JP3392775B2 - Tunnel interior finishing method and equipment - Google Patents

Tunnel interior finishing method and equipment

Info

Publication number
JP3392775B2
JP3392775B2 JP07948699A JP7948699A JP3392775B2 JP 3392775 B2 JP3392775 B2 JP 3392775B2 JP 07948699 A JP07948699 A JP 07948699A JP 7948699 A JP7948699 A JP 7948699A JP 3392775 B2 JP3392775 B2 JP 3392775B2
Authority
JP
Japan
Prior art keywords
tunnel
interior
formwork
mold
interior finishing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07948699A
Other languages
Japanese (ja)
Other versions
JP2000274194A (en
Inventor
謙一 仮屋
原田  進
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tobishima Corp
Original Assignee
Tobishima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tobishima Corp filed Critical Tobishima Corp
Priority to JP07948699A priority Critical patent/JP3392775B2/en
Publication of JP2000274194A publication Critical patent/JP2000274194A/en
Application granted granted Critical
Publication of JP3392775B2 publication Critical patent/JP3392775B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、トンネルの内装仕上げ
工法及びその装置に関するものである。一般にトンネル
内面にタイルなどで内装仕上げすることは、完成された
トンネル内を通行する車両運転者や歩行者等の視界環境
を向上させると共にトンネル内での密室的圧迫感から生
ずる不安感や不快感をも解消出来ると考えられている。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tunnel interior finishing method and apparatus. Generally, finishing the interior of the tunnel with tiles etc. improves the visibility environment of vehicle drivers and pedestrians who pass through the completed tunnel, and also causes anxiety and discomfort caused by the closed room pressure in the tunnel. It is believed that can also be solved.

【0002】よって、近年においては老朽化したトンネ
ルの改修工事を行う際に、あるいは新設トンネルを施工
する際に、トンネルの内装仕上げを行うことが要請され
ている。
Therefore, in recent years, it has been required to finish the interior of the tunnel at the time of repairing an aged tunnel or constructing a new tunnel.

【0003】[0003]

【従来の技術】従来のトンネルの内装仕上げ施工として
は、いわゆるタイルをトンネル内面に貼り付けるタイル
工法、トンネル内面を塗装する塗装工法、トンネル内面
にパネルを貼り付けるパネル貼り付け工法、トンネル内
面にブロックを貼り付けるブロック貼り工法等がある。
2. Description of the Related Art As conventional interior finishing work for tunnels, so-called tiles are applied to the inner surface of the tunnel, tile inner coating is applied, panel attachment is applied to the inner surface of the tunnel, block is applied to the inner surface of the tunnel. There is a block pasting method for pasting.

【0004】ここで、従来のタイル工法及び塗装工法の
場合は、いわゆる覆工コンクリート施工の終了後に下地
塗りの工程を必要とし、該下地塗り工程の後、建築工事
の一般的なタイル貼り等とほぼ同様な工程で内装仕上げ
施工が行われていた。このように、従来のトンネル内装
仕上げはいわゆる移動型型枠装置(スライドセントル)
を用いたトンネル本体工事が終了した後に、トンネル本
体工事の後工程として別途トンネル内装仕上げ施工を行
うものであった。
[0006] Here, in the case of the conventional tile construction method and coating construction method, an undercoating step is required after the so-called lining concrete construction is completed, and after the undercoating step, general tile application for construction work and the like are performed. The interior finishing work was performed in almost the same process. In this way, the conventional tunnel interior finish is the so-called movable formwork device (slide center).
After finishing the tunnel body construction using, the tunnel interior finishing work was separately performed as a post process of the tunnel body construction.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、前記従
来のトンネル内装施工では、前述のようにトンネル内装
施工がトンネル本体の工事終了後の後工程として行われ
るために、トンネル本体の工事期間に加えてトンネル内
装施工の工事期間が必要となっていた。また、従来で
は、トンネルの内装施工の準備工程として、固化したト
ンネル壁面コンクリートの表面に内装仕上げ材を固着す
るための下地を作る下地塗り工程が必要となり、さらに
そのための付随作業および工事期間が必要とされてい
た。
However, in the conventional tunnel interior construction, as described above, since the tunnel interior construction is performed as a post-process after the completion of the construction of the tunnel body, in addition to the construction period of the tunnel body. The construction period for tunnel interior construction was required. Further, conventionally, as a preparatory step for the interior construction of the tunnel, an undercoating step for forming an underlay for fixing the interior finishing material to the surface of the solidified tunnel wall concrete is required, and further work and construction period for it are required. Was said.

【0006】かくして本発明は上記従来の課題に鑑みて
創案されたものであり、トンネル工事期間の大幅な短
縮、工事コストの大幅な低減を図ることが出来るトンネ
ルの内装仕上げ工法及びその装置を提供することを目的
とするものである。
Thus, the present invention was devised in view of the above-mentioned conventional problems, and provides a tunnel interior finishing method and a device thereof, which can significantly shorten the tunnel construction period and the construction cost. The purpose is to do.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に、本発明は、掘削されたトンネルの内側に打設間隔を
あけて略アーチ状をなす型枠部と、略門型をなす装置本
体部と、型枠部を装置本体部に保持する伸縮自在のジャ
ッキが設けられた保持部と、型枠部と装置本体部とを連
結する伸縮自在の複数本の支持材とを有する型枠装置を
配置し、前記型枠装置のトンネル外周面側には、トンネ
ル表面に取り付けられる内装仕上げ材をあらかじめユニ
ット化して取り付けてなり、該取り付けは、内装仕上げ
材の裏面に固定用突起を4ヵ所設け、前記固定用突起を
前記型枠部に嵌挿させ、テーパーピンを前記固定用突起
の穴に嵌め込むことにより型枠部に内装仕上げ材を固定
することにより行い、トンネル外周面と型枠装置との間
にコンクリートを打設して固化させ、型枠装置をあらか
じめテーパーピンを抜いた上で脱型した後、前記内装仕
上げ材を前記固化したコンクリートに固着して取り付け
たことを特徴とし、または、掘削されたトンネルの内側
に打設間隔をあけて設置された型枠装置と、 該型枠装
置のトンネル外周面側に取り付けられる内装仕上げ材と
を備え、前記型枠装置は、略アーチ状をなす型枠部と、
略門型をなす装置本体部と、型枠部を装置本体部に保持
する伸縮自在のジャッキが設けられた保持部と、型枠部
と装置本体部とを連結する伸縮自在の複数本の支持材と
を有し、前記内装仕上げ材は、型枠内に打設され固化す
るコンクリートに固着される裏面が凹凸の波状に形成さ
れている固着部と、トンネルの表面側に現れる内装仕上
げ部と、内装仕上げ部と型枠装置とを離脱可能に接着す
る接着部とを有し、前記接着部は、取付基板の裏面に固
定用突起が4ヵ所設けられ、固定用突起を型枠部に嵌挿
させ、テーパーピンを固定用突起の穴に嵌め込むことに
より、内装仕上げ材を型枠部に取り付けたことを特徴と
するものである。
In order to achieve the above-mentioned object, the present invention provides a substantially arch-shaped form part with a driving interval inside the excavated tunnel and a substantially gate-shaped device. Book
An extendable jar that holds the body and the formwork in the main body of the device.
The holding part provided with a stick, the mold part and the device main body are connected.
The mold device having a plurality of support telescopic for binding arranged, the tunnel outer circumferential surface of the mold device is made by attaching in advance unitized interior finish to be attached to the tunnel surface, the Installation is an interior finish
Provide four fixing protrusions on the back surface of the material and attach the fixing protrusions.
Insert the taper pin into the frame and insert the taper pin into the fixing projection.
Fix the interior finishing material to the mold by fitting it in the hole
By placing concrete between the outer peripheral surface of the tunnel and the formwork device to solidify the formwork device .
Characterized by attaching the interior finishing material to the solidified concrete after removing it from the die after removing the taper pin , or installing it inside the excavated tunnel with a driving interval. And an interior finishing material attached to the outer peripheral surface side of the tunnel of the mold device, wherein the mold device has a substantially arched mold portion,
Holds the main body of the device and the mold frame that form a nearly gate shape on the main body of the device.
A holding part with a retractable jack and a mold part
And a plurality of expandable and contractible support members that connect the main body with the device
The interior finishing material has a corrugated wavy back surface that is fixed to concrete that is cast into the mold and solidifies.
A fixed portion, an interior finishing portion that appears on the front surface side of the tunnel, and an adhesive portion that detachably adheres the interior finishing portion and the formwork device, and the adhesive portion is fixed to the back surface of the mounting substrate.
Four fixed protrusions are provided, and fixed protrusions are inserted into the mold
To fit the taper pin into the hole of the fixing projection.
In addition, the interior finishing material is attached to the mold part .

【0008】[0008]

【作用】本発明によれば、トンネルの内装仕上げ材が型
枠と一体化された状態で覆工コンクリートが打設され、
もって覆工コンクリートの施工と同時にトンネル内装仕
上げ施工をも行うことが出来る。したがって、覆工コン
クリートの施工完了後にトンネル内装仕上げ施工をおこ
なう二度手間が解消され、工事期間を大幅に減少出来
る。
According to the present invention, the lining concrete is placed with the interior finishing material of the tunnel being integrated with the formwork,
Therefore, tunnel interior finishing work can be done at the same time as lining concrete work. Therefore, the troublesome work of finishing the tunnel interior after the completion of the lining concrete is eliminated, and the construction period can be greatly reduced.

【0009】さらに、覆工コンクリート打設後、コンク
リートの締め固め時に内装仕上げ材が前記コンクリート
壁面に圧着され、固化したコンクリートの固化強度を利
用して前記内装仕上げ材が強固に固定されるので、従来
のトンネル壁面に塗られた下地に対して内装仕上げ材を
固着する方法に比し、剥離等の問題が生じにくく堅固で
耐久性の優れた内装仕上げ材の取り付け施工が行える。
Further, after the lining concrete is cast, the interior finishing material is pressed against the concrete wall surface when the concrete is compacted, and the interior finishing material is firmly fixed by utilizing the solidifying strength of the solidified concrete. Compared with the conventional method of fixing the interior finishing material to the base painted on the wall surface of the tunnel, it is possible to mount the interior finishing material that is firm and has excellent durability with less problems such as peeling.

【0010】[0010]

【発明の実施の態様】以下、図面に基づいて本発明の好
適な実施の形態につき説明する。図1においてトンネル
7が略アーチ状に掘削されている。ここで、符号1は移
動式型枠装置を示し、前記トンネル7内に設置されてい
る。尚、図示されてはいないが、移動式型枠装置1の前
方には一般に掘削機が接続され、前方でトンネルの掘削
施工が行われ、それと同時に後方ではトンネルの覆工コ
ンクリート施工が行えるものとされている。
BEST MODE FOR CARRYING OUT THE INVENTION Preferred embodiments of the present invention will be described below with reference to the drawings. In FIG. 1, the tunnel 7 is excavated in a substantially arch shape. Here, reference numeral 1 indicates a mobile formwork device, which is installed in the tunnel 7. Although not shown in the figure, an excavator is generally connected in front of the mobile formwork apparatus 1 so that tunnel excavation can be performed in the front and at the same time tunnel lining concrete can be performed in the rear. Has been done.

【0011】該移動式型枠装置1は略アーチ状をなす形
枠部2と略門型をなす装置本体部3と前記形枠部2を装
置本体部3に保持する保持部4とを有している。そし
て、略門型をなす装置本体部3の脚部には掘削したトン
ネルの掘削方向に向かって移動し得るよう車輪部8が取
り付けられている。また形枠部2を保持する保持部4に
は伸縮自在のジャッキ5が設けられ、形枠部2の設置並
びに脱型が容易に行えるよう構成されている。
The movable formwork device 1 has a substantially arch-shaped formwork part 2, a substantially gate-shaped device body part 3 and a holding part 4 for holding the formwork part 2 on the device body part 3. is doing. A wheel portion 8 is attached to a leg portion of the apparatus main body portion 3 having a substantially gate shape so as to be movable in the excavation direction of the excavated tunnel. Further, a retractable jack 5 is provided on the holding portion 4 for holding the shape frame portion 2 so that the shape frame portion 2 can be easily installed and demolded.

【0012】さらに、トンネル7のいわゆる側面方向に
も前記型枠部2を設置並びに脱型出来るよう伸縮自在の
支持材6が複数本設けられ、形枠部2と装置本体部3と
を連結している。ここで、形枠部2は例えばスキンプレ
ートをアーチ状に曲げ、その内側に補強材15を間隔を
おいて平行に配設することにより構成される。
Further, a plurality of expandable / contractible support members 6 are provided in the so-called lateral direction of the tunnel 7 so that the mold frame 2 can be installed and demolded, and the mold frame 2 and the apparatus main body 3 are connected to each other. ing. Here, the frame 2 is formed, for example, by bending a skin plate in an arch shape and disposing the reinforcing members 15 inside the skin plate in parallel at intervals.

【0013】符号9はタイルユニットを示し、該タイル
ユニット9は図2乃至図4に図示されているように、例
えば幅750ミリ、長さ1050ミリの長方形をなす軽
量の金属部材、例えばアルミ製の取付基板10とこの取
付基板10に接着剤11を介して接着された複数のタイ
ル12とを有して構成されている。そして、図示する実
施例では通常1枚の取付基板10には8枚のタイル12
が接着される。
Reference numeral 9 indicates a tile unit, and the tile unit 9 is, as shown in FIGS. 2 to 4, made of a lightweight metal member in the form of a rectangle having a width of 750 mm and a length of 1050 mm, for example, aluminum. The mounting substrate 10 and the plurality of tiles 12 bonded to the mounting substrate 10 with an adhesive 11 are included. Further, in the illustrated embodiment, usually one mounting substrate 10 has eight tiles 12
Are glued together.

【0014】さらに、この取付基板10の裏面には図示
するような固定用突起13が四隅に4カ所設けられてお
り、該固定用突起13を形枠部2に貫挿させ、テーパー
ピン14を固定用突起13の穴に嵌め込むことによりタ
イルユニット9を形枠部2に取り付けることが出来るも
のとなっている。ここで、形枠部2を構成するスキンプ
レート等には固定用突起13が貫挿する穴を開けなけれ
ばならないが、比較的小さな穴ですむため、後述する打
設したコンクリートが前記穴から漏れるおそれはない。
Further, as shown in the drawing, fixing projections 13 are provided at four corners on the back surface of the mounting substrate 10. The fixing projections 13 are inserted into the frame 2 to form the taper pins 14. The tile unit 9 can be attached to the frame 2 by fitting it into the hole of the fixing projection 13. Here, it is necessary to make a hole through which the fixing projection 13 penetrates in the skin plate or the like which forms the form frame portion 2, but since a relatively small hole is required, the poured concrete, which will be described later, leaks from the hole. There is no fear.

【0015】以上のようにして、形枠部2のトンネル面
側に全てタイルユニット9を取り付ける。ここで1枚の
タイルユニット9は約30kg程の重量であり2人程度
の作業者で容易に取付作業が出来る重量とされている。
尚、タイルユニット9に取り付けられたタイル12には
その表面側があらかじめ接着剤11を介して取付基板1
0に接着されているが、その裏面は打設されるコンクリ
ートに固着され、タイル12が固定される。よってタイ
ル12の裏面は凹凸の波状に形成され、コンクリートと
の付着が向上するよう形成されている。
As described above, the tile units 9 are all attached to the tunnel surface side of the frame 2. Here, one tile unit 9 has a weight of about 30 kg, which is a weight that can be easily mounted by about two workers.
The surface of the tile 12 mounted on the tile unit 9 is attached to the mounting substrate 1 with an adhesive 11 in advance.
It is adhered to No. 0, but the back surface thereof is adhered to the concrete to be placed and the tile 12 is fixed. Therefore, the back surface of the tile 12 is formed in a corrugated wavy shape so as to improve the adhesion to the concrete.

【0016】以上の状態(図3参照)からトンネル7の
外周面と形枠部2との間にコンクリートが打設される。
そして、コンクリートを打設して所要の養生時間経過
後、コンクリートの固化を確認してから形枠部2を脱型
する。この脱型は保持部4及び支持材6を縮めて形枠部
2をトンネル7の中心に移動させることで行える。
From the above state (see FIG. 3), concrete is poured between the outer peripheral surface of the tunnel 7 and the frame 2.
Then, after the concrete is poured and the required curing time has elapsed, the solidification of the concrete is confirmed, and then the form frame 2 is demolded. This demolding can be performed by shrinking the holding portion 4 and the support member 6 and moving the frame 2 to the center of the tunnel 7.

【0017】尚、脱型作業の際、タイルユニット9を形
枠部2に固定してあるテーパーピン14は固定用突起1
3の穴からあらかじめ抜いておくものとする。脱型した
状態を図4に示す。尚、タイルユニット9は形枠部2を
脱型する際、固化したコンクリートにタイル12の裏面
が付着する。よって、その後は手作業で取付基板10を
剥がす作業を行う。すなわち、取付基板10は接着剤1
1により複数のタイル12の表面に接着しているが、手
作業によって取付基板10のみを剥がす。すると、複数
のタイル12がトンネル7の内面側に貼り付けられ、ト
ンネル内面の内装仕上げ工程が完了する(図5参照)。
During the demolding work, the taper pin 14 fixing the tile unit 9 to the frame 2 is fixed by the fixing projection 1.
It shall be removed from the hole of 3 in advance. The demolded state is shown in FIG. When the form unit 2 is removed from the tile unit 9, the back surface of the tile 12 adheres to the solidified concrete. Therefore, thereafter, the work of peeling off the mounting substrate 10 is manually performed. That is, the mounting substrate 10 is the adhesive 1
Although it is adhered to the surfaces of the plurality of tiles 12 by 1, the mounting substrate 10 is peeled off by hand. Then, the plurality of tiles 12 are attached to the inner surface side of the tunnel 7, and the interior finishing process for the inner surface of the tunnel is completed (see FIG. 5).

【0018】そして、形枠部2を脱型した後は、移動式
型枠装置1をさらにトンネル7の掘削した奥側に移動さ
せ、その箇所で形枠部2を設置して再度コンクリートの
打設作業を行い、前記の内装仕上げ作業が繰り返され
る。
After removing the formwork section 2, the movable formwork apparatus 1 is further moved to the far side of the excavated tunnel 7, the formwork section 2 is installed at that location, and concrete is poured again. Installation work is performed, and the above interior finishing work is repeated.

【0019】[0019]

【発明の効果】かくして、本発明は以上の構成よりな
る。そして本発明によるトンネルの内装仕上げ工法及び
その装置であれば、トンネルの内装仕上げ材が型枠と一
体化された状態で覆工コンクリートが打設され、もって
覆工コンクリートの施工と同時にトンネル内装仕上げ施
工を行うことが出来る。
As described above, the present invention has the above constitution. With the tunnel interior finishing method and apparatus according to the present invention, the lining concrete is placed in a state where the tunnel interior finishing material is integrated with the formwork, so that the tunnel interior finishing is performed at the same time when the lining concrete is constructed. Can be constructed.

【0020】したがって、覆工コンクリートの施工完了
後にトンネル内装仕上げ施工をおこなう二度手間が解消
され、工事期間を大幅に減少出来る。さらに、覆工コン
クリート打設後、コンクリートの締め固め時に内装仕上
げ材が前記コンクリート壁面に圧着され、固化したコン
クリートの強度を利用して前記内装仕上げ材が固定され
るので、従来のトンネル壁面に塗られた下地に対して内
装仕上げ材を固着する方法に比し、剥離等の問題が生じ
にくく堅固で耐久性の有する取付施工が行えるとの優れ
た効果を奏する。
Therefore, the trouble of performing the tunnel interior finishing work after the completion of the lining concrete is eliminated, and the construction period can be greatly reduced. Furthermore, after placing the lining concrete, when the concrete is compacted, the interior finishing material is pressed against the concrete wall surface, and the strength of the solidified concrete is used to fix the interior finishing material. Compared with the method of fixing the interior finishing material to the base, it has an excellent effect that it is possible to carry out an attachment construction which is firm and durable with less problems such as peeling.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の構成を説明する概略構成説明図であ
る。
FIG. 1 is a schematic configuration explanatory diagram illustrating a configuration of the present invention.

【図2】タイルユニットの構成説明図である。FIG. 2 is an explanatory diagram of the configuration of a tile unit.

【図3】タイルユニットを形枠部に取り付けた構成説明
図である。
FIG. 3 is a structural explanatory view in which a tile unit is attached to a frame portion.

【図4】型枠装置を脱型した後、タイルユニットが固化
したコンクリートに固着した状態を説明した説明図であ
る。
FIG. 4 is an explanatory diagram illustrating a state in which the tile unit is fixed to the solidified concrete after the mold device is demolded.

【図5】タイルユニットから取付基板を離脱した状態を
説明する説明図である。
FIG. 5 is an explanatory diagram illustrating a state in which the mounting substrate is detached from the tile unit.

【符号の説明】[Explanation of symbols]

1 移動式型枠装置 2 形枠部 3 装置本体部 4 保持部 5 ジャッキ 6 支持材 7 トンネル 8 車輪部 9 タイルユニット 10 取付基板 11 接着剤 12 タイル 13 固定用突起 14 テーパーピン 15 補強材 1 Mobile formwork equipment 2 Shape frame 3 Device body 4 holding part 5 jacks 6 Support material 7 tunnels 8 wheels 9 tile unit 10 Mounting board 11 adhesive 12 tiles 13 Fixing protrusion 14 Taper pin 15 Reinforcement material

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 掘削されたトンネルの内側に打設間隔を
あけて略アーチ状をなす型枠部と、略門型をなす装置本
体部と、型枠部を装置本体部に保持する伸縮自在のジャ
ッキが設けられた保持部と、型枠部と装置本体部とを連
結する伸縮自在の複数本の支持材とを有する型枠装置を
配置し、 前記型枠装置のトンネル外周面側には、トンネル表面に
取り付けられる内装仕上げ材をあらかじめユニット化し
て取り付けてなり、該取り付けは、内装仕上げ材の裏面に固定用突起を4ヵ
所設け、前記固定用突起を前記型枠部に嵌挿させ、テー
パーピンを前記固定用突起の穴に嵌め込むことにより型
枠部に内装仕上げ材を固定することにより行い 、 トンネル外周面と型枠装置との間にコンクリートを打設
して固化させ、型枠装置をあらかじめテーパーピンを抜
いた上で脱型した後、前記内装仕上げ材を前記固化した
コンクリートに固着して取り付けたことを特徴とするト
ンネルの内装仕上げ工法。
1. A substantially arch-shaped form part at a driving interval inside an excavated tunnel, and a substantially gate-shaped device book.
An extendable jar that holds the body and the formwork in the main body of the device.
The holding part provided with a stick, the mold part and the device main body are connected.
The mold device having a plurality of support telescopic for binding arranged, the tunnel outer circumferential surface of the mold device is made by attaching in advance unitized interior finish to be attached to the tunnel surface, the Attach the fixing projections on the back of the interior finishing material with four
Provided in place, and the fixing projection is inserted into the mold part to
By inserting the par pin into the hole of the fixing projection,
By fixing the interior finishing material to the frame, concrete is poured between the outer peripheral surface of the tunnel and the formwork device to solidify it, and the formwork device is pulled out of the taper pin in advance.
A method for finishing the interior of a tunnel, characterized in that the interior finishing material is fixed and attached to the solidified concrete after being removed from the mold.
【請求項2】 掘削されたトンネルの内側に打設間隔を
あけて設置された型枠装置と、 該型枠装置のトンネル外周面側に取り付けられる内装仕
上げ材とを備え、前記型枠装置は、略アーチ状をなす型枠部と、略門型を
なす装置本体部と、型枠部を装置本体部に保持する伸縮
自在のジャッキが設けられた保持部と、型枠部と装置本
体部とを連結する伸縮自在の複数本の支持材とを有し、 前記内装仕上げ材は、型枠内に打設され固化するコンク
リートに固着される裏面が凹凸の波状に形成されている
固着部と、トンネルの表面側に現れる内装仕上げ部と、
内装仕上げ部と型枠装置とを離脱可能に接着する接着部
とを有し、前記接着部は、取付基板の裏面に固定用突起が4ヵ所設
けられ、固定用突起を型枠部に嵌挿させ、テーパーピン
を固定用突起の穴に嵌め込むことにより、内装仕上げ材
を型枠部に取り付けたことを 特徴とするトンネルの内装
仕上げ装置。
2. A driving interval is provided inside the excavated tunnel.
Form device installed open, An interior finish that is attached to the outer peripheral side of the tunnel of the formwork device.
With raised material,The formwork device includes a formwork part having a substantially arch shape and a substantially gate form.
Elongating device body and expansion / contraction for holding the mold part in the device body
A holding part with a free jack, a mold part and a device book
Having a plurality of expandable and contractible support members that connect the body portion, The interior finishing material is a concrete that is cast into the mold and solidifies.
Stuck to the reetThe back surface is formed with uneven wavy
A fixed part and an interior finishing part that appears on the surface side of the tunnel,
Adhesive part that detachably adheres the interior finishing part and the formwork device
Has andThe adhesive part has four fixing protrusions on the back surface of the mounting board.
The fixing pin is fitted into the frame and the taper pin
The interior finishing material by fitting the
Was attached to the formwork Interior of the characteristic tunnel
Finishing equipment.
JP07948699A 1999-03-24 1999-03-24 Tunnel interior finishing method and equipment Expired - Fee Related JP3392775B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07948699A JP3392775B2 (en) 1999-03-24 1999-03-24 Tunnel interior finishing method and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07948699A JP3392775B2 (en) 1999-03-24 1999-03-24 Tunnel interior finishing method and equipment

Publications (2)

Publication Number Publication Date
JP2000274194A JP2000274194A (en) 2000-10-03
JP3392775B2 true JP3392775B2 (en) 2003-03-31

Family

ID=13691237

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07948699A Expired - Fee Related JP3392775B2 (en) 1999-03-24 1999-03-24 Tunnel interior finishing method and equipment

Country Status (1)

Country Link
JP (1) JP3392775B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019214863A (en) * 2018-06-12 2019-12-19 株式会社大林組 Protection method of reinforced concrete structure

Also Published As

Publication number Publication date
JP2000274194A (en) 2000-10-03

Similar Documents

Publication Publication Date Title
JP3392775B2 (en) Tunnel interior finishing method and equipment
JP4676394B2 (en) Curing equipment for lining concrete and curing method
JP3527106B2 (en) Concrete placement method using formwork fitted with boxless foam
JPH06134736A (en) Exposed aggregate finishing method of concrete
JP2002235495A (en) Concrete placing method and device for tunnel widening work
JPH0781518B2 (en) Tunnel lining method and device
JP4017711B2 (en) Tunnel lining method and tunnel lining apparatus used for carrying out tunnel lining
JP3278371B2 (en) Direct casting method of tunnel interior plate and its equipment
JP4476403B2 (en) Forming apparatus for manufacturing hollow PCa member and manufacturing method using the same
JP3076566B1 (en) Inner mold for manufacturing hollow PCa members
JPH0639878B2 (en) Moving mechanism for mobile formwork for lining
JPH0434200A (en) Shield device and tunnel lining method
CN111926701B (en) Bridge road end concrete railing stand column for cast-in-place construction
JPH1193595A (en) Method for installing waterproof sheet in tunnel and waterproof sheet for use in the same
JPH0521599Y2 (en)
JP2003027413A (en) Overlay method, cut-overlay method, and paving method
CN210459463U (en) Auxiliary formwork trolley for ditch pouring and shaping
JP4044654B2 (en) Method of placing concrete for tunnels using forms with different cross-sectional shapes on the wife side
JPH07269109A (en) Form device and constructing method for guide way for motor car using above device
JPH10317898A (en) Method and device for installing waterproof sheet into tunnel
JPH1144197A (en) Method and device for placing tunnel concrete using form with variable cross-sectional shape
JP3950208B2 (en) Apparatus for placing concrete for secondary lining in tunnel and method for placing concrete for secondary lining using the apparatus
JP3760010B2 (en) Arch culvert construction method
JPH1150797A (en) Concrete placing method and device for tunnel using formwork which can be widened
JPH04333767A (en) Placing method for wall concrete

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
R150 Certificate of patent or registration of utility model

Ref document number: 3392775

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090124

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100124

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100124

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110124

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110124

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120124

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130124

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140124

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140124

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150124

Year of fee payment: 12

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees