JP3358681B2 - Tube connector assembly equipment - Google Patents

Tube connector assembly equipment

Info

Publication number
JP3358681B2
JP3358681B2 JP16294594A JP16294594A JP3358681B2 JP 3358681 B2 JP3358681 B2 JP 3358681B2 JP 16294594 A JP16294594 A JP 16294594A JP 16294594 A JP16294594 A JP 16294594A JP 3358681 B2 JP3358681 B2 JP 3358681B2
Authority
JP
Japan
Prior art keywords
tube connector
press
pin
valve body
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP16294594A
Other languages
Japanese (ja)
Other versions
JPH081460A (en
Inventor
伸之 伊賀
清澄 高橋
英己 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JATCO Ltd
Original Assignee
JATCO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JATCO Ltd filed Critical JATCO Ltd
Priority to JP16294594A priority Critical patent/JP3358681B2/en
Publication of JPH081460A publication Critical patent/JPH081460A/en
Application granted granted Critical
Publication of JP3358681B2 publication Critical patent/JP3358681B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、バルブボディにチュー
ブコネクタを組み立てるチューブコネクタ組立装置に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tube connector assembling apparatus for assembling a tube connector into a valve body.

【0002】[0002]

【従来の技術】図13に示すようにバルブボディ40に
は油圧回路が形成してあり、所定の油圧回路同志をチュ
ーブコネクタ42で接続している。図13において、4
2a〜42gまではチューブコネクタである。
2. Description of the Related Art As shown in FIG. 13, a hydraulic circuit is formed in a valve body 40, and predetermined hydraulic circuits are connected by a tube connector 42. In FIG. 13, 4
Tube connectors 2a to 42g are tube connectors.

【0003】そして、前記バルブボディ40にチューブ
コネクタ42を組み立てるチューブコネクタ組立工程で
は、まず、図14に示すように治具台52に、挿入孔4
1の端部に圧入端ストッパー54を装着した前記バルブ
ボディ40を載置して、チューブコネクタ42を前記挿
入孔41に位置合わせし、作業者がチューブコネクタ4
2の片側をハンマー55で打ち込んで仮決めし、次に、
チューブコネクタ42の両側をハンマー55で交互に打
ち込んで、チューブコネクタ42の端部が圧入端ストッ
パー54に当たるまで、前記挿入孔41に挿入する。
In the tube connector assembling step of assembling the tube connector 42 with the valve body 40, first, as shown in FIG.
The valve body 40 with the press-fit end stopper 54 mounted thereon is mounted on one end of the tube connector 4 and the tube connector 42 is aligned with the insertion hole 41.
Driving one side of the 2 with a hammer 55 and tentatively determining
The two sides of the tube connector 42 are alternately driven with a hammer 55 and inserted into the insertion hole 41 until the end of the tube connector 42 hits the press-fit end stopper 54.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記従
来のチューブコネクタ組立では、チューブコネクタ42
の組付け本数が多く、工程上1本づつバルブボディ40
に組付けなければならず、多大な工数がかかるし、チュ
ーブコネクタ42の圧入時に、バルブボディ40の壁面
を削り切粉が発生するし(チューブコネクタ42の面取
り部が機械加工のため尖っていて、チューブコネクタ4
2の倒れ位置ずれにより壁面とチューブコネクタ42と
が接触した場合や、ハンマー55で打ち込む場合にバル
ブボディ40の壁面を削り切粉が発生する)、ハンマー
55で打ち込むため作業者の手首が疲労するし、静圧入
ではチューブコネクタ42が少しでも傾くと挿入(圧
入)できないという問題点があった。
However, in the above-described conventional tube connector assembly, the tube connector 42 is not provided.
Of the valve body 40 one by one in the process
Requires a great deal of man-hours, and when the tube connector 42 is press-fitted, the wall surface of the valve body 40 is shaved to generate chips (the chamfered portion of the tube connector 42 is sharp due to machining). , Tube connector 4
(2) When the wall surface comes into contact with the tube connector 42 due to the misalignment of 2, or when the hammer 55 is used for driving, the wall surface of the valve body 40 is shaved and chips are generated.) However, in the case of static press-fitting, there is a problem that insertion (press-fitting) cannot be performed if the tube connector 42 is slightly inclined.

【0005】本発明は、上記の問題点に着目して成され
たものであって、その目的とするところは、ガイドピン
にチューブコネクタの端部を仮置きする以外は、全て機
械によりチューブコネクタの組み立てを実施することが
できて、作業者による圧入工程がなくなり、また、複数
のチューブコネクタを同時に挿入することが可能になっ
て組立工数を削減することができ作業能率を向上させる
ことができるチューブコネクタ組立装置を提供すること
にある。
The present invention has been made in view of the above-mentioned problems, and has as its object the purpose of the present invention except that the end of the tube connector is temporarily placed on the guide pin. Can be assembled, the press-in process by the operator can be eliminated, and a plurality of tube connectors can be inserted at the same time, so that the number of assembling steps can be reduced and the working efficiency can be improved. An object of the present invention is to provide a tube connector assembling apparatus.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めに、本発明は、テーブルユニット上に配された投入ス
テーション、圧入ステーション及び払出しステーション
と、前記テーブルユニットに設けられて、前記投入ステ
ーションと圧入ステーションと払出しステーションに、
バルブボディとこのバルブボディの所定の油圧回路同志
を接続するチューブコネクタとより成るワークを割出し
搬送するインデックステーブルと、このインデックステ
ーブルに取り付けられて、バルブボディが位置決めされ
ると共に、このバルブボディの挿入孔にチューブコネク
タの接続端部を案内するガイドピン機構を有するパレッ
トユニットと、前記圧入ステーションの上方に昇降動可
能に位置して、下降時に、前記チューブコネクタを、振
動を与えながら押圧するパンチ機構を有するパンチユニ
ットと、前記パンチユニットを昇降させる昇降・圧入機
構とを備えたことを特徴とする。
In order to achieve the above object, the present invention provides a charging station, a press-fitting station, and a discharging station arranged on a table unit, and a charging station provided on the table unit. And press-in and pay-out stations,
An index table for indexing and transporting a work comprising a valve body and a tube connector for connecting predetermined hydraulic circuits of the valve body, and mounted on the index table to position the valve body and to position the valve body. A pallet unit having a guide pin mechanism for guiding the connection end of the tube connector into the insertion hole, and a punch that is located above the press-fitting station so as to be able to move up and down and presses the tube connector while applying vibration when descending. A punch unit having a mechanism, and a lifting / lowering / press-fitting mechanism for lifting / lowering the punch unit are provided.

【0007】また、前記ガイドピン機構を、パレット本
体に固着されたピンガイドの収容孔部に圧入端ストッパ
ーとスプリングにより保持されるピン受け部材とを収容
すると共に、前記ピンガイドの上端部に、ピン孔部を有
するワーク受け部材を固着し、前記ピン孔部に、先側を
チューブコネクタ挿入部にしたガイドピンを上下摺動可
能に挿入して、このガイドピンの下端部を前記ピン受け
部材で受けるように構成してもよい。
Further, the guide pin mechanism accommodates a press-fit end stopper and a pin receiving member held by a spring in an accommodation hole of the pin guide fixed to the pallet body, and has an upper end of the pin guide. A work receiving member having a pin hole is fixed, and a guide pin having a tip side as a tube connector insertion portion is inserted into the pin hole so as to be vertically slidable, and the lower end of the guide pin is inserted into the pin receiving member. You may be comprised so that it may receive by.

【0008】また、前記パンチ機構を、ベース部材の下
面部の所定の位置に、ワーク押え部材とワークの倒れを
防止するワークガイドとを取り付けると共に、前記ベー
ス部材に振動発生装置を取り付けて構成してもよい。
Further, the punch mechanism is constructed by mounting a work holding member and a work guide for preventing the work from falling down at a predetermined position on the lower surface of the base member, and mounting a vibration generator to the base member. You may.

【0009】[0009]

【作用】かかる構成により、前記投入ステーションにお
いて、パレットユニットに、バルブボディを位置決めし
てセットし、作業者が、チューブコネクタを接続する挿
入孔に、このチューブコネクタの端部を位置させて、こ
の端部内に、前記ガイドピンを挿入して、前記バルブボ
ディにチューブコネクタをセットする。
With this configuration, at the loading station, the valve body is positioned and set on the pallet unit, and the operator positions the end of the tube connector in the insertion hole for connecting the tube connector. Insert the guide pin into the end and set the tube connector on the valve body.

【0010】次に、前記インデックステーブルを割り出
し回転させ、前記バルブボディにチューブコネクタをセ
ットして成るワークを圧入ステーションに位置させ、前
記昇降・圧入機構を作動させて、振動を与えられたパン
チユニットを下降して、前記チューブコネクタを振動さ
せながら押して行き、前記チューブコネクタの接続端部
をバルブボディの各挿入孔へ挿入(圧入)する。
Next, the index table is indexed and rotated, a work comprising a tube connector set on the valve body is positioned at a press-fitting station, and the lifting / lowering / press-fitting mechanism is operated to apply a vibration to the punch unit. To push down while vibrating the tube connector, and insert (press fit) the connection end of the tube connector into each insertion hole of the valve body.

【0011】[0011]

【実施例】以下、本発明の一実施例を図面に基づいて説
明する。図1は本発明に係わるチューブコネクタ組立装
置の正面図、図2は同チューブコネクタ組立装置の左側
面図、図3は同チューブコネクタ組立装置の右側面図、
図4は同チューブコネクタ組立装置の平面図、図5は同
チューブコネクタ組立装置のパレットユニットの平面図
である。
An embodiment of the present invention will be described below with reference to the drawings. 1 is a front view of a tube connector assembling apparatus according to the present invention, FIG. 2 is a left side view of the tube connector assembling apparatus, FIG. 3 is a right side view of the tube connector assembling apparatus,
FIG. 4 is a plan view of the tube connector assembling apparatus, and FIG. 5 is a plan view of a pallet unit of the tube connector assembling apparatus.

【0012】本発明に係わるチューブコネクタ組立装置
は、機体1に設けられたテーブルユニット2を備えてお
り、このテーブルユニット2の上面部には、投入ステー
ションAと、第1圧入ステーションBと、第1圧入ステ
ーションCと、払出しステーションDとの4つのステー
ションが円を4等分するように配置してあり、テーブル
ユニット2の上面部には、投入ステーションAと、第1
圧入ステーションBと、第2圧入ステーションCと、払
出しステーションDにワークを搬送する(90度毎の割
出しを行う)インデックステーブル3が設けてあり、テ
ーブルユニット2にはインデックステーブル3の割出し
駆動機構3Aが設けてある。
The tube connector assembling apparatus according to the present invention includes a table unit 2 provided on a body 1, and a charging station A, a first press-fitting station B, and a Four stations, ie, a press-fitting station C and a dispensing station D, are arranged so as to divide a circle into four equal parts.
An index table 3 for carrying (indexing every 90 degrees) a work is provided to the press-fitting station B, the second press-fitting station C, and the payout station D. The indexing drive of the index table 3 is performed in the table unit 2. A mechanism 3A is provided.

【0013】また、前記インデックステーブル3には4
つのパレットユニット4が取り付けてある。これらのパ
レットユニット4は図5に示すようにパレット本体7を
備えており、このパレット本体7には、図6に示す1本
のガイドピンを有する第1のガイドピン機構5と、図7
に示す2本のガイドピンを有する第2のガイドピン機構
6とが設けてある。
The index table 3 has 4
One pallet unit 4 is attached. These pallet units 4 are provided with a pallet body 7 as shown in FIG. 5, and the pallet body 7 includes a first guide pin mechanism 5 having one guide pin shown in FIG.
And a second guide pin mechanism 6 having two guide pins shown in FIG.

【0014】第1のガイドピン機構5は、前記パレット
本体7に固着されたピンガイド8を有しており、このピ
ンガイド8の収容孔部8aには圧入端ストッパー9とス
プリング10とピン受け部材11とが収容してあって、
このピン受け部材11はスプリング10により保持され
ている。また、前記ピンガイド8の上端部にはワーク受
け部材12が固着してあり、このワーク受け部材12に
はピン孔部13が形成してあり、このピン孔部13の周
部にはシール溝14が形成してあり、このシール溝14
のダストシール15が挿入してあって、これらでスクレ
ーパ16を構成している。
The first guide pin mechanism 5 has a pin guide 8 fixed to the pallet main body 7. A press-fit end stopper 9, a spring 10, and a pin receiving portion 8 a are provided in the accommodation hole 8 a of the pin guide 8. The member 11 is housed,
This pin receiving member 11 is held by a spring 10. A work receiving member 12 is fixed to an upper end of the pin guide 8, and a pin hole 13 is formed in the work receiving member 12, and a seal groove is formed around the pin hole 13. 14 is formed, and this seal groove 14 is formed.
The dust seal 15 is inserted, and these constitute a scraper 16.

【0015】そして、前記ピン孔部13にはガイドピン
17が上下摺動可能に挿入してあり、このガイドピン1
7の先側は、その中間部から基部のピン本体17aに比
べて小径なチューブコネクタ挿入部17bになされてい
る。また、前記ガイドピン17は、その下端部において
前記ピン受け部材11に受けられている。
A guide pin 17 is inserted into the pin hole 13 so as to be slidable up and down.
The front side of 7 is formed from its middle part to a tube connector insertion part 17b having a smaller diameter than the base pin body 17a. The guide pin 17 is received by the pin receiving member 11 at its lower end.

【0016】また、第2のガイドピン機構6は、前記パ
レット本体7に固着されたピンガイド18を有してお
り、このピンガイド18には、2つの収容孔部18aを
有しており、これら収容孔部18aには圧入端ストッパ
ー19とスプリング20とピン受け部材21が収容して
あり、また、前記ピンガイド18の上端部にはワーク受
け部材22が固着してあり、このワーク受け部材22に
は2つのピン孔部23が形成してあり、このピン孔部2
3の周部には前記スクレーパ16と同構成のスクレーパ
24が設けてある。そして、前記ピン孔部23には前記
ガイドピン17と同構成のガイドピン25に上下摺動可
能に挿入してある。
The second guide pin mechanism 6 has a pin guide 18 fixed to the pallet main body 7, and this pin guide 18 has two receiving holes 18a. A press-fit end stopper 19, a spring 20, and a pin receiving member 21 are accommodated in these accommodation holes 18a, and a work receiving member 22 is fixed to the upper end of the pin guide 18. 22, two pin holes 23 are formed.
A scraper 24 having the same configuration as that of the scraper 16 is provided on a peripheral portion of 3. A guide pin 25 having the same configuration as the guide pin 17 is inserted into the pin hole 23 so as to be vertically slidable.

【0017】前記機体1には、前記第1圧入ステーショ
ンBと、第2圧入ステーションCとのそれぞれの上方に
位置させてパンチユニット26が昇降・圧入機構27に
より昇降動可能に配置してある。これらのパンチユニッ
ト26は図8に示すようにベース部材28と、このベー
ス部材28に設けられたパンチ機構38とを備えてお
り、このパンチ機構38はベース部材28の下面部の所
定の位置に取り付けられたワーク押え部材29を有し、
これらのワーク押え部材29は合成樹脂製であり、後述
するバイブレータの振動をワークに伝えるものである。
また、前記ベース部材28の下面部には、所定の前記ワ
ーク押え部材29に並べて、ワークの倒れを防止するワ
ークガイド30、31が取り付けてある。そして、前記
ベース部材28の上面部には振動発生装置としてのピス
トンバイブレータ32が取り付けてある。
In the machine body 1, a punch unit 26 is arranged above the first press-fitting station B and the second press-fitting station C so as to be able to move up and down by an elevating / pressing mechanism 27. As shown in FIG. 8, these punch units 26 include a base member 28 and a punch mechanism 38 provided on the base member 28. The punch mechanism 38 is provided at a predetermined position on the lower surface of the base member 28. It has an attached work holding member 29,
These work holding members 29 are made of synthetic resin, and transmit vibration of a vibrator described later to the work.
Work guides 30 and 31 for preventing the work from falling down are attached to the lower surface of the base member 28 in such a manner as to be arranged on the predetermined work holding member 29. A piston vibrator 32 as a vibration generator is attached to the upper surface of the base member 28.

【0018】前記昇降・圧入機構27は、機体1に取り
付けられた圧入シリンダ33を備えており、この圧入シ
リンダ33のピストンロッド34の下端部には保持部材
35が取り付けてあり、この保持部材35にプレスユニ
ット36を介して前記パンチユニット26が取り付けて
ある。このプレスユニット36は上下にスプリング37
を介在させてこれらのスプリング37により前記パンチ
ユニット26が振動し易くしてある。
The lifting / lowering / press-fitting mechanism 27 includes a press-fitting cylinder 33 attached to the body 1, and a holding member 35 is attached to the lower end of a piston rod 34 of the press-fitting cylinder 33. The punch unit 26 is attached via a press unit. The press unit 36 has a spring 37
The punch 37 is easily vibrated by the springs 37 with the interposition of the spring 37.

【0019】次に、上記したチューブコネクタ組立装置
によるチューブコネクタのバルブボディへの組立てを説
明する。前記投入ステーションAにおいて、パレットユ
ニット4に、バルブボディ40を位置決めしてセットす
る。この場合、バルブボディ40は、前記第1、第2の
ガイドピン機構5、6のワーク受け部材12、22に載
せられており、バルブボディ40の各挿入孔41に第
1、第2のガイドピン機構5、6のガイドピン17、2
5が挿入されていて、これらのガイドピン17、25の
チューブコネクタ挿入部17b、25bはバルブボディ
40上方に突出する。
Next, assembling of the tube connector into the valve body by the above tube connector assembling apparatus will be described. At the charging station A, the valve body 40 is positioned and set on the pallet unit 4. In this case, the valve body 40 is mounted on the work receiving members 12 and 22 of the first and second guide pin mechanisms 5 and 6, and the first and second guides are inserted into the respective insertion holes 41 of the valve body 40. Guide pins 17, 2 of pin mechanisms 5, 6
The tube connector insertion portions 17b and 25b of the guide pins 17 and 25 project above the valve body 40.

【0020】そして、作業者が、チューブコネクタ42
を接続する挿入孔41に、このチューブコネクタ42の
接続端部を位置させて、この接続端部内に、前記チュー
ブコネクタ挿入部17b、25bを挿入して、前記バル
ブボディ40にチューブコネクタ42をセット(仮置
き)する。
Then, the operator operates the tube connector 42.
The tube connector 42 is set in the valve body 40 by inserting the tube connector insertion portions 17b and 25b into the connection ends by inserting the connection end of the tube connector 42 into the insertion hole 41 for connecting the tube connector 42 to the valve body 40. (Temporary placement).

【0021】次に、前記インデックステーブル3を90
度割り出し回転させ、上記のように前記バルブボディ4
0にチューブコネクタ42をセットして成る第1のワー
クWを第1の圧入ステーションBに位置させる。
Next, the index table 3 is stored in the
And rotate the valve body 4 as described above.
The first work W having the tube connector 42 set to 0 is positioned at the first press-fitting station B.

【0022】次に、前記投入ステーションAにおいて、
再び、パレットユニット4に、バルブボディ40を位置
決めし、バルブボディ40にチューブコネクタ42をセ
ットして、第2のワークWとする。
Next, at the charging station A,
Again, the valve body 40 is positioned on the pallet unit 4, the tube connector 42 is set on the valve body 40, and the second work W is obtained.

【0023】次に、前記インデックステーブルを90度
割り出し回転させ、第1の圧入ステーションBに位置し
ていた第1のワークWを第2の圧入ステーションCに位
置させると共に、上記のように前記バルブボディ40に
チューブコネクタ42をセットして成る第2のワークW
を第1の圧入ステーションBに位置させる。
Next, the index table is rotated by 90 degrees so that the first work W located at the first press-fitting station B is located at the second press-fitting station C. A second workpiece W having a tube connector 42 set on a body 40
At the first press-fitting station B.

【0024】次に、前記投入ステーションAにおいて、
再び、パレットユニット4に、バルブボディ40を位置
決めし、バルブボディ40にチューブコネクタ42をセ
ットして、第3のワークWとする。
Next, at the charging station A,
Again, the valve body 40 is positioned on the pallet unit 4, the tube connector 42 is set on the valve body 40, and the third work W is obtained.

【0025】第1、第2の圧入ステーションB、Cにお
いて、それぞれの前記昇降・圧入機構27の圧入シリン
ダ33を作動させて、前記保持部材35およびプレスユ
ニット36を介して前記パンチユニット26を下降させ
る。そして、前記ピストンバイブレータ32を作動させ
てパンチユニット26に振動を与える。この場合、前記
プレスユニット36は上下にスプリング37を介在させ
ているために、前記パンチユニット26の振動は良好に
成される。
At the first and second press-fitting stations B and C, the press-fitting cylinders 33 of the respective lifting / lowering / press-fitting mechanisms 27 are operated to lower the punch unit 26 via the holding member 35 and the press unit 36. Let it. Then, the piston vibrator 32 is operated to apply vibration to the punch unit 26. In this case, since the press unit 36 has the springs 37 interposed therebetween, the vibration of the punch unit 26 is satisfactorily performed.

【0026】このように振動を与えられたパンチユニッ
ト26は下降して、前記ワーク押え部材29が前記チュ
ーブコネクタ42に接触し、このチューブコネクタ42
を振動させながら押して行く。このとき、前記ワークガ
イド30、31がチューブコネクタ42に側面部に当接
して、このチューブコネクタ42の倒れを矯正する。
The punch unit 26 thus vibrated is lowered, and the work holding member 29 comes into contact with the tube connector 42.
Press while vibrating. At this time, the work guides 30 and 31 abut against the tube connector 42 on the side surface, and correct the fall of the tube connector 42.

【0027】前記チューブコネクタ42の接続端部は、
振動を与えられて押圧されることにより、ガイドピン1
7、25に案内されてバルブボディ40の各挿入孔41
に挿入(圧入)される。この挿入により前記ガイドピン
17、25がピン受け部材11、21を介してスプリン
グ10、20に抗して下降して、これらのピン受け部材
11、21が前記圧入端ストッパー9、19に接した時
点で、前記チューブコネクタ42の端部のバルブボディ
40の各挿入孔41への挿入(圧入)が終了する。
The connection end of the tube connector 42 is
The guide pin 1 is pressed by being given vibration.
Each insertion hole 41 of the valve body 40 is guided by
(Press-fit). By this insertion, the guide pins 17, 25 are lowered via the pin receiving members 11, 21 against the springs 10, 20, and the pin receiving members 11, 21 contact the press-fit end stoppers 9, 19, respectively. At this point, the insertion (press-fitting) of the end of the tube connector 42 into each insertion hole 41 of the valve body 40 is completed.

【0028】次に、前記前記ピストンバイブレータ32
の作動を停止してパンチユニット26の振動を止め、前
記昇降・圧入機構27の圧入シリンダ33を縮小作動し
てパンチユニット26を上昇させる。
Next, the piston vibrator 32
Is stopped to stop the vibration of the punch unit 26, and the press-in cylinder 33 of the lifting / lowering / press-fitting mechanism 27 is contracted to raise the punch unit 26.

【0029】次に、前記インデックステーブル3を90
度割り出し回転させ、第2の圧入ステーションCに位置
していた第1のワークWを払い出しステーションDに送
って払い出し、さらに、前記インデックステーブルを9
0度割り出し回転させ、第2の圧入ステーションCに位
置していた第2のワークWを払い出しステーションDに
送って払いだし、次の第3、第4のワークWを第1、第
2の圧入ステーションB、Cに位置させる。
Next, the index table 3 is stored in the
The first work W located at the second press-fitting station C is sent out to the pay-out station D and paid out.
Rotate by 0 degrees, send the second work W located at the second press-fitting station C to the payout station D and pay it out, and then feed the next third and fourth work W into the first and second press-fittings. It is located at stations B and C.

【0030】[0030]

【発明の効果】以上説明したように、本発明は、テーブ
ルユニット上に配された投入ステーション、圧入ステー
ション及び払出しステーションと、前記テーブルユニッ
トに設けられて、前記投入ステーションと圧入ステーシ
ョンと払出しステーションに、バルブボディとこのバル
ブボディの所定の油圧回路同志を接続するチューブコネ
クタとより成るワークを割出し搬送するインデックステ
ーブルと、このインデックステーブルに取り付けられ
て、バルブボディが位置決めされると共に、このバルブ
ボディの挿入孔にチューブコネクタの接続端部を案内す
るガイドピン機構を有するパレットユニットと、前記圧
入ステーションの上方に昇降動可能に位置して、下降時
に、前記チューブコネクタを、振動を与えながら押圧す
るパンチ機構を有するパンチユニットと、前記パンチユ
ニットを昇降させる昇降・圧入機構とを備えたから、前
記投入ステーションにおいて、パレットユニットに、バ
ルブボディを位置決めしてセットし、作業者が、チュー
ブコネクタを接続する挿入孔に、このチューブコネクタ
の接続端部を位置させて、この接続端部内に、前記ガイ
ドピンを挿入して、前記バルブボディにチューブコネク
タをセットし、次に、前記インデックステーブルを割り
出し回転させ、前記バルブボディにチューブコネクタを
セットして成るワークを圧入ステーションに位置させ、
前記昇降・圧入機構を作動させて、振動を与えられたパ
ンチユニットを下降して、前記チューブコネクタを振動
させながら押して行き、前記チューブコネクタの接続端
部をバルブボディの各挿入孔へ挿入(圧入)することが
できる。
As described above, the present invention provides a charging station, a press-fitting station, and a dispensing station arranged on a table unit, and a charging station, a press-fitting station, and a dispensing station provided on the table unit. An index table for indexing and transporting a work comprising a valve body and a tube connector for connecting predetermined hydraulic circuits of the valve body, and mounted on the index table to position the valve body, A pallet unit having a guide pin mechanism for guiding the connection end of the tube connector to the insertion hole of the pallet; and a pallet unit positioned above the press-fitting station so as to be able to move up and down. Has a punch mechanism Since a punch unit and an elevating / press-fitting mechanism for elevating and lowering the punch unit are provided, at the loading station, the valve body is positioned and set on the pallet unit, and an operator inserts a tube connector into an insertion hole. Position the connection end of the tube connector, insert the guide pin into the connection end, set the tube connector on the valve body, then index and rotate the index table, and rotate the valve body. Position the work consisting of a tube connector on the press-fitting station,
By operating the lifting / lowering / press-fitting mechanism, the vibrated punch unit is lowered and pushed while vibrating the tube connector, and the connection end of the tube connector is inserted into each insertion hole of the valve body (press-fit). )can do.

【0031】上記のように、前記ガイドピンにチューブ
コネクタの端部を仮置きする以外は、全て機械によりチ
ューブコネクタの組み立てを実施することができて、作
業者による圧入工程がなくなり、また、複数のチューブ
コネクタを同時に挿入することが可能になり、組立工数
を削減することができ作業能率を向上させることができ
る。
As described above, except that the end of the tube connector is temporarily placed on the guide pin, the tube connector can be assembled by a machine in all cases, and the press-in process by the operator is eliminated. Can be inserted at the same time, the number of assembly steps can be reduced, and the working efficiency can be improved.

【0032】また、前記ガイドピン機構を、パレット本
体に固着されたピンガイドの収容孔部に圧入端ストッパ
ーとスプリングにより保持されるピン受け部材とを収容
すると共に、前記ピンガイドの上端部に、ピン孔部を有
するワーク受け部材を固着し、前記ピン孔部に、先側を
チューブコネクタ挿入部にしたガイドピンを上下摺動可
能に挿入して、このガイドピンの下端部を前記ピン受け
部材で受けるように構成したために、ガイドピンの先側
のチューブコネクタ挿入部を、チューブコネクタの端部
に挿入するだけの作業でチューブコネクタの仮置きを実
施することができ、しかも、前記チューブコネクタの端
部は、振動を与えられて押圧されることにより、ガイド
ピンに案内されてバルブボディの各挿入孔に挿入(圧
入)されるようになり、作業性が良好になる。
Further, the guide pin mechanism accommodates a press-fit end stopper and a pin receiving member held by a spring in an accommodating hole of the pin guide fixed to the pallet main body. A work receiving member having a pin hole is fixed, and a guide pin having a tip side as a tube connector insertion portion is inserted into the pin hole so as to be vertically slidable, and the lower end of the guide pin is inserted into the pin receiving member. In order to receive the tube connector, it is possible to temporarily place the tube connector by simply inserting the tube connector insertion portion on the tip side of the guide pin into the end of the tube connector. The end portion is guided by the guide pin and is inserted (press-fitted) into each insertion hole of the valve body by being vibrated and pressed. , Workability is improved.

【0033】また、前記パンチ機構を、ベース部材の下
面部の所定の位置にワーク押え部材とワークの倒れを防
止するワークガイドとを取り付けると共に、前記ベース
部材に振動発生装置を取り付けて構成することにより、
ワーク押え部材が前記チューブコネクタに接触してチュ
ーブコネクタに振動を与えつつ押圧するし、前記ワーク
ガイドがチューブコネクタの側面部に当接して、このチ
ューブコネクタの倒れを矯正するようになり、チューブ
コネクタの面取部によるバルブボディの削れがなくな
り、夾雑物を削減することができる。
Further, the punch mechanism is configured by mounting a work holding member and a work guide for preventing the work from falling down at a predetermined position on the lower surface of the base member, and mounting a vibration generator to the base member. By
The work holding member contacts the tube connector and presses it while giving vibration to the tube connector, and the work guide comes into contact with the side portion of the tube connector to correct the fall of the tube connector. This eliminates shaving of the valve body due to the chamfered portion, thereby reducing impurities.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係わるチューブコネクタ組立装置の正
面図である。
FIG. 1 is a front view of a tube connector assembling apparatus according to the present invention.

【図2】同チューブコネクタ組立装置の左側面図であ
る。
FIG. 2 is a left side view of the tube connector assembling apparatus.

【図3】同チューブコネクタ組立装置の右側面図であ
る。
FIG. 3 is a right side view of the tube connector assembling apparatus.

【図4】同チューブコネクタ組立装置の平面図である。FIG. 4 is a plan view of the tube connector assembling apparatus.

【図5】同チューブコネクタ組立装置のパレットユニッ
トの平面図である。
FIG. 5 is a plan view of a pallet unit of the tube connector assembling apparatus.

【図6】図5のU−U線に沿う断面図である。FIG. 6 is a sectional view taken along the line UU in FIG. 5;

【図7】図5のV−V線に沿う断面図である。FIG. 7 is a sectional view taken along line VV in FIG. 5;

【図8】同チューブコネクタ組立装置のパンチユニット
の平面図である。
FIG. 8 is a plan view of a punch unit of the tube connector assembling apparatus.

【図9】図8のW1−W1線に沿う断面図である。FIG. 9 is a sectional view taken along line W1-W1 of FIG.

【図10】図9のX−X線に沿う断面図である。FIG. 10 is a sectional view taken along the line XX of FIG. 9;

【図11】図8のY−Y線に沿う断面図である。FIG. 11 is a sectional view taken along the line YY in FIG. 8;

【図12】図8のZ−Z線に沿う断面図である。FIG. 12 is a sectional view taken along line ZZ in FIG. 8;

【図13】ワークの平面図である。FIG. 13 is a plan view of a work.

【図14】従来のチューブコネクタ組立の説明図であ
る。
FIG. 14 is an explanatory view of a conventional tube connector assembly.

【符号の説明】[Explanation of symbols]

2 テーブルユニット 3 インデックステーブル 4 パレットユニット 26 パンチユニット 27 昇降・圧入機構 40 バルブボディ 41 挿入孔 42 チューブコネクタ B 第1圧入ステーション C 第2圧入ステーション W ワーク 2 Table unit 3 Index table 4 Pallet unit 26 Punch unit 27 Elevating / press-fitting mechanism 40 Valve body 41 Insertion hole 42 Tube connector B 1st press-fitting station C 2nd press-fitting station W Work

フロントページの続き (56)参考文献 特開 昭61−252032(JP,A) (58)調査した分野(Int.Cl.7,DB名) B23P 19/02 Continuation of front page (56) References JP-A-61-252032 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) B23P 19/02

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 テーブルユニット上に配された投入ステ
ーション、圧入ステーション及び払出しステーション
と、 前記テーブルユニットに設けられて、前記投入ステーシ
ョンと圧入ステーションと払出しステーションに、バル
ブボディとこのバルブボディの所定の油圧回路同志を接
続するチューブコネクタとより成るワークを割出し搬送
するインデックステーブルと、 このインデックステーブルに取り付けられて、バルブボ
ディが位置決めされると共に、このバルブボディの挿入
孔にチューブコネクタの接続端部を案内するガイドピン
機構を有するパレットユニットと、 前記圧入ステーションの上方に昇降動可能に位置して、
下降時に、前記チューブコネクタを、振動を与えながら
押圧するパンチ機構を有するパンチユニットと、 前記パンチユニットを昇降させる昇降・圧入機構とを備
えたことを特徴とするチューブコネクタ組立装置。
An injection station, a press-fitting station, and a dispensing station disposed on a table unit; a valve body provided on the table unit, a press-fitting station, and a dispensing station; An index table for indexing and transporting a work comprising a tube connector for connecting hydraulic circuits, and a valve body attached to the index table to position the valve body, and to a connection end of the tube connector in an insertion hole of the valve body. A pallet unit having a guide pin mechanism for guiding the press-fitting station,
A tube connector assembling apparatus, comprising: a punch unit having a punch mechanism for pressing the tube connector while applying vibration while descending; and a lifting / lowering / press-fitting mechanism for lifting and lowering the punch unit.
【請求項2】 前記ガイドピン機構を、パレット本体に
固着されたピンガイドの収容孔部に圧入端ストッパーと
スプリングにより保持されるピン受け部材とを収容する
と共に、前記ピンガイドの上端部に、ピン孔部を有する
ワーク受け部材を固着し、前記ピン孔部に、先側をチュ
ーブコネクタ挿入部にしたガイドピンを上下摺動可能に
挿入して、このガイドピンの下端部を前記ピン受け部材
で受けるように構成した請求項1記載のチューブコネク
タ組立装置。
And a guide pin mechanism for accommodating a press-fit end stopper and a pin receiving member held by a spring in an accommodating hole of the pin guide fixed to the pallet body, and an upper end of the pin guide. A work receiving member having a pin hole is fixed, and a guide pin having a tip side as a tube connector insertion portion is inserted into the pin hole so as to be vertically slidable, and the lower end of the guide pin is inserted into the pin receiving member. 2. The tube connector assembling apparatus according to claim 1, wherein the tube connector assembling apparatus is configured to receive the tube connector.
【請求項3】 パンチ機構を、ベース部材の下面部の所
定の位置に、ワーク押え部材とワークの倒れを防止する
ワークガイドとを取り付けると共に、前記ベース部材に
振動発生装置を取り付けて構成した請求項1記載のチュ
ーブコネクタ組立装置。
3. A punch mechanism comprising: a work holding member and a work guide for preventing the work from falling down; and a vibration generator attached to the base member at a predetermined position on a lower surface of the base member. Item 2. The tube connector assembling apparatus according to Item 1.
JP16294594A 1994-06-22 1994-06-22 Tube connector assembly equipment Expired - Lifetime JP3358681B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16294594A JP3358681B2 (en) 1994-06-22 1994-06-22 Tube connector assembly equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16294594A JP3358681B2 (en) 1994-06-22 1994-06-22 Tube connector assembly equipment

Publications (2)

Publication Number Publication Date
JPH081460A JPH081460A (en) 1996-01-09
JP3358681B2 true JP3358681B2 (en) 2002-12-24

Family

ID=15764250

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16294594A Expired - Lifetime JP3358681B2 (en) 1994-06-22 1994-06-22 Tube connector assembly equipment

Country Status (1)

Country Link
JP (1) JP3358681B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6297234B1 (en) 1999-02-04 2001-10-02 American Home Products Corporation Arylthiophene vasopressin agonists
CN103495863B (en) * 2013-09-25 2015-09-02 宁波大学 Joint for running water pipe assembling device is used in a kind of pouring
CN104226769B (en) * 2013-10-29 2016-05-11 苏州通锦自动化设备有限公司 Servo spinning machine
CN104400427B (en) * 2014-12-01 2016-08-24 西北工业大学 Assembly bench based on group technology
CN106239149B (en) * 2016-09-29 2018-01-26 潍坊路加精工有限公司 A kind of high speed contact pin kludge
CN116967763B (en) * 2023-09-25 2024-02-20 广东赛普智能制造股份有限公司 Pipe body processing system and application thereof

Also Published As

Publication number Publication date
JPH081460A (en) 1996-01-09

Similar Documents

Publication Publication Date Title
US5400502A (en) Apparatus and method for fitting a press-fit connector to a printed circuit board
US4102043A (en) Pin inserting apparatus
JP3358681B2 (en) Tube connector assembly equipment
US4493450A (en) Welding apparatus for vehicle body of two-wheeled vehicle
JP2976266B2 (en) Multi-point assembly system
EP0882547A2 (en) Multi-stage assembling robot
CN110524238B (en) Processing production line of igniter for gasoline engine
EP0774321A1 (en) Printed-circuit board holding device
EP0154848A2 (en) Apparatus for automatically inserting electronic part
JP3087545B2 (en) Connector press-fitting device
US4577400A (en) Pin insertion tool
US5276962A (en) Method and apparatus for pressing contact elements of multipolar plug-in connectors into printed circuit board
CN110253484A (en) One kind pressing assembly tool and its working method aloud
US5522123A (en) Method and apparatus for assembling electronic component
JP2649790B2 (en) Wire transport cutting assembly for wire harness assembly equipment
CN213531487U (en) Positioning and assembling jig for oil pump
DE60002927T2 (en) Improvements in the assembly of connections with electrical conductors in plug housings
JP3087544B2 (en) Connector press-fitting device
JPH0783199B2 (en) Electronic component mounting method
CN113911678B (en) Material storage device, rotor processing equipment and motor assembly system
JPH038599B2 (en)
CN113798538B (en) Multi-station drilling equipment
US5507087A (en) Cover sheet assembling apparatus for electronic component
CN217741522U (en) Automatic pressfitting smelting tool of small-size motor stator
CN113681263B (en) Copper part feeding device

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081011

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091011

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091011

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101011

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101011

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111011

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111011

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121011

Year of fee payment: 10