JP3360621B2 - Manufacturing method of welded steel pipe by high energy beam - Google Patents

Manufacturing method of welded steel pipe by high energy beam

Info

Publication number
JP3360621B2
JP3360621B2 JP24945098A JP24945098A JP3360621B2 JP 3360621 B2 JP3360621 B2 JP 3360621B2 JP 24945098 A JP24945098 A JP 24945098A JP 24945098 A JP24945098 A JP 24945098A JP 3360621 B2 JP3360621 B2 JP 3360621B2
Authority
JP
Japan
Prior art keywords
energy beam
high energy
manufacturing
steel pipe
welded steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24945098A
Other languages
Japanese (ja)
Other versions
JP2000079490A (en
Inventor
邦保 大石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
JFE Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Engineering Corp filed Critical JFE Engineering Corp
Priority to JP24945098A priority Critical patent/JP3360621B2/en
Publication of JP2000079490A publication Critical patent/JP2000079490A/en
Application granted granted Critical
Publication of JP3360621B2 publication Critical patent/JP3360621B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/06Tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2103/00Materials to be soldered, welded or cut
    • B23K2103/02Iron or ferrous alloys
    • B23K2103/04Steel or steel alloys

Landscapes

  • Laser Beam Processing (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、高エネルギービ
ームによる溶接鋼管の製造方法、特に、高エネルギービ
ームの照射位置と溶接速度との関係をコントロールする
ことによって、溶接欠陥がなく、しかも、機械的性質に
優れた溶接部を得ることができる、高エネルギービーム
による溶接鋼管の製造方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for manufacturing a welded steel pipe using a high energy beam, and more particularly to a method for controlling the relationship between the irradiation position of a high energy beam and the welding speed so that there is no welding defect and mechanical The present invention relates to a method for manufacturing a welded steel pipe using a high energy beam, which can obtain a welded part having excellent properties.

【0002】[0002]

【従来の技術】近年、抵抗溶接による電縫管の製造方法
と異なり、高エネルギービームによる溶接鋼管の製造方
法が開発された。この高エネルギービームによる溶接鋼
管の製造方法は、従来の抵抗溶接による電縫管の製造方
法と基本構成は同じであり、オープンパイプの突合わせ
部を抵抗溶接によるかレーザー等の高エネルギービーム
によって溶接するかの違いである。
2. Description of the Related Art In recent years, a method for manufacturing a welded steel pipe using a high energy beam has been developed, unlike a method for manufacturing an electric resistance welded pipe by resistance welding. The method for manufacturing a welded steel pipe using this high energy beam is the same as the conventional method for manufacturing an electric resistance welded pipe using resistance welding, and the butt portion of the open pipe is welded using resistance welding or a high energy beam such as a laser. Is the difference.

【0003】以下、この鋼帯を高エネルギービームによ
る溶接鋼管の製造方法の概略を、図面を参照しながら説
明する。図4は、高エネルギービームによる溶接鋼管の
製造装置を示す概略平面図である。
The outline of a method for manufacturing a welded steel pipe from this steel strip using a high energy beam will be described below with reference to the drawings. FIG. 4 is a schematic plan view showing an apparatus for manufacturing a welded steel pipe using a high energy beam.

【0004】図4において、1は、鋼帯、2は、ブレー
クダウンロール群、3は、ケージロール群(あるいはク
ラスターロール群)、4は、フィンパスロール群、5
は、スクイズスタンドに設けられたスクイズロール、そ
して、6は、各ロール群2、3および4によって円筒形
状に形成されたオープンパイプである。
In FIG. 4, 1 is a steel strip, 2 is a breakdown roll group, 3 is a cage roll group (or cluster roll group), 4 is a fin pass roll group, and 5 is
Is a squeeze roll provided on the squeeze stand, and 6 is an open pipe formed into a cylindrical shape by each of the roll groups 2, 3 and 4.

【0005】上述したように構成される、高エネルギー
ビームによる溶接鋼管の製造装置によれば、溶接鋼管
は、以下のようにして製造される。鋼帯1は、ブレーク
ダウンロール群2、ケージロール群3およびフィンパス
ロール群4によって円筒形状のオープンパイプ6に連続
的に成型される。オープンパイプ6の対向する両側突合
わせ部6Aは、スクイズロール5を備えたスクイズスタ
ンドにおいて、レーザー等の高エネルギービームが、突
合わせ部6Aに倣って照射されることにより溶融して連
続的に溶接され、これによって、溶接鋼管が連続的に製
造される。
[0005] According to the apparatus for manufacturing a welded steel pipe using a high-energy beam configured as described above, the welded steel pipe is manufactured as follows. The steel strip 1 is continuously formed into a cylindrical open pipe 6 by a breakdown roll group 2, a cage roll group 3, and a fin pass roll group 4. Opposite side butt portions 6A of the open pipe 6 are fused and continuously welded by irradiating a high energy beam such as a laser along the butt portion 6A in a squeeze stand provided with the squeeze roll 5. As a result, a welded steel pipe is continuously manufactured.

【0006】[0006]

【発明が解決しようとする課題】従来から高エネルギー
ビームによる溶接法においては、ビームをスクイズロー
ル5の中心線(L)、即ち、一対のスクイズロール5の
各々の中心軸線5A間の中央部を通り、中心軸線5Aと
平行な直線の近傍の突合わせ部6Aに向けて照射してい
るが、ビーム照射位置を明確に規定した例はない。即
ち、ビーム照射位置は、厳密にスクイズロール5の中心
線(L)上なのか、中心線(L)の入側なのか出側なの
か、入側あるいは出側だとすれば、中心線(L)からど
のくらい距離をおくべきか等についての開示は一切な
い。
Conventionally, in a welding method using a high-energy beam, the beam is applied to the center line (L) of the squeeze roll 5, that is, the central portion between the respective center axes 5A of the pair of squeeze rolls 5. As described above, irradiation is performed toward the butting portion 6A near a straight line parallel to the central axis 5A, but there is no example in which the beam irradiation position is clearly defined. That is, if the beam irradiation position is strictly on the center line (L) of the squeeze roll 5, on the entry side or on the exit side of the center line (L), on the entry side or exit side, the center line ( There is no disclosure as to how far from L).

【0007】本願発明者等は、高エネルギービームの照
射部分がスクイズロールの中心線を通過するまで、即
ち、高エネルギービームの照射からスクイズロールによ
る突合わせ部のアップセットが完了する時点までの溶融
部の凝固時間に着目し、溶接部の強度を母材と同程度に
維持するには、如何にしたら良いかについて、鋭意研究
を重ねた。その結果、高エネルギービームの照射部分が
スクイズロールの中心線を通過するまでの時間と溶接部
の機械的性能に相関があり、溶接速度、即ち、高エネル
ギービームの照射部分がスクイズロールの中心線を通過
するまでの時間を特定すれば、溶接欠陥の発生を防止す
ることができ、しかも、溶接部の強度を母材と同程度に
維持することができるといった知見を得た。
[0007] The inventors of the present invention devised that the high-energy beam irradiation portion passes through the center line of the squeeze roll, that is, from the high-energy beam irradiation to the completion of the upset of the butted portion by the squeeze roll. Focusing on the solidification time of the weld, the intensive research was conducted on how to maintain the strength of the weld at the same level as the base metal. As a result, there is a correlation between the time required for the high-energy beam irradiated portion to pass through the center line of the squeeze roll and the mechanical performance of the welded portion. It has been found that, by specifying the time required to pass through, the occurrence of welding defects can be prevented and the strength of the welded portion can be maintained at the same level as that of the base metal.

【0008】この発明は、上述した知見に基づきなされ
たものであり、高エネルギービームの照射位置と溶接速
度との関係をコントロールすることによって、溶接欠陥
がなく、しかも、機械的性質に優れた溶接部を得ること
ができる、高エネルギービームによる溶接鋼管の製造方
法を提供することにある。
[0008] The present invention has been made based on the above-mentioned findings, and has no welding defects and has excellent mechanical properties by controlling the relationship between the irradiation position of the high energy beam and the welding speed. It is an object of the present invention to provide a method for manufacturing a welded steel pipe using a high energy beam, which can obtain a portion.

【0009】[0009]

【課題を解決するための手段】請求項1記載の発明は、
鋼帯を一連のロール群により円筒形状のオープンパイプ
に連続的に成型し、スクイズロールを備えたスクイズス
タンドにおいて、前記オープンパイプの対向する両側突
合わせ部に高エネルギービームを照射して、前記両側突
合わせ部を連続的に溶接することからなる、溶接鋼管の
製造方法において、前記高エネルギービームを前記スク
イズロールの入側において前記突合わせ部に照射し、前
記高エネルギービームの照射部分が前記スクイズロール
の中心線を通過するまでの時間を0.15secから
0.30secの範囲内に限定することことに特徴を有
するものである。
According to the first aspect of the present invention,
The steel strip is continuously formed into a cylindrical open pipe by a series of rolls, and in a squeeze stand equipped with a squeeze roll, a high energy beam is applied to a butt portion on both sides of the open pipe facing each other, and A method for manufacturing a welded steel pipe, comprising continuously welding a butt portion, wherein the high energy beam is irradiated to the butt portion on the entrance side of the squeeze roll, and the irradiated portion of the high energy beam is squeezed. It is characterized in that the time required to pass through the center line of the roll is limited to the range of 0.15 sec to 0.30 sec.

【0010】[0010]

【発明の実施の形態】この発明の、高エネルギービーム
による溶接鋼管の製造方法の一実施態様を、図面を参照
しながら説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of a method for manufacturing a welded steel pipe by using a high energy beam according to the present invention will be described with reference to the drawings.

【0011】図1は、この発明の、高エネルギービーム
による溶接鋼管の製造方法を示す概略正面図、図2は、
この発明の、高エネルギービームによる溶接鋼管の製造
方法を示す概略平面図である。
FIG. 1 is a schematic front view showing a method of manufacturing a welded steel pipe using a high energy beam according to the present invention, and FIG.
It is an outline top view showing the manufacturing method of the welding steel pipe by a high energy beam of the present invention.

【0012】図1および図2 において、5は、スクイズ
ロール、6は、造管方向上流側の上述した一連のロール
群(図示せず)により円筒形状に形成されたオープンパ
イプ、7は、オープンパイプ6の突合わせ部6Aに照射
されるレーザー等の高エネルギービームである。ビーム
7は、スクイズロール5の入側において突合わせ部6A
に照射される。
In FIGS. 1 and 2, 5 is a squeeze roll, 6 is an open pipe formed in a cylindrical shape by the above-mentioned series of rolls (not shown) on the upstream side in the pipe forming direction, and 7 is an open pipe. It is a high energy beam such as a laser beam applied to the butting portion 6A of the pipe 6. The beam 7 has a butt portion 6A on the entrance side of the squeeze roll 5.
Is irradiated.

【0013】なお、Lは、スクイズロール5の中心線、
即ち、一対のスクイズロール5の各々の中心軸線5A間
の中央部を通り、中心軸線5Aと平行な直線であり、M
は、ビーム7の照射部分(P)を通り、中心線(L)と
平行な直線であり、そして、Xは、直線(M)と中心線
(L)との間の距離である。
L is the center line of the squeeze roll 5,
That is, it is a straight line that passes through the central portion between the central axes 5A of the pair of squeeze rolls 5 and is parallel to the central axis 5A.
Is a straight line passing through the irradiated portion (P) of the beam 7 and parallel to the center line (L), and X is a distance between the straight line (M) and the center line (L).

【0014】この発明において、ビーム7の照射部分
(P)がスクイズロール5の中心線(L)を通過するま
での時間を0.15secから0.30secの範囲内
に限定した理由について説明する。
In the present invention, the reason why the time required for the irradiated portion (P) of the beam 7 to pass through the center line (L) of the squeeze roll 5 is limited to the range of 0.15 sec to 0.30 sec will be described.

【0015】ビーム7の照射部分(P)がスクイズロー
ル5の中心線(L)を通過するまでの時間が0.15s
ec未満であると、突合わせ部6Aがビーム7によって
溶融されてからスクイズロール5によるアップセットが
完了するまでの時間が短いので、溶融部が完全に凝固し
きれない。従って、外部からの拘束が解かれるので、溶
接部に凝固割れといわれる内部欠陥が発生しやすい。こ
の結果、靭性が低下する等、機械的性質が悪化する。こ
の原因は、母材中の炭素(C)や硫黄(S)等の低融点
の成分が凝固過程で溶融部中心付近で濃縮されることに
ある。
The time required for the irradiated portion (P) of the beam 7 to pass through the center line (L) of the squeeze roll 5 is 0.15 s.
If it is less than ec, the time from the melting of the butted portion 6A by the beam 7 to the completion of the upset by the squeeze roll 5 is short, so that the melted portion cannot be completely solidified. Accordingly, since the external restraint is released, an internal defect called solidification crack is easily generated in the welded portion. As a result, mechanical properties such as toughness are deteriorated. This is because low melting point components such as carbon (C) and sulfur (S) in the base material are concentrated near the center of the molten portion during the solidification process.

【0016】一方、ビーム7の照射部分(P)がスクイ
ズロール5の中心線(L)を通過するまでの時間が0.
30secを超えると、突合わせ部6Aがスクイズロー
ル5により完全にアップセットされる以前に溶融部の凝
固が完了してしまう。従って、完全溶融による溶接が行
われず、いわゆる、冷接状態となるので、良好な溶接部
性能が得られない。
On the other hand, the time required for the irradiated portion (P) of the beam 7 to pass through the center line (L) of the squeeze roll 5 is set to 0.
If it exceeds 30 sec, the solidification of the melted portion is completed before the butting portion 6A is completely upset by the squeeze roll 5. Therefore, welding by complete melting is not performed, and a so-called cold contact state is obtained, so that good welded portion performance cannot be obtained.

【0017】従って、この発明においては、ビーム7の
照射部分(P)がスクイズロール5の中心線(L)を通
過するまでの時間を0.15secから0.30sec
の範囲内に限定した。
Therefore, in the present invention, the time required for the irradiated portion (P) of the beam 7 to pass through the center line (L) of the squeeze roll 5 is from 0.15 sec to 0.30 sec.
Within the range.

【0018】[0018]

【実施例】次に、この発明の、高エネルギービームによ
る溶接鋼管の製造方法を実施例により更に詳細に説明す
る。
Next, a method for manufacturing a welded steel pipe by a high energy beam according to the present invention will be described in more detail with reference to examples.

【0019】表1 に示す化学成分を有する×60クラス
の耐サワー用熱延鋼板を素材として、外径406.4m
m×肉厚9.5mmの溶接鋼管を製造した。溶接は、高
エネルギービームとして高出力レーザーを使用し、スク
イズロールの入側においてオープンパイプの突合わせ部
にレーザーを照射し、この直前で給電チップを介して高
周波電流を突合わせ部に流して、突合わせ部を700℃
程度の温度に予熱することにより行った。更に、溶接後
のシーム部を950℃に加熱し、次いで、急冷し、そし
て、650℃に加熱することによって、溶接部に焼入れ
焼戻し熱処理を施した。
A hot rolled steel sheet for sour resistance of × 60 class having the chemical components shown in Table 1 was used as a material, and the outer diameter was 406.4 m.
A welded steel pipe of mx 9.5 mm thickness was manufactured. Welding uses a high-power laser as a high-energy beam, irradiates the laser to the butt portion of the open pipe on the entrance side of the squeeze roll, and immediately before this, a high-frequency current flows through the butt portion via the power supply tip, 700 ° C at the butt
This was done by preheating to a moderate temperature. Furthermore, the seam after welding was heated to 950 ° C., then quenched, and then heated to 650 ° C. to perform a quenching and tempering heat treatment on the weld.

【0020】この結果を表2および図3に示す。なお、
溶接部の性能は、−40℃におけるシャルピー衝撃試験
の吸収エネルギー値を求めることにより評価した。まと
めて評価しやすいように評価の値は、10mmサイズに
換算してあり、それぞれ1水準当たり3個づつの平均値
である。なお、表1の母材の吸収エネルギーは、300
から370(J)の範囲内であった。
The results are shown in Table 2 and FIG. In addition,
The performance of the weld was evaluated by determining the absorbed energy value of a Charpy impact test at −40 ° C. The values of the evaluations are converted into 10 mm sizes so that the evaluations can be easily performed collectively, and each is an average value of three pieces per one level. The absorbed energy of the base material in Table 1 was 300
To 370 (J).

【0021】[0021]

【表1】 [Table 1]

【0022】[0022]

【表2】 [Table 2]

【0023】図3および表2から明らかなように、高エ
ネルギービームの照射部分がスクイズロールの中心線を
通過するまでの時間が0.15secから0.30se
cの範囲内である場合には、何れも、溶接部の強度は、
母材の強度である300から370(J)の範囲内であ
り、優れた機械的特性を有していた。
As apparent from FIG. 3 and Table 2, the time required for the irradiated portion of the high energy beam to pass through the center line of the squeeze roll is from 0.15 sec to 0.30 sec.
When the value is within the range of c, the strength of the welded portion is:
The strength of the base material was in the range of 300 to 370 (J), and it had excellent mechanical properties.

【0024】[0024]

【発明の効果】以上説明したように、この発明によれ
ば、鋼帯を一連のロール群により円筒形状のオープンパ
イプに連続的に成型し、スクイズロールを備えたスクイ
ズスタンドにおいて、前記オープンパイプの対向する両
側突合わせ部に高エネルギービームを照射して、前記両
側突合わせ部を連続的に溶接することからなる、溶接鋼
管の製造方法において、前記高エネルギービームを前記
スクイズロールの入側において前記突合わせ部に照射
し、前記高エネルギービームの照射部分が前記スクイズ
ロールの中心線を通過するまでの時間を0.15sec
から0.30secの範囲内に限定することによって、
溶接欠陥がなく、しかも、機械的性質に優れた溶接部を
得ることができるといった有用な効果がもたらされる。
As described above, according to the present invention, in a squeeze stand provided with a squeeze roll, a steel strip is continuously formed into a cylindrical open pipe by a series of rolls. A method of manufacturing a welded steel pipe, comprising irradiating a high-energy beam to opposing two-sided butted portions and continuously welding the two-sided butted portions, wherein the high-energy beam is applied to an entrance side of the squeeze roll. Irradiates the butt portion, and the time required for the irradiated portion of the high energy beam to pass through the center line of the squeeze roll is 0.15 sec.
By limiting to within 0.30 sec,
Useful effects such as being able to obtain a weld having no welding defects and excellent mechanical properties are provided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の、高エネルギービームによる溶接鋼
管の製造方法を示す概略正面図である。
FIG. 1 is a schematic front view showing a method for manufacturing a welded steel pipe using a high energy beam according to the present invention.

【図2】この発明の、高エネルギービームによる溶接鋼
管の製造方法を示す概略平面図である。
FIG. 2 is a schematic plan view showing a method for manufacturing a welded steel pipe using a high energy beam according to the present invention.

【図3】高エネルギービームの照射部分がスクイズロー
ルの中心線を通過するまでの時間とシャルピー衝撃試験
における吸収エネルギー値との関係を示すグラフであ
る。
FIG. 3 is a graph showing a relationship between a time required for an irradiated portion of a high energy beam to pass through a center line of a squeeze roll and an absorbed energy value in a Charpy impact test.

【図4】高エネルギービームによる溶接鋼管の製造装置
を示す概略平面図である。
FIG. 4 is a schematic plan view showing an apparatus for manufacturing a welded steel pipe using a high energy beam.

【符号の説明】[Explanation of symbols]

1:鋼帯 2:ブレークダウンロール群 3:ケージロール群 4:フィンパスロール群 5:スクイズロール 5A:スクイズロールの中心軸線 6:オープンパイプ 6A:オープンパイプの突合わせ部 7:ビーム 1: Steel strip 2: Breakdown roll group 3: Cage roll group 4: Fin pass roll group 5: Squeeze roll 5A: Center axis of squeeze roll 6: Open pipe 6A: Butt of open pipe 7: Beam

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 鋼帯を一連のロール群により円筒形状の
オープンパイプに連続的に成型し、スクイズロールを備
えたスクイズスタンドにおいて、前記オープンパイプの
対向する両側突合わせ部に高エネルギービームを照射し
て、前記両側突合わせ部を連続的に溶接することからな
る、溶接鋼管の製造方法において、 前記高エネルギービームを前記スクイズロールの入側に
おいて前記突合わせ部に照射し、前記高エネルギービー
ムの照射部分が前記スクイズロールの中心線を通過する
までの時間を0.15secから0.30secの範囲
内に限定することを特徴とする、高エネルギービームに
よる溶接鋼管の製造方法。
1. A steel strip is continuously formed into a cylindrical open pipe by a series of rolls, and a squeeze stand provided with a squeeze roll irradiates a high energy beam to a butt portion of the open pipe facing both sides. Then, in the method for manufacturing a welded steel pipe, comprising continuously welding the two-sided butted portions, irradiating the butted portion with the high-energy beam on the entrance side of the squeeze roll, A method for manufacturing a welded steel pipe with a high energy beam, wherein a time required for an irradiated portion to pass through a center line of the squeeze roll is limited to a range of 0.15 sec to 0.30 sec.
JP24945098A 1998-09-03 1998-09-03 Manufacturing method of welded steel pipe by high energy beam Expired - Fee Related JP3360621B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24945098A JP3360621B2 (en) 1998-09-03 1998-09-03 Manufacturing method of welded steel pipe by high energy beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24945098A JP3360621B2 (en) 1998-09-03 1998-09-03 Manufacturing method of welded steel pipe by high energy beam

Publications (2)

Publication Number Publication Date
JP2000079490A JP2000079490A (en) 2000-03-21
JP3360621B2 true JP3360621B2 (en) 2002-12-24

Family

ID=17193157

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24945098A Expired - Fee Related JP3360621B2 (en) 1998-09-03 1998-09-03 Manufacturing method of welded steel pipe by high energy beam

Country Status (1)

Country Link
JP (1) JP3360621B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6210551B2 (en) * 2013-02-22 2017-10-11 古河電気工業株式会社 Terminal, terminal manufacturing method, and electric wire terminal connection structure

Also Published As

Publication number Publication date
JP2000079490A (en) 2000-03-21

Similar Documents

Publication Publication Date Title
RU2448796C1 (en) Welded steel tube produced using high-power-density beam and method of its production
KR100228252B1 (en) The method for producing electric-resistance-welded steel pipe
TW202012089A (en) Butt weld joint of steel materials and manufacturing method thereof
JPH09220682A (en) Production of duplex stainless steel welded tube
JP3360621B2 (en) Manufacturing method of welded steel pipe by high energy beam
KR101242688B1 (en) Laser welding method of silicon steel
JPS6129830B2 (en)
JP2001287061A (en) Method of manufacturing welded pipe of martensite-based stainless steel
JP7006632B2 (en) Steel strip joining method and steel strip joining device
JP3079962B2 (en) Manufacturing method of welded steel pipe
CN110248763B (en) Method for producing electric-welded metal pipe and electric-welded metal pipe
JP3149754B2 (en) Method for producing carbon steel pipe excellent in toughness by high energy density beam welding
JPH0852512A (en) Manufacture of welded tube
JP3360620B2 (en) Manufacturing method of welded steel pipe by high energy beam
JP2000317642A (en) Flash butt welding method for high-carbon steel sheet or steel strip
KR100482222B1 (en) A Method of Flash Butt Welding for High Carbon Steel
JP4586515B2 (en) Welded steel pipe with secondary workability comparable to that of the base metal in the welded part and method for producing the same
JPH08155665A (en) Laser beam welding method of ferritic stainless steel
JPH1099984A (en) Manufacture of two-phase stainless steel welded tube
JP2924675B2 (en) Manufacturing method of welded section steel
JP2023108212A (en) Steel strip joining method and steel strip joining device
JPS5942731B2 (en) Method for improving the toughness of the welded heat-affected zone of ERW steel pipes
JPH10296458A (en) Manufacture of welded steel tube
JPH0971837A (en) Electric resistance welded tube excellent in carbon dioxide resistance and its production
JPH02160189A (en) Production of electric welded pipe

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081018

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091018

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101018

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101018

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111018

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111018

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121018

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121018

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131018

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees