JP3756866B2 - Hardware, building, floor construction methods - Google Patents

Hardware, building, floor construction methods Download PDF

Info

Publication number
JP3756866B2
JP3756866B2 JP2002297522A JP2002297522A JP3756866B2 JP 3756866 B2 JP3756866 B2 JP 3756866B2 JP 2002297522 A JP2002297522 A JP 2002297522A JP 2002297522 A JP2002297522 A JP 2002297522A JP 3756866 B2 JP3756866 B2 JP 3756866B2
Authority
JP
Japan
Prior art keywords
floor
concrete
level
panel
leveling member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002297522A
Other languages
Japanese (ja)
Other versions
JP2004132050A (en
Inventor
智 小林
Original Assignee
智 小林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 智 小林 filed Critical 智 小林
Priority to JP2002297522A priority Critical patent/JP3756866B2/en
Publication of JP2004132050A publication Critical patent/JP2004132050A/en
Application granted granted Critical
Publication of JP3756866B2 publication Critical patent/JP3756866B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、パネル床とコンクリート床とが隣接する床の施工に用いて好適な金物、床の施工方法等に関する。
【0002】
【従来の技術】
近年、フリーアクセスフロア等と称されるパネル床(パネル床)が多く施工されている。このパネル床は、建物のスラブ上に支柱を立て、この支柱上にフロアパネルを敷設することで、室内の床面を形成するものであり、このようなパネル床は、防音性の確保や、床下に配管や配線を収納できるという利点を有している。このようなフロアパネルでは、床面の不陸を防ぐため、支柱に高さ調整機能を備えているのが一般である(例えば、特許文献1、2参照。)。
【0003】
【特許文献1】
特開2001−152651号公報(第4頁、図1)
【特許文献2】
特開平11−107416号公報(第6頁、図1)
【0004】
ところで、例えばクリーンルームや地下ピット等においてパネル床を適用する場合、室内の中央部のみをパネル床とし、その外周部はパネル床のフロアパネルと同レベルまで打設したコンクリートによって形成することがある。
このような構造の床を施工する場合、図8〜図9に示すような施工手順を踏む。
図8および図9は、例えば鉄骨造の建物において、クリーンルームの床をパネル床とする場合の例である。
図8(a)に示すように、建物の躯体を構成する鉄骨梁1の上面において、後にコンクリート床を形成する部分に断面波状の鋼板2を敷設する。また、後にパネル床を形成する部分には、鉄骨梁1の上面にスラブ板3を敷設する。
そして、コンクリート床を形成するための型枠4を鉄骨梁1(あるいは鋼板2)上に設置する。また、この型枠4の型枠面4aに接するように、例えば角材や角パイプ5を、コンクリート床およびパネル床の上面レベルとなるべき位置に合わせて、鉄骨梁1や鋼板2に溶接固定した差し筋6等によって所定の高さに設置する。この角パイプ5は、後に説明するように、コンクリート床のレベル調整用のコンクリートを打設するための代(しろ)を形成するためのものである。
続いて、図8(b)に示すように、鋼板2上の型枠4(と図示しない壁面)によって囲まれた部分に、コンクリート床を形成する一次コンクリートC1を打設する。このとき、一次コンクリートC1は、その打設レベルが、角材や角パイプ5の上面、つまりコンクリート床およびパネル床の上面レベルよりも下方となるように打設する。
図8(c)に示すように、打設した一次コンクリートC1の硬化後、型枠4を解体し、撤去する。また、角材や角パイプ5も撤去する。そして、型枠4を解体することで露出した一次コンクリートC1の側面7に、防塵用の塗料等を必要に応じて塗布する。
【0005】
この後、図9(a)に示すように、スラブ板3上の所定位置に、所定本数の支柱10を立て、支柱10上にフロアパネル11を敷設することで、間隔を隔てたスラブ板3とフロアパネル11とからなるパネル床F1が形成される。このとき、フロアパネル11は、支柱10に備えた図示しない高さ調整機構によって所定の高さに調整する。
この段階で、パネル床F1の上面レベルと、コンクリート床を形成する一次コンクリートC1の上面レベルとは異なっている(一次コンクリートC1の上面レベルの方が低い)。
そこで、図9(b)に示すように、先に打設した一次コンクリートC1上に、二次コンクリートC2を追加打設し、その上面レベルをパネル床F1の上面レベルに合わせる。
これによって、パネル床F1に隣接して、パネル床F1と同レベルのコンクリート床F2が形成されることになる。
【0006】
【発明が解決しようとする課題】
しかしながら、上記したような施工方法では、(1)型枠4、角材や角パイプ5の設置、(2)一次コンクリートC1の打設、養生(硬化)、(3)型枠4の解体、撤去、(4)フロアパネル11の設置、(5)二次コンクリートC2の打設、養生、と合計5工程を要している。
特に、コンクリート床F2を形成するために、一次コンクリートC1の打設、二次コンクリートC2の打設と、2回にわたってコンクリート打設を行っている。一次コンクリートC1、二次コンクリートC2の打設時には、それぞれの硬化のために養生期間が必要であり、これが工期短縮の妨げとなっている。
【0007】
また、施工計画上、コンクリート工(左官)が施工を担当する(2)、(5)の工程の間に、型枠工や金物工等が施工を行う(3)、(4)の工程が入るため、特にコンクリート工の工程が寸断され、これによって人員コストの削減も難しいと言う問題がある。
この他、高いクリーン度が要求されるクリーンルーム等においては、型枠4を撤去することで露出する一次コンクリートC1の側面7に防塵用の塗装等を施す必要があり、これもコスト削減の妨げとなっている。
【0008】
本発明は、このような技術的課題に基づいてなされたもので、コンクリート床に隣接してパネル床を形成するに際し、施工の効率化を計り、工期短縮、コスト削減を図ることのできる金物、床の施工方法等を提供することを目的とする。
【0009】
【課題を解決するための手段】
ここで、図8(a)に示した型枠4を設置する段階で、型枠4の上端レベルを、予め形成すべきパネル床の上面レベルに合わせておき、図8(b)に示した一次コンクリートC1の打設時に、型枠4の上端レベルに合わせて一次コンクリートC1を打設することで、図9(b)に示した二次コンクリートC2の打設工程を省略することが考えられる。
しかし、一次コンクリートC1を打設すると、一次コンクリートC1の重量によりこれを支持する鉄骨梁1が下方に撓む。これに伴い、一次コンクリートC1の打設レベルの基準となる型枠4の上端レベルが下方にずれてしまう。このため、一次コンクリートC1を、形成すべきパネル床の上面レベル(絶対レベル)に合わせて打設するのは、実質的に不可能なのである。
【0010】
これに対してなされた本発明の金物は、コンクリート床とこれに隣接して設置されるパネル床との継ぎ目において、コンクリート床の側面を形成する型枠とともに用いられる金物であって、この金物は、コンクリート床が形成される基礎面上に設置されるベース部材と、コンクリート床を形成するコンクリートの打設レベルの基準面となるレベル出し部材と、ベース部材から上方に延び、レベル出し部材の位置を上下に調整する位置調整部と、を備えることを特徴とする。
このような金物では、位置調整部によりレベル出し部材の位置が上下に調整可能となっているので、コンクリートの打設によって床を支持する梁等が下方に撓んでも、これに応じてレベル出し部材の位置を再調整することができる。
【0011】
また、このような金物は、コンクリート床の側面を形成する型枠をベース部材に一体化し、レベル出し部材を金物に沿って上下動可能な状態とすることもできる。つまり金物と型枠を一体の製品等とすることもできる。
【0012】
前記の位置調整部は、ベース部材から上方に延びる棒材と、棒材に沿って上下方向に移動可能に装着されてレベル出し部材を支持するレベル調整部材と、から構成する。そして、このような構成において、レベル出し部材を、その上面と下面にそれぞれ孔が形成された角パイプで構成し、棒材を棒ネジから構成し、レベル調整部材をこの棒材に螺着するネジ部を有したナット等で構成する。レベル出し部材は、棒材を下面の孔から突出させた状態の棒材に螺着させたレベル調整部材上で、レベル(位置)を調整して支持される。そして、このレベル調整部材と、レベル出し部材の上面の孔から挿入されて棒ネジに螺着された固定ナットとで、レベル出し部材を固定するのである。
さらに、この固定ナットを、外形略円筒状で、その外径が、レベル出し部材の下面の孔よりも大きく、かつ上面の孔よりも小さなものとすれば、この固定ナットに通常の六角ナットを利用する場合に比較し、固定ナットおよびレベル出し部材を小型化することができる。
【0013】
また、上記の金物に、金物および型枠と基礎面とを連結し、金物および型枠の鉛直度を保持する保持部材をさらに備えることもできる。これにより、型枠内に打設したコンクリートの圧力によって型枠や金物が傾くのを防止できる。この保持部材は、型枠に対して金物とは反対側、つまり型枠の内部側に設けても良いし、型枠に対して金物側に設けても良い。
【0014】
さて、本発明は、基礎面上に立脚した支柱および支柱に支持されたフロアパネルから形成されるパネル床と、パネル床に隣接し、パネル床と略同レベルに設定されたコンクリート床と、を備える建物として捉えることもできる。この建物は、パネル床とコンクリート床との継ぎ目の部分に、コンクリート床の側面を覆う板体と、板体に対してパネル床側において、板体および基礎面に沿って位置する下部部材と、パネル床およびコンクリート床の床面と略同レベルに沿って位置する上部部材と、下部部材から上方に延び、上部部材を上下方向に移動可能に支持する支持部材と、が設けられていることを特徴とする。このような構成の建物は、上記したような金物を用いてコンクリート床を形成することにより実現される。
【0015】
また、本発明は、基礎面上に立脚した支柱および支柱に支持された床パネルから形成されるパネル床と、パネル床と略同レベルに設定されたコンクリート床とが隣接する床の施工方法として捉えることもできる。この施工方法では、基礎面上にコンクリート床を形成するための型枠を設けるとともに、型枠に沿った位置に、コンクリート床を形成するコンクリートの打設レベルを、形成すべき前記床のレベルに合わせるためのレベル出し部材を上下動可能な状態で設ける。そして、型枠内にレベル出し部材を基準としてコンクリートを打設することでコンクリート床を形成する。また、このコンクリート床に隣接した位置にて、基礎面上に支柱を立てるとともに、支柱上にフロアパネルを設置することでパネル床を形成するのである。
ここで、コンクリート床を形成する工程にて、コンクリートの打設後、レベル出し部材のレベルを調整し、レベル調整後のレベル出し部材を基準としてコンクリートを追加打設することもできる。
また、コンクリートの硬化後、型枠およびレベル出し部材を撤去しても良いが、型枠およびレベル出し部材を残置することもできる。
【0016】
【発明の実施の形態】
以下、添付図面に示す実施の形態に基づいてこの発明を詳細に説明する。
図1は、本実施の形態における金物および床の施工方法を用いて施工する建物を説明するための図である。
この図1に示すように、建物20は、躯体を構成する柱21、21間に架設された梁22に、適宜間隔で小梁23が設けられている。室内空間を形成する床30は、その四方を梁22によって囲まれた部分に、所定本数の小梁23に支持される形で形成されている。この図1において、符号24は、床30の周囲に設けられた壁である。
【0017】
ここで、床30は、その外周側がコンクリート床30Cとされ、内周側が所定枚数のフロアパネル31を敷設することで形成されるパネル床30Pとなっている。
図2に示すように、コンクリート床30Cは、小梁23と周囲の梁22間に敷設された鋼板(基礎面)32上にコンクリートCを所定のレベルまで打設することで形成されている。
パネル床30Pは、小梁23上に敷設されたベース板33上に、所定の大きさのフロアパネル31が支柱34を介して支持されることで形成されている。ここで支柱34は、例えば、ネジ部35aを有したベース部35と、ネジ部35aに噛み合うナット36と、ナット36上に支持され、フロアパネル31の下面に図示しないネジやピンで固定されるパネル支持部材37とから構成されている。これにより、ナット36を回転させることでナット36およびパネル支持部材37がネジ部35aに沿って上下し、支柱34で支持するフロアパネル31の高さを調整できるようになっている。
【0018】
本実施の形態において、上記のようなコンクリート床30Cとパネル床30Pは、小梁23の上部フランジ23a上で互いに隣接するようになっている。
コンクリート床30Cとパネル床30Pの継ぎ目の部分には、金物40が設置されている。
この金物40は、後に詳述するようにコンクリート床30Cを施工するときに型枠として機能するものである。金物40は、コンクリート床30Cの側面38を覆う型枠板(型枠、板体)50に隣接して設置され、型枠板50に対しパネル床30P側に位置するレベル調整部60と、型枠板50に対しコンクリート床30C側に位置し、コンクリート床30C内に埋設された形の補強部(保持部材)70とから構成される。
【0019】
図3に示すように、レベル調整部60は、ベース部材(下部部材)61、レベル出し部材(上部部材)62、レベル調整部材(位置調整部、棒材、支持部材)63、からなる。ベース部材61は、レベル調整部60を小梁23上に設置する際のベースとなるもので、例えば断面ロ字状の角パイプによって構成されている。レベル出し部材62は、コンクリート床30Cを形成するコンクリートCを打設する際の打設レベルの基準となるもので、本実施の形態では、角パイプによって構成されている。
【0020】
レベル調整部材63は、ベース部材61に対しレベル出し部材62のレベルを調整するための機能を有しており、所定長を有したベース部材61、レベル出し部材62に対し、所定本数(少なくとも両端部)が配置される。
各レベル調整部材63は、その外周面にネジ溝が形成された棒ネジからなり、その下端部がベース部材61の上面に形成された孔61aに挿入された状態で、例えばダブルナット64、65によってベース部材61に固定されている。
【0021】
図3および図4に示すように、このレベル調整部材63の上端部には、レベル調整ナット(位置調整部、レベル調整部材、支持部材)66が装着されている。レベル出し部材62は、その下面にレベル調整ナット66よりも小径の孔62aが形成されている。このレベル出し部材62は、この孔62aにレベル調整部材63の上端部を挿入した状態でレベル調整ナット66上に載置されることで、その高さが位置決めされる。
また、レベル出し部材62の上面には、孔62aよりも大径の孔62bが形成されている。そして、レベル出し部材62の内方に突出しているレベル調整部材63の先端部には、固定ナット67がねじ込まれている。図4、図5に示すように、この固定ナット67は、略円筒状で、下面にはレベル調整部材63に噛み合うネジ穴67aが形成され、上面には、固定ナット67を回すための工具が嵌まる六角穴67bが形成され、その外径は、孔62bよりも小径でかつ孔62aよりも大径とされている。このような固定ナット67を、レベル出し部材62の上面の孔62bからレベル出し部材62の内方に挿入し、六角穴67bに対応する工具でレベル調整部材63の先端部にねじ込むと、この固定ナット67の下面とレベル調整ナット66の上面とでレベル出し部材62の下側を挟み込む。これによって所定の高さに調整したレベル調整ナット66にレベル出し部材62を固定できるようになっている。
図2、図3に示したように、このレベル出し部材62上には、必要に応じ、コンクリート床30Cとパネル床30Pの隙間を塞ぐ、断面略L字状の見切り金物80を装着することもできる。
【0022】
また、図2および図4に示したように、所定の長さを有したベース部材61、レベル出し部材62に対し、所定間隔毎に配置されたレベル調整部材63のうち、少なくともその一部のレベル調整部材63の中間部には、このレベル調整部60を型枠板50および補強部70に固定・連結するためのネジ部材68が装着されている。このネジ部材68は、一端側が雄ネジ部68a、他端側がリング状のスリーブ部68bとされ、スリーブ部68bにレベル調整部材63が挿通されることで、ネジ部材68がレベル調整部材63に対して上下に移動可能となっている。
【0023】
図4に示したように、型枠板50には、所定の位置に孔51が形成されている。この型枠板50に対し、レベル調整部60は、上下のベース部材61、レベル出し部材62を沿わせた状態で、孔51にネジ部材68が挿入されることで、このネジ部材68は型枠板50の反対側に突出している。そして、このネジ部材68に、型枠板50の反対側から筒状のナット71がねじ込まれることで、型枠板50とレベル調整部60は一体に連結された状態となっている。ここで、孔51の部分には、ブッシュ52が嵌め込まれ、孔51とネジ部材68との隙間を塞ぐようになっている。
【0024】
図2に示したように、補強部70は、前記のネジ部材68にねじ込まれたナット71の他端に、調整ネジ72をねじ込むとともに、コンクリート床30Cの鋼板32に調整ネジ73の一端を溶接し、これら調整ネジ72、73をターンバックル74で連結することで構成される。このような補強部70は、鋼板32と型枠板50を斜めに連結するように配設され、これによって型枠板50およびレベル調整部60の角度(鉛直度)を固定する機能を有している。
【0025】
さて次に、上記したような金物40を用いて床30を施工する方法について説明する。
床30を施工するには、まず、図6に示すように、先に設置された小梁23の上部フランジ23aの上面に、金物40をセットする。これにはまず、上部フランジ23aの上面に予め施された墨出しに合わせて、ベース部材61を位置決めし、これを上部フランジ23aに溶接する。そして、ベース部材61には、レベル調整部材63をダブルナット64、65によって取り付け、レベル調整部材63にはネジ部材68やレベル調整ナット66を取り付ける。
また、型枠板50を、ベース部材61に沿わせてセットし、その下端部をベース部材61および小梁23の上部フランジ23aに溶接する。このとき、型枠板50は、その下端部をベース部材61に溶接して一体化しておき、ベース部材61と同時に小梁23上に溶接するようにしてもよい。
【0026】
一方、鋼板32の上面には、ネジ部材68を備えたレベル調整部材63に対応した位置に、補強部70の調整ネジ73の一端を溶接する。そして、調整ネジ72を、調整ネジ73にターンバックル74で接続する。また、型枠板50に予め形成された孔51に合わせてネジ部材68の高さを調節し、この孔51にネジ部材68を差し込む。このとき、孔51にはブッシュ52を嵌め込み、ネジ部材68と孔51の隙間を塞ぐようにする。そして、ネジ部材68を、調整ネジ72にナット71で接続する。
この後、ターンバックル74を回すことにより、型枠板50の鉛直度を調整する。
【0027】
次いで、各レベル調整部材63にセットされたレベル調整ナット66上に、レベル出し部材62をセットする。このとき、レベル調整ナット66を回すことで、レベル出し部材62の上面のレベルを、形成すべきコンクリート床30Cの上面レベルに合わせて調整する。この状態で、レベル出し部材62の内方には、レベル調整部材63の先端部が突出している。
レベル出し部材62のレベル調整が完了した後、レベル出し部材62の上面側の孔62bから固定ナット67を挿入し、レベル調整部材63の先端部にねじ込む。これによって、レベル出し部材62がレベル調整ナット66と固定ナット67との間に挟み込まれ、固定されることになる。
この状態で、レベル出し部材62は型枠板50の上端部に沿ってはいるものの、型枠板50とは縁が切れた状態となっている。
これにより、金物40のセットが完了した状態となる。
【0028】
この後、図7に示すように、型枠板50内にコンクリートCを打設する。コンクリートCの打設レベルは、金物40のレベル出し部材62の上面に合わせる。
このとき、打設したコンクリートCの荷重により、小梁23等が下方に撓むことがあるが、この撓みに応じ、この時点でレベル出し部材62のレベルを再調整することができる。これには、ある程度コンクリートCを打設した時点で、レベル出し部材62の絶対レベルを計測し、所定以上のズレが認められれば、固定ナット67を緩め、レベル調整ナット66を回してレベル出し部材62のレベルを調整する。そして、レベル調整後、再度固定ナット67を締め付けることで、レベル出し部材62のレベルの再調整が完了する。
そして、再調整したレベル出し部材62に合わせ、コンクリートCを追加打設すれば良い。
この、レベル出し部材62の再調整には、さほど時間がかからないのは明白であるため、コンクリートCの打設を一時中断するのみで良く、したがって工程(施工日程)上から言えば、コンクリートCの打設は一工程(一度)に行うことができる。
【0029】
なおこのとき、打設したコンクリートCにより、型枠板50をレベル調整部60側に押圧する力が作用するが、型枠板50およびレベル調整部60は、補強部70によって支持されているため、この力に抗することができ、型枠板50が側方に傾くのを防止できる。
本発明者がこの点を確認するための実験を行ったところ、補強部70を用いない場合には、コンクリートCの打設後に型枠板50の上端部において2mm程度の傾きが認められたが、補強部70を用いた場合には、型枠板50の傾きは認められなかった。
【0030】
さて、打設したコンクリートCが硬化すると、これによってコンクリート床30Cが形成されることになる。
この後、図2に示したように、小梁23の上部フランジ23a上に、ベース板33が一体化された支柱34を所定本数セットする。そして、これら支柱34上にフロアパネル31を取り付け、固定することで、パネル床30Pが形成される。
このとき、フロアパネル31の設置時に、フロアパネル31の側面と金物40のレベル出し部材62との間に、例えば5〜10mmの隙間をあけておき、フロアパネル31の設置後に、レベル出し部材62上に見切り金物80をセットし、前記の隙間を塞ぐようにするのが好ましい。これにより、フロアパネル31の気温による寸法変化や、設置誤差等に対応することができる。
このようにして、コンクリート床30Cとパネル床30Pとからなる床30の施工が完了する。
【0031】
上述したように、レベル調整ナット66によってレベル出し部材62のレベル調整を行える金物40を用いることにより、コンクリートCの打設による小梁23等の撓み等が生じても、これに応じたレベル調整を容易に行うことができる。これにより、コンクリートCの打設を1工程で行うことが可能となり、2工程に分けていた従来工法に比較すれば、床30の施工に要する工期を大幅に削減することができる。また、コンクリートCの打設を行うコンクリート工の作業も不要に分断されず、したがって人員コストの削減も可能となる。
しかも、金物40を残置し、そのまま床30の一部としてしまうことによって、従来のように型枠4(図8参照)の解体・撤去を行う必要もなく、また型枠板50によってコンクリート床30Cの側面38も覆われたままの状態となるため、防塵用の塗装等も行う必要が無い。その結果、施工コストを削減することが可能となる。
【0032】
また、上記したような金物40においては、レベル調整部60を、角パイプや棒ネジ、ナット等、容易に入手可能な部材で形成するようにしたので、金物40を非常に低コストで製作することができる。また、このような金物40は、組み立て式とできるので、組み立て前の状態ではコンパクトで運搬が容易であり、また組み立ても容易に行うことができる。
レベル調整ナット66上にセットするレベル出し部材62を固定するための固定ナット67については、通常のナット(六角ナット)ではなく、外径略円筒状とした。これにより、通常のナットよりも外径を小さくすることが可能となり、レベル出し部材62を、より幅の狭いものとすることができる。これは、コンクリート床30Cとパネル床30Pの間に存在することになるレベル出し部材62をなるべく小さくすることに貢献することになる。
【0033】
さらに、上記金物40は、打設されるコンクリートC中に埋設される補強部70を有しているので、これによって打設したコンクリートCによる加圧力で型枠板50が傾くのを抑えることができ、コンクリート床30Cの施工精度を高めることができる。
【0034】
なお、上記実施の形態では、金物40の型枠板50およびレベル調整部60を施工後にもそのまま残置する構成としたが、これに限るものではなく、コンクリート床30Cの施工後に撤去するようにしても良い。
また、施工の順序についても、上記の金物40を用いて床30を形成することができるのであれば、上記の実施の形態で示したものに何ら限定されるものではない。
さらに、金物40は、例えば要求される施工精度等に応じ、補強部70を廃した構成としたり、他の細部を適宜異なる構成とすることが可能である。例えば、レベル調整部60を角パイプやナット、棒ネジ等で構成するようにしたが、レベル調整部材63とベース部材61を予め溶接したり、あるいはこれらを一体の成形品とすること等は、設計事項の範疇に入る。
さらに、パネル床30Pの構成、つまり支柱34やフロアパネル31の構成については何ら限定するものではなく、種々の工夫を凝らした構成を支柱34やフロアパネル31に適用するのが望ましい。
【0035】
加えて、上記実施の形態では、建物20の躯体を鉄骨造とする例としたが、もちろん、鉄筋コンクリート(RC)造、鉄骨鉄筋コンクリート(SRC)造等、他の構造とすることも可能である。また、これらの場合や、プレキャスト、ハーフプレキャスト造のスラブを用いる場合等には、金物40をコンクリート面上に設置することもある。このような場合、ベース部材61は、溶接ではなく、コンクリートビス等、適宜の固定手段を用いて固定すればよい。
また、上記実施の形態では、クリーンルーム等の床30に本発明を適用する例を示したが、例えば、外周部がコンクリートによって形成される地下ピットにおいて、地下ピットのピット部分(凹部)にパネル床30Pを形成する場合等においても、上記と同様にして本発明を適用することが可能である。
これ以外にも、本発明の主旨を逸脱しない限り、上記実施の形態で挙げた構成を取捨選択したり、他の構成に適宜変更することが可能である。
【0036】
【発明の効果】
以上説明したように、本発明によれば、レベル調整の容易なレベル出し部材を備えた金物を用いることで、コンクリート床を形成するコンクリートの打設を1工程で行うことが可能となる。これにより、工期の短縮化を図ることができる。
また、このような金物をそのまま床の一部としてしまうことで、型枠の解体・撤去や、コンクリートの防塵塗装等が不要となり、この点においても施工コスト、工期の短縮化に貢献できる。
さらに、打設したコンクリートの押圧力に抗する補強部を備えることで、金物の精度を維持することができ、施工精度を向上させることもできる。
【図面の簡単な説明】
【図1】 本実施の形態における金物を適用して施工する建物の床の一例を示す図であり、(a)は平面図、(b)は立断面図である。
【図2】 コンクリート床とパネル床の継ぎ目に位置する金物の構成を示す断面図である。
【図3】 金物の要部を示す図である。
【図4】 金物のレベル調整部分の構造を示す断面図である。
【図5】 金物の設置状態を示す斜視図である。
【図6】 本実施の形態における金物を用いての施工方法を示す図であり、金物および型枠を設置した状態を示す図である。
【図7】 同、図6に示した状態に続き、コンクリートを打設した状態を示す図である。
【図8】 従来の施工方法を示す図である。
【図9】 図8に続く工程を示す図である。
【符号の説明】
20…建物、23…小梁、30C…コンクリート床、30P…パネル床、30…床、31…フロアパネル、32…鋼板(基礎面)、33…ベース板、34…支柱、38…側面、40…金物、50…型枠板(型枠、板体)、60…レベル調整部、61…ベース部材(下部部材)、62…レベル出し部材(上部部材)、62a…孔、62b…孔、63…レベル調整部材(位置調整部、棒材、支持部材)、66…レベル調整ナット(位置調整部、レベル調整部材、支持部材)、67…固定ナット、68…ネジ部材、70…補強部(保持部材)、80…見切り金物、C…コンクリート
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a hardware, a floor construction method, and the like suitable for construction of a floor in which a panel floor and a concrete floor are adjacent to each other.
[0002]
[Prior art]
In recent years, many panel floors (panel floors) called free access floors have been constructed. This panel floor is intended to form an indoor floor surface by setting up a pillar on the slab of the building and laying a floor panel on this pillar. It has the advantage that piping and wiring can be stored under the floor. In such a floor panel, in order to prevent unevenness of the floor surface, it is general that the support column is provided with a height adjusting function (see, for example, Patent Documents 1 and 2).
[0003]
[Patent Document 1]
JP 2001-152651 A (page 4, FIG. 1)
[Patent Document 2]
JP-A-11-107416 (page 6, FIG. 1)
[0004]
By the way, when applying a panel floor in a clean room or an underground pit, for example, only the central part of the room may be a panel floor, and the outer peripheral part may be formed of concrete cast to the same level as the floor panel of the panel floor.
When constructing a floor having such a structure, construction procedures as shown in FIGS.
FIG. 8 and FIG. 9 are examples when the floor of a clean room is a panel floor in a steel structure building, for example.
As shown in FIG. 8 (a), a corrugated steel plate 2 is laid on the upper surface of the steel beam 1 constituting the building frame in a portion where a concrete floor will be formed later. Moreover, the slab board 3 is laid on the upper surface of the steel beam 1 in the part which forms a panel floor later.
And the formwork 4 for forming a concrete floor is installed on the steel beam 1 (or steel plate 2). Further, for example, a square bar or a square pipe 5 is welded and fixed to the steel beam 1 or the steel plate 2 so as to be in contact with the formwork surface 4a of the formwork 4 in accordance with the position to be the upper surface level of the concrete floor and the panel floor. It is installed at a predetermined height by the insertion bar 6 or the like. As will be described later, the square pipe 5 is for forming a margin for placing concrete for level adjustment of the concrete floor.
Subsequently, as shown in FIG. 8B, primary concrete C1 forming a concrete floor is placed in a portion surrounded by the mold 4 (and a wall surface not shown) on the steel plate 2. At this time, the primary concrete C1 is placed so that the placement level is lower than the top surface of the square bar or the square pipe 5, that is, the top surface level of the concrete floor and the panel floor.
As shown in FIG. 8 (c), after hardening the placed primary concrete C1, the mold 4 is disassembled and removed. Further, the square bar and the square pipe 5 are also removed. Then, a dustproof paint or the like is applied to the side surface 7 of the primary concrete C1 exposed by disassembling the mold 4 as necessary.
[0005]
Thereafter, as shown in FIG. 9A, a predetermined number of columns 10 are set up at predetermined positions on the slab plate 3, and a floor panel 11 is laid on the columns 10, thereby separating the slab plates 3 at intervals. A panel floor F1 including the floor panel 11 is formed. At this time, the floor panel 11 is adjusted to a predetermined height by a height adjusting mechanism (not shown) provided in the column 10.
At this stage, the upper surface level of the panel floor F1 is different from the upper surface level of the primary concrete C1 forming the concrete floor (the upper surface level of the primary concrete C1 is lower).
Therefore, as shown in FIG. 9 (b), the secondary concrete C2 is additionally placed on the previously placed primary concrete C1, and the upper surface level thereof is adjusted to the upper surface level of the panel floor F1.
As a result, a concrete floor F2 of the same level as the panel floor F1 is formed adjacent to the panel floor F1.
[0006]
[Problems to be solved by the invention]
However, in the construction method as described above, (1) installation of the formwork 4, square bars and square pipes 5, (2) placement, curing (curing) of the primary concrete C1, (3) disassembly and removal of the formwork 4 (4) Installation of the floor panel 11, (5) Placing of secondary concrete C2, curing, total 5 steps are required.
In particular, in order to form the concrete floor F2, the concrete is placed twice by placing the primary concrete C1 and placing the secondary concrete C2. At the time of placing the primary concrete C1 and the secondary concrete C2, a curing period is required for curing each of the primary concrete C1 and the secondary concrete C2.
[0007]
In addition, in the construction plan, the concrete worker (plamber) is in charge of the construction (2), (5), during the process of (3), (4) the work of the formwork and hardware, etc. Therefore, there is a problem that it is difficult to reduce the labor cost due to the fact that the concrete work process is cut off.
In addition, in a clean room or the like that requires a high degree of cleanliness, it is necessary to apply dust-proof coating or the like to the side surface 7 of the primary concrete C1 that is exposed by removing the formwork 4 and this also hinders cost reduction. It has become.
[0008]
The present invention was made on the basis of such a technical problem, when forming a panel floor adjacent to a concrete floor, to improve the efficiency of construction, shorten the work period, cost reduction, The purpose is to provide floor construction methods.
[0009]
[Means for Solving the Problems]
Here, at the stage of installing the mold 4 shown in FIG. 8 (a), the upper end level of the mold 4 is matched with the upper surface level of the panel floor to be formed in advance, as shown in FIG. 8 (b). At the time of placing the primary concrete C1, it is considered that the placing step of the secondary concrete C2 shown in FIG. 9B is omitted by placing the primary concrete C1 in accordance with the upper end level of the formwork 4. .
However, when the primary concrete C1 is placed, the steel beam 1 supporting the primary concrete C1 is bent downward due to the weight of the primary concrete C1. Along with this, the upper end level of the mold 4 as a reference for the placement level of the primary concrete C1 is shifted downward. For this reason, it is practically impossible to place the primary concrete C1 in accordance with the upper surface level (absolute level) of the panel floor to be formed.
[0010]
The hardware of the present invention made against this is a hardware used together with a formwork forming a side surface of a concrete floor at a joint between a concrete floor and a panel floor installed adjacent thereto. A base member installed on the foundation surface on which the concrete floor is formed, a leveling member serving as a reference surface for the placement level of the concrete forming the concrete floor, and a position of the leveling member extending upward from the base member And a position adjusting unit that adjusts the height up and down.
In such a hardware, the position of the leveling member can be adjusted up and down by the position adjusting portion. Therefore, even if the beam supporting the floor is bent downward by placing concrete, the leveling member is adjusted accordingly. The position of the member can be readjusted.
[0011]
Moreover, such a hardware can also be made into a state in which the form forming the side surface of the concrete floor is integrated with the base member and the leveling member can be moved up and down along the hardware. That is, the hardware and the mold can be integrated into one product.
[0012]
  The position adjusting unit includes a bar extending upward from the base member, and a level adjusting member that is mounted so as to be movable in the vertical direction along the bar and supports the leveling member. In such a configuration, the leveling member is constituted by a square pipe having holes formed on the upper surface and the lower surface thereof, the bar is constituted by a bar screw, and the level adjusting member is screwed to the bar. It consists of a nut with a threaded part. The leveling member is supported by adjusting the level (position) on the level adjusting member that is screwed to the bar in a state where the bar is protruded from the hole on the lower surface. Then, the leveling member is fixed by the level adjusting member and a fixing nut inserted through the hole on the upper surface of the leveling member and screwed to the bar screw.
  Furthermore, if this fixed nut has a substantially cylindrical outer shape, and its outer diameter is larger than the hole on the lower surface of the leveling member and smaller than the hole on the upper surface, an ordinary hex nut is attached to this fixed nut. Compared with the case where it uses, a fixed nut and a leveling member can be reduced in size.
[0013]
Further, the above hardware can be further provided with a holding member that connects the hardware, the mold, and the base surface to maintain the verticality of the hardware and the mold. Thereby, it can prevent that a mold and a metal fitting incline with the pressure of the concrete cast | injected in the mold. The holding member may be provided on the opposite side of the metal mold from the metal mold, that is, on the inner side of the mold, or may be provided on the metal mold side of the mold.
[0014]
Now, the present invention provides a panel floor formed from a column and a floor panel supported by the column, and a concrete floor adjacent to the panel floor and set at substantially the same level as the panel floor. It can also be understood as a building. The building includes a plate body covering the side surface of the concrete floor at a joint portion between the panel floor and the concrete floor, and a lower member positioned along the plate body and the foundation surface on the panel floor side with respect to the plate body, An upper member positioned along substantially the same level as the floor surface of the panel floor and the concrete floor, and a support member that extends upward from the lower member and supports the upper member so as to be movable in the vertical direction are provided. Features. A building having such a structure is realized by forming a concrete floor using the above hardware.
[0015]
In addition, the present invention is a construction method for a floor in which a panel floor formed from a column and a floor panel supported by the column on a foundation surface, and a concrete floor set at substantially the same level as the panel floor are adjacent to each other. It can also be captured. In this construction method, a formwork for forming a concrete floor is provided on the foundation surface, and the placement level of the concrete forming the concrete floor is set to a level of the floor to be formed at a position along the formwork. A leveling member for matching is provided so as to be movable up and down. A concrete floor is formed by placing concrete in the mold with the leveling member as a reference. Further, at a position adjacent to the concrete floor, a column is formed by placing a column on the foundation surface and installing a floor panel on the column.
Here, in the step of forming the concrete floor, after the concrete is placed, the level of the leveling member can be adjusted, and the concrete can be additionally placed based on the leveling member after the level adjustment.
Further, after the concrete is hardened, the formwork and leveling member may be removed, but the formwork and leveling member may be left behind.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in detail based on embodiments shown in the accompanying drawings.
FIG. 1 is a diagram for explaining a building to be constructed using the hardware and floor construction method in the present embodiment.
As shown in FIG. 1, a building 20 is provided with small beams 23 at appropriate intervals on a beam 22 constructed between columns 21 and 21 constituting a frame. The floor 30 forming the indoor space is formed in a form supported by a predetermined number of small beams 23 in a portion surrounded by the beams 22 on all four sides. In FIG. 1, reference numeral 24 denotes a wall provided around the floor 30.
[0017]
Here, the floor 30 is a concrete floor 30C on the outer peripheral side, and a panel floor 30P formed by laying a predetermined number of floor panels 31 on the inner peripheral side.
As shown in FIG. 2, the concrete floor 30 </ b> C is formed by placing concrete C to a predetermined level on a steel plate (foundation surface) 32 laid between the small beam 23 and the surrounding beam 22.
The panel floor 30 </ b> P is formed by supporting a floor panel 31 of a predetermined size via a support column 34 on a base plate 33 laid on the small beam 23. Here, the column 34 is supported on the base portion 35 having the screw portion 35a, the nut 36 meshing with the screw portion 35a, the nut 36, and fixed to the lower surface of the floor panel 31 with screws or pins (not shown). A panel support member 37 is included. Thereby, by rotating the nut 36, the nut 36 and the panel support member 37 move up and down along the screw portion 35a, and the height of the floor panel 31 supported by the support column 34 can be adjusted.
[0018]
In the present embodiment, the concrete floor 30C and the panel floor 30P as described above are adjacent to each other on the upper flange 23a of the small beam 23.
A hardware 40 is installed at the joint between the concrete floor 30C and the panel floor 30P.
The hardware 40 functions as a mold when constructing the concrete floor 30C as will be described in detail later. The hardware 40 is installed adjacent to a mold plate (form frame, plate body) 50 that covers the side surface 38 of the concrete floor 30C, and a level adjusting unit 60 that is located on the panel floor 30P side with respect to the mold plate 50, and a mold. The frame plate 50 includes a reinforcing portion (holding member) 70 that is positioned on the concrete floor 30C side and embedded in the concrete floor 30C.
[0019]
As shown in FIG. 3, the level adjustment unit 60 includes a base member (lower member) 61, a leveling member (upper member) 62, and a level adjustment member (position adjustment unit, bar, support member) 63. The base member 61 serves as a base when the level adjusting unit 60 is installed on the small beam 23, and is configured by, for example, a square pipe having a square cross section. The leveling member 62 serves as a reference for the placement level when the concrete C forming the concrete floor 30C is placed, and is constituted by a square pipe in the present embodiment.
[0020]
The level adjusting member 63 has a function of adjusting the level of the leveling member 62 with respect to the base member 61. The level adjusting member 63 has a predetermined number (at least both ends) of the base member 61 and the leveling member 62 having a predetermined length. Part) is arranged.
Each level adjusting member 63 is composed of a bar screw having a thread groove formed on the outer peripheral surface thereof, and the bottom end thereof is inserted into a hole 61a formed on the upper surface of the base member 61, for example, double nuts 64, 65, for example. It is being fixed to the base member 61 by.
[0021]
As shown in FIGS. 3 and 4, a level adjustment nut (position adjustment unit, level adjustment member, support member) 66 is attached to the upper end portion of the level adjustment member 63. The leveling member 62 has a hole 62 a having a smaller diameter than the level adjusting nut 66 on the lower surface thereof. The leveling member 62 is positioned on the level adjusting nut 66 in a state where the upper end portion of the level adjusting member 63 is inserted into the hole 62a, thereby positioning the height thereof.
Further, a hole 62b having a larger diameter than the hole 62a is formed on the upper surface of the leveling member 62. A fixing nut 67 is screwed into the tip of the level adjusting member 63 protruding inward of the leveling member 62. As shown in FIGS. 4 and 5, the fixing nut 67 has a substantially cylindrical shape, a screw hole 67 a that engages with the level adjusting member 63 is formed on the lower surface, and a tool for turning the fixing nut 67 is formed on the upper surface. A hexagonal hole 67b to be fitted is formed, and its outer diameter is smaller than the hole 62b and larger than the hole 62a. When such a fixing nut 67 is inserted into the leveling member 62 inward from the hole 62b on the upper surface of the leveling member 62 and screwed into the tip of the level adjusting member 63 with a tool corresponding to the hexagonal hole 67b, the fixing nut 67 is fixed. The lower side of the leveling member 62 is sandwiched between the lower surface of the nut 67 and the upper surface of the level adjusting nut 66. As a result, the leveling member 62 can be fixed to the level adjusting nut 66 adjusted to a predetermined height.
As shown in FIGS. 2 and 3, on the leveling member 62, a parting piece 80 having a substantially L-shaped cross section that closes the gap between the concrete floor 30C and the panel floor 30P may be mounted as necessary. it can.
[0022]
Further, as shown in FIGS. 2 and 4, at least a part of the level adjusting member 63 arranged at predetermined intervals with respect to the base member 61 and the leveling member 62 having a predetermined length. A screw member 68 for fixing and connecting the level adjusting portion 60 to the mold plate 50 and the reinforcing portion 70 is attached to an intermediate portion of the level adjusting member 63. The screw member 68 has a male screw portion 68 a on one end side and a ring-shaped sleeve portion 68 b on the other end side, and the level adjusting member 63 is inserted into the sleeve portion 68 b, so that the screw member 68 is connected to the level adjusting member 63. Can be moved up and down.
[0023]
As shown in FIG. 4, holes 51 are formed in the mold plate 50 at predetermined positions. The level adjusting unit 60 is inserted into the hole 51 in a state where the upper and lower base members 61 and the leveling member 62 are aligned with respect to the mold plate 50. Projecting to the opposite side of the frame plate 50. The cylindrical nut 71 is screwed into the screw member 68 from the opposite side of the mold plate 50, so that the mold plate 50 and the level adjusting unit 60 are integrally connected. Here, the bush 52 is fitted into the hole 51 so as to close the gap between the hole 51 and the screw member 68.
[0024]
As shown in FIG. 2, the reinforcing portion 70 is screwed with the adjusting screw 72 into the other end of the nut 71 screwed into the screw member 68 and welds one end of the adjusting screw 73 to the steel plate 32 of the concrete floor 30C. The adjustment screws 72 and 73 are connected by a turnbuckle 74. Such a reinforcing portion 70 is disposed so as to obliquely connect the steel plate 32 and the mold plate 50, thereby having a function of fixing the angle (verticality) of the mold plate 50 and the level adjusting unit 60. ing.
[0025]
Next, a method for constructing the floor 30 using the above-described hardware 40 will be described.
In order to construct the floor 30, first, as shown in FIG. 6, the hardware 40 is set on the upper surface of the upper flange 23 a of the small beam 23 previously installed. First, the base member 61 is positioned and welded to the upper flange 23a in accordance with the ink marking previously applied to the upper surface of the upper flange 23a. The level adjusting member 63 is attached to the base member 61 with double nuts 64 and 65, and the screw member 68 and the level adjusting nut 66 are attached to the level adjusting member 63.
Further, the mold plate 50 is set along the base member 61, and its lower end is welded to the base member 61 and the upper flange 23 a of the small beam 23. At this time, the lower end portion of the mold plate 50 may be integrated with the base member 61 and may be welded onto the small beam 23 simultaneously with the base member 61.
[0026]
On the other hand, one end of the adjustment screw 73 of the reinforcing portion 70 is welded to the upper surface of the steel plate 32 at a position corresponding to the level adjustment member 63 provided with the screw member 68. Then, the adjustment screw 72 is connected to the adjustment screw 73 with a turnbuckle 74. Further, the height of the screw member 68 is adjusted in accordance with the hole 51 formed in the mold plate 50 in advance, and the screw member 68 is inserted into the hole 51. At this time, the bush 52 is fitted into the hole 51 so as to close the gap between the screw member 68 and the hole 51. Then, the screw member 68 is connected to the adjustment screw 72 with a nut 71.
Thereafter, the turnbuckle 74 is turned to adjust the verticality of the mold plate 50.
[0027]
Next, the leveling member 62 is set on the level adjusting nut 66 set on each level adjusting member 63. At this time, by turning the level adjustment nut 66, the level of the upper surface of the leveling member 62 is adjusted to the upper surface level of the concrete floor 30C to be formed. In this state, the tip of the level adjusting member 63 protrudes inside the leveling member 62.
After the level adjustment of the leveling member 62 is completed, the fixing nut 67 is inserted from the hole 62b on the upper surface side of the leveling member 62 and screwed into the tip end portion of the level adjusting member 63. As a result, the leveling member 62 is sandwiched between the level adjusting nut 66 and the fixing nut 67 and fixed.
In this state, the leveling member 62 is along the upper end portion of the mold plate 50, but the edge from the mold plate 50 is cut off.
Thereby, the setting of the hardware 40 is completed.
[0028]
Thereafter, as shown in FIG. 7, concrete C is placed in the mold plate 50. The placement level of the concrete C is adjusted to the upper surface of the leveling member 62 of the hardware 40.
At this time, the small beam 23 or the like may bend downward due to the load of the concrete C that has been placed. At this time, the level of the leveling member 62 can be readjusted according to this bending. To this end, when the concrete C is placed to some extent, the absolute level of the leveling member 62 is measured, and if a deviation more than a predetermined amount is recognized, the fixing nut 67 is loosened and the level adjusting nut 66 is turned to turn the leveling member. Adjust level 62. After the level adjustment, the readjustment of the level of the leveling member 62 is completed by tightening the fixing nut 67 again.
Then, the concrete C may be additionally placed according to the readjusted leveling member 62.
Since it is obvious that the readjustment of the leveling member 62 does not take much time, it is only necessary to temporarily stop the placement of the concrete C. Therefore, in terms of the process (construction schedule), the concrete C Placing can be performed in one step (once).
[0029]
In addition, at this time, although the force which presses the formwork board 50 to the level adjustment part 60 side acts by the cast concrete C, since the formwork board 50 and the level adjustment part 60 are supported by the reinforcement part 70, it is. This force can be resisted and the mold plate 50 can be prevented from tilting sideways.
When the inventor conducted an experiment for confirming this point, when the reinforcing portion 70 was not used, an inclination of about 2 mm was recognized at the upper end portion of the mold plate 50 after the concrete C was placed. When the reinforcing part 70 was used, the inclination of the mold plate 50 was not recognized.
[0030]
Now, when the cast concrete C hardens | cures, this will form the concrete floor 30C.
After that, as shown in FIG. 2, a predetermined number of support posts 34 with the base plate 33 integrated are set on the upper flange 23 a of the small beam 23. And the panel floor 30P is formed by attaching and fixing the floor panel 31 on these support | pillars 34. As shown in FIG.
At this time, when the floor panel 31 is installed, a level gap of 5 to 10 mm, for example, is left between the side surface of the floor panel 31 and the leveling member 62 of the hardware 40, and the leveling member 62 is installed after the floor panel 31 is installed. It is preferable to set a parting piece 80 on the upper side so as to close the gap. Thereby, it can respond to the dimensional change by the temperature of the floor panel 31, an installation error, etc.
In this way, the construction of the floor 30 composed of the concrete floor 30C and the panel floor 30P is completed.
[0031]
As described above, by using the hardware 40 that can adjust the level of the leveling member 62 with the level adjusting nut 66, even if the small beam 23 or the like is bent due to the placement of the concrete C, the level adjustment according to this is performed. Can be easily performed. As a result, the concrete C can be placed in one process, and the construction period required for the construction of the floor 30 can be greatly reduced as compared with the conventional construction method divided into two processes. Further, the work of the concrete worker for placing the concrete C is not unnecessarily divided, and therefore the personnel cost can be reduced.
In addition, by leaving the hardware 40 and leaving it as a part of the floor 30, there is no need to disassemble and remove the formwork 4 (see FIG. 8) as in the prior art. Since the side surface 38 is still covered, it is not necessary to perform dustproof coating or the like. As a result, construction costs can be reduced.
[0032]
In addition, in the hardware 40 as described above, the level adjustment unit 60 is formed of a readily available member such as a square pipe, a bar screw, or a nut, so the hardware 40 is manufactured at a very low cost. be able to. In addition, since such a hardware 40 can be assembled, it can be compact and easy to transport in a state before assembly, and can be easily assembled.
The fixing nut 67 for fixing the leveling member 62 set on the level adjusting nut 66 is not an ordinary nut (hexagon nut) but a substantially cylindrical shape with an outer diameter. Thereby, it becomes possible to make an outer diameter smaller than a normal nut, and the leveling member 62 can be made narrower. This contributes to making the leveling member 62 that exists between the concrete floor 30C and the panel floor 30P as small as possible.
[0033]
Further, since the metal piece 40 has the reinforcing portion 70 embedded in the concrete C to be placed, it is possible to suppress the inclination of the form plate 50 due to the pressure applied by the concrete C placed. The construction accuracy of the concrete floor 30C can be increased.
[0034]
In addition, in the said embodiment, although it was set as the structure which leaves the formwork board 50 and the level adjustment part 60 of the metal fitting 40 as it is after construction, it is not restricted to this, It is made to remove after construction of the concrete floor 30C. Also good.
Also, the order of construction is not limited to that shown in the above embodiment as long as the floor 30 can be formed using the above-described hardware 40.
Further, the hardware 40 can have a configuration in which the reinforcing portion 70 is eliminated, or other details can be appropriately changed depending on, for example, required construction accuracy. For example, the level adjusting unit 60 is configured by a square pipe, a nut, a bar screw, etc., but the level adjusting member 63 and the base member 61 are welded in advance, or these are formed as an integral molded product. Enter the category of design matters.
Furthermore, the configuration of the panel floor 30P, that is, the configuration of the support column 34 and the floor panel 31 is not limited at all, and it is desirable to apply a configuration with various ideas to the support column 34 and the floor panel 31.
[0035]
In addition, in the said embodiment, although the frame of the building 20 was made into the example made into steel frame, of course, it is also possible to set it as other structures, such as reinforced concrete (RC) structure and steel frame reinforced concrete (SRC) structure. In these cases, or when using a precast or half-precast slab, the hardware 40 may be installed on the concrete surface. In such a case, the base member 61 may be fixed by using an appropriate fixing means such as a concrete screw instead of welding.
In the above-described embodiment, an example in which the present invention is applied to the floor 30 of a clean room or the like has been described. For example, in an underground pit whose outer peripheral portion is formed of concrete, a panel floor is formed in a pit portion (concave portion) of the underground pit. Even in the case of forming 30P, the present invention can be applied in the same manner as described above.
In addition to this, as long as it does not depart from the gist of the present invention, the configuration described in the above embodiment can be selected or changed to another configuration as appropriate.
[0036]
【The invention's effect】
As described above, according to the present invention, it is possible to place concrete for forming a concrete floor in one step by using a hardware provided with a leveling member whose level can be easily adjusted. As a result, the construction period can be shortened.
Moreover, by disposing such hardware as a part of the floor as it is, it is not necessary to dismantle / remove the formwork or to prevent dust from being applied to the concrete. This also contributes to shortening the construction cost and the construction period.
Furthermore, by providing a reinforcing portion that resists the pressing force of the placed concrete, the accuracy of the hardware can be maintained and the construction accuracy can be improved.
[Brief description of the drawings]
FIG. 1 is a diagram showing an example of a floor of a building constructed by applying hardware according to the present embodiment, where (a) is a plan view and (b) is an elevational sectional view.
FIG. 2 is a cross-sectional view showing a configuration of a hardware positioned at a joint between a concrete floor and a panel floor.
FIG. 3 is a diagram showing a main part of a hardware.
FIG. 4 is a cross-sectional view showing a structure of a hardware level adjustment portion.
FIG. 5 is a perspective view showing an installation state of hardware.
FIG. 6 is a diagram showing a construction method using hardware in the present embodiment, and is a diagram showing a state in which the hardware and a mold are installed.
FIG. 7 is a view showing a state in which concrete is placed following the state shown in FIG. 6;
FIG. 8 is a diagram showing a conventional construction method.
FIG. 9 is a diagram showing a step that follows the step of FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 20 ... Building, 23 ... Small beam, 30C ... Concrete floor, 30P ... Panel floor, 30 ... Floor, 31 ... Floor panel, 32 ... Steel plate (base surface), 33 ... Base plate, 34 ... Post, 38 ... Side, 40 ... Metal, 50 ... Form plate (form frame, plate), 60 ... Level adjusting unit, 61 ... Base member (lower member), 62 ... Leveling member (upper member), 62a ... Hole, 62b ... Hole, 63 ... Level adjustment member (position adjustment part, bar, support member), 66 ... Level adjustment nut (position adjustment part, level adjustment member, support member), 67 ... Fixing nut, 68 ... Screw member, 70 ... Reinforcement part (holding) Member), 80 ... Parting hardware, C ... Concrete

Claims (7)

コンクリート床とこれに隣接して設置されるパネル床との継ぎ目において、前記コンクリート床の側面を形成する型枠とともに用いられる金物であって、
前記コンクリート床が形成される基礎面上に設置されるベース部材と、
前記コンクリート床を形成するコンクリートの打設レベルの基準面となるレベル出し部材と、
前記ベース部材から上方に延び、前記レベル出し部材の位置を上下に調整する位置調整部と、
を備え
前記位置調整部は、
前記ベース部材から上方に延びる棒材と、
前記棒材に沿って上下方向に移動可能に装着され、前記レベル出し部材を支持するレベル調整部材と、
から構成され、
前記レベル出し部材は、その上面と下面にそれぞれ孔が形成された角パイプからなり、棒ネジからなる前記棒材に螺着し、前記棒材を下面の前記孔から突出させた状態で前記レベル出し部材を支持する前記レベル調整部材と、上面の前記孔から挿入され前記棒ネジに螺着された固定ナットとにより、前記レベル出し部材が固定されていることを特徴とする金物。
In a joint between a concrete floor and a panel floor installed adjacent thereto, it is a hardware used together with a formwork forming a side surface of the concrete floor,
A base member installed on a foundation surface on which the concrete floor is formed;
A leveling member that serves as a reference surface for the placement level of the concrete forming the concrete floor;
A position adjusting unit that extends upward from the base member and adjusts the position of the leveling member up and down;
Equipped with a,
The position adjusting unit is
A bar extending upward from the base member;
A level adjusting member that is mounted so as to be movable in the vertical direction along the bar, and supports the leveling member;
Consisting of
The leveling member is a square pipe having holes formed on the upper surface and the lower surface thereof, and is screwed onto the bar material made of a bar screw, and the leveling member protrudes from the hole on the lower surface. A metal object , wherein the leveling member is fixed by the level adjusting member that supports the protruding member, and a fixing nut that is inserted through the hole on the upper surface and is screwed to the rod screw .
前記コンクリート床の側面を形成する型枠が前記ベース部材に一体化され、かつ前記レベル出し部材が前記型枠に沿って上下動可能な状態とされていることを特徴とする請求項1に記載の金物。  The formwork forming the side surface of the concrete floor is integrated with the base member, and the leveling member is movable up and down along the formwork. Hardware. 前記固定ナットは、外形略円筒状で、その外径が、前記レベル出し部材の下面の前記孔よりも大きく、かつ上面の前記孔よりも小さく設定されていることを特徴とする請求項1または2に記載の金物。The fixing nut is a contour substantially cylindrical shape, its outer diameter is larger than the bore of the lower surface of the leveling member, and claims, characterized in that is smaller than the bore of the upper surface 1 or 2. The hardware according to 2 . 前記金物および前記型枠と前記基礎面とを連結し、前記金物および前記型枠の鉛直度を保持する保持部材をさらに備えることを特徴とする請求項1からのいずれかに記載の金物。The hardware according to any one of claims 1 to 3 , further comprising a holding member that connects the hardware and the mold and the base surface, and holds a vertical degree of the hardware and the mold. 基礎面上に立脚した支柱および前記支柱に支持されたフロアパネルから形成されるパネル床と、
前記パネル床に隣接し、前記パネル床と略同レベルに設定されたコンクリート床と、を備え、
前記パネル床と前記コンクリート床との継ぎ目の部分に、
前記コンクリート床の側面を覆う板体と、
前記板体に対して前記パネル床側において、前記板体および前記基礎面に沿って位置する下部部材と、
前記パネル床および前記コンクリート床の床面と略同レベルに沿って位置する上部部材と、
前記下部部材から上方に延び、前記上部部材を上下方向に移動可能に支持する支持部材と、
が設けられていることを特徴とする建物。
A panel floor formed from a pillar standing on a foundation surface and a floor panel supported by the pillar;
A concrete floor that is adjacent to the panel floor and is set at substantially the same level as the panel floor;
In the seam between the panel floor and the concrete floor,
A plate covering the side of the concrete floor;
On the panel floor side with respect to the plate body, a lower member positioned along the plate body and the base surface,
An upper member located along substantially the same level as the floor surface of the panel floor and the concrete floor;
A support member extending upward from the lower member and supporting the upper member so as to be movable in the vertical direction;
Building characterized by being provided.
基礎面上に立脚した支柱および前記支柱に支持された床パネルから形成されるパネル床と、前記パネル床と略同レベルに設定されたコンクリート床とが隣接する床の施工方法であって、
前記基礎面上に前記コンクリート床を形成するための型枠を設けるとともに、前記コンクリート床を形成するコンクリートの打設レベルを前記床のレベルに合わせるためのレベル出し部材を、前記型枠に沿った位置に上下動可能な状態で設ける工程と、
前記型枠内に前記レベル出し部材を基準としてコンクリートを打設することで前記コンクリート床を形成する工程と、
前記コンクリート床に隣接した位置にて、前記基礎面上に支柱を立てるとともに、前記支柱上にフロアパネルを設置することで前記パネル床を形成する工程と、
有し、
前記コンクリート床を形成する工程にて、前記コンクリートの打設後、前記レベル出し部材のレベルに所定以上のズレが認められたときに、前記レベル出し部材のレベルを調整し、レベル調整後の前記レベル出し部材を基準としてコンクリートを追加打設することを特徴とする床の施工方法。
A method of constructing a floor in which a panel floor formed from a pillar standing on a foundation surface and a floor panel supported by the pillar, and a concrete floor set substantially at the same level as the panel floor,
A mold for forming the concrete floor is provided on the foundation surface, and a leveling member for adjusting a concrete placement level for forming the concrete floor to the level of the floor is provided along the mold. Providing the position in a state in which it can move up and down;
Forming the concrete floor by placing concrete in the mold with reference to the leveling member;
In the position adjacent to the concrete floor, the step of standing the pillar on the foundation surface, and forming the panel floor by installing a floor panel on the pillar;
Have
In the step of forming the concrete floor, after the concrete is placed, when a deviation of a predetermined level or more is recognized in the level of the leveling member, the level of the leveling member is adjusted, and the level after the level adjustment is adjusted A floor construction method characterized by additionally placing concrete on the basis of a leveling member .
前記コンクリートの硬化後も、前記型枠および前記レベル出し部材を残置することを特徴とする請求項に記載の床の施工方法。The floor construction method according to claim 6 , wherein the formwork and the leveling member are left after the concrete is hardened.
JP2002297522A 2002-10-10 2002-10-10 Hardware, building, floor construction methods Expired - Fee Related JP3756866B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002297522A JP3756866B2 (en) 2002-10-10 2002-10-10 Hardware, building, floor construction methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002297522A JP3756866B2 (en) 2002-10-10 2002-10-10 Hardware, building, floor construction methods

Publications (2)

Publication Number Publication Date
JP2004132050A JP2004132050A (en) 2004-04-30
JP3756866B2 true JP3756866B2 (en) 2006-03-15

Family

ID=32287203

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002297522A Expired - Fee Related JP3756866B2 (en) 2002-10-10 2002-10-10 Hardware, building, floor construction methods

Country Status (1)

Country Link
JP (1) JP3756866B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6252834B2 (en) * 2013-10-02 2017-12-27 清水建設株式会社 Underground pit structure
CN106907010A (en) * 2017-02-28 2017-06-30 中国二十冶集团有限公司 Reduce the construction method of concrete slab thickness deviation

Also Published As

Publication number Publication date
JP2004132050A (en) 2004-04-30

Similar Documents

Publication Publication Date Title
KR101745242B1 (en) Bariable beam form and construction method thereof
JP4020406B2 (en) Formwork support mechanism and placement method
KR101736749B1 (en) Supporting Apparatus For Beam Form
KR20190008053A (en) An assembly type supporting beam mold using form-panel, and method for constructing this same
US10494815B2 (en) Adjustable dap assembly
JP3756866B2 (en) Hardware, building, floor construction methods
KR20220022256A (en) Non-welding prefabricated deck stairs
KR101739126B1 (en) Method for Forming Top-down-typed Underground Strucutre
KR101181493B1 (en) Improved support system
JP2011202486A (en) Building
KR100778139B1 (en) Frame for length adjustment in horizontal prop of mold
JP4416141B2 (en) How to install seismic isolation devices
KR101806000B1 (en) Extender for extending length of support
JP2017137730A (en) Fixing method and connection structure of connection steel frame in composite structure
KR102125300B1 (en) Steel post manufacturing system and manufacturing method for clean room
JP5345238B1 (en) Construction method of base-isolated base structure and base-isolated base structure
WO2019230028A1 (en) Intermediate falsework
JP2016132917A (en) Installation method for foundation structure
JP5185634B2 (en) Anchor bolt setting jig and anchor bolt setting method
JP2670968B2 (en) Jig for temporary assembly of frame structure and method of temporary assembly of frame structure
JP3531109B2 (en) Temporary formwork support device
JPWO2019230028A1 (en) Intermediate support
KR102169114B1 (en) Method to construct expansion joint
JP7380042B2 (en) Building column and beam connection method
JP2019056282A (en) Leg-shaped part support structure and method for producing the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050613

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20050707

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20050801

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050830

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051026

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051213

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051222

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100106

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110106

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130106

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130106

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140106

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees