JP4058194B2 - Unit type building and its construction method - Google Patents

Unit type building and its construction method Download PDF

Info

Publication number
JP4058194B2
JP4058194B2 JP15193499A JP15193499A JP4058194B2 JP 4058194 B2 JP4058194 B2 JP 4058194B2 JP 15193499 A JP15193499 A JP 15193499A JP 15193499 A JP15193499 A JP 15193499A JP 4058194 B2 JP4058194 B2 JP 4058194B2
Authority
JP
Japan
Prior art keywords
floor
building
unit
building unit
upper floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP15193499A
Other languages
Japanese (ja)
Other versions
JP2000336764A (en
Inventor
勝幸 千原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP15193499A priority Critical patent/JP4058194B2/en
Publication of JP2000336764A publication Critical patent/JP2000336764A/en
Application granted granted Critical
Publication of JP4058194B2 publication Critical patent/JP4058194B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、居室を形成する複数の建物ユニットと、下階および上階に各二個並設され、吹き抜け空間を形成する吹抜用建物ユニットとを有するユニット式建物およびその施工方法に関するものである。
【0002】
【背景技術】
従来より、工場で生産される複数の建物ユニットを建築現場で上下に組み合わせることにより建てられるユニット式建物において、各建物ユニットは、四隅に立設される柱と、これらの柱の上端間、下端間を相互に連結する複数の梁を含む骨組みを有している。
このようなユニット式建物としては、その内部に、天井面が開口された下階建物ユニットと、床面が開口された上階建物ユニットとを上下左右に4つ配置することで大きな吹き抜け空間を形成したものがある(特開平8−218491号公報)。
この際、吹き抜け空間を横切る下階建物ユニットの天井梁および上階建物ユニットの床梁を省略できれば、見通しがよく、開放感のある大きな吹き抜け空間とすることができる。
【0003】
【発明が解決しようとする課題】
しかしながら、平面視で凸部を有する凸形状に形成されたユニット式建物において、大きな吹き抜け空間を形成する4つの建物ユニットの一部が、前述の凸部を構成している場合、当該凸部において、水平外力に対する耐力壁要素が一枚となる部分が発生し、ユニット式建物の剛性が不足するおそれがあるので、前述のように、吹き抜け空間を横切る下階建物ユニットの天井梁および上階建物ユニットの床梁を省略することは設計上困難であるという問題がある。
【0004】
本発明の目的は、一部の梁を省略しても、剛性を確保することが可能なユニット式建物およびその施工方法を提供することにある。
【0005】
【課題を解決するための手段】
本発明の第1発明は、図面を参照して説明すると、居室を形成する複数の建物ユニット10A、20Aと、下階と上階とに各二個並設され、吹き抜け空間3Bを形成する吹抜用建物ユニット10B、10C、20B、20Cとを有するユニット式建物1であって、建物ユニット10A、20Aおよび吹抜用建物ユニット10B、10C、20B、20Cは、四隅に立設される柱と、これら柱の上端間および下端間を相互に連結する梁とを含んで箱状に形成され、上階吹抜用建物ユニット20B、20Cの柱51B、61A同士を連結する上階連結具71と、下階吹抜用建物ユニット10B、10Cの柱31B、41A同士を連結する下階連結具72と、上階吹抜用建物ユニット20Bおよびこの上階吹抜用建物ユニット20Bに隣接する上階建物ユニット20Aを連結する上階連結部材(例えば、上階連結板73)と、下階吹抜用建物ユニット10Bおよびこの下階吹抜用建物ユニット10Bに隣接する下階建物ユニット10Aを連結する下階連結部材(例えば、下階連結板74)とを備えていることを特徴とする。
このような本発明によれば、吹き抜け空間を構成する吹抜用建物ユニットが、居室を形成する通常の建物ユニットに強固に接合されているので、吹抜用建物ユニットの一部の梁を省略しても、剛性を確保することが可能となる。
【0006】
以上において、前述の建物ユニット10A、20Aおよび吹抜用建物ユニット10B、10C、20B、20Cからなる建物本体3は、平面視で凸部3Aを有する平面凸形状に構成されていることが好ましい。
このように、建物本体に凸部があり、この凸部に吹抜空間が形成され、水平外力に対する耐力壁要素が一枚となる部分が発生しても、吹き抜け空間となる凸部も他の隣接する通常の建物ユニットに強固に接合されている。これにより、平面凸形状のユニット式建物において、吹抜用建物ユニットの一部の梁を省略しても、剛性を確保することが可能となる。
【0007】
また、上階連結具71および下階連結具72は、柱51B、61A、31B、41Aの外側面に設けられ、端面が開口された筒状部材から構成されていることが望ましい。
このようにすれば、筒状部材の開口部分から手を入れて、連結具を柱に接合する際の締め付け作業等を簡単に行うことができ、これにより、建物ユニットの連結作業が容易となる。
【0008】
さらに、筒状部材は、開口された端面が垂直に配置されていることが好ましい。
このようにすれば、連結部分の、水平方向の力に対する剛性を高くすることが可能となり、ひいては、ユニット式建物の剛性を一層高くすることが容易に可能となる。
【0009】
本発明の第2発明は、図面を参照して説明すると、居室を形成する複数の建物ユニット10A、20Aと、下階と上階とに各二個並設され、吹き抜け空間3Bを形成する吹抜用建物ユニット10B、10C、20B、20Cとを有するユニット式建物1の施工方法であって、前記建物ユニット10A、20Aは、四隅に立設される柱と、これら柱の上端間および下端間を相互に連結する梁とを含んで箱状に構成され、前記吹抜用建物ユニット10B、10C、20B、20Cは、前記建物ユニットを構成する梁の少なくとも一部が欠損して構成され、この欠損部分には、前記柱と着脱可能な仮梁100が設けられ、吹抜用建物ユニット10B、10C、20B、20Cを下階と上階とに各二個並設する工程と、吹抜用建物ユニット10B、10C、20B、20Cの仮梁を取り外す工程と、上階吹抜用建物ユニット20B、20Cの柱51B、61A同士を上階連結具71で連結する工程と、下階吹抜用建物ユニット10B、10Cの柱31B、41A同士を下階連結具72で連結する工程と、上階吹抜用建物ユニット20Bおよびこの上階吹抜用建物ユニット20Bに隣接する上階建物ユニット20Aを上階連結部材(例えば、上階連結板73)で連結する工程と、下階吹抜用建物ユニット10Bおよびこの下階吹抜用建物ユニット10Bに隣接する下階建物ユニット10Aを下階連結部材(例えば、下階連結板74)で連結する工程とを備えていることを特徴とする。
このような本発明では、吹き抜け空間を構成する吹抜用建物ユニットが、居室を形成する通常の建物ユニットに強固に接合されているので、吹抜用建物ユニットの一部の梁を省略しても、剛性を確保することが可能となる。その上、凸部を有するユニット式建物において、当該凸部に、梁のない大きな吹き抜け空間を支障なく形成することが可能となる。
【0010】
以上において、前述の施工方法は、まず、吹抜用建物ユニット10B、10C、20B、20Cを下階と上階とに各二個並設する工程を行い、次に、上階吹抜用建物ユニット20B、20Cの柱51B、61A同士を上階連結具71で連結する工程および下階吹抜用建物ユニット10B、10Cの柱31B、41A同士を下階連結具72で連結する工程を行い、さらに、上階吹抜用建物ユニット20Bおよびこの上階吹抜用建物ユニット20Bに隣接する上階建物ユニット20Aを上階連結部材で連結する工程および下階吹抜用建物ユニット10Bおよびこの下階吹抜用建物ユニット10Bに隣接する下階建物ユニット10Aを下階連結部材で連結する工程を行い、最後に、吹抜用建物ユニット10B、10C、20B、20Cの仮梁を取り外す工程を行うのが好ましい。
このようにすれば、吹抜用建物ユニットを建築現場に運ぶ際に、吹き抜け空間となる部分に設けられる仮梁を当該建築現場で取り外す工程を最後にしているので、施工中に吹抜用建物ユニットに水平力等が作用しても、仮梁で対向することが可能となり、ユニット式建物を確実に施工することが可能となる。
【0011】
【発明の実施の形態】
以下に本発明の実施の形態を図面に基づいて説明する。
図1には、本発明の一実施形態に係るユニット式建物1が示されている。
このユニット式建物1は、基礎2上に設置された建物本体3と、この建物本体3の上部に設けられた図示しない屋根とを含んで構成されている。
【0012】
建物本体3は、下階側に並設された複数の下階建物ユニットである一階建物ユニット10と、これら一階建物ユニット10の上部に並設された複数の上階建物ユニットである二階建物ユニット20とを含み、平面視で凸部3Aを有する平面凸形状に構成されている。
図中一点鎖線で示されるように、前述の一、二階建物ユニット10、20のうち、建物本体3の凸部3Aに設けられ、下階と上階とに各二個並設された一、二階建物ユニット10B、10C、20B、20Cの内部は、一つの大きな吹き抜け空間3Bになっている。つまり、一、二階建物ユニット10B、10C、20B、20Cは、吹き抜け空間3Bを形成する吹抜用建物ユニットである。
【0013】
建物ユニット10、20のうち、吹抜空間3Bを構成しない一、二階建物ユニット10A、20Aは、図2に示されるように、四隅に立設する柱11Aと、これらの柱11Aの上端および下端間に架け渡された天井梁11Bおよび床梁11Cとで直方体状に形成された骨組み11を有する。床梁11C間には、図示しない床面材を支持する床根太12が架け渡され、天井梁11B間には、図示しない天井面材を支持する天井小梁13が架け渡されている。
【0014】
内部が吹き抜け空間3Bとなっている一、二階建物ユニット10B、10C、20B、20Cは、図3に示されるような骨組み30、40、50、60を有する。
詳しくは、各骨組み30、40、50、60は、各々四隅に立設された中空の角材からなる四本の柱31A〜31D、41A〜41D、51A〜51D、61A〜61Dと、これらの下端間に架け渡されたチャンネル材からなる床梁32A〜32D、42A〜42D、52A〜52C、62A〜62Cと、上端間に架け渡されたチャンネル材からなる天井梁33A〜33C、43A〜43C、53A〜53D、63A〜63Dとを含んで箱状に構成されている。
【0015】
ここで、一階建物ユニット10B、10Cを構成する骨組み30、40において、各々柱31B、31Cの上端間および柱41A、41Dの上端間には、天井梁が架け渡されていない。また、二階建物ユニット20B、20Cを構成する骨組み50、60において、各々柱51B、51Cの下端間および柱61A、61Dの下端間には、床梁が架け渡されていない。
【0016】
このような一、二階建物ユニット10B、10C、20B、20Cにおいて、天井梁および床梁が架け渡されていない柱31B、41A、51B、61Aと、これらに対向配置された柱31C、41D、51C、61Dとの間には、これらの柱と着脱可能な仮梁100が架け渡される。
これら仮梁100は、工場で一、二階建物ユニット10B、10C、20B、20Cが生産される際に装着され、建築現場で連結された後に取り外されるものである。つまり、この仮梁100が装着されることにより、天井梁あるいは床梁のない一、二階建物ユニット10B、10C、20B、20Cの輸送中における強度や、建築現場で作業中に加わる外力に対しての強度が確保されるようになっている。
【0017】
図4および図5には、図1の円 IIIで囲まれた部分における、吹き抜け空間3Bを形成する一、二階建物ユニット10B、10C、20B、20Cと、それらに隣接する一、二階建物ユニット10A、20Aとの連結構造が示されている。一階建物ユニット10B、10Cの天井梁が架け渡されていない柱31B、41Aの上端同士は、下階連結具72で相互に連結されている。同様に、二階建物ユニット20B、20Cの床梁が架け渡されていない柱51B、61Aの下端同士は、上階連結具71で相互に連結されている。
【0018】
また、一階建物ユニット10Bの天井梁が架け渡されていない柱31Bと、この一階建物ユニット10Bに隣接する一階建物ユニット10Aの柱11Aとは、2枚の下階連結部材である板状の下階連結板74で相互に連結されている。同様に、二階建物ユニット20Bの床梁が架け渡されていない柱51Bと、この二階建物ユニット20Bに隣接する二階建物ユニット20Aの柱11Aとは、2枚の上階連結部材である板状の上階連結板73で相互に連結されている。
【0019】
詳しくは、上階連結具71および下階連結具72は、図6に示されるように、各柱31B、41A、51B、61Aの外側面に設けられ、端面が開口された筒状部材から構成されている。これらは、開口された端面が垂直に配置されている。
各連結具71、72の各柱31B、41A、51B、61Aに当接する面には、ボルト101を挿通するための4つのボルト挿通孔71A、72Aが形成されている。この各連結具71、72が当接する柱31B、41A、51B、61Aにも、ボルト挿通孔71A、72Aの孔位置に応じてそれぞれ4つのボルト孔80が形成され、内部にこれらのボルト孔80に対応する図示略の裏ナットが固設されている。これにより、各連結具71、72と各柱31B、41A、51B、61Aとは、ボルト101、ナットで相互に連結され、ひいては一階建物ユニット10B、10C同士および二階建物ユニット20B、20C同士がそれぞれ相互に連結されるようになっている。
【0020】
また、上階連結板73および下階連結板74は、図7に示されるように、二階建物ユニット20Bの床梁が架け渡されていない柱51Bおよびこの二階建物ユニット20Bに隣接する二階建物ユニット20Aの柱11A、一階建物ユニット10Bの天井梁が架け渡されていない柱31Bおよびこの一階建物ユニット10Bに隣接する一階建物ユニット10Aの柱11Aにそれぞれ架け渡す程度の長さ寸法を有する長方形状に形成され、これらは、前述の柱11A、51B、11A、31B同士を挟み込むように配置されている。
【0021】
各連結板73、74の柱11A、51B、11A、31Bに当接する部分には、ボルト101を挿通するための複数のボルト挿通孔73A、74Aが形成されている。この各連結板73、74が当接する柱11A、51B、11A、31Bにも、ボルト挿通孔73A、74Aの孔位置に応じてそれぞれ複数のボルト孔80が形成され、内部にこれらのボルト孔80に対応する図示略の裏ナットが固設されている。これにより、各連結板73、74と柱11A、51B、11A、31Bとはボルト101、ナットで相互に連結され、ひいては一階建物ユニット10A、10B同士および二階建物ユニット20A、20B同士がそれぞれ相互に連結されるようになっている。
【0022】
このように、一、二階建物ユニット10A、10B、10C、20A、20B、20Cが連結具71、72および連結板73、74で連結されることにより、仮梁100が取り外されても吹き抜け空間3B周辺の強度が確保されるようになっている。
なお、図1の円 IIIで囲まれた部分と反対側の部分も、前述の吹き抜け空間3Bを形成する一、二階建物ユニット10B、10C、20B、20Cと、それらに隣接する一、二階建物ユニット10A、20Aとの連結構造と同様の構造となっている。
【0023】
次に、このようなユニット式建物1の建築手順を説明する。
まず、工場において、外壁パネルや内壁パネル等が取り付けられた複数の一、二階建物ユニット10、20を製造する。この際、一階建物ユニット10B、10Cにおいて、柱31B、31Cの上端間、柱41A、41Dの上端間に各々仮梁100を装着しておく。同様に、二階建物ユニット20B、20Cにおいて、柱51B、51Cの下端間、柱61A、61Dの下端間に各々仮梁100を装着しておく。
【0024】
次いで、建築現場において、各一、二階建物ユニット10、20を基礎2上に上下に組み合わせて建物本体3を建築する。
この際、一、二階建物ユニット10B、10C、20B、20Cの組み合わせ作業を行うに当たっては、一階建物ユニット10B、10Cを並設した後、互いに隣接する柱31B、41A、31C、41D同士を下階連結具72で相互に連結するとともに、互いに隣接する柱11A、31B、11A、31C同士を下階連結板74で相互に連結する。尚、下階連結具72と柱31B、41A、31C、41Dとの連結に際しては、筒状の下階連結具72の開口端面から手を入れてボルト締めをすることにより行う。
【0025】
そして、一階建物ユニット10B、10Cの上部に二階建物ユニット20B、20Cを組み合わせ、一階部分と同様に、互いに隣接する柱51B、61A、51C、61D同士を上階連結具71で相互に連結するとともに、互いに隣接する柱11A、51B、11A、51C同士を上階連結板73で相互に連結する。
その後、一、二階建物ユニット10B、10C、20B、20Cからそれぞれ仮梁100を取り外す。最後に図示しない屋根を設け、吹き抜け空間3Bを有するユニット式建物1を完成させる。
【0026】
このような本実施形態によれば、次のような効果が得られる。
すなわち、下階連結具72、上階連結具71、下階連結板74、上階連結板73を用いて、吹き抜け空間3Bを構成する一、二階建物ユニット10B、10C、20B、20Cを、居室を形成する一、二階建物ユニット10A、20Aに強固に接合したので、一、二階建物ユニット10B、10C、20B、20Cの一部の梁を省略しても、剛性を確保することができる。
【0027】
また、吹き抜け空間3Bを凸部3Aに形成し、当該凸部3Aにおいて、水平外力に対する耐力壁要素が一枚となる部分が発生しても、吹き抜け空間3Bとなる凸部3Aも他の隣接する一、二階建物ユニット10A、20Aに強固に接合されている。これにより、平面凸形状のユニット式建物1において、一、二階建物ユニット10B、10C、20B、20Cの一部の梁を省略しても、剛性を確保することができる。
【0028】
さらに、上階連結具71および下階連結具72を、端面が開口した筒状部材で構成したので、その開口部分から手を入れて、各連結具71、72を柱31B、41A、51B、61Aに接合する際の締め付け作業等を簡単に行うことができ、これにより、一階建物ユニット10B、10C同士および二階建物ユニット20B、20C同士の連結作業を容易に行うことができる。
【0029】
また、筒状部材で構成した各連結具71、72を、開口した端面を垂直に配置したので、連結部分の、水平方向の力に対する剛性を高くすることができ、ひいては、ユニット式建物1の剛性を一層高くすることが容易にできる。
【0030】
さらに、ユニット式建物1を建築する際に、仮梁100を建築現場で取り外す工程を、一、二階建物ユニット10B、10C、20B、20Cを設置、連結した後に行っているので、施工中に一、二階建物ユニット10B、10C、20B、20Cに水平力等が作用しても、仮梁100で対向することができ、ユニット式建物1を確実に施工することができる。
【0031】
なお、本発明は前記実施の形態に限定されるものではなく、本発明の目的を達成できる他の構成等を含み、以下に示すような変形等も本発明に含まれる。
例えば、ユニット式建物の施工手順としては、仮梁を建築現場で取り外す工程を、一、二階建物ユニットを設置、連結した後に行うに限らず、例えば、連結具だけ取り付けた後に取り外してもよく、仮梁の取り外し時期は、ユニット式建物の建築手順に応じて適宜決めればよい。
【0032】
また、連結具としては、筒状部材に限らず、例えば、断面C字形状のチャンネル材でもよいし、フランジとウェブとを備えた断面H字形状のものでもよい。
【0033】
さらに、吹き抜け空間としては、平面凸形状の建物本体の凸部に形成するに限らず、建物本体の形状に応じて、任意の位置に形成してもよい。
【0034】
また、前記実施形態では、柱同士を連結板で連結していたが、これに限らず、各梁同士を連結板で連結してもよく、要するに、各建物ユニット同士を所定の力で相互に連結できればよい。
【0035】
【発明の効果】
以上に述べたように、本発明のユニット式建物およびその施工方法によれば、次のような効果がある。
すなわち、請求項1に記載のユニット式建物によれば、吹き抜け空間を構成する吹抜用建物ユニットが、居室を形成する通常の建物ユニットに強固に接合されているので、吹抜用建物ユニットの一部の梁を省略しても、剛性を確保することができる。
【0036】
また、請求項2に記載のユニット式建物によれば、吹き抜け空間を凸部に形成し、当該凸部において、水平外力に対する耐力壁要素が一枚となる部分が発生しても、吹き抜け空間となる凸部も他の隣接する通常の建物ユニットに強固に接合されている。これにより、平面凸形状のユニット式建物において、吹抜用建物ユニットの一部の梁を省略しても、剛性を確保することができる。
【0037】
さらに、請求項3に記載のユニット式建物によれば、筒状部材の開口部分から手を入れて、連結具を柱に接合する際の締め付け作業等を簡単に行うことができ、これにより、建物ユニットの連結作業を容易にできる。
【0038】
また、請求項4に記載のユニット式建物によれば、連結部分の、水平方向の力に対する剛性を高くすることができ、ひいては、ユニット式建物の剛性を一層高くすることが容易にできる。
【0039】
さらに、請求項5に記載のユニット式建物の施工方法によれば、吹き抜け空間を構成する吹抜用建物ユニットが、居室を形成する通常の建物ユニットに強固に接合されているので、吹抜用建物ユニットの一部の梁を省略しても、剛性を確保することができる。その上、凸部を有するユニット式建物において、当該凸部に、梁のない大きな吹き抜け空間を支障なく形成することができる。
【0040】
また、請求項6に記載のユニット式建物の施工方法によれば、吹抜用建物ユニットを建築現場に運ぶ際に、吹き抜け空間となる部分に設けられる仮梁を当該建築現場で取り外す工程を最後にしているので、施工中に吹抜用建物ユニットに水平力等が作用しても、仮梁で対向することができ、ユニット式建物を確実に施工することができる。
【図面の簡単な説明】
【図1】本発明の一実施形態におけるユニット式建物を示す斜視図である。
【図2】前記実施形態における一、二階建物ユニットの骨組みを示す斜視図である。
【図3】前記実施形態における吹き抜け空間を形成する一、二階建物ユニットの骨組みを示す斜視図である。
【図4】図1の円IIIで囲まれた部分の連結構造を示す拡大斜視図である。
【図5】図1の円IIIで囲まれた部分の連結構造を示す平断面図である。
【図6】前記実施形態における上階連結具および下階連結具の連結構造を示す分解斜視図である。
【図7】前記実施形態における上階連結板および下階連結板の連結構造を示す分解斜視図である。
【符号の説明】
1 ユニット式建物
3 建物本体
3A 凸部
3B 吹き抜け空間
10、10A〜10C 一階建物ユニット
20、20A〜20C 二階建物ユニット
31B、41A、51B、61A 柱
71 上階連結具
72 下階連結具
73 上階連結部材である上階連結板
74 下階連結部材である下階連結板
100 仮梁
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a unit-type building having a plurality of building units forming a living room, and two building units arranged side by side on a lower floor and an upper floor to form an atrium space, and a construction method thereof. .
[0002]
[Background]
Conventionally, in a unit building built by combining multiple building units produced at a factory up and down at the construction site, each building unit has columns that are erected at the four corners, and between the upper ends of these columns and the lower ends. It has a framework including a plurality of beams that interconnect each other.
Such a unit-type building has a large atrium space by arranging four lower-floor building units with an open ceiling and four upper-floor building units with an open floor. Some are formed (JP-A-8-218491).
At this time, if the ceiling beam of the lower-floor building unit and the floor beam of the upper-floor building unit crossing the atrium space can be omitted, a large atrium space with good visibility and a feeling of opening can be obtained.
[0003]
[Problems to be solved by the invention]
However, in a unit type building formed in a convex shape having a convex part in plan view, when a part of the four building units forming a large atrium space constitutes the above convex part, As mentioned above, there is a possibility that a part with one load-bearing wall element against horizontal external force may occur, and the rigidity of the unit type building may be insufficient. As described above, the ceiling beam and upper floor building of the lower floor building unit that crosses the atrium space There is a problem that omission of the floor beam of the unit is difficult in design.
[0004]
An object of the present invention is to provide a unit type building that can ensure rigidity even if some of the beams are omitted, and a construction method therefor.
[0005]
[Means for Solving the Problems]
The first invention of the present invention will be described with reference to the drawings. A plurality of building units 10A, 20A forming a living room, and two each of a lower floor and an upper floor are provided side by side to form an atrium space 3B. Unit building 1 having building units 10B, 10C, 20B, and 20C for building, the building units 10A and 20A, and the building units 10B, 10C, 20B, and 20C for blowing-out, An upper floor connecting member 71 that is formed in a box shape including beams connecting the upper end and the lower end of the columns, and connects the columns 51B, 61A of the upper floor building units 20B, 20C; Lower floor connecting tool 72 that connects pillars 31B and 41A of the building units 10B and 10C for the atrium, the upper floor building unit 20B, and the upper floor adjacent to the upper floor building unit 20B Upper floor connecting member (for example, upper floor connecting plate 73) that connects object unit 20A, lower floor building unit 10B, and lower floor building unit 10A adjacent to this lower floor building unit 10B And a connecting member (for example, a lower floor connecting plate 74).
According to the present invention, the building unit for the blowout that constitutes the atrium space is firmly joined to the normal building unit that forms the living room, so that some beams of the building unit for the blowout are omitted. Also, it becomes possible to ensure rigidity.
[0006]
In the above, it is preferable that the building main body 3 including the building units 10A and 20A and the building units 10B, 10C, 20B, and 20C described above is configured in a planar convex shape having the convex portion 3A in plan view.
In this way, the building main body has a convex portion, and a hollow space is formed in the convex portion, and even if a portion where the load-bearing wall element with respect to the horizontal external force becomes one piece is generated, the convex portion that becomes the atrium space is also adjacent to the other. It is firmly joined to a normal building unit. As a result, in a planar convex unit type building, it is possible to ensure rigidity even if some of the beams of the blowout building unit are omitted.
[0007]
Moreover, it is desirable that the upper floor coupling tool 71 and the lower floor coupling tool 72 are formed of cylindrical members that are provided on the outer surfaces of the pillars 51B, 61A, 31B, and 41A and whose end surfaces are opened.
If it does in this way, it can put in a hand from the opening part of a cylindrical member, and can perform easily the fastening operation | work etc. at the time of joining a connection tool to a pillar, Thereby, the connection operation | work of a building unit becomes easy. .
[0008]
Furthermore, it is preferable that the open end surface of the cylindrical member is arranged vertically.
If it does in this way, it will become possible to make the rigidity with respect to the force of a horizontal direction of a connection part high, and also it becomes possible to make the rigidity of a unit type building still higher easily.
[0009]
When the second invention of the present invention is described with reference to the drawings, a plurality of building units 10A and 20A forming a living room, and two each of the two lower floors and the upper floor are formed side by side to form an atrium space 3B. It is a construction method of the unit type building 1 which has the building units 10B, 10C, 20B, and 20C for the building, and the building units 10A and 20A are provided between the pillars erected at the four corners and between the upper ends and the lower ends of these pillars. The building units 10B, 10C, 20B, and 20C for the blow-out are configured by lacking at least part of the beams that constitute the building unit. Is provided with a temporary beam 100 that can be attached to and detached from the pillar, and a step of arranging two building units 10B, 10C, 20B, and 20C for the atrium on the lower floor and the upper floor, and a building unit 10B for the atrium. 1 Removing the temporary beams of C, 20B, and 20C, connecting the columns 51B and 61A of the upper-floor building units 20B and 20C with the upper-floor connector 71, and the lower-floor building units 10B and 10C. The steps of connecting the pillars 31B and 41A with the lower floor connecting member 72, the upper floor building unit 20B, and the upper floor building unit 20A adjacent to the upper floor building unit 20B are connected to the upper floor connecting member (for example, The step of connecting with the floor connecting plate 73), the lower floor building unit 10B and the lower floor building unit 10A adjacent to the lower floor building unit 10B with the lower floor connecting member (for example, the lower floor connecting plate 74). And a connecting step.
In the present invention, since the building unit for the blowout that constitutes the atrium space is firmly joined to the normal building unit that forms the living room, even if some beams of the building unit for the blowout are omitted, It is possible to ensure rigidity. In addition, in a unit type building having a convex portion, it is possible to form a large space without a beam in the convex portion without any trouble.
[0010]
In the above, the construction method described above first performs the step of arranging two building units 10B, 10C, 20B, and 20C for the atrium on the lower floor and the upper floor, and then the building unit for the upper floor atrium 20B. The steps of connecting the pillars 51B and 61A of the 20C with the upper floor connecting tool 71 and the steps of connecting the pillars 31B and 41A of the building units 10B and 10C for the lower floor with the lower floor connecting tool 72 are performed. The step of connecting the upper floor building unit 20B and the upper floor building unit 20A adjacent to the upper floor building unit 20B with the upper floor connecting member and the lower floor building unit 10B and the lower floor building unit 10B The process of connecting the adjacent lower floor building unit 10A with the lower floor connecting member is performed, and finally the temporary beams of the building units 10B, 10C, 20B, and 20C for the blowout are taken. It is preferably carried out to process.
By doing this, when carrying the building unit for the blowout to the construction site, the last step is to remove the temporary beam provided in the part that becomes the atrium space at the building site. Even if a horizontal force or the like is applied, it is possible to face each other with a temporary beam, and it is possible to reliably construct a unit type building.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 shows a unit building 1 according to an embodiment of the present invention.
The unit building 1 includes a building body 3 installed on a foundation 2 and a roof (not shown) provided on the upper portion of the building body 3.
[0012]
The building body 3 includes a first-floor building unit 10 that is a plurality of lower-floor building units arranged side by side on the lower floor side, and a second floor that is a plurality of upper-floor building units juxtaposed on top of these first-floor building units 10. It includes a building unit 20 and is configured in a planar convex shape having a convex portion 3A in plan view.
As shown by the one-dot chain line in the figure, out of the first and second floor building units 10 and 20, the one provided in the convex portion 3A of the building body 3 and two in parallel on the lower floor and the upper floor, The interior of the second-floor building units 10B, 10C, 20B, and 20C is one large atrium space 3B. That is, the 1st and 2nd floor building units 10B, 10C, 20B, and 20C are the building units for the atrium forming the atrium space 3B.
[0013]
Of the building units 10 and 20, the first and second floor building units 10A and 20A that do not constitute the ventilated space 3B are, as shown in FIG. 2, the pillars 11A standing at the four corners and between the upper and lower ends of these pillars 11A. The frame 11 is formed in a rectangular parallelepiped shape with the ceiling beam 11B and the floor beam 11C spanned between the two. A floor joist 12 that supports a floor material (not shown) is bridged between the floor beams 11C, and a ceiling beam 13 that supports a ceiling surface material (not shown) is bridged between the ceiling beams 11B.
[0014]
The first and second-floor building units 10B, 10C, 20B, and 20C, which have a hollow space 3B inside, have a skeleton 30, 40, 50, and 60 as shown in FIG.
Specifically, each of the frames 30, 40, 50, 60 includes four pillars 31A to 31D, 41A to 41D, 51A to 51D, and 61A to 61D made of hollow square members standing at four corners, and lower ends thereof. Floor beams 32A-32D, 42A-42D, 52A-52C, 62A-62C made of channel material spanned between, and ceiling beams 33A-33C, 43A-43C made of channel material bridged between upper ends, 53A-53D and 63A-63D are comprised in the box shape.
[0015]
Here, in the frames 30 and 40 constituting the first-floor building units 10B and 10C, no ceiling beams are spanned between the upper ends of the columns 31B and 31C and between the upper ends of the columns 41A and 41D, respectively. Further, in the frames 50 and 60 constituting the second-floor building units 20B and 20C, no floor beams are bridged between the lower ends of the columns 51B and 51C and between the lower ends of the columns 61A and 61D, respectively.
[0016]
In such first- and second-floor building units 10B, 10C, 20B, and 20C, the columns 31B, 41A, 51B, and 61A in which the ceiling beams and the floor beams are not bridged, and the columns 31C, 41D, and 51C that are disposed to face these columns 31B, 41A, 51B, and 61C , 61D, these columns and a temporary beam 100 that can be attached and detached are bridged.
These temporary beams 100 are attached when the first and second floor building units 10B, 10C, 20B, and 20C are produced in the factory, and are removed after being connected at the construction site. In other words, by mounting the temporary beam 100, against the strength during transportation of the first and second floor building units 10B, 10C, 20B, and 20C without the ceiling beam or floor beam, and the external force applied during work at the construction site. The strength of the is ensured.
[0017]
4 and 5, the first and second floor building units 10B, 10C, 20B, and 20C that form the atrium space 3B in the portion surrounded by the circle III in FIG. 1 and the first and second floor building units 10A adjacent to them. , 20A is shown. The upper ends of the columns 31B and 41A on which the ceiling beams of the first-floor building units 10B and 10C are not bridged are connected to each other by the lower-floor connector 72. Similarly, the lower ends of the columns 51B and 61A where the floor beams of the second-floor building units 20B and 20C are not bridged are connected to each other by the upper-floor connector 71.
[0018]
Further, the pillar 31B on which the ceiling beam of the first-floor building unit 10B is not bridged and the pillar 11A of the first-floor building unit 10A adjacent to the first-floor building unit 10B are the two lower-floor connecting members. The lower floor connecting plates 74 are connected to each other. Similarly, the pillar 51B in which the floor beam of the second-floor building unit 20B is not bridged and the pillar 11A of the second-floor building unit 20A adjacent to the second-floor building unit 20B are plate-like plates that are two upper-floor connecting members. The upper floor connecting plates 73 are connected to each other.
[0019]
Specifically, as shown in FIG. 6, the upper floor coupling tool 71 and the lower floor coupling tool 72 are formed of cylindrical members that are provided on the outer surfaces of the pillars 31B, 41A, 51B, and 61A and whose end surfaces are opened. Has been. In these, the opened end faces are arranged vertically.
Four bolt insertion holes 71 </ b> A and 72 </ b> A for inserting the bolt 101 are formed on the surfaces of the coupling members 71 and 72 that are in contact with the columns 31 </ b> B, 41 </ b> A, 51 </ b> B, and 61 </ b> A. Four bolt holes 80 are also formed in the columns 31B, 41A, 51B, 61A with which the respective connecting tools 71, 72 abut according to the positions of the bolt insertion holes 71A, 72A, and these bolt holes 80 are formed inside. A back nut (not shown) corresponding to is fixed. Thereby, each connection tool 71,72 and each pillar 31B, 41A, 51B, 61A are mutually connected with the volt | bolt 101 and a nut, and eventually 1st floor building units 10B and 10C and 2nd floor building units 20B and 20C are mutually connected. They are connected to each other.
[0020]
Further, as shown in FIG. 7, the upper floor connecting plate 73 and the lower floor connecting plate 74 are a pillar 51B in which the floor beam of the second floor building unit 20B is not bridged and a second floor building unit adjacent to the second floor building unit 20B. 20A pillar 11A, first floor building unit 10B has a column 31B on which the ceiling beam is not bridged, and has a length dimension that spans the pillar 11A of the first floor building unit 10A adjacent to the first floor building unit 10B. It is formed in a rectangular shape, and these are arranged so as to sandwich the aforementioned pillars 11A, 51B, 11A, 31B.
[0021]
A plurality of bolt insertion holes 73 </ b> A and 74 </ b> A for inserting the bolts 101 are formed in portions of the connection plates 73 and 74 that contact the pillars 11 </ b> A, 51 </ b> B, 11 </ b> A, and 31 </ b> B. A plurality of bolt holes 80 are also formed in the pillars 11A, 51B, 11A, 31B with which the connecting plates 73, 74 abut according to the positions of the bolt insertion holes 73A, 74A, respectively. A back nut (not shown) corresponding to is fixed. Thereby, each connection board 73 and 74 and pillar 11A, 51B, 11A, 31B are mutually connected with the volt | bolt 101 and a nut, and by extension, 1st floor building units 10A and 10B and 2nd floor building units 20A and 20B are mutually mutually connected. To be connected to.
[0022]
In this way, the first and second floor building units 10A, 10B, 10C, 20A, 20B, and 20C are connected by the connecting tools 71 and 72 and the connecting plates 73 and 74, so that even if the temporary beam 100 is removed, the blow-through space 3B. The surrounding strength is secured.
1 also includes the first and second floor building units 10B, 10C, 20B, and 20C that form the above-described atrium space 3B, and the first and second floor building units adjacent thereto. It has the same structure as the connecting structure with 10A and 20A.
[0023]
Next, the construction procedure of such a unit type building 1 will be described.
First, a plurality of one- and two-story building units 10 and 20 to which outer wall panels and inner wall panels are attached are manufactured in a factory. At this time, in the first floor building units 10B and 10C, the temporary beams 100 are respectively mounted between the upper ends of the columns 31B and 31C and between the upper ends of the columns 41A and 41D. Similarly, in the two-story building units 20B and 20C, the temporary beams 100 are respectively mounted between the lower ends of the columns 51B and 51C and between the lower ends of the columns 61A and 61D.
[0024]
Next, at the construction site, the building main body 3 is constructed by combining the first and second floor building units 10 and 20 on the foundation 2 up and down.
At this time, in performing the combination work of the first and second floor building units 10B, 10C, 20B, and 20C, the first floor building units 10B and 10C are arranged side by side, and the columns 31B, 41A, 31C, and 41D that are adjacent to each other are lowered. While being connected to each other by the floor connection tool 72, the pillars 11A, 31B, 11A, 31C adjacent to each other are connected to each other by the lower floor connection plate 74. In addition, when connecting the lower floor coupling tool 72 and the pillars 31B, 41A, 31C, and 41D, it is performed by putting a hand from the opening end surface of the cylindrical lower floor coupling tool 72 and tightening the bolt.
[0025]
Then, the second-floor building units 20B and 20C are combined with the upper parts of the first-floor building units 10B and 10C, and the columns 51B, 61A, 51C, and 61D adjacent to each other are connected to each other by the upper-floor connection tool 71 in the same manner as the first-floor portion. At the same time, the pillars 11A, 51B, 11A, 51C adjacent to each other are connected to each other by the upper connection plate 73.
Thereafter, the temporary beams 100 are removed from the first and second floor building units 10B, 10C, 20B, and 20C, respectively. Finally, a roof (not shown) is provided to complete the unit building 1 having the atrium space 3B.
[0026]
According to this embodiment, the following effects can be obtained.
That is, the first and second floor building units 10B, 10C, 20B, and 20C that constitute the atrium space 3B are formed by using the lower floor coupling tool 72, the upper floor coupling tool 71, the lower floor coupling board 74, and the upper floor coupling board 73. Are firmly joined to the first and second floor building units 10A and 20A, so that rigidity can be ensured even if some of the first and second floor building units 10B, 10C, 20B and 20C are omitted.
[0027]
Moreover, even if a portion where the bearing wall element against the horizontal external force is formed in the convex portion 3A is formed in the convex portion 3A, the convex portion 3A serving as the blow-through space 3B is adjacent to the other. It is firmly joined to the first and second floor building units 10A and 20A. Thereby, in the unit type building 1 of a plane convex shape, rigidity can be secured even if some of the first and second floor building units 10B, 10C, 20B, and 20C are omitted.
[0028]
Furthermore, since the upper-floor coupler 71 and the lower-floor coupler 72 are configured by cylindrical members whose end faces are opened, hands are inserted from the opening portion to connect the couplers 71 and 72 to the pillars 31B, 41A, 51B, The fastening operation | work at the time of joining to 61A etc. can be performed easily, and, thereby, the connection operation | work of 1st floor building units 10B and 10C and 2nd floor building units 20B and 20C can be performed easily.
[0029]
In addition, since the open end surfaces of the connecting tools 71 and 72 formed of cylindrical members are arranged vertically, the rigidity of the connecting portion with respect to the force in the horizontal direction can be increased. The rigidity can be further increased easily.
[0030]
Further, when building the unit type building 1, the process of removing the temporary beam 100 at the construction site is performed after the first and second floor building units 10B, 10C, 20B, and 20C are installed and connected. Even if a horizontal force or the like acts on the second-floor building units 10B, 10C, 20B, 20C, they can be opposed by the temporary beams 100, and the unit building 1 can be reliably constructed.
[0031]
In addition, this invention is not limited to the said embodiment, Other structures etc. which can achieve the objective of this invention are included, The deformation | transformation etc. which are shown below are also contained in this invention.
For example, as a construction procedure of a unit type building, the process of removing the temporary beam at the construction site is not limited to performing after installing and connecting the first and second floor building units, for example, it may be removed after attaching only the connector, The removal time of the temporary beam may be determined appropriately according to the construction procedure of the unit type building.
[0032]
Moreover, as a connection tool, not only a cylindrical member but a cross-section C-shaped channel material may be sufficient, for example, and the thing of the cross-section H shape provided with the flange and the web may be sufficient.
[0033]
Further, the atrium space is not limited to being formed on the convex portion of the planar convex building body, but may be formed at an arbitrary position according to the shape of the building main body.
[0034]
Moreover, in the said embodiment, although pillars were connected with the connection board, not only this but each beam may be connected with a connection board, and in short, each building unit mutually with predetermined force. It only has to be connected.
[0035]
【The invention's effect】
As described above, according to the unit type building and the construction method of the present invention, the following effects are obtained.
That is, according to the unit type building of the first aspect, since the building unit for the blowout that forms the atrium space is firmly joined to the normal building unit that forms the living room, a part of the building unit for the blowout Even if the beam is omitted, rigidity can be secured.
[0036]
Moreover, according to the unit type building of Claim 2, even if it forms the atrium space in a convex part and the part in which the load-bearing wall element with respect to a horizontal external force becomes one piece in the said convex part, The convex portion is firmly joined to another adjacent normal building unit. As a result, in a plane-type unit building, rigidity can be secured even if some of the beams of the building unit for blowout are omitted.
[0037]
Furthermore, according to the unit type building of the third aspect, it is possible to easily perform a tightening operation and the like when joining the connecting tool to the column by putting a hand from the opening portion of the cylindrical member, The building unit can be easily connected.
[0038]
Moreover, according to the unit type building of Claim 4, the rigidity with respect to the force of a horizontal direction of a connection part can be made high, and also the rigidity of a unit type building can be made still higher easily.
[0039]
Furthermore, according to the construction method of the unit type building of Claim 5, since the building unit for a blow-off which comprises an atrium space is firmly joined to the normal building unit which forms a living room, the building unit for a blow-out Even if some of the beams are omitted, rigidity can be ensured. In addition, in a unit type building having a convex portion, a large atrium space without a beam can be formed in the convex portion without hindrance.
[0040]
Moreover, according to the construction method of the unit type building of Claim 6, when carrying the building unit for a blowout to a construction site, the process which removes the temporary beam provided in the part used as a blow-off space at the said construction site is made last. Therefore, even if a horizontal force or the like acts on the blowout building unit during construction, it can be opposed by a temporary beam, and a unit type building can be reliably constructed.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a unit building in an embodiment of the present invention.
FIG. 2 is a perspective view showing a framework of a first- and second-floor building unit in the embodiment.
FIG. 3 is a perspective view showing a framework of a first- and second-floor building unit that forms an atrium space in the embodiment.
4 is an enlarged perspective view showing a connecting structure of a portion surrounded by a circle III in FIG. 1. FIG.
5 is a cross-sectional plan view showing a connecting structure of a portion surrounded by a circle III in FIG. 1. FIG.
FIG. 6 is an exploded perspective view showing a connection structure of an upper floor connector and a lower floor connector in the embodiment.
FIG. 7 is an exploded perspective view showing a connection structure of an upper floor connection plate and a lower floor connection plate in the embodiment.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Unit type building 3 Building main body 3A Convex part 3B Atrium space 10, 10A-10C First floor building unit 20, 20A-20C Second floor building unit 31B, 41A, 51B, 61A Pillar 71 Upper floor coupling tool 72 Lower floor coupling tool 73 Upper Upper floor connection plate 74 as a floor connection member Lower floor connection plate 100 as a lower floor connection member

Claims (6)

居室を形成する複数の建物ユニットと、下階および上階に各二個並設され、吹き抜け空間を形成する吹抜用建物ユニットとを有するユニット式建物であって、
前記建物ユニットおよび吹抜用建物ユニットは、四隅に立設される柱と、これら柱の上端間および下端間を相互に連結する梁とを含んで箱状に形成され、
前記上階吹抜用建物ユニットの前記柱同士を連結する上階連結具と、
前記下階吹抜用建物ユニットの前記柱同士を連結する下階連結具と、
前記上階吹抜用建物ユニットおよびこの上階吹抜用建物ユニットに隣接する上階建物ユニットを連結する上階連結部材と、
前記下階吹抜用建物ユニットおよびこの下階吹抜用建物ユニットに隣接する下階建物ユニットを連結する下階連結部材とを備えていることを特徴とするユニット式建物。
A unit type building having a plurality of building units that form a living room, and two building units that are arranged side by side on the lower floor and the upper floor and that form an atrium space,
The building unit and the building unit for blowout are formed in a box shape including columns standing at four corners, and beams connecting the upper ends and lower ends of these columns to each other,
An upper floor coupler for connecting the pillars of the upper floor atrium building unit;
A lower floor connector for connecting the pillars of the lower floor aerial building unit;
An upper floor connecting member connecting the upper floor building unit and the upper floor building unit adjacent to the upper floor building unit;
A unit-type building comprising: the lower-floor building unit and a lower-floor connecting member that connects the lower-floor building unit adjacent to the lower-floor building unit.
請求項1に記載のユニット式建物において、
前記建物ユニットおよび前記吹抜用建物ユニットからなる建物本体は、平面視で凸部を有する平面凸形状に構成されていることを特徴とするユニット式建物。
In the unit type building of Claim 1,
The building main body which consists of the said building unit and the said building unit for blowing-out is comprised by the planar convex shape which has a convex part by planar view, The unit type building characterized by the above-mentioned.
請求項1または請求項2に記載のユニット式建物において、
前記上階連結具および前記下階連結具は、前記柱の外側面に設けられ、端面が開口された筒状部材から構成されていることを特徴とするユニット式建物。
In the unit type building of Claim 1 or Claim 2,
The upper floor connector and the lower floor connector are configured from a cylindrical member that is provided on the outer surface of the column and has an open end surface.
請求項3に記載のユニット式建物において、
前記筒状部材は、前記開口された端面が垂直に配置されていることを特徴とするユニット式建物。
In the unit type building of Claim 3,
The cylindrical building is characterized in that the opened end face is arranged vertically, and the unit type building.
居室を形成する複数の建物ユニットと、下階および上階に各二個並設され、吹き抜け空間を形成する吹抜用建物ユニットとを有するユニット式建物の施工方法であって、
前記建物ユニットは、四隅に立設される柱と、これら柱の上端間および下端間を相互に連結する梁とを含んで箱状に構成され、
前記吹抜用建物ユニットは、前記建物ユニットを構成する梁の少なくとも一部が欠損して構成され、この欠損部分には、前記柱と着脱可能な仮梁が設けられ、
前記吹抜用建物ユニットを下階および上階に各二個並設する工程と、
前記吹抜用建物ユニットの仮梁を取り外す工程と、
前記上階吹抜用建物ユニットの前記柱同士を上階連結具で連結する工程と、前記下階吹抜用建物ユニットの前記柱同士を下階連結具で連結する工程と、
前記上階吹抜用建物ユニットおよびこの上階吹抜用建物ユニットに隣接する上階建物ユニットを上階連結部材で連結する工程と、
前記下階吹抜用建物ユニットおよびこの下階吹抜用建物ユニットに隣接する下階建物ユニットを下階連結部材で連結する工程とを備えていることを特徴とするユニット式建物の施工方法。
It is a construction method of a unit type building having a plurality of building units forming a living room and two building units arranged in parallel on the lower floor and the upper floor, and forming an atrium space,
The building unit is configured in a box shape including columns erected at four corners, and beams connecting the upper ends and the lower ends of the columns to each other,
The building unit for the blowout is constituted by missing at least a part of the beams constituting the building unit, and the missing part is provided with a temporary beam that can be attached to and detached from the pillar.
A step of arranging two each of the above-mentioned building units for the blowout on the lower floor and the upper floor;
Removing the temporary beam of the blowout building unit;
Connecting the columns of the upper-floor building units with upper floor connectors, and connecting the columns of the lower-floor building units with lower floor connectors;
Connecting the upper floor building unit and the upper floor building unit adjacent to the upper floor building unit with an upper floor connecting member;
A method for constructing a unit type building, comprising: a step of connecting the lower-floor building unit and a lower-floor building unit adjacent to the lower-floor building unit with a lower-floor connecting member.
請求項5に記載のユニット式建物の施工方法において、
まず、前記吹抜用建物ユニットを下階および上階に各二個並設する工程を行い、
次に、前記上階吹抜用建物ユニットの前記柱同士を上階連結具で連結する工程および前記下階吹抜用建物ユニットの前記柱同士を下階連結具で連結する工程を行い、
さらに、前記上階吹抜用建物ユニットおよびこの上階吹抜用建物ユニットに隣接する上階建物ユニットを上階連結部材で連結する工程および前記下階吹抜用建物ユニットおよびこの下階吹抜用建物ユニットに隣接する下階建物ユニットを下階連結部材で連結する工程を行い、
最後に、前記吹抜用建物ユニットの仮梁を取り外す工程を行うことを特徴とするユニット式建物の施工方法。
In the construction method of the unit type building of Claim 5,
First, perform the process of arranging two building units for the atrium on the lower floor and the upper floor,
Next, the steps of connecting the columns of the upper floor building unit with an upper floor connector and the steps of connecting the columns of the lower floor building unit with a lower floor connector are performed,
Further, the upper floor building unit and the upper floor building unit adjacent to the upper floor building unit are connected by an upper floor connecting member, the lower floor building unit and the lower floor building unit Perform the process of connecting adjacent lower floor building units with the lower floor connecting members,
Finally, the construction method of the unit type building characterized by performing the process which removes the temporary beam of the said building unit for blowing-out.
JP15193499A 1999-05-31 1999-05-31 Unit type building and its construction method Expired - Fee Related JP4058194B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15193499A JP4058194B2 (en) 1999-05-31 1999-05-31 Unit type building and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15193499A JP4058194B2 (en) 1999-05-31 1999-05-31 Unit type building and its construction method

Publications (2)

Publication Number Publication Date
JP2000336764A JP2000336764A (en) 2000-12-05
JP4058194B2 true JP4058194B2 (en) 2008-03-05

Family

ID=15529406

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15193499A Expired - Fee Related JP4058194B2 (en) 1999-05-31 1999-05-31 Unit type building and its construction method

Country Status (1)

Country Link
JP (1) JP4058194B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4749611B2 (en) * 2001-07-04 2011-08-17 ミサワホーム株式会社 Unit type building and its construction method
JP4801857B2 (en) * 2001-09-06 2011-10-26 ミサワホーム株式会社 Unit building and expansion unit
JP5501571B2 (en) * 2008-03-25 2014-05-21 ミサワホーム株式会社 Connecting members and unit buildings
CN106948483A (en) * 2017-04-29 2017-07-14 天津大学 A kind of connecting node applied to modularization steel building

Also Published As

Publication number Publication date
JP2000336764A (en) 2000-12-05

Similar Documents

Publication Publication Date Title
JP4058194B2 (en) Unit type building and its construction method
JP5362310B2 (en) Unit building
JP2002097722A (en) Unit type building and corner reinforcing material therefor
JPS59106641A (en) Unit house
JP4504046B2 (en) Unit type building and construction method of unit type building
JP4328429B2 (en) Connector
JP4749611B2 (en) Unit type building and its construction method
JP3893061B2 (en) Unit building
JP4676609B2 (en) Unit building
JP3871410B2 (en) Unit building with carport
JPH1061025A (en) Unit building and construction method thereof
JP4234294B2 (en) Reinforcement plate and unit building
JP3579596B2 (en) Unit building and its construction method
JP4717245B2 (en) Unit buildings and corner reinforcements for unit buildings
JP3311323B2 (en) Pillarless building units and unit buildings
JP3887233B2 (en) Unit building
JP4132392B2 (en) Building unit and unit building
JP5000881B2 (en) Unit type building and construction method of the unit type building
JP4381631B2 (en) Unit building shed structure
JP4801856B2 (en) Unit building
JP3766775B2 (en) Reinforced beams and unit buildings
JP3820297B2 (en) Unit building
JP2618553B2 (en) Unit building
JP4104246B2 (en) Unit building and its construction method
JP2000144921A (en) Connecting structure and connecting method of building unit

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060502

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20070704

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20070827

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071205

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071211

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071217

R150 Certificate of patent or registration of utility model

Ref document number: 4058194

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101221

Year of fee payment: 3

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20080108

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20080131

A072 Dismissal of procedure

Free format text: JAPANESE INTERMEDIATE CODE: A072

Effective date: 20080523

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101221

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101221

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101221

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111221

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121221

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121221

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131221

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees