JP3703324B2 - Roof construction method - Google Patents

Roof construction method Download PDF

Info

Publication number
JP3703324B2
JP3703324B2 JP35131298A JP35131298A JP3703324B2 JP 3703324 B2 JP3703324 B2 JP 3703324B2 JP 35131298 A JP35131298 A JP 35131298A JP 35131298 A JP35131298 A JP 35131298A JP 3703324 B2 JP3703324 B2 JP 3703324B2
Authority
JP
Japan
Prior art keywords
roof
tension ring
lifted
jack
roof portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP35131298A
Other languages
Japanese (ja)
Other versions
JP2000170253A (en
Inventor
睦雄 佐橋
建次 梅村
徹 古川
良一 今井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP35131298A priority Critical patent/JP3703324B2/en
Publication of JP2000170253A publication Critical patent/JP2000170253A/en
Application granted granted Critical
Publication of JP3703324B2 publication Critical patent/JP3703324B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、低位置においてドームなどの屋根部を組み立て、その後、その屋根部を所定の位置にまで持ち上げて固定部に支持させる屋根構築方法に関する。
【0002】
【従来の技術】
この種の屋根構築方法によると、屋根部を低位置で組み立てるから、その屋根部の組み立てを作業性良く行える利点がある。
【0003】
そのような屋根構築方法として、従来では、特開平8‐158487号公報で見られるように、地上に設置したジャッキで屋根部を所定の位置まで持ち上げ、その状態で固定部に支持させていた。
【0004】
【発明が解決しようとする課題】
しかし、上記従来の技術によるときは、地上に設置したジャッキで屋根部を所定の位置にまで持ち上げるから、ジャッキとして、ストロークの大きな大型なものが必要で、ジャッキの設置作業性が悪かった。
【0005】
本発明の目的は、ジャッキの設置作業性に優れた屋根構築方法を提供する点にある。
【0006】
【課題を解決するための手段】
請求項1に係る本第1発明の特徴、作用、効果は次の通りである。
【0007】
〔特徴〕
低位置において屋根部を組み立てるとともに、その屋根部の周部に屈折状態の梁の一端部を連結し、かつ、他端部を固定部に連結し、その後、地上に設置した第1ジャッキを介して前記梁を伸展させつつ屋根部を設定位置まで持ち上げ、持ち上げ後、前記梁に設けた第2ジャッキを介して所定の姿勢にまで前記梁を伸展させることにより屋根部を所定の位置にまで持ち上げて前記梁を介して屋根部を固定部に支持させる点にある。
【0008】
〔作用〕
本第1発明によるときは、地上に設置した第1ジャッキにより梁を伸展させつつ屋根部を設定位置まで持ち上げた後、梁に設けた第2ジャッキにより梁を所定の姿勢にまで進展させることで屋根部を所定の位置にまで持ち上げるから、第1ジャッキとして所定の位置よりも低い設定位置にまで屋根部を持ち上げるだけのストロークの小さな小型のもので済む。
【0009】
しかも、第2ジャッキにより梁を屈折状態から所定姿勢まで伸展させるのではなく、第1ジャッキによる設定位置への屋根部持ち上げに伴い梁がある程度伸展した状態から所定姿勢にまで伸展させるから、梁を屈折状態から所定姿勢まで伸展させて屋根部を持ち上げる場合に比較して、梁を伸展させての屋根部持ち上げに伴い第2ジャッキに作用する負荷を軽減することができることにより、第2ジャッキを用いながらも、第2ジャッキとして小型のもので済む。
【0010】
〔効果〕
従って、本第1発明によれば、地上に設置した第1ジャッキのみならず、梁に設けた第2ジャッキを用いながらも、第1ジャッキ及び第2ジャッキとしてともに小型なものを用いることができ、ジャッキの設置作業性を優れたものにできるようになった。
【0011】
請求項2に係る本第2発明の特徴、作用、効果は次の通りである。
【0012】
〔特徴〕
上記本第1発明の特徴において、対象となる屋根部がドームであり、その屋根部の外周部に設けたテンションリングの一部を固定部に直接に支持させた状態でその支持部を支点としてテンションリングが対地傾斜姿勢に位置するように屋根部を上方に持ち上げ回転する点にある。
【0013】
〔作用〕
屋根部がドームである場合、屋根部の外周部に設けたテンションリングを対地傾斜姿勢に配置するように屋根部を設置すると、屋根部の大きさ、つまり、敷地面積の割りには、屋根中心から距離を隔てた箇所の屋根高さを高くすることができる。このような屋根は、ホームベース付近上の屋根高さを設定以上にしたいドーム化した野球場の屋根として好適である。
【0014】
本第2発明によるときは、ドームである屋根部を、そのテンションリングが対地傾斜姿勢に位置する状態に設置することができる。
【0015】
〔効果〕
従って、本第2発明によれば、野球場のドーム化に好適な方法を提供できるようになった。
【0016】
請求項3に係る本第3発明の特徴、作用、効果は次の通りである。
【0017】
〔特徴〕
上記本第2発明の特徴において、梁の複数個を周方向に分散配置した状態で持ち上げる点にある。
【0018】
〔作用〕
本第3発明によるときは、複数の梁を周方向に分散配置した状態で屋根部を持ち上げるから、屋根部の姿勢を安定させて屋根部を持ち上げることができるのみならず、各梁に設ける第2ジャッキで持ち上げを分担することによる各第2ジャッキの負担の軽減化により各第2ジャッキを小型化できる。
【0019】
〔効果〕
従って、本第3発明によれば、作業性良く屋根部を持ち上げることができるとともに、より一層、第2ジャッキの設置作業性を高めることができるようになった。
【0020】
【発明の実施の形態】
ドームは、図1、図2に示すように、基礎1(図では場所打ち鉄筋コンクリート杭で示してある。)に支持された基礎テンションリング2に周方向複数の柱3を介して下部テンションリング4を支持させ、この下部テンションリング4に球面トラスドームに形成された屋根部5を支持させて構成されている。
【0021】
前記基礎テンションリング2、柱3、下部テンションリング4は、鉄筋コンクリート造りのものである。
【0022】
前記屋根部5は、鉄骨造りのものであって、図3に詳しく示すように、複数の立体トラス梁6を放射状に配置し、これら立体トラス梁6の中心側端部同士を複層トラス7で連結し、立体トラス梁6の外周側端部をテンションリング8に連結し、隣合う立体トラス梁6間に位置する単層トラス9を立体トラス梁6及び複層トラス7に支持させた骨組みを備え、この骨組みに透光性の屋根材10を取り付けて構成されている。屋根材10としては、膜材や板材を挙げることができる。
【0023】
前記立体トラス梁6は、図4の(イ)(ロ)に示すように、一対の上部弦材6Aと一つの下部弦材6Bとの三者を複数の斜材6Cを介して連結することで構成されており、内部には、デッキ11を設けることで梁長手方向に沿ったメンテナンス通路12が形成されている。
【0024】
また、屋根部5のテンションリング8は、図1、図2に示すように、水平軸芯周りに片側を持ち上げた対地傾斜姿勢に位置する状態に配置されており、屋根部5を下部テンションリング4に支持させる手段は、テンションリング8の傾斜下端を下部テンションリング4に直接に載置支持させ、テンションリング8の他の部分を壁13を介して下部テンションリング4に支持させる手段である。壁13は、テンションリング8を下部テンションリング4に支持させる骨組みに壁材を取り付けて構成されている。
【0025】
そして、前記基礎テンションリング2及び下部テンションリング4、テンションリング8は全て円形に構成されており、基礎テンションリング2及び下部テンションリング4は、屋根部5の屋根中心RCと屋根部5の下傾斜上端とを含む円弧に連なる同一曲率の仮想円弧aが下部テンションリング4の設置レベルLと交わる点bよりも屋根中心RC側に位置するように配置されている。
つまり、図5に示すように、屋根部5に連なる仮想球面が下部テンションリング4の設置レベルLと交わる点から形成される仮想円Cの内側に下部テンションリング4の大部分を位置させて、屋根部5と曲率及び高さが同じでテンションリングが水平に配置されているドーム屋根を備えたドームに比較してドーム中心DCを屋根中心RC側に位置させることができ、これによって、野球場のドーム化を図る場合にホームベース付近上の屋根高さを所定以上にする際、屋根部5を水平に設置する場合に比較して敷地面積を小さくすることができる。
【0026】
また、屋根部5の中心に位置する複層トラス7が、照明器具や放送設備、動力源などの設備機器を吊り下げ支持する器具吊り下げ部14となっている。
【0027】
前記屋根部5の構築方法を次に説明する。
〈1〉図6の(イ)に示すように、テンションリング8のうち傾斜下端となる部分、つまり、立体トラス梁6との連結部を下部テンションリング4に載置させかつ他の立体トラス梁6との連結部を地上に設置した架台15に載置させる状態で、つまり、低位置において屋根部5を組み立てるとともに、その屋根部5の周部に周方向に間隔を隔てた箇所、つまり、立体トラス梁6との連結部それぞれに屈折状態の梁16の一端部を連結し、かつ、各梁16の他端部を固定部である下部テンションリング4に連結する。
前記梁16は、図7の(イ)(ロ)(ハ)に示すように、水平第1軸芯P1周りに屈折伸展自在な外側梁材16Aと前記水平第1軸芯P1と平行な水平第2軸芯P2周りに屈折進展自在な内側梁材16Bとの上下両端同士を枢支連結し、外側梁材16Aを内側梁材16Bよりも長く設定することにより、水平第1軸芯P1と水平第2軸芯P2とを近づけることで屈折し、遠ざけて枢支連結点を含む平面内に水平第2軸芯P2を位置させることで最長姿勢に伸展するように構成されている。この梁16は、屋根部5の持ち上げ後も残置されて壁13の骨組みとして作用する。
〈2〉図6の(ロ)に示すように、地上に設置した、詳しくは、架台15に設置した第1ジャッキ17を介して前記梁16を伸展させつつテンションリング8を、下部テンションリング4への載置部を支点として設定位置まで持ち上げ回転させる。
〈3〉図6の(ハ)に示すように、前記梁16に設けた第2ジャッキ18を介して梁16を所定の姿勢、つまり、内側梁材16Bが直線状に伸びた最長姿勢にまで伸展させることにより、屋根部5を所定の位置まで持ち上げ回転させるとともに、第1ジャッキ17を撤去する。
〈4〉梁16を最長姿勢に固定して、この梁16で屋根部5を下部テンションリング4に支持させるとともに、第2ジャッキ18を撤去する。
【0028】
〔別実施形態〕
上記実施の形態において、第2ジャッキ18を撤去せずにそのまま残置させて壁13を施工しても良い。
【0029】
上記実施の形態では、屋根部5を傾けるように持ち上げたが、屋根部5を水平に持ち上げて水平に設置しても良い。
【0030】
尚、特許請求の範囲の項に図面との対照を便利にする為に符号を記すが、該記入により本発明は添付図面の構成に限定されるものではない。
【図面の簡単な説明】
【図1】ドームの側面図
【図2】ドームの縦断側面図
【図3】屋根の平面図
【図4】立体トラスの縦断正面図と斜視図
【図5】ドームの横断平面図
【図6】屋根部の構築工程を示す断面図
【図7】梁の伸展動作を示す側面図
【符号の説明】
4 固定部
5 屋根部
8 テンションリング
16 梁
17 第1ジャッキ
18 第2ジャッキ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a roof construction method in which a roof portion such as a dome is assembled at a low position, and then the roof portion is lifted to a predetermined position and supported by a fixed portion.
[0002]
[Prior art]
According to this type of roof construction method, since the roof portion is assembled at a low position, there is an advantage that the roof portion can be assembled with good workability.
[0003]
As such a roof construction method, conventionally, as seen in Japanese Patent Application Laid-Open No. 8-158487, a roof portion is lifted to a predetermined position by a jack installed on the ground and supported by a fixed portion in that state.
[0004]
[Problems to be solved by the invention]
However, according to the above-described conventional technique, the roof portion is lifted to a predetermined position by a jack installed on the ground, so that a large jack having a large stroke is required, and the jack installation workability is poor.
[0005]
An object of the present invention is to provide a roof construction method excellent in jack installation workability.
[0006]
[Means for Solving the Problems]
The features, actions, and effects of the first invention according to claim 1 are as follows.
[0007]
〔Characteristic〕
While assembling the roof portion at a low position, one end of the beam in the bent state is connected to the periphery of the roof portion, and the other end is connected to the fixed portion, and then through a first jack installed on the ground. The roof portion is lifted to a predetermined position while extending the beam, and after lifting, the roof portion is lifted to a predetermined position by extending the beam to a predetermined posture through a second jack provided on the beam. The roof portion is supported by the fixed portion via the beam.
[0008]
[Action]
According to the first aspect of the present invention, the beam is extended to the set position while the beam is extended by the first jack installed on the ground, and then the beam is advanced to a predetermined posture by the second jack provided on the beam. Since the roof portion is lifted up to a predetermined position, the first jack may be a small one having a small stroke for lifting the roof portion to a setting position lower than the predetermined position.
[0009]
In addition, the beam is not extended from the bent state to the predetermined position by the second jack, but is extended from the state where the beam is extended to a predetermined position as the roof is lifted to the set position by the first jack. Compared with the case where the roof portion is lifted by extending from the refraction state to a predetermined posture, the load acting on the second jack can be reduced by lifting the roof portion by extending the beam. However, a small second jack is sufficient.
[0010]
〔effect〕
Therefore, according to the first invention, not only the first jack installed on the ground but also the second jack provided on the beam, both the first jack and the second jack can be small. The installation workability of the jack can be improved.
[0011]
The features, functions, and effects of the second invention according to claim 2 are as follows.
[0012]
〔Characteristic〕
In the above feature of the first invention, the target roof portion is a dome, and the supporting portion is used as a fulcrum in a state where a part of the tension ring provided on the outer peripheral portion of the roof portion is directly supported by the fixing portion. The roof ring is lifted up and rotated so that the tension ring is positioned in the ground inclination posture.
[0013]
[Action]
When the roof part is a dome, if the roof part is installed so that the tension ring provided on the outer periphery of the roof part is placed in an inclined attitude to the ground, the size of the roof part, that is, the site area, The roof height can be increased at a distance from the distance. Such a roof is suitable as a dome-shaped baseball stadium roof in which the roof height in the vicinity of the home base is desired to be higher than a set value.
[0014]
According to the second aspect of the present invention, the roof portion which is a dome can be installed in a state where the tension ring is positioned in the ground inclination posture.
[0015]
〔effect〕
Therefore, according to the second aspect of the present invention, it is possible to provide a method suitable for forming a dome in a baseball field.
[0016]
The features, actions, and effects of the third aspect of the present invention according to claim 3 are as follows.
[0017]
〔Characteristic〕
In the second aspect of the present invention, a plurality of beams are lifted in a state of being distributed in the circumferential direction.
[0018]
[Action]
According to the third aspect of the invention, since the roof portion is lifted with the plurality of beams distributed in the circumferential direction, the roof portion can be lifted while stabilizing the posture of the roof portion. Each 2nd jack can be reduced in size by reducing the burden of each 2nd jack by sharing lifting with 2 jacks.
[0019]
〔effect〕
Therefore, according to the third invention, the roof portion can be lifted with good workability, and the workability of installing the second jack can be further improved.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
As shown in FIGS. 1 and 2, the dome has a lower tension ring 4 via a plurality of circumferential columns 3 on a foundation tension ring 2 supported by a foundation 1 (indicated by cast-in-place reinforced concrete piles in the figure). And the roof portion 5 formed on the spherical truss dome is supported by the lower tension ring 4.
[0021]
The basic tension ring 2, pillar 3, and lower tension ring 4 are made of reinforced concrete.
[0022]
The roof portion 5 is made of steel, and as shown in detail in FIG. 3, a plurality of three-dimensional truss beams 6 are arranged in a radial pattern, and the center side ends of these three-dimensional truss beams 6 are multi-layer truss 7. The outer frame side end of the three-dimensional truss beam 6 is connected to the tension ring 8, and the single-layer truss 9 positioned between the adjacent three-dimensional truss beams 6 is supported by the three-dimensional truss beam 6 and the multi-layer truss 7. And the translucent roofing material 10 is attached to the frame. Examples of the roof material 10 include a film material and a plate material.
[0023]
As shown in FIGS. 4A and 4B, the three-dimensional truss beam 6 connects a pair of upper chord member 6A and one lower chord member 6B via a plurality of diagonal members 6C. A maintenance passage 12 along the beam longitudinal direction is formed by providing a deck 11 therein.
[0024]
Further, as shown in FIGS. 1 and 2, the tension ring 8 of the roof portion 5 is arranged in a state of being inclined to the ground with one side lifted around the horizontal axis, and the roof portion 5 is connected to the lower tension ring. The means for supporting the tension ring 8 is a means for placing and supporting the inclined lower end of the tension ring 8 directly on the lower tension ring 4 and supporting the other part of the tension ring 8 on the lower tension ring 4 via the wall 13. The wall 13 is configured by attaching a wall material to a framework for supporting the tension ring 8 on the lower tension ring 4.
[0025]
The foundation tension ring 2, the lower tension ring 4, and the tension ring 8 are all circular, and the foundation tension ring 2 and the lower tension ring 4 are inclined downward from the roof center RC of the roof portion 5 and the roof portion 5. An imaginary arc a having the same curvature connected to the arc including the upper end is arranged so as to be located closer to the roof center RC than a point b where the installation level L of the lower tension ring 4 intersects.
That is, as shown in FIG. 5, most of the lower tension ring 4 is positioned inside the virtual circle C formed from the point where the virtual spherical surface connected to the roof portion 5 intersects the installation level L of the lower tension ring 4, The dome center DC can be positioned on the roof center RC side as compared with a dome having a dome roof having the same curvature and height as the roof portion 5 and a tension ring arranged horizontally. When the roof height in the vicinity of the home base is increased to a predetermined level or more when the dome is to be formed, the site area can be reduced as compared with the case where the roof portion 5 is installed horizontally.
[0026]
A multi-layer truss 7 located at the center of the roof 5 serves as an instrument suspension 14 that supports equipment such as lighting equipment, broadcasting equipment, and a power source.
[0027]
Next, the construction method of the roof part 5 will be described.
<1> As shown in FIG. 6 (a), the portion of the tension ring 8 that is the lower end of the inclination, that is, the connecting portion with the three-dimensional truss beam 6 is placed on the lower tension ring 4 and another three-dimensional truss beam. 6 in a state where the connecting portion with 6 is placed on the mount 15 installed on the ground, that is, the roof portion 5 is assembled at a low position, and the circumferential portion of the roof portion 5 is spaced apart in the circumferential direction, that is, One end portion of the beam 16 in a refracted state is connected to each of the connecting portions with the three-dimensional truss beam 6, and the other end portion of each beam 16 is connected to the lower tension ring 4 as a fixing portion.
As shown in FIGS. 7A, 7B and 7C, the beam 16 includes an outer beam 16A that can be bent and extended around a horizontal first axis P1, and a horizontal parallel to the horizontal first axis P1. The upper and lower ends of the inner beam member 16B that can freely bend around the second axis P2 are pivotally connected to each other, and the outer beam member 16A is set longer than the inner beam member 16B. It is configured to be refracted by bringing it closer to the horizontal second axis P2, and to extend to the longest position by positioning the horizontal second axis P2 in a plane including the pivot connection point away from it. This beam 16 is left behind even after the roof portion 5 is lifted and acts as a frame of the wall 13.
<2> As shown in FIG. 6B, the tension ring 8 is installed on the ground. Specifically, the tension ring 8 is extended to the lower tension ring 4 while the beam 16 is extended through the first jack 17 installed on the gantry 15. Lift up to the set position with the mounting part as a fulcrum and rotate.
<3> As shown in FIG. 6C, the beam 16 is brought into a predetermined posture through the second jack 18 provided on the beam 16, that is, the longest posture in which the inner beam member 16B extends linearly. By extending, the roof part 5 is lifted and rotated to a predetermined position, and the first jack 17 is removed.
<4> The beam 16 is fixed to the longest posture, and the roof portion 5 is supported by the lower tension ring 4 with the beam 16 and the second jack 18 is removed.
[0028]
[Another embodiment]
In the above embodiment, the wall 13 may be constructed by leaving the second jack 18 without being removed.
[0029]
In the above embodiment, the roof portion 5 is lifted so as to be inclined, but the roof portion 5 may be lifted horizontally and installed horizontally.
[0030]
In addition, although the code | symbol is written in order to make contrast with drawing convenient for the term of a claim, this invention is not limited to the structure of an accompanying drawing by this entry.
[Brief description of the drawings]
[Fig. 1] Side view of dome [Fig. 2] Vertical side view of dome [Fig. 3] Plan view of roof [Fig. 4] Vertical front view and perspective view of three-dimensional truss [Fig. 5] Transverse plan view of dome [Fig. ] Cross-sectional view showing the construction process of the roof [Fig. 7] Side view showing the beam extension operation [Explanation of symbols]
4 fixing part 5 roof part 8 tension ring 16 beam 17 first jack 18 second jack

Claims (3)

低位置において屋根部(5)を組み立てるとともに、その屋根部(5)の周部に屈折状態の梁(16)の一端部を連結し、かつ、他端部を固定部(4)に連結し、その後、地上に設置した第1ジャッキ(17)を介して前記梁(16)を伸展させつつ屋根部(5)を設定位置まで持ち上げ、持ち上げ後、前記梁(16)に設けた第2ジャッキ(18)を介して所定の姿勢にまで前記梁(16)を伸展させることにより屋根部(5)を所定の位置にまで持ち上げて前記梁(16)を介して屋根部(5)を固定部(4)に支持させる屋根構築方法。While assembling the roof part (5) at the low position, one end of the beam (16) in a bent state is connected to the peripheral part of the roof part (5), and the other end is connected to the fixing part (4). Thereafter, the roof (5) is lifted to a set position while the beam (16) is extended through the first jack (17) installed on the ground, and then the second jack provided on the beam (16) is lifted. The roof (5) is lifted to a predetermined position by extending the beam (16) to a predetermined posture via (18) and the roof (5) is fixed to the fixed position via the beam (16). The roof construction method supported in (4). 対象となる屋根部(5)がドームであり、その屋根部(5)の外周部に設けたテンションリング(8)の一部を固定部(4)に直接に支持させた状態でその支持部を支点としてテンションリング(8)が対地傾斜姿勢に位置するように屋根部(5)を上方に持ち上げ回転する請求項1記載の屋根構築方法。The target roof portion (5) is a dome, and the support portion is supported in a state where a part of the tension ring (8) provided on the outer peripheral portion of the roof portion (5) is directly supported by the fixed portion (4). The roof construction method according to claim 1, wherein the roof portion (5) is lifted up and rotated so that the tension ring (8) is positioned in a ground-inclined posture with the fulcrum as a fulcrum. 梁(16)の複数個を周方向に分散配置した状態で持ち上げる請求項2記載の屋根構築方法。The roof construction method according to claim 2, wherein a plurality of beams (16) are lifted in a state of being distributed in the circumferential direction.
JP35131298A 1998-12-10 1998-12-10 Roof construction method Expired - Fee Related JP3703324B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35131298A JP3703324B2 (en) 1998-12-10 1998-12-10 Roof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35131298A JP3703324B2 (en) 1998-12-10 1998-12-10 Roof construction method

Publications (2)

Publication Number Publication Date
JP2000170253A JP2000170253A (en) 2000-06-20
JP3703324B2 true JP3703324B2 (en) 2005-10-05

Family

ID=18416462

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35131298A Expired - Fee Related JP3703324B2 (en) 1998-12-10 1998-12-10 Roof construction method

Country Status (1)

Country Link
JP (1) JP3703324B2 (en)

Also Published As

Publication number Publication date
JP2000170253A (en) 2000-06-20

Similar Documents

Publication Publication Date Title
CN108166660B (en) Installation method of curved surface single-layer latticed shell structure
JP3703324B2 (en) Roof construction method
CN211898949U (en) Rotatable base device of inclined mast with truss cable structure
CN113136961A (en) Lifting structure for large-span truss and lifting method thereof
JP3426339B2 (en) Construction method of large building with dome roof
JP3409265B2 (en) Large dome with membrane structure and its construction method
JP3939237B2 (en) How to construct a girder frame
JP2004156388A (en) Construction method of arch structure, dome structure and its construction method
KR101209134B1 (en) Soleplate for amending ecentricity and protecting punching of tension ring truss for large-scaled dome roof structure
JP2946074B2 (en) Large roof erection method
JPH09111943A (en) Building having domed roof
JPH09256535A (en) Constructing method of dome type roof
JP2008261181A (en) Dome roof frame construction method
JPH09228483A (en) Installation method of roof on structure and the structure
JPH10219905A (en) Method of constructing roof structure
JPH0932120A (en) Method of construction of structure
JP2000170308A (en) Roof
JP3506022B2 (en) How to build a dome roof
CN220201244U (en) Integral steel truss lifting device
KR102346754B1 (en) Construction membrane structure including clamp-integrated gutter
JPH10184015A (en) Method for constructing roof dome
JP2000170309A (en) Dome
JP2994205B2 (en) Structural assembly method
JP2996870B2 (en) Roof structure frame method
JPH0742238A (en) Roof structure and construction method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050627

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050707

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050719

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080729

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090729

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090729

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100729

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees