JP4562252B2 - Elevator for elevator installation work - Google Patents

Elevator for elevator installation work Download PDF

Info

Publication number
JP4562252B2
JP4562252B2 JP2000217127A JP2000217127A JP4562252B2 JP 4562252 B2 JP4562252 B2 JP 4562252B2 JP 2000217127 A JP2000217127 A JP 2000217127A JP 2000217127 A JP2000217127 A JP 2000217127A JP 4562252 B2 JP4562252 B2 JP 4562252B2
Authority
JP
Japan
Prior art keywords
elevator
tow rope
holding body
tow
hoistway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000217127A
Other languages
Japanese (ja)
Other versions
JP2002037568A (en
Inventor
一郎 曲渕
竜大 志村
隆 夏目
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2000217127A priority Critical patent/JP4562252B2/en
Publication of JP2002037568A publication Critical patent/JP2002037568A/en
Application granted granted Critical
Publication of JP4562252B2 publication Critical patent/JP4562252B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、昇降路に仮設されて据付工事に使用する作業床を昇降運行するエレベーターの据付作業用昇降装置に関する。
【0002】
【従来の技術】
図22〜図25は、従来のエレベーターの据付作業用昇降装置を示す図で、図22はエレベーターの据付作業を概念的に示す縦断面図、図23は図22のエンドレスウィンチ箇所の斜視図、図24は図22のエレベーターの他の据付作業状況を示す図22相当図、図25も図22のエレベーターの他の据付作業状況を示す図22相当図である。
【0003】
図において、1はエレベーターの昇降路、2は昇降路1の上に設けられた第二機械室、3は第二機械室2の上に設けられた第1機械室、4は昇降路1の下端に形成されたピット、5は第一機械室3に設置された巻上機、6は取付台7を介して第二機械室2に仮設されたエンドレスウィンチ、8はエレベーターの据付工事に作業員が乗り込んで作業する作業床で、エンドレスウィンチ6の一対の牽引索9の負荷側に吊持される。
【0004】
10は第二機械室2に枢着されてエンドレスウィンチ6に対向して昇降路1の壁面寄り対応位置に配置されたそらせ車、11は昇降路1に配置されて牽引索9の反負荷側端部を保持した牽引索保持体、12は制限スイッチ等の昇降路機器で、作業床8からの作業によって昇降路1の壁に装着される。13は主索で、巻上機5に巻掛けられて昇降路1に吊下されて下端が昇降路1のピット4に搬入されたつり合おもり14位置に配置される。
【0005】
また、図26〜図28は、他の従来のエレベーターの据付作業用昇降装置を示す図で、図26はエレベーターの据付作業を概念的に示す縦断面図、図27は図26のエレベーターの他の据付作業状況を示す図26相当図、図28は図27のエンドレスウィンチ箇所の斜視図である。
【0006】
図において、前述の図22〜図25と同符号は相当部分を示し、15はエンドレスウィンチ6の一対の牽引索で、負荷側が作業床8に枢着された吊り車16に巻掛けられ、端部が第二機械室2に設けられた綱止め梁17に連結されて、作業床8が2:1ローピングの綱掛け構成によって吊持される。
【0007】
従来のエレベーターの据付作業用昇降装置は上記のように構成され、第二機械室2にエンドレスウィンチ6が、昇降路1に作業床8がそれぞれ仮設される。次いで、牽引索9,15を吊設して作業床8を吊持し、エンドレスウィンチ6を運転して作業床8を昇降させる。そして、作業床8に乗り込んだ作業員によって図22、図24、図25又は図26、図27に示すように昇降路1内に配置される昇降路機器12の据付作業が行われる。
【0008】
なお、このような据付作業において作業床8が到達できない昇降路1の端部位置に配置される昇降路機器12に対しては、作業用足場を別に仮設することになる。したがって、作業用足場を仮設する作業の手数を省くために、作業床8がより昇降路1端部近くに到達できるようにエレベーターの据付作業用昇降装置を構成する必要がある。
【0009】
また、図26〜図28に示す他の従来のエレベーターの据付作業用昇降装置においては、作業床8が2:1ローピングの綱掛け構成によって吊持されているので、作業床8が昇降路1の下端寄りに下降した場合に、牽引索15の負荷側において昇降路1の全高のほぼ二倍の長さの牽引索15が吊設される。
【0010】
したがって、作業床8が図27に示すように昇降路1の上端寄りに上昇した場合に、牽引索15の反負荷側の長さは昇降路1の全高のほぼ二倍の長さとなる。
そして、この長さの牽引索15における昇降路1全高長さは昇降路1に吊下されるものの、他の昇降路1全高相当の長さは図27に示すようにピット4に乱れた状態で堆積する。
【0011】
【発明が解決しようとする課題】
上記のような従来のエレベーターの据付作業用昇降装置では、図22に示す据付作業用昇降装置において、エンドレスウィンチ6の牽引索9の反負荷側は昇降路1に自由懸垂されている。このため、作業床8の昇降によって牽引索9の反負荷側が揺れて、昇降路機器12に接触したり、絡みついたりして据付作業の妨げになるという問題点があった。
【0012】
また、図27に示す据付作業用昇降装置において、ピット4に乱れた状態で堆積した反負荷側の牽引索15は相互に絡み合うことがあって、作業床8の昇降に支障を及ぼし据付作業が妨げられるという問題点があった。
【0013】
この発明は、かかる問題点を解消するためになされたものであり、エンドレスウィンチの牽引索によって吊持された作業床を円滑に昇降運行できるエレベーターの据付作業用昇降装置を得ることを目的とする。
【0014】
【課題を解決するための手段】
この発明に係るエレベーターの据付作業用昇降装置においては、エレベーターの昇降路の上端側に仮設されたエンドレスウィンチと、昇降路に立設されたエレベーターのつり合おもり用案内レールと、エンドレスウィンチの牽引索の負荷側に吊持されて、つり合おもり用案内レールから水平投影面において離れた経路を昇降する作業床と、エンドレスウィンチの牽引索の反負荷側が連結されてつり合おもり用案内レールに昇降自在に係合された牽引索保持体とが設けられる。
【0015】
また、この発明に係るエレベーターの据付作業用昇降装置においては、水平投影面において側面から引退して形成された凹所を有する牽引索保持体が設けられ、また水平投影面において牽引索保持体の凹所に配置されたエレベーターの本設用の主索が設けられる。
【0016】
また、この発明に係るエレベーターの据付作業用昇降装置においては、1:1ローピングよりも大きい綱掛け比の綱掛け構成によって作業床及び牽引索保持体を吊持した牽引索が設けられる。
【0017】
また、この発明に係るエレベーターの据付作業用昇降装置においては、作業床を吊持した綱掛け構成の綱掛け比よりも、大きい綱掛け比の綱掛け構成によって牽引索保持体を吊持した牽引索が設けられる。
【0018】
また、この発明に係るエレベーターの据付作業用昇降装置においては、牽引索保持体に設けられて互いに水平方向に離れて吊設された牽引索の端部がそれぞれ連結されて、牽引索の張力差を均衡する張力均衡機構が設けられる。
【0019】
また、この発明に係るエレベーターの据付作業用昇降装置においては、牽引索保持体に設けられて張力均衡機構が所定位置を超えて変位することによって動作する過変位検出器が設けられる。
【0020】
また、この発明に係るエレベーターの据付作業用昇降装置においては、過変位検出器に対応してそれぞれ設けられた表示灯と、過変位検出器の動作を介して、動作した過変位検出器に対応した表示灯を付勢する張力不均衡検出回路とが設けられる。
【0021】
【発明の実施の形態】
実施の形態1.
図1〜図4は、この発明の実施の形態の一例を示す図で、図1はエレベーターの据付作業を概念的に示す縦断面図、図2は図1のエンドレスウィンチ箇所の斜視図、図3は図1における牽引索保持体箇所の拡大正面図、図4は図3の平面図である。
【0022】
図において、1はエレベーターの昇降路、2は昇降路1の上に設けられた第二機械室、3は第二機械室2の上に設けられた第1機械室、4は昇降路1の下端に形成されたピット、5は第一機械室3に設置された巻上機、6は取付台7を介して第二機械室2に仮設されたエンドレスウィンチ、8はエレベーターの据付工事に作業員が乗り込んで作業する作業床で、エンドレスウィンチ6の一対の牽引索9の負荷側に吊持される。
【0023】
10は第二機械室2に枢着されてエンドレスウィンチ6に対向して昇降路1の壁面寄り対応位置に配置されたそらせ車、11は昇降路1に配置されて牽引索9の反負荷側端部を保持した牽引索保持体、18は昇降路1に立設された本設用のつり合おもり用案内レールである。
【0024】
19は案内具で、牽引索保持体11の両側に設けられて対向したつり合おもり用案内レール18に昇降自在に係合する。20は牽引索保持体11に設けられた張力均衡機構で、牽引索保持体11に設けられて長手が水平に配置された軸21、長手中心が軸21に枢持されて両端にそれぞれ牽引索9の反負荷側が連結された腕体22によって構成されている。
【0025】
上記のように構成されたエレベーターの据付作業用昇降装置において、第二機械室2にエンドレスウィンチ6が、昇降路1に作業床8がそれぞれ仮設される。
また、昇降路1に本設用のつり合おもり用案内レール18が立設され、案内具19を介して牽引索保持体11が係合される。次いで、牽引索9を吊設して負荷側によって作業床8を吊持し、牽引索9の反負荷側が牽引索保持体11の張力均衡機構20に連結される。
【0026】
このような装置構成によって、エンドレスウィンチ6を運転して作業床8を昇降させる。そして、作業床8に乗り込んだ作業員によって前述の図22〜図25のエレベーターの据付作業用昇降装置の場合と同様な作業が行われて、前述の昇降路機器12等の据付作業が行われる。この据付作業における作業床8の昇降時にエンドレスウィンチ6の牽引索9の反負荷側が、張力均衡機構20によって張力が均衡した状態で牽引索保持体11に連結され、また牽引索保持体11は昇降移動がつり合おもり用案内レール18によって案内される。
【0027】
したがって、作業床8の昇降によって牽引索9の反負荷側が揺れ、昇降路機器12に接触したり、絡みついたりして据付作業の妨げになる不具合を解消することができる。このため、エンドレスウィンチ6の牽引索9によって吊持されて昇降する作業床8を円滑に昇降運行でき据付作業能率を向上することができる。
【0028】
実施の形態2.
図5及び図6は、この発明の他の実施の形態の一例を示す図で、図5はエンドレスウィンチ箇所の斜視図、図6は図5における牽引索保持体箇所の拡大平面図である。なお、図5及び図6の他は前述の図1〜図4と同様にエレベーターの据付作業用昇降装置が構成されている。
【0029】
図において、図1〜図4と同符号は相当部分を示し、23は前述の牽引索保持体11と同様な牽引索保持体で、両側のつり合おもり用案内レール18の相互間の中心位置に水平投影面において引退した凹所24が設けられている。25は巻上機5に巻掛けられて昇降路1に吊下されたエレベーターの本設用の主索で、据付作業工程の適時において図6に示すように牽引索保持体23の凹所24に配置される。
【0030】
上記のように構成されたエレベーターの据付作業用昇降装置においても、エンドレスウィンチ6の牽引索9の反負荷側が、つり合おもり用案内レール18に係合された牽引索保持体23に保持される。したがって、詳細な説明を省略するが図5及び図6の実施の形態においても図1〜図4の実施の形態と同様な作用が得られる。
【0031】
また、図5及び図6の実施の形態において、据付作業工程の適時に巻上機5に巻掛けられて昇降路1に吊下されたエレベーターの本設用の主索25が、牽引索保持体23に設けられた凹所24に配置される。このため、吊下された主索25に接することなく牽引索保持体23が正常に昇降するので、作業床8を円滑に運行でき据付作業能率を向上することができる。
【0032】
実施の形態3.
図7〜図12も、この発明の他の実施の形態の一例を示す図で、図7はエレベーターの据付作業を概念的に示す縦断面図、図8は図7のエンドレスウィンチ箇所の斜視図、図9は図7における牽引索保持体箇所の拡大正面図、図10は図9の平面図、図11は図7における牽引索の吊設状態を概念的に示す立面図、図12は図9の牽引索保持体に対応して設けられた電気回路図である。
【0033】
図において、前述の図1〜図4、図5及び図6と同符号は相当部分を示し、26は作業床8に枢着された吊り車、27は第二機械室2に設けられた綱止め梁、28は昇降路1の上端部に設けられた綱止め具、29は張力均衡機構20の腕体22の両端部にそれぞれ枢着された滑車である。
【0034】
15はエンドレスウィンチ6の牽引索で、負荷側を構成する一端が綱止め梁27に連結されて下降し作業床8の吊り車26に巻掛けられて上昇し、エンドレスウィンチ6に係合されて反負荷側を構成して下降し張力均衡機構20の滑車29に巻掛けられて上昇して他端は綱止め具28に連結されている。
【0035】
30は右側過変位検出器で、牽引索保持体23に設けられて張力均衡機構20の腕体22の図9における右側の長手端部の下側に配置され、腕体22の右側が所定位置を超えて下方へ回動変位したときに作動部が押圧されて動作する。31は左側過変位検出器で、牽引索保持体23に設けられて張力均衡機構20の腕体22の図9における左側の長手端部の下側に配置され、腕体22の左側が所定位置を超えて下方へ回動変位したときに作動部が押圧されて動作する。
【0036】
32は右側表示灯で、牽引索保持体23の間口方向の右側に設けられて右側過変位検出器30に接続されている。33は左側表示灯で、牽引索保持体23の間口方向の左側に設けられて左側過変位検出器31に接続されている。34は右側過変位検出器30等からなる電気回路図の電源で、電池によって構成されている。35は右側過変位検出器30、左側過変位検出器31、右側表示灯32、左側表示灯33を主要機器とする張力不均衡検出回路である。
【0037】
上記のように構成されたエレベーターの据付作業用昇降装置においても、エンドレスウィンチ6の牽引索15の反負荷側が、つり合おもり用案内レール18に係合された牽引索保持体23に保持される。したがって、詳細な説明を省略するが図7〜図11の実施の形態においても図1〜図4の実施の形態、図5及び図6の実施の形態と同様な作用が得られる。
【0038】
また、図7〜図11の実施の形態において牽引索15が2:1ローピングの綱掛け構成によって吊設されるので、小さい牽引容量のエンドレスウィンチ6を使用することができる。このため、エンドレスウィンチ6の昇降路1への搬入等の費用を節減することができる。また、牽引索15の反負荷側が昇降路1上方と張力均衡機構20の滑車29の間に吊持されるので、ピット4に乱れた状態で堆積することがない。
【0039】
このため、牽引索15の反負荷側がピット4に乱れた状態で堆積して相互に絡み合って、作業床8の昇降に支障を及ぼし据付作業が妨げられることがなく、作業床8を円滑に運行でき据付作業能率を向上することができる。
また、張力不均衡検出回路35が設けられて一対の牽引索15の一方が他方よりも長くなった場合に張力均衡機構20の腕体22が傾く。
【0040】
このような場合に、腕体22が傾いて下降した側の過変位検出器が押圧されて動作し、張力不均衡検出回路35を介して腕体22が傾いて下降した側の牽引索15に対応した表示灯が点灯する。これによって、牽引索15の一方の異常伸びが表示されるので、作業員は迅速に異常発生に対応することができる。
【0041】
なお、牽引索15に異常伸びが発生した状態では牽引索保持体23が傾いて過大な昇降抵抗が発生し、牽引索保持体23が昇降不能になる恐れがある。また、一対の牽引索15をそれぞれ牽引するエンドレスウィンチ6を設置した構成の場合に、両方のエンドレスウィンチ6を付勢して作業床8を昇降運行したときに、運行中において一方の牽引索15が他方よりも長くなることがある。
【0042】
このときに、長くなった牽引索15に対応した表示灯が点灯する。これによって、異常発生が表示されるので作業員が迅速に対応することができる。
なお、右側表示灯32と左側表示灯33の発光色を相互に異なるものとする。
このような構成によって、牽引索保持体23位置から離れた場所であっても、異常伸び等の異常が発生した牽引索を容易に判別することができる。
【0043】
そして、例えば点灯した表示灯に対応した牽引索側のエンドレスウィンチ6を、張力均衡機構20の腕体22が水平姿勢に復帰して表示灯が消灯する方向に寸動操作することによって異常時対策することができる。したがって、据付作業に対する異常時対策、エンドレスウィンチ6の異常時制御等を容易化することができ、据付作業能率を向上することができる。
【0044】
実施の形態4.
図13〜図15も、この発明の他の実施の形態の一例を示す図で、図13はエレベーターの据付作業を概念的に示す縦断面図、図14は図13のエンドレスウィンチ箇所の斜視図、図15は図13における牽引索の吊設状態を概念的に示す立面図である。
【0045】
図において、前述の図7〜図12と同符号は相当部分を示し、12は制限スイッチ等の昇降路機器で、作業床8からの作業によって昇降路1の壁に装着される。14は昇降路1のピット4に搬入されたつり合おもり、36はエンドレスウィンチ6の牽引索で、負荷側を構成する一端が作業床8に連結されて上昇し、エンドレスウィンチ6に係合されて反負荷側を構成して下降し、張力均衡機構20の滑車29に巻掛けられて上昇して他端は綱止め具28に連結されている。
【0046】
上記のように構成されたエレベーターの据付作業用昇降装置においても、エンドレスウィンチ6の牽引索36の反負荷側が、つり合おもり用案内レール18に係合された牽引索保持体23に保持される。したがって、詳細な説明を省略するが図13〜図15の実施の形態においても図1〜図4の実施の形態、図5及び図6の実施の形態と同様な作用が得られる。
【0047】
また、図13〜図15の実施の形態において牽引索36の負荷側が作業床8に直接連結される綱掛け構成、すなわち1:1ローピングによって吊設され、また反負荷側は2:1ローピングの綱掛け構成によって吊設される。これによって、作業床8を図13に示すように所定位置よりも距離h上昇した場合に、牽引索保持体23の下降は距離はh/2となる。
【0048】
したがって、作業床8の所定上昇位置よりも上方の昇降路機器12を取付けるために、作業床8を過上昇しても牽引索保持体23がつり合おもり14に衝突することはなく、作業床8の上昇可能範囲を広げることができる。このため、作業床8からの作業によって昇降路1上端寄りの昇降路機器12を容易に取付けることができ、据付作業能率を向上することができる。
【0049】
実施の形態5.
図16〜図20も、この発明の他の実施の形態の一例を示す図で、図16はエレベーターの据付作業を概念的に示す縦断面図、図17は図16のエンドレスウィンチ箇所の斜視図、図18は図16における牽引索保持体箇所の拡大正面図、図19は図18の平面図、図20は図16における牽引索の吊設状態を概念的に示す立面図である。
【0050】
図において、前述の図7〜図12と同符号は相当部分を示し、37は昇降路1の壁に枢着された昇降路滑車、38はエンドレスウィンチ6の牽引索で、負荷側を構成する一端が綱止め梁27に連結されて下降し作業床8の吊り車26に巻掛けられて上昇し、エンドレスウィンチ6に係合されて反負荷側を構成して下降し張力均衡機構20の滑車29に巻掛けられて上昇し、昇降路滑車37に巻掛けられて下降して他端は牽引索保持体23に連結されている。
【0051】
上記のように構成されたエレベーターの据付作業用昇降装置においても、エンドレスウィンチ6の牽引索38の反負荷側が、つり合おもり用案内レール18に係合された牽引索保持体23に保持される。また、牽引索保持体23に設けられた張力均衡機構20及び張力不均衡検出回路35が装備される。したがって、詳細な説明を省略するが図16〜図20の実施の形態においても図7〜図12の実施の形態と同様な作用が得られる。
【0052】
また、図16〜図20の実施の形態において牽引索38が負荷側において2:1ローピングの綱掛け構成によって吊設される。また、反負荷側は3:1ローピングの綱掛け構成によって吊設される。これによって、作業床8を所定位置よりも例えば距離H上昇した場合に、牽引索保持体23の下降は距離はH/1.5となる。
【0053】
したがって、作業床8の所定上昇位置よりも上方の昇降路機器12を取付けるために、作業床8を過上昇しても牽引索保持体23がつり合おもり14に衝突することはなく、作業床8の上昇可能範囲を広げることができる。このため、作業床8からの作業によって昇降路1上端寄りの昇降路機器12を容易に取付けることができ、据付作業能率を向上することができる。
【0054】
また、図16〜図20の実施の形態による構成において、牽引索38の負荷側の合計重量がエンドレスウィンチ6の牽引容量の一倍ないし二倍未満の場合に適用でき、負荷側の合計重量に対してエンドレスウィンチ6の牽引容量が不足するときであっても、支障なく作業床8を牽引して昇降することができる。
【0055】
実施の形態6.
図21も、この発明の他の実施の形態の一例を示す図で、エレベーターの据付作業を概念的に示す縦断面図である。なお、図21の他は前述の図13〜図15の実施の形態と同様にエレベーターの据付作業用昇降装置が構成されている。図において、図13〜図15と同符号は相当部分を示し、39は昇降路1の上端部に仮設された取付梁で、昇降路1の最上階の乗場から足場を仮設し、この足場での作業によって設置される。
【0056】
上記のように構成されたエレベーターの据付作業用昇降装置は、前述の図13〜図15の実施の形態を第二機械室2が設置されない構造の昇降路1に適用したものである。すなわち、エンドレスウィンチ6の牽引索36の反負荷側が、つり合おもり用案内レール18に係合された牽引索保持体23に保持され、また牽引索36が図13〜図15の実施の形態と同様に吊設される。したがって、詳細な説明を省略するが第二機械室2が設置されない構造の図21の実施の形態においても図13〜図15の実施の形態と同様な作用が得られる。
【0057】
【発明の効果】
この発明は以上説明したように、エレベーターの昇降路の上端側に仮設されたエンドレスウィンチと、昇降路に立設されたエレベーターのつり合おもり用案内レールと、エンドレスウィンチの牽引索の負荷側に吊持されて、つり合おもり用案内レールから水平投影面において離れた経路を昇降する作業床と、エンドレスウィンチの牽引索の反負荷側が連結されてつり合おもり用案内レールに昇降自在に係合された牽引索保持体とを設けたものである。
【0058】
これによって、エンドレスウィンチを運転して作業床を昇降運行して、作業床に乗り込んだ作業員によってエレベーターの据付作業が行われる。そして、エンドレスウィンチの牽引索の反負荷側が牽引索保持体に連結されて、この据付作業における作業床の昇降時に牽引索保持体がつり合おもり用案内レールによって案内されて昇降移動する。したがって、作業床の昇降によって牽引索の反負荷側が揺れて、昇降路機器に接触したり、絡みついたりして据付作業の妨げになる不具合を解消することができ、エンドレスウィンチの牽引索によって吊持されて昇降する作業床を円滑に運行でき据付作業能率を向上する効果がある。
【0059】
また、この発明は以上説明したように、水平投影面において側面から引退して形成された凹所を有する牽引索保持体を設け、また水平投影面において凹所に配置されたエレベーターの本設用の主索を設けたものである。
【0060】
これによって、据付作業工程の適時に巻上機に巻掛けられて昇降路に吊下されたエレベーターの本設用の主索が、牽引索保持体に設けられた凹所に配置される。このため、吊下された主索に接することなく牽引索保持体が正常に昇降し、作業床を円滑に運行でき据付作業能率を向上する効果がある。
【0061】
また、この発明は以上説明したように、1:1ローピングよりも大きい綱掛け比の綱掛け構成によって作業床及び牽引索保持体を吊持した牽引索を設けたものである。
【0062】
これによって、作業床等が1:1ローピングよりも大きい綱掛け比の綱掛け構成によって吊持され、小さい牽引容量のエンドレスウィンチを使用することができ、エンドレスウィンチの昇降路への搬入等の費用を節減する効果がある。
【0063】
また、この発明は以上説明したように、作業床を吊持した綱掛け構成の綱掛け比よりも、大きい綱掛け比の綱掛け構成によって牽引索保持体を吊持した牽引索を設けたものである。
【0064】
これによって、作業床の綱掛け構成の綱掛け比よりも、大きい綱掛け比の綱掛け構成によって牽引索保持体が吊持されて、作業床の昇降距離よりも牽引索保持体昇降距離が短くなる。したがって、作業床の所定上昇位置よりも上方の昇降路機器を取付けるために、作業床を過上昇しても牽引索保持体がつり合おもりに衝突することはない。このため、作業床の上昇可能範囲を広げることができ、作業床からの作業によって昇降路上端寄りの昇降路機器を容易に取付けることができて据付作業能率を向上する効果がある。
【0065】
また、この発明は以上説明したように、牽引索保持体に設けられて互いに水平方向に離れて吊設された牽引索の端部がそれぞれ連結されて、牽引索の張力差を均衡する張力均衡機構を設けたものである。
【0066】
このように、牽引索保持体に張力均衡機構を介してエンドレスウィンチの牽引索が連結される。このため、牽引索相互の張力が均衡されて据付作業時における作業床の昇降時に、牽引索の緩みによって昇降路機器に接触したり、牽引索相互が絡みついたりして据付作業の妨げになる不具合を解消することができ、作業床を円滑に運行できて据付作業能率を向上する効果がある。
【0067】
また、この発明は以上説明したように、牽引索保持体に設けられて張力均衡機構が所定位置を超えて変位することによって動作する過変位検出器を設けたものである。
【0068】
これによって、牽引索の異常伸びによって過変位検出器が動作し、この動作を介して作業員が異常発生に迅速に対応できる。このため、牽引索の異常伸びによる不具合の発生を未然に防止でき、作業床を円滑に運行できて据付作業能率を向上する効果がある。
【0069】
また、この発明は以上説明したように、過変位検出器に対応してそれぞれ設けられた表示灯と、過変位検出器の動作を介して、動作した過変位検出器に対応した表示灯を付勢する張力不均衡検出回路とを設けたものである。
【0070】
これによって、異常伸びが発生した牽引索に対応して配置されて、動作した過変位検出器が表示灯の点灯によって表示される。このため、作業員が異常発生の牽引索に対して迅速に対策することができ、二本のうち一本の牽引索の異常伸びのために牽引索保持体が傾いて過大な昇降抵抗が発生する等の不具合の発生を未然に防止できる。これにより、作業床を円滑に運行できて据付作業能率を向上する効果がある。
【図面の簡単な説明】
【図1】 この発明の実施の形態1を示す図で、エレベーターの据付作業を概念的に示す縦断面図。
【図2】 図1のエンドレスウィンチ箇所の斜視図。
【図3】 図1における牽引索保持体箇所の拡大正面図。
【図4】 図3の平面図。
【図5】 この発明の実施の形態2を示す図で、エンドレスウィンチ箇所の斜視図。
【図6】 図5における牽引索保持体箇所の拡大平面図。
【図7】 この発明の実施の形態3を示す図で、エレベーターの据付作業を概念的に示す縦断面図。
【図8】 図7のエンドレスウィンチ箇所の斜視図。
【図9】 図7における牽引索保持体箇所の拡大正面図。
【図10】 図9の平面図。
【図11】 図7における牽引索の吊設状態を概念的に示す立面図。
【図12】 図9の牽引索保持体に対応して設けられた電気回路図。
【図13】 この発明の実施の形態4を示す図で、エレベーターの据付作業を概念的に示す縦断面図。
【図14】 図13のエンドレスウィンチ箇所の斜視図。
【図15】 図13における牽引索の吊設状態を概念的に示す立面図。
【図16】 この発明の実施の形態5を示す図で、エレベーターの据付作業を概念的に示す縦断面図。
【図17】 図16のエンドレスウィンチ箇所の斜視図。
【図18】 図16における牽引索保持体箇所の拡大正面図。
【図19】 図18の平面図。
【図20】 図16における牽引索の吊設状態を概念的に示す立面図。
【図21】 この発明の実施の形態6を示す図で、エレベーターの据付作業を概念的に示す縦断面図。
【図22】 従来のエレベーターの据付作業用昇降装置を示す図で、エレベーターの据付作業を概念的に示す縦断面図。
【図23】 図22のエンドレスウィンチ箇所の斜視図。
【図24】 図22のエレベーターの他の据付作業状況を示す図で、図22相当図。
【図25】 図22のエレベーターの他の据付作業状況を示す図で、図22相当図。
【図26】 他の従来のエレベーターの据付作業用昇降装置を示す図で、エレベーターの据付作業を概念的に示す縦断面図。
【図27】 図26のエレベーターの他の据付作業状況を示す図で、図26相当図。
【図28】 図27のエンドレスウィンチ箇所の斜視図。
【符号の説明】
1 昇降路、6 エンドレスウィンチ、8 作業床、9 牽引索、11 牽引索保持体、15 牽引索、18 つり合おもり用案内レール、20 張力均衡機構、24 凹所、25 主索、30 右側過変位検出器、31 左側過変位検出器、32 右側表示灯、33 左側表示灯、35 張力不均衡検出回路、36牽引索、38 牽引索。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a lifting device for elevator installation work that moves up and down a work floor temporarily installed in a hoistway and used for installation work.
[0002]
[Prior art]
22 to 25 are diagrams showing a conventional elevator installation lifting apparatus, FIG. 22 is a longitudinal sectional view conceptually showing the elevator installation work, and FIG. 23 is a perspective view of the endless winch portion of FIG. 24 is a view corresponding to FIG. 22 showing another installation work situation of the elevator of FIG. 22, and FIG. 25 is also a view equivalent to FIG. 22 showing another installation work situation of the elevator of FIG.
[0003]
In the figure, 1 is an elevator hoistway, 2 is a second machine room provided on the hoistway 1, 3 is a first machine room provided on the second machine room 2, and 4 is a hoistway 1. A pit formed at the lower end, 5 is a hoist installed in the first machine room 3, 6 is an endless winch temporarily installed in the second machine room 2 via a mounting base 7, and 8 is used for elevator installation work. It is suspended on the load side of the pair of tow ropes 9 of the endless winch 6 on a work floor on which an operator gets on and works.
[0004]
10 is a baffle that is pivotally attached to the second machine room 2 and faces the endless winch 6, and is arranged at a position corresponding to the wall surface of the hoistway 1. 11 is arranged in the hoistway 1 and is on the side opposite to the load side of the tow rope 9. A tow rope holding body 12, which holds an end, is a hoistway device such as a limit switch, and is attached to the wall of the hoistway 1 by work from the work floor 8. A main rope 13 is wound around the hoisting machine 5 and suspended from the hoistway 1, and the lower end is arranged at a counterweight 14 position carried into the pit 4 of the hoistway 1.
[0005]
FIGS. 26 to 28 are diagrams showing another conventional elevator lifting apparatus, FIG. 26 is a longitudinal sectional view conceptually showing the elevator installation work, and FIG. 27 is another elevator of FIG. FIG. 28 is a perspective view of the endless winch portion of FIG. 27. FIG.
[0006]
In the figure, the same reference numerals as those in FIGS. 22 to 25 denote the corresponding parts. Reference numeral 15 denotes a pair of tow ropes of the endless winch 6, which is wound around a suspension wheel 16 whose load side is pivotally attached to the work floor 8. The part is connected to a rope holding beam 17 provided in the second machine room 2, and the work floor 8 is suspended by a rope hanging structure of 2: 1 roping.
[0007]
A conventional elevator installation lifting apparatus is configured as described above, and an endless winch 6 is temporarily installed in the second machine room 2 and a work floor 8 is temporarily installed in the lifting path 1. Subsequently, the tow lines 9 and 15 are suspended to suspend the work floor 8, and the endless winch 6 is operated to raise and lower the work floor 8. Then, as shown in FIGS. 22, 24, 25, 26, and 27, an installation operation of the hoistway device 12 disposed in the hoistway 1 is performed by a worker who has entered the work floor 8.
[0008]
In addition, a working scaffold is temporarily installed for the hoistway equipment 12 arranged at the end position of the hoistway 1 where the work floor 8 cannot reach in such installation work. Therefore, in order to save the work of temporarily setting up the work scaffold, it is necessary to configure the elevator work lifting device so that the work floor 8 can reach closer to the end of the hoistway 1.
[0009]
Further, in the other conventional elevator installation lifting apparatus shown in FIGS. 26 to 28, the work floor 8 is suspended by a 2: 1 roping leash construction, so that the work floor 8 is the hoistway 1. When the traction line 15 is lowered toward the lower end of the traction line 15, the traction line 15 having a length almost twice the total height of the hoistway 1 is suspended on the load side of the traction line 15.
[0010]
Therefore, when the work floor 8 rises toward the upper end of the hoistway 1 as shown in FIG. 27, the length of the tow rope 15 on the side opposite to the load becomes approximately twice the total height of the hoistway 1.
And although the total length of the hoistway 1 in the length of the tow rope 15 is suspended from the hoistway 1, the length corresponding to the total height of the other hoistway 1 is disturbed by the pit 4 as shown in FIG. Deposit with.
[0011]
[Problems to be solved by the invention]
In the conventional elevator installation lifting apparatus as described above, the lifting load 9 of the endless winch 6 is suspended freely on the hoistway 1 in the installation lifting apparatus shown in FIG. For this reason, when the work floor 8 is moved up and down, the side opposite to the load of the tow rope 9 is shaken to come into contact with the hoistway device 12 or become entangled, thereby hindering the installation work.
[0012]
Further, in the lifting device for installation shown in FIG. 27, the tow ropes 15 on the anti-load side accumulated in a turbulent state in the pit 4 may be entangled with each other, which hinders the lifting of the work floor 8 and causes the installation work to be performed. There was the problem of being disturbed.
[0013]
The present invention has been made to solve such problems, and an object thereof is to obtain an elevator installation lifting device that can smoothly lift and lower a work floor suspended by a towing line of an endless winch. .
[0014]
[Means for Solving the Problems]
In the elevator lifting / lowering apparatus according to the present invention, the endless winch temporarily installed on the upper end side of the elevator hoistway, the counterweight guide rail for the elevator erected on the hoistway, and the pulling of the endless winch The work floor, which is suspended on the load side of the cable and moves up and down the path away from the counterweight guide rail on the horizontal projection plane, is connected to the counterload side of the endless winch's towline to the counterweight guide rail. A tow rope holding body engaged so as to freely move up and down is provided.
[0015]
In the elevator lifting / lowering apparatus according to the present invention, a tow rope holding body having a recess formed by retreating from the side surface on the horizontal projection plane is provided, and the tow rope holding body of the horizontal projection plane is provided. A main rope for an elevator installed in the recess is provided.
[0016]
Moreover, in the elevator lifting / lowering apparatus according to the present invention, a tow rope that suspends the work floor and the tow rope holding body is provided by a leash structure having a larger leash ratio than 1: 1 roping.
[0017]
Further, in the elevator lifting / lowering apparatus according to the present invention, the traction is obtained by suspending the tow rope holding body by a leash structure having a larger leash ratio than the leash ratio of the leash structure where the work floor is hung. A cord is provided.
[0018]
Further, in the elevator lifting / lowering apparatus according to the present invention, the ends of the tow ropes provided on the tow rope holding body and hung apart from each other in the horizontal direction are connected to each other, and the tension difference of the tow rope is connected. A tension balancing mechanism is provided for balancing.
[0019]
In the elevator lifting / lowering apparatus according to the present invention, an over-displacement detector that is provided on the tow rope holding body and operates when the tension balance mechanism is displaced beyond a predetermined position is provided.
[0020]
Further, in the elevator lifting / lowering apparatus according to the present invention, it corresponds to the over-displacement detector that has been operated through the operation of the indicator lamp and the over-displacement detector respectively provided corresponding to the over-displacement detector. A tension imbalance detection circuit for energizing the indicator lamp.
[0021]
DETAILED DESCRIPTION OF THE INVENTION
Embodiment 1 FIG.
1 to 4 are diagrams showing an example of an embodiment of the present invention. FIG. 1 is a longitudinal sectional view conceptually showing an elevator installation work. FIG. 2 is a perspective view of an endless winch portion in FIG. 3 is an enlarged front view of the tow rope holding body portion in FIG. 1, and FIG. 4 is a plan view of FIG.
[0022]
In the figure, 1 is an elevator hoistway, 2 is a second machine room provided on the hoistway 1, 3 is a first machine room provided on the second machine room 2, and 4 is a hoistway 1. A pit formed at the lower end, 5 is a hoist installed in the first machine room 3, 6 is an endless winch temporarily installed in the second machine room 2 via a mounting base 7, and 8 is used for elevator installation work. It is suspended on the load side of the pair of tow ropes 9 of the endless winch 6 on a work floor on which an operator gets on and works.
[0023]
10 is a baffle that is pivotally attached to the second machine room 2 and faces the endless winch 6, and is arranged at a position corresponding to the wall surface of the hoistway 1. 11 is arranged in the hoistway 1 and is on the side opposite to the load side of the tow rope 9. A tow rope holding body 18 that holds the end, 18 is a guide rail for a counterweight for standing installed on the hoistway 1.
[0024]
A guide 19 is provided on both sides of the tow rope holding body 11 and engages with the counterweight guide rails 18 facing each other so as to be movable up and down. Reference numeral 20 denotes a tension balance mechanism provided on the tow rope holding body 11, which is provided on the tow rope holding body 11 and has a shaft 21 that is horizontally arranged in the longitudinal direction. It is comprised by the arm body 22 to which the anti-load side of 9 was connected.
[0025]
In the elevator installation lifting apparatus configured as described above, an endless winch 6 is temporarily installed in the second machine room 2 and a work floor 8 is temporarily installed in the lifting path 1.
Further, a counterweight guide rail 18 for permanent installation is erected on the hoistway 1, and the tow rope holder 11 is engaged via a guide 19. Next, the tow rope 9 is suspended and the work floor 8 is hung by the load side, and the anti-load side of the tow line 9 is connected to the tension balancing mechanism 20 of the tow line holder 11.
[0026]
With such an apparatus configuration, the endless winch 6 is operated to raise and lower the work floor 8. Then, an operator who gets on the work floor 8 performs the same work as that of the elevator installation lifting apparatus shown in FIGS. 22 to 25 described above, and the installation work of the hoistway equipment 12 and the like is performed. . When the work floor 8 is moved up and down in this installation work, the opposite side of the towline 9 of the endless winch 6 is connected to the towline holding body 11 in a state where the tension is balanced by the tension balancing mechanism 20, and the towline holding body 11 is moved up and down. The movement is guided by the counterweight guide rail 18.
[0027]
Accordingly, it is possible to eliminate the trouble that hinders the installation work due to the lift of the work floor 8 swaying the anti-load side of the tow rope 9 and coming into contact with the hoistway device 12 or tangling. For this reason, the work floor 8 suspended and lifted by the tow rope 9 of the endless winch 6 can be smoothly moved up and down, and the installation work efficiency can be improved.
[0028]
Embodiment 2. FIG.
5 and 6 are diagrams showing an example of another embodiment of the present invention. FIG. 5 is a perspective view of an endless winch portion, and FIG. 6 is an enlarged plan view of a tow rope holder portion in FIG. In addition to FIG.5 and FIG.6, the raising / lowering apparatus for the installation work of an elevator is comprised like the above-mentioned FIGS. 1-4.
[0029]
In the figure, the same reference numerals as in FIGS. 1 to 4 show the corresponding parts, and reference numeral 23 denotes a tow rope holding body similar to the aforementioned tow rope holding body 11, and the center position between the counterweight guide rails 18 on both sides. Is provided with a recess 24 which is retreated on the horizontal projection plane. Reference numeral 25 denotes a main rope for an elevator installed around the hoisting machine 5 and suspended in the hoistway 1. As shown in FIG. Placed in.
[0030]
Also in the elevator installation lifting apparatus configured as described above, the opposite side of the tow rope 9 of the endless winch 6 is held by the tow rope holding body 23 engaged with the counterweight guide rail 18. . Therefore, although the detailed description is omitted, the same operation as the embodiment of FIGS. 1 to 4 can be obtained also in the embodiment of FIGS.
[0031]
In the embodiment of FIGS. 5 and 6, the main rope 25 for the main installation of the elevator that is wound around the hoist 5 and suspended in the hoistway 1 at the appropriate time of the installation work process is held by the tow rope. It is disposed in a recess 24 provided in the body 23. For this reason, since the tow rope holding body 23 normally moves up and down without coming into contact with the suspended main rope 25, the work floor 8 can be operated smoothly and the installation work efficiency can be improved.
[0032]
Embodiment 3 FIG.
FIGS. 7 to 12 are also diagrams showing an example of another embodiment of the present invention. FIG. 7 is a longitudinal sectional view conceptually showing an elevator installation operation, and FIG. 8 is a perspective view of the endless winch portion of FIG. 9 is an enlarged front view of the tow rope holding body portion in FIG. 7, FIG. 10 is a plan view of FIG. 9, FIG. 11 is an elevation view conceptually showing the suspended state of the tow rope in FIG. FIG. 10 is an electric circuit diagram provided corresponding to the tow rope holder in FIG. 9.
[0033]
In the figure, the same reference numerals as those in FIGS. 1 to 4, 5, and 6 denote the corresponding parts, 26 is a suspension wheel pivotally attached to the work floor 8, and 27 is a rope provided in the second machine room 2. A stop beam 28 is a rope stop provided at the upper end of the hoistway 1, and 29 is a pulley pivotally attached to both ends of the arm body 22 of the tension balance mechanism 20.
[0034]
Reference numeral 15 denotes a pulling rope for the endless winch 6, one end constituting the load side is connected to the rope tie 27, descends, is wound around the suspension wheel 26 of the work floor 8, and is engaged with the endless winch 6. The other end of the tension balance mechanism 20 is lowered and wound around the pulley 29, and the other end is connected to the rope stopper 28.
[0035]
Reference numeral 30 denotes a right over-displacement detector, which is provided on the tow rope holding body 23 and is arranged below the right longitudinal end of the arm body 22 of the tension balance mechanism 20 in FIG. The operating portion is pressed and operated when it is rotated and displaced downward beyond the range. Reference numeral 31 denotes a left-side over-displacement detector, which is provided on the tow rope holding body 23 and is disposed below the left longitudinal end of the arm body 22 of the tension balance mechanism 20 in FIG. The operating portion is pressed and operated when it is rotated and displaced downward beyond the range.
[0036]
Reference numeral 32 denotes a right side indicator lamp which is provided on the right side in the frontage direction of the tow rope holding body 23 and is connected to the right side overdisplacement detector 30. Reference numeral 33 denotes a left indicator lamp which is provided on the left side in the frontage direction of the tow rope holder 23 and is connected to the left overdisplacement detector 31. Reference numeral 34 denotes an electric circuit diagram power source including the right overdisplacement detector 30 and the like, and is constituted by a battery. Reference numeral 35 denotes a tension imbalance detection circuit including the right overdisplacement detector 30, the left overdisplacement detector 31, the right indicator lamp 32, and the left indicator lamp 33 as main devices.
[0037]
Also in the elevator installation lifting apparatus configured as described above, the side opposite to the towline 15 of the endless winch 6 is held by the towline holding body 23 engaged with the counterweight guide rail 18. . Therefore, although the detailed description is omitted, the same operation as the embodiment of FIGS. 1 to 4 and the embodiment of FIGS. 5 and 6 can be obtained also in the embodiment of FIGS.
[0038]
Further, in the embodiment shown in FIGS. 7 to 11, the tow rope 15 is suspended by a 2: 1 roping rope structure, so that the endless winch 6 having a small traction capacity can be used. For this reason, the expenses, such as carrying in to the hoistway 1 of the endless winch 6, can be reduced. Further, since the anti-load side of the tow rope 15 is suspended above the hoistway 1 and the pulley 29 of the tension balancing mechanism 20, the pit 4 does not accumulate in a disordered state.
[0039]
For this reason, the antiload side of the tow rope 15 accumulates in a turbulent state in the pit 4 and is entangled with each other, hindering the raising and lowering of the working floor 8 and preventing the installation work from being disturbed. The installation work efficiency can be improved.
Further, when the tension imbalance detection circuit 35 is provided and one of the pair of tow ropes 15 is longer than the other, the arm body 22 of the tension balancing mechanism 20 is tilted.
[0040]
In such a case, the over-displacement detector on the side where the arm body 22 is tilted and lowered is pressed and operated, and the torsion line 15 on the side on which the arm body 22 is tilted and lowered via the tension imbalance detection circuit 35 is operated. The corresponding indicator lights up. As a result, one abnormal extension of the tow rope 15 is displayed, so that the worker can quickly respond to the occurrence of the abnormality.
[0041]
Note that, when the abnormal extension of the tow rope 15 occurs, the tow rope holding body 23 is inclined and excessive lifting resistance is generated, and the towing rope holding body 23 may not be able to move up and down. Further, when the endless winch 6 that pulls the pair of tow ropes 15 is installed, when the endless winch 6 is energized and the work floor 8 is moved up and down, one of the tow ropes 15 is in operation. May be longer than the other.
[0042]
At this time, the indicator lamp corresponding to the lengthened tow rope 15 is turned on. As a result, the occurrence of abnormality is displayed, so that the worker can respond quickly.
Note that the light emission colors of the right side indicator lamp 32 and the left side indicator lamp 33 are different from each other.
With such a configuration, it is possible to easily discriminate a towing line in which an abnormality such as abnormal elongation has occurred even at a location away from the position of the tow rope holding body 23.
[0043]
Then, for example, when the endless winch 6 on the tow rope side corresponding to the lit indicator light is operated in the direction in which the arm body 22 of the tension balance mechanism 20 returns to the horizontal posture and the indicator light turns off, the countermeasure for the abnormal state is taken. can do. Therefore, it is possible to facilitate measures against abnormalities in installation work, control during abnormalities of the endless winch 6, and the like, and improve the efficiency of installation work.
[0044]
Embodiment 4 FIG.
FIGS. 13 to 15 also show examples of other embodiments of the present invention. FIG. 13 is a longitudinal sectional view conceptually showing an elevator installation operation, and FIG. 14 is a perspective view of an endless winch portion in FIG. FIG. 15 is an elevation view conceptually showing the suspended state of the tow rope in FIG.
[0045]
In the figure, the same reference numerals as those in FIGS. 7 to 12 denote the corresponding parts, and reference numeral 12 denotes a hoistway device such as a limit switch, which is attached to the wall of the hoistway 1 by work from the work floor 8. 14 is a counterweight carried into the pit 4 of the hoistway 1, and 36 is a towline for the endless winch 6, one end constituting the load side is connected to the work floor 8 and is lifted and engaged with the endless winch 6. The anti-load side is lowered, wound around the pulley 29 of the tension balance mechanism 20 and raised, and the other end is connected to the rope stopper 28.
[0046]
Also in the elevator installation lifting apparatus configured as described above, the opposite side of the tow rope 36 of the endless winch 6 is held by the tow rope holding body 23 engaged with the counterweight guide rail 18. . Therefore, although the detailed description is omitted, the same operations as those of the embodiments of FIGS. 1 to 4 and FIGS. 5 and 6 can be obtained in the embodiments of FIGS.
[0047]
Further, in the embodiment shown in FIGS. 13 to 15, the load side of the tow rope 36 is directly connected to the work floor 8, that is, suspended by 1: 1 roping, and the anti-load side is 2: 1 roping. Suspended by a leash structure. As a result, when the work floor 8 is raised by a distance h from a predetermined position as shown in FIG. 13, the descending distance of the tow rope holding body 23 becomes h / 2.
[0048]
Therefore, in order to mount the hoistway device 12 above the predetermined ascending position of the work floor 8, the tow rope holding body 23 does not collide with the counterweight 14 even if the work floor 8 is excessively raised, and the work floor The range in which 8 can be raised can be expanded. For this reason, the hoistway apparatus 12 near the upper end of the hoistway 1 can be easily attached by work from the work floor 8, and the installation work efficiency can be improved.
[0049]
Embodiment 5 FIG.
16 to 20 are also diagrams showing an example of another embodiment of the present invention. FIG. 16 is a longitudinal sectional view conceptually showing an elevator installation work, and FIG. 17 is a perspective view of the endless winch portion of FIG. 18 is an enlarged front view of a portion of the tow rope holding body in FIG. 16, FIG. 19 is a plan view of FIG. 18, and FIG. 20 is an elevation view conceptually showing a suspended state of the tow rope in FIG.
[0050]
In the figure, the same reference numerals as in FIGS. 7 to 12 indicate the corresponding parts, 37 is a hoistway pulley pivotally attached to the wall of the hoistway 1, and 38 is a towline of the endless winch 6, which constitutes the load side. One end is connected to the leash 27 and descends, is wound around the suspension wheel 26 of the work floor 8, is lifted, is engaged with the endless winch 6, constitutes an anti-load side, and descends, and is a pulley of the tension balance mechanism 20. The other end is connected to the tow rope holding body 23. The other end is connected to the tow rope holding body 23.
[0051]
Also in the elevator lifting / lowering apparatus configured as described above, the opposite side of the tow rope 38 of the endless winch 6 is held by the tow rope holding body 23 engaged with the counterweight guide rail 18. . Further, a tension balance mechanism 20 and a tension imbalance detection circuit 35 provided on the tow rope holding body 23 are provided. Therefore, although the detailed description is omitted, the same operation as the embodiment of FIGS. 7 to 12 can be obtained also in the embodiment of FIGS.
[0052]
In addition, in the embodiment shown in FIGS. 16 to 20, the tow rope 38 is hung on the load side by a 2: 1 roping rope structure. Further, the non-load side is suspended by a 3: 1 roping rope structure. As a result, when the work floor 8 is raised by a distance H, for example, from a predetermined position, the descending of the tow rope holding body 23 is H / 1.5.
[0053]
Therefore, in order to mount the hoistway device 12 above the predetermined ascending position of the work floor 8, the tow rope holding body 23 does not collide with the counterweight 14 even if the work floor 8 is excessively raised, and the work floor The range in which 8 can be raised can be expanded. For this reason, the hoistway apparatus 12 near the upper end of the hoistway 1 can be easily attached by work from the work floor 8, and the installation work efficiency can be improved.
[0054]
In addition, in the configuration according to the embodiment of FIGS. 16 to 20, it can be applied when the total weight on the load side of the tow rope 38 is less than one or two times the traction capacity of the endless winch 6. On the other hand, even when the traction capacity of the endless winch 6 is insufficient, the work floor 8 can be pulled up and down without hindrance.
[0055]
Embodiment 6 FIG.
FIG. 21 also shows an example of another embodiment of the present invention, and is a longitudinal sectional view conceptually showing an elevator installation work. Except for FIG. 21, an elevator installation lifting apparatus is configured in the same manner as in the above-described embodiments of FIGS. 13 to 15. In the figure, the same reference numerals as in FIGS. 13 to 15 denote corresponding parts, 39 is a mounting beam temporarily installed at the upper end of the hoistway 1, and a scaffold is temporarily installed from the landing on the top floor of the hoistway 1. It is installed by the work of.
[0056]
The elevator installation elevator apparatus configured as described above is obtained by applying the embodiment shown in FIGS. 13 to 15 to the elevator shaft 1 having a structure in which the second machine room 2 is not installed. That is, the anti-load side of the tow rope 36 of the endless winch 6 is held by the tow rope holding body 23 engaged with the counterweight guide rail 18, and the tow rope 36 is the same as that of the embodiment of FIGS. Similarly, it is suspended. Therefore, although the detailed description is omitted, the same operation as that of the embodiment of FIGS. 13 to 15 can be obtained also in the embodiment of FIG.
[0057]
【The invention's effect】
As described above, the present invention provides an endless winch temporarily installed on the upper end side of the elevator hoistway, an elevator weight guide rail erected on the hoistway, and a load side of the endless winch towing cable. The work floor that is suspended and lifts the path away from the counterweight guide rail on the horizontal projection plane is connected to the counterload side of the endless winch's towline so that it can be lifted and lowered to the counterweight guide rail. The tow rope holding body is provided.
[0058]
As a result, the endless winch is operated to move up and down the work floor, and an elevator installation work is performed by a worker who gets on the work floor. Then, the non-load side of the tow rope of the endless winch is connected to the tow rope holding body, and the tow rope holding body is moved up and down by being guided by the counterweight guide rail when the work floor is raised and lowered in this installation operation. Therefore, it is possible to eliminate the trouble that hinders the installation work by shaking the anti-load side of the tow rope due to the lift of the work floor, touching the hoistway equipment or getting tangled, and suspended by the tow rope of the endless winch As a result, the working floor that moves up and down can be operated smoothly and the installation work efficiency can be improved.
[0059]
Further, as described above, the present invention is provided with a tow rope holding body having a recess formed by retreating from the side surface on the horizontal projection surface, and for the main installation of the elevator disposed in the recess on the horizontal projection surface. The main rope is provided.
[0060]
As a result, the main rope for the main installation of the elevator, which is wound around the hoisting machine at an appropriate time in the installation work process and suspended from the hoistway, is arranged in a recess provided in the tow rope holder. For this reason, the tow rope holding body normally moves up and down without coming into contact with the suspended main rope, and the working floor can be operated smoothly, thereby improving the installation work efficiency.
[0061]
In addition, as described above, the present invention is provided with a tow rope that suspends a work floor and a tow rope holding body with a leash structure having a larger leash ratio than 1: 1 roping.
[0062]
As a result, the work floor or the like is suspended by a leash structure having a larger leash ratio than 1: 1 roping, and an endless winch with a small traction capacity can be used, and the cost of carrying the endless winch into the hoistway, etc. Has the effect of saving.
[0063]
In addition, as described above, the present invention is provided with a tow rope that suspends the tow rope holding body by a leash structure having a larger leash ratio than that of the leash structure that suspends the work floor. It is.
[0064]
As a result, the tow rope holding body is suspended by the leash structure having a larger leash ratio than the leash ratio of the work floor leash structure, and the towing line holding body elevating distance is shorter than the elevating distance of the work floor. Become. Therefore, in order to attach the hoistway device above the predetermined ascending position of the work floor, the tow rope holding body does not collide with the counterweight even if the work floor is raised excessively. For this reason, the range in which the work floor can be raised can be widened, and hoistway equipment close to the upper end of the hoistway can be easily attached by work from the work floor, thereby improving the installation work efficiency.
[0065]
Further, as described above, the present invention provides a tension balance in which the ends of the tow ropes provided on the tow rope holding body and hung apart from each other in the horizontal direction are connected to balance the tension difference between the tow lines. A mechanism is provided.
[0066]
Thus, the tow rope of the endless winch is connected to the tow rope holding body via the tension balance mechanism. For this reason, the tension between the towing lines is balanced, and when the work floor is raised and lowered during the installation work, it comes into contact with the hoistway device due to the looseness of the towing lines or the tow lines are entangled with each other, which hinders the installation work. Can be eliminated, and the work floor can be smoothly operated to improve the installation work efficiency.
[0067]
Further, as described above, the present invention is provided with an over-displacement detector that is provided on the tow rope holding body and operates when the tension balance mechanism is displaced beyond a predetermined position.
[0068]
As a result, the over-displacement detector operates due to the abnormal extension of the tow rope, and the worker can quickly respond to the occurrence of the abnormality through this operation. For this reason, it is possible to prevent the occurrence of problems due to the abnormal extension of the tow rope, and to smoothly operate the work floor, thereby improving the installation work efficiency.
[0069]
In addition, as described above, the present invention is provided with an indicator lamp provided corresponding to the overdisplacement detector and an indicator lamp corresponding to the operated overdisplacement detector through the operation of the overdisplacement detector. And a tension imbalance detection circuit for energizing.
[0070]
As a result, the over-displacement detector that has been placed and operated corresponding to the tow rope in which the abnormal extension has occurred is displayed by turning on the indicator lamp. For this reason, the operator can quickly take measures against the abnormal towing line, and the towing line holding body tilts due to abnormal extension of one of the two towing lines, and excessive lifting resistance is generated. It is possible to prevent the occurrence of problems such as failure. Thereby, there is an effect that the work floor can be smoothly operated and the installation work efficiency is improved.
[Brief description of the drawings]
FIG. 1 is a longitudinal sectional view conceptually showing an elevator installation operation according to Embodiment 1 of the present invention.
FIG. 2 is a perspective view of the endless winch portion of FIG. 1;
FIG. 3 is an enlarged front view of a tow rope holding body portion in FIG. 1;
4 is a plan view of FIG. 3. FIG.
FIG. 5 is a diagram showing a second embodiment of the present invention, and is a perspective view of an endless winch portion.
6 is an enlarged plan view of the tow rope holding body portion in FIG. 5. FIG.
FIG. 7 is a longitudinal sectional view conceptually showing an elevator installation operation according to a third embodiment of the present invention.
FIG. 8 is a perspective view of the endless winch portion of FIG. 7;
FIG. 9 is an enlarged front view of the tow rope holding body portion in FIG. 7;
10 is a plan view of FIG. 9. FIG.
FIG. 11 is an elevation view conceptually showing a suspended state of the tow rope in FIG. 7;
12 is an electric circuit diagram provided corresponding to the tow rope holder of FIG. 9;
FIG. 13 is a longitudinal sectional view conceptually showing an elevator installation operation according to a fourth embodiment of the present invention.
14 is a perspective view of the endless winch portion of FIG. 13. FIG.
FIG. 15 is an elevation view conceptually showing a suspended state of the tow rope in FIG. 13;
FIG. 16 is a longitudinal sectional view conceptually showing an elevator installation operation according to the fifth embodiment of the present invention.
17 is a perspective view of the endless winch portion of FIG. 16. FIG.
18 is an enlarged front view of the tow rope holding body portion in FIG. 16;
FIG. 19 is a plan view of FIG.
FIG. 20 is an elevation view conceptually showing a suspended state of the tow rope in FIG. 16;
FIG. 21 is a longitudinal sectional view conceptually showing an elevator installation operation according to a sixth embodiment of the present invention.
FIG. 22 is a longitudinal sectional view conceptually showing an elevator installation work, showing a conventional elevator installation lifting device.
FIG. 23 is a perspective view of the endless winch portion of FIG. 22;
24 is a view showing another installation work situation of the elevator shown in FIG. 22, and is equivalent to FIG.
FIG. 25 is a view showing another installation work situation of the elevator shown in FIG. 22, and is equivalent to FIG.
FIG. 26 is a longitudinal sectional view conceptually showing an elevator installation work, showing another conventional elevator installation lifting device.
FIG. 27 is a view showing another installation work situation of the elevator shown in FIG. 26, and is a view corresponding to FIG.
28 is a perspective view of the endless winch portion of FIG. 27. FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Hoistway, 6 Endless winch, 8 Work floor, 9 Towing rope, 11 Towing rope holder, 15 Towing rope, 18 Guide rail for counterweight, 20 Tension balance mechanism, 24 Recess, 25 Main rope, 30 Right overload Displacement detector 31 Left side over displacement detector 32 Right side indicator light 33 Left side indicator light 35 Tension imbalance detection circuit 36 Towing line 38 Towing line

Claims (7)

エレベーターの昇降路の上端側に仮設されたエンドレスウィンチと、上記昇降路に立設された上記エレベーターのつり合おもり用案内レールと、上記エンドレスウィンチの牽引索の負荷側に吊持されて、上記つり合おもり用案内レールから水平投影面において離れた経路を昇降する作業床と、上記エンドレスウィンチの牽引索の反負荷側が連結されて上記つり合おもり用案内レールに昇降自在に係合された牽引索保持体とを備えたエレベーターの据付作業用昇降装置。The endless winch temporarily installed on the upper end side of the elevator hoistway, the balance weight guide rail for the elevator standing on the hoistway, and suspended on the load side of the towline of the endless winch, A tow that is connected to the counterweight guide rail for lift and is connected to a work floor that moves up and down a path away from the counterweight guide rail on the horizontal projection plane and the antiload side of the endless winch tow rope. A lifting device for elevator installation comprising a rope holder. 牽引索保持体を、水平投影面において側面から引退して形成された凹所を有するものとし、水平投影面において上記凹所に配置されたエレベーターの本設用の主索を備えたことを特徴とする請求項1記載のエレベーターの据付作業用昇降装置。The tow rope holding body has a recess formed by retreating from the side surface on the horizontal projection plane, and is provided with a main rope for an elevator installed in the recess on the horizontal projection plane. A lifting device for elevator installation according to claim 1. 牽引索を、1:1ローピングよりも大きい綱掛け比の綱掛け構成によって作業床及び牽引索保持体を吊持したものとしたことを特徴とする請求項1記載のエレベーターの据付作業用昇降装置。2. A lifting device for elevator installation according to claim 1, wherein the tow rope is a work floor and a tow rope holding body suspended by a leash structure having a larger leash ratio than 1: 1 roping. . 牽引索を、作業床を吊持した綱掛け構成の綱掛け比よりも、大きい綱掛け比の綱掛け構成によって牽引索保持体を吊持したものとしたことを特徴とする請求項1記載のエレベーターの据付作業用昇降装置。2. The tow rope holding body is suspended by a leash structure having a larger leash ratio than that of a leash structure in which a work floor is hung. Elevator for elevator installation work. 牽引索保持体に設けられて互いに水平方向に離れて吊設された牽引索の端部がそれぞれ連結されて、上記牽引索の張力差を均衡する張力均衡機構を備えたことを特徴とする請求項1記載のエレベーターの据付作業用昇降装置。A tension balance mechanism is provided, wherein end portions of the tow ropes provided on the tow rope holding body and hung apart from each other in the horizontal direction are connected to each other, and a tension balance mechanism for balancing the tension difference between the tow ropes is provided. Item 2. A lifting device for elevator installation according to Item 1. 牽引索保持体に設けられて張力均衡機構が所定位置を超えて変位することによって動作する過変位検出器を備えたことを特徴とする請求項5記載のエレベーターの据付作業用昇降装置。6. The elevator lifting / lowering apparatus according to claim 5, further comprising an over-displacement detector provided on the tow rope holding body and operating when the tension balance mechanism is displaced beyond a predetermined position. 過変位検出器に対応してそれぞれ設けられた表示灯と、上記過変位検出器の動作を介して、動作した上記過変位検出器に対応した上記表示灯を付勢する張力不均衡検出回路とを備えたことを特徴とする請求項6記載のエレベーターの据付作業用昇降装置。An indicator lamp provided for each of the over-displacement detectors, and a tension imbalance detection circuit for energizing the indicator lamps corresponding to the operated over-displacement detectors through the operation of the over-displacement detectors. The elevator elevating device for elevator installation according to claim 6.
JP2000217127A 2000-07-18 2000-07-18 Elevator for elevator installation work Expired - Fee Related JP4562252B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000217127A JP4562252B2 (en) 2000-07-18 2000-07-18 Elevator for elevator installation work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000217127A JP4562252B2 (en) 2000-07-18 2000-07-18 Elevator for elevator installation work

Publications (2)

Publication Number Publication Date
JP2002037568A JP2002037568A (en) 2002-02-06
JP4562252B2 true JP4562252B2 (en) 2010-10-13

Family

ID=18712282

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000217127A Expired - Fee Related JP4562252B2 (en) 2000-07-18 2000-07-18 Elevator for elevator installation work

Country Status (1)

Country Link
JP (1) JP4562252B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL3645443T3 (en) * 2017-06-26 2021-08-02 Inventio Ag Elevator system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59133188A (en) * 1983-01-20 1984-07-31 株式会社東芝 Elevator
JPS6175782A (en) * 1984-09-17 1986-04-18 三菱電機株式会社 Temporarily installed operating device for elevator
JPH0570055A (en) * 1991-09-13 1993-03-23 Mitsubishi Electric Corp Installing lift base for elevator
JPH09272671A (en) * 1996-04-03 1997-10-21 Mitsubishi Electric Corp Elevator installation device and installation engineering method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59133188A (en) * 1983-01-20 1984-07-31 株式会社東芝 Elevator
JPS6175782A (en) * 1984-09-17 1986-04-18 三菱電機株式会社 Temporarily installed operating device for elevator
JPH0570055A (en) * 1991-09-13 1993-03-23 Mitsubishi Electric Corp Installing lift base for elevator
JPH09272671A (en) * 1996-04-03 1997-10-21 Mitsubishi Electric Corp Elevator installation device and installation engineering method

Also Published As

Publication number Publication date
JP2002037568A (en) 2002-02-06

Similar Documents

Publication Publication Date Title
JP4191331B2 (en) Elevator equipment
JP2000255933A5 (en)
JP2002080178A (en) Elevator device
JP5961416B2 (en) Crane double pulley mechanism
JP4934941B2 (en) Elevator equipment
JP2011006218A (en) Elevator passenger rescue apparatus
JP4849431B2 (en) Machine room-less elevator
JP3281168B2 (en) Lifting equipment for elevator cars
JP4562252B2 (en) Elevator for elevator installation work
JP4091326B2 (en) Elevator equipment
JPH0318598A (en) Stacker crane
KR20140003918A (en) Central limit device
JP2707942B2 (en) Elevator rope tension balancer
JP3353032B2 (en) elevator
JP2000169055A5 (en)
JP4189891B2 (en) Counterweight proximity alarm device for construction elevator
JP3528840B2 (en) Machine room-less elevator equipment
JP2002068641A (en) Elevator apparatus
JP4493759B2 (en) Elevator equipment
JPH07137991A (en) Wire rope hoisting device
JP2004026396A (en) Balance weight hoisting device for elevator system
JP4115823B2 (en) Elevator equipment
JP2000169055A (en) Passenger rescue method of elevator
WO2005077804A1 (en) Elevator
JPH0849442A (en) Safety device for use in multistory parking device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070627

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091014

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100727

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100727

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130806

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees