JP3904398B2 - Manufacturing method of multi-core polarization maintaining fiber assembly - Google Patents

Manufacturing method of multi-core polarization maintaining fiber assembly Download PDF

Info

Publication number
JP3904398B2
JP3904398B2 JP2001071583A JP2001071583A JP3904398B2 JP 3904398 B2 JP3904398 B2 JP 3904398B2 JP 2001071583 A JP2001071583 A JP 2001071583A JP 2001071583 A JP2001071583 A JP 2001071583A JP 3904398 B2 JP3904398 B2 JP 3904398B2
Authority
JP
Japan
Prior art keywords
maintaining fiber
polarization
core
polarization maintaining
thermosetting resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001071583A
Other languages
Japanese (ja)
Other versions
JP2002267880A (en
Inventor
雅徳 野々村
秀徳 飯田
淳史 小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Totoku Electric Co Ltd
Original Assignee
Totoku Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Totoku Electric Co Ltd filed Critical Totoku Electric Co Ltd
Priority to JP2001071583A priority Critical patent/JP3904398B2/en
Priority to US09/942,857 priority patent/US6926793B2/en
Priority to CNB011419091A priority patent/CN1162720C/en
Priority to TW090123576A priority patent/TW496974B/en
Publication of JP2002267880A publication Critical patent/JP2002267880A/en
Priority to HK03101585.6A priority patent/HK1049518B/en
Priority to US10/796,229 priority patent/US7252130B2/en
Application granted granted Critical
Publication of JP3904398B2 publication Critical patent/JP3904398B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/24Coupling light guides
    • G02B6/36Mechanical coupling means
    • G02B6/38Mechanical coupling means having fibre to fibre mating means
    • G02B6/3807Dismountable connectors, i.e. comprising plugs
    • G02B6/3833Details of mounting fibres in ferrules; Assembly methods; Manufacture
    • G02B6/3855Details of mounting fibres in ferrules; Assembly methods; Manufacture characterised by the method of anchoring or fixing the fibre within the ferrule
    • G02B6/3861Adhesive bonding
    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/24Coupling light guides
    • G02B6/36Mechanical coupling means
    • G02B6/38Mechanical coupling means having fibre to fibre mating means
    • G02B6/3807Dismountable connectors, i.e. comprising plugs
    • G02B6/381Dismountable connectors, i.e. comprising plugs of the ferrule type, e.g. fibre ends embedded in ferrules, connecting a pair of fibres
    • G02B6/3812Dismountable connectors, i.e. comprising plugs of the ferrule type, e.g. fibre ends embedded in ferrules, connecting a pair of fibres having polarisation-maintaining light guides
    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/24Coupling light guides
    • G02B6/36Mechanical coupling means
    • G02B6/38Mechanical coupling means having fibre to fibre mating means
    • G02B6/3807Dismountable connectors, i.e. comprising plugs
    • G02B6/3833Details of mounting fibres in ferrules; Assembly methods; Manufacture
    • G02B6/3834Means for centering or aligning the light guide within the ferrule
    • G02B6/3843Means for centering or aligning the light guide within the ferrule with auxiliary facilities for movably aligning or adjusting the fibre within its ferrule, e.g. measuring position or eccentricity
    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/24Coupling light guides
    • G02B6/36Mechanical coupling means
    • G02B6/3616Holders, macro size fixtures for mechanically holding or positioning fibres, e.g. on an optical bench

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Mechanical Coupling Of Light Guides (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、多芯偏波保持ファイバアセンブリの製造方法に関し、さらに詳しくは、方向性を持つ偏波保持ファイバを多芯フェルールに固着した多芯偏波保持ファイバアセンブリを容易に製造できるようにする多芯偏波保持ファイバアセンブリの製造方法に関する。
【0002】
【従来の技術】
従来、2本の偏波保持ファイバを1つのフェルールに固着してなる2芯偏波保持ファイバアセンブリは、次のようにして製造されている。
(1)2本の偏波保持ファイバ素線の端部の被膜をそれぞれ数cmの長さに剥離する。
(2)多芯フェルールの素線孔に熱硬化性樹脂を注入する。
(3)多芯フェルールの素線孔に2本の偏波保持ファイバ素線を挿入し、被覆を剥離して露出した偏波保持ファイバを多芯フェルールのファイバ孔に挿通する。
(4)多芯フェルールを回転しないように保持し、各偏波保持ファイバを軸回転させて各偏波保持ファイバの方向を調整する。
(5)多芯フェルールを加熱して熱硬化性樹脂を硬化させる。
【0003】
【発明が解決しようとする課題】
上記従来の2芯偏波保持ファイバアセンブリの製造方法には、次の問題点があった。
(1)多芯フェルールのファイバ孔に偏波保持ファイバ素線を挿入する作業が煩雑である。
(2)各偏波保持ファイバの方向を調整する作業が繁雑である。
(3)熱硬化性樹脂を硬化させる作業が繁雑である。
【0004】
そこで、本発明の目的は、偏波保持ファイバを多芯フェルールに固着した多芯偏波保持ファイバアセンブリを容易に製造できるようにする多芯偏波保持ファイバアセンブリの製造方法を提供することにある。
【0005】
【課題を解決するための手段】
第1の観点では、本発明は、(1)複数の偏波保持ファイバ素線の端部の被膜をそれぞれ数cmかつ剥離部の長さに数mmずつの差を付けて剥離する被膜剥離工程と、(2)複数の挿通孔を穿設した保持チューブの前記挿通孔にそれぞれ偏波保持ファイバ素線を挿通し、剥離部の基端を揃えて一体的に保持し、多芯フェルールの素線孔に注入する第2の熱硬化性樹脂が保持チューブの挿入孔に吸い込まれるのを阻止しうる程度に第2の熱硬化性樹脂よりも粘度が高い第1の熱硬化性樹脂で挿通孔の先端側を封止する一体化工程と、(3)多芯フェルールのファイバ孔に偏波保持ファイバを挿通する際に邪魔にならない程度に粘度が低い第2の熱硬化性樹脂を多芯フェルールの素線孔に注入する接着剤注入工程と、(4)多芯フェルールの素線孔に、保持チューブで一体化した複数の偏波保持ファイバ素線を挿入し、各偏波保持ファイバ素線の剥離部を多芯フェルールのファイバ孔に挿通する光ファイバ挿通工程と、(5)多芯フェルールを回転しないように保持治具に保持し、各偏波保持ファイバを軸回転させて各偏波保持ファイバの方向を調整する方向調整工程と、(6)保持治具に多芯フェルールを保持したまま加熱して前記熱硬化性樹脂を硬化させる接着剤硬化工程とを有することを特徴とする多芯偏波保持ファイバアセンブリの製造方法を提供する。
【0006】
上記第1の観点による多芯偏波保持ファイバアセンブリの製造方法では、次の作用がある。
(1)複数の偏波保持ファイバ素線を保持チューブで一体的にまとめてから多芯フェルールの素線孔に挿入するから、個々の偏波保持ファイバ素線を順に挿入するよりも作業が容易になる。
(2)複数の偏波保持ファイバ素線の剥離部の長さに数mmずつの差を付けて剥離した後、剥離部の基端を揃えて一体化しているから、露出した偏波保持ファイバの先端の位置に段差が生じている。この先端の段差のため、多芯フェルールのファイバ孔に各偏波保持ファイバを順に入れることができ、偏波保持ファイバの先端の位置に段差がない場合よりも作業が容易になる。
(3)細いファイバ孔に偏波保持ファイバを挿通する際に邪魔にならない程度に粘度が低い第2の熱硬化性樹脂を多芯フェルールの素線孔に注入するため、細いファイバ孔に偏波保持ファイバを挿通する際に第2の熱硬化性樹脂が邪魔にならない。
(4)第2の熱硬化性樹脂が保持チューブの挿入孔に吸い込まれるのを阻止しうる程度に第2の熱硬化性樹脂よりも粘度が高い第1の熱硬化性樹脂で保持チューブの挿通孔を封止するため、第2の熱硬化性樹脂が保持チューブの挿通孔に吸い込まれてしまうことを防止できる。
(5)保持治具を用いて各偏波保持ファイバの方向を調整するため、作業が容易になる。
(6)保持治具に多芯フェルールを保持したまま加熱して熱硬化性樹脂を硬化させるため、作業が容易になる。
【0007】
第2の観点では、本発明は、前記第1の観点による多芯偏波保持ファイバアセンブリの製造方法において、前記第1の熱硬化性樹脂の粘度が38000cpsであり、前記第2の熱硬化性樹脂の粘度が2000cpsであることを特徴とする多芯偏波保持ファイバアセンブリの製造方法を提供する。
【0010】
【発明の実施の形態】
以下、図に示す実施の形態により本発明をさらに詳細に説明する。なお、これにより本発明が限定されるものではない。
図1は、本発明の一実施形態にかかる2芯偏波保持ファイバアセンブリの製造方法を示すフロー図である。
【0011】
ステップP1は、被膜剥離工程である。
図2に示すように、第1偏波保持ファイバ素線11の端部の被膜11bを例えば5cmだけ剥離し、第1偏波保持ファイバ11aを露出させる。第1偏波保持ファイバ11aの先端は、垂直にカットする。
同様に、第2偏波保持ファイバ素線12の端部の被膜12bを例えば4.5cmだけ剥離し、第1偏波保持ファイバ12aを露出させる。第2偏波保持ファイバ12aの先端は、垂直にカットする。
これにより、剥離部11c,12cの長さには、例えば5mmの差が付く。
【0012】
ステップP2は、一体化工程である。
図3に示すように、ナイロン製の保持チューブ10の挿通孔10a,10bに第1偏波保持ファイバ素線11,第2偏波保持ファイバ素線12をそれぞれ挿通し、剥離部基端11d,12dを揃えて一体的に保持する。これにより、第1偏波保持ファイバ先端11eと第2偏波保持ファイバ先端12eには、例えば5mmの段差が付く。なお、図3の(a)は先端から見た図、図3の(b)は側方から見た図である。
次に、図4に示すように、粘度が比較的高い熱硬化性樹脂4Aで挿通孔10a,10bの先端側を封止する。熱硬化性樹脂4Aは、例えば商品名「ハイスーパー」(セメダイン社)で、粘度は38000cpsである。なお、図4の(a)は先端から見た図、図4の(b)は側方から見た図である。
【0013】
ステップP3は、接着剤注入工程である。
図5に示すように、ステンレス管2の先端側にセラミック体3を固着してなる2芯フェルール1の素線孔1aに粘度が比較的低い熱硬化性樹脂4Bを注入する。熱硬化性樹脂4Bは、例えば商品名「3BND」(エポテック社)で、粘度は2000cpsである。この時、第1ファイバ孔31および第2ファイバ孔32の先端側から真空ポンプで空気を吸引し、第1ファイバ孔31および第2ファイバ孔32にも熱硬化性樹脂4Bを充填する。
【0014】
ステップP4は、光ファイバ挿通工程である。
図6に示すように、第2熱硬化性樹脂4Bを注入した2芯フェルール1の素線孔1aに、保持チューブ10で一体化した偏波保持ファイバ素線11,12を挿入し、最初に第1偏波保持ファイバ先端11eを第1ファイバ孔31に挿入する。次に、図7に示すように、第2偏波保持ファイバ先端12eを第2ファイバ孔32に挿入する。最後に、図8に示すように、偏波保持ファイバ先端11e,12eが突き出るまで偏波保持ファイバ11a,12aをファイバ孔31,32に挿通する。
この後、第1偏波保持ファイバ先端11eおよび第2偏波保持ファイバ先端12eに付着した第2熱硬化性樹脂4Bを除去しておく。
【0015】
ステップP5は、方向調整工程である。
図9に示すように、2芯偏波保持ファイバアセンブリ製造装置300は、保持治具100と方向調整装置200とを具備してなる。
まず、保持治具100のフェルール保持部103に、2芯フェルール1を保持する。2芯フェルール1は、回転しないように、上下から板状部材で挟まれて保持される。また、2芯フェルール1に入る直前部分の偏波保持ファイバ素線11,12の被覆11b,12bに照明光が当たるように、照明ライト106が設けられている。
【0016】
次に、保持治具100の光ファイバ保持部101,102に、第1偏波保持ファイバ素線11,第2偏波保持ファイバ12素線を、それぞれ保持する。偏波保持ファイバ素線11,12は、上下からローラで挟まれて保持される。下側のローラがサーボモータ101m,102mにより回転されることで、偏波保持ファイバ素線11,12をそれぞれ軸回転させることが出来る。
【0017】
次に、方向調整装置200を作動させる。
図10は、方向調整装置200の動作を示すフロー図である。
ステップQ1では、情報処理部203は、顕微鏡201の焦点調整を行い、2芯フェルール1から突き出している第1偏波保持ファイバ先端面11eに焦点を合わせる。顕微鏡201で撮影した第1偏波保持ファイバ先端面11eの画像は、図11に示すように、ディスプレイ202の画面の半分に表示される。
ステップQ2では、情報処理部203は、第1偏波保持ファイバ先端面11eの応力付与部11f,11fを画像認識により識別し、図12に示すように、応力付与部11f,11fに矩形の第1パターンP1,第2パターンP2を位置決めする。
【0018】
ステップQ3では、情報処理部203は、顕微鏡201の焦点調整を行い、2芯フェルール1から突き出している第2偏波保持ファイバ先端面12eに焦点を合わせる。顕微鏡201で撮影した第2偏波保持ファイバ先端面12eの画像は、図13に示すように、ディスプレイ202の画面の半分に表示される。
ステップQ4では、情報処理部203は、第2偏波保持ファイバ先端面12eの応力付与部12f,12fを画像認識により識別し、図14に示すように、応力付与部12f,12fに矩形の第3パターンP3,第4パターンP4を位置決めする。
【0019】
ステップQ5では、画像処理部203は、図15に示すように、第1パターンP1,第2パターンP2の中心間を結ぶ第1基準線L1を生成する。また、第3パターンP3,第4パターンP4の中心間を結ぶ第2基準線L2を生成する。さらに、第1基準線L1,第2基準線L2の中心間を結ぶ第3基準線L3を生成する。
【0020】
ステップQ6では、画像処理部203は、図16に示すように、第1基準線L1から時計回りに第3基準線L3を見た第1角度θ1および第2基準線L2から時計回りに第3基準線L3を見た第2角度θ2を算出する。
ステップQ7では、画像処理部203は、第1角度θ1と予め作業者が設定した第1目標角度ψ1との第1角度差(θ1−ψ1)が許容範囲内か判定する。また、第2角度θ2と予め作業者が設定した第2目標角度ψ2との第2角度差(θ2−ψ2)が許容範囲内か判定する。そして、第1角度差(θ1−ψ1)および第2角度差(θ2−ψ2)の両方が許容範囲内ならばステップQ11へ進み、そうでないならステップQ8へ進む。
【0021】
ステップQ8では、画像処理部203は、第1角度差(θ1−ψ1)および第2角度差(θ2−ψ2)の両方が許容範囲内になるようなサーボモータ101m,102mの回転角度φ1,φ2を計算する。
ステップQ9では、画像処理部203は、モータ制御部204を介して、サーボモータ101m,102mを回転角度φ1,φ2だけ回転させる。
【0022】
ステップQ10では、画像処理部203は、安定時間(例えば6秒)が経過するのを待ってから前記ステップQ6に戻る。この安定時間を設けたため、サーボモータ101m,102mの停止後に、熱硬化性樹脂の粘性等によって生じる偏波保持ファイバ素線11,12の角度ずれを加味した角度調整が可能となり、安定時間を設けない場合よりも、許容範囲内への収束が早くなる。
例えば、第1目標角度ψ1=90゜、第2目標角度ψ2=0゜とした場合、図17に示すような状態に偏波保持ファイバ先端面11e,12eの方向が調整される。
【0023】
ステップQ11では、画像処理部203は、確認時間(例えば30秒)が経過するのを待ってからステップQ12へ進む。この確認時間を設けたため、第1角度差(θ1−ψ1)および第2角度差(θ2−ψ2)の両方が偶然に許容範囲内になっており、前記ステップQ8〜Q10を一度も通らなかった場合でも、第1角度差(θ1−ψ1)および第2角度差(θ2−ψ2)の両方が許容範囲内に落ち着いているかを確認できる。
【0024】
ステップQ12では、画像処理部203は、第1角度θ1および第2角度θ2を算出する。
ステップQ13では、画像処理部203は、第1角度差(θ1−ψ1)および第2角度差(θ2−ψ2)の両方が許容範囲内ならばステップQ14へ進み、そうでないなら前記ステップQ8に戻る。
【0025】
ステップQ14〜Q16では、画像処理部203は、ヒータ制御部205を介して、温度センサ104をモニタしながらヒータ105に給電し、熱硬化性樹脂4A,4Bを加熱し硬化させ、その後、ヒータ105をオフする。
ヒータ105による加熱条件は、例えば60℃で1時間〜80℃で2時間くらいとする。もし、60℃で1時間よりも低温・短時間にすると、硬化が不十分になる。一方、80℃で2時間よりも高温・長時間にすると、光ファイバ11,12の特性に影響を与えかねない。
【0026】
前記ステップQ16の後、保持治具100から2芯フェルール1および偏波保持ファイバ11,12を外し、2芯フェルール1の先端面を研磨する。
【0027】
図18は、ψ1=90゜、ψ2=0゜とした場合に製造できる対称型2芯偏波保持ファイバアセンブリ501の先端面を示す模式図である。
図19は、ψ1=0゜、ψ2=0゜とした場合に製造できる対称型2芯偏波保持ファイバアセンブリ502の先端面を示す模式図である。
図20は、ψ1=90゜、ψ2=90゜とした場合に製造できる対称型2芯偏波保持ファイバアセンブリ503の先端面を示す模式図である。
図21は、ψ1=90゜、ψ2=0゜とした場合に製造できる非対称型2芯偏波保持ファイバアセンブリ504の先端面を示す模式図である。
図22は、ψ1=0゜、ψ2=0゜とした場合に製造できる非対称型2芯偏波保持ファイバアセンブリ505の先端面を示す模式図である。
図23は、ψ1=90゜、ψ2=90゜とした場合に製造できる非対称型2芯偏波保持ファイバアセンブリ506の先端面を示す模式図である。
図24は、ψ1=0゜、ψ2=90゜とした場合に製造できる非対称型2芯偏波保持ファイバアセンブリ507の先端面を示す模式図である。
【0028】
上記実施形態では、2芯の偏波保持ファイバアセンブリの製造方法および装置について説明したが、3芯以上の偏波保持ファイバアセンブリの製造方法および装置についても上記と同様に本発明を実施できる。
また、上記実施形態では、パンダ型偏波保持ファイバについて説明したが、他の種類の偏波保持ファイバについても上記と同様に本発明を実施できる。
【0029】
【発明の効果】
本発明の多芯偏波保持ファイバアセンブリの製造方法によれば、次の効果が得られる。
(1)複数の偏波保持ファイバ素線を多芯フェルールの素線孔に挿入する作業が容易になる。
(2)多芯フェルールのファイバ孔に各偏波保持ファイバを入れる作業が容易になる。
(3)細いファイバ孔に偏波保持ファイバを挿通する際に熱硬化性樹脂が邪魔にならない。
(4)多芯フェルールの素線孔に注入する熱硬化性樹脂が保持チューブの挿通孔に吸い込まれてしまうことを防止できる。
(5)保持治具を用いて各偏波保持ファイバの方向を調整するため、作業が容易になる。
(6)保持治具に多芯フェルールを保持したまま加熱して熱硬化性樹脂を硬化させるため、作業が容易になる。
【図面の簡単な説明】
【図1】本発明の一実施形態にかかる2芯偏波保持ファイバアセンブリの製造方法の各工程を示すフロー図である。
【図2】本発明に係る被膜剥離工程を説明するための偏波保持ファイバ素線の模式図である。
【図3】本発明に係る一体化工程の第1段階を説明するための保持チューブの先端面図および側面図である。
【図4】本発明に係る一体化工程の第2段階を説明するための保持チューブの先端面図および側面図である。
【図5】本発明に係る接着剤注入工程を説明するための2芯フェルールの断面図である。
【図6】本発明に係る光ファイバ挿通工程の第1段階を説明するための2芯フェルールの断面図である。
【図7】本発明に係る光ファイバ挿通工程の第2段階を説明するための2芯フェルールの断面図である。
【図8】本発明に係る光ファイバ挿通工程の第3段階を説明するための2芯フェルールの断面図である。
【図9】本発明に係る2芯偏波保持ファイバアセンブリ製造装置を示す構成図である。
【図10】本発明に係る2芯偏波保持ファイバアセンブリ製造装置の動作を示すフロー図である。
【図11】第1偏波保持ファイバ先端面の画像を示す模式図である。
【図12】第1偏波保持ファイバ先端面の応力付与部の画像認識を示す説明図である。
【図13】第2偏波保持ファイバ先端面の画像を示す模式図である。
【図14】第2偏波保持ファイバ先端面の応力付与部の画像認識を示す説明図である。
【図15】偏波保持ファイバ素線の方向調整のための基準線の生成を示す説明図である。
【図16】偏波保持ファイバ素線の方向調整のための基準線間角度を示す説明図である。
【図17】偏波保持ファイバ素線の方向調整後の画面を示す模式図である。
【図18】本発明により製造される対称型2芯偏波保持ファイバアセンブリの第1例の先端面を示す模式図である。
【図19】本発明により製造される対称型2芯偏波保持ファイバアセンブリの第2例の先端面を示す模式図である。
【図20】本発明により製造される対称型2芯偏波保持ファイバアセンブリの第3例の先端面を示す模式図である。
【図21】本発明により製造される非対称型2芯偏波保持ファイバアセンブリの第1例の先端面を示す模式図である。
【図22】本発明により製造される非対称型2芯偏波保持ファイバアセンブリの第2例の先端面を示す模式図である。
【図23】本発明により製造される非対称型2芯偏波保持ファイバアセンブリの第3例の先端面を示す模式図である。
【図24】本発明により製造される非対称型2芯偏波保持ファイバアセンブリの第4例の先端面を示す模式図である。
【符号の説明】
1 2芯フェルール
2 ステンレス管
3 セラミック体
4A 第1熱硬化性樹脂
4B 第2熱硬化性樹脂
10 保持チューブ
11 第1偏波保持ファイバ素線
11a 第1偏波保持ファイバ
11b 被覆
11e 先端面
12 第2偏波保持ファイバ素線
12a 第2偏波保持ファイバ
12b 被覆
12e 先端面
31 第1ファイバ孔
32 第2ファイバ孔
100 保持治具
101,102 光ファイバ保持部
101m,102m サーボモータ
103 フェルール保持部
104 温度センサ
105 ヒータ
200 方向調整装置
201 顕微鏡
202 ディスプレイ
203 情報処理部
204 モータ制御部
205 ヒータ制御部
300 2芯偏波保持ファイバアセンブリ製造装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to the production how multicore polarization maintaining fiber assembly, and more particularly, to be able to easily produce a multi-core polarization-maintaining fiber assembly the polarization maintaining fiber fixed to the multi-core ferrules having directionality relates to the production how multicore polarization maintaining fiber assembly to.
[0002]
[Prior art]
Conventionally, a two-core polarization maintaining fiber assembly in which two polarization maintaining fibers are fixed to one ferrule is manufactured as follows.
(1) The coatings at the ends of the two polarization maintaining fiber strands are each peeled to a length of several centimeters.
(2) A thermosetting resin is injected into the wire hole of the multi-core ferrule.
(3) Two polarization-maintaining fiber strands are inserted into the strand holes of the multi-core ferrule, and the polarization-maintaining fibers exposed by peeling off the coating are inserted into the fiber holes of the multi-core ferrule.
(4) The multi-core ferrule is held so as not to rotate, and each polarization maintaining fiber is axially rotated to adjust the direction of each polarization maintaining fiber.
(5) The multi-core ferrule is heated to cure the thermosetting resin.
[0003]
[Problems to be solved by the invention]
The manufacturing method of the conventional two-core polarization maintaining fiber assembly has the following problems.
(1) The operation of inserting the polarization-maintaining fiber strand into the fiber hole of the multi-core ferrule is complicated.
(2) The work of adjusting the direction of each polarization maintaining fiber is complicated.
(3) The work of curing the thermosetting resin is complicated.
[0004]
An object of the present invention is to provide a manufacturing how multicore polarization maintaining fiber assembly that enables the multi-core polarization-maintaining fiber assembly which is fixed a polarization maintaining fiber to the multi-core ferrule can be easily produced is there.
[0005]
[Means for Solving the Problems]
In a first aspect, the present invention provides (1) a film peeling step for peeling a film at the end of a plurality of polarization maintaining fiber strands by a difference of several centimeters and a length of the peeling part by several millimeters. If, (2) inserted through the respective polarization-maintaining fiber in the insertion hole of the holding tube bored a plurality of through holes, integrally holds align the proximal end of the peeling section, of the multi-core ferrule containing the second thermosetting resin is insertion holes in the second thermosetting higher viscosity than the resin first thermosetting resin to the extent that may block being sucked into the insertion hole of the holding tube to be injected into the line hole And (3) a multi-core ferrule with a second thermosetting resin having a low viscosity so as not to obstruct the insertion of the polarization-maintaining fiber into the fiber hole of the multi-core ferrule. an adhesive injection step of injecting the wire hole of, (4) the strands of the multi-core ferrule An optical fiber insertion step of inserting a plurality of polarization-maintaining fiber strands integrated with each other into a holding tube, and inserting a separation portion of each polarization-maintaining fiber strand into a fiber hole of a multi-core ferrule; A direction adjusting step in which the core ferrule is held by a holding jig so as not to rotate, and each polarization maintaining fiber is axially rotated to adjust the direction of each polarization holding fiber; and (6) a multi-core ferrule is attached to the holding jig. An adhesive curing step of curing the thermosetting resin by heating while being held is provided. A method for manufacturing a multi-core polarization maintaining fiber assembly is provided.
[0006]
The manufacturing method of the multi-core polarization maintaining fiber assembly according to the first aspect has the following effects.
(1) Since a plurality of polarization maintaining fiber strands are integrated together with a holding tube and then inserted into the strand hole of the multi-core ferrule, the work is easier than inserting individual polarization maintaining fiber strands in order. become.
(2) Since the lengths of the stripped portions of a plurality of polarization maintaining fiber strands are stripped with a difference of several millimeters, and the base ends of the stripped portions are aligned and integrated, the exposed polarization maintaining fiber There is a step in the position of the tip. Because of this step difference at the tip, each polarization maintaining fiber can be put into the fiber hole of the multi-core ferrule in order, and the work becomes easier than when there is no step at the tip position of the polarization maintaining fiber.
(3) Since the second thermosetting resin having a viscosity that does not interfere with insertion of the polarization maintaining fiber into the thin fiber hole is injected into the strand hole of the multicore ferrule, When inserting the holding fiber, the second thermosetting resin does not get in the way.
(4) Inserting the holding tube with the first thermosetting resin having a higher viscosity than the second thermosetting resin to the extent that the second thermosetting resin can be prevented from being sucked into the insertion hole of the holding tube. Since the hole is sealed, the second thermosetting resin can be prevented from being sucked into the insertion hole of the holding tube.
(5) Since the direction of each polarization-maintaining fiber is adjusted using the holding jig, the operation becomes easy.
(6) Since the thermosetting resin is cured by heating while holding the multi-core ferrule on the holding jig, the operation becomes easy.
[0007]
In a second aspect, the present invention provides the method for producing a multi-core polarization maintaining fiber assembly according to the first aspect, wherein the viscosity of the first thermosetting resin is 38000 cps, and the second thermosetting is performed. Provided is a method for manufacturing a multi-core polarization maintaining fiber assembly, wherein the viscosity of the resin is 2000 cps .
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in more detail with reference to embodiments shown in the drawings. Note that the present invention is not limited thereby.
FIG. 1 is a flowchart showing a method of manufacturing a two-core polarization maintaining fiber assembly according to an embodiment of the present invention.
[0011]
Step P1 is a film peeling process.
As shown in FIG. 2, the coating 11b at the end of the first polarization maintaining fiber 11 is peeled off by, for example, 5 cm to expose the first polarization maintaining fiber 11a. The tip of the first polarization maintaining fiber 11a is cut vertically.
Similarly, the coating 12b at the end of the second polarization maintaining fiber 12 is peeled off by, for example, 4.5 cm to expose the first polarization maintaining fiber 12a. The tip of the second polarization maintaining fiber 12a is cut vertically.
Thereby, for example, a difference of 5 mm is attached to the lengths of the peeling portions 11c and 12c.
[0012]
Step P2 is an integration process.
As shown in FIG. 3, the first polarization-maintaining fiber strand 11 and the second polarization-maintaining fiber strand 12 are inserted into the insertion holes 10a and 10b of the nylon holding tube 10, respectively, and the peeling portion base end 11d, 12d is aligned and held integrally. Accordingly, a step of, for example, 5 mm is provided between the first polarization maintaining fiber tip 11e and the second polarization maintaining fiber tip 12e. 3A is a view seen from the tip, and FIG. 3B is a view seen from the side.
Next, as shown in FIG. 4, the front end side of the insertion holes 10a and 10b is sealed with a thermosetting resin 4A having a relatively high viscosity. The thermosetting resin 4A is, for example, a trade name “High Super” (Cemedine), and has a viscosity of 38000 cps. 4A is a view seen from the tip, and FIG. 4B is a view seen from the side.
[0013]
Step P3 is an adhesive injection process.
As shown in FIG. 5, a thermosetting resin 4 </ b> B having a relatively low viscosity is injected into the wire hole 1 a of the two-core ferrule 1 formed by fixing the ceramic body 3 to the tip end side of the stainless tube 2. The thermosetting resin 4B is, for example, a trade name “3BND” (Epotech) and has a viscosity of 2000 cps. At this time, air is sucked from the tip side of the first fiber hole 31 and the second fiber hole 32 by a vacuum pump, and the first fiber hole 31 and the second fiber hole 32 are also filled with the thermosetting resin 4B.
[0014]
Step P4 is an optical fiber insertion step.
As shown in FIG. 6, the polarization-maintaining fiber strands 11 and 12 integrated with the holding tube 10 are inserted into the strand hole 1a of the two-core ferrule 1 into which the second thermosetting resin 4B is injected. The first polarization maintaining fiber tip 11 e is inserted into the first fiber hole 31. Next, as shown in FIG. 7, the second polarization maintaining fiber tip 12 e is inserted into the second fiber hole 32. Finally, as shown in FIG. 8, the polarization maintaining fibers 11a and 12a are inserted into the fiber holes 31 and 32 until the polarization maintaining fiber tips 11e and 12e protrude.
Thereafter, the second thermosetting resin 4B attached to the first polarization maintaining fiber tip 11e and the second polarization maintaining fiber tip 12e is removed.
[0015]
Step P5 is a direction adjustment process.
As shown in FIG. 9, the two-core polarization maintaining fiber assembly manufacturing apparatus 300 includes a holding jig 100 and a direction adjusting device 200.
First, the two-core ferrule 1 is held in the ferrule holding portion 103 of the holding jig 100. The two-core ferrule 1 is sandwiched and held from above and below so as not to rotate. Moreover, the illumination light 106 is provided so that illumination light may strike the coatings 11b and 12b of the polarization-maintaining fiber strands 11 and 12 immediately before entering the two-core ferrule 1.
[0016]
Next, the first polarization maintaining fiber strand 11 and the second polarization maintaining fiber 12 strand are held in the optical fiber holding portions 101 and 102 of the holding jig 100, respectively. The polarization maintaining fiber strands 11 and 12 are held between rollers from above and below. When the lower roller is rotated by the servo motors 101m and 102m, the polarization-maintaining fiber strands 11 and 12 can be axially rotated.
[0017]
Next, the direction adjusting device 200 is operated.
FIG. 10 is a flowchart showing the operation of the direction adjusting device 200.
In step Q1, the information processing unit 203 adjusts the focus of the microscope 201 and focuses on the first polarization maintaining fiber distal end surface 11e protruding from the two-core ferrule 1. An image of the first polarization maintaining fiber distal end surface 11e photographed by the microscope 201 is displayed on a half of the screen of the display 202 as shown in FIG.
In step Q2, the information processing unit 203 identifies the stress applying portions 11f and 11f of the first polarization maintaining fiber distal end surface 11e by image recognition, and as shown in FIG. The first pattern P1 and the second pattern P2 are positioned.
[0018]
In step Q <b> 3, the information processing unit 203 adjusts the focus of the microscope 201 and focuses on the second polarization maintaining fiber distal end surface 12 e protruding from the two-core ferrule 1. An image of the second polarization maintaining fiber distal end surface 12e photographed by the microscope 201 is displayed on half of the screen of the display 202 as shown in FIG.
In step Q4, the information processing unit 203 identifies the stress applying portions 12f and 12f of the second polarization maintaining fiber distal end surface 12e by image recognition, and as shown in FIG. The third pattern P3 and the fourth pattern P4 are positioned.
[0019]
In step Q5, the image processing unit 203 generates a first reference line L1 connecting the centers of the first pattern P1 and the second pattern P2, as shown in FIG. In addition, a second reference line L2 connecting the centers of the third pattern P3 and the fourth pattern P4 is generated. Further, a third reference line L3 connecting the centers of the first reference line L1 and the second reference line L2 is generated.
[0020]
In step Q6, as shown in FIG. 16, the image processing unit 203 performs the third rotation clockwise from the first reference line L1 and the first angle θ1 viewed from the third reference line L3 and the second reference line L2. A second angle θ2 viewed from the reference line L3 is calculated.
In step Q7, the image processing unit 203 determines whether the first angle difference (θ1−ψ1) between the first angle θ1 and the first target angle ψ1 set in advance by the operator is within an allowable range. Further, it is determined whether the second angle difference (θ2−ψ2) between the second angle θ2 and the second target angle ψ2 set in advance by the operator is within an allowable range. If both the first angle difference (θ1−ψ1) and the second angle difference (θ2−ψ2) are within the allowable range, the process proceeds to step Q11, and if not, the process proceeds to step Q8.
[0021]
In step Q8, the image processing unit 203 determines the rotation angles φ1, φ2 of the servo motors 101m, 102m so that both the first angle difference (θ1-ψ1) and the second angle difference (θ2-ψ2) are within the allowable range. Calculate
In step Q9, the image processing unit 203 rotates the servo motors 101m and 102m by rotation angles φ1 and φ2 via the motor control unit 204.
[0022]
In step Q10, the image processing unit 203 waits for a stable time (for example, 6 seconds) to elapse, and then returns to step Q6. Since this stabilization time is provided, after the servo motors 101m and 102m are stopped, it is possible to adjust the angle by taking into account the angular deviation of the polarization-maintaining fiber strands 11 and 12 caused by the viscosity of the thermosetting resin, and the stabilization time is provided. Convergence within the allowable range is faster than in the case of no.
For example, when the first target angle ψ1 = 90 ° and the second target angle ψ2 = 0 °, the directions of the polarization-maintaining fiber tip faces 11e and 12e are adjusted to the state shown in FIG.
[0023]
In step Q11, the image processing unit 203 waits for the confirmation time (for example, 30 seconds) to elapse before proceeding to step Q12. Since this confirmation time is provided, both the first angle difference (θ1−ψ1) and the second angle difference (θ2−ψ2) are within the allowable range by chance, and the steps Q8 to Q10 have never been performed. Even in this case, it can be confirmed whether both the first angle difference (θ1−ψ1) and the second angle difference (θ2−ψ2) are within the allowable range.
[0024]
In step Q12, the image processing unit 203 calculates the first angle θ1 and the second angle θ2.
In step Q13, the image processing unit 203 proceeds to step Q14 if both the first angle difference (θ1−ψ1) and the second angle difference (θ2−ψ2) are within the allowable range, and returns to step Q8 if not. .
[0025]
In steps Q14 to Q16, the image processing unit 203 supplies power to the heater 105 through the heater control unit 205 while monitoring the temperature sensor 104, and heats and cures the thermosetting resins 4A and 4B. Turn off.
The heating condition by the heater 105 is, for example, 1 hour at 60 ° C. to 2 hours at 80 ° C. If the temperature is lower than 1 hour at 60 ° C. for a short time, curing becomes insufficient. On the other hand, if the temperature is set at 80 ° C. for a longer time and longer than 2 hours, the characteristics of the optical fibers 11 and 12 may be affected.
[0026]
After the step Q16, the two-core ferrule 1 and the polarization maintaining fibers 11 and 12 are removed from the holding jig 100, and the tip surface of the two-core ferrule 1 is polished.
[0027]
FIG. 18 is a schematic diagram showing the front end face of a symmetrical two-core polarization maintaining fiber assembly 501 that can be manufactured when ψ1 = 90 ° and ψ2 = 0 °.
FIG. 19 is a schematic diagram showing the front end face of a symmetrical two-core polarization-maintaining fiber assembly 502 that can be manufactured when ψ1 = 0 ° and ψ2 = 0 °.
FIG. 20 is a schematic diagram showing the front end face of a symmetric two-core polarization maintaining fiber assembly 503 that can be manufactured when ψ1 = 90 ° and ψ2 = 90 °.
FIG. 21 is a schematic diagram showing a front end surface of an asymmetric type dual-polarization-maintaining fiber assembly 504 that can be manufactured when ψ1 = 90 ° and ψ2 = 0 °.
FIG. 22 is a schematic view showing a front end surface of an asymmetric type dual-polarization-maintaining fiber assembly 505 that can be manufactured when ψ1 = 0 ° and ψ2 = 0 °.
FIG. 23 is a schematic diagram showing a front end surface of an asymmetric type dual-polarization-maintaining fiber assembly 506 that can be manufactured when ψ1 = 90 ° and ψ2 = 90 °.
FIG. 24 is a schematic diagram showing the distal end surface of an asymmetric type dual-polarization-maintaining fiber assembly 507 that can be manufactured when ψ1 = 0 ° and ψ2 = 90 °.
[0028]
In the above embodiment, the method and apparatus for manufacturing a two-core polarization maintaining fiber assembly has been described. However, the present invention can also be applied to a method and apparatus for manufacturing a polarization maintaining fiber assembly having three or more cores.
Moreover, although the panda type polarization maintaining fiber has been described in the above embodiment, the present invention can be implemented in the same manner as described above for other types of polarization maintaining fibers.
[0029]
【The invention's effect】
According to the manufacturing how multicore polarization maintaining fiber assembly of the present invention, the following effects can be obtained.
(1) The operation of inserting a plurality of polarization-maintaining fiber strands into the strand holes of the multicore ferrule is facilitated.
(2) The operation of putting each polarization maintaining fiber into the fiber hole of the multi-core ferrule becomes easy.
(3) When the polarization maintaining fiber is inserted into the thin fiber hole, the thermosetting resin does not get in the way.
(4) It is possible to prevent the thermosetting resin injected into the strand hole of the multi-core ferrule from being sucked into the insertion hole of the holding tube.
(5) Since the direction of each polarization-maintaining fiber is adjusted using the holding jig, the operation becomes easy.
(6) Since the thermosetting resin is cured by heating while holding the multi-core ferrule on the holding jig, the operation becomes easy.
[Brief description of the drawings]
FIG. 1 is a flowchart showing each step of a manufacturing method of a two-core polarization maintaining fiber assembly according to an embodiment of the present invention.
FIG. 2 is a schematic view of a polarization-maintaining fiber strand for explaining a film peeling process according to the present invention.
FIGS. 3A and 3B are a front end view and a side view of a holding tube for explaining a first stage of an integration process according to the present invention. FIGS.
FIGS. 4A and 4B are a front end view and a side view of a holding tube for explaining a second stage of an integration process according to the present invention. FIGS.
FIG. 5 is a cross-sectional view of a two-core ferrule for explaining an adhesive injection process according to the present invention.
FIG. 6 is a cross-sectional view of a two-core ferrule for explaining a first stage of an optical fiber insertion process according to the present invention.
FIG. 7 is a cross-sectional view of a two-core ferrule for explaining a second stage of the optical fiber insertion step according to the present invention.
FIG. 8 is a cross-sectional view of a two-core ferrule for explaining a third stage of the optical fiber insertion step according to the present invention.
FIG. 9 is a configuration diagram showing a two-core polarization maintaining fiber assembly manufacturing apparatus according to the present invention.
FIG. 10 is a flowchart showing the operation of the two-core polarization maintaining fiber assembly manufacturing apparatus according to the present invention.
FIG. 11 is a schematic diagram showing an image of the front end face of the first polarization maintaining fiber.
FIG. 12 is an explanatory diagram showing image recognition of a stress applying portion on the distal end face of the first polarization maintaining fiber.
FIG. 13 is a schematic diagram showing an image of a tip surface of a second polarization maintaining fiber.
FIG. 14 is an explanatory diagram showing image recognition of a stress applying portion on the distal end face of a second polarization maintaining fiber.
FIG. 15 is an explanatory diagram showing generation of a reference line for adjusting the direction of a polarization maintaining fiber;
FIG. 16 is an explanatory diagram showing an angle between reference lines for adjusting the direction of a polarization maintaining fiber;
FIG. 17 is a schematic diagram showing a screen after adjusting the direction of the polarization-maintaining fiber strand.
FIG. 18 is a schematic view showing a front end surface of a first example of a symmetrical two-core polarization maintaining fiber assembly manufactured according to the present invention.
FIG. 19 is a schematic view showing a front end surface of a second example of a symmetric two-core polarization maintaining fiber assembly manufactured according to the present invention.
FIG. 20 is a schematic view showing a tip surface of a third example of a symmetric two-core polarization maintaining fiber assembly manufactured according to the present invention.
FIG. 21 is a schematic view showing a front end surface of a first example of an asymmetric type two-core polarization maintaining fiber assembly manufactured according to the present invention.
FIG. 22 is a schematic view showing a front end surface of a second example of the asymmetric type two-core polarization maintaining fiber assembly manufactured according to the present invention.
FIG. 23 is a schematic view showing a tip surface of a third example of the asymmetric two-core polarization maintaining fiber assembly manufactured according to the present invention.
FIG. 24 is a schematic view showing a front end surface of a fourth example of an asymmetric two-core polarization maintaining fiber assembly manufactured according to the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 2 core ferrule 2 Stainless steel tube 3 Ceramic body 4A 1st thermosetting resin 4B 2nd thermosetting resin 10 Holding tube 11 1st polarization-maintaining fiber strand 11a 1st polarization-maintaining fiber 11b Coating 11e End face 12 Two-polarization-maintaining fiber strand 12a Second polarization-maintaining fiber 12b Coating 12e Front end surface 31 First fiber hole 32 Second fiber hole 100 Holding jigs 101, 102 Optical fiber holders 101m, 102m Servo motor 103 Ferrule holder 104 Temperature sensor 105 Heater 200 Direction adjustment device 201 Microscope 202 Display 203 Information processing unit 204 Motor control unit 205 Heater control unit 300 Two-core polarization maintaining fiber assembly manufacturing apparatus

Claims (2)

(1)複数の偏波保持ファイバ素線の端部の被膜をそれぞれ数cmかつ剥離部の長さに数mmずつの差を付けて剥離する被膜剥離工程と、(2)複数の挿通孔を穿設した保持チューブの前記挿通孔にそれぞれ偏波保持ファイバ素線を挿通し、剥離部の基端を揃えて一体的に保持し、多芯フェルールの素線孔に注入する第2の熱硬化性樹脂が保持チューブの挿入孔に吸い込まれるのを阻止しうる程度に第2の熱硬化性樹脂よりも粘度が高い第1の熱硬化性樹脂で挿通孔の先端側を封止する一体化工程と、(3)多芯フェルールのファイバ孔に偏波保持ファイバを挿通する際に邪魔にならない程度に粘度が低い第2の熱硬化性樹脂を多芯フェルールの素線孔に注入する接着剤注入工程と、(4)多芯フェルールの素線孔に、保持チューブで一体化した複数の偏波保持ファイバ素線を挿入し、各偏波保持ファイバ素線の剥離部を多芯フェルールのファイバ孔に挿通する光ファイバ挿通工程と、(5)多芯フェルールを回転しないように保持治具に保持し、各偏波保持ファイバを軸回転させて各偏波保持ファイバの方向を調整する方向調整工程と、(6)保持治具に多芯フェルールを保持したまま加熱して前記熱硬化性樹脂を硬化させる接着剤硬化工程とを有することを特徴とする多芯偏波保持ファイバアセンブリの製造方法。(1) A coating peeling process for peeling off the coatings at the ends of a plurality of polarization-maintaining fiber strands by a few centimeters and a difference of several millimeters in the length of the peeling portions, and (2) a plurality of insertion holes Second thermosetting that inserts the polarization-maintaining fiber strands into the insertion holes of the perforated holding tube, holds the base ends of the peeling portions together, and injects them into the strand holes of the multi-core ferrule. Integration step of sealing the distal end side of the insertion hole with the first thermosetting resin having a viscosity higher than that of the second thermosetting resin to the extent that the resin can be prevented from being sucked into the insertion hole of the holding tube (3) Adhesive injection for injecting a second thermosetting resin having a low viscosity so as not to obstruct the insertion of the polarization maintaining fiber into the fiber hole of the multi-core ferrule. Process and (4) Integrated into the wire hole of multi-core ferrule with holding tube An optical fiber insertion step of inserting a plurality of polarization-maintaining fiber strands and inserting a separation portion of each polarization-maintaining fiber strand into a fiber hole of the multi-core ferrule; and (5) preventing the multi-core ferrule from rotating. A direction adjusting step of holding the holding jig and rotating each polarization holding fiber to adjust the direction of each polarization holding fiber; and (6) heating and holding the multi-core ferrule on the holding jig. A method for manufacturing a multi-core polarization maintaining fiber assembly, comprising: an adhesive curing step for curing a thermosetting resin. 請求項1に記載の多芯偏波保持ファイバアセンブリの製造方法において、前記第1の熱硬化性樹脂の粘度が38000cpsであり、前記第2の熱硬化性樹脂の粘度が2000cpsであることを特徴とする多芯偏波保持ファイバアセンブリの製造方法。2. The method of manufacturing a multi-core polarization maintaining fiber assembly according to claim 1, wherein the viscosity of the first thermosetting resin is 38000 cps and the viscosity of the second thermosetting resin is 2000 cps. A manufacturing method of a multi-core polarization maintaining fiber assembly.
JP2001071583A 2001-03-14 2001-03-14 Manufacturing method of multi-core polarization maintaining fiber assembly Expired - Fee Related JP3904398B2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP2001071583A JP3904398B2 (en) 2001-03-14 2001-03-14 Manufacturing method of multi-core polarization maintaining fiber assembly
US09/942,857 US6926793B2 (en) 2001-03-14 2001-08-30 Method and apparatus for fabricating a multi-fiber polarization-maintaining fiber assembly
CNB011419091A CN1162720C (en) 2001-03-14 2001-09-21 Method and apparatus for producing multi-optical fibre optical fibre assembly to keep polarization
TW090123576A TW496974B (en) 2001-03-14 2001-09-25 Method and apparatus for fabricating a multi-fiber polarization-maintaining fiber assembly
HK03101585.6A HK1049518B (en) 2001-03-14 2003-03-04 Manufacturing method for multifiber polarization maintaining fiber assembly and multifiber polarization maintaining fiber assembly manufacturing device
US10/796,229 US7252130B2 (en) 2001-03-14 2004-03-09 Apparatus for fabricating a multi-fiber polarization-maintaining fiber assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001071583A JP3904398B2 (en) 2001-03-14 2001-03-14 Manufacturing method of multi-core polarization maintaining fiber assembly

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2005344885A Division JP4516006B2 (en) 2005-11-30 2005-11-30 Multi-core polarization maintaining fiber assembly manufacturing equipment

Publications (2)

Publication Number Publication Date
JP2002267880A JP2002267880A (en) 2002-09-18
JP3904398B2 true JP3904398B2 (en) 2007-04-11

Family

ID=18929288

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001071583A Expired - Fee Related JP3904398B2 (en) 2001-03-14 2001-03-14 Manufacturing method of multi-core polarization maintaining fiber assembly

Country Status (5)

Country Link
US (2) US6926793B2 (en)
JP (1) JP3904398B2 (en)
CN (1) CN1162720C (en)
HK (1) HK1049518B (en)
TW (1) TW496974B (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6907147B2 (en) * 2001-03-30 2005-06-14 Intel Corporation Method and apparatus for aligning and orienting polarization maintaining optical fibers
WO2003025640A1 (en) * 2001-09-13 2003-03-27 Fujikura Ltd. Optical fiber sheet and optical fiber sheet production method
US7156559B2 (en) 2003-04-21 2007-01-02 The Johns Hopkins University High temperature light guide
US7549802B2 (en) * 2007-06-28 2009-06-23 Verizon Services Corp. Fiber optic connector
US8485735B2 (en) * 2008-12-19 2013-07-16 US Conec, Ltd Field install fiber clip and method of use
US20130177273A1 (en) * 2010-07-12 2013-07-11 Research Foundation of CUNY on behalf of City College Cylindrical Vector Beam Generation From A Multicore Optical Fiber
US8946554B1 (en) * 2010-08-03 2015-02-03 Lockheed Martin Corporation Cable-end water sealing device for water-blocking non-water-blocked cable
US20130078587A1 (en) * 2011-09-28 2013-03-28 Ksaria Corporation Modular epoxy curing system
CN104216061B (en) * 2013-05-29 2016-02-10 中航光电科技股份有限公司 A kind of method for making of polarization maintaining optical fibre connector assembly
US9645328B2 (en) 2014-10-29 2017-05-09 Compass Electro Optical Systems Ltd. No-polish optical element attachment for optical fiber ferrule
US20160124163A1 (en) * 2014-10-29 2016-05-05 Compass Electro Optical Systems Ltd. Vacuum gripper
US9651744B2 (en) 2014-10-29 2017-05-16 Compass Electro Optical Systems Ltd. Multi-fiber ferrule
JP6388445B2 (en) * 2014-12-25 2018-09-12 Kddi株式会社 Multicore optical fiber grating manufacturing method and grating manufacturing apparatus
JP2016148806A (en) * 2015-02-13 2016-08-18 株式会社中原光電子研究所 Polarization maintaining optical fiber, capillary, and connector
CN106796327B (en) * 2015-02-13 2021-03-16 古河电气工业株式会社 Fixing structure of optical fiber
CN106468807B (en) * 2015-08-17 2018-05-29 泰科电子(上海)有限公司 The manufacturing method of automatic injection system and porous ferrule assembly
CN105487176A (en) * 2015-12-02 2016-04-13 杰讯光电(福建)有限公司 Optical fiber collimator gluing process and automatic gluing machine
CN105467524B (en) * 2015-12-11 2017-07-07 河南仕佳光子科技股份有限公司 Prepare the device and its application method of polarization maintaining optical fibre array
WO2020145010A1 (en) 2019-01-08 2020-07-16 住友電気工業株式会社 Method for manufacturing optical connector
US11953745B2 (en) * 2021-03-29 2024-04-09 Commscope Technologies Llc Fiber optic cable transition tube
WO2024047983A1 (en) * 2022-09-02 2024-03-07 株式会社フジクラ Optical unit
EP4339669A1 (en) * 2022-09-13 2024-03-20 Optek Systems, Inc. Method for orienting and terminating polarization-maintaining (pm) optical fiber and forming a pm optical fiber assembly

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7830817U1 (en) * 1977-11-14 1979-03-08 Thomas & Betts Corp., Elizabeth, N.J. (V.St.A.) DEVICE FOR ASSEMBLING LONGITUDINAL OBJECTS
DE3042609C2 (en) * 1980-11-12 1985-10-03 ANT Nachrichtentechnik GmbH, 7150 Backnang Procedure for adjusting a connector
JPS62100711A (en) * 1985-10-28 1987-05-11 Nippon Telegr & Teleph Corp <Ntt> Fixing jig for optical fiber
JPH01232308A (en) * 1988-03-14 1989-09-18 Nippon Telegr & Teleph Corp <Ntt> Assembling tool and assembling method for optical connector plug
GB9027638D0 (en) * 1990-12-20 1991-02-13 Raychem Ltd Cable-sealing mastic material
JP2801107B2 (en) * 1992-03-24 1998-09-21 日本碍子株式会社 How to assemble an optical fiber array
JP2819954B2 (en) * 1992-08-25 1998-11-05 富士通株式会社 Connection method and connection structure between multi-core tape fiber and ferrule
US5422971A (en) * 1993-02-02 1995-06-06 Sumitomo Electric Industries, Ltd. Optical fiber connector using adhesive
GB9320907D0 (en) * 1993-10-11 1993-12-01 Haxey Eng Ltd A clamp
FR2725796B1 (en) * 1994-10-14 1997-01-03 Alcatel Nv METHOD FOR FIXING OPTICAL FIBER WITH POLARIZATION HOLD AND FERRULE FOR SUCH FIBER
JP3007828B2 (en) * 1995-11-02 2000-02-07 日本碍子株式会社 Method for rotating polarization-maintaining optical fiber and jig used therefor
JPH09222536A (en) * 1995-12-13 1997-08-26 Furukawa Electric Co Ltd:The Multi-fiber optical connector
US6062740A (en) * 1997-08-25 2000-05-16 Sumitomo Electric Industries, Ltd. Optical connector and method of making the same
JP3821971B2 (en) * 1997-12-26 2006-09-13 日本碍子株式会社 Fiber optic array
JPH11305062A (en) * 1998-04-22 1999-11-05 Seiko Instruments Inc Heating and bonding device
US6134360A (en) * 1998-07-07 2000-10-17 Jds Uniphase Inc. Optical fibre sleeve
JP3295053B2 (en) * 1999-06-18 2002-06-24 株式会社精工技研 4-core ferrule for constant polarization optical fiber
JP2001318268A (en) * 2000-05-09 2001-11-16 Totoku Electric Co Ltd Tow-core, polarization maintaining optical fiber
JP2001318269A (en) * 2000-05-09 2001-11-16 Totoku Electric Co Ltd Method of manufacturing two-core polarization- maintaining optical fiber
JP2002040286A (en) * 2000-07-21 2002-02-06 Totoku Electric Co Ltd Method for manufacturing ferrule assembly, holding tool and device for manufacturing ferrule assembly
JP2002048942A (en) * 2000-08-04 2002-02-15 Totoku Electric Co Ltd Method for manufacturing ferrule assembly and device for manufacturing holder and ferrule assembly
US6799370B2 (en) * 2001-06-28 2004-10-05 Chiaro Networks Ltd. Manufacturing technique for optical fiber array

Also Published As

Publication number Publication date
CN1162720C (en) 2004-08-18
HK1049518B (en) 2005-01-21
US20020129623A1 (en) 2002-09-19
CN1374537A (en) 2002-10-16
US7252130B2 (en) 2007-08-07
US20040175091A1 (en) 2004-09-09
US6926793B2 (en) 2005-08-09
JP2002267880A (en) 2002-09-18
HK1049518A1 (en) 2003-05-16
TW496974B (en) 2002-08-01

Similar Documents

Publication Publication Date Title
JP3904398B2 (en) Manufacturing method of multi-core polarization maintaining fiber assembly
JP7024266B2 (en) Manufacturing equipment and manufacturing method for optical fibers with bent portions
CN112055824B (en) Optical connector and method of manufacturing the same
JP4516006B2 (en) Multi-core polarization maintaining fiber assembly manufacturing equipment
JP2003156648A (en) Polarization fiber and method for manufacturing the same, ribbon fiber and optical waveguide device using the same, and optical fiber array and method for manufacturing the same
JP2018165814A (en) Method of manufacturing optical connector
JP2002040286A (en) Method for manufacturing ferrule assembly, holding tool and device for manufacturing ferrule assembly
JP2002048942A (en) Method for manufacturing ferrule assembly and device for manufacturing holder and ferrule assembly
JPH11160575A (en) Optical connector and formation of optical connector using the same
JP2009244612A (en) Optical waveguide attaching component, optical waveguide connector, and method for manufacturing optical waveguide connector
US8201322B2 (en) Fiber optic connector tooling device
US5825953A (en) Polarized light variable lens holder
JPH0212113A (en) Manufacture of optical connector
WO2022138763A1 (en) Method for manufacturing optical fiber connection component
KR100419880B1 (en) Polarization Maintaining Fiber Alignment And Inspection Equipment
JP2006145832A (en) Polarization maintaining optical fiber with ferrule and its manufacturing method
JPH1020146A (en) Connection structure and method of optical waveguide and optical fiber
JP2000131551A (en) Coated optical fiber of which terminal end has been processed and coated optical fiber with connector ferrule and its manufacture
JPS6197605A (en) Manufacture of polarization plane maintaining fiber array
JPS604162Y2 (en) Optical fiber connector
JP2001318269A (en) Method of manufacturing two-core polarization- maintaining optical fiber
JP2005128093A (en) Optical fiber connector, and manufacturing method therefor
JP2004317927A (en) V-groove pedestal setting for coated optical fiber connection and method for assembling coated optical fiber connection tool using same
JPH09230170A (en) Production of optical connector
JPS6227708A (en) Method for attaching ferrule to terminal part of optical fiber

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041020

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050914

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051004

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070109

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070109

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110119

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110119

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120119

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120119

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130119

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140119

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees