動型枠1の移動を行う。移動型枠1の移動は、最後部に位置するブラケット2およびブラケット間走行レール3部分を前記ブラケット盛替え設備8によって移動方向前方側に盛替えたならば、ブラケット2、2の1スパン距離分だけ移動型枠1と共に張出部移動支保設備4を前方側に移動させる。この作業を複数回、本例では5回繰り返して移動型枠1を次のコンクリート頂壁部31の施工位置まで移動させる。なお、この際、前記推進ジャッキ14も適時盛替えが行われる。
【0023】
移動型枠1を次施工場所まで移動させたならば、支持脚11、11…を伸長させて張出部移動支保設備4を固定し張出部下面がわ型枠6Cを支持するとともに、脱型用ジャッキ20を伸長させてL字コーナー部型枠6Dを正規の状態に固定保持する。さらに、側面型枠6Aを所定の位置に固定するとともに、側面型枠6Bとセパレータ23、23によって連結し固定を図る。
【0024】
次いで、型枠内部で鉄筋の組立を行った後、上型枠6Eにより上面を塞ぐとともに、前記上型枠6Eにコンクリート打設のために形成した開口からコンクリートを流し込み、その後コンクリートの硬化を待って脱型を行う。
【0025】
以上の施工工程を順に繰り返すことにより、既設コンクリート壁30の上面に連続して、張出部31aを有するコンクリート頂壁部31を足場支保工無しに効率的に構築することが可能となる。。
【0026】
ところで、上記移動型枠1は、既設コンクリート壁30の天端が水平の場合の構造例を示したものであるが、前記既設コンクリート壁30の天端に傾斜があるような場合には、図6に示されるように、一部に変更を加えた移動型枠1Bが好適に使用される。この移動型枠1Bでは、傾斜に対応するようにフレーム体5の形状に変更を加えるとともに、張出部移動支保設備4の逸走防止のための側枠13の後端部と走行レール3A、3B間に逸走防止ジャッキ26を介在させている。この逸走防止ジャッキ26は、側枠13側に一端が連結されるとともに、他端側に係合部26aを有する部材で、走行レール3A、3Bを連結している連結バー27に対して前記係合部26aを係合させることにより、張出部移動支保設備4の逸走を防止するようにしてある。また、前記張出部移動支保設備4の支持脚11、11…の接地板12、12…は、それぞれレール傾斜面に対して均等に接地するように側面視で三角形状となっている。これ以外の構造については、前述の移動型枠1と同様であるため、同符号を付して説明は省略する。
【0027】
〔第2形態例〕
本第2形態例では、逆T字状に両側に張出部31a、31aを有するコンクリート頂壁部31を施工するための移動型枠1Cについて、図7〜図9に基づいて詳述する。
【0028】
打設済みコンクリート壁30の両側にそれぞれ、移動方向に所定の間隔でかつ所定区間に亘って設置される複数のブラケット群2〜2と、ブラケット間2〜2に移動方向に沿って架け渡されるとともに、各ブラケット間2、2n+1毎に分割可能とされる走行レール3A、3Bと、この走行レール3A、3Bに沿って走行自在とされる張出部移動支保設備4とを設け、前記既設コンクリート壁30の両側に配置される前記張出部移動支保設備4、4によって支持される、型枠6B〜6D、6E、足場7A・7C、ブラケット2および走行レール3A、3Bの盛替え設備8などを備えるフレーム体5と、から主に構成される型枠装置である。すなわち、前記第1形態例における張出部31a側部分の構造を左右対称配置で設けた構造となっている。
【0029】
それぞれの構造については、第1形態例で説明済みであるため同符号を付して省略するが、移動型枠1Cの移動に際しては、左右両側で併行してブラケット2およびブラケット間走行レール3の盛替えを行い、フレーム体5の移動も推進ジャッキ14、14を同調的に連動操作して移動させる必要がある。
【0030】
以上、本発明移動型枠1〜1Cについて詳述したが、施工対象は前述のダム導流壁の波返し部以外に、足場の据え付けが困難な箇所、例えば海工事、山間工事、高架橋、建築物などの張出構造部分を持つコンクリート壁の施工、リニューアル工事における架空足場を必要とする場合などにおいても同様に適用することが可能である。
【0031】
【発明の効果】
以上詳説のとおり本発明によれば、既設コンクリートの上部に、張出部を有する堤趾導流壁を施工するに当たり、足場工、型枠支保工、型枠工、鉄筋工およびコンクリート打設工などの一連の施工工程を、基盤面等から組み立てた足場支保工無しで施工できるようになる。
【図面の簡単な説明】
【図1】 第1形態例に係る本発明の足場一体型移動型枠装置1の側面図である。
【図2】 その平面図である。
【図3】 その横断面図(図1のIII−III線矢視図)である。
【図4】 その横断面図(図1のIV−IV線矢視図)である。
【図5】 コンクリート頂壁部の施工フロー図である。
【図6】 傾斜方向に沿ってコンクリート頂壁部を施工する場合の移動型枠1Bの側面図である。
【図7】 両側に張出部を有する場合の移動型枠1Cの平面図である。
【図8】 その横断面図(その1)である。
【図9】 その横断面図(その2)である。
【図10】 導流壁51を有するダムの縦断面図である。
【図11】 導流壁51の波返し部52を足場支保工によって施工する場合の(A)は側面図、(B)は断面図である。
【符号の説明】
1・1B・1C…移動型枠、2〜2…ブラケット、3A・3B…走行レール、4…張出部移動支保設備、5…フレーム体、5A…上部フレーム体、5B…下部フレーム体、6A〜6E…型枠、7A〜7C…足場、8…盛替え設備
[0001]
BACKGROUND OF THE INVENTION
TECHNICAL FIELD The present invention relates to a scaffold-integrated movable frame apparatus that can be constructed without a scaffold supporting work assembled from a base surface or the like on a dike flow wall having an overhanging portion.
[0002]
[Prior art]
For example, as shown in FIG. 10, in the levee diversion wall constructed on the left bank side and the right bank side of the dam, a wave return portion 52 projecting in an inverted L shape is provided on the top of the diversion wall. (See FIG. 11B).
[0003]
As shown in FIG. 11, the wave returning portion 52 is constructed by assembling pipe supporters 56 using scaffold supporters 54 and 55 assembled and installed on both sides of the existing concrete 53 respectively from the base surface. For each concrete placement work section, the lower surface of the wave return portion is provided with a mold frame 57, and mold frames 58 and 59 such as side molds are provided, and concrete is poured into these mold frames 57 to 59, and then the concrete. The mold was removed after waiting for curing, and construction was carried out by repeatedly moving the molds 57 to 59 laterally.
[0004]
[Problems to be solved by the invention]
However, in the case of the conventional method (scaffold support), the scaffold support capacity increases, and the installation period becomes long. That is, as shown in FIG. 11, one row of scaffolding support is sufficient on the non-overhanging portion side on the wave return portion 52 side, whereas multiple rows on the overhanging portion side, 3 in the illustrated example. Row scaffolding support work is required.
[0005]
Moreover, the lateral movement at the time of diverting the formwork is very complicated. Furthermore, since the assembly, dismantling work of the formwork, scaffolding and support work is a high place work by human power, there are problems such as requiring a lot of manpower and work days and increasing the number of dangerous work.
[0006]
Therefore, the main problem of the present invention is that, in constructing a dike channel wall with an overhanging part, continuously on top of the existing concrete, scaffolding, formwork support, formwork, reinforcement, and concrete placement An object of the present invention is to provide a scaffold-integrated movable formwork apparatus that can perform a series of construction processes such as construction without a scaffold support constructed from a base surface or the like.
[0007]
[Means for Solving the Problems]
A first aspect of the present invention for solving the above-described problems is a scaffold for performing construction while sequentially moving a dike channel wall having an overhanging portion on one side of a wall surface, continuously from the upper surface of a cast concrete wall. An integrated moving formwork device,
A plurality of brackets installed over the predetermined section in the moving direction with respect to the wall surface of the overhanging portion of the concrete wall that has been placed,
Among these bracket groups, a running rail that is bridged along a moving direction between a predetermined number of bracket groups and that can be divided,
An overhanging part moving support facility that is allowed to travel along the traveling rail;
The non-overhanging portion of the placed concrete wall is supported so as to be movable along the moving direction with respect to the wall surface, and the overhanging portion of the cast concrete wall is supported on the wall surface. A frame body supported by the facility;
A side surface formwork and an overhanging bottom face formwork provided in the frame body;
Comprising a scaffold attached to the frame body and / or bracket ;
The bracket is provided over a section that is substantially contained within the frame body, and the running rail can be divided between the brackets, and the rearmost bracket can be transferred to the frontmost part in the frame body in plan view. A U-shaped transfer rail, a traveling body with a hook that can travel along the transportation rail, and a lifting device that is suspended by the traveling body with the hook. It is characterized in that it is provided with a refilling facility for refilling the bracket and the traveling rail part located at the rearmost part to the front side in the movement direction .
[0008]
The second aspect of the present invention also provides a scaffold-integrated movable form for construction while sequentially moving the dike-introducing wall having overhanging portions on both sides of the wall surface, continuously on the upper surface of the cast concrete wall. A device,
A plurality of brackets installed on both sides of the placed concrete wall at predetermined intervals and over a predetermined section in the moving direction,
Among these bracket groups, a running rail that is bridged along a moving direction between a predetermined number of bracket groups and that can be divided,
An overhanging part moving support facility that is allowed to travel along the traveling rail;
A frame body supported by the overhanging portion moving support equipment respectively disposed on both sides of the placing concrete wall ;
A side surface formwork and an overhanging part lower face formwork installed in the frame body ;
Comprising a scaffold attached to the frame body and / or bracket ;
The bracket is provided over a section that is substantially contained within the frame body, and the running rail can be divided between the brackets, and the rearmost bracket can be transferred to the frontmost part in the frame body in plan view. A U-shaped transfer rail, a traveling body with a hook that can travel along the transportation rail, and a lifting device that is suspended by the traveling body with the hook. It is characterized in that it is provided with a refilling facility for refilling the bracket and the traveling rail part located at the rearmost part to the front side in the movement direction .
[0009]
In these first and second inventions, when the top end of the existing concrete wall is inclined, it is desirable to provide the frame body with an upper mold that closes the upper surface of the concrete placing portion. Further, in order to facilitate demolding after the concrete is hardened, it is desirable that at least a part of the molds is provided with a demolding mechanism for peeling the molds from the concrete surface.
[0010]
The apparatus of the present invention can be used to efficiently construct a dike-guiding wall including an overhanging portion projecting laterally on the top of a concrete wall that has already been placed. Along with the frame body integrally equipped with the equipment, the overhanging part moving support equipment for supporting the mold frame on the underside of the overhanging part can be moved sequentially with the replacement of the bracket and the rail part between the brackets. According to the present apparatus, a series of construction processes such as scaffolding, formwork support, formwork, rebar work, and concrete placement work can be performed without the scaffold support work assembled from the base surface.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0012]
[First embodiment]
FIG. 1 is a side view of a scaffold-integrated movable mold apparatus 1 according to the present invention, FIG. 2 is a plan view thereof, and FIGS. 3 and 4 are cross-sectional views thereof.
[0013]
As shown in FIG. 3, the scaffold-integrated moving formwork device 1 is a concrete top wall including an overhanging portion 31 a that is continuous to the upper surface of the cast concrete wall 30 and that protrudes laterally in an inverted L shape. It is a device for construction while moving the part (the dike flow wall) 31 sequentially, and a series of construction processes such as scaffolding, formwork support work, formwork work, rebar work and concrete placement work, It can be constructed without the scaffolding support constructed from the base surface.
[0014]
The following is a detailed description.
The scaffold-integrated movable mold apparatus 1 (hereinafter simply referred to as a movable mold frame) is arranged at a predetermined interval and a predetermined interval in the moving direction with respect to the wall surface of the overhanging concrete wall 30. a plurality of bracket groups 2 1 to 2 8 installed over, together with the bridged along the movement direction between these bracket series 2 1 to 2 8 is dividable into 2 n, each 2 n + 1 between the brackets Traveling rails 3A, 3B, the overhanging portion moving support facility 4 that can travel along the traveling rails 3A, 3B, and the non-overhanging portion of the placed concrete 30 with respect to the wall surface, Forms 6A to 6E and scaffolds 7A to 7C are supported so as to be movable along the moving direction, and the overhanging portion of the cast concrete wall 30 is supported on the wall surface by the overhanging portion moving support equipment 4. , Bracket 2 n and a frame body 5 including a refilling facility 8 for the traveling rails 3A and 3B, and the like.
[0015]
The bracket 2 1 to 2 8, as shown in FIG. 1, a bracket supported framework by fasteners such as anchors against existing concrete wall 30, the moving direction, specifically in existing concrete wall 30 are provided at predetermined intervals in a direction along the top edge of the frame body 5 and over a section that is substantially contained in the frame body 5. Of the bracket series 2 1 to 2 8, between the bracket 2 2-2 8, Article 2 of the running rails 3A along the moving direction of the moving mold apparatus 1, together with 3B are bridged, the scaffold 7A Is overlaid. The travel rails 3A and 3B can be divided between the brackets 2n and 2n + 1 . The travel rails 3A and 3B may be divided not only for each bracket support but for each arbitrary length.
[0016]
The travel rails 3A and 3B are provided with an overhanging portion moving support facility 4 that can travel along the travel rails 3A and 3B. This overhanging portion moving support facility 4 has rollers 10a (10b) at the lower end at the front side position and the rear side position of the support beam 16 composed of two H-beams 16A and 16B, respectively, and can extend and retract. Legs 10A and 10B are provided . Further , a plurality of, in the illustrated example, three support legs 11, 11,... Are provided between the travel legs 10A, 10B. Each of these support legs 11, 11... Includes a grounding plate 12 that can be moved up and down by rotating the lifting operation handle 11 a, and when the overhanging portion moving support equipment 4 moves, the support legs 11, 11. ... are separated from the traveling rails 3A, 3B, and when the overhanging portion moving support equipment 4 is positioned at a predetermined position, the support legs 11, 11, ... are lowered, and the grounding plate 12 is moved to the traveling rail 3A, The lower surface of the overhanging portion supports the frame 6C by grounding to 3B. In addition, the movement operation of the overhanging part moving support facility 4 is such that one end is connected to the side frames 13 and 13 spanned between the traveling legs 10A and 10B, and a predetermined bracket 2 n (in the same figure). This is accomplished by extending and retracting the propulsion jack 14 connected to the bracket 2 4 ). Further, the upper surface of the support beam 16 is connected to the frame body 5, and the movable mold 1 can be moved by moving the overhanging portion moving support equipment 4.
[0017]
The frame body 5 is supported movably by using a slide guide rail 17 provided on the wall surface of the non-projected concrete wall 30 along the moving direction as a support member, and the cast concrete. The overhang portion of the wall 30 is supported by the overhang portion moving support facility 4 on the wall surface. The frame body 5 includes an upper frame body 5A that covers the periphery from one side surface to the other side surface of the concrete top wall portion 31 to be constructed, and the upper frame body 5A, and a concrete projecting portion 31a. A step frame 7B having a lower frame body 5B that covers the bottom surface and the L-shaped corner portion, and the non-extending portion is integrally provided on the side wall surface with a three-stage scaffold in the vertical direction. In addition, the step scaffold 7C is integrally provided on the wall surface of the overhanging portion.
[0018]
The frame body 5 is provided with side molds 6A and 6B, an overhanging lower surface mold 6C, an L-shaped corner mold 6D continuous from the overhanging lower surface mold 6C, and a concrete placing portion. The upper mold 6E that closes the upper surface of the upper mold 6 is provided. Each of these molds 6A to 6E is provided with a demolding mechanism so that it can be easily peeled off from the concrete surface after the concrete is hardened. That is, the side mold 6A can be separated from the concrete surface by rotating the mounting bolts 18, 18,..., And one end of the upper mold 6E is connected to the frame body 5 side, and the other end is connected. The demolding jack 19 can be peeled from the concrete surface by a demolding jack 19 connected to the upper mold 6E, and the L-shaped corner mold 6D is connected to the overhanging part moving support equipment 4 at one end. Can be peeled from the concrete surface. It should be noted that the side mold 6B and the overhanging lower surface mold 6C can be easily demolded by contracting the traveling legs 10A, 10B of the overhanging movement supporting equipment 4 and lowering the entire frame body 5. It has become. In this case, on the slide guide rail 17 side of the frame body 5, an extendable jack 29 is interposed in the middle of the vertical frame so that the frame body 5 can move up and down.
[0019]
If a lateral feed mechanism (not shown) is added to the side surface formwork 6B so that the side face formwork 6B can be moved away from the concrete surface, the mold can be easily removed and the frame body 5 can be removed. Can be easily moved. In addition, it will be able to flexibly handle curve construction. The upper mold frame 6E can be omitted when the upper surface of the overhanging portion 31a is flat.
[0020]
Further, the lower frame member. 5B, Sheng replacement equipment 8 for Sheng sort the movement direction front side moving direction rearward of the bracket 2 8 and the bracket between the running rail 3 8 is provided. As shown in FIG. 2, the refilling facility 8 has a U-shaped transfer rail 21 in plan view so that the rearmost bracket 28 can be transferred to the forefront, and runs along the transfer rail 21. It is a transfer facility comprising a traveling body 22 with a free hook and a lifting device (not shown) such as a chain block suspended on the traveling body 22 with a hook. with bracket 2 8 is replaced Sheng moving forward side located section, the bracket between the running rail portion 3 8 located at the end portion is replaced bloom in the moving direction of the front side. The frame body 5 is equipped with a power generator 24 for driving a hydraulic pump for driving the various hydraulic jacks 14, 19, 20.
[0021]
Next, the procedure for constructing the concrete top wall portion using the above-described movable mold 1 will be described in detail based on the flowchart of FIG.
[0022]
First, when the concrete placement on the concrete top wall portion 31 is completed and the molds 6A to 6E have been removed, the movable mold 1 is moved. Movement of the mobile frame 1, if the bracket 2 8 and the bracket between the running rails 3 8 portion located at the end portion was replaced Sheng moving forward side by the bracket Sakarigae equipment 8, one span of the bracket 2,2 The overhanging part moving support equipment 4 is moved forward together with the movable mold 1 by the distance. This operation is repeated a plurality of times, in this example, five times, and the movable mold 1 is moved to the construction position of the next concrete top wall portion 31. At this time, the propulsion jack 14 is also timely refilled.
[0023]
When the movable mold 1 is moved to the next construction site, the support legs 11, 11... Are extended to fix the overhanging portion moving support equipment 4, and the underside of the overhanging portion supports the die frame 6C and is removed. The mold jack 20 is extended to hold the L-shaped corner part mold 6D in a normal state. Further, the side mold 6A is fixed at a predetermined position, and is fixed by being connected by the side mold 6B and the separators 23 and 23.
[0024]
Next, after rebar assembly inside the mold, the upper mold 6E closes the upper surface, and the concrete is poured into the upper mold 6E for opening the concrete, and then the concrete is cured. To demold.
[0025]
By repeating the above construction steps in order, the concrete top wall portion 31 having the overhanging portion 31a can be efficiently constructed without the scaffolding support, continuously from the upper surface of the existing concrete wall 30. .
[0026]
By the way, the movable mold 1 shows an example of the structure when the top end of the existing concrete wall 30 is horizontal, but when the top end of the existing concrete wall 30 is inclined, As shown in FIG. 6, the movable mold 1 </ b> B with some changes is preferably used. In this movable mold frame 1B, the shape of the frame body 5 is changed so as to correspond to the inclination, and the rear end portion of the side frame 13 and the traveling rails 3A, 3B for preventing the overhanging portion moving support equipment 4 from running away. An escape prevention jack 26 is interposed therebetween. The runaway prevention jack 26 is a member having one end connected to the side frame 13 side and an engaging portion 26a on the other end side, and is connected to the connecting bar 27 connecting the running rails 3A and 3B. By engaging the joint portion 26a, the overhanging portion moving support facility 4 is prevented from running away. Further, the grounding plates 12, 12... Of the support legs 11, 11... Of the overhanging part moving support facility 4 have a triangular shape in side view so as to be grounded evenly with respect to the rail inclined surface. Since the other structure is the same as that of the above-described movable mold 1, the same reference numerals are given and the description thereof is omitted.
[0027]
[Second embodiment]
In the second embodiment, the movable mold 1C for constructing the concrete top wall portion 31 having the overhang portions 31a and 31a on both sides in an inverted T shape will be described in detail with reference to FIGS.
[0028]
On both sides of the pouring already concrete wall 30, a plurality of bracket groups 2 1 to 2 8 installed over a and predetermined section predetermined intervals in the moving direction, the movement direction to the bracket between 2 2-2 8 And travel rails 3A and 3B that can be divided between the brackets 2n and 2n + 1 , and overhanging portion moving support equipment 4 that can travel along the travel rails 3A and 3B. , And supported by the overhanging part moving support facilities 4 and 4 disposed on both sides of the existing concrete wall 30, the molds 6B to 6D and 6E, the scaffolds 7A and 7C, the bracket 2n, and the traveling rail 3A, It is a formwork apparatus mainly composed of a frame body 5 provided with a 3B refilling facility 8 and the like. That is, the structure of the projecting portion 31a side portion in the first embodiment is provided in a symmetrical arrangement.
[0029]
For each structure, although not by the same symbol for is already described in the first embodiment, when the movement of the mobile frame 1C is concurrently with the left and right sides bracket 2 8 and the bracket between the running rail 3 do Sheng sort of 8, there is a need also the movement of the frame body 5 to move the propulsion jacks 14 and 14 tuning interlocked operation to.
[0030]
In the above, the movable molds 1 to 1C of the present invention have been described in detail, but the construction object is a place where the scaffolding is difficult to install, for example, sea construction, mountain construction, viaduct, construction, in addition to the above-described undulation portion of the dam guide wall The present invention can also be applied in the same manner when a concrete wall having an overhanging structure such as an object is constructed or an aerial scaffolding is required for renewal work.
[0031]
【The invention's effect】
As described above in detail, according to the present invention, in the construction of a dike wall having an overhang on the existing concrete, scaffolding, formwork support, formwork, reinforcement, and concrete placement work It becomes possible to perform a series of construction processes such as without the scaffold support assembled from the base surface.
[Brief description of the drawings]
FIG. 1 is a side view of a scaffold-integrated movable mold apparatus 1 according to a first embodiment of the present invention.
FIG. 2 is a plan view thereof.
FIG. 3 is a transverse sectional view (a view taken along the line III-III in FIG. 1).
FIG. 4 is a transverse cross-sectional view (a view taken along the line IV-IV in FIG. 1).
FIG. 5 is a construction flow diagram of a concrete top wall.
FIG. 6 is a side view of the movable mold 1B when a concrete top wall portion is constructed along an inclination direction.
FIG. 7 is a plan view of the movable mold frame 1C in the case of having overhang portions on both sides.
FIG. 8 is a first cross-sectional view thereof.
FIG. 9 is a second cross-sectional view thereof.
10 is a longitudinal sectional view of a dam having a flow guide wall 51. FIG.
11A is a side view and FIG. 11B is a cross-sectional view when the wave return portion 52 of the flow guide wall 51 is constructed by scaffolding support work.
[Explanation of symbols]
1 · 1B · 1C ... moving mold, 2 1 to 2 8 ... bracket, 3A, 3B ... running rail, 4 ... overhang moving support equipment, 5 ... frame body, 5A ... upper frame body, 5B ... lower frame body , 6A-6E ... Formwork, 7A-7C ... Scaffolding, 8 ... Replacement equipment

Claims (4)

打設済みコンクリート壁の上面に連続して、壁面の一方側に張出部を有する堤趾導流壁を順次移動しながら施工するための足場一体型移動型枠装置であって、
前記打設済みコンクリート壁の張出部がわ壁面に対して、前記移動方向に所定の間隔でかつ所定区間に亘って設置される複数のブラケットと、
これらブラケット群の内、所定数のブラケット群間に移動方向に沿って架け渡されるとともに、分割可能とされる走行レールと、
この走行レールに沿って走行自在とされる張出部移動支保設備と、
前記打設済みコンクリートの非張出部がわ壁面に対して、前記移動方向に沿って移動可能に支持されるとともに、打設済みコンクリート壁の張出部がわ壁面において前記張出部移動支保設備によって支持されるフレーム体と、
前記フレーム体に設備される側面型枠および張出部下面型枠と、
前記フレーム体および/またはブラケットに取り付けられる足場とからなり、
前記ブラケットは前記フレーム体内にほぼ収まる区間に亘って設けられ、前記走行レールは各ブラケット間毎に分割可能とされ、前記フレーム体内に、最後部のブラケットを最前部まで移送可能なように平面視でコ字状を成す移送レールと、この移送レールに沿って走行自在のフック付き走行体と、このフック付き走行体に吊持される揚重器具とからなり、移動型枠の移動に伴って最後部に位置するブラケット及び走行レール部分を移動方向前方側に盛替えする盛替え設備を備えたことを特徴とする足場一体型移動型枠装置。
A scaffold-integrated mobile formwork device for construction while continuously moving a dike guiding wall having an overhanging portion on one side of a wall surface, continuously on the top surface of a concrete wall that has been placed,
A plurality of brackets installed over the predetermined section in the moving direction with respect to the wall surface of the overhanging portion of the concrete wall that has been placed,
Among these bracket groups, a running rail that is bridged along a moving direction between a predetermined number of bracket groups and that can be divided,
An overhanging part moving support facility that is allowed to travel along the traveling rail;
The non-overhanging portion of the placed concrete wall is supported so as to be movable along the moving direction with respect to the wall surface, and the overhanging portion of the cast concrete wall is supported on the wall surface. A frame body supported by the facility;
A side surface formwork and an overhanging bottom face formwork provided in the frame body;
Comprising a scaffold attached to the frame body and / or bracket ;
The bracket is provided over a section that is substantially contained within the frame body, and the running rail can be divided between the brackets, and the rearmost bracket can be transferred to the frontmost part in the frame body in plan view. A U-shaped transfer rail, a traveling body with a hook that can travel along the transportation rail, and a lifting device that is suspended by the traveling body with the hook. A scaffolding-integrated moving mold apparatus comprising a refilling facility for refilling a bracket located at the rearmost part and a traveling rail part to the front side in the moving direction .
打設済みコンクリート壁の上面に連続して、壁面の両側にそれぞれ張出部を有する堤趾導流壁を順次移動しながら施工するための足場一体型移動型枠装置であって、
前記打設済みコンクリート壁の両側にそれぞれ、前記移動方向に所定の間隔でかつ所定区間に亘って設置される複数のブラケットと、
これらブラケット群の内、所定数のブラケット群間に移動方向に沿って架け渡されるとともに、分割可能とされる走行レールと、
この走行レールに沿って走行自在とされる張出部移動支保設備と、
前記打設コンクリート壁の両側にそれぞれ配設された張出部移動支保設備によって支持されるフレーム体と、
このフレーム体に設備される側面型枠および張出部下面型枠と、
前記フレーム体および/またはブラケットに取り付けられる足場とからなり、
前記ブラケットは前記フレーム体内にほぼ収まる区間に亘って設けられ、前記走行レールは各ブラケット間毎に分割可能とされ、前記フレーム体内に、最後部のブラケットを最前部まで移送可能なように平面視でコ字状を成す移送レールと、この移送レールに沿って走行自在のフック付き走行体と、このフック付き走行体に吊持される揚重器具とからなり、移動型枠の移動に伴って最後部に位置するブラケット及び走行レール部分を移動方向前方側に盛替えする盛替え設備を備えたことを特徴とする足場一体型移動型枠装置。
A scaffold-integrated mobile formwork device for constructing a levee-guiding wall that has overhangs on both sides of the wall surface in succession on the top surface of the concrete wall that has been placed,
A plurality of brackets installed on both sides of the placed concrete wall at predetermined intervals and over a predetermined section in the moving direction,
Among these bracket groups, a running rail that is bridged along a moving direction between a predetermined number of bracket groups and that can be divided,
An overhanging part moving support facility that is allowed to travel along the traveling rail;
A frame body supported by the overhanging portion moving support equipment respectively disposed on both sides of the placing concrete wall ;
A side surface formwork and an overhanging part lower face formwork installed in the frame body ;
Comprising a scaffold attached to the frame body and / or bracket ;
The bracket is provided over a section that is substantially contained within the frame body, and the running rail can be divided between the brackets, and the rearmost bracket can be transferred to the frontmost part in the frame body in plan view. A U-shaped transfer rail, a traveling body with a hook that can travel along the transportation rail, and a lifting device that is suspended by the traveling body with the hook. A scaffolding-integrated moving mold apparatus comprising a refilling facility for refilling a bracket located at the rearmost part and a traveling rail part to the front side in the moving direction .
前記フレーム体は、コンクリート打設部分の上面を塞ぐ上型枠を備える請求項1、2いずれか記載の足場一体型移動型枠装置。The scaffolding-integrated movable formwork apparatus according to any one of claims 1 and 2, wherein the frame body includes an upper formwork that closes an upper surface of a concrete placing portion. 前記型枠の内、少なくとも一部の型枠には型枠板をコンクリート面から剥離させる脱型機構を備えている請求項1〜3いずれかに記載の足場一体型移動型枠装置。The scaffold-integrated moving formwork apparatus according to any one of claims 1 to 3, wherein at least a part of the formwork is provided with a demolding mechanism for peeling the formwork plate from the concrete surface.
JP2001044556A 2001-02-21 2001-02-21 Scaffold integrated moving formwork device Expired - Fee Related JP4570063B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001044556A JP4570063B2 (en) 2001-02-21 2001-02-21 Scaffold integrated moving formwork device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001044556A JP4570063B2 (en) 2001-02-21 2001-02-21 Scaffold integrated moving formwork device

Publications (2)

Publication Number Publication Date
JP2002242162A JP2002242162A (en) 2002-08-28
JP4570063B2 true JP4570063B2 (en) 2010-10-27

Family

ID=18906529

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001044556A Expired - Fee Related JP4570063B2 (en) 2001-02-21 2001-02-21 Scaffold integrated moving formwork device

Country Status (1)

Country Link
JP (1) JP4570063B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5290714B2 (en) * 2008-11-27 2013-09-18 株式会社フジタ PRECAST CONCRETE MEMBER FOR WAVE RETURN PART OF DAM WALL WALL
CN111305166A (en) * 2020-03-25 2020-06-19 中铁二十局集团第六工程有限公司 Construction method for support frame of bracket template for arc door hinge of overflow gate dam
JP7510227B1 (en) 2024-03-11 2024-07-03 丸栄コンクリート工業株式会社 Wall installation scaffolding and wall installation method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56150217U (en) * 1981-02-17 1981-11-11
JPS5789005A (en) * 1980-11-25 1982-06-03 Okabe Co Ltd Device for moving form for wall
JPS5934364A (en) * 1982-08-23 1984-02-24 岡部株式会社 Construction of moving type concrete molding frame
JPS60112910A (en) * 1983-11-21 1985-06-19 Sumitomo Kensetsu Kk Construction of slant concrete structure
JPS62206161A (en) * 1986-03-06 1987-09-10 岡部株式会社 Moving type mold frame construction method of high bridge slab
JPH09195228A (en) * 1996-01-17 1997-07-29 Kawatetsu Kizai Kogyo Kk Build-up trestle for bridge pier reinforcing work and its using method
JPH108710A (en) * 1996-06-20 1998-01-13 Oriental Constr Co Ltd Scaffolding member
JPH10114914A (en) * 1996-10-14 1998-05-06 Kawada Kensetsu Kk Floor system shuttering moving equipment
JPH11293628A (en) * 1998-04-08 1999-10-26 Ps Corp Hung scaffold assembling method for bridge

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5789005A (en) * 1980-11-25 1982-06-03 Okabe Co Ltd Device for moving form for wall
JPS56150217U (en) * 1981-02-17 1981-11-11
JPS5934364A (en) * 1982-08-23 1984-02-24 岡部株式会社 Construction of moving type concrete molding frame
JPS60112910A (en) * 1983-11-21 1985-06-19 Sumitomo Kensetsu Kk Construction of slant concrete structure
JPS62206161A (en) * 1986-03-06 1987-09-10 岡部株式会社 Moving type mold frame construction method of high bridge slab
JPH09195228A (en) * 1996-01-17 1997-07-29 Kawatetsu Kizai Kogyo Kk Build-up trestle for bridge pier reinforcing work and its using method
JPH108710A (en) * 1996-06-20 1998-01-13 Oriental Constr Co Ltd Scaffolding member
JPH10114914A (en) * 1996-10-14 1998-05-06 Kawada Kensetsu Kk Floor system shuttering moving equipment
JPH11293628A (en) * 1998-04-08 1999-10-26 Ps Corp Hung scaffold assembling method for bridge

Also Published As

Publication number Publication date
JP2002242162A (en) 2002-08-28

Similar Documents

Publication Publication Date Title
KR100634848B1 (en) Bridge construction method using main girder launching system with temporary scaffolding
CN110513125B (en) Inner and outer mould trolley lining system for open cut underdrain
CN108858723A (en) The novel intensive construction technology of highway prefabricated case beam
KR100239913B1 (en) Device for lifting concrete forms
KR100454406B1 (en) Method and apparatus for changing steel bridge of supporting rail into concrete bridge using temporary bent
CN109457619B (en) A multi-functional movable support of complex for cast-in-situ construction of concrete girder
CN107724671A (en) A kind of monoblock type climbing form system and its construction method
CN109139050B (en) Self-propelled integrated tunnel inverted arch device
JP4570063B2 (en) Scaffold integrated moving formwork device
KR101082418B1 (en) mold apparatus for forming concrete slab of bridge
CN216765625U (en) Integral hydraulic creeping formwork structure for double-column pier construction
CN218031749U (en) Pile foundation rotary digging pore-forming underground gas pipeline in-situ isolation protection system
CN115405759B (en) In-situ isolation protection system for pile foundation rotary digging pore-forming underground gas pipeline and construction method
CN107100648B (en) Auxiliary facility and method for tunnel plain concrete lining construction
CN115418983A (en) Construction method for prefabricated box culvert in highway-railway combined large-section shield tunnel
CN210637087U (en) Inner and outer mould trolley lining system for open-cut underground canal
CN209836812U (en) Rail-mounted movable shaping mould frame
KR101078564B1 (en) moving device of side scaffolding system
CN216765987U (en) Comprehensive pipe gallery trolley slip form supporting system
CN109629443B (en) Cast-in-place channel beam three-point pushing system crossing existing road and construction method
CN214573250U (en) Continuous beam convenient to assemble and prefabricated by segment box girders
CN217233526U (en) Arch lining template trolley is detained to hole stake method
CN111139832B (en) Pouring template system for concrete cushion layer of river dike and dyke and construction method
JP2874539B2 (en) Method for constructing concrete structure and weir plate used in this method
CN115573555A (en) Construction method of square-round window type facing wall

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080118

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20080118

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20080118

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080609

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090622

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090819

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091013

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20091020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100709

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100806

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees