JP3725596B2 - Pipe fixing jig - Google Patents

Pipe fixing jig Download PDF

Info

Publication number
JP3725596B2
JP3725596B2 JP34819695A JP34819695A JP3725596B2 JP 3725596 B2 JP3725596 B2 JP 3725596B2 JP 34819695 A JP34819695 A JP 34819695A JP 34819695 A JP34819695 A JP 34819695A JP 3725596 B2 JP3725596 B2 JP 3725596B2
Authority
JP
Japan
Prior art keywords
pipe
fixing jig
pipe fixing
locking
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP34819695A
Other languages
Japanese (ja)
Other versions
JPH09170681A (en
Inventor
邦彦 樋口
繁彦 木山
Original Assignee
株式会社長谷工コーポレーション
有限会社大丸技建
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社長谷工コーポレーション, 有限会社大丸技建 filed Critical 株式会社長谷工コーポレーション
Priority to JP34819695A priority Critical patent/JP3725596B2/en
Publication of JPH09170681A publication Critical patent/JPH09170681A/en
Application granted granted Critical
Publication of JP3725596B2 publication Critical patent/JP3725596B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/14Hangers in the form of bands or chains

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、例えば、集合住宅等の建物の天井スラブ等に配設される配管等を固定する治具に関する。
【0002】
【従来の技術】
従来、集合住宅等の建物の天井スラブ等に水道管等の配管を配設するには、例えば、図13に示す配管固定治具が用いられている。配管固定治具100は金属製の台座部101と金属製のバンド部102からなる。この配管固定治具100を天井スラブ103に取り付けるに当たっては、天井スラブ103のコンクリート打設の時点で、治具を取り付ける複数箇所に予めアンカーボルト105を螺合するためのインサート104を埋設しておく。そして、天井スラブの型枠脱型後、アンカーボルト105をインサート104に螺合し、アンカーボルト105に配管固定治具100の台座部101を螺合して取り付け、ヒンジ部102aを有するバンド部102で配管を抱合し、このバンド部102をネジ106により台座部101に止着して配管を固定するようにしている。
【0003】
【発明が解決しようとする課題】
しかしながら、上記従来の配管固定治具には次のような問題点がある。まず、天井スラブに予めインサートを埋設する際に、スラブ型枠にインサートを固定しておくが、スラブ配筋やコンクリート打ちの時点でインサートが外れたり、曲がったりすることがある。かかる場合には、天井スラブに再度穴を開けてインサートを埋設する手間を要する。また、インサートを予め埋設するため、取り付け位置が固定され、作業現場での施工状況に応じて取り付け位置を変更することができない。したがって、変更する場合には上記と同様に別に取り付け穴を開ける手間を要することになる。
【0004】
さらに、上記治具は、金属バンド部によって配管を固定するために、例えば給水管として凹凸を密に形成した樹脂製の鞘管方式を使用した場合は、十分な固定ができずにウォーターハンマー現象等によって配管がずれるおそれがある。そのため、この治具はそのまま鞘管には適用できないという問題点がある。
【0005】
そこで、本発明の目的は、配管の配設が容易で作業性が良く、しかも低コストの配管固定治具を提供することにある。
【0006】
【課題を解決するための手段】
本発明の配管固定治具は、係止片を有する配管配設係止部材にスライド可能に嵌合可能な係止溝を有する台座部と、配管取付部とを一体に設けたことを特徴とする。この配管固定治具は合成樹脂を一体成形してなるのが好ましい。この配管固定治具は配管配設係止部材を用いないで直接天井スラブ等に取り付けてもよい。
【0007】
また、上記の台座部は平面略円形状であることを特徴とする。台座部の厚みを配管配設係止部材の係止溝の溝幅よりもやや狭く形成すれば、配管固定治具を容易にスライド又は回動させることができて配管の取付位置及び方向を任意に選択できる。
【0008】
さらに、上記配管取付部には配管を支持する凹部が形成されており、この凹部に支持された配管を締め付けて固定する可撓性結束部材を有することを特徴とする。上記凹部は円弧状に形成するのが好ましく、対向する位置に1対づつ設けて1本の配管を2点で支持するのが好ましく、複数の配管を配置する場合は、複数対の凹部を設けるのが好ましい。上記可撓性結束部材には、その一端部に他端部を貫通させて係止する係止部を設けた合成樹脂製の可撓性紐状結束部材を用いるのが好ましい。
【0009】
また、上記凹部は配管を互いに交差する方向のいずれか一方に固定可能な位置にそれぞれ形成され、交差する方向の一方向と他方向では、互いに異なる数の配管を固定するように異なる数の凹部又は異なる数の対の凹部を形成してあることを特徴とする。これにより配置すべき配管の数に応じて凹部を選択して配置・固定する。
【0010】
さらに、上記凹部には突起部が設けてあることを特徴とする。この突起部は凹部に沿って突状に形成してあるのが好ましく、給水管に鞘管を用いた場合、鞘管の凹部を嵌め込んでずれないように固定する。この突起部は、異なるピッチの鞘管に対応できるように対の凹部の一方に設けるのが好ましい。
【0011】
【実施の形態】
以下、図面を参照して本発明の実施の形態を説明する。
図1及び2は、本発明の第1実施例に係る配管固定治具の施工状態を示すもので、図1は配管固定治具に配管を取り付ける前の状態を示し、図2は配管を取り付けた状態を示している。天井スラブ1には、配管配設係止部材であるレール部材2が配設されている。このレール部材2は、天井スラブ1のコンクリート打設後、配管の設置箇所及び設置範囲に合わせて適宜切断され、鋲3により天井スラブ1に止着される。レール部材2の幅方向両端部には、その端部を内側に折り返して係止片部2aと係止溝2bが形成されている。
【0012】
レール部材2には、配管固定治具4が取り付けられる。図6〜図9に示すように、配管固定治具4は台座部41と配管取付部42とからなり、これらを一体に設けたもので、合成樹脂により一体成形されている。
【0013】
台座部41には、レール部材2の係止片部2aに嵌合する係止溝41aが形成されている。図7に示すように、台座部41は平面円形状に形成されている。このため後述のように、レール部材2に取り付ける際あるいは取り付けた状態で、水平方向の取付角度を任意に設定することができるという利点がある。また、台座部41には、レール部材2に打ち込まれた鋲3の頭部が通過可能な凹部41bが形成されている。台座部41の厚みは、レール部材2の係止溝2bの溝幅よりもやや狭く形成されているため、台座部41はレール部材2内でスライド可能である。
【0014】
配管取付部42は平面略長方形状に形成されている。配管取付部42は、係止溝41aから延びる軸部とそれに続く平面部とからなる基部42aと、その周端部から垂下して形成された配管支持部42bとからなる。配管支持部42bには、その対向する辺にそれぞれ対をなして、配管をはめ込む円弧状の凹部42cが形成され、配管を交差する方向のいずれか一方に配置できるように構成されている。すなわち、この実施例では、平面略長方形状の配管取付部42の対向する長辺部Lに当たる配管支持部42bには、2対の凹部42cがそれぞれ対向して形成され、短辺部Sに当たる配管支持部42bには、1対の凹部42cが対向して形成されている(図6参照)。つまり、この実施例の配管固定治具4では、上記の長辺部Lに当たる配管支持部42bの2対の凹部42cを使用すれば、図1及び2に示すように、2本の配管を平行に配設することが可能であり、また、短辺部Sに当たる凹部42cを使用して1本の配管を配設することもできる。なお、この実施例では、上記凹部42cにより長辺部Lで2本、短辺部Sで1本の配管を取り付けるようにしているが、この配置は限定されないので、例えば、長辺部Lで3本、短辺部Sで2本の配管を取り付けるようにして、その配管の数に見合った数の凹部42cを形成してもよい。
【0015】
なお、配管取付部42の平面形状は、長方形状には限定されないので、例えば平面円形状に形成し、上記と同様に交差する方向の位置に異なる数の凹部42cを形成し、併設する配管の本数に応じて凹部を選択できるようにしてもよい。
【0016】
対向して対をなす凹部42cの一方の側には、突起部42dが形成されている。この突起部42dは凹部42cに沿って円弧状の突条に形成されている。突起部42dは、配管に後記する樹脂製の鞘管を用いる場合に、鞘管の凹部に嵌合されて鞘管を固定し、ウォーターハンマー等の振動により生じるズレを有効に防止することができる。また、突起部42dを対をなす凹部42cの一方の側にのみ設けているので、異なるピッチの凹凸を有する鞘管に対応することができるようになっている。
【0017】
配管取付部42には、配管を締め付けて固定する可撓性結束部材5を挿通可能な取付孔42e,42fが形成されている。すなわち、配管取付部42の長辺部Lの中央部には、対向する1対の取付孔42eが形成されている。この取付孔42eは、配管支持部42bの短辺部に形成された凹部42cに配管を固定する場合に紐状の可撓性結束部材5を挿通して使用する。配管取付部42の短辺部の凹部42cの上部には、対向する1対の取付孔42fが形成されている。この取付孔42fは、配管支持部42bの長辺部に形成された2対の凹部42cに配管を固定する場合に可撓性結束部材5を挿通して使用するものである。また、図7に示すように、配管取付部42の基部平面部の四隅には、補助的な取付孔42gが4箇所形成されている。この取付孔42gは、凹部42cに比較的小さな径の配管を固定する場合に、可撓性結束部材5を取り付けるためのものである。したがって、この配管固定治具4は、径の異なる配管に対応することができる。なお、上記取付孔42e,42f,42gの配置数及び配置位置はこの実施例に示した構成に限定されないので、凹部42cの配置数を変更した場合などには適宜変更すればよい。
【0018】
可撓性結束部材5は、この実施例では合成樹脂製の紐状係止部材を用いている。図1及び2に示すように、その一端部には係止孔を形成した係止部5aが設けられ、他端部5bには図示しない小突起が形成されており、他端部5bを係止部5aの係止孔に挿通した状態で、係止孔内に設けられた戻り止め突起に係合され固定されるようになっている。なお、可撓性結束部材5には銅線を芯材としてこれを合成樹脂で被覆したビニールタイを用いてもよく、その場合は係止部を設けずに、ビニールタイの端部同士を結び付けて固定するようにしてもよい。本実施例では、配管を固定するのに上記した可撓性結束部材を用いている。したがって、管だけでなく電線等の線材を束ねて結束することもできるので、この配管固定治具4は配線にも適用できる。
【0019】
次に、配管固定治具4をレール部材2に固定するための固定手段について説明すると、図2、図7及び図8に示すように、配管固定治具4の軸部には、ボルト孔42hが形成してある。このボルト孔42hに下方から固定ボルト8を螺合して締め付けると、固定ボルト8の上端部がレール部材2の平面部下側に圧接され、このため台座部41とレール部材2の係止片2aが締め付けられて固定される。図3に示す固定ボルト8は、合成樹脂を一体成形したものであり、その頭部にはドライバー用の溝部8aと手回し用のつまみ部8bが形成されている。
【0020】
固定ボルト8に代えて図4に示すような割りピン9を用いてもよい。この割りピン9を用いる場合は、ボルト孔42hに下から割りピン9を挿入し、その端部がレール部材2の平面部下側に達した時に押圧すれば、割り溝9aが開いて、配管固定治具4の台座部41とレール部材2の隙間に嵌入されることになる。これにより上記と同様に台座部41とレール部材2の係止片2aが締め付けられて固定される。
【0021】
なお、配管固定治具4は、図6及び図9に示すように、その台座部41の上端部が平面状に形成されているので、天井スラブ1に直接取り付けることも可能である。このための構成として、図2及び図8に示すように、ナットを取り付けることが可能なナット取付凹部42iが形成されている。このナット取付凹部42iに図示しないナットをはめ込んで、天井スラブ1に埋設されたインサートにボルトを介して配管固定治具4を固定すれば、天井スラブ1に直接取り付けることができる。
【0022】
図10〜図13は、配管固定治具4を天井スラブ1に取り付けるための他の固定手段を示している。図10の例では、先割れボルト10を天井スラブ1に埋設して、そのねじ部にナットで配管固定治具4を固定する。図11の例では、天井スラブ1に形成した取付穴1aに硬化性樹脂11を充填し、そこにねじ12で配管固定治具4を固定する。図12の例では、図示しない鋲打ち機等により鋲13を配管固定治具4の軸部を貫通して打ち込むことにより固定する。図13の例では、配管固定治具4の台座部41の上端部と天井スラブ1間を両面接着テープ14により接着・固定する。
【0023】
本第1実施例では、配管に合成樹脂製の鞘管6を用いた例を示している。鞘管6内には可撓性の合成樹脂管7が貫通している。なお、配管固定治具4は図示した鞘管6だけでなく、硬質の合成樹脂管、金属管等にも適用できることはもちろんである。
【0024】
次に、配管固定治具4により配管を配設する過程を説明すると、図1に示すレール部材2の端部から、配管固定治具4の台座部41をレール部材2の係止溝2bにはめ込み、この配管固定治具4を設置する所定箇所までスライドさせる。この際、台座部41の厚みはレール部材2の係止溝2bの溝幅より狭い厚みに形成されており(図2参照)、かつ台座部41にはレール部材2に打ち込まれた鋲3の頭部が通過可能な逃げ凹部41bが形成されているので、円滑にスライドさせることができる。配管固定治具4が所定位置に達したら、ボルト孔42hに固定ボルト8をねじ込み、これを締め付けて配管固定治具4をレール部材2に固定する。この際、台座部41は平面円形に形成されているので、配管固定治具4の向きを任意に選択できる。次に、配管支持部42bの凹部42cに鞘管6を当ててはめ込む。この際、図1のように、配管支持部42bの長辺部Lの凹部42cを選んで、2本の鞘管6を平行に配設してもよく、あるいは短辺部Sの凹部42cを選んで1本の鞘管を配設してもよい。このように、本発明の配管固定治具によれば、配管の位置、方向及び本数等を任意に設定することが容易である。そして、凹部42cの突起部42dが鞘管6の凹部にはまり込むように取り付ける。次いで、取付孔42fに通した可撓性結束部材5を鞘管6の外周に回して、可撓性結束部材5の端部5bを係止部5aに通して締め付ける。この際、可撓性結束部材5は鞘管6の凹部にはまり込むように取り付け、しっかりと固定する。
【0025】
なお、本実施例の配管固定治具4には、可撓性結束部材5が配管固定治具4に固着されていないので、可撓性結束部材5が損傷した場合の交換が極めて容易である。
【0026】
図5に示すように、この配管固定治具4では、従来の金属バンド部からなる配管固定治具100を取り付けて使用することもできる。すなわち、配管固定治具4の台座部41内には、ナットNを収容する凹部41cが形成されている(図5及び図7参照)。このため凹部41c内にナットNを嵌め込んで、配管固定治具100に固定したボルト105をナットNに螺合させ、ボルト105の上端部でレール部材2の内面を圧接して締め付けるようにすれば、配管固定治具4と配管固定治具100はレール部材2に固定される。
【0027】
図14ないし図17は、本発明の第2実施例に係る配管固定治具を示している。配管固定治具40は、1本の配管を配設する治具であり、配管支持部42bには配管をはめ込む凹部42cが1対形成されているものである。そして、台座部41の係止溝41aの下側にリング状のリブ43が形成され、レール部材2の係止片2aにはめ込んだ際のぐらつきを防止するようになっている。他の構成は上記第1実施例とほぼ同様であるのでその説明を省略する。
【0028】
図20は、第3実施例に係る配管固定治具44を示すものである。この配管固定治具44は、レール部材2に取り付けられる台座部44aと配管固定ベルト部44bを合成樹脂により一体成形したものである。台座部44aは、第1及び第2実施例と同様に平面円形に形成されている。配管固定ベルト部44bには、係止凹部44cと係止凸部44dが形成されており、この係止凹部44cと係止凸部44dを係合させることによって、配管固定ベルト部44b内に配管を保持するものである。
【0029】
図18及び図19は他の実施例を概念的に示している。図18の配管固定治具45は、3本の配管Hを固定するものである。配管Hは鞘管でもよく、金属管等でもよい。配管固定治具45には3本の配管Hを平行に配設可能な位置に、配管Hを支持する円弧状凹部45aを並列に形成してある。配管固定治具45には可撓性結束部材Kを挿通可能な取付孔45b,45cが形成されていると共に、可撓性結束部材Kを係止するフック部Fが凹部45aの間に設けてある。配管Hの取り付けに際しては、頭部を有する可撓性結束部材Kを取付孔45bから挿通し、3本の配管Hのそれぞれの外周に掛け回すようにして各フック部Fに係止し、反対側の取付孔45cに挿通して、図示しない係止部材により締め付けて固定する。
【0030】
図19は、配管Hを縦形に配置するための構成を有する配管固定治具46を示している。この配管固定治具46では、台座部46aと直交する方向に配管支持部46bを突設してある。配管支持部46bには、その片側に1個所、反対側に2個所の円弧状凹部46cが形成されている。そして、配管支持部46bの上下のそれぞの位置に可撓性結束部材Kを挿通して取り付ける取付孔46d,46eが形成されている。この配管固定治具46では配管Hを図示のように配置して可撓性結束部材Kで固定する。なお、凹部46cの数及び位置は、配管Hの本数及び設置位置に合わせて適宜設定すればよい。また、各凹部46cの近傍に図18に示すようなフック部Fを複数設けるようにしてもよい。
【0031】
なお、上記各実施例では、天井スラブに配管を配設する例を説明したが、本発明の配管固定治具は室内の壁又は床、あるいは外壁の配管固定にも用いることができる。
【0032】
【発明の効果】
本発明の配管固定治具は、配管配設係止部材に嵌合可能な係止溝を有する台座部と配管取付部とを一体に設けてあるので、配管等の配設が容易で作業性が良く、しかも低コストである。
【0033】
また、配管取付部に配管を支持する凹部が形成されており、この凹部にはめ込まれた配管を締め付けて固定する可撓性結束部材を有するので、配管の固定が容易で作業性が向上し、径の異なる配管、さらには配線にも適用できるので応用範囲が広い。また、メンテナンスも容易である。
【0034】
さらに、上記配管取付部は互いに交差する方向のいずれにも配置可能な位置に配管を支持する凹部が形成され、かつこの凹部は交差する二方向では異なる本数の配管を配置可能に形成されているので、同じ配管固定治具を使用して異なる本数の配管を配設することが可能である。
【0035】
さらに、上記凹部には突起部が設けてあるので、鞘管をずれないように固定することができる。
【図面の簡単な説明】
【図1】 本発明の配管固定治具の施工状態を示す斜視図である。
【図2】 配管を固定した状態を示す断面図である。
【図3】 固定ボルトの斜視図である。
【図4】 止着部材(割りピン)の正面図である。
【図5】 金属バンド製の配管固定治具を取り付けた状態を示す断面図である。
【図6】 第1実施例の配管固定治具を示す正面図である。
【図7】 図6の平面図である。
【図8】 図6の底面図である。
【図9】 図6の側面図である。
【図10】 先割れボルトによる固定状態を示す断面図である。
【図11】 硬化性樹脂とボルトによる固定状態を示す断面図である。
【図12】 鋲打ちによる固定状態を示す断面図である。
【図13】 両面接着テープによる固定状態を示す断面図である。
【図14】 第2実施例の配管固定治具を示す正面図である。
【図15】 図14の側面図である。
【図16】 図14の平面図である。
【図17】 図15の底面図である。
【図18】 他の実施例の断面図である。
【図19】 他の実施例の断面図である。
【図20】 第3実施例の配管固定治具の取付状態を示す一部断面正面図である。
【図21】 従来例の配管固定治具の取付状態を示す一部断面正面図である。
【符号の説明】
1 天井スラブ
2 配管配設係止部材(レール部材)
2a 係止片
4,40,44,45,46 配管固定治具
41,46a 台座部
41a 係止溝
42,46b 配管取付部
42c,45a,46c 凹部
42d 突起部
5,K 可撓性結束部材
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a jig for fixing piping or the like disposed on a ceiling slab of a building such as an apartment house.
[0002]
[Prior art]
Conventionally, for example, a pipe fixing jig shown in FIG. 13 is used to arrange a pipe such as a water pipe on a ceiling slab of a building such as an apartment house. The pipe fixing jig 100 includes a metal pedestal 101 and a metal band 102. When the pipe fixing jig 100 is attached to the ceiling slab 103, inserts 104 for screwing anchor bolts 105 are embedded in advance at a plurality of positions where the jig is attached at the time of concrete placement of the ceiling slab 103. . Then, after the formwork of the ceiling slab is removed, the anchor bolt 105 is screwed to the insert 104, the base portion 101 of the pipe fixing jig 100 is screwed to the anchor bolt 105, and the band portion 102 having the hinge portion 102a is attached. Then, the piping is conjugated, and the band portion 102 is fixed to the pedestal portion 101 with a screw 106 to fix the piping.
[0003]
[Problems to be solved by the invention]
However, the conventional pipe fixing jig has the following problems. First, when the insert is embedded in the ceiling slab in advance, the insert is fixed to the slab formwork, but the insert may come off or bend at the time of slab reinforcement or concrete placement. In such a case, it is necessary to make a hole in the ceiling slab again and embed the insert. Moreover, since the insert is embedded in advance, the attachment position is fixed, and the attachment position cannot be changed according to the construction situation at the work site. Therefore, when changing, it is necessary to make a separate mounting hole as described above.
[0004]
Furthermore, in order to fix the pipe by the metal band part, for example, when using a resin sheath pipe method in which unevenness is densely formed as a water supply pipe, the jig cannot be fixed sufficiently and the water hammer phenomenon occurs. There is a risk that the piping will shift due to such reasons. Therefore, there is a problem that this jig cannot be directly applied to the sheath tube.
[0005]
SUMMARY OF THE INVENTION An object of the present invention is to provide a pipe fixing jig that is easy to dispose piping, has good workability, and is low in cost.
[0006]
[Means for Solving the Problems]
The pipe fixing jig of the present invention is characterized in that a pedestal part having a locking groove slidably fitted to a pipe arrangement locking member having a locking piece and a pipe mounting part are integrally provided. To do. This pipe fixing jig is preferably formed by integrally molding a synthetic resin. This pipe fixing jig may be directly attached to a ceiling slab or the like without using a pipe arrangement locking member.
[0007]
In addition, the pedestal portion has a substantially circular plane shape. If the thickness of the pedestal is made slightly narrower than the groove width of the locking groove of the piping arrangement locking member, the piping fixing jig can be easily slid or rotated, and the mounting position and direction of the piping can be arbitrarily set. Can be selected.
[0008]
Further, the pipe mounting part is formed with a concave part for supporting the pipe, and has a flexible binding member for fastening and fixing the pipe supported by the concave part. The recesses are preferably formed in a circular arc shape, preferably provided in pairs at opposing positions to support one pipe at two points. When a plurality of pipes are arranged, a plurality of pairs of recesses are provided. Is preferred. As the flexible binding member, it is preferable to use a flexible string-like binding member made of synthetic resin provided with a locking portion that penetrates and locks the other end portion at one end thereof.
[0009]
In addition, the recesses are formed at positions where the pipes can be fixed in any one of the directions intersecting each other, and different numbers of recesses are fixed so that different numbers of pipes are fixed in one direction and the other direction of the intersecting directions Alternatively, a different number of pairs of recesses are formed. Accordingly, the concave portion is selected and arranged / fixed according to the number of pipes to be arranged.
[0010]
Further, the concave portion is provided with a protruding portion. The protrusion is preferably formed in a protruding shape along the recess, and when a sheath pipe is used as the water supply pipe, the recess of the sheath pipe is fitted and fixed so as not to be displaced. This protrusion is preferably provided on one of the pair of recesses so as to accommodate the sheath pipes having different pitches.
[0011]
Embodiment
Embodiments of the present invention will be described below with reference to the drawings.
1 and 2 show a construction state of the pipe fixing jig according to the first embodiment of the present invention. FIG. 1 shows a state before the pipe is attached to the pipe fixing jig, and FIG. 2 shows the pipe is attached. Shows the state. The ceiling slab 1 is provided with a rail member 2 which is a piping arrangement locking member. The rail member 2 is appropriately cut in accordance with the installation location and installation range of the pipe after the concrete placement of the ceiling slab 1, and is fixed to the ceiling slab 1 by the eaves 3. At both ends in the width direction of the rail member 2, the end portions are folded back inward to form locking pieces 2 a and locking grooves 2 b.
[0012]
A pipe fixing jig 4 is attached to the rail member 2. As shown in FIGS. 6 to 9, the pipe fixing jig 4 includes a pedestal portion 41 and a pipe mounting portion 42, which are integrally formed and are integrally formed of synthetic resin.
[0013]
The pedestal portion 41 is formed with a locking groove 41 a that fits into the locking piece portion 2 a of the rail member 2. As shown in FIG. 7, the pedestal portion 41 is formed in a planar circular shape. Therefore, as described later, there is an advantage that the horizontal mounting angle can be arbitrarily set when the rail member 2 is mounted or in the mounted state. Further, the pedestal portion 41 is formed with a concave portion 41b through which the head of the rod 3 driven into the rail member 2 can pass. Since the thickness of the pedestal portion 41 is slightly narrower than the groove width of the locking groove 2 b of the rail member 2, the pedestal portion 41 can slide within the rail member 2.
[0014]
The pipe mounting portion 42 is formed in a substantially rectangular shape on a plane. The pipe attachment part 42 includes a base part 42a composed of a shaft part extending from the locking groove 41a and a flat part following the shaft part, and a pipe support part 42b formed to hang from the peripheral end part. The pipe support part 42b is formed with an arcuate concave part 42c for fitting the pipes in pairs facing each other, so that the pipe support part 42b can be arranged in any one of the directions intersecting the pipes. In other words, in this embodiment, two pairs of recesses 42c are formed to face each other on the pipe support part 42b corresponding to the opposing long side part L of the pipe attachment part 42 having a substantially rectangular plane, and the pipe corresponding to the short side part S is formed. The support portion 42b is formed with a pair of recesses 42c facing each other (see FIG. 6). That is, in the pipe fixing jig 4 of this embodiment, if two pairs of recesses 42c of the pipe support part 42b corresponding to the long side part L are used, as shown in FIGS. Further, it is possible to arrange one pipe by using the concave portion 42c corresponding to the short side portion S. In this embodiment, two pipes are attached at the long side portion L and one pipe at the short side portion S by the concave portion 42c. However, since this arrangement is not limited, for example, at the long side portion L, The number of the concave portions 42c corresponding to the number of the pipes may be formed by attaching two pipes with three short sides S.
[0015]
Note that the planar shape of the pipe mounting portion 42 is not limited to a rectangular shape. For example, it is formed in a planar circular shape, and a different number of concave portions 42c are formed at the positions in the intersecting direction in the same manner as described above. You may enable it to select a recessed part according to the number.
[0016]
A protruding portion 42d is formed on one side of the concave portion 42c that is opposed to each other. The protrusion 42d is formed in an arc-shaped protrusion along the recess 42c. When the resin-made sheath tube which will be described later is used for the pipe, the protruding portion 42d is fitted into the recess of the sheath tube to fix the sheath tube, and can effectively prevent the deviation caused by the vibration of the water hammer or the like. . Further, since the protrusions 42d are provided only on one side of the paired recesses 42c, it is possible to deal with the sheath tube having unevenness with different pitches.
[0017]
The pipe attachment portion 42 is formed with attachment holes 42e and 42f through which the flexible binding member 5 for fastening and fixing the pipe can be inserted. That is, a pair of opposing mounting holes 42 e are formed in the center of the long side portion L of the pipe mounting portion 42. The attachment hole 42e is used by inserting the string-like flexible binding member 5 when the pipe is fixed to the recess 42c formed in the short side part of the pipe support part 42b. A pair of opposing mounting holes 42f are formed in the upper portion of the concave portion 42c on the short side portion of the pipe mounting portion 42. This attachment hole 42f is used by inserting the flexible binding member 5 when the pipe is fixed to the two pairs of recesses 42c formed in the long side part of the pipe support part 42b. Moreover, as shown in FIG. 7, four auxiliary attachment holes 42g are formed at the four corners of the base plane portion of the pipe attachment portion 42. The attachment hole 42g is for attaching the flexible binding member 5 when a pipe having a relatively small diameter is fixed to the recess 42c. Therefore, the pipe fixing jig 4 can correspond to pipes having different diameters. In addition, since the arrangement number and arrangement position of the mounting holes 42e, 42f, and 42g are not limited to the configuration shown in this embodiment, they may be appropriately changed when the arrangement number of the concave portions 42c is changed.
[0018]
In this embodiment, the flexible binding member 5 uses a string-like locking member made of synthetic resin. As shown in FIGS. 1 and 2, a locking portion 5a having a locking hole is provided at one end thereof, and a small projection (not shown) is formed at the other end 5b, and the other end 5b is engaged. In a state where it is inserted through the locking hole of the locking part 5a, it is engaged and fixed to a detent protrusion provided in the locking hole. The flexible binding member 5 may be a vinyl tie having a copper wire as a core material and coated with a synthetic resin. In this case, the ends of the vinyl ties are connected to each other without providing a locking portion. May be fixed. In this embodiment, the flexible binding member described above is used to fix the pipe. Accordingly, not only the tube but also a wire material such as an electric wire can be bundled and bound, so that the pipe fixing jig 4 can be applied to wiring.
[0019]
Next, the fixing means for fixing the pipe fixing jig 4 to the rail member 2 will be described. As shown in FIGS. 2, 7 and 8, the shaft portion of the pipe fixing jig 4 has a bolt hole 42h. Is formed. When the fixing bolt 8 is screwed into the bolt hole 42h and tightened from below, the upper end portion of the fixing bolt 8 is pressed against the lower side of the flat surface portion of the rail member 2, so that the base piece 41 and the locking piece 2a of the rail member 2 are pressed. Is tightened and fixed. The fixing bolt 8 shown in FIG. 3 is formed by integrally molding synthetic resin, and has a groove 8a for a driver and a knob portion 8b for turning by hand at the head.
[0020]
Instead of the fixing bolt 8, a split pin 9 as shown in FIG. When this split pin 9 is used, if the split pin 9 is inserted into the bolt hole 42h from below and pressed when the end reaches the lower side of the flat surface of the rail member 2, the split groove 9a is opened to fix the pipe It will be inserted into the gap between the pedestal 41 of the jig 4 and the rail member 2. As a result, the base 41 and the locking piece 2a of the rail member 2 are fastened and fixed in the same manner as described above.
[0021]
As shown in FIGS. 6 and 9, the pipe fixing jig 4 can be directly attached to the ceiling slab 1 because the upper end portion of the pedestal portion 41 is formed in a flat shape. As a configuration for this purpose, as shown in FIGS. 2 and 8, a nut mounting recess 42i to which a nut can be mounted is formed. If a nut (not shown) is fitted into the nut mounting recess 42 i and the pipe fixing jig 4 is fixed to the insert embedded in the ceiling slab 1 via a bolt, the nut can be directly mounted on the ceiling slab 1.
[0022]
10 to 13 show other fixing means for attaching the pipe fixing jig 4 to the ceiling slab 1. In the example of FIG. 10, the cracked bolt 10 is embedded in the ceiling slab 1, and the pipe fixing jig 4 is fixed to the screw portion with a nut. In the example of FIG. 11, the mounting hole 1 a formed in the ceiling slab 1 is filled with a curable resin 11, and the pipe fixing jig 4 is fixed thereto with screws 12. In the example of FIG. 12, the scissors 13 are fixed by being driven through the shaft portion of the pipe fixing jig 4 with a scissor not shown. In the example of FIG. 13, the upper end portion of the base portion 41 of the pipe fixing jig 4 and the ceiling slab 1 are bonded and fixed by the double-sided adhesive tape 14.
[0023]
In the first embodiment, an example in which a sheath pipe 6 made of synthetic resin is used for piping is shown. A flexible synthetic resin tube 7 passes through the sheath tube 6. Of course, the pipe fixing jig 4 can be applied not only to the illustrated sheath pipe 6 but also to a hard synthetic resin pipe, a metal pipe or the like.
[0024]
Next, the process of arranging the pipe by the pipe fixing jig 4 will be described. From the end of the rail member 2 shown in FIG. 1, the pedestal 41 of the pipe fixing jig 4 is moved into the locking groove 2 b of the rail member 2. It is inserted and slid to a predetermined place where this pipe fixing jig 4 is installed. At this time, the thickness of the pedestal portion 41 is formed to be narrower than the groove width of the locking groove 2b of the rail member 2 (see FIG. 2), and the pedestal portion 41 has the flange 3 driven into the rail member 2. Since the escape recess 41b through which the head can pass is formed, it can be smoothly slid. When the pipe fixing jig 4 reaches a predetermined position, the fixing bolt 8 is screwed into the bolt hole 42h and is tightened to fix the pipe fixing jig 4 to the rail member 2. At this time, since the pedestal portion 41 is formed in a flat circular shape, the direction of the pipe fixing jig 4 can be arbitrarily selected. Next, the sheath pipe 6 is fitted into the recess 42c of the pipe support part 42b. At this time, as shown in FIG. 1, the concave portion 42c of the long side portion L of the pipe support portion 42b may be selected to arrange the two sheath tubes 6 in parallel, or the concave portion 42c of the short side portion S may be provided. You may choose and arrange | position one sheath tube. Thus, according to the pipe fixing jig of the present invention, it is easy to arbitrarily set the position, direction and number of pipes. And it attaches so that the protrusion part 42d of the recessed part 42c may fit in the recessed part of the sheath pipe 6. FIG. Next, the flexible binding member 5 passed through the attachment hole 42f is turned to the outer periphery of the sheath tube 6, and the end 5b of the flexible binding member 5 is passed through the locking portion 5a and tightened. At this time, the flexible binding member 5 is attached so as to fit into the concave portion of the sheath tube 6 and firmly fixed.
[0025]
In addition, since the flexible binding member 5 is not fixed to the pipe fixing jig 4 in the pipe fixing jig 4 of the present embodiment, the replacement when the flexible binding member 5 is damaged is extremely easy. .
[0026]
As shown in FIG. 5, in this pipe fixing jig 4, a pipe fixing jig 100 made of a conventional metal band portion can be attached and used. That is, a recessed portion 41c for accommodating the nut N is formed in the pedestal portion 41 of the pipe fixing jig 4 (see FIGS. 5 and 7). For this reason, the nut N is fitted into the recess 41c, the bolt 105 fixed to the pipe fixing jig 100 is screwed into the nut N, and the inner surface of the rail member 2 is pressed and tightened at the upper end of the bolt 105. For example, the pipe fixing jig 4 and the pipe fixing jig 100 are fixed to the rail member 2.
[0027]
14 to 17 show a pipe fixing jig according to the second embodiment of the present invention. The pipe fixing jig 40 is a jig for arranging one pipe, and the pipe support part 42b is formed with a pair of concave parts 42c for fitting the pipes. And the ring-shaped rib 43 is formed under the latching groove 41a of the base part 41, and prevents the wobbling at the time of engaging with the latching piece 2a of the rail member 2. Other configurations are substantially the same as those of the first embodiment, and the description thereof is omitted.
[0028]
FIG. 20 shows a pipe fixing jig 44 according to the third embodiment. The pipe fixing jig 44 is formed by integrally molding a pedestal part 44a attached to the rail member 2 and a pipe fixing belt part 44b with a synthetic resin. The pedestal portion 44a is formed in a flat circular shape as in the first and second embodiments. The piping fixing belt portion 44b is formed with a locking recess 44c and a locking projection 44d. By engaging the locking recess 44c and the locking projection 44d, the piping fixing belt portion 44b has a piping. Is to hold.
[0029]
18 and 19 conceptually show another embodiment. The pipe fixing jig 45 in FIG. 18 is for fixing three pipes H. The pipe H may be a sheath pipe or a metal pipe. In the pipe fixing jig 45, arc-shaped concave portions 45a for supporting the pipe H are formed in parallel at positions where the three pipes H can be arranged in parallel. Mounting holes 45b and 45c through which the flexible binding member K can be inserted are formed in the pipe fixing jig 45, and a hook portion F for locking the flexible binding member K is provided between the recesses 45a. is there. When the pipe H is attached, the flexible binding member K having a head is inserted through the attachment hole 45b, and is hooked around the outer circumferences of the three pipes H and locked to the hook portions F. It is inserted into the mounting hole 45c on the side, and is fastened and fixed by a locking member (not shown).
[0030]
FIG. 19 shows a pipe fixing jig 46 having a configuration for arranging the pipes H vertically. In this pipe fixing jig 46, a pipe support part 46b is projected in a direction orthogonal to the pedestal part 46a. The pipe support part 46b has one arcuate recess 46c formed on one side and two on the opposite side. Then, mounting holes 46d and 46e are formed in the upper and lower positions of the pipe support 46b, respectively, through which the flexible binding member K is inserted. In this pipe fixing jig 46, the pipe H is arranged as shown in the figure and fixed by the flexible binding member K. In addition, what is necessary is just to set suitably the number and position of the recessed part 46c according to the number and installation position of the piping H. FIG. Further, a plurality of hook portions F as shown in FIG. 18 may be provided in the vicinity of each recess 46c.
[0031]
In each of the above-described embodiments, the example in which the pipe is disposed on the ceiling slab has been described. However, the pipe fixing jig of the present invention can also be used for fixing a pipe on an indoor wall or floor or an outer wall.
[0032]
【The invention's effect】
In the pipe fixing jig of the present invention, since the pedestal part having a locking groove that can be fitted to the pipe mounting locking member and the pipe mounting part are integrally provided, the piping and the like can be easily arranged and workability is improved. Is good and low cost.
[0033]
Moreover, since the recessed part which supports piping is formed in the piping attachment part, and it has a flexible binding member which fastens and fixes the pipe fitted in this recessed part, fixing of piping is easy and workability | operativity improves, Since it can be applied to pipes with different diameters and wiring, the application range is wide. Also, maintenance is easy.
[0034]
Further, the pipe mounting portion is formed with a concave portion for supporting the pipe at a position where it can be arranged in any of the directions intersecting each other, and the concave portion is formed so that different numbers of pipes can be arranged in the two intersecting directions. Therefore, it is possible to arrange different numbers of pipes using the same pipe fixing jig.
[0035]
Furthermore, since the protrusion is provided in the recess, the sheath tube can be fixed so as not to be displaced.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a construction state of a pipe fixing jig of the present invention.
FIG. 2 is a cross-sectional view showing a state in which piping is fixed.
FIG. 3 is a perspective view of a fixing bolt.
FIG. 4 is a front view of a fastening member (split pin).
FIG. 5 is a cross-sectional view showing a state where a metal band-made pipe fixing jig is attached.
FIG. 6 is a front view showing a pipe fixing jig of the first embodiment.
7 is a plan view of FIG. 6. FIG.
FIG. 8 is a bottom view of FIG. 6;
9 is a side view of FIG. 6. FIG.
FIG. 10 is a cross-sectional view showing a fixed state with a cracked bolt.
FIG. 11 is a cross-sectional view showing a fixed state with a curable resin and a bolt.
FIG. 12 is a cross-sectional view showing a fixed state by beating.
FIG. 13 is a cross-sectional view showing a fixed state using a double-sided adhesive tape.
FIG. 14 is a front view showing a pipe fixing jig of a second embodiment.
15 is a side view of FIG.
16 is a plan view of FIG. 14. FIG.
FIG. 17 is a bottom view of FIG. 15;
FIG. 18 is a cross-sectional view of another embodiment.
FIG. 19 is a cross-sectional view of another embodiment.
FIG. 20 is a partial cross-sectional front view showing a mounting state of the pipe fixing jig of the third embodiment.
FIG. 21 is a partial cross-sectional front view showing an attachment state of a conventional pipe fixing jig.
[Explanation of symbols]
1 Ceiling slab
2 Piping arrangement locking member (rail member)
2a Locking piece
4, 40, 44, 45, 46 Piping fixture
41, 46a pedestal
41a Locking groove
42, 46b Piping attachment
42c, 45a, 46c recess
42d protrusion
5, K Flexible binding member

Claims (2)

係止片を有する配管配設係止部材にスライド可能に嵌合可能な係止溝を有する台座部と、配管取付部とを一体に設け、
上記配管取付部には配管を支持する凹部が形成されており、この凹部に支持された配管を締め付けて固定する可撓性結束部材を有し、
上記凹部は、上記配管を互いに交差する方向のいずれか一方に固定可能な位置にそれぞれ形成され、
上記交差する方向の一方向と他方向では、互いに異なる数の上記配管を固定するように異なる数の上記凹部を形成してあることを特徴とする配管固定治具
A pedestal portion having a locking groove that can be slidably fitted to a piping arrangement locking member having a locking piece, and a pipe mounting portion are provided integrally.
The pipe mounting part has a concave part for supporting the pipe, and has a flexible binding member for fastening and fixing the pipe supported by the concave part,
The recesses are formed at positions where the pipes can be fixed to either one of the directions intersecting each other,
A pipe fixing jig having different numbers of the concave portions formed so as to fix different numbers of the pipes in one direction and the other direction of the intersecting direction .
請求項において、上記凹部には突起部が設けてあることを特徴とする配管固定治具。2. The pipe fixing jig according to claim 1, wherein a projection is provided in the recess.
JP34819695A 1995-12-19 1995-12-19 Pipe fixing jig Expired - Lifetime JP3725596B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34819695A JP3725596B2 (en) 1995-12-19 1995-12-19 Pipe fixing jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34819695A JP3725596B2 (en) 1995-12-19 1995-12-19 Pipe fixing jig

Publications (2)

Publication Number Publication Date
JPH09170681A JPH09170681A (en) 1997-06-30
JP3725596B2 true JP3725596B2 (en) 2005-12-14

Family

ID=18395399

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34819695A Expired - Lifetime JP3725596B2 (en) 1995-12-19 1995-12-19 Pipe fixing jig

Country Status (1)

Country Link
JP (1) JP3725596B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010142069A (en) * 2008-12-15 2010-06-24 Sekisui Chem Co Ltd Pipe stand set
JP6377901B2 (en) * 2013-12-05 2018-08-22 未来工業株式会社 Wiring and piping material support
JP6078110B2 (en) * 2015-06-19 2017-02-08 新菱冷熱工業株式会社 Partition wall construction method using wall penetration sleeve unit
CN105587936B (en) * 2016-03-03 2017-08-08 中国能源建设集团江苏省电力设计院有限公司 A kind of two-way compound motion boatswain chair device of rotary shaft
JP2018071668A (en) * 2016-10-31 2018-05-10 株式会社オーティス Pipe support tool
JP6385013B2 (en) * 2016-11-09 2018-09-05 株式会社エスコ Duct mounting member
JP7296200B2 (en) * 2018-09-28 2023-06-22 株式会社昭和コーポレーション Attachment for pipe support

Also Published As

Publication number Publication date
JPH09170681A (en) 1997-06-30

Similar Documents

Publication Publication Date Title
US9534709B2 (en) Plumbing bracket assembly
US6547192B2 (en) Cable tray junction
US5303887A (en) Universal pipe support and hanger
JP3725596B2 (en) Pipe fixing jig
JP2008248514A (en) Reinforcing fitting and reinforcing fitting mounting method
JP2001327053A (en) Cable support
JP2589138Y2 (en) Suspension device for outfitting and auxiliary member for mounting used therefor
GB2263933A (en) A clip
JP3421851B2 (en) Box fixing device for reinforcing bars
JPH019224Y2 (en)
JPH1137390A (en) Stand device brought close to wall
JP3382798B2 (en) Saddle for multiple piping
JPS5814310Y2 (en) Pedestal metal fittings for equipment mounting parts
JP3679379B2 (en) Fence fixture
JP2001020507A (en) Support device for floor panel
JPH06240804A (en) Connecting structure for ceiling finishing material
JPH08338130A (en) Supporting member for object to be buried in concrete and laying tool
JP3281578B2 (en) Pipe and cable fixtures for wiring and piping receivers
JP3163512B2 (en) Connection structure of ceiling bar
JP3201518B2 (en) Sleeve support for equipment construction
JPH05106299A (en) Coupling metal fixture for ceiling bar
JP3295348B2 (en) Mounting tools such as pipes, control panels, boxes, cables, etc. that can be attached to the building, beams, haze, etc.
JP4137411B2 (en) Wiring device and wiring frame
JP3650020B2 (en) Joist support and floor structure
JPH0241247B2 (en)

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050525

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050607

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050729

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050830

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050922

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110930

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120930

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140930

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term