JP3791422B2 - Water heater - Google Patents

Water heater Download PDF

Info

Publication number
JP3791422B2
JP3791422B2 JP2002016680A JP2002016680A JP3791422B2 JP 3791422 B2 JP3791422 B2 JP 3791422B2 JP 2002016680 A JP2002016680 A JP 2002016680A JP 2002016680 A JP2002016680 A JP 2002016680A JP 3791422 B2 JP3791422 B2 JP 3791422B2
Authority
JP
Japan
Prior art keywords
hot water
combustion
water supply
flow rate
maximum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002016680A
Other languages
Japanese (ja)
Other versions
JP2003214707A (en
Inventor
栄一 辻
武司 坂田
俊一 三木
昌明 松田
新悟 木村
佐一郎 羽藤
浩次 岸尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Noritz Corp
Original Assignee
Noritz Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Noritz Corp filed Critical Noritz Corp
Priority to JP2002016680A priority Critical patent/JP3791422B2/en
Publication of JP2003214707A publication Critical patent/JP2003214707A/en
Application granted granted Critical
Publication of JP3791422B2 publication Critical patent/JP3791422B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、給湯流量に応じて燃焼能力を可変制御する給湯装置に関する。
【0002】
【従来の技術】
たとえばガス給湯器では、出湯時の給湯流量や給湯設定温度などに応じて燃焼能力を可変制御している。制御目標とされる燃焼能力については、給湯設定温度や入水温度、さらにはトータル給湯流量などに基づいて号数により表現され、機種ごとに最大燃焼能力(最大号数)が定められている。このようなガス給湯器では、燃焼運転の開始直後に給湯流量が最大となるように出湯要求され、しかも、給湯設定温度が比較的高く設定されていると、燃焼能力が段階的かつ速やかに上昇させられ、ただちに最大燃焼能力が発揮されるように燃焼制御される。
【0003】
【発明が解決しようとする課題】
しかしながら、燃焼運転の開始直後に最大燃焼能力を発揮させる場合、燃焼能力を段階的かつ速やかに上昇させるのに起因して燃焼状態が不安定となり、ひいては火炎が不規則に変動するような状態に陥り、いわゆる振動燃焼が継続的に発生するという問題があった。
【0004】
また、振動燃焼が発生するような状況は言うに及ばず、最大燃焼能力に至るまでには、給湯流量を最大としても給湯設定温度に満たない状態で給湯が行われ、これでは使い勝手が良くないという問題もあった。
【0005】
【発明の開示】
本発明は、このような事情のもとで考え出されたものであって、振動燃焼を防止しつつも使い勝手の良い給湯装置を提供することを、その課題としている。
【0006】
上記の課題を解決するため、本発明では、次の技術的手段を講じている。
【0007】
すなわち、本発明によれば、給湯流量に応じて燃焼能力を可変制御する給湯装置であって、燃焼運転を開始してから所定時間が経過するまでは、最大給湯流量を所定の流量値に制限し、かつ、最大燃焼能力も所定の能力値に制限して給湯設定温度に保持した給湯を行い、所定時間を経過した後は、最大給湯流量および最大燃焼能力についての制限を徐々に緩和して給湯設定温度に保持した給湯を行う給湯燃焼制御手段を備えたことを特徴とする、給湯装置が提供される。
【0009】
他の好ましい実施の形態によれば、燃焼能力の実測結果に基づいて燃焼燃料としてのガス種を判定するガス種判定手段を備え、給湯燃焼制御手段は、ガス種判定手段によりガス種の判定結果が未だ得られない状況下において、最大給湯流量および最大燃焼能力を制限する。
【0010】
他の好ましい実施の形態によれば、燃焼運転に伴って上昇する装置内の雰囲気温度を検出する温度検出手段を備え、給湯燃焼制御手段は、温度検出手段により所定レベルの雰囲気温度が未だ検出されない状況下において、最大給湯流量および最大燃焼能力を制限する。
【0011】
本発明によれば、たとえばガス種の判定を終えていない状態や雰囲気温度が所定レベルに満たない燃焼運転の開始直後であっても、所定時間が経過するまでは、最大給湯流量ならびに最大燃焼能力がある程度のレベルに制限された上で給湯燃焼動作が行われ、所定時間の経過後は、その制限を徐々に緩和して給湯設定温度に保持した給湯動作が行われるので、そのように制限された給湯燃焼動作により所定時間が経過するまでは安定した燃焼状態を保ちながらも、たとえば給湯設定温度を満足するような流量をもって給湯を行うことができ、振動燃焼を防止しつつも使い勝手を良くすることができる。
【0012】
本発明のその他の特徴および利点は、添付図面を参照して以下に行う発明の実施の形態の説明によって、より明らかになるであろう。
【0013】
【発明の実施の形態】
以下、本発明の好ましい実施の形態を、図面を参照して具体的に説明する。
【0014】
図1は、本発明に係る給湯装置の概略構成を説明するための説明図である。この図に示す給湯装置は、いわゆるガス給湯器であって、ガスを燃料とするバーナ1、バーナ1により加熱される熱交換器2、熱交換器2に対して上水道からの水を供給する入水管3、熱交換器2で加熱された湯水を水栓10に案内する出湯管4、ガス給湯器を制御する制御部(給湯燃焼制御手段)5などにより構成される。
【0015】
バーナ1は、缶体6内に収容された複数の燃焼管11と、燃焼管11の燃焼本数の切り替えを行う複数の能力切替弁12a〜12cと、燃焼管11に供給するガス圧を調節するガス比例弁13と、燃料ガスの供給/停止の切り替えを行う元ガス電磁弁14などからなる。なお、缶体6内には、燃焼管11に着火するための点火プラグ15、燃焼管11の立ち消えなどを検出するための立ち消え安全装置16、燃焼管11付近の温度を検出するためのバーナサーミスタ17などが設けられている。
【0016】
燃焼管11は、多数本が缶体6内の熱交換器2に臨むように設けられており、能力切替弁12a〜12cの開閉動作に応じて燃焼本数が切り替えられる。具体的に言うと、制御部5からの制御信号に基づいて能力切替弁12aが開動作すると、それに対応する2本の燃焼管11が燃焼状態とされ、能力切替弁12bが開動作すると、それに対応する3本の燃焼管11が燃焼状態とされ、能力切替弁12cが開動作すると、それに対応する6本の燃焼管11が燃焼状態とされる。また、ガス比例弁13は、制御部5からの制御信号に基づいて弁体13aの開度を調節することにより、燃焼管11に供給されるガス圧を調節するものである。さらに、元ガス電磁弁14は、制御部5からの制御信号に基づいて弁体14aを開閉することにより、燃焼管11に対する燃料ガスの供給/停止を行うものである。つまり、能力切替弁12a〜12cやガス比例弁13を開閉制御することで燃焼管11の燃焼本数やガス圧が変化させられ、これにより燃焼能力が可変制御されている。ちなみに、制御目標となる燃焼能力は、給湯設定温度や入水温度、さらにはトータル給湯流量などに基づいて号数単位で求められる。
【0017】
また、缶体6内には、燃焼室内の給排気を行うための燃焼ファン18が設けられている。この燃焼ファン18は、モータ回転数のフィードバック制御可能なファンモータ(図示省略)を動力源として回転するものであって、ファンモータの回転数は、制御部5からの制御信号に基づいて制御可能とされている。特に図示しないが、ファンモータの回転軸には、たとえばロータリエンコーダなどからなる回転数センサが設けられており、この回転数センサからの検出信号が制御部5に入力されるように構成されている。
【0018】
熱交換器2は、その一端が入水管3に接続されるとともに、他端が出湯管4に接続されており、入水管3から供給される水を加熱して出湯管4に湯水を導くように構成されている。入水管3は、図示しない上水道から給水される水を熱交換器2に供給するための配管であって、この入水管3には、入水温度を検出する入水温度センサ31と、缶体流量を検出する缶体流量センサ32とが設けられている。一方、出湯管4は、熱交換器2で加熱された湯水を水栓10に供給するための配管であって、この出湯管4には、出湯(給湯)流量を調節するための出湯流量調節弁41と、出湯流量調節弁41の上流側における出湯温度を検出する出湯上流温度センサ42とが設けられている。なお、入水温度センサ31、缶体流量センサ32、および出湯上流温度センサ42は、検出信号を制御部5に入力するように構成されている。また、出湯流量調節弁41は、制御部5からの制御信号に基づいて開度調節可能に構成されている。
【0019】
さらに、入水管3と出湯管4との間には、バイパス管7が配管されている。そのため、出湯管4には、熱交換器2から供給される湯水とバイパス管7を通じて供給される水とを混合するための攪拌機構43が設けられているとともに、この攪拌機構43の下流側で出湯温度を検出する出湯下流温度センサ44とが設けられている。一方、バイパス管7には、その流量を検出するバイパス流量センサ71と、流量を調節するためのバイパス流量調整弁72とが設けられている。なお、出湯下流温度センサ44は、検出信号を制御部5に入力するように構成されている。また、バイパス流量調整弁72は、制御部5からの制御信号に基づいて開度調節可能に構成されている。
【0020】
制御部5は、ガス給湯器各部の動作を制御するために、一般に周知のCPU、ROM、RAMなどで構成されたマイクロコンピュータや周辺回路などからなるものである。マイクロコンピュータは、各種の制御プログラムやデータに基づいて給湯燃焼制御を行うように構成されている。特に、データには、ガス種ごとに燃焼能力(号数)をどのように制御するのかを表したガス種対応燃焼データが含まれる。具体的な内容としてガス種対応燃焼データには、ガス種ごとに目標燃焼能力に応じた燃焼能力段数(能力切替弁12a,12b,12cの開閉パターン)、ガス圧データ(ガス比例弁13の開度)、燃焼ファン18のファンモータ回転数などをあらかじめ定めたデータテーブルが含まれる。また、制御プログラムには、目標燃焼能力に対する燃焼能力の実測結果(出湯温度や入水温度、さらにはトータル給湯流量などから求められる実燃焼能力)の割合を基にしてガス種を自動的に判定するプログラム(ガス種判定手段)が含まれる。なお、特に図示しないが、制御部5には、使用者が燃焼運転の開始/停止を指示したり給湯設定温度を設定するための遠隔操作リモコンが接続されており、制御部5は、遠隔操作リモコンとの間で各種の信号をやり取りできるように構成されている。また、ガス種の自動判定プログラムは、トータル給湯流量などに基づくものばかりでなく、それ以外の事項に基づいてガス種を自動的に判定するものも存在する。
【0021】
ここで、ガス種の自動判定について具体的に説明すると、燃焼運転の開始直後においては、制御部5のマイクロコンピュータにより装置内の雰囲気温度に基づいて暖まり具合が良否判定される。この暖まり具合の良否判定は、装置内に設けられた図示しない雰囲気サーミスタや、出湯上流温度センサ42などによる検出温度が所定レベル以上かどうかを判定し、検出温度が所定レベル以上になると暖まり具合を良とした判定結果が得られる。逆に言えば、検出温度が所定レベル未満では、暖まり具合が不十分と判定される。
【0022】
以上のようにして暖まり具合が不十分と判定される状況下にあっても、制御部5のマイクロコンピュータには、たとえば「12A」あるいは「13A」といったガス種を自動判定するプログラムがロードされるが、ガス種の判定結果が得られるまでは、とりあえず発熱量の低いガス種「12A」に対応した燃焼データに基づいて燃焼制御が行われる。これは、実際にガス種「12A」が供給されるにもかかわらず、ガス種「13A」に対応したモータ回転数で燃焼ファン18を回転させると、給気量が過剰となって燃焼管11が着火不良や立ち消えを起こす可能性があるためである。
【0023】
その後、制御部5のマイクロコンピュータは、入水温度センサ31、缶体流量センサ32、出湯下流温度センサ44、バイパス流量センサ71などからの検出信号に基づいて、実際に出力中の実燃焼能力を求める。一例として、実燃焼能力は、下記数式1に示す演算関係式から求められる。なお、制御目標として可変制御される目標燃焼能力は、下記数式1の出湯温度に給湯設定温度を代入することで求められる。また、トータル給湯流量は、缶体流量センサ32およびバイパス流量センサ71の双方で検出された流量を加算することで求められる。
【0024】
【数1】

Figure 0003791422
【0025】
そして、制御部5のマイクロコンピュータは、現時点で制御目標とする目標燃焼能力と実測結果として得られた実燃焼能力とを比較し、実燃焼能力が目標燃焼能力の規定割合以上の場合には、実際に供給されているガス種を「13A」と判定する。一方、実燃焼能力が目標燃焼能力の規定割合未満の場合には、実際に供給されているガス種を「12A」と判定する。こうして判定結果が得られると、マイクロコンピュータには、実際のガス種に対応した燃焼データがロードされ、ガス種に応じて最適な状態で燃焼制御が行われる。
【0026】
ところで、燃焼運転の開始直後にあって未だガス種の判定結果が得られない状況下では、使用者により水栓10が最大開度とされることでトータル給湯流量が最大とされ、しかも、その際に給湯設定温度が比較的高く設定されていることもあり得る。そうした場合、従来の燃焼制御では、燃焼能力が段階的かつ速やかに上昇させられ、ただちに最大燃焼能力を発揮するように制御されるが、その際、比較的低い雰囲気温度の下で燃焼管11の燃焼本数を敏速に切り替えるのに伴い、燃焼ファン18のファン回転数が追従しきれなかったり、空燃比のバランスが不安定になってしまい、その結果として振動燃焼を起こすおそれがある。また、最大燃焼能力に至るまでには、燃焼能力不足により使用者が望む給湯設定温度に満たない状態で給湯が行われてしまう。
【0027】
そのため、本実施形態に係るガス給湯器では、図2に示すように、燃焼運転を開始してからガス種の判定結果が得られるまでの初期燃焼時間T1内に限り、最大給湯流量を本来の100%よりも低いA%に制限し、それに応じて最大燃焼能力についても本来の100%よりも低いA%となるように制限している。ちなみに、初期燃焼時間T1は、たとえば10秒程度とされる。また、A%は、たとえば60〜80%程度とされる。したがって、燃焼運転の開始直後に使用者が水栓10を最大開度としても、初期燃焼時間T1内においては最大給湯流量のA%しか出湯されないが、振動燃焼もなく正常に燃焼能力を発揮し得る状態で燃焼制御が行われるので、実際に出湯される湯水は、ほぼ給湯設定温度に保たれた状態で出湯される。
【0028】
ただし、初期燃焼時間T1経過後にあっては、図2に示すように、T1〜T2の時間間隔、さらにT2〜T3の時間間隔ごとに段階的なレベルを踏んで最大給湯流量および最大燃焼能力の割合を徐々に引き上げるように制御される。つまり、燃焼運転を開始してから燃焼状態が安定する十分な時間T3が経過すると、最大給湯流量および最大燃焼能力を100%発生し得る状態となり、これらの制限が解除された状態となる。したがって、燃焼運転の開始から十分な時間T3が経過することでもはや暖まり具合が十分なレベルにあり、ガス種の判定結果も得た状態で実際のガス種に適応して燃焼制御が行われる安定燃焼状態では、出湯特性を損なうことなく使用者の要求に応じた流量および温度をもって湯水が出湯されることとなる。なお、最大給湯流量および最大燃焼能力の制限を解除するための条件は、時間T3の経過、ガス種の判定結果、雰囲気温度に基づく暖まり具合といった3種の条件を同時に満たす場合に限らず、上記した3種の条件のうち、いずれか1つの条件、あるいは少なくともいずれか2つの条件を満たせば、最大給湯流量および最大燃焼能力の制限を解除するとしても良い。
【0029】
次に、制御部5のマイクロコンピュータが実行する燃焼制御手順について説明する。
【0030】
図3は、燃焼制御処理を示すフローチャートであって、まず、マイクロコンピュータのCPUは、使用者により燃焼開始が指示されると(S1:YES)、タイマカウンタの値を「0」にリセットする(S2)。タイマカウンタの値は、1秒ごとに1つずつ加算される。
【0031】
そして、CPUは、ガス種を自動判定するモードか否かを確認する(S3)。なお、前回の燃焼時にガス種の自動判定が行われ、すでにガス種が判明している場合には、この燃焼制御処理とは異なるガス種対応のルーチンが実行され、ガス種の自動判定モードとは異なるモードとされる。
【0032】
ガス種の自動判定モードではあるが(S3:YES)、ガス種の判定結果が未だ得られていない場合(S4:YES)、CPUは、タイマカウンタの値が10未満か否かを調べる(S5)。
【0033】
タイマカウンタの値が10未満の場合(S5:YES)、CPUは、最大燃焼能力および最大給湯流量をA%までダウンさせ(S6)、その後S4に戻る。
【0034】
一方、S5において、タイマカウンタの値が10以上の場合(S5:NO)、CPUは、最大燃焼能力および最大給湯流量を所定の割合ずつ段階的にアップさせ(S7)、最終的には最大燃焼能力および最大給湯流量を100%とした状態でこの処理を終える。
【0035】
S4において、ガス種の判定結果がすでに得られている場合(S4:NO)、CPUは、S7に進む。ただし、この場合には、ガス種に応じた最適な燃焼制御が行われるので、最大給湯流量および最大燃焼能力の制限が即解除される。
【0036】
S3において、ガス種の自動判定モードとは異なるモードの場合(S3:NO)、CPUは、別ルーチンに進むべくこの処理を終える。
【0037】
S1において、燃焼開始が指示されない場合(S1:NO)、CPUは、燃焼開始が指示されるまで本ルーチンを実行しない。
【0038】
つまり、図3に示すルーチンに従って燃焼制御を実行中、仮に給湯流量が最大となるように要求されても、最大燃焼能力とともに最大給湯流量がA%までとなるように制限されているので、そのような制限の下では給湯設定温度に保たれたある程度の流量をもって湯水が出湯される。
【0039】
したがって、上記ガス給湯器によれば、ガス種「12A」,「13A」の判定結果が得られていない燃焼運転の開始直後であっても、最大給湯流量ならびに最大燃焼能力がA%にまで制限された上で給湯燃焼動作が行われるので、そのように制限された給湯燃焼動作により初期燃焼時間T1が経過するまでは安定した燃焼状態を保ちながらも、給湯設定温度に保たれた流量をもって給湯を行うことができ、振動燃焼を防止しつつも使い勝手を良くすることができる。
【0040】
なお、本発明は、上記実施形態に限定されるものではない。
【0041】
上記実施形態では、燃焼運転の開始後、暖まり具合の良否判定を経てガス種の判定結果が得られた場合や初期燃焼時間T1を経てさらに時間T3の経過後、最大燃焼能力および最大給湯流量が100%とされるが、燃焼運転に必要な最低作動流量が確認されてから所定時間経過後に最大燃焼能力および最大給湯流量が100%に戻されるとしても良い。
【0042】
また、ガス種の判定における目標燃焼能力と実燃焼能力との比較においては、下記数式2を採用すればガス種判定精度をより向上させることができる。ここで、入水温度は、入水温度センサ31の検出値、缶体流量は、缶体流量センサ32の検出値、出湯上流温度は、出湯上流温度センサ42の検出値である。
【0043】
【数2】
Figure 0003791422
【0044】
【発明の効果】
以上説明したように、本発明によれば、たとえばガス種の判定を終えていない状態や雰囲気温度が所定レベルに満たない燃焼運転の開始直後であっても、所定時間が経過するまでは、最大給湯流量ならびに最大燃焼能力がある程度のレベルに制限された上で給湯燃焼動作が行われ、所定時間の経過後は、その制限を徐々に緩和して給湯設定温度に保持した給湯動作が行われるので、そのように制限された給湯燃焼動作により所定時間が経過するまでは安定した燃焼状態を保ちながらも、たとえば給湯設定温度を満足するような流量をもって給湯を行うことができ、振動燃焼を防止しつつも使い勝手を良くすることができる。
【図面の簡単な説明】
【図1】本発明に係る給湯装置の概略構成を説明するための説明図である。
【図2】最大給湯流量および最大燃焼能力が時間軸に沿って制御されることを説明するための説明図である。
【図3】燃焼制御処理を示すフローチャートである。
【符号の説明】
1 バーナ
2 熱交換器
3 入水管
4 出湯管
5 制御部
6 缶体
10 水栓
11 燃焼管
12a,12b,12c 能力切替弁
13 ガス比例弁
14 元ガス電磁弁
15 点火プラグ
16 立ち消え安全装置
17 バーナサーミスタ
18 燃焼ファン
31 入水温度センサ
32 缶体流量センサ
41 出湯流量調節弁
42 出湯上流温度センサ
43 攪拌機構
44 出湯下流温度センサ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a hot water supply apparatus that variably controls a combustion capacity in accordance with a hot water supply flow rate.
[0002]
[Prior art]
For example, in a gas water heater, the combustion capacity is variably controlled according to the hot water flow rate at the time of hot water discharge, the hot water supply set temperature, and the like. The combustion capacity that is the control target is expressed by a number based on the hot water supply set temperature, the incoming water temperature, and the total hot water supply flow rate, and the maximum combustion capacity (maximum number) is determined for each model. In such a gas water heater, hot water discharge is requested so that the hot water supply flow rate becomes maximum immediately after the start of the combustion operation, and if the hot water supply set temperature is set to be relatively high, the combustion capacity increases stepwise and quickly. The combustion is controlled so that the maximum combustion capacity is immediately exerted.
[0003]
[Problems to be solved by the invention]
However, when the maximum combustion capacity is exerted immediately after the start of the combustion operation, the combustion state becomes unstable due to the increase in the combustion capacity in a stepwise and rapid manner, and as a result, the flame fluctuates irregularly. There was a problem that so-called vibration combustion occurred continuously.
[0004]
Needless to say, the situation where vibration combustion occurs, until the maximum combustion capacity is reached, hot water supply is performed in a state where the hot water supply flow rate is not reached even at the hot water supply set temperature, which is not easy to use. There was also a problem.
[0005]
DISCLOSURE OF THE INVENTION
The present invention has been conceived under such circumstances, and an object thereof is to provide a hot water supply device that is easy to use while preventing vibration combustion.
[0006]
In order to solve the above problems, the present invention takes the following technical means.
[0007]
That is, according to the present invention, a hot water supply device that variably controls the combustion capacity according to the hot water supply flow rate, and the maximum hot water supply flow rate is limited to a predetermined flow rate value until a predetermined time elapses after the combustion operation is started. In addition, the hot water supply is performed by limiting the maximum combustion capacity to a predetermined capacity value and maintaining the hot water supply set temperature, and after a predetermined time has elapsed, gradually limit the maximum hot water flow rate and the maximum combustion capacity. There is provided a hot water supply apparatus comprising hot water combustion control means for supplying hot water held at a hot water supply set temperature .
[0009]
According to another preferred embodiment, it is provided with a gas type determination means for determining a gas type as combustion fuel based on the actual measurement result of the combustion capacity, and the hot water supply combustion control means is a gas type determination result by the gas type determination means. However, the maximum hot water flow rate and the maximum combustion capacity are limited in a situation where the above cannot be obtained yet.
[0010]
According to another preferred embodiment, it is provided with temperature detection means for detecting the atmospheric temperature in the apparatus that rises with combustion operation, and the hot water combustion control means has not yet detected a predetermined level of atmospheric temperature by the temperature detection means. Under circumstances, limit the maximum hot water flow rate and maximum combustion capacity.
[0011]
According to the present invention, for example, even when the determination of the gas type is not completed or immediately after the start of the combustion operation in which the ambient temperature is less than the predetermined level , the maximum hot water supply flow rate and the maximum combustion capacity are maintained until a predetermined time elapses. limited but hot water supply combustion operation is performed on that are restricted to certain levels, after a predetermined time, that limitation is gradually relaxed hot water supply operation held in hot water set temperature is carried out Runode, as such For example, while maintaining a stable combustion state until a predetermined time has elapsed due to the hot water combustion operation performed, hot water can be supplied at a flow rate that satisfies the hot water set temperature, for example, and it is easy to use while preventing vibration combustion can do.
[0012]
Other features and advantages of the present invention will become more apparent from the following description of embodiments of the present invention with reference to the accompanying drawings.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.
[0014]
Drawing 1 is an explanatory view for explaining a schematic structure of a hot-water supply device concerning the present invention. The hot water supply apparatus shown in this figure is a so-called gas water heater, which is a burner 1 that uses gas as fuel, a heat exchanger 2 that is heated by the burner 1, and an inlet that supplies water from the water supply to the heat exchanger 2. A water pipe 3, a hot water pipe 4 that guides hot water heated by the heat exchanger 2 to the faucet 10, a control unit (hot water supply combustion control means) 5 that controls the gas water heater, and the like.
[0015]
The burner 1 adjusts the gas pressure supplied to the combustion tube 11, the plurality of combustion tubes 11 accommodated in the can body 6, the plurality of capacity switching valves 12 a to 12 c that switch the number of combustion tubes 11. It consists of a gas proportional valve 13 and a source gas solenoid valve 14 for switching between supply / stop of fuel gas. In the can 6, a spark plug 15 for igniting the combustion tube 11, a turn-off safety device 16 for detecting the turn-off of the combustion tube 11, and a burner thermistor for detecting the temperature in the vicinity of the combustion tube 11. 17 etc. are provided.
[0016]
Many combustion pipes 11 are provided so as to face the heat exchanger 2 in the can 6, and the number of combustion pipes is switched according to the opening / closing operation of the capacity switching valves 12 a to 12 c. More specifically, when the capacity switching valve 12a is opened based on the control signal from the control unit 5, the two combustion pipes 11 corresponding thereto are brought into a combustion state, and when the capacity switching valve 12b is opened, When the corresponding three combustion pipes 11 are in the combustion state and the capacity switching valve 12c is opened, the corresponding six combustion pipes 11 are in the combustion state. Further, the gas proportional valve 13 adjusts the gas pressure supplied to the combustion pipe 11 by adjusting the opening of the valve body 13 a based on a control signal from the control unit 5. Further, the original gas electromagnetic valve 14 opens / closes the valve body 14 a based on a control signal from the control unit 5 to supply / stop the fuel gas to the combustion pipe 11. That is, the combustion number and the gas pressure of the combustion pipe 11 are changed by opening / closing the capacity switching valves 12a to 12c and the gas proportional valve 13, whereby the combustion capacity is variably controlled. Incidentally, the combustion capacity that is the control target is obtained in units of number based on the hot water supply set temperature, the incoming water temperature, and the total hot water supply flow rate.
[0017]
A combustion fan 18 for supplying and exhausting air in the combustion chamber is provided in the can body 6. The combustion fan 18 rotates using a fan motor (not shown) capable of feedback control of the motor rotation speed as a power source, and the rotation speed of the fan motor can be controlled based on a control signal from the control unit 5. It is said that. Although not shown in particular, the rotation shaft of the fan motor is provided with a rotation speed sensor such as a rotary encoder, and a detection signal from this rotation speed sensor is input to the control unit 5. .
[0018]
One end of the heat exchanger 2 is connected to the inlet pipe 3 and the other end is connected to the outlet pipe 4 so that the water supplied from the inlet pipe 3 is heated to guide the hot water to the outlet pipe 4. It is configured. The water intake pipe 3 is a pipe for supplying water supplied from a water supply (not shown) to the heat exchanger 2. The water intake pipe 3 includes a water intake temperature sensor 31 for detecting the water intake temperature, and a can body flow rate. A can body flow sensor 32 for detection is provided. On the other hand, the tapping pipe 4 is a pipe for supplying hot water heated by the heat exchanger 2 to the faucet 10, and the tapping pipe 4 has a tapping flow rate adjustment for adjusting the tapping (hot water supply) flow rate. A valve 41 and a hot water upstream temperature sensor 42 for detecting the hot water temperature on the upstream side of the hot water flow rate adjustment valve 41 are provided. The incoming water temperature sensor 31, the can body flow sensor 32, and the hot water upstream temperature sensor 42 are configured to input detection signals to the control unit 5. Moreover, the hot water flow rate adjustment valve 41 is configured to be able to adjust the opening degree based on a control signal from the control unit 5.
[0019]
Further, a bypass pipe 7 is provided between the water inlet pipe 3 and the hot water outlet pipe 4. Therefore, the outlet pipe 4 is provided with a stirring mechanism 43 for mixing hot water supplied from the heat exchanger 2 and water supplied through the bypass pipe 7, and on the downstream side of the stirring mechanism 43. A hot water downstream temperature sensor 44 for detecting the hot water temperature is provided. On the other hand, the bypass pipe 7 is provided with a bypass flow rate sensor 71 for detecting the flow rate and a bypass flow rate adjustment valve 72 for adjusting the flow rate. The hot water downstream temperature sensor 44 is configured to input a detection signal to the control unit 5. Further, the bypass flow rate adjustment valve 72 is configured to be able to adjust the opening degree based on a control signal from the control unit 5.
[0020]
The control unit 5 includes a microcomputer, a peripheral circuit, and the like that are generally configured with a CPU, ROM, RAM, and the like in order to control the operation of each part of the gas water heater. The microcomputer is configured to perform hot water supply combustion control based on various control programs and data. In particular, the data includes gas type corresponding combustion data representing how to control the combustion capacity (number) for each gas type. Specifically, the combustion data corresponding to the gas type includes the number of combustion capacity stages (open / close patterns of the capacity switching valves 12a, 12b, and 12c) corresponding to the target combustion capacity for each gas type, and gas pressure data (opening of the gas proportional valve 13). Degree), the fan motor rotation speed of the combustion fan 18, and the like, a data table in which a predetermined value is included is included. In addition, the control program automatically determines the gas type based on the ratio of the actual measurement result of the combustion capacity with respect to the target combustion capacity (the actual combustion capacity obtained from the tapping temperature, the incoming water temperature, and the total hot water supply flow rate). A program (gas type determination means) is included. Although not particularly illustrated, the control unit 5 is connected to a remote operation remote controller for the user to instruct start / stop of the combustion operation or set the hot water supply set temperature. Various signals can be exchanged with the remote control. In addition, the automatic gas type determination program includes not only a program based on the total hot water supply flow rate, but also a program that automatically determines the gas type based on other matters.
[0021]
Here, the automatic determination of the gas type will be specifically described. Immediately after the start of the combustion operation, the microcomputer of the control unit 5 determines whether the warming is good or not based on the ambient temperature in the apparatus. This warming condition determination is performed by determining whether the temperature detected by an atmospheric thermistor (not shown) provided in the apparatus, the hot water upstream temperature sensor 42, or the like is equal to or higher than a predetermined level. A good judgment result is obtained. In other words, when the detected temperature is lower than the predetermined level, it is determined that the warming condition is insufficient.
[0022]
Even in a situation where it is determined that the degree of warming is insufficient as described above, the microcomputer of the control unit 5 is loaded with a program for automatically determining a gas type such as “12A” or “13A”, for example. However, until the determination result of the gas type is obtained, the combustion control is performed based on the combustion data corresponding to the gas type “12A” having a low calorific value for the time being. This is because when the combustion fan 18 is rotated at the motor speed corresponding to the gas type “13A”, the supply amount becomes excessive, even though the gas type “12A” is actually supplied. This is because there is a possibility of causing poor ignition and disappearance.
[0023]
Thereafter, the microcomputer of the control unit 5 obtains the actual combustion capacity during actual output based on detection signals from the incoming water temperature sensor 31, the can flow rate sensor 32, the tapping water downstream temperature sensor 44, the bypass flow rate sensor 71, and the like. . As an example, the actual combustion capacity is obtained from an arithmetic relational expression shown in the following mathematical formula 1. The target combustion capacity that is variably controlled as the control target can be obtained by substituting the hot water supply set temperature for the hot water temperature of Equation 1 below. Further, the total hot water supply flow rate is obtained by adding the flow rates detected by both the can flow rate sensor 32 and the bypass flow rate sensor 71.
[0024]
[Expression 1]
Figure 0003791422
[0025]
Then, the microcomputer of the control unit 5 compares the target combustion capacity as the control target at the present time with the actual combustion capacity obtained as the actual measurement result, and when the actual combustion capacity is equal to or greater than the specified ratio of the target combustion capacity, The gas type actually supplied is determined as “13A”. On the other hand, when the actual combustion capacity is less than the specified ratio of the target combustion capacity, the actually supplied gas type is determined as “12A”. When the determination result is obtained in this manner, the microcomputer is loaded with combustion data corresponding to the actual gas type, and combustion control is performed in an optimum state according to the gas type.
[0026]
By the way, under the situation where the determination result of the gas type is not yet obtained immediately after the start of the combustion operation, the total hot water supply flow rate is maximized by setting the faucet 10 to the maximum opening by the user. At that time, the hot water supply set temperature may be set relatively high. In such a case, in the conventional combustion control, the combustion capacity is increased stepwise and quickly, and immediately controlled so as to exhibit the maximum combustion capacity. At this time, the combustion pipe 11 is controlled under a relatively low ambient temperature. As the number of combustions is quickly switched, the fan rotation speed of the combustion fan 18 cannot follow, or the air-fuel ratio balance becomes unstable, and as a result, vibration combustion may occur. Moreover, by the time the maximum combustion capacity is reached, hot water is supplied in a state where the hot water supply temperature desired by the user is not satisfied due to insufficient combustion capacity.
[0027]
Therefore, in the gas water heater according to the present embodiment, as shown in FIG. 2, the maximum hot water supply flow rate is set to the original flow rate only during the initial combustion time T1 from the start of the combustion operation until the determination result of the gas type is obtained. It is limited to A% lower than 100%, and the maximum combustion capacity is also limited to A% lower than the original 100% accordingly. Incidentally, the initial combustion time T1 is set to about 10 seconds, for example. In addition, A% is, for example, about 60 to 80%. Therefore, even if the user sets the faucet 10 to the maximum opening degree immediately after the start of the combustion operation, only A% of the maximum hot water supply flow rate is discharged within the initial combustion time T1, but the combustion capability is exhibited normally without vibration combustion. Since the combustion control is performed in the obtained state, the hot water actually discharged is discharged in a state where the hot water supply temperature is substantially maintained.
[0028]
However, after the initial combustion time T1 has elapsed, as shown in FIG. 2, the maximum hot water supply flow rate and the maximum combustion capacity of the time intervals of T1 to T2, and further to the time intervals of T2 to T3 are stepped on. Controlled to gradually increase the rate. That is, when a sufficient time T3 for stabilizing the combustion state has elapsed since the start of the combustion operation, the maximum hot water supply flow rate and the maximum combustion capacity can be generated 100%, and these restrictions are released. Therefore, when a sufficient time T3 has elapsed from the start of the combustion operation, the warming condition is no longer sufficient, and the combustion control is performed in accordance with the actual gas type in a state where the determination result of the gas type is also obtained. In the combustion state, the hot water is discharged at a flow rate and temperature according to the user's request without impairing the hot water characteristics. The conditions for releasing the restrictions on the maximum hot water supply flow rate and the maximum combustion capacity are not limited to the case where the three conditions such as the passage of time T3, the determination result of the gas type, and the warming condition based on the ambient temperature are satisfied simultaneously. Of these three types of conditions, if any one of the conditions, or at least any two of the conditions are satisfied, the restrictions on the maximum hot water supply flow rate and the maximum combustion capacity may be released.
[0029]
Next, a combustion control procedure executed by the microcomputer of the control unit 5 will be described.
[0030]
FIG. 3 is a flowchart showing the combustion control process. First, the CPU of the microcomputer resets the value of the timer counter to “0” when the user gives an instruction to start combustion (S1: YES) ( S2). The value of the timer counter is incremented by 1 every second.
[0031]
Then, the CPU confirms whether or not it is a mode for automatically determining the gas type (S3). If the gas type is automatically determined at the previous combustion and the gas type is already known, a routine corresponding to the gas type different from the combustion control process is executed, and the automatic gas type determination mode and Are in different modes.
[0032]
In the automatic gas type determination mode (S3: YES), if the determination result of the gas type is not yet obtained (S4: YES), the CPU checks whether the value of the timer counter is less than 10 (S5). ).
[0033]
When the value of the timer counter is less than 10 (S5: YES), the CPU decreases the maximum combustion capacity and the maximum hot water supply flow rate to A% (S6), and then returns to S4.
[0034]
On the other hand, in S5, when the value of the timer counter is 10 or more (S5: NO), the CPU gradually increases the maximum combustion capacity and the maximum hot water flow rate by a predetermined ratio (S7), and finally the maximum combustion. This processing is finished in a state where the capacity and the maximum hot water supply flow rate are set to 100%.
[0035]
If the determination result of the gas type has already been obtained in S4 (S4: NO), the CPU proceeds to S7. However, in this case, the optimum combustion control according to the gas type is performed, so that the restrictions on the maximum hot water supply flow rate and the maximum combustion capacity are immediately released.
[0036]
In S3, when the mode is different from the automatic gas type determination mode (S3: NO), the CPU ends this process to proceed to another routine.
[0037]
If the start of combustion is not instructed in S1 (S1: NO), the CPU does not execute this routine until the start of combustion is instructed.
[0038]
That is, even if the hot water supply flow rate is requested to be maximized during the combustion control according to the routine shown in FIG. 3, the maximum hot water supply flow rate is limited to A% together with the maximum combustion capacity. Under such restrictions, hot water is discharged at a certain flow rate maintained at the hot water supply set temperature.
[0039]
Therefore, according to the gas water heater, the maximum hot water flow rate and the maximum combustion capacity are limited to A% even immediately after the start of the combustion operation in which the determination results of the gas types “12A” and “13A” are not obtained. Since the hot water supply combustion operation is performed after that, the hot water supply with the flow rate maintained at the hot water supply set temperature is maintained while maintaining the stable combustion state until the initial combustion time T1 elapses due to the hot water supply combustion operation limited as described above. It is possible to improve the usability while preventing vibration combustion.
[0040]
In addition, this invention is not limited to the said embodiment.
[0041]
In the above embodiment, the maximum combustion capacity and the maximum hot water supply flow rate are obtained when the determination result of the gas type is obtained after the start of the combustion operation and the determination result of the gas type is obtained or after the initial combustion time T1 and further after the time T3. The maximum combustion capacity and the maximum hot water supply flow rate may be returned to 100% after a predetermined time has elapsed after the minimum operating flow rate required for the combustion operation is confirmed.
[0042]
Further, in the comparison between the target combustion capacity and the actual combustion capacity in the determination of the gas type, the accuracy of the gas type determination can be further improved by employing the following formula 2. Here, the incoming water temperature is a detected value of the incoming water temperature sensor 31, the can body flow rate is a detected value of the can body flow rate sensor 32, and the outgoing hot water upstream temperature is a detected value of the outgoing hot water upstream temperature sensor 42.
[0043]
[Expression 2]
Figure 0003791422
[0044]
【The invention's effect】
As described above, according to the present invention, for example, in a state where the determination of the gas type is not completed, or even immediately after the start of the combustion operation in which the ambient temperature is less than the predetermined level, until the predetermined time elapses, the maximum hot water flow rate as well as the maximum combustion capability hot water supply combustion operation is performed on that are restricted to certain levels, after a predetermined time, the hot water supply operation is Ru performed held in the hot water set temperature is gradually alleviate the restriction Therefore, hot water can be supplied at a flow rate that satisfies the hot water set temperature, for example, while maintaining a stable combustion state until a predetermined time elapses due to the hot water supply combustion operation limited as described above, and vibration combustion is prevented. However, it is possible to improve usability.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram for explaining a schematic configuration of a hot water supply apparatus according to the present invention.
FIG. 2 is an explanatory diagram for explaining that a maximum hot water supply flow rate and a maximum combustion capacity are controlled along a time axis.
FIG. 3 is a flowchart showing a combustion control process.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Burner 2 Heat exchanger 3 Inlet pipe 4 Outlet pipe 5 Control part 6 Can body 10 Faucet 11 Combustion pipes 12a, 12b, 12c Capacity switching valve 13 Gas proportional valve 14 Original gas solenoid valve 15 Spark plug 16 Turn off safety device 17 Burner Thermistor 18 Combustion fan 31 Incoming water temperature sensor 32 Can body flow rate sensor 41 Hot water flow rate control valve 42 Hot water upstream temperature sensor 43 Stirring mechanism 44 Hot water downstream temperature sensor

Claims (3)

給湯流量に応じて燃焼能力を可変制御する給湯装置であって、
燃焼運転を開始してから所定時間が経過するまでは、最大給湯流量を所定の流量値に制限し、かつ、最大燃焼能力も所定の能力値に制限して給湯設定温度に保持した給湯を行い、前記所定時間を経過した後は、前記最大給湯流量および最大燃焼能力についての制限を徐々に緩和して給湯設定温度に保持した給湯を行う給湯燃焼制御手段を備えたことを特徴とする、給湯装置。
A hot water supply device that variably controls the combustion capacity according to the hot water flow rate,
Until the specified time has elapsed since the start of combustion operation, the maximum hot water supply flow rate is limited to a predetermined flow rate value, and the maximum combustion capacity is also limited to a predetermined capacity value and hot water is maintained at a preset hot water supply temperature. The hot water supply combustion control means is provided with hot water combustion control means for performing hot water supply at a hot water supply set temperature by gradually relaxing restrictions on the maximum hot water supply flow rate and maximum combustion capacity after the predetermined time has elapsed. apparatus.
燃焼能力の実測結果に基づいて燃焼燃料としてのガス種を判定するガス種判定手段を備え、前記給湯燃焼制御手段は、前記ガス種判定手段によりガス種の判定結果が未だ得られない状況下において、前記最大給湯流量および最大燃焼能力を制限する、請求項1に記載の給湯装置。Gas type determination means for determining the gas type as the combustion fuel based on the actual measurement result of the combustion capacity is provided, and the hot water supply combustion control means is in a situation where the gas type determination means has not yet obtained the gas type determination result. The hot water supply apparatus according to claim 1, wherein the maximum hot water supply flow rate and the maximum combustion capacity are limited. 燃焼運転に伴って上昇する装置内の雰囲気温度を検出する温度検出手段を備え、前記給湯燃焼制御手段は、前記温度検出手段により所定レベルの雰囲気温度が未だ検出されない状況下において、前記最大給湯流量および最大燃焼能力を制限する、請求項1に記載の給湯装置。Temperature detecting means for detecting the atmospheric temperature in the apparatus that rises with combustion operation, and the hot water combustion control means is configured to detect the maximum hot water supply flow rate in a situation where a predetermined level of atmospheric temperature is not yet detected by the temperature detecting means. The hot water supply device according to claim 1, which limits a maximum combustion capacity.
JP2002016680A 2002-01-25 2002-01-25 Water heater Expired - Fee Related JP3791422B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002016680A JP3791422B2 (en) 2002-01-25 2002-01-25 Water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002016680A JP3791422B2 (en) 2002-01-25 2002-01-25 Water heater

Publications (2)

Publication Number Publication Date
JP2003214707A JP2003214707A (en) 2003-07-30
JP3791422B2 true JP3791422B2 (en) 2006-06-28

Family

ID=27652664

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002016680A Expired - Fee Related JP3791422B2 (en) 2002-01-25 2002-01-25 Water heater

Country Status (1)

Country Link
JP (1) JP3791422B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015203342A1 (en) * 2015-02-25 2016-08-25 Robert Bosch Gmbh Control unit, instantaneous water heater and method of controlling a water heater

Also Published As

Publication number Publication date
JP2003214707A (en) 2003-07-30

Similar Documents

Publication Publication Date Title
JP3791422B2 (en) Water heater
JPH07234014A (en) Hot water supplying apparatus
JPH11211228A (en) Combination hot water supply apparatus
JP3556481B2 (en) Combustion equipment
JPH0532652B2 (en)
JP3854700B2 (en) Hot water control device for hot water heater of bypass mixing system
JPH0718589B2 (en) Water amount control device for water heater
JP2003130346A (en) Combustion device
JPH01127854A (en) Heater
JP3317571B2 (en) Air-fuel ratio controlled gas combustion equipment
JP3695386B2 (en) Combustion equipment
JP2024002212A (en) combustion device
JP3845099B2 (en) Water heater heating control device
JPH1183004A (en) Combustion apparatus and firing control method
JP3884873B2 (en) Incomplete combustion detector for combustion equipment
KR930001172B1 (en) Combustion control device for hot water supplier
JP3403886B2 (en) Combustion equipment
JPH0571846B2 (en)
JP3668955B2 (en) Combustion equipment
JP3888783B2 (en) Water heater
JPH0814545A (en) Combustion device
JPH102608A (en) Hot-water supply apparatus
JPH0828869A (en) Combustion device
JPH0257860A (en) Bypass mixing type hot water feeder
KR20000032721A (en) Method of controlling supply/exhaust amount of gas boiler

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051111

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051122

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060123

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060314

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060327

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100414

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110414

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110414

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120414

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees